Kontraktor Pelaksana : SITE DRAINASE BACKUP DATA Pembuatan Drainase Jl. Mekar Indah Lr II, Kel. Kadia, Kec. Kadia, Kota Kendari Type A Type B Type C Type D Type E Type F Type G Type H Type I Type J Type K Type L Type a Type b Pekerjaan : Lokasi : Kab, Konawe Selatan Kontraktor Pelaksana : CV. PELITA KONSEL I. PEKERJAAN PERSIAPAN 1. Pembersihan Site = 2. Administrasi, Dokumen, P3K = 3. Bangsal Kerja = 4. Papan Proyek = II. PEMBUATAN TOWER 1.. Pek. Galian Tanah V = x x = x x = x bh = x Unit = 2. Pek. Urugan Tanah Kembali V = x V galian = x = 3. Pek. Timbunan Pasir Alas Rabat V = x x = x x = x bh = x Unit = 4. Pek. Timbunan Tanah V = x x = x x = x bh = x Unit = 5. Plat Poor Beton Bertulang V = x x = x x = x bh = x Unit = 6. Pek. Kolom Beton Bertulang V = x x = x x = x bh = x Unit = 1.00 Ls 1.00 Ls 1.00 Ls 1.00 Ls 0.10 0.15 1.21 2.56 M3 BACKUP DATA Pembangunan Jaringa Air Minum Derah Rawan Air Tersebar Kab. Konsel 0.80 0.80 0.20 0.13 4.00 0.71 M3 36.73 P L T 1.21 1.21 1.02 M3 5.00 57.97 P L T 1.21 1.21 1.02 1.48 0.25 1.21 0.49 P 2.83 14.15 M3 L T 0.10 4.00 M3 5.00 4.00 11.59 M3 0.25 57.97 14.49 M3 1.21 0.15 0.33 M3 5.00 1.66 M3 M3 4.00 7.35 M3 5.00 M3 P L T 0.90 P L T 0.30 0.30 0.304 M3 0.51 M3 5.00 M3 0.80 0.15 0.90 0.08 M3 4.00 7. Pek. Sloef Beton Bertulang V = x x = x x = x bh = x Unit = 8. Pek. Rabat Beton V = x x = x x = = x Unit = 9. Pek. Menara V = x 5 Unit = Buah 10. Plesteran V = x 5 Unit = M2 11. Pengad. Bak Air Fiber V = x 5 Unit = Unit 12. Pipa PVC Dia. 25mm V = x 5 Unit = M1 13. Elbow PVC Dia. 40 mm V = x 5 Unit = Buah 14. Elbow PVC Dia. 25mm V = x 5 Unit = M1 15. Tee Stek. Dia. 40mm V = x 5 Unit = Buah 16. Tee Stek Dia. 16s/d 25mm V = x 5 Unit = Buah 17. Stop Kran Dia. 25mm V = x 5 Unit = Buah 18. Stop Kran Dia. 40mm V = x 5 Unit = Buah 19. Pek Tangga Tower V = x 5 Unit = Unit 5.00 2.00 10.00 2.00 10.00 2.00 10.00 4.00 20.00 1.00 1.00 5.00 12.80 64.00 2.00 10.00 30.00 150.00 10.00 50.00 6.00 30.00 3.00 P L T 14.00 0.25 0.25 0.88 M3 1.00 0.88 M3 5.00 4.38 M3 0.90 M3 5.00 4.50 M3 P L T 3.00 2.00 0.15 0.90 M3 Sloef 20/20 20. Pengad. Mesin Pompa V = x 5 Unit = Unit 21. Pengad./Pemas. Sumur Bor V = x 5 Unit = Unit 22. Pengad./Pemas. Pipa Dia. 4", 2,5", 1" V = x 4 5 = Ls 23. Pengad./Pemas. Pipa Jaringan Dist. V = x 5 Unit = M1 III. PEK. RUMAH POMPA 1.Pek. Galian Tanaha V = x x = x x = = x Unit = 2. Pek. Pasangan Bata V = x = x = = x Unit = 3. Pek. Plesteran V = x Pas. Bata = x = 4. Pengad/Pemas. Engsel Kupu-Kupu V = x 5 Unit = Buah 5. Pengad/Pemas. Grendel Kunci V = x 5 Unit = Buah 6. Pengad/Pemas. Plat Penutup V = x 5 Unit = Kg 7. Pek. Pembersihan Akhir V = Ls Mengetahui Konsultan Pengawas Kontraktor Pelaksana Pengawas Lapangan CV. KAISON KONSULTAN CV. PELITA KONSE DINAS PU PROV. SULTRA ASRUL AMRAD A.Md Ir. Bashri AL MIUN Nip. 19801124 201001 1 010 Koordinator Pengawas Direktur 1.00 1.00 5.00 1.00 5.00 1.00 4.00 31.00 155.00 1.00 5.00 64.80 324.00 P 0.80 4.00 2.00 10.00 2.00 2.00 7.00 14.00 M3 1.40 M3 1.40 M3 5.00 7.00 M3 L T 4.00 0.20 0.20 0.16 M3 0.16 M3 5.00 M3 P L 0.35