0 penilaian0% menganggap dokumen ini bermanfaat (0 suara)
6 tayangan1 halaman
This document is a questionnaire assessing improvements from joint work between TOYO-J Management and respondents. It asks respondents to describe 1) what they learned from the joint work, such as project procedures, instruction methods, scheduling considerations, or piping design skills, and 2) what changed or improved compared to before, such as shortened modeling times, reduced revisions, increased manufacturing speeds/quality, or shortened analysis times. Respondents are prompted to provide up to three examples for each question using numerical metrics where possible.
This document is a questionnaire assessing improvements from joint work between TOYO-J Management and respondents. It asks respondents to describe 1) what they learned from the joint work, such as project procedures, instruction methods, scheduling considerations, or piping design skills, and 2) what changed or improved compared to before, such as shortened modeling times, reduced revisions, increased manufacturing speeds/quality, or shortened analysis times. Respondents are prompted to provide up to three examples for each question using numerical metrics where possible.
This document is a questionnaire assessing improvements from joint work between TOYO-J Management and respondents. It asks respondents to describe 1) what they learned from the joint work, such as project procedures, instruction methods, scheduling considerations, or piping design skills, and 2) what changed or improved compared to before, such as shortened modeling times, reduced revisions, increased manufacturing speeds/quality, or shortened analysis times. Respondents are prompted to provide up to three examples for each question using numerical metrics where possible.
Name ; ***************** Grade ; *** Date ; 2014-Sep.-**
Project or Proposal Name ( In case of WGL, indicate Group Name )
TOYO-J Management wants to know what was improved through Joint work with TOYO-J ( HO, Project & Proposal )
If you can indicate with numerical value such as time, quantity, percentage, etc., then it is very helpful to understand.
1) What did you get or learn through Joint work with TOYO-J? For Example.) How to proceed project, How to make instruction, Schedule consideration, Piping Design skill, Vendor DWG check, etc.
1-1) 1-2) 1-3)
2) What was changed or improved compared with before? For Example.) 3D modeling time for one line is shorted from 1 hour to 45 minutes. Revision is reduced from 60% to 30 %. MTO speed / quality is increased. Stress Analysis time is shorted from two days to one day. etc.
Knotten and Svalestuen 2014 - Implementing Virtual Design and Construction (VDC) in Veidekke Using Simple Metrics To Improve The Design Management Process