Project : Global Village, Tanglin Development ltd
Subject : Regrouping of existing buildings to achieve ari! bene"t for
electrical energ#
his is in continuation to the meeting held at anglin o$ce for the topic
mentioned in subject line% he buildings under consideration are 1& 1&
'& ()'& ()*& DR+ and 4
he follo,ing are the (Ds at present -inputs as received from facilit#
team.
1 12'9 /01
2 1401 /01
' 1201 /01
()' 1200 /01
()* 342 /1 -his is the present /01 ,ith onl# one ,ing 51 functional%
6o,ever& since 7ing 8 is being shortl# occupied b# 1ccenture& for the
purpose of design& ,e are considering the (D as 1200 /01.
(D for to,er 5 4 -from load details. is '299 /01%
he present t,o loops are as follo,s:
1% 9oop 1 1 :2 : '
2% 9oop 2 (' : (* : DR+
Proposal 1 :
Loop 1: T1 + T2 = 123+1!"1 = 2#!" $V%
Loop 2: &T3 + &T' = 1("" + 1("" = 3#"" $V%
Loop 3: T! + T3 = 12"1 + 32 = !'"" $V%
Se;uence of steps for execution:
1% 8#pass ' b# ma/ing a 6 outdoor joint
2% 8#pass DR+ b# ma/ing a 6 outdoor joint
'% <xtend cable from 4 to '
4% <xtend +able from 2 to DR+
Proposal 2 :
Loop 1: T1 + T2 = 123+1!"1 = 2#!" $V%
Loop 2: &T3 + &T'+ T3 = 1("" + 1(""+12"1 = !("" $V%
1
Loop 3: T! = 32 $V%
Se;uence of steps for execution:
1% 8#pass ' b# ma/ing a 6 outdoor joint
2% 8#pass DR+ b# ma/ing a 6 outdoor joint
'% <xtend cable from (* to '
4% <xtend +able from 2 to DR+
5. +able is alread# brought for 4% o be retained as it is%
Proposal 3 :
Loop 1: T1 + T2 = 123+1!"1 = 2#!" $V%
Loop 2: &T3 + T3 = 1("" +12"1 = 3""" $V%
Loop 3: &T' + T! = 1("" + 32 = '" $V%
Se;uence of steps for execution:
1% 8#pass ' b# ma/ing a 6 outdoor joint
2% 8#pass DR+ b# ma/ing a 6 outdoor joint%
'% <xtend the cable from 2 to DR+%
4% <xtend cable from (' to '
*% +able is alread# brought for 4% <xtend cable from 4 to (*
-crossing the bund.%
=n all the options& additional 6 brea/ers as re;uired in (RSS to be
installed%