DATE:

Time
interval
W/H Pressure
(barg)
05 Min. 05 Min.
10 Min. 10 Min.
15 Min. 15 Min.
20 Min. 20 Min.
25 Min. 25 Min.
30 Min. 30 Min.
Time
interval
W/H Pressure
(barg)
05 Min. 05 Min.
10 Min. 10 Min.
15 Min. 15 Min.
20 Min. 20 Min.
25 Min. 25 Min.
30 Min. 30 Min.

Rashid S.A J Louis
RSES
SSV LEAK TEST / HOLD TEST
Up stream Pressure
Well Shut in Pressure
(barg)
W/H pressure
after
depresuriseing
(barg)
Observations
Performer Field Supervisor
SCSSV Closed
SSV Open
SSV Closed
SCSSV Open
Status
W/H pressure
after
depresuriseing
(barg)
Status
Flow line pressure
During test (barg)
D-124P
SCSSV LEAK / HOLD TEST
SIMOPS TEST
MONTHLY LEAK / HOLD TEST FOR SCSSV / SSV
North West Cluster
04/02/2006
Obervations
Mansoor/Karnik
Flow line pressure Up stream Pressure
Well Shut in Pressure
(barg)
During test (barg)
Production Supdt.
Obervations

DATE:

Time
interval
W/H Pressure
(barg)
05 Min. 05 Min.
10 Min. 10 Min.
15 Min. 15 Min.
20 Min. 20 Min.
25 Min. 25 Min.
30 Min. 30 Min.
Time
interval
W/H Pressure
(barg)
05 Min. 05 Min.
10 Min. 10 Min.
15 Min. 15 Min.
20 Min. 20 Min.
25 Min. 25 Min.
30 Min. 30 Min.

Rashid S.A J Louis
RSES
Mansoor/Karnik
Flow line pressure Up stream Pressure
Well Shut in Pressure
(barg)
During test (barg)
Production Supdt.
SIMOPS TEST
MONTHLY LEAK / HOLD TEST FOR SCSSV / SSV
North West Cluster
04/02/2006
Status
Flow line pressure
During test (barg)
D-129P
SCSSV LEAK / HOLD TEST
Observations
Performer Field Supervisor
SCSSV Closed
SSV Open
SSV Closed
SCSSV Open
Status
W/H pressure
after
depresuriseing
(barg)
Obervations
Obervations
SSV LEAK TEST / HOLD TEST
Up stream Pressure
Well Shut in Pressure
(barg)
W/H pressure
after
depresuriseing
(barg)