DATE:

Time
interval
W/H Pressure
05 Min. 24 05 Min. 100
10 Min. 24 10 Min. 100
15 Min. 15 Min.
20 Min. 20 Min.
25 Min. 25 Min.
30 Min. 30 Min.
Time
interval
W/H Pressure
05 Min.
39
05 Min.
40
10 Min.
39.5
10 Min.
40.5
15 Min.
40
15 Min.
41
20 Min.
40.5
20 Min.
41.5
25 Min. 25 Min.
30 Min. 30 Min.
Remarks
SSV Test has been done on flow line (wing valve opened)
Karnik Rashid S.A Flex Volle
RSES
M. Maranber
Production Supdt.
D-124P
Obervations
Obervations
SSV LEAK TEST / HOLD TEST
Up stream Pressure
Well Shut in Pressure
150
150 38
Observations
Performer Field Supervisor
SCSSV Closed
SSV Open
SSV Closed
SCSSV Open
Status
100
W/H pressure
after
depresuriseing
SIMOPS TEST
MONTHLY LEAK / HOLD TEST FOR SCSSV / SSV
South Cluster
6th October 05
Status
Flow line pressure
During test
Flow line pressure Up stream Pressure
Well Shut in Pressure During test
W/H pressure
after
depresuriseing
SCSSV LEAK / HOLD TEST