2009
2010
2011
2012
2013
X
4
1
0
1
4
10
X
-2
-1
0
1
2
0
a
b
Y
32,000
35,000
38,000
41,000
45,000
191,000
XY
-64,000
-35,000
0
41,000
90,000
32,000
Y
64,000
70,000
76,000
82,000
90,000
382,000
XY
2,048,000,000
2,450,000,000
2,888,000,000
3,362,000,000
4,050,000,000
14,798,000,000
38200
3200
Y = a +bx
Y2023 = 38200 + 3200(12)
76600
X
32,000
35,000
38,000
41,000
45,000
191,000
36,481,000,000
X
1,024,000,000
1,225,000,000
1,444,000,000
1,681,000,000
2,025,000,000
7,399,000,000
a = *(Y(X)-(X)(XY)+/*nX-(X)+
b = *nXY-(X)(Y)+/*nX-(X)+
Y = a + bX
Y2023 = 0 +2(76600)
Peluang = Permintaan - Penawaran
Asumsi penwaran = 0
Maka,
Peluang pasar pada tahun 2023 = 153,200 - 0 = 153,200 ton
Perusahaan ingin menangkap 30% peluang pasar = 30% x 153,200 ton = 45,950 ton
Productive time = 7920 jam per tahun
Kapasitas kerja pabrik = 45,960/7920 = 5.8 ton/jam (konsentrat bijih Mn)
0
2
153,200
R = 1/NK x 100%
90% = 1/NK x 100%
NK2 = 100/90 = 1.11
NK = F/C = (c-t)/(f-t)
Pada sistem 2
NK2 = (0.8 - 0.185) / (f-0.185)
1.11 = (0.615) / (f-0.185)
0.615 = 1.11f - 0.205
f = 0.7390 = 73.9%
dimana f = c1
NK2 = C1/5.80
C1 = 5.80 x 1.11 = 6.438 ton/jam
Pada sistem 1
NK1 = F/C1
NK1 = (0.739-0.04)/((0.2+0.185)-0.04)
NK1 = (0.699)/(0.385-0.04)
NK1 = 2.026
NK1 = F/C1
F = 2.026 x 6.438 = 13.043 ton/jam
DIPILIH
Jig 2
DIPILIH
Size
10" x 12"
12" x 16"
18" x 22"
24" x 28"
42" x 42"
Capacity (ton/hour)
2
3.3
7
10
25
%solid
20
20
20
20
20
Power (kW)
0.55
1.1
1.3
1.5
2
Price (USD)
8,000
15,000
25,000
50,000
110,000
Size
10" x 12"
12" x 16"
18" x 22"
24" x 28"
42" x 42"
Capacity (ton/hour)
2
3.3
7
10
25
%solid
20
20
20
20
20
Power (kW)
0.55
1.1
1.3
1.5
2
Price (USD)
8,000
15,000
25,000
50,000
110,000
Neraca air
Jig 1
Jig 2
13.043
0.2
6.438
0.4
9.657
0.2
25.752
52.172
Tahun
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
Satuan Ton
45,960
5.80
x
-2
-1
0
1
2
3
4
5
6
7
8
9
10
11
12
feed (ton/hour)
13.043
13.043
13.043
13.043
13.043
feed (ton/hour)
6.438
6.438
6.438
6.438
6.438