Tugas & Tanggung Jawab Section Survey

1. Target Mingguan/Weekly :
- Update data topografi mingguan
- Join survey mingguan
- Update data roof dan floor batu bara
- Jumlah papan blok per 100 m
- Jumlah point data topografi & kerapatan datanya
- Jumlah patok yang dipasang per fleet (1 fleet minimal 10 patok)
- Update haul road (peta grade jalan) +Long Cross Section road
- Volume & peta inventory recovery blasting
- Update data curah hujan & elevasi air sump
- Peta inventory drill & blast plan (include elevasi survace)
- Reconcile volume survey vs volume geometri Drill & Blast)
- Pemasangan patok boundary area blasting plan
- Patok boundary area inventory blasting
- Pick up lubang bor per lokasi

2. Target/Kewajiban Bulanan :
- Deviasi & analisa joint survey
- Ketelitian Alat Survey : 10-15
- Ketelitian Bench Mark Survey (Nilai KKH & KKV)
- Update Peta Situasi Tambang
- Update Density Material Tambang
- Serah terima pit/disposal/reklamasi
- Update jalur pipa pump
- Monthly Report Survey +Man Power Survey +Roster Cuti
- Jadwal Kalibrasi Alat Survey (Total Station)

3. Target/kewajiban 3 bulanan :
- Reconcile Survey (Volume & Sectionnya)

4. Produk Survey :
- Peta Topografi Mingguan
- Peta Situasi Tambang bulanan
- Peta Grade Jalan Mingguan
- Peta inventory drill & blast harian
- Peta batubara mingguan
- Analisa Joint survey bulanan
- Peta section jalan (long-cross section)
- Peta reconcile 3 bulanan
- Berita acara serah terima pit/disposal/reklamasi