Anda di halaman 1dari 1

FORM EPS 19A

CONFIRMATION FOR HANDING OVER BY CONSULTANT


(To be filled by Consultant)
To

Head of District, SYABAS District

Consultant

_____________________________________________________

Name of Development

_____________________________________________________

File No

_____________________________________________________

Date

_____________________________________________________

CONFIRMATION FOR HANDING OVER BY CONSULTANT


We the consultant CONFIRM that the permanent water supply
system had been completed successfully and ready to be handed over to SYABAS for operation. We
have
a)

c)

completed all outstanding works and rectified all defects as per final joint inspection
report.
prepared three (3) set of master keys to be handed over for main gates of service
reservoir/ pump house/suction tank/manhole covers/ chambers)
Paid all outstanding TNB bills, a copy of which is enclosed.

d)

Others _______________________________________________________

b)

(tick, where relevant)


Thank you
Confirmed by :
Consultant Signature

: _________________________________

Name

: _________________________________

PE No

: _________________________________

Designation

: _________________________________

Date

: _________________________________

Anda mungkin juga menyukai