Anda di halaman 1dari 1

Proyek

Sampel
Tempat tes

: Penelitian
: Keramas
: Lab. Mekanika Tanah Politeknik Negeri Bali

Tanggal

: 16 Desember 2002

Petugas

: I Gst. Agung Manubawa K. A. Md.

A . ANALISIS AYAKAN

SARINGAN

TERTAHAN (gr)

PERSEN KUMULATIF

No.

D (mm)

diatas

kumulatif

tertahan

lolos ( N' )

4.760

1.60

1.6

0.32

99.68

10

2.000

18.10

19.7

3.94

96.06

20

0.840

24.00

43.7

8.74

91.26

40

0.420

38.20

81.9

16.38

83.62

60

0.250

49.80

131.7

26.34

73.66

100

0.105

44.45

176.15

35.23

64.77

200
Van

0.074
0.000

20.60
303.25

196.75
500

39.35
100

60.65
0.00

B . ANALISIS HYDROMETER
Volume larutan
Berat sampel kering untuk hydrometer

( V ):

1000

cm 3

Berat volume butir tanah

(Ws1):

50

gram

Temperatur perc

(T):

30

500

gram

Berat volume air pd.T

(g w) :

0.9957

303.25

gram

Harga air pada T

(m):

Berat sampel kering untuk ayakan ( Ws ):


Berat tanah lolos ayakan no.200
Berat jenis tanah

(W1):
(Gs):

(gs) :

2.387

8.157E-06

gram/cm3
o

Celcius

gram/cm3
gr.dt/cm2

2.387

Type Hydrometer : ASTM (E100) 151H - 713


WAKTU (t)

Bacaan hydrometer

(menit)
0.25
0.5
1
2
5
15
30
60
240
1440

R
1.0260
1.0245
1.0190
1.0150
1.0130
1.0105
1.0080
1.0060
1.0035
1.0020

Rw
0.9957
0.9957
0.9957
0.9957
0.9957
0.9957
0.9957
0.9957
0.9957
0.9957

(R-Rw)

Zr

Zr/t

N'

0.03030
0.02880
0.02330
0.01930
0.01730
0.01480
0.01230
0.01030
0.00780
0.00630

(%)
103.84
98.70
79.85
66.14
59.29
50.72
42.15
35.30
26.73
21.59

(cm)
15.07
15.47
16.93
18.00
18.53
19.20
19.87
20.40
21.07
21.47

(cm/dt)
1.0022
0.7180
0.5312
0.3873
0.2486
0.1461
0.1051
0.0753
0.0382
0.0158

(micron)
103.0
73.8
54.6
39.8
25.5
15.0
10.8
7.7
3.9
1.6

(%)
62.98
59.86
48.43
40.12
35.96
30.76
25.57
21.41
16.21
13.10

FORMULA :
N = Gs/(Gs-1) x V / Ws1 x g w x (R - Rw) x 100 %
N' = N x W1/Ws
18m
D=
gs - gw

Zr
t

GRAFIK ANALISIS GRADASI


100
90
80

N' (%)

70
60
50
40
30
20
10
0
0

D ( MICRON )

CLAY

10

SILT

100

1000

SAND

10000

100000

GRAVEL

Anda mungkin juga menyukai