Anda di halaman 1dari 22

No. SPLN No.

1 SPLN 19 : 1979
2 SPLN 20 : 1980
3 SPLN 20A : 1978
4 SPLN 21A : 1980
5 SPLN 22 : 1980
6 SPLN 23A : 1980
7 SPLN 23B : 1980
8 SPLN 23C : 1980
9 SPLN 23D : 1980
10 SPLN 23E : 1980
11 SPLN 23F : 1980
12 SPLN 23G : 1980
13 SPLN 23H : 1980
14 SPLN 24 : 1980
15 SPLN 25 : 1980
BIDANG PEMBANGKITAN
16 SPLN 30 : 1980
17 SPLN 32 S1 : 1984
18 SPLN 32 : 1980
19 SPLN 33 : 1980
20 SPLN 34-1 : 1980
21 SPLN 34A : 1980
22 SPLN 34B : 1980
23 SPLN 34C : 1980
24 SPLN 34D : 1980
25 SPLN 34E : 1980
26 SPLN 35 : 1981
27 SPLN 35A : 1980
28 SPLN 38 : 1980
29 SPLN 44 : 1981
30 SPLN 46-1 : 1981
31 SPLN 46-2 : 1981
32 SPLN 46-3 : 1982
33 SPLN 47-1 S1 : 1984
34 SPLN 47-1 : 1981
35 SPLN 47-2 : 1982
36 SPLN 47-3 : 1986
37 SPLN 47-4 : 1983
38 SPLN 47-4 : 1984
39 SPLN 47-5 : 1986
40 SPLN 48 : 1981
41 SPLN 51 : 1982
42 SPLN 53 : 1983
43 SPLN 58 : 1984
44 SPLN 62-1 : 1986
45 SPLN 62-2 : 1987
46 SPLN 73 : 1987
47 SPLN 79 : 1987
48 SPLN 80 : 1989
49 SPLN 85 : 1990
50 SPLN 86-2 : 1992
51 SPLN 86 : 1990
52 SPLN 89-1 : 1991
53 SPLN 89-2 : 1994
54 SPLN 90-2-1 : 1995
55 SPLN 90 : 1990
56 SPLN 111-1 : 1994
57 SPLN 111-4 : 1995
58 SPLN 112 : 1994
59 SPLN 68-1A : 1986
JUDUL
PEMBAKUAN PERALATAN LABORATORIUM PLTU
PEDOMAN PENERAPAN UNTUK KOMISIONING, PENGUSAHAAN
DAN PEMELIHARAN TURBIN AIR
GUIDE FOR COMISSIONING, OPERATION AND MAINTENANCE OF
HYDROLIC TURBINES
INTERNATIONAL CODE FOR THE FIELD ACCEPTANCE TESTS OF
HYDROLIC TURBINES
IKHTISAR PERENCANAAN DAN HAL-HAL YANG PERLU DIPERHATI
PADA BLOK PONDASI UNTUK MESIN DIESEL MENURUT BSI CP
2021 : PART 1
RECIPROCATING INTERNAL COMBUSTION ENGINES - DEFINITIONS
OF LOCATIONS ON AN ENGINE
RECIPROCATING INTERNAL COMBUSTION ENGINES - VOCABULARY
RECIPROCATING INTERNAL COMBUSTION ENGINES - PERFORMANCE
PART 1 : STANDARD REFERENCE CONDITIONS AND DECLARATIONS
OF POWER, FUEL CONSUMPTION AND LUBRICATING OIL
CONSUMPTION
RECIPROCATING INTERNAL COMBUSTION ENGINES - PERFORMANCE
PART 2 : TEST METHODS
RECIPROCATING INTERNAL COMBUSTION ENGINES - PERFORMANCE
PART 3 : TEST MEASUMENTS
RECIPROCATING INTERNAL COMBUSTION ENGINES - PERFORMANCE
PART 4 : SPEED GOVERNING
RECIPROCATING INTERNAL COMBUSTION ENGINES - DESIGNATION
OF THE DIRECTION OF ROTATION
RECIPROCATING INTERNAL COMBUSTION ENGINES - DESIGNATION
OF THE CYLINDERS
GUIDE FOR COMISSIONING, OPERATION AND MAINTENANCE OF
DIESEL ENGINES
PEDOMAN PENERAPAN UNTUK KOMISIONING, PENGUSAHAAN DAN
BIDANG PEMBANGKITAN
PEMELIHARAAN MESIN DIESEL.
PEDOMAN PENERAPAN METODA ASTM UNTUK ANALISA KIMIA AIR
SUPLEMEN PERTAMA SPLN 32 1980
PEMBAKUAN KAPASITAS SATUAN PEMBANGKIT DIESEL DAN KAPASITAS
PUSAT LISTRIK TENAGA DIESEL
PEMBAKUAN KAPASITAS SATUAN PEMBANGKIT DIESEL DAN KAPASI
TAS PUSAT LISTRIK TENAGA DIESEL
PEDOMAN PENERAPAN PUBLIKASI IEC 34 MESIN LISTRIK YANG BER
PUTAR
BAGIAN 1 : PUBLIKASI 34-1 S/D 34-5
ROTATING ELECTRICAL MACHINES
PART 1 : RATING AND PERFORMANCE
ROTATING ELECTRICAL MACHINES
PART 2 : METHODS OF DETERMINING LOSSES AND EFFICIENCY OF
ROTATING ELECTRICAL MACHINERY FROM TESTS
( EXCLUDING MACHINES FOR TRACTION VEHICLES )
ROTATING ELECTRICAL MACHINES
PART 3 : RATINGS AND CHARACTERISTICS OF THREE PHASE, 50 HZ
TURBINE TYPE MACHINES
RECOMMENDATIONS FOR ROTATING ELECTRICAL MACHINERY
(EXCLUDING MACHINES FOR TRACTION VEHICLES
PART 4 : METHODS FOR DETERMINING FOR SYNCHRONOUS
MACHINE QUANTITIES FROM TESTS
ROTATING ELECTRICAL MACHINES
PART 5 : DEGREES OF PROTECTION BY ENCLOSERS FOR ROTATING
MACHINERY
PEDOMAN PENERAPAN PUBLIKASI IEC 193 (1965) DAN 193A (1972)
INTERNATIONAL CODE FOR MODEL ACCEPTANCE TESTS OF HYDRO
LIC TURBINES
FIRST SUPPLEMENT TO PUBLICATION 193 (1965)
PEDOMAN PENERAPAN METODA ASTM UNTUK ANALISA MINYAK
PELUMAS
PEDOMAN PENERAPAN METODA ASME UNTUK ANALISA GAS BUANG
PEDOMAN PEMBATASAN TINGKAT BISING
BAGIAN 1 : TINGKAT BISING DI TEMPAT KERJA
PEDOMAN PEMBATASAN TINGKAT BISING
BAGIAN 2 : TINGKAT BISING PUSAT LISTRIK TERHADAP LINGKUNGAN
PEDOMAN PEMBATASAN TINGKAT BISING
BAGIAN 3 : PEDOMAN PENGUKURAN TINGKAT BISING DI-TEMPAT
KERJA DAN TINGKAT BISING LINGKUNGAN
SUPLEMEN PERTAMA SPLN 47-1 : 1981 PEMBAKUAN PLTD
BAGIAN 1 : PLTD BAKAL, PLTD KECIL DAN PLTD SEDANG
PEMBAKUAN PLTD
BAGIAN 1 : PLTD BAKAL, PLTD KECIL DAN PLTD SEDANG
PEMBAKUAN PLTD
BAGIAN 2 : PLTD BESAR
PEMBAKUAN PLTD
BAGIAN 3 : GENERATOR
PEMBAKUAN PLTD
BAGIAN 4 : KONTROL DAN PENGAMAN
A. BAGIAN MEKANIS
UNTUK PLTD BAKAL, PLTD KECIL DAN PLTD SEDANG
PEMBAKUAN PLTD
BAGIAN 4 : KONTROL DAN PENGAMAN
C. PLTD BESAR
PEMBAKUAN PLTD
BAGIAN 5 : UJI SIAP GUNA
PEDOMAN PENERAPAN METODA ASTM UNTUK ANALISA BATUBARA
PEDOMAN PENERAPAN METODA ASTM UNTUK ANALISA BAHAN
BAKAR GAS ALAM
PEDOMAN PENERAPAN STANDAR ISO 3744 DAN 3746
MENENTUKAN TINGKAT DAYA BUNYI SUMBER BISING
KOMISIONING PLTG
STANDAR OPERASI PUSAT LISTRIK TENAGA UAP
BAGIAN SATU : POLA PENGUSAHAAN
STANDAR OPERASI PUSAT LISTRIK TENAGA UAP
BAGIAN DUA : FAKTOR-FAKTOR PENGUSAHAAN
KOMISIONING JARINGAN
STANDAR OPERASI PUSAT LISTRIK TENAGA DIESEL
STANDAR OPERASI PUSAT LISTRIK TENAGA GAS
KOMISIONING KETEL UAP
KOMISIONING TURBIN UAP PUSAT LISTRIK
BAGIAN 2 : PERHITUNGAN UNJUK KERJA TURBIN UAP
KOMISIONING TURBIN UAP PUSAT LISTRIK
BAGIAN 1 : UMUM
GETARAN MESIN PEMBANGKIT
BAGIAN 1 : PEMANTAUAN GETARAN MESIN PEMBANGKIT DALAM
KONDISI OPERASI NORMAL
GETARAN MESIN PEMBANGKIT
BAGIAN 2 : IDENTIFIKASI GETARAN TIDAK NORMAL PADA MESIN
PEMBANGKIT
KOMISIONING PLTA
BAGIAN 2-1 : PEDOMAN PENGUJIAN PRAJALAN TURBIN AIR DAN
PERALATAN BANTUNYA
KOMISIONING PLTA
MANAJEMEN PEMELIHARAAN PUSAT LISTRIK
BAGIAN 1 : UMUM
MANAJEMEN PEMELIHARAAN PUSAT LISTRIK
BAGIAN 4 : MANAJEMEN PEMELIHARAAN PLTD
AMBANG BATAS KUAT MEDAN LISTRIK DAN INDUKSI MEDAN MAGNIT
DIBAWAH SALURAN TEGANGAN TINGGI DAN EKSTRA TINGGI
TINGKAT JAMINAN SISTEM TENAGA LISTRIK
BAGIAN SATU : SISTEM TENAGA HULU
A. PEMBANGKITAN
No. SPLN No. JUDUL
1 SPLN 2 : 1978 PENTANAHAN NETRAL SISTEM TRANSMISI, SUB-TRANSMISI
DAN DISTRIBUSI BESERTA PENGAMANANNYA
2 SPLN 7 : 1978 PEDOMAN PEMILIHAN TINGKAT ISOLASI TRANSFORMATOR
DAN PENANGKAP PETIR
3 SPLN 7A : 1978 KOORDINASI ISOLASI
BAGIAN 1 : ISTILAH, DEFINISI,PRINSIP DAN KETENTUAN
4 SPLN 7B : 1978 KOORDINASI ISOLASI
BAGIAN 2 : PEDOMAN APLIKASI
5 SPLN 7C : 1978 LIGHTNING ARRESTER
PART 1 : NON LINEAR RESISTOR TYPE ARRESTER FOR AC SYSTEM
6 SPLN 7D : 1978 RECOMMENDATIONS FOR LIGHTNING ARRESTERS
PART 1 : NON LINEAR RESISTOR -TYPE ARRESTERS
7 SPLN 8-1 : 1991 TRANSFORMATOR TENAGA
BAGIAN 1 : UMUM
8 SPLN 8-2 : 1991 TRANSFORMATOR TENAGA
BAGIAN 2 : KENAIKAN SUHU
9 SPLN 8-3-1 : 1991 TRANSFORMATOR TENAGA
BAGIAN 3-1 : TINGKAT ISOLASI DAN UJI DIELEKTRIK JARAK
BEBAS LUAR DI UDARA
10 SPLN 8-3 : 1991 TRANSFORMATOR TENAGA
BAGIAN 3 : TINGKAT ISOLASI DAN UJI DIELEKTRIK
11 SPLN 8-4 : 1991 TRANSFORMATOR TENAGA
BAGIAN 4 : SADAPAN DAN HUBUNGAN
12 SPLN 8-5 : 1991 TRANSFORMATOR TENAGA
BAGIAN 5 : KEMAMPUAN MENAHAN HUBUNG SINGKAT
13 SPLN 9A : 1978 HIGH VOLTAGE ALTERNATING CURRENT CIRCUIT BREAKERS
PART 1 : GENERAL AND DEFINITIONS
14 SPLN 9B : 1978 HIGH VOLTAGE ALTERNATING CURRENT CIRCUIT BREAKERS
PART 2 : RATING
15 SPLN 9C : 1978 HIGH VOLTAGE ALTERNATING CURRENT CIRCUIT BREAKERS
PART 3 : DESIGN AND CONSTRUCTION
BIDANG TRANSMISI
16 SPLN 9D : 1978 HIGH VOLTAGE ALTERNATING CURRENT CIRCUIT BREAKERS
PART 4 : TYPE TESTS AND ROUTINE TESTS
17 SPLN 9E : 1978 HIGH VOLTAGE ALTERNATING CURRENT CIRCUIT BREAKERS
PART 4 : TYPE TESTS AND ROUTINE TESTS
APPENDIX E- : METHODS OF DETERMINING PROSPECTIVE
TRANSIENT RECOVERY VOLTAGE WAVES
18 SPLN 9F : 1978 HIGH VOLTAGE ALTERNATING CURRENT CIRCUIT BREAKERS
PART 5 : RULES FOR THE SELECTION OF CIRCUIT BREAKERS FOR
SERVICE
19 SPLN 9G : 1978 HIGH VOLTAGE ALTERNATING CURRENT CIRCUIT BREAKERS
PART 6 : INFORMATION TO BE GIVEN WITH ENQUIRIES,TENDERS
AND ORDERS RULES FOR TRANSPORT, ERECTION AND
MAINTENANCE
20 SPLN 10-1 : 1978 KETENTUAN TENTANG JENIS DAN UKURAN ISOLATOR YANG
DIPILIH
21 SPLN 10-1A : 1996 ISOLATOR RENTENG JENIS KAP DAN PIN
22 SPLN 10-1B : 1978 DIMENSI BOLA DAN KOPLING SENDI DARI UNIT (SATUAN)
ISOLATOR RENTENGAN
23 SPLN 10-1C : 1978 LOCKING DEVICES FOR BALL AND SOCKET COUPLINGS OF
STRING INSULATOR UNITS
PART 1 : DIMENSIONS AND GENERAL RULES
24 SPLN 10-1D : 1978 LOCKING DEVICES FOR BALL AND SOCKET COUPLINGS OF
STRING INSULATOR UNITS
PART 2 : TESTS
25 SPLN 10-1E-1 : 1996 ISOLATOR UNTUK SALURAN UDARA DENGAN TEGANGAN
NOMINAL DIATAS 1000 VOLT
BAGIAN 1 : UNIT ISOLATOR KERAMIK ATAU GELAS UNTUK
SISTEM ARUS BOLAK BALIK, DEFINISI ,METODE UJI
DAN KRITERIA SERAH TERIMA.
26 SPLN 10-1E-2 : 1996 ISOLATOR UNTUK SALURAN UDARA DENGAN TEGANGAN
NOMINAL DIATAS 1000 VOLT
BAGIAN 2 : RENTENGAN ISOLATOR DAN SET ISOLATOR UNTUK
SISTEM ARUS BOLAK BALIK, DEFINISI ,METODE UJI
DAN KRITERIA SERAH TERIMA.
27 SPLN 10-1F : 1989 PENGUJIAN TEGANGAN IMPULS HUBUNG PADA ISOLATOR
TEGANGAN TINGGI
28 SPLN 10-2A : 1978 TEST ON INDOOR AND OUTDOOR POST INSULATORS FOR
SYSTEM WITH NOMINAL VOLTAGE GREATER THAN 1000V
29 SPLN 10-2B : 1978 DIMENSIONS OF INDOOR AND OUTDOOR POST INSULATORS
AND POST INSULATOR UNITS FOR SYSTEMS WITH NOMINAL
VOLTAGES GREATER THAN 1000 V
30 SPLN 10-3B : 1993 TINGKAT INTENSITAS POLUSI SEHUBUNGAN DENGAN PEDOMAN
PEMILIHAN ISOLATOR
31 SPLN 10-4A : 1994 ISOLATOR TONGGAK PIN (PIN POST) UNTUK SALURAN UDARA
TEGANGAN MENENGAH 20 kV
32 SPLN 10-4B : 1995 ISOLATOR TONGGAK SALURAN UNTUK SALURAN UDARA
TEGANGAN MENENGAH 20 kV
33 SPLN 10-4C : 1997 ISOLATOR PIN UNTUK SALURAN UDARA TEGANGAN MENENGAH
20 kV
34 SPLN 11A : 1978 HIGH VOLTAGE TEST TECHNIQUES
PART 1 : GENERAL DEFINITIONS AND TEST REQUIREMENTS
35 SPLN 11B : 1978 HIGH VOLTAGE TEST TECHNIQUES
PART 2 : TEST PROCEDURES
36 SPLN 11C : 1978 HIGH VOLTAGE TEST TECHNIQUES
PART 3 : MEASURING DEVICES
37 SPLN 11D : 1978 REKOMENDASI PENGUKURAN TEGANGAN DENGAN MENGGUNA
KAN SELA BOLA (SATU BOLA DITANAHKAN)
38 SPLN 13 : 1978 KRITERIA DASAR BAGI PERENCANAAN SALURAN UDARA
TEGANGAN TINGGI 66 kV DAN 150 kV
39 SPLN 15 : 1979 PEDOMAN PEMILIHAN JENIS DAN UKURAN PENGHANTAR
ALUMINIUM BAGI SALURAN UDARA 20 kV, 66 kV dan 150 kV
40 SPLN 16 : 1979 PEDOMAN PENERAPAN SALURAN UDARA TEGANGAN TINGGI
66 KV DAN 150 KV DENGAN ISOLATOR TONGGAK SALURAN
41 SPLN 17 : 1979 PEDOMAN PEMBEBANAN TRANSFORMATOR TERENDAM MINYAK
42 SPLN 17A : 1979 LOADING GUIDE FOR OIL-IMMERSED TRANSFORMERS
43 SPLN 18A : 1979 ON LOAD TAP CHANGERS
44 SPLN 18B : 1979 PEDOMAN PENERAPAN PENGUBAH SADAPAN BERBEBAN
45 SPLN 31 : 1980 TEGANGAN PENGENAL TRANSFORMATOR DAN JANGKAUAN
PENYADAPAN PENGUBAH SADAPAN BERBEBAN PADA SISTEM
66 KV DAN 150 KV
46 SPLN 37A : 1980 APLICATION GUIDE FOR POWER TRANSFORMERS
47 SPLN 49-1 : 1982 MINYAK ISOLASI
BAGIAN 1 : PEDOMAN PENERAPAN SPESIFIKASI DAN
PEMELIHARAAN MINYAK ISOLASI
48 SPLN 49-1A : 1982 SPESIFICATION FOR NEW INSULATING OILS FOR TRANSFORMERS
AND SWITCHGEAR
49 SPLN 49-1B : 1982 MAINTENANCE AND SUPERVISION GUIDE FOR INSULATING OILS
IN SERVICE
50 SPLN 49-2 : 1982 MINYAK ISOLASI
BAGIAN 2 : PEDOMAN PENERAPAN METODE IEC UNTUK ANALISA
MINYAK ISOLASI
51 SPLN 52-1 : 1983 POLA PENGAMANAN SISTEM
BAGIAN 1 : A. SISTEM TRANSMISI 66 KV
52 SPLN 52-1 : 1983 POLA PENGAMANAN SISTEM
BAGIAN 1 : C. TRANSFORMATOR 150/66 KV, 150/20 KV DAN
66/20 KV
53 SPLN 52-2 : 1985 POLA PENGAMANAN SISTEM
BAGIAN 2 : GENERATOR
54 SPLN 52-3 : 1983 POLA PENGAMANAN SISTEM
BAGIAN 3 : SISTEM DISTRIBUSI 6 KV DAN 20 KV
55 SPLN 61 : 1997 SPESIFIKASI TRANSFORMATOR TENAGA TEGANGAN TINGGI
56 SPLN 65 : 1985 PETUNJUK PEMILIHAN DAN PENGGUNAAN RELAI STATIS
57 SPLN 73 : 1987 KOMISIONING JARINGAN
58 SPLN 78 : 1987 PERHITUNGAN PENGARUH ARUS HUBUNG SINGKAT
59 SPLN 82-1 : 1991 PEKERJAAN DALAM KEADAAN BERTEGANGAN
BAGIAN 1 : PERATURAN UMUM
60 SPLN 82-2 : 1991 PEKERJAAN DALAM KEADAAN BERTEGANGAN
BAGIAN 2 : - JARINGAN TEGANGAN RENDAH
- PERSYARATAN KERJA DAN LEMBARAN TEKNIK
PERKAKAS.
61 SPLN 82-3 : 1993 PEKERJAAN DALAM KEADAAN BERTEGANGAN
BAGIAN 3 : - JARINGAN TEGANGAN MENENGAH
- PERSYARATAN KERJA DAN LEMBARAN TEKNIK
PERKAKAS.
62 LAMPIRAN
SPLN 82-3 : 1993 LEMBARAN TEKNIK PERKAKAS DAN LEMBARAN TEKNIK-METODE
OPERASI
63 SPLN 100-3 : 1993 SALURAN UDARA TEGANGAN TINGGI
PEMBEBANAN PENYANGGA SALURAN UDARA
BAGIAN III : PEMBEBANAN KHUSUS
64 SPLN 112 : 1994 AMBANG BATAS KUAT MEDAN LISTRIK DAN INDUKSI MEDAN
MAGNIT DIBAWAH SALURAN TEGANGAN TINGGI DAN EKSTRA
TINGGI
65 SPLN 119 : 1996 TIANG BETON PRATEKAN UNTUK SALURAN UDARA TEGANGAN
TINGGI 70 KV DAN 150 KV
66 SPLN 120 : 1996 TIANG BAJA UNTUK SALURAN UDARA TEGANGAN TINGGI 70 KV
DAN 150 KV
67 SPLN 121 : 1996 KONSTRUKSI SALURAN UDARA TEGANGAN TINGGI 70 KV DAN
150 KV DENGAN TIANG BETON/BAJA
SPLN 68-1B : 1986 TINGKAT JAMINAN SISTEM TENAGA LISTRIK
BAGIAN SATU : SISTEM TENAGA HULU
A. TRANSMISI
No. SPLN No. JUDUL
1 SPLN 1 : 1995 TEGANGAN-TEGANGAN STANDAR
2 SPLN 3 :1978
3 SPLN 12 : 1978
4 SPLN 14 : 1979
5 SPLN 26 : 1980
6 SPLN 27 : 1980
PENTANAHAN INSTALASI KONSUMEN UNTUK PELISTRIKAN DESA
7 SPLN 39-1 :1981 PENGUJIAN KABEL LISTRIK
8 SPLN 39-2 :1981 PENGUJIAN KABEL LISTRIK
- Pengujian Latu Listrik
9 SPLN 40-1 : 1981
10 SPLN 41-1 :1991
11 SPLN 41-2 :1981
12 SPLN 41-2 : 1991
13 SPLN 41-3 : 1981
14 SPLN 41-4 : 1981
15 SPLN 41-5 : 1981 HANTARAN TEMBAGA TELANJANG JENIS KERAS (BCC H)
16 SPLN 41-6 : 1981 HANTARAN ALUMINIUM (AAC)
17 SPLN 41-7 : 1981 HANTARAN ALUMINIUM BERPENGUAT BAJA (ACSR)
18 SPLN 41-8 : 1981 HANTARAN ALUMINIUM CAMPURAN (AAAC)
19 SPLN 41-9 : 1986
20 SPLN 41-10 : 1991
21 SPLN 41-11 :1992 PERSYARATAN ISOLASI DAN SELUBUNG PE KABEL LISTRIK
22 SPLN 42-1 : 1991
23 SPLN 42-2 : 1992
24 SPLN 42-3 : 1992
25 SPLN 42-4 : 1992
KAWAT FLEKSIBEL BERISOLASI PVC TEGANGAN PENGENAL 450/750 V
(NYAF)
KAWAT FLEKSIBEL KEMBAR DUA DAN TIGA BERISOLASI PVC
TEGANGAN PENGENAL 300/300 VOLT (NYZ/NYD)
BIDANG DISTRIBUSI
KAWAT BERISOLASI PVC TEGANGAN PENGENAL 450/750 V (NYA)
PENTANAHAN JARING TEGANGAN RENDAH PLN DAN PENTANAHAN
INSTALASI
PEDOMAN PENERAPAN SISTEM DISTRIBUSI 20 KV FASA-TIGA, 4-
KAWAT
KRITERIA DASAR BAGI PERENCANAAN SALURAN UDARA TEGANGAN
MENENGAH 20 KV SERTA TEGANGAN TINGGI 66 KV DAN 150 KV
PEDOMAN PENERAPAN SISTEM DISTRIBUSI 20 KV FASA-TIGA, 3-
KAWAT DENGAN TAHANAN RENDAH DAN TAHANAN TINGGI
- Pengujian retak pada suhu rendah untuk isolasi dan selubung PVC
TANDA TANDA PENGENAL UNTUK KAWAT DAN KABEL LISTRIK
BERISOLASI
KABEL BERISOLASI DAN BERSELUBUNG PVC TEGANGAN PENGENAL
300/500 VOLT (NYM)
PERSYARATAN PENGHANTAR TEMBAGA DAN ALUMINIUM UNTUK
KABEL LISTRIK BERISOLASI
PERSYARATAN KOMPON PVC UNTUK KAWAT DAN KABEL LISTRIK
TEGANGAN NOMINAL 0,6/1 KV
PERSYARATAN KOMPON PVC UNTUK ISOLASI DAN SELUBUNG KABEL
LISTRIK
PERSYARATAN KOMPON KARET UNTUK KAWAT DAN KABEL LISTRIK
TEGANGAN NOMINAL S/D 1000 V
HANTARAN TEMBAGA TELANJANG JENIS SETENGAH KERAS (BCC 1/2
H)
PERSYARATAN KOMPON XLPE UNTUK KABEL BERTEGANGAN
PENGENAL DIATAS 1 kV S/D 30 kV
PENGHANTAR ALUMINIUM PADUAN BERSELUBUNG POLIETILEN IKAT
SILANG (AAAC-S)
26 SPLN 42-5 : 1981
27 SPLN 42-6-1 : 1991 KABEL FLEKSIBEL BERISOLASI DAN BERSELUBUNG PVC
28 SPLN 42-6-2 : 1991 KABEL FLEKSIBEL BERISOLASI DAN BERSELUBUNG PVC
29 SPLN 42-6-3 : 1991 KABEL FLEKSIBEL BERISOLASI DAN BERSELUBUNG PVC
30 SPLN 42-7 : 1992
31 SPLN 42-8 : 1981
32 SPLN 42-9 : 1981
33 SPLN 42-10 : 1993
34 SPLN 42-11 : 1991
35 SPLN 43-1 : 1994
36 SPLN 43-2 : 1994
37 SPLN 43-3 :1994
38 SPLN 43-4 : 1994
39 SPLN 43-5-1 : 1995
40 SPLN 43-5-2 : 1995
41 SPLN 43-5-3 :1995
42 SPLN 43-5-4 : 1995
43 SPLN 43-5-5 : 1995
KABEL PILIN UDARA BERISOLASI XLPE DAN BERSELUBUNG PVC
BERPENGGANTUNG KAWAT BAJA DENGAN TEGANGAN PENGENAL
12/20 (24) KV
KABEL TANAH INTI TUNGGAL BERISOLASI XLPE DAN BERSELUBUNG
PE/PVC DENGAN ATAU TANPA PERISAI TEGANGAN PENGENAL 3,6/6
(7,2) KV S/D 12/20 (24) KV
KABEL TANAH INTI TIGA BERISOLASI XLPE DAN BERSELUBUNG PE/PVC
DENGAN ATAU TANPA PERISAI TEGANGAN PENGENAL 3,6/6 (7,2) KV
S/D 12/20 (24) KV
KABEL TANAH INTI TUNGGAL BERISOLASI XLPE DAN BERSELUBUNG
PE/PVC BERPENGHANTAR KONSENTRIS DENGAN ATAU TANPA
PERISAI TEGANGAN PENGENAL 3,6/6 (7,2) KV S/D 12/20 (24) KV
KABEL BERISOLASI DAN BERSELUBUNG PVC TEGANGAN NOMINAL
500 V (NYM OVAL)
KABEL PILIN UDARA TEGANGAN PENGENAL 0,6/1 KV (NFA2X-
T/NFA2X/NF2X)
KABEL TANAH BERISOLASI DAN BERSELUBUNG PVC, BERPERISAI
KAWAT BAJA ATAU ALUMINIUM TEGANGAN PENGENAL 0,6/1 KV
(NYFGbY/NAYFGbY/NYRGbY/NAYRGbY)
KABEL TANAH BERISOLASI DAN BERSELUBUNG PVC, BERPERISAI PITA
BAJA ATAU ALUMINIUM TEGANGAN PENGENAL 0,6/1 KV
(NYBY/NAYBY)
KABEL TANAH BERISOLASI DAN BERSELUBUNG PVC, DENGAN
PENGHANTAR KONSENTRIS TEMBAGA TEGANGAN PENGENAL 0,6/1
KV (NYCY/NAYCY)
KABEL PILIN TANAH BERISOLASI XLPE DAN BERSELUBUNG PE/PVC
DENGAN TEGANGAN PENGENAL 12/20 (24) KV
KABEL SAMBUNGAN RUMAH BERISOLASI XLPE DAN B ERSELUBUNG
PVC DENGAN PENGHANTAR KONSENTRIS TEMBAGA TEGANGAN
PENGENAL 0,6/1 KV (N2XCY-SR/NA2XCY-SR)
KABEL TANAH BERISOLASI DAN BERSELUBUNG PVC, TEGANGAN
PENGENAL 0,6/1 KV (NYY/NAYY)
KAWAT FLEKSIBEL KEMBAR DUA DAN TIGA BERISOLASI PVC
TEGANGAN PENGENAL 300/300 VOLT (NYZ/NYD)
KAWAT BERISOLASI KARET TEGANGAN NOMINAL 1000 V (NGA)
TEGANGAN PENGENAL 300/300 V UNTUK BEBAN MEKANIS RINGAN
(NYLHYrd/NYLHYf1)
TEGANGAN PENGENAL 300/500 V UNTUK BEBAN MEKANIS SEDANG
(NYLHYrd/NYLHYf1)
TEGANGAN PENGENAL 450/750 V UNTUK BEBAN MEKANIS BERAT (NYSHY)
KABEL PIPIH BERISOLASI DAN BERSELUBUNG PVC TEGANGAN
PENGENAL 300/500 V (NYIFY)
NYMT PVC INSULATED SELF SUPPORTING AERIAL CABLE WITH BLACK
OUTER SHEATH RATED VOLTAGE 500 V (UNOFFICIAL)
44 SPLN 43-5-6 : 1995
45 SPLN 43-6 : 1994
46 SPLN 43-7 : 1994
47 SPLN 43-8 : 1994
48 SPLN 50 : 1997 SPESIFIKASI TRANSFORMATOR DISTRIBUSI
49 SPLN 54 : 1983 STANDAR TIANG BAJA
50 SPLN 55 : 1990 ALAT PENGUKUR, PEMBATAS DAN PERLENGKAPANNYA
- LAMPIRAN D :
APP TIPE KHUSUS II A S/D II F DGN TUTUP PELINDUNG
51 SPLN 56-1 : 1993 SAMBUNGAN TENAGA LISTRIK TEGANGAN RENDAH (SLTR)
52 SPLN 56-2 : 1994 SAMBUNGAN TENAGA LISTRIK TEGANGAN MENENGAH
(SLTM)
53 SPLN 56-3-1 : 1996 SAMBUNGAN TENAGA LISTRIK TEGANGAN MENENGAH
DIATAS 8 MVA S/D 60 MVA
BAGIAN 1 : SALURAN KABEL DIBAWAH TANAH
54 SPLN 56 : 1984 SAMBUNGAN LISTRIK
55 SPLN 57-1 : 1991 KWH METER ARUS BOLAK BALIK
KELAS 0,5 ; 1 DAN 2
BAGIAN 1 : PASANGAN DALAM
56 SPLN 57-2 : 1993 KETENTUAN UJI TAMBAHAN UNTUK KWH METER PASANGAN
LUAR
57 SPLN 57-3 : 1993 METER STATIK ARUS BOLAK BALIK UNTUK ENERGI AKTIF
(KELAS 0,2S DAN 0,5S)
58 SPLN 57-4 : 1994 METER STATIS ENERGI AKTIF ARUS BOLAK BALIK (KELAS 1
DAN 2 )
59 SPLN 59 : 1985 KEANDALAN PADA SISTEM DISTRIBUSI 20 kVdan 6 kV
60 SPLN 60-1 : 1992 KAMAR UJI INSTRUMEN UKUR LISTRIK
KABEL TANAH BERISOLASI XLPE DAN BERSELUBUNG PVC BERPERISAI
KAWAT BAJA ATAU ALUMINIUM TEGANGAN PENGENAL 0,6/1 KV
(N2XFGbY/NA2XFGbY/N2XRGbY/NA2XRGbY)
KABEL TANAH BERISOLASI XLPE DAN BERSELUBUNG PVC BERPERISAI
PITA BAJA ATAU ALUMINIUM TEGANGAN PENGENAL 0,6/1 KV
(N2XBY/NA2XBY)
KABEL TANAH INTI TUNGGAL BERISOLASI XLPE DAN BERSELUBUNG
PE/PVC BERPENGHANTAR KONSENTRIS DENGAN ATAU TANPA
PERISAI TEGANGAN PENGENAL 3,6/6 (7,2) KV S/D 12/20 (24) KV
KABEL TANAH INTI TIGA BERISOLASI XLPE DAN BERSELUBUNG PE/PVC
BERPENGHANTAR KONSENTRIS DENGAN ATAU TANPA PERISAI
TEGANGAN PENGENAL 3,6/6 (7,2) KV S/D 12/20 (24) KV
KABEL TANAH BERISOLASI XLPE DAN BERSELUBUNG PVC TEGANGAN
PENGENAL 0,6/1 KV (N2XY/NA2XY)
61 SPLN 60-2 : 1992 KAMAR UJI INSTRUMEN UKUR LISTRIK
BAGIAN 2 : PROSEDUR SALING BANDING SEL STANDAR DAN
RESISTOR STANDAR.
62 SPLN 60-3 : 1992 KAMAR UJI INSTRUMEN UKUR LISTRIK
BAGIAN 3 : PROSEDUR UJI INSTRUMEN UKUR ENERGI LISTRIK
63 SPLN 60-4 : 1992 KAMAR UJI INSTRUMEN UKUR LISTRIK
BAGIAN 4 : PROSEDUR UJI PENUNJUK KEBUTUHAN MAKSIMUM
64 SPLN 60-5 : 1992 KAMAR UJI INSTRUMEN UKUR LISTRIK
BAGIAN 5 : PROSEDUR UJI PERLENGKAPAN UJI METER ENERGI
LISTRIK
65 SPLN 60-6 : 1992 KAMAR UJI INSTRUMEN UKUR LISTRIK
BAGIAN 6 : PROSEDUR UJI INSTRUMEN UKUR LISTRIK PENUN
JUK LANGSUNG
66 SPLN 60-7 : 1992 KAMAR UJI INSTRUMEN UKUR LISTRIK
BAGIAN 7 : PROSEDUR UJI TRANSFORMATOR INSTRUMEN
67 SPLN 60 : 1985 STANDARISASI KAMAR TERA
68 SPLN 63 : 1991 INSPEKSI PENERIMAAN METER KILOWATTJAM ARUS BOLAK
BALIK KELAS 2
69 SPLN 64 : 1985 PETUNJUK PEMILIHAN DAN PENGGUNAAN PELEBUR PADA
SISTEM DISTRIBUSI TEGANGAN MENENGAH
70 SPLN 72 : 1987 SPESIFIKASI DESAIN UNTUK JARINGAN TEGANGAN MENENGAH
DAN JARINGAN TEGANGAN RENDAH
71 SPLN 74 : 1987 STANDAR LISTRIK PEDESAAN
72 SPLN 75 : 1987 GANGGUAN PADA SISTEM SUPLAI YANG DIAKIBATKAN OLEH
PEMANFAAT LISTRIK DAN PERLENGKAPAN SERUPA
73 SPLN 76 : 1987 TRANSFORMATOR ARUS
74 SPLN 77 : 1987 TRANSFORMATOR TEGANGAN
75 SPLN 83 : 1991 LENGKAPAN SAMBUNGAN RUMAH DENGAN SALURAN UDARA
BERISOLASI
76 SPLN 84 : 1992 KONEKTOR TEMBUS KEDAP AIR UNTUK KABEL PILIN UDARA
TEGANGAN RENDAH
77 SPLN 87 : 1991 STANDAR KONSTRUKSI LISTRIK PEDESAAN
78 SPLN 88 : 1991 PEMBUMIAN NETRAL SISTEM 20 KV DENGAN LEBIH DARI SATU
SUMBER
79 SPLN 91-1 : 1992 SPESIFIKASI PIPA UNTUK INSTALASI LISTRIK
BAGIAN 1 : PERSYARATAN UMUM
80 SPLN 91-2 : 1994 SPESIFIKASI PIPA UNTUK INSTALASI LISTRIK
BAGIAN 2 : DIAMETER LUAR PIPA DAN ULIR
81 SPLN 91-3 : 1994 SPESIFIKASI PIPA UNTUK INSTALASI LISTRIK
BAGIAN 3 : PERSYARATAN KHUSUS PIPA LOGAM
82 SPLN 91-4 : 1994 SPESIFIKASI PIPA UNTUK INSTALASI LISTRIK
BAGIAN 4 : PERSYARATAN KHUSUS PIPA LISTRIK ISOLASI KAKU
RATA
83 SPLN 91-5 : 1995 SPESIFIKASI PIPA UNTUK INSTALASI LISTRIK
BAGIAN 5 : PERSYARATAN KHUSUS PIPA LISTRIK FLEKSIBEL
84 SPLN 93 : 1991 TIANG BETON PRATEKAN UNTUK JARINGAN DISTRIBUSI
85 SPLN 94 : 1993 METER VAR - JAM (ENERGI REAKTIF)
86 SPLN 95 : 1994 TRANSFORMATOR DENGAN PENGAMAN SENDIRI FASE
TUNGGAL UNTUK JARINGAN SISTEM FASE TIGA 4 - KAWAT
87 SPLN 96 : 1993 PERLENGKAPAN UJI UNTUK METER ENERGI LISTRIK
88 SPLN 97 : 1993 ALAT PENUNJUK KEBUTUHAN DAYA MAKSIMUM KELAS 1
89 SPLN 98 : 1992 LENGKAPAN PEGANG KABEL PILIN SALURAN UDARA TEGANGAN
RENDAH
90 SPLN 101 : 1992 KONEKTOR ALUR PARALEL UNTUK PENGHANTAR TELANJANG
91 SPLN 102 : 1993 ELEKTRODA BUMI JENIS BATANG BULAT BERLAPIS TEMBAGA
92 SPLN 103 : 1993 SAKLAR WAKTU UNTUK KONTROL TARIF DAN KENDALI BEBAN
93 SPLN 108 : 1993 PEMUTUS TENAGA MINI UNTUK PEMBATAS DAN PENGAMAN
ARUS LEBIH UNTUK INSTALASI GEDUNG DAN RUMAH
94 SPLN 114 : 1993 BLOK TERMINAL
95 SPLN 115 : 1995 TIANG KAYU UNTUK JARINGAN DISTRIBUSI
96 SPLN 118-3-1 : 1996 PERANGKAT HUBUNG BAGI
BAGIAN 3-1 : SPESIFIKASI PERANGKAT HUBUNG BAGI
TEGANGAN RENDAH GARDU DISTRIBUSI
97 SPLN 118-4-1 : 1996 PERANGKAT HUBUNG BAGI
BAGIAN 4-1 : SPESIFIKASI PERANGKAT HUBUNG BAGI
TEGANGAN MENENGAH GARDU DISTRIBUSI
98 SPLN D3.002-1 : 2007 SPESIFIKASI TRANSFORMATOR DISTRIBUSI
BAGAIAN 1 : TRANSFORMATOR FASE TIGA, 20 KV-400V &
TRANSFORMATOR FASE TUNGGAL, 20 KV-231 DAN
20/3 KV-231 V
99 SPLN 68-2 : 1986 TINGKAT JAMINAN SISTEM TENAGA LISTRIK
BAGIAN DUA : SISTEM DISTRIBUSI
No. SPLN No. JUDUL
1 SPLN 109-1 : 1996 POLA SCADA
BAGIAN 1 : PEDOMAN DASAR
2 SPLN 109-2 : 1996 POLA SCADA
BAGIAN 2 : PENGATUR ANTAR REGIONAL
3 SPLN 109-3 : 1996 POLA SCADA
BAGIAN 3 : PENGATUR WILAYAH
4 SPLN 109-4 : 1996 POLA SCADA
BAGIAN 4 : PENGATUR REGIONAL
5 SPLN 109-5 : 1996 POLA SCADA
BAGIAN 5 : PENGATUR DISTRIBUSI
6 SPLN 109-6 : 1996 POLA SCADA
BAGIAN 6 : PENGATUR SUBREGIONAL
BIDANG SCADA
No. SPLN No. JUDUL
1 SPLN 4 : 1978 PEMBAGIAN TUGAS KELOMPOK-KELOMPOK PEMBAKUAN
2 SPLN 5 : 1978 TATA TERTIB PEMBAHASAN KONSEP PEMBAKUAN
3 SPLN 6 : 1978 PEDOMAN UNTUK PENYUSUNAN NASKAH STANDAR
4 SPLN 29 : 1980 PENYUSUNAN KONSEP PEMBAKUAN UNTUK PERALATAN LISTRIK
PRODUKSI DALAM NEGERI
5 SPLN 36A : 1980 LOADING TESTS ON OVERHEAD LINE TOWERS
6 SPLN 66 : 1986 STANDAR PERALATAN KESELAMATAN KERJA
7 SPLN 66A : 1986 TERMINOLOGI UNTUK PERKAKAS DAN PERLENGKAPAN YANG
DIGUNAKAN UNTUK PEKERJAAN BERTEGANGAN
8 SPLN 67-1A : 1986 KONDISI SPESIFIK INDONESIA
BAGIAN SATU : A. KONDISI ALAM
9 SPLN 67-1B : 1986 KONDISI SPESIFIK INDONESIA
BAGIAN SATU : B. DESAIN DAN OPERASI SISTEM
10 SPLN 67-1C : 1987 KONDISI SPESIFIK DI INDONESIA
BAGIAN SATU : C. PUSAT LISTRIK TENAGA TERMAL
11 SPLN 67-2A : 1986 KONDISI SPESIFIK INDONESIA
BAGIAN DUA : A. PEMBANGKIT LISTRIK TENAGA AIR
12 SPLN 67-2B : 1986 KONDISI SPESIFIK INDONESIA
BAGIAN DUA : B. KOMISIONING DAN PENGUJIAN INSTALASI
LISTRIK
13 SPLN 67-2C : 1986 KONDISI SPESIFIK INDONESIA
BAGIAN DUA : C. PENGENDALIAN DAN PENGAWASAN MUTU
14 SPLN 69-1 : 1986 STANDARISASI PERALATAN UJI
BAGIAN SATU : KOMISIONING INSTALASI DAN PENGUJIAN
PERALATAN
15 SPLN 69-2 : 1987 STANDARISASI PERALATAN UJI
BAGIAN DUA : STANDAR PERALATAN UJI
BIDANG UMUM
16 SPLN 70-1 : 1985 PEMBAKUAN ISTILAH TEKNIK BIDANG KELISTRIKAN
17 SPLN 70-2 : 1986 PEMBAKUAN ISTILAH TEKNIK BIDANG KETENAGALISTRIKAN
(SERI KEDUA)
18 SPLN 70-3 : 1987 PEMBAKUAN ISTILAH TEKNIK BIDANG KETENAGALISTRIKAN
(SERI KETIGA)
19 SPLN 70-4 : 1992 PEMBAKUAN ISTILAH TEKNIK BIDANG KETENAGALISTRIKAN
(SERI KEEMPAT)
20 SPLN 70-5 : 1995 PEMBAKUAN ISTILAH TEKNIK BIDANG KETENAGALISTRIKAN
(SERI KELIMA)
21 SPLN 70-6 : 1995 PEMBAKUAN ISTILAH TEKNIK BIDANG KETENAGALISTRIKAN
(SERI KEENAM)
22 SPLN 70-7 : 1995 PEMBAKUAN ISTILAH TEKNIK BIDANG KETENAGALISTRIKAN
(SERI KETUJUH)
23 SPLN 71-1 : 1987 PEMBAKUAN LAMBANG TEKNIK BIDANG KETENAGALISTRIKAN
(SERI PERTAMA)
24 SPLN 71-2 : 1989 PEMBAKUAN LAMBANG TEKNIK BIDANG KETENAGALISTRIKAN
(SERI KEDUA)
25 SPLN 71-3 : 1993 PEMBAKUAN LAMBANG TEKNIK BIDANG KETENAGALISTRIKAN
(SERI KETIGA)
26 SPLN 99 : 1992 WARNA LAMBANG STANDAR UNTUK DIAGRAM MIMIK
27 SPLN 104 : 1993 WARNA STANDAR
28 SPLN 105 : 1995 PERWAJAHAN PUBLIKASI SPLN
29 SPLN 106 : 1993 TANDA KESELAMATAN KERJA
30 SPLN 107 : 1993 WARNA PIPA DAN TANGKI PUSAT LISTRIK

Anda mungkin juga menyukai