Anda di halaman 1dari 2

PEDESTAL

SKETCH

a
mm

BARBENDING SCHEDULE
b
c
mm
mm

dia

L.potong
m

Qty

TOP X1 D16-200

4425

200

16

4.625

TOP X2 D16-200

9750

200

16

9.95

38

TOP X3 D16-200

875

200

16

1.075

TOP X4 D16-200

6200

200

16

6.4

TOP Y1 D16-200

7024

200

16

7.224

12

TOP Y2 D16-200

875

200

16

1.075

12

TOP Y3 D16-200

8800

200

16

26

Berat Total Pembesian


Volume Total Beton

Berat Satuan Total Berat


kg/m
kg

50.3

1.86

50.3

19.02

50.3

0.43

15.15385

50.3

1.29

13.69077

50.3

4.36

207.4678

50.3

0.65

50.3

11.77
39.38
15.61