Anda di halaman 1dari 14

DATOS METEOROLOGICOS

Para el calculo de la demanda de agua, se tomaran los parametros climaticos generados por el estudio hidrologico para la zona
del proyecto.

1. REGISTRO DE PRECIPITACIONES TOTAL MENSUAL (mm)


REGISTRO DE PRECIPITACIONES MENSUAL GENERADA (mm)
ESTACION

: GENERADA

DISTRITO

: TAMBILLO

ALTITUD

CODIGO

: 002

PROVINCIA

: HUAMANGA

LATITUD

: 1313'06,72"S

DEPARTAMENTO

: AYACUCHO

LONGITUD

: 7406'22,68"O

AO
1964
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
MEDIA
MAX.
MIN.
DESV.
P50%
P75%
P90%
Precipitacin
Efectiva al
75%8(USDA
SCS)

3550.00

msnm

ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SEP

OCT

NOV

DIC

148.53
136.84
147.46
195.71
175.56
145.61
171.01
155.05
159.11
188.28
185.22
150.39
153.04
142.73
159.33
140.77
143.27
166.62
157.33
140.70
206.11
146.26
148.29
143.94
149.11
139.03
147.07
139.48
132.41
203.32
142.19
136.35
185.79
173.10
161.58
141.03
144.77
205.98
100.87
125.90
78.79
114.74
157.50
123.29
182.19
141.54
229.34
215.43
123.78
155.55

145.86
132.86
142.88
202.07
169.72
142.56
155.78
154.26
145.98
179.34
185.19
144.91
150.71
143.17
152.17
139.90
139.98
162.97
156.24
133.99
0.00
144.28
139.60
138.95
146.48
134.28
140.03
121.33
138.67
142.33
133.32
143.96
178.71
145.41
126.32
170.55
219.45
111.03
173.74
155.45
152.04
83.73
135.89
99.80
171.83
163.28
122.17
226.70
196.54
146.34

132.41
124.41
130.15
190.38
152.97
131.77
142.35
140.81
143.62
168.14
163.86
131.79
136.43
127.77
136.89
128.91
128.47
147.75
138.07
124.51
180.30
132.00
128.53
128.25
131.83
124.35
127.62
113.51
109.86
178.30
132.45
156.11
166.11
91.96
129.25
137.94
141.00
180.14
160.72
169.50
105.51
130.28
142.44
180.90
123.72
79.35
109.44
145.76
117.09
120.45

50.93
46.58
48.74
68.26
59.83
49.66
56.52
54.08
52.68
64.00
60.75
49.80
51.17
50.08
53.68
49.56
49.18
56.79
55.04
48.84
69.73
51.02
50.25
49.60
50.99
47.63
50.34
43.77
35.94
71.69
63.56
47.39
58.39
48.56
35.74
68.15
45.81
34.57
51.80
69.35
28.32
29.26
60.73
58.12
20.65
68.33
46.27
86.06
100.57
24.74

17.03
16.03
18.29
23.80
19.25
17.23
19.51
17.85
17.70
20.55
20.49
17.98
18.03
16.60
17.36
16.53
16.64
18.98
17.19
16.21
22.69
17.07
17.38
16.88
17.46
15.88
16.46
14.51
15.60
28.96
21.73
0.00
11.97
12.97
0.00
11.00
34.41
47.80
15.16
14.46
0.00
10.53
9.44
13.09
22.18
17.83
11.11
13.54
6.71
31.51

10.93
10.32
10.85
14.34
0.00
10.46
11.68
11.44
11.34
13.17
0.00
10.95
11.26
10.75
11.44
10.59
10.69
12.13
11.13
10.46
15.51
0.00
0.00
10.49
10.96
10.23
0.00
0.00
20.62
0.00
7.90
5.13
0.00
10.34
17.60
0.00
23.68
8.47
2.47
5.55
18.68
8.49
6.64
7.46
9.49
6.67
5.68
8.61
11.39
23.44

15.29
14.30
14.61
21.70
17.86
15.57
16.48
16.65
16.68
19.16
18.65
14.81
15.36
15.18
15.74
14.45
14.90
16.70
16.26
14.53
22.40
15.30
14.59
14.54
15.35
13.88
14.73
12.66
20.06
25.80
16.54
7.71
0.00
0.00
15.67
0.00
0.00
0.00
59.32
0.00
21.10
12.75
13.76
0.00
0.00
19.86
9.82
12.65
4.73
21.12

16.60
15.52
16.31
22.54
18.84
16.52
18.10
17.61
17.32
21.46
21.48
16.32
16.76
16.00
16.76
16.05
16.17
18.87
18.22
15.78
23.41
16.60
16.31
17.28
16.66
15.44
17.15
15.70
26.34
22.44
12.15
0.00
19.23
44.30
9.11
0.00
16.26
16.70
26.06
25.44
13.20
13.94
27.20
8.09
3.25
7.66
12.06
6.68
9.17
26.00

28.93
25.42
25.50
37.03
31.01
26.62
29.91
28.52
26.69
32.90
32.93
26.78
29.52
26.49
28.71
25.12
26.60
31.99
29.15
26.02
38.52
28.29
26.30
27.11
26.33
25.85
26.54
25.16
19.31
0.00
25.10
21.59
0.00
45.43
13.63
44.37
19.80
21.32
55.01
23.27
68.61
38.80
12.48
20.76
27.37
0.00
24.43
35.99
0.00
0.00

49.02
46.15
52.54
69.21
59.38
50.23
52.34
51.61
52.39
60.08
58.54
49.07
48.85
48.81
52.91
47.13
48.44
60.54
52.34
47.31
69.78
51.33
48.07
48.23
48.08
45.90
50.89
42.43
83.14
82.93
26.84
41.02
49.14
28.70
50.29
64.72
67.19
0.00
63.02
24.60
0.00
56.25
89.10
55.30
60.50
46.11
39.26
38.21
42.61
55.33

57.88
55.53
59.29
82.34
71.92
60.23
63.77
60.25
60.73
72.07
70.24
59.34
59.06
60.50
64.11
58.16
58.55
69.82
67.87
57.19
84.85
59.95
59.44
58.63
59.62
55.24
62.30
49.85
42.25
105.65
56.73
93.18
47.23
88.23
48.93
48.52
33.83
81.49
89.53
38.72
49.43
35.65
118.77
41.26
39.07
107.81
28.92
71.86
50.27
54.40

112.39
108.16
111.87
157.05
134.15
115.87
123.46
122.41
117.69
142.27
135.88
115.56
115.66
112.01
119.70
108.58
111.79
127.96
119.26
109.23
157.47
113.85
111.10
111.94
116.01
106.10
114.30
94.86
104.13
169.90
82.51
77.07
101.79
139.06
93.04
89.80
106.91
81.64
151.96
136.88
154.08
146.22
103.03
122.63
79.63
122.48
136.22
114.32
175.42
155.09

155.15
229.34
78.79
28.60
148.41
140.83
125.69

147.65
226.70
0.00
33.80
145.16
138.74
122.08

137.92
190.38
79.35
22.93
132.20
127.66
113.15

52.87
100.57
20.65
14.16
50.96
47.87
35.63

17.03
47.80
0.00
7.84
17.05
14.47
10.42

9.19
23.68
0.00
5.93
10.46
5.92
0.00

14.18
59.32
0.00
9.40
15.04
12.68
0.00

16.74
44.30
0.00
7.25
16.60
15.46
8.04

26.34
68.61
0.00
12.79
26.57
23.56
11.23

50.52
89.10
0.00
16.24
50.26
46.40
37.26

62.61
118.77
28.92
18.73
59.39
51.30
41.04

119.81
175.42
77.07
22.68
115.61
108.27
92.71

109.10

107.94

101.58

44.20

14.14

5.87

12.42

15.08

22.67

42.95

47.09

89.51

CONSOLIDACION DE LA INFORMACION METEOROLOGICA (GENERADA)


ESTACION

: GENERADA

DISTRITO:

ALTITUD :

CODIGO

: 002

PROVINCIA:

LATITUD

: 1313'06,72"S

DEPARTAMENTO:

LONGITUD

: 7406'22,68"O

MES
ENE
FEB
MAR
ABR
MAY
JUN
JUL
AGO
SEP
OCT
NOV
DIC

PE
N Das/mes
(mm)
31
109.10
28
107.94
31
101.58
30
44.20
31
14.14
30
5.87
31
12.42
31
15.08
30
22.67
31
42.95
30
47.09
31
89.51
Promedio

T Med.
(C)
6.42
6.24
6.09
5.17
2.78
2.35
2.15
3.52
4.66
6.01
5.93
6.10
4.78

3550.0

HRm
(%)
77.88
80.67
78.68
76.55
68.86
64.68
62.09
62.95
64.57
64.52
67.49
72.68
70.14

msnm

OFERTA MENSUAL DE AGUA DE RIEGO CON PROYECTO (DE LA REPRESA CAYRAMAYO)


DESCRIPCION

ENE.

FEB.

MAR.

ABR.

MAY.

JUN.

JUL.

AGOS.

SET.

OCT.

NOV

DIC.

N DE DIAS POR MES

31

28

31

30

31

30

31

31

30

31

30

31

DISPONIB. RIEGO (DIAS)

DISPONIB. DIAS POR MES (a/b)

31

28

31

30

31

30

31

31

30

31

30

31

N HORAS DISPONIBLES (dia)

24

24

24

24

24

24

24

24

24

24

24

24

N HORAS DE RIEGO (dia)

24
280

24
289

24
278

24
186

24
66

24
45

24
55

24
61

24
72

24
101

24
114

24
268

CAUDAL OFERTADO POR LA FUENTE (l/S)

748,983

699,320

744,234

481,011

177,935

116,485

147,654

164,172

187,570

269,501

295,145

716,607

OFERTA DE CAUDAL REGULADO (l/S)

57

38.26

127.99

200.59

287.37

303.38

107.86

50.32

0.00

VOL ENTREGADO (M3/MES)

147,107

102,475

331,745

537,255

769,679

786,351

288,905

130,440

748,983

1,448,303

2,192,537

2,526,441

2,601,901

2,386,641

1,997,040

1,391,533

792,752

773,348

938,053

1,654,660

OKEY

OKEY

OKEY

OKEY

OKEY

OKEY

OKEY

OKEY

OKEY

OKEY

OKEY

OKEY

ENE.

FEB.

MAR.

ABR.

MAY.

JUN.

JUL.

AGOS.

SET.

OCT.

NOV

DIC.

31
1.00
31.00
24.00
889.54

28
1.00
28.00
24.00
889.54

31
1.00
31.00
24.00
889.54

30
1.00
30.00
24.00
889.54

31
1.00
31.00
24.00
889.54

30
1.00
30.00
24.00
889.54

31
1.00
31.00
24.00
889.54

31
1.00
31.00
24.00
889.54

30
1.00
30.00
24.00
889.54

31
1.00
31.00
24.00
889.54

30
1.00
30.00
24.00
889.54

31
1.00
31.00
24.00
889.54

2382543.94

2151975.17

2382543.94

2305687.68

2382543.94

2305687.68

2382543.94

2382543.94

2305687.68

2382543.94

2305687.68

2382543.94

VOLUMEN MENSUAL DE LA FUENTE (M3/MES)

VOL DISPONIBLE EN LA PRESA

OFERTA MENSUAL DE AGUA DE RIEGO SIN PROYECTO (DE LA REPRESA CAYRAMAYO)


DESCRIPCION
(a)

N DE DIAS POR MES

(b)

DISPONIB. RIEGO (DIAS)

(c)

DISPONIB. DIAS POR MES (a/b)

(d) N HORAS DISPONIBLES (dia)


(e)

CAUDAL (l/S)
VOLUMEN MENSUAL (M3/MES) (cxdxex3.6)

FORMULACION DE LA CEDULA Y CALENDARIO DE CULTIVO SIN PROYECTO


PARA SISTEMA DE RIEGO POR GRAVEDAD DEL SECTOR TAMBILLO.
A) FORMULACION DE LA CEDULA DE CULTIVO:
FACTORES:
Clima, Suelo, Cultivos, Disponibilidad de agua, Mercado.
Area de Cultivo (Has)
Cultivo (I)

Campaa Grande

Cultivos (II)

Campaa Chica

PAPA
QUINUA
MAIZ GRANO
TRIGO
CEBADA
ARVEJA VERDE
ALFALFA

195

QUINUA

158

PAPA

145

65

PAPA

115

180

55

QUINUA

85

140

TOTAL

775

353

185

185

135

280

115

115

25

25
503

B) CALENDARIO AGRICOLA:
PROYECTO DE RIEGO
UBICACIN
ALTITUD
CULTIVO
PRINCIPAL

1278

CONSTRUCCION DE LA PRESA HIDRAULICA CAYRAMAYO, DISTRITO DE TAMBILLO,


TAMBILLO
:
3550.00
:
msnm
AREA
(Has)

ENE

FEB

MAR

ABR

PAPA

195

CG

CG

CG

CG

QUINUA

185

CG

CG

CG

CG

MAIZ GRANO

135
115

CG

CG

CG

CH

CG

CG

CG

CG

CEBADA

65

CG

CG

CG

CG

ARVEJA VERDE

55

CG

CG

CG

ALFALFA

25

CG

CG

CG

TRIGO

TOTAL

Total

775

(*) CG: Campaa Grande, CH : Campaa Chica

CG

CALENDARIO AGRCOLA
MAY
JUN
JUL
AGO
CH

CH

CH

CH

CH

CH

CH

CH

SET

OCT

NOV

DIC

CH

CH

CG

CG

CG

CG

CG

CG

CG

CG

CH

CG

CULTIVO
ROTAC.

AREA
(Has)

QUINUA

158

PAPA

145

CH

CH

CH

CH

CH

CH

CG

CG

PAPA

115

CH

CH

CH

CH

CH

CH

CG

CG

QUINUA

85

CG

CG

CG

CG

CG

CG

CG

CG

503

C) AREA DE CULTIVO:
CULTIVO

AREA

PRINCIPAL

(Has)

ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SET

OCT

NOV

DIC

PAPA

195

195

195

195

195

158

158

158

158

158

158

195

195

QUINUA

185

185

185

185

185

185

185

MAIZ GRANO

135

135

135

135

145

135

135

TRIGO

115

115

115

115

115

115

115

CEBADA

65

65

65

65

65

ARVEJA VERDE

55

55

55

55

ALFALFA

25

25

25

25

775

775

775

775

TOTAL

MESES

145

145

145

145

145

135

CULTIVO

AREA

ROTAC.

(Has)

QUINUA

158

PAPA

145

115

115

115

115

115

115

65

65

PAPA

115

85

85

85

85

85

85

55

55

QUINUA

85

25

25

25

25

25

25

25

25

25

730

528

528

528

528

528

518

775

775

503

D) DETERMINACION DEL COEFICIENTE DE CULTIVO (Kc):


CULTIVO

AREA

PRINCIPAL

MESES

(Has)

ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SET

OCT

NOV

DIC

PAPA

195

1.00

1.17

1.17

0.90

0.39

0.65

1.05

1.13

1.12

0.73

0.49

0.55

QUINUA

185

1.05

1.13

1.12

0.73

0.00

0.00

0.00

0.00

0.00

0.00

0.39

0.65

MAIZ GRANO

135

1.15

1.18

1.05

0.72

0.49

0.55

1.17

1.17

0.9

0.45

0.71

TRIGO

115

0.88

1.05

0.99

0.62

0.00

0.00

0.00

0.00

0.00

0.00

0.50

0.70

CEBADA

65

0.95

1.13

1.02

0.60

0.49

0.55

1.17

1.17

0.9

0.48

ARVEJA VERDE

55

1.16

1.02

0.39

0.65

1.05

1.13

1.12

0.73

0.65

ALFALFA

25

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

775

1.02

1.12

1.01

0.75

0.46

0.61

1.02

1.14

1.13

0.80

0.48

0.67

Kc ponderado

CULTIVO

AREA

ROTAC.

(Has)

QUINUA

158

PAPA

145

0.68

PAPA

115

0.94

QUINUA

85

503

E) CALCULO DE LA EVAPOTRANSPIRACION POTENCIAL (ETo): METODO DE HARGREAVES

ETo = MF *TMF * CH * CE
Donde:

ETo=ETP = Evapotranspiracin potencial (mm/mes)


MF = Factor mensual de latitud, se obtiene de un cuadro
TMF = Temperatura media mensual (F):
CH = Factor de correccin para la humedad relativa
CE = Factor de correccin para la altura o elevacin del lugar.

= 0 . 166 * (100

CH
Donde:

1
2

HR = Humedad relativa media mensual (%)


La frmula anterior se emplea para valores de HR mayores de 64%. Para HR < 64%, CH = 1

CE = 1.0 + 0.04 *
Donde:

E
2000

E = Altitud o Elevacin del lugar (m.s.n.m)

TMF =

9
*T (C ) + 32
5

Donde:

Latitud

HR )

T(C) = Temperatura media en grados celsius

13
2.6040168

11'
2.2613348

28.0''
2.297163556

13.191
1.93744693

1.725667 1.5338176

1.643765

1.878316

2.111613 2.43563102 2.496448 2.62749324

PARAMETRO

ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SET

OCT

NOV

DIC

TMM (C)

6.42

6.24

6.09

5.17

2.78

2.35

2.15

3.52

4.66

6.01

5.93

6.10

TMF

43.55

43.23

42.96

41.30

37.01

36.23

35.88

38.33

40.38

42.82

42.68

42.97

MF
HR

2.66
77.88

2.31
80.67

2.34
78.68

1.98
76.55

1.76
68.86

1.57
64.68

1.68
62.09

1.92
62.95

2.15
64.57

2.49
64.52

2.55
67.49

2.68
72.68

CH

0.78

0.73

0.77

0.80

0.93

0.99

1.00

1.00

0.99

0.99

0.95

0.87

CE

1.07

1.07

1.07

1.07

1.07

1.07

1.07

1.07

1.07

1.07

1.07

1.07

TOTAL

ETo (mm/mes)

96.77

77.97

82.66

70.29

64.65

59.91

64.45

78.69

92.08

112.70

110.20

107.06

1017.43

F) DETERMINACION DE LA PRECIPITACION EFECTIVA PE EN LA ZONA DE RIEGO(mm):

REGISTRO DE PRECIPITACIONES MENSUAL (mm)


ESTACION

: GENERADA

DISTRITO

: TAMBILLO

ALTITUD

CODIGO

: 002

PROVINCIA

: HUAMANGA

LATITUD

DEPARTAMENTO

AO
1964
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007

ENE
148.53
136.84
147.46
195.71
175.56
145.61
171.01
155.05
159.11
188.28
185.22
150.39
153.04
142.73
159.33
140.77
143.27
166.62
157.33
140.70
206.11
146.26
148.29
143.94
149.11
139.03
147.07
139.48
132.41
203.32
142.19
136.35
185.79
173.10
161.58
141.03
144.77
205.98
100.87
125.90
78.79
114.74
157.50
123.29

FEB
145.86
132.86
142.88
202.07
169.72
142.56
155.78
154.26
145.98
179.34
185.19
144.91
150.71
143.17
152.17
139.90
139.98
162.97
156.24
133.99
0.00
144.28
139.60
138.95
146.48
134.28
140.03
121.33
138.67
142.33
133.32
143.96
178.71
145.41
126.32
170.55
219.45
111.03
173.74
155.45
152.04
83.73
135.89
99.80

MAR
132.41
124.41
130.15
190.38
152.97
131.77
142.35
140.81
143.62
168.14
163.86
131.79
136.43
127.77
136.89
128.91
128.47
147.75
138.07
124.51
180.30
132.00
128.53
128.25
131.83
124.35
127.62
113.51
109.86
178.30
132.45
156.11
166.11
91.96
129.25
137.94
141.00
180.14
160.72
169.50
105.51
130.28
142.44
180.90

ABR
50.93
46.58
48.74
68.26
59.83
49.66
56.52
54.08
52.68
64.00
60.75
49.80
51.17
50.08
53.68
49.56
49.18
56.79
55.04
48.84
69.73
51.02
50.25
49.60
50.99
47.63
50.34
43.77
35.94
71.69
63.56
47.39
58.39
48.56
35.74
68.15
45.81
34.57
51.80
69.35
28.32
29.26
60.73
58.12

MAY
17.03
16.03
18.29
23.80
19.25
17.23
19.51
17.85
17.70
20.55
20.49
17.98
18.03
16.60
17.36
16.53
16.64
18.98
17.19
16.21
22.69
17.07
17.38
16.88
17.46
15.88
16.46
14.51
15.60
28.96
21.73
0.00
11.97
12.97
0.00
11.00
34.41
47.80
15.16
14.46
0.00
10.53
9.44
13.09

: AYACUCHO

JUN
10.93
10.32
10.85
14.34
0.00
10.46
11.68
11.44
11.34
13.17
0.00
10.95
11.26
10.75
11.44
10.59
10.69
12.13
11.13
10.46
15.51
0.00
0.00
10.49
10.96
10.23
0.00
0.00
20.62
0.00
7.90
5.13
0.00
10.34
17.60
0.00
23.68
8.47
2.47
5.55
18.68
8.49
6.64
7.46

3550.0 msnm
: 1313'06,72"S

LONGITUD

JUL
15.29
14.30
14.61
21.70
17.86
15.57
16.48
16.65
16.68
19.16
18.65
14.81
15.36
15.18
15.74
14.45
14.90
16.70
16.26
14.53
22.40
15.30
14.59
14.54
15.35
13.88
14.73
12.66
20.06
25.80
16.54
7.71
0.00
0.00
15.67
0.00
0.00
0.00
59.32
0.00
21.10
12.75
13.76
0.00

AGO
16.60
15.52
16.31
22.54
18.84
16.52
18.10
17.61
17.32
21.46
21.48
16.32
16.76
16.00
16.76
16.05
16.17
18.87
18.22
15.78
23.41
16.60
16.31
17.28
16.66
15.44
17.15
15.70
26.34
22.44
12.15
0.00
19.23
44.30
9.11
0.00
16.26
16.70
26.06
25.44
13.20
13.94
27.20
8.09

SEP
28.93
25.42
25.50
37.03
31.01
26.62
29.91
28.52
26.69
32.90
32.93
26.78
29.52
26.49
28.71
25.12
26.60
31.99
29.15
26.02
38.52
28.29
26.30
27.11
26.33
25.85
26.54
25.16
19.31
0.00
25.10
21.59
0.00
45.43
13.63
44.37
19.80
21.32
55.01
23.27
68.61
38.80
12.48
20.76

: 7406'22,68"O

OCT
49.02
46.15
52.54
69.21
59.38
50.23
52.34
51.61
52.39
60.08
58.54
49.07
48.85
48.81
52.91
47.13
48.44
60.54
52.34
47.31
69.78
51.33
48.07
48.23
48.08
45.90
50.89
42.43
83.14
82.93
26.84
41.02
49.14
28.70
50.29
64.72
67.19
0.00
63.02
24.60
0.00
56.25
89.10
55.30

NOV
57.88
55.53
59.29
82.34
71.92
60.23
63.77
60.25
60.73
72.07
70.24
59.34
59.06
60.50
64.11
58.16
58.55
69.82
67.87
57.19
84.85
59.95
59.44
58.63
59.62
55.24
62.30
49.85
42.25
105.65
56.73
93.18
47.23
88.23
48.93
48.52
33.83
81.49
89.53
38.72
49.43
35.65
118.77
41.26

DIC
112.39
108.16
111.87
157.05
134.15
115.87
123.46
122.41
117.69
142.27
135.88
115.56
115.66
112.01
119.70
108.58
111.79
127.96
119.26
109.23
157.47
113.85
111.10
111.94
116.01
106.10
114.30
94.86
104.13
169.90
82.51
77.07
101.79
139.06
93.04
89.80
106.91
81.64
151.96
136.88
154.08
146.22
103.03
122.63

2008
2009
2010
2011
2012
2013
PROM.
MAX.
MIN.
DESV.
P50%
P75%
P90%
PE(mm)

182.19
141.54
229.34
215.43
123.78
155.55
155.1
229.3
78.8
28.60
148.4
140.833
125.688
109.10

171.83
163.28
122.17
226.70
196.54
146.34
147.7
226.7
0.0
33.80
145.2
138.737
122.085
107.94

123.72
79.35
109.44
145.76
117.09
120.45
137.9
190.4
79.4
22.93
132.2
127.660
113.147
101.58

20.65
68.33
46.27
86.06
100.57
24.74
52.9
100.6
20.7
14.16
51.0
47.865
35.626
44.20

22.18
17.83
11.11
13.54
6.71
31.51
17.0
47.8
0.0
7.84
17.1
14.473
10.419
14.14

9.49
6.67
5.68
8.61
11.39
23.44
9.2
23.7
0.0
5.93
10.5
5.922
0.000
5.87

Ec. Autocorrelacin para Completacin


A=
B=

0.00
19.86
9.82
12.65
4.73
21.12
14.2
59.3
0.0
9.40
15.0
12.682
0.000
12.42

3.25
7.66
12.06
6.68
9.17
26.00
16.7
44.3
0.0
7.25
16.6
15.462
8.044
15.08

27.37
0.00
24.43
35.99
0.00
0.00
26.3
68.6
0.0
12.79
26.6
23.560
11.228
22.67

60.50
46.11
39.26
38.21
42.61
55.33
50.5
89.1
0.0
16.24
50.3
46.396
37.257
42.95

DISTRIBUCION DE LA PE
Pp
%PE
5
0
0.00
30
95
0.95
55
90
0.90
80
82
0.82
105
65
0.65
130
45
0.45
155
25
0.25
>155
5
0.05

49.75525
0.272971
68.65

39.07
107.81
28.92
71.86
50.27
54.40
62.6
118.8
28.9
18.73
59.4
51.302
41.044
47.09

79.63
122.48
136.22
114.32
175.42
155.09
119.8
175.4
77.1
22.68
115.6
108.269
92.711
89.51

Total
733.16
612.56

RIEGO POR CANAL ABIERTO


Eficiencias %
Conducc
0.75
Distribuc
0.84
Aplicac
0.40
Efic. Riego
0.25

RESUMEN:

N de dias/mes
Kc ponderado
ETo (mm/da)
ETo (mm/mes)
PP efectiva
(mm/mes)

Ene
31
1.02
3.12
96.77

Feb
28
1.12
2.78
77.97

Mar
31
1.01
2.67
82.66

Abr
30
0.75
2.34
70.29

May
31
0.46
2.09
64.65

Jun
30
0.61
2.00
59.91

Jul
31
1.02
2.08
64.45

Ago
31
1.14
2.54
78.69

Sep
30
1.13
3.07
92.08

Oct
31
0.80
3.64
112.70

Nov
30
0.48
3.67
110.20

Dic
31
0.67
3.45
107.06

109.10

107.94

101.58

44.20

14.14

5.87

12.42

15.08

22.67

42.95

47.09

89.51

0.85
2.79

FORMULACION DE LA CEDULA Y CALENDARIO DE CULTIVO CON PROYECTO


CONSTRUCCION DE LA PRESA HIDRAULICA CAYRAMAYO, DISTRITO DE TAMBILLO, PROVINCIA DE HUAMANGA AYACUCHO
A) FORMULACION DE LA CEDULA DE CULTIVO:
FACTORES:
Clima, Suelo, Cultivos, Disponibilidad de agua, Mercado.
Area de Cultivo (Has)

Cultivo Camp. (I)

PAPA
QUINUA
MAIZ GRANO
TRIGO
CEBADA
ARVEJA VERDE
ALFALFA

Campaa (I)
195

Cultivo Camp. II

Campaa (II)
115

Total

QUINUA

208

ARVEJA VERDE

140

348

145

PAPA

95

240

105

MAIZ CHOCLO

51

156

75

75

115

115

10

TOTAL

10

853

401

B) CALENDARIO AGRICOLA:
PROYECTO DE RIEGO
UBICACIN
ALTITUD
CULTIVO
PRINCIPAL
PAPA
QUINUA
MAIZ GRANO
TRIGO
CEBADA
ARVEJA VERDE
ALFALFA

TOTAL

AREA
(Has)
195
208
145
105
75
115
10
853

310

1254

CONSTRUCCION DE LA PRESA HIDRAULICA CAYRAMAYO, DISTRITO DE TAMBILLO, PROVINCIA DE HUAMANGA AYACUCHO


TAMBILLO

3250

:
msnm
:

ENE

FEB

MAR

ABR

CG

CG

CG

CG

CG

CG

CG

CG

CG

CG

CG

CG

CG

CG

CG

CG

CG

CG

CG

CG

CG

CG

CG

CG

CG

CG

CG

CALENDARIO AGRCOLA
MAY
JUN
JUL
AGO
CH

CULTIVO
ROTAC.

SET

OCT

NOV

DIC

CH

CG

CG

QUINUA

CG

CG

ARVEJA VERDE

CH

CH

CH

CH

CH

CH

CH

CH

CH

CH

CH

CH

CH

CH

CG

CG

PAPA

CH

CH

CH

CH

CH

CH

CG

CG

MAIZ CHOCLO

CG

CG

CG

CG

CG

CG

CG

CG

CG

CG

CG

CG

AREA
(Has)
115
140
95
51

401

(*) CG: Campaa Grande, CH : Campaa Chica


C) AREA DE CULTIVO:
CULTIVO
PRINCIPAL
PAPA
QUINUA
MAIZ GRANO
TRIGO
CEBADA
ARVEJA VERDE
ALFALFA

TOTAL

AREA
(Has)
195
208
145
105
75
115
10
853

MESES
JUN
JUL

CULTIVO
ROTAC.

AREA
(Has)

195

QUINUA

115

208

ARVEJA VERDE

140

145

145

PAPA

95

51

105

105

MAIZ CHOCLO

51

75

75

115

115

10

10

10

10

271

853

853

ENE

FEB

MAR

ABR

MAY

AGO

SET

OCT

NOV

DIC

195

195

195

195

115

115

208

208

208

208

140

115

115

115

115

195

140

140

140

208

145

145

145

145

95

95

95

95

95

95

105

105

105

105

51

51

51

51

51

75

75

75

75

115

115

10

10

10

10

10

10

10

10

853

853

738

738

271

411

411

411

411

401

D) DETERMINACION DEL COEFICIENTE DE CULTIVO (Kc):


CULTIVO

AREA

PRINCIPAL

(Has)

ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SET

OCT

NOV

DIC

PAPA

195

1.00

1.17

1.17

0.90

0.39

0.65

1.05

1.13

1.12

0.73

0.49

QUINUA

208

1.05

1.13

1.12

0.73

0.65

0.94

1.16

1.02

MAIZ GRANO

145

1.15

1.18

1.05

0.72

0.49

0.55

1.17

1.17

0.9

TRIGO

105

0.88

1.05

0.99

0.62

0.45

0.71

1.15

1.18

1.05

0.72

CEBADA

75

0.95

1.13

1.02

0.60

ARVEJA VERDE

115

1.16

1.02

ALFALFA

10

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

853

1.04

1.12

1.09

0.75

0.46

0.64

1.01

1.15

1.08

0.76

Kc ponderado

MESES

CULTIVO

AREA

0.55

ROTAC.
QUINUA

(Has)
115

0.39

0.65

ARVEJA VERDE

140

0.45

0.71

PAPA

95

0.50

0.70

MAIZ CHOCLO

51

0.48

0.68

0.65

0.94

0.90

0.90

0.49

0.69

E) CALCULO DE LA EVAPOTRANSPIRACION POTENCIAL (ETo): METODO DE HARGREAVES

ETo = MF *TMF * CH * CE
Donde:

ETo=ETP = Evapotranspiracin potencial (mm/mes)


MF = Factor mensual de latitud, se obtiene de un cuadro
TMF = Temperatura media mensual (F):
CH = Factor de correccin para la humedad relativa
CE = Factor de correccin para la altura o elevacin del lugar.
1

CH = 0.166 * (100 HR ) 2
Donde:

HR = Humedad relativa media mensual (%)


La frmula anterior se emplea para valores de HR mayores de 64%. Para HR < 64%, CH = 1

CE = 1.0 + 0.04 *
Donde:

E
2000

E = Altitud o Elevacin del lugar (m.s.n.m)

9
TMF = *T (C ) + 32
5
Donde:

T(C) = Temperatura media en grados celsius

2.6040168 2.26133476

2.2971636 1.9374469 1.7256668

1.5338176 1.6437649 1.878316 2.1116125 2.43563102

2.496448 2.62749324

401

PARAMETRO

ENE

FEB

MAR

ABR

MAY

JUN

JUL

AGO

SET

OCT

NOV

DIC

TMM (C)

6.42

6.24

6.09

5.17

2.78

2.35

2.15

3.52

4.66

6.01

5.93

6.10

TMF

43.55

43.23

42.96

41.30

37.01

36.23

35.88

38.33

40.38

42.82

42.68

42.97

MF
HR

2.657
77.9

2.307
80.7

2.344
78.7

1.977
76.6

1.761
68.9

1.565
64.7

1.677
62.1

1.917
62.9

2.155
64.6

2.485
64.5

2.547
67.5

2.681
72.7

CH

0.78

0.73

0.77

0.80

0.93

0.99

1.00

1.00

0.99

0.99

0.95

0.87

CE

1.07

1.07

1.07

1.07

1.07

1.07

1.07

1.07

1.07

1.07

1.07

1.07

ETo (mm/mes)

96.22

77.53

82.20

69.90

64.29

59.57

64.09

78.25

91.56

112.07

109.59

106.46

F) DETERMINACION DE LA PRECIPITACION EFECTIVA PE EN LA ZONA DE RIEGO(mm):

REGISTRO DE PRECIPITACIONES MENSUAL (mm)


ESTACION

: GENERADA

DISTRITO

: TAMBILLO

ALTITUD

CODIGO

: 002

PROVINCIA

: HUAMANGA

LATITUD

DEPARTAMENTO

AO
1964
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992

ENE
148.5
136.8
147.5
195.7
175.6
145.6
171.0
155.0
159.1
188.3
185.2
150.4
153.0
142.7
159.3
140.8
143.3
166.6
157.3
140.7
206.1
146.3
148.3
143.9
149.1
139.0
147.1
139.5
132.4

FEB
145.9
132.9
142.9
202.1
169.7
142.6
155.8
154.3
146.0
179.3
185.2
144.9
150.7
143.2
152.2
139.9
140.0
163.0
156.2
134.0
0.0
144.3
139.6
138.9
146.5
134.3
140.0
121.3
138.7

MAR
132.4
124.4
130.2
190.4
153.0
131.8
142.3
140.8
143.6
168.1
163.9
131.8
136.4
127.8
136.9
128.9
128.5
147.7
138.1
124.5
180.3
132.0
128.5
128.3
131.8
124.3
127.6
113.5
109.9

ABR
50.9
46.6
48.7
68.3
59.8
49.7
56.5
54.1
52.7
64.0
60.7
49.8
51.2
50.1
53.7
49.6
49.2
56.8
55.0
48.8
69.7
51.0
50.3
49.6
51.0
47.6
50.3
43.8
35.9

MAY
17.0
16.0
18.3
23.8
19.2
17.2
19.5
17.9
17.7
20.5
20.5
18.0
18.0
16.6
17.4
16.5
16.6
19.0
17.2
16.2
22.7
17.1
17.4
16.9
17.5
15.9
16.5
14.5
15.6

: AYACUCHO

JUN
10.9
10.3
10.8
14.3
0.0
10.5
11.7
11.4
11.3
13.2
0.0
11.0
11.3
10.7
11.4
10.6
10.7
12.1
11.1
10.5
15.5
0.0
0.0
10.5
11.0
10.2
0.0
0.0
20.6

3550.0 msnm
: 1313'06,72"S

LONGITUD

JUL
15.3
14.3
14.6
21.7
17.9
15.6
16.5
16.7
16.7
19.2
18.7
14.8
15.4
15.2
15.7
14.4
14.9
16.7
16.3
14.5
22.4
15.3
14.6
14.5
15.3
13.9
14.7
12.7
20.1

AGO
16.6
15.5
16.3
22.5
18.8
16.5
18.1
17.6
17.3
21.5
21.5
16.3
16.8
16.0
16.8
16.1
16.2
18.9
18.2
15.8
23.4
16.6
16.3
17.3
16.7
15.4
17.1
15.7
26.3

SEP
28.9
25.4
25.5
37.0
31.0
26.6
29.9
28.5
26.7
32.9
32.9
26.8
29.5
26.5
28.7
25.1
26.6
32.0
29.1
26.0
38.5
28.3
26.3
27.1
26.3
25.8
26.5
25.2
19.3

: 7406'22,68"O

OCT
49.0
46.2
52.5
69.2
59.4
50.2
52.3
51.6
52.4
60.1
58.5
49.1
48.8
48.8
52.9
47.1
48.4
60.5
52.3
47.3
69.8
51.3
48.1
48.2
48.1
45.9
50.9
42.4
83.1

NOV
57.9
55.5
59.3
82.3
71.9
60.2
63.8
60.2
60.7
72.1
70.2
59.3
59.1
60.5
64.1
58.2
58.6
69.8
67.9
57.2
84.9
60.0
59.4
58.6
59.6
55.2
62.3
49.9
42.2

DIC
112.4
108.2
111.9
157.0
134.2
115.9
123.5
122.4
117.7
142.3
135.9
115.6
115.7
112.0
119.7
108.6
111.8
128.0
119.3
109.2
157.5
113.9
111.1
111.9
116.0
106.1
114.3
94.9
104.1

TOTAL

13LS

1011.73

1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
PROM.
MAX.
MIN.
DESV.
P50%
P75%
P90%
PE(mm)

203.3
142.2
136.3
185.8
173.1
161.6
141.0
144.8
206.0
100.9
125.9
78.8
114.7
157.5
123.3
182.2
141.5
229.3
215.4
123.8
155.5
155.1
229.3
78.8
28.60
148.4
140.833
125.69
109.1

142.3
133.3
144.0
178.7
145.4
126.3
170.6
219.4
111.0
173.7
155.4
152.0
83.7
135.9
99.8
171.8
163.3
122.2
226.7
196.5
146.3
147.7
226.7
0.0
33.80
145.2
138.737
122.08
107.9

178.3
132.5
156.1
166.1
92.0
129.3
137.9
141.0
180.1
160.7
169.5
105.5
130.3
142.4
180.9
123.7
79.4
109.4
145.8
117.1
120.5
137.9
190.4
79.4
22.93
132.2
127.660
113.15
101.6

71.7
63.6
47.4
58.4
48.6
35.7
68.2
45.8
34.6
51.8
69.4
28.3
29.3
60.7
58.1
20.7
68.3
46.3
86.1
100.6
24.7
52.9
100.6
20.7
14.16
51.0
47.865
35.63
44.2

29.0
21.7
0.0
12.0
13.0
0.0
11.0
34.4
47.8
15.2
14.5
0.0
10.5
9.4
13.1
22.2
17.8
11.1
13.5
6.7
31.5
17.0
47.8
0.0
7.84
17.1
14.473
10.42
14.1

0.0
7.9
5.1
0.0
10.3
17.6
0.0
23.7
8.5
2.5
5.6
18.7
8.5
6.6
7.5
9.5
6.7
5.7
8.6
11.4
23.4
9.2
23.7
0.0
5.93
10.5
5.922
0.00
5.9

Ec. Autocorrelacin para Completacin


A=
B=

25.8
16.5
7.7
0.0
0.0
15.7
0.0
0.0
0.0
59.3
0.0
21.1
12.8
13.8
0.0
0.0
19.9
9.8
12.7
4.7
21.1
14.2
59.3
0.0
9.40
15.0
12.682
0.00
12.4

22.4
12.2
0.0
19.2
44.3
9.1
0.0
16.3
16.7
26.1
25.4
13.2
13.9
27.2
8.1
3.3
7.7
12.1
6.7
9.2
26.0
16.7
44.3
0.0
7.25
16.6
15.462
8.04
15.1

0.0
25.1
21.6
0.0
45.4
13.6
44.4
19.8
21.3
55.0
23.3
68.6
38.8
12.5
20.8
27.4
0.0
24.4
36.0
0.0
0.0
26.3
68.6
0.0
12.79
26.6
23.560
11.23
22.7

82.9
26.8
41.0
49.1
28.7
50.3
64.7
67.2
0.0
63.0
24.6
0.0
56.3
89.1
55.3
60.5
46.1
39.3
38.2
42.6
55.3
50.5
89.1
0.0
16.24
50.3
46.396
37.26
43.0

DISTRIBUCION DE LA PE
Pp
%PE
5
0
0.00
30
95
0.95
55
90
0.90
80
82
0.82
105
65
0.65
130
45
0.45
155
25
0.25
>155
5
0.05

50.13281
0.246979
67.23

105.6
56.7
93.2
47.2
88.2
48.9
48.5
33.8
81.5
89.5
38.7
49.4
35.7
118.8
41.3
39.1
107.8
28.9
71.9
50.3
54.4
62.6
118.8
28.9
18.73
59.4
51.302
41.04
47.1

169.9
82.5
77.1
101.8
139.1
93.0
89.8
106.9
81.6
152.0
136.9
154.1
146.2
103.0
122.6
79.6
122.5
136.2
114.3
175.4
155.1
119.8
175.4
77.1
22.68
115.6
108.269
92.71
89.5

Total
733.16
612.56

RIEGO POR CANAL ABIERTO


Eficiencias %
Conducc
0.9
Distribuc
0.95
Aplicac
0.47
Efic. Riego
0.40

RESUMEN:
PARAMETRO
N de dias/mes
Kc ponderado
ETo (mm/da)
ETo (mm/mes)
PP efectiva
(mm/mes)

Ene
31
1.04
3.10
96.22

Feb
28
1.12
2.77
77.53

Mar
31
1.09
2.65
82.20

Abr
30
0.75
2.33
69.90

May
31
0.46
2.07
64.29

Jun
30
0.64
1.99
59.57

Jul
31
1.01
2.07
64.09

Ago
31
1.15
2.52
78.25

Sep
30
1.08
3.05
91.56

Oct
31
0.76
3.62
112.07

Nov
30
0.49
3.65
109.59

Dic
31
0.69
3.43
106.46

109.10

107.94

101.58

44.20

14.14

5.87

12.42

15.08

22.67

42.95

47.09

89.51

0.86
2.77

CALCULO DE DEMANDA DE AGUA DE LA REPRESA CAYRAMAYO (SIN PROYECTO)


Camp.I

Camp.II

ENE
31

FEB
28

MAR
31

ABR
30

MAY
31

JUN
30

JUL
31

AGO
31

SET
30

OCT
31

NOV
30

DIC
31

PAPA
QUINUA
MAIZ GRANO
TRIGO
CEBADA
ARVEJA VERDE
ALFALFA

195
185
135
115
65
55
25

158
0
145
0
115
85
0

1.00

1.17

1.17

0.90

0.39

0.65

1.05

1.13

1.12

0.73

0.49

0.55

1.05

1.13

1.12

0.73

0.00

0.00

0.00

0.00

0.00

0.00

0.39

0.65

1.15

1.18

1.05

0.72

0.49

0.55

1.00

1.17

1.17

0.90

0.45

0.71

0.88

1.05

0.99

0.62

0.00

0.00

0.00

0.00

0.00

0.00

0.50

0.70

0.95

1.13

1.02

0.60

0.49

0.55

1.00

1.17

1.17

0.90

0.48

0.68

1.16

1.02

0.00

0.00

0.39

0.65

1.05

1.13

1.12

0.73

0.65

0.94

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

Area cult./ mes (Has)


kc Ponderado
ETo (mm/dia)
ETc(mm/dia) UC
Precip. Efectiva (mm/mes)
Dn(mm/mes)
Efic.Riego (%)
Db(mm/mes)
Db(m3/Ha)
NHoras de riego/dia
Db(m3)
Db(mmc)
Db(l/s)
Mod.Riego(l/s/Ha)

775

503

Camp.I

Camp.II

ENE
31

FEB
28

MAR
31

ABR
30

MAY
31

JUN
30

JUL
31

AGO
31

SET
30

OCT
31

NOV
30

DIC
31

195
208
145
105
75
115
10

115
140
95
51
0
0
0

1.00

1.17

1.17

0.90

0.39

0.65

1.05

1.13

1.12

0.73

0.49

0.55

1.05

1.13

1.12

0.73

0.00

0.65

0.94

1.16

1.02

0.00

0.39

0.65

1.15

1.18

1.05

0.72

0.49

0.55

1.00

1.17

1.17

0.90

0.45

0.71

0.88

1.05

0.99

0.62

0.45

0.71

1.15

1.18

1.05

0.72

0.50

0.70

0.95

1.13

1.02

0.60

0.00

0.00

0.00

0.00

0.00

0.00

0.48

0.68

1.16

1.02

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.65

0.94

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

0.90

853

401

FACTORES
das/mes

775
1.02
3.12
3.20
109.10
-9.99
25.00
-39.96
-399.62
24.00
-309702.82
-0.31
-115.63
-0.15

775
1.12
2.78
3.12
107.94
-20.48
25.00
-81.94
-819.39
24.00
-635027.38
-0.64
-262.49
-0.34

775
1.01
2.67
2.68
101.58
-18.41
25.00
-73.66
-736.58
24.00
-570849.53
-0.57
-213.13
-0.28

730
0.75
2.34
1.76
44.20
8.54
25.00
34.17
341.68
24.00
249429.97
0.25
96.23
0.13

CALCULO DE DEMANDA DE AGUA


RIEGO POR CANAL ABIERTO
FACTORES
das/mes
PAPA
QUINUA
MAIZ GRANO
TRIGO
CEBADA
ARVEJA VERDE
ALFALFA
Area cult./ mes (Has)
kc Ponderado
ETo (mm/dia)
ETc(mm/dia) UC
Precip. Efectiva (mm/mes)
Dn(mm/mes)
Efic.Riego (%)
Db(mm/mes)
Db(m3/Ha)
NHoras de riego/dia
Db(m3)
Db(mmc)
Db(l/s)
Mod.Riego(l/s/Ha)
CAUDAL DE DISEO

853
1.04
3.10
3.22
109.10
-9.13
40.00
-22.82
-228.20
24.00
-194718.70
-0.19
-72.70
-0.09

853
1.12
2.77
3.10
107.94
-21.08
40.00
-52.71
-527.09
24.00
-449750.51
-0.45
-185.91
-0.22

738
1.09
2.65
2.88
101.58
-12.16
40.00
-30.41
-304.11
24.00
-224518.40
-0.22
-83.83
-0.11

528
0.46
2.09
0.97
14.14
15.82
25.00
63.29
632.88
24.00
334161.17
0.33
124.76
0.24

528
0.61
2.00
1.22
5.87
30.83
25.00
123.34
1233.40
24.00
651233.67
0.65
251.25
0.48

528
1.02
2.08
2.12
12.42
53.20
25.00
212.81
2128.11
24.00
1123642.99
1.12
419.52
0.79

528
1.14
2.54
2.89
15.08
74.53
25.00
298.11
2981.14
24.00
1574041.07
1.57
587.68
1.11

528
1.13
3.07
3.48
22.67
81.76
25.00
327.05
3270.49
24.00
1726818.97
1.73
666.21
1.26

518
0.80
3.64
2.89
42.95
46.68
25.00
186.74
1867.38
24.00
967304.00
0.97
361.15
0.70

775
0.48
3.67
1.78
47.09
6.29
25.00
25.16
251.61
24.00
194999.61
0.19
75.23
0.10

775
0.67
3.45
2.33
89.51
-17.37
25.00
-69.48
-694.76
24.00
-538438.59
-0.54
-201.03
-0.26

DE LA REPRESA CAYRAMAYO (CON PROYECTO)

738
0.75
2.33
1.74
44.20
7.97
40.00
19.93
199.26
24.00
147107.12
0.15
56.75
0.08

271
0.46
2.07
0.94
14.14
15.13
40.00
37.81
378.14
24.00
102474.95
0.10
38.26
0.14

411
411
0.64
1.01
1.99
2.07
1.27
2.09
5.87
12.42
32.29
52.29
40.00
40.00
80.72
130.72
807.17
1307.19
24.00
24.00
331744.92
537254.54
0.33
0.54
127.99
200.59
0.31
0.49
303.38

411
1.15
2.52
2.90
15.08
74.91
40.00
187.27
1872.70
24.00
769679.47
0.77
287.37
0.70

RESUMEN DE REQUERIMIENTO HIDRICO


RH(mmc)
SP
CP
TAMBILLO
6.82
3.094
COMIT

411
1.08
3.05
3.31
22.67
76.53
40.00
191.33
1913.26
24.00
786350.82
0.79
303.38
0.74

271
0.76
3.62
2.76
42.95
42.64
40.00
106.61
1066.07
24.00
288905.10
0.29
107.86
0.40

853
0.49
3.65
1.77
47.09
6.11
40.00
15.29
152.87
24.00
130440.35
0.13
50.32
0.06

853
0.69
3.43
2.36
89.51
-16.25
40.00
-40.63
-406.33
24.00
-346711.27
-0.35
-129.45
-0.15

BALANCE HIDRICO DE OFERTA - DEMANDA


(SITUACION SIN PROYECTO - RIEGO POR GRAVEDAD DE LA REPRESA CAYRAMAYO (TAMBILLO)
DESCRIPCION

CAUDAL DEMANDADO(M3/mes)
CAUDAL REGULADO POR LA PRESA(M3/ mes)
BALANCE DEM-OFE (M3/mes)

ENE.

FEB.

MAR.

ABR.

MAY.

JUN.

JUL.

AGOS.

SET.

OCT.

NOV

DIC.

-309702.82

-635027.38

-570849.53

249429.97

334161.17

651233.67

1123642.99

1574041.07

1726818.97

967304.00

194999.61

-538438.59

2382543.94

2151975.17

2382543.94

2305687.68

2382543.94

2305687.68

2382543.94

2382543.94

2305687.68

2382543.94

2305687.68

2382543.94

-2692246.76

-2787002.54

-2953393.46

-2056257.71

-2048382.77

-1654454.01

-1258900.95

-808502.86

-578868.71

-1415239.93

-2110688.07

-2920982.52

( - ) SUPERAVIT
( + ) DEFICIT (FALTA)

BALANCE HIDRICO DE OFERTA - DEMANDA


(SITUACION CON PROYECTO - RIEGO POR GRAVEDAD DEL ( DE LA REPRESA CAYRAMAYO)

DESCRIPCION
CAUDAL DEMANDADO(M3/mes)

ENE.

FEB.

MAR.

ABR.

MAY.

JUN.

JUL.

AGOS.

SET.

OCT.

NOV

DIC.

-194,718.70

-449,750.51

-224,518.40

147,107.12

102,474.95

331,744.92

537,254.54

769,679.47

786,350.82

288,905.10

130,440.35

-346,711.27

0.00

0.00

0.00

147,107.12

102,474.95

331,744.92

537,254.54

769,679.47

786,350.82

288,905.10

130,440.35

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

CAUDAL REGULADO POR LA PRESA(M3/mes)


BALANCE DEM-OFE (M3/mes)
( - ) SUPERAVIT
( + ) DEFICIT

BALANCE HIDRICO DE OFERTA - DEMANDA (CON PROYECTO)

BALANCE HIDRICO DE OFERTA - DEMANDA (SIN PROYECTO)

1,500,000.00

DEMANDA

OFERTA

OFERTA

NOV

DIC.

OCT.

SET.

JUL.

MAY.

DEMANDA

JUN.

MAR.

ABR.

MESES

AGOS.

DIC.

OCT.

NOV

SET.

AGOS.

JUL.

MAY.

JUN.

MAR.

MESES

ENE.

500,000.00

FEB.

VOLUMEN AGUA
(m3 / mes)

1,000,000.00

0.00
ABR.

0.00

ENE.

5000000.00

FEB.

VOLUMEN AGUA
(m3/mes)

10000000.00

Anda mungkin juga menyukai