Twenty Three (23) Years –800 TPD Dry Process integrated Cement Plant
• Design and Capacity Finalisation of Different Electrical and
Instrumentation Equipment in
• Erection and Commissioning of Electrical Machineries in Coordination
with Mechanical and Process Equipment.
• Operation Trial Run Test and Maintenance of Electrical Mechanical
Instrumentation Equipment.
• Operation of The Complete Plant as a Production Manager.
• Retiered as DGM (Tech.) in Year 2002.