Anda di halaman 1dari 2

ETAP

Project:

6.0.0

Location:

Page:

Date:

10-24-2013

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

Filename:

Study Case: LF
analisa Aliran Daya

Branch Losses Summary Report

CKT / Branch
ID

From-To Bus Flow


MW

Mvar

To-From Bus Flow


MW

Mvar

Losses
kW

% Bus Voltage
kvar

Vd
% Drop
in Vmag

From

To

T1

-6.597

-4.948

6.610

5.186

12.8

238.9

129.2

132.7

2.44

Cable2

-6.610

-5.186

6.610

5.137

0.0

-49.5

132.7

132.7

0.00

12.8

189.4

ETAP

Project:

6.0.0

Location:

Page:

Date:

10-24-2013

Contract:

SN:

12345678

Engineer:

Revision:

Base

Config.:

Normal

Filename:

Study Case: LF
analisa Aliran Daya