Anda di halaman 1dari 5
rm x aN gaat in souennesieoes. Peta coer 9 aten oo 1 EMeCoueHrocce Homme cmon Hoc ee | SPENCE yuu asus pion ITIN COMENT OF IMI Fak BEET cmon CoS MEOUCTION BY IN AES () tite onnkem COD TS ISEOSUR TA THUD PET oR 6) Bedann own (3) TS Se FR ay PURPOSE OTHER THAN Tse FOR RICH 7 15 SUPPLIED. Preliminary (Not Use for Construction) mak [et Posco [1 BAP Bait Bia waa [| 8 | Octo7 eR D011 _| Revised due to the change HB. bla pee idle es Fr Sep.16 = ro A ort Revised by client’s requirement. Kins | Acne | Tee oe Sep. | Issued for i 70 [| g | Sepo | !ssued for proposal « wae woes | [97] one DESCRIPTION Ten DeSTeNED | GOED | apPROVED wm | sca eae Cochrane Thermoelectric Power Plant eae 259MW x 1unit + 1 Optional unit 1ST ANGLE BEE osecrion EXPECTED ASH QUANTITIES em | Tm mae AND RAS PROJECTION ASH SIZE DISTRIBUTION Set 108 wo cone 0 We Engineering Gr. THI 2220 99000937-1211 K090-075 iB Power Plant Div. Raving no (27) 4. Purpose of supplemental document This supplemental document is provided for the design information to design ash handling system. 2. Reference Document ‘The expected ash quantities shown in this document is calculated based on the design basis shown in the following documents; 2) Heat Balance Data: The heat balance daa rev03 [28-Sep-11] provided by Posco Eac. b) Fuel Specification :ReferoK090.085 Fuel Specticaton for Boler& Aunlary Design eA (mes 3. Expected Ash Quantities Expected ash quantities for the Maximum Coal and Performance coal for 2 cases shown following are shown in Table-1 Case 1; At firing Max Ash emission and performance coal Max Ash Distribution * System Design Case. Case 2; At firing Max Ash emission and performance coal Normal Ash Distribution reference Case. coe 3; At firing performance coal Max Ash Distribution * System Design Case and Guarantee Case. *T.A; Total Ash E; Fly ash at GAH outlet to AQCS 95% of TA, (sys. design) TL tam erta froma /c; ECO outlet Hopper 410% of TA. (sys. design) 3% of TA. (normal) Q D; AH outlet Hopper 5% of T.A. (sys. design) B; Bottom Ash Tener evs. design) 2% of T.A. (normal) 40% of TA (normal) Note) a) In normal ease, each distribution is calculated in order that total ash (B+C+D+E) is to be equal to 100%. ) In sys. design case, each distribution is led by IHI's experience for application of design of ash handiing system, ‘The Supplier of ash handling system should apply this case to design ash handling system, 2. Expected Ash Size Distribution Expected ash size distribution is shown in Fig-1 WORK NO. CODE NO. 99000937-1211 | _K090-075 8 rerrrs) Table -1 Expected Ash Distribution for Each Case (37) CASE1 CASE 2 CASE 3 System Design Ash Distribution ‘System Design Normal & Guarantee * BMCR BMCR BMCR BMCR TMCR Coal Property (Max Ash coal) |(Performance coal)| (Max Ash coal) | Performance coal)| (Performance coal) Pe NA: 54%" NA: 54%" Nt: 54%" N4: 5436" NA: 54% No: 46%"* IN : 46%" N9: 46%" N9 : 46567" NO : 46%"* Normal ka/ hour kgfhour kgl hour kgihour kgihour % A [Total Ash Generation. 100% 19,000 18,000 18,800 17,600 18,000 B |Bottom Ash 15% 10% 2,850 2,700 1,880 41,800 2,700 C |ECO outlet Hopper 10% 3% 1,900 1,800 600 600 1,800 D |GAH outlet Hopper 5% 2% 1,000 900 400 400 900 E |Fly Ash at GAH outlet 95% 85% 18,000 17,000 16,000 15,000 17,000 F |Sum of B to 125% 100% 23,750 22,500 18,800 17,600 22,500 se this data for esgn ‘ash handling system ‘All of the value shown in the tabulation should be based on 1 week rolling average. ‘Sum of B to E exceed A. These distribution ratio of ash is our recommended design condition for the ash handling plant and for the dust collector. * The guarantee condi “The data marked wit n should be referred to KO90-060 of IHI's document and the guarantee value should be evaluated in the condition of KO90-060 )" shows privious blended coal based on the K090-055:Fuel specification for Boiler and Auxiliary revA based on the RFQ provided by POSCOE&C. ) 4s (emerw) 22RNO HYD 32 UONNGUASIG onued payoIpedd 1-Bla (ui) 921g oped ‘00008 ‘0008 oor o a a a 3 gs Snnanedsasg 228 2 F ‘SBRSRSSRS B9RINEIIASAA S GODENG, 090-075 B WORK NO. 99000937-1211 (%¥) 21g uenlo vey se6e7, qweoied USIEM annemUN, (6 ED 3. Heat flux & Maximum predicted temperature, pressure At terminal between Client and IHI, the following condition in Table-2 should be designed into ash handling system design. I minal Condi for Ash Hand! System No ki Maximum Temp. or Maximum Pressure _| Location Heat Flux (Predictea)** 1. | Bottom Ash Hopper 7,800,000 kJthe** +h 2.0 kPa (Long Term) +/- 8.7 kPa (Short Term) 2 | Economizer Ash Hopper 399 degc +2.0,-3.2 kPa (Long Term) ~ 8.7 kPa (Short Term) + 2.0, -5.0 kPa (Long Term) 3. | AH outlet Ash Hopper 180 degC -9.5 kPa (Short Term) ‘1 Sum of heat flux owing to radiation (calculated by Stefan-Boltzmann law) and heat rate of residues. *2To be released for detail design in detail design stage. WORK NO, ‘GODENG: 99000937-1211 | _K090-075 B errys)

Anda mungkin juga menyukai