LABOUR AND MATERIAL COEFFICIENTS (CIVIL) 2009

LabourandMaterialsCoefficients(CivilWorks)2009

Contents

CONTENTS

1. LabourandMaterialsCoefficients

Sl.No Description

Page

01

DismantlingandDemolition

02

ClearingandGrubbing

03

Earthwork

10

04

Drainage

20

05

Mortars

35

06

ConcreteWorks

37

07

DampProofing

47

08

ReinforcedConcrete

49

09

BrickWork

69

10

Stone/Mud

73

11

WoodWork

84

12

Steel

120

13

Flooring

126

14

TilingWallandFloor

137

15

Roofing

139

16

PlumbingIndoorWork

149

17

PlumbingOutdoorWork

168

18

Plastering

208

19

PaintingandWallPaper

216

20

Additions,AlterationsandRepairs

225

21

RoadWorks

227

2.TransportationWorksheets(MechanicalandManual)

Labour and Material Coefficients (Civil Works) - 2009

CHAPTER 1

DISMANTLING & DEMOLITION WORK

DD0001

Demolishing cement concrete 1:3:6 & richer, including disposal of Materials within 50m lead
Coefficient for per cu.m
Code
Description
LB0077 Labour

DD0002

Quant
2.89000

Demolishing cement concrete 1:4:8 & leaner, including disposal of Materials within 50m lead
Coefficient for per cu.m
Code
Description
LB0077 Labour

DD0003

Units
day

Quant
1.79000

Units
day

Demolishing reinforced concrete, including stacking steel bars and disposal of rubbish within 50m lead
Coefficient for per cu.m
Code
Description
LB0077 Labour

DD0004

Units
day

Demolishing lime concrete and disposal of rubbish within 50m lead


Code
Description
LB0077 Labour

DD0005

Quant
4.21300

Coefficient for per cu.m


Quant
Units
0.76000
day

Demolishing stone rubble masonry including stacking useful materials & disposal of rubbish within
50m lead - in lime mortar
Coefficient for per cu.m
Code
Description
LB0077 Labour

DD0006

Quant
1.10000

Units
day

Demolishing stone rubble masonry including stacking useful materials & disposal of rubbish within
50m lead - in cement mortar
Coefficient for per cu.m
Code
Description
LB0077 Labour

DD0007

Quant
2.25000

Units
day

Dismantling dressed ashlar face stone work including stacking useful materials & disposal of rubbish
within 50m lead - in lime mortar
Coefficient for per cu.m
Code
Description
LB0077 Labour

DD0008

Quant
1.40000

Units
day

Demolishing dressed ashlar face stone work including stacking useful materials & disposal of rubbish
within 50m lead - in cement mortar
Coefficient for per cu.m
Code
Description
LB0077 Labour

DD0009

Quant
2.70000

Units
day

Removing Mortar from stones and cleaning stones and concrete articles and arranging in stacks - In
lime mortar
Coefficient for per cu.m
Code
Description
LB0077 Labour
LB0051 Mason Gd.2

Quant
1.05000
0.08000

Standards & Quality Control Authority, MoWHS

Units
day
day

Labour and Material Coefficients (Civil Works) - 2009

DD0010

Removing Mortar from stones and cleaning stones and concrete articles and arranging in stacks - In
cement mortar
Coefficient for per cu.m
Code
Description
LB0077 Labour
LB0051 Mason Gd.2

DD0011

Quant
1.15000
0.10000

Units
day
day

Demolishing hollow block masonry including stacking useful Materials & disposal of rubbish within
50m lead
Coefficient for per cu.m
Code
Description
LB0077 Labour

DD0012

Quant
4.08500

Demolishing reinforced brickwork, including stacking steel bars and disposal of rubbish within 50m
lead
Coefficient for per cu.m
Code
Description
LB0077 Labour

DD0013

Units
day

Quant
3.77500

Units
day

Extra, for scraping, cleaning, straightening reinforcement from R.C & reinforced brick work
Coefficient for per kg
Code
Description
LB0032 Blacksmith (metal-worker)
LB0077 Labour

DD0014

Quant
0.00330
0.00660

Units
day
day

Extra for cutting reinforcement bars in reinforced cement concrete and reinforced brickwork (payment
to be made the cross sectional area of RCC or RB work)
Coefficient for per sq.m
Code
Description
LB0077 Labour

DD0015

Quant
1.20000

Units
day

Demolishing brick work including stacking useful materials & disposal of rubbish within 50m lead - in
mud mortar
Coefficient for per cu.m
Code
Description
LB0077 Labour

DD0016

Quant
0.65000

Units
day

Demolishing brick work including stacking useful materials & disposal of rubbish within 50m lead - in
lime mortar
Coefficient for per cu.m
Code
Description
LB0077 Labour

DD0017

Quant
0.77000

Units
day

Demolishing brick work including stacking useful materials & disposal of rubbish within 50m lead - in
cement mortar
Coefficient for per cu.m
Code
Description
LB0077 Labour

DD0018

Quant
1.90000

Units
day

Removing Mortar from bricks and cleaning bricks including stacking useful materials within 50m lead from BW in mud mortar
Coefficient for per 1000#
Code
Description
LB0077 Labour
LB0051 Mason Gd.2

Quant
3.90000
0.35000

Standards & Quality Control Authority, MoWHS

Units
day
day

Labour and Material Coefficients (Civil Works) - 2009

DD0019

Removing Mortar from bricks and cleaning bricks including stacking useful materials within 50m lead from BW in lime mortar
Coefficient for per 1000#
Code
Description
LB0077 Labour
LB0051 Mason Gd.2

DD0020

Quant
4.10000
0.70000

Units
day
day

Removing Mortar from bricks and cleaning bricks including stacking useful materials within 50m lead from BW in cement mortar
Coefficient for per 1000#
Code
Description
LB0077 Labour
LB0051 Mason Gd.2

DD0021

Quant
4.85000
1.10000

Dismantling steelwork in single sections including dismembering and stacking within 50m lead in RS
joists
Coefficient for per kg
Code
Description
LB0077 Labour

DD0022

Units
day
day

Quant
0.00340

Units
day

Dismantling steelwork in single sections including dismembering and stacking within 50m lead in
channels, angles, tees and flats
Coefficient for per kg
Code
Description
LB0077 Labour

DD0023

Quant
0.00300

Dismantling steelwork in built up sections in channels, angles, tees and flats in all gusset plates, bolts,
nuts, cutting rivets, welding etc. including dismembering and stacking within 50 m lead
Coefficient for per kg
Code
Description
LB0077 Labour

DD0024

Units
day

Quant
0.00700

Units
day

Dismantling steelwork in built up sections without dismembering and stacking within 50 m lead
Coefficient for per kg
Code
Description
LB0077 Labour

DD0025

Quant
0.00600

Units
day

Dismantling wood work of sectional area 40 sq.cm and above in frames,trusses (<10m span) including
stacking within 50m lead
Coefficient for per cu.m
Code
Description
LB0033 Carpenter Gd.2
LB0077 Labour

DD0026

Quant
1.00000
1.60000

Dismantling wood work of sectional area <40 sq.cm in frames, trusses including stacking within 50m
lead
Coefficient for per m
Code
Description
LB0033 Carpenter Gd.2
LB0077 Labour

DD0027

Units
day
day

Quant
0.05000
0.20000

Units
day
day

Extra for dismantling trusses, rafters, purlins etc. of every additional span of 1 metre or part thereof for
span >10m (sectional area > 40sq.cm)
Coefficient for per cu.m/m span
Code
Description
LB0033 Carpenter Gd. 2
LB0077 Labour

Quant
0.10000
0.45000

Standards & Quality Control Authority, MoWHS

Units
day
day

Labour and Material Coefficients (Civil Works) - 2009

DD0028

Extra for dismantling trusses, rafters, purlins etc. every additional span of 1 metre or part thereof >10m
(sectional area < 40sq.cm)
Coefficient for per cu.m/m span
Code
Description
LB0033 Carpenter Gd. 2
LB0077 Labour

DD0029

Description
Carpenter Gd. 2
Mason Gd.2
Labour

Quant
0.06250
0.12500
0.22500

Description
Carpenter Gd. 2
Mason Gd.2
Labour

Quant
0.08800
0.16300
0.31250

Units
day
day
day

Taking out doors, windows and clerestory windows shutters <3sq.m (steel, wood) including stacking
within 50m lead
Coefficient for per each
Code
Description
LB0051 Mason Gd.2
LB0077 Labour

DD0032

Units
day
day
day

Dismantling doors, windows and clerestory windows >3sq.m (steel/wood) including architrave, hold
fasts, and stacking within 50m lead
Coefficient for per each
Code
LB0033
LB0051
LB0077

DD0031

Units
day
day

Dismantling doors, windows, and clerestory windows <3sq.m (steel, wood) including architrave, hold
fasts, stacking within 50m lead
Coefficient for per each
Code
LB0033
LB0051
LB0077

DD0030

Quant
0.00050
0.00200

Quant
0.06250
0.10000

Units
day
day

Taking out doors, windows and clerestory window shutters >3sq.m (steel or wood) including stacking
within 50m lead
Coefficient for per each
Code
Description
LB0051 Mason Gd.2
LB0077 Labour

DD0040

Quant
0.08800
0.31300

Units
day
day

Dismantling wooden flooring including stacking useful materials & disposal rubbish within 50m lead
Coefficient for per sq.m
Code
Description
LB0033 Carpenter Gd.2
LB0077 Labour

DD0041

Quant
0.05600
0.11200

Dismantling dry brick patching in floors, drains etc including stacking useful materials & disposal of
rubbish within 50m lead
Coefficient for per cu.m
Code
Description
LB0077 Labour

DD0042

Units
day
day

Quant
1.25000

Units
day

Dismantling stone slab flooring laid in cement mortar including stacking useful materials & disposal of
rubbish within 50m lead
Coefficient for per sq.m of stone flooring
Code
Description
LB0051 Mason Gd.2
LB0077 Labour

Quant
0.02500
0.22500

Standards & Quality Control Authority, MoWHS

Units
day
day

Labour and Material Coefficients (Civil Works) - 2009

DD0043

Dismantling jack arch roofing and floors including stacking useful materials & disposal of rubbish
within 50m lead
Coefficient for per sq.m of jack arch roof and floor
Code
Description
LB0077 Labour

DD0045

Quant
0.25000

Units
day

Dismantling G.I sheets including ridges, hips, valleys, gutters, & stacking Materials within 50m lead
Coefficient for per sq.m
Code
Description
LB0033 Carpenter Gd.2
LB0077 Labour

DD0046

Quant
0.06250
0.12500

Units
day
day

Dismantling tiled roofing with batten boarding etc. complete including stacking useful materials &
disposal of rubbish within 50m lead
Coefficient for per sq.m of tile roofing
Code
Description
LB0077 Labour
LB0033 Carpenter Gd.2

DD0050

Quant
0.19500
0.02000

Dismantling expanded metal, fabrics & battens, beading including stacking useful materials within 50m
lead
Coefficient for per sq.m
Code
Description
LB0033 Carpenter Gd.2
LB0077 Labour

DD0055

Quant
0.01250
0.07500

Quant
0.04400

Units
day

Dismantling fence posts, struts/T & L iron/pipes & earth work/demolishing of concrete and stacking
within 50m lead
Coefficient for per each
Code
Description
LB0077 Labour

DD0057

Units
day
day

Dismantling barbed wire, flexible wire including making rolls, & stacking within 50m lead
Coefficient for per kg
Code
Description
LB0077 Labour

DD0056

Units
day
day

Quant
0.41748

Units
day

Dismantling fence posts, struts R.C including earth work/demolishing concrete footings, stacking, 50m
lead
Coefficient for per each
Code
Description
LB0077 Labour

DD0058

Quant
0.49690

Units
day

Cutting ballies/wooden posts at ground or projection above concrete & stacking within 50m lead
Coefficient for per each
Code
Description
LB0077 Labour

DD0065

Quant
0.12500

Units
day

Dismantling cement A.C., celotex, hardboard ceiling, partition, including stacking useful materials,
disposal rubbish within 50m
Coefficient for per sq.m
Code
Description
LB0033 Carpenter Gd.2
LB0077 Labour

Quant
0.02500
0.03800

Standards & Quality Control Authority, MoWHS

Units
day
day

Labour and Material Coefficients (Civil Works) - 2009

DD0066

Dismantling of ekra wall in cement mortar 1:6 or richer including stacking useful materials & disposal
of rubbish within 50m lead
Coefficient for per sq.m
Code
Description
LB0033 Carpenter Gd.2
LB0077 Labour

DD0067

Quant
0.02500
0.09300

Dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including
disposal of rubbish within 50m lead
Coefficient for per sq.m
Code
Description
LB0077 Labour

DD0075

Quant
0.05000

Quant
0.10700

Quant
0.11800

Quant
0.12600

Units
day

Dismantling CI pipes including excavation and refilling trenches after taking out the pipes, breaking
lead caulked joints, melting of lead and making into blocks, stacking of pies at site and disposal of
rubbish within 50m lead - upto 150 mm dia
Coefficient for per m length of pipe
Code
LB0077
LB0054
MT0035
MT0040
MT0042
EW0135

DD0079

Units
day

Demolishing of old S.W pipes including breaking joints, bed concrete, stacking of useful materials &
disposal of rubbish within 50m lead - 200mm dia
Coefficient for per m
Code
Description
LB0077 Labour

DD0078

Units
day

Demolishing of old S.W pipes including breaking joints, bed concrete, stacking of useful materials &
disposal of rubbish within 50m lead - 150mm dia
Coefficient for per m
Code
Description
LB0077 Labour

DD0077

Units
day

Demolishing of old S.W pipes including breaking joints, bed concrete, stacking of useful materials, &
disposal of rubbish within 50m lead - 100mm dia
Coefficient for per m
Code
Description
LB0077 Labour

DD0076

Units
day
day

Description
Labour
plumber Gd. 2
Kerosene
Firewood
Mud dry
Excavation and refilling in all kinds of soil

Quant
0.04720
0.01860
0.00940
0.00086
0.01100
0.40200

Units
day
day
litre
cu.m
cu.m
cu.m

Dismantling CI pipes including excavation and refilling trenches after taking out the pipes, breaking
lead caulked joints, melting of lead and making into blocks, stacking of pies at site and disposal of
rubbish within 50m lead - from 150 mm upto 300 mm
Coefficient for per m length of pipe
Code
LB0077
LB0054
MT0035
MT0040
MT0042
EW0135

Description
Labour
plumber Gd. 2
Kerosene
Firewood
Mud dry
Excavation and refilling in all kinds of soil

Standards & Quality Control Authority, MoWHS

Quant
0.14280
0.04350
0.02830
0.00200
0.05880
0.42870

Units
day
day
litre
cu.m
cu.m
cu.m

Labour and Material Coefficients (Civil Works) - 2009

DD0080

Dismantling CI pipes including excavation and refilling trenches after taking out the pipes, breaking
lead caulked joints, melting of lead and making into blocks, stacking of pies at site and disposal of
rubbish within 50m lead - above 300 mm dia
Coefficient for per m length of pipe
Code
LB0077
LB0054
MT0035
MT0040
MT0042
EW0316

DD0085

Description
Labour
plumber Gd. 2
Kerosene
Firewood
Mud dry
Excavation and refilling in all kinds of soil

Quant
0.29810
0.08690
0.56380
0.00273
0.18080
0.45650

Dismantling of G.I or HDPE pipes of diameter 100mm to 250mm including breaking bed concrete,
clamps, etc. and stacking of useful materials & disposal of rubbish within 50 m lead. - G.I Pipes
Coefficient for per m
Code
Description
LB0077 Labour

DD0086

Units
day
day
litre
cu.m
cu.m
cu.m

Quant
0.09700

Units
day

Dismantling of G.I or HDPE pipes of diameter 100mm to 250mm including breaking bed concrete,
clamps, etc. and stacking of useful materials, & disposal of rubbish within 50 m lead. - H.D.P.E Pipes
Coefficient for per m
Code
Description
LB0077 Labour

DD0090

Quant
0.12800

Dismantling of precast concrete or stone slabs in walls, partition walls etc. including of useful materials
& disposal of rubbish within 50 m lead - upto 40 mm thickness
Coefficient for per sq.m area of wall
Code
Description
LB0077 Labour
LB0051 Mason Gd.2

DD0091

Units
day

Quant
0.23000
0.05000

Units
day
day

Dismantling of precast concrete or stone slabs in walls, partition walls etc. including of useful materials
& disposal of rubbish within 50 m lead - above 40 mm thickness and upto 74mm thickness
Coefficient for per sq.m area of wall
Code
Description
LB0077 Labour
LB0051 Mason Gd.2

DD0095

Quant
0.32500
0.08500

Dismantling water bound macadam road including stacking of useful materials & disposal of rubbish
within 50 m lead
Coefficient for per sq.m area of road
Code
Description
LB0077 Labour

DD0096

Quant
0.22400

Units
day

Dismantling bituminous road including cutting, stacking of useful materials & disposal of rubbish
within 50 m lead
Coefficient for per sq.m area of road
Code
Description
LB0077 Labour

DD0100

Units
day
day

Quant
0.03450

Units
day

Dismantling of flushing cistern of any size including stacking of useful materials & disposal of rubbish
within 50 m lead
Coefficient for per no of flushing cistern
Code
Description
LB0077 Labour
LB0054 Plumber Gd.2

Quant
0.45000
0.35000

Standards & Quality Control Authority, MoWHS

Units
day
day

Labour and Material Coefficients (Civil Works) - 2009

CHAPTER 2

CLEARING AND GRUBBING

CG0001

Clearing grass including removal of rubbish within 50m of site


Coefficient for per sq.m
Code
Description
LB0077 Labour

CG0002

Quant
0.01060

Clearing jungle including uprooting of vegetation & trees of girth < 300mm, disposal within 50m of the
site
Coefficient for per sq.m
Code
Description
LB0077 Labour

CG0010

Units
day

Quant
0.03350

Units
day

Felling trees including cutting of trunks and branches, removal of roots, stacking of serviceable
materials and disposal of rubbish within 50m lead - Girth 300 to 600mm
Coefficient for per each
Code
Description
LB0077 Labour

CG0011

Quant
0.31260

Felling trees including cutting of trunks and branches, removal of roots, stacking of serviceable
materials and disposal of rubbish within 50m lead - Girth 600 to 1200mm
Coefficient for per each
Code
Description
LB0077 Labour

CG0012

Quant
1.41000

Quant
6.56250

Units
day

Felling trees including cutting of trunks and branches, removal of roots, stacking of serviceable
materials and disposal of rubbish within 50m lead - Girth > 2400mm
Coefficient for per each
Code
Description
LB0077 Labour

CG0020

Units
day

Felling trees including cutting of trunks and branches, removal of roots, stacking of serviceable
materials and disposal of rubbish within 50m lead - Girth 1200 to 2400 mm
Coefficient for per each
Code
Description
LB0077 Labour

CG0013

Units
day

Quant
13.12500

Units
day

Felling of trees including removal of roots and disposal of rubbish using bull dozer (excluding cutting
of trunks, branches & stacking) - Girth 300 to 600mm
Coefficient for per Each
Code
Description
MP0208 Bull Dozer ( IH TD20E)

CG0021

Quant
0.00360

Units
day

Felling of trees including removal of roots and disposal of rubbish using bull dozer (excluding cutting
of trunks, branches & stacking) - Girth 600 to 1200mm
Coefficient for per Each
Code
LB0047
MP0208
MT0020
MT0021
MT0022

Description
Blaster
Bull Dozer ( IH TD20E)
Superdyne / Gelatine
Fuse Coil
Detonator

Quant
0.01000
0.01000
0.50000
0.25000
1.00000

Standards & Quality Control Authority, MoWHS

Units
day
day
kg
each
each

Labour and Material Coefficients (Civil Works) - 2009

CG0022

Felling of trees including removal of roots and disposal of rubbish using bull dozer (excluding cutting
of trunks, branches & stacking) - Girth 1200 to 2400 mm
Coefficient for per Each
Code
LB0047
MP0208
MT0020
MT0021
MT0022

CG0023

Description
Blaster
Bull Dozer ( IH TD20E)
Superdyne / Gelatine
Fuse Coil
Detonator

Quant
0.02000
0.02000
1.00000
0.50000
2.00000

Units
day
day
kg
each
each

Felling of trees including removal of roots and disposal of rubbish using bull dozer (excluding cutting
of trunks, branches & stacking) - Girth > 2400mm
Coefficient for per Each
Code
LB0047
MP0208
MT0020
MT0021
MT0022

CG0030

Description
Blaster
Bull Dozer ( IH TD20E)
Superdyne / Gelatine
Fuse Coil
Detonator

Quant
0.04000
0.03500
2.00000
1.00000
4.00000

Units
day
day
kg
each
each

Clearing grass removal of landslide debris & surface material including excav.& disposal within 50m
lead
Coefficient for per cu.m
Code
Description
LB0077 Labour

Quant
0.22600

Standards & Quality Control Authority, MoWHS

Units
day

Labour and Material Coefficients (Civil Works) - 2009

10

CHAPTER 3

EARTH WORK

EW0001

Surface dressing of ground, including removal of vegetations and inequalities < 150mm deep, disposal
of rubbish within 50m lead and 1.5m lifts - Ordinary Soil
Coefficient for per sq.m
Code
Description
LB0077 Labour

EW0002

Quant
0.03390

Units
day

Surface dressing of ground, including removal of vegetations and inequalities < 150mm deep, disposal
of rubbish within 50m lead and 1.5m lifts - Hard Soil
Coefficient for per sq.m
Code
Description
LB0077 Labour

EW0010

Quant
0.04760

Units
day

Ploughing the existing ground to a depth 150mm to 250mm, and watering the same - Ordinary Soil
Coefficient for per sq.m
Code
Description
LB0077 Labour

EW0010

Quant
0.01252

Units
day

Ploughing the existing ground to a depth 150mm to 250mm, and watering the same - Hard Soil
Coefficient for per sq.m
Code
Description
LB0077 Labour

EW0020

Quant
0.03000

Units
day

Earth work in surface excavation, depth <300mm, width >1.5m, area >10 Sq.m in plan, including
disposal of excavated earth within 50m lead & 1.5m lift and disposed soil to be neatly dressed Ordinary soil
Coefficient for per sq.m
Code
Description
LB0077 Labour

EW0020

Quant
0.06260

Units
day

Earth work in surface excavation, depth <300mm, width >1.5m, area >10 Sq.m in plan, including
disposal of excavated earth within 50m lead & 1.5m lift and disposed soil to be neatly dressed - Hard
soil
Coefficient for per sq.m
Code
Description
LB0077 Labour

EW0030

Quant
0.08750

Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including
disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed Ordinary Soil
Coefficient for per cu.m
Code
Description
LB0077 Labour

EW0031

Units
day

Quant
0.43010

Units
day

Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including
disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Hard
Soil
Coefficient for per cu.m
Code
Description
LB0077 Labour

Quant
0.55630

Standards & Quality Control Authority, MoWHS

Units
day

Labour and Material Coefficients (Civil Works) - 2009

EW0032

11

Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including
disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed Ordinary rock with or without blasting
Coefficient for per cu.m
Code
LB0077
MT0020
MT0021
MT0022

EW0033

Description
Labour
Superdyne / Gelatine
Fuse Coil
Detonator

Quant
2.11800
0.39300
0.40000
0.40000

Description
Blacksmith (metal-worker)
Mason Gd.2
Labour

Quant
0.05060
0.30500
3.20720

Units
day
day
day

Quant
0.13000

Units
day

Extra, for every additional lead of 250m beyond 50m upto 1000m and deposit to a level upto 1.5m - All
kinds of soil
Coefficient for per cu.m
Code
LB0077
MP0203
MP0211

EW0046

Units
day
kg
each
each

Extra, for every additional lead of 25m beyond 50m upto 250m and deposit to a level upto 1.5m - All
kinds of soil
Coefficient for per cu.m
Code
Description
LB0077 Labour

EW0040

Units
day
kg
each
each

Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including
disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Hard
rock requiring chiselling (where blasting is prohibited)
Coefficient for per cu.m
Code
LB0032
LB0051
LB0077

EW0035

Quant
1.59600
0.19700
0.20000
0.20000

Earth work in excavation over areas, depth >300mm, width >1.5m, area >10 Sq.m on plan, including
disposal of excavated earth within 50m lead and 1.5m lift & disposed soil to be neatly dressed - Hard
rock requiring blasting
Coefficient for per cu.m
Code
LB0077
MT0020
MT0021
MT0022

EW0034

Description
Labour
Superdyne / Gelatine
Fuse Coil
Detonator

Description
Labour
Pay Loader ( Cat -910)
Truck/Tipper (Tata,1210SK32)

Quant
0.02420
0.00200
0.00610

Units
day
day
day

Earth work in excavation over areas by Dozer including levelling and dressing - All kinds of soils
Coefficient for per cu.m
Code
Description
LB0039 Work Supervisor (Lajab)
MP0208 Bull Dozer ( IH TD20E)

EW0047

Quant
0.00330
0.00370

Units
day
day

Earth work in excavation over areas by Dozer including levelling and dressing - All kinds of rocks (
blasted)
Coefficient for per cu.m
Code
Description
LB0039 Work Supervisor (Lajab)
MP0208 Bull Dozer ( IH TD20E)

Quant
0.00330
0.00500

Standards & Quality Control Authority, MoWHS

Units
day
day

Labour and Material Coefficients (Civil Works) - 2009

EW0055

Blasting of rocks complete excluding the cost of collection and stacking of blasted rock - Ordinary
rock
Coefficient for per cu.m
Code
LB0047
LB0077
MP0212
MT0020
MT0021
MT0022
MT0023

EW0056

12

Description
Blaster
Labour
Compressor (CPS - 300)
Superdyne / Gelatine
Fuse Coil
Detonator
Drill rod- 8'

Quant
0.00250
0.00400
0.00400
0.16600
0.20000
0.20000
0.00250

Units
day
day
day
kg
each
each
each

Blasting of rocks complete excluding the cost of collection and stacking of blasted rock - Hard rock
Coefficient for per cu.m
Code
LB0047
LB0077
MP0212
MT0020
MT0021
MT0022
MT0023

EW0065

Description
Blaster
Labour
Compressor (CPS - 300)
Superdyne / Gelatine
Fuse Coil
Detonator
Drill rod

Quant
0.00500
0.00800
0.00800
0.33200
0.40000
0.40000
0.00500

Units
day
day
day
kg
each
each
each

Breaking of rocks using non-explosive blaster (silent blaster) in over areas, depth >300mm, width
>1.5m, area >10sq.m on plan including stacking of boulders or useful materials and disposal of rubbish
etc complete - Ordinary rock
Coefficient for per cu.m
Code
LB0077
MP0212
MT0023
MT0024

EW0066

Description
Labour
Compressor (CPS - 300)
Drill rod
Silent Blaster

Quant
2.01600
0.00800
0.00125
10.00000

Units
day
day
each
kg

Breaking of rocks using non-explosive blaster (silent blaster) in over areas, depth >300mm, width
>1.5m, area >10sq.m on plan including stacking of boulders or useful materials and disposal of rubbish
etc complete - Hard rock
Coefficient for per cu.m
Code
LB0077
MP0212
MT0023
MT0024

EW0075

Quant
2.50000
0.00800
0.00600
10.00000

Units
day
day
each
kg

Breaking of rocks using non-explosive blaster (silent blaster) in foundation trenches width <1.5m, area
<10sq.m on plan including stacking of boulders or useful materials and disposal of rubbish etc
complete - Ordinary rock
Coefficient for per cu.m
Code
LB0077
MP0212
MT0023
MT0024

EW0076

Description
Labour
Compressor (CPS - 300)
Drill rod
Silent Blaster

Description
Labour
Compressor (CPS - 300)
Drill rod
Silent Blaster

Quant
2.20000
0.00800
0.00125
10.00000

Units
day
day
each
kg

Breaking of rocks using non-explosive blaster (silent blaster) in foundation trenches width <1.5m, area
<10sq.m on plan including stacking of boulders or useful materials and disposal of rubbish etc
complete - Hard rock
Coefficient for per cu.m
Code
LB0077
MP0212
MT0023
MT0024

Description
Labour
Compressor (CPS - 300)
Drill rod
Silent Blaster

Quant
2.80000
0.00800
0.00600
10.00000

Standards & Quality Control Authority, MoWHS

Units
day
day
each
kg

Labour and Material Coefficients (Civil Works) - 2009

EW0085

13

Earth work in rough excavation & banking of excavated earth in layers < 200 mm in depth for road,
flood/guide banks & depressions, including watering, power rolling, dressing, lead upto 50m & 1.5m lift All kinds of Soil
Coefficient for per cu.m
Code
Description
LB0077 Labour
MP0200 Roller, CAT -CS551

EW0096

Quant
0.56538
0.00200

Units
day
day

Banking excavated earth for road, flood banks, guide banks & depressions, in layers <200mm depth,
including watering, rolling & dressing up within 50m lead & 1.5m lift - All kinds of Soil
Coefficient for per cu.m
Code
Description
LB0077 Labour
MP0200 Roller, CAT -CS551

EW0097

Quant
0.34706
0.00200

Units
day
day

Banking excavated earth for road, flood banks, guide banks & depressions, in layers <200mm depth,
including watering, rolling & dressing up within 50m lead & 1.5m lift - Deduction - for not rolling with
power roller in layered banking works
Coefficient for per cu.m
Code
Description
LB0077 Labour
MP0200 Roller, CAT -CS551

EW0098

Quant
0.00100
0.00200

Units
day
day

Banking excavated earth for road, flood banks, guide banks & depressions, in layers <200mm depth,
including watering, rolling & dressing up within 50m lead & 1.5m lift - Deduction - for not watering in
layered, banking works
Coefficient for per cu.m
Code
Description
LB0077 Labour

EW0105

Quant
0.02130

Units
day

Excavation in foundation trenches or drains, not exceeding 1.5m in width or area 10 sq.m on plan, and
depth > 300 mm including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lift Ordinary Soil
Coefficient for per cu.m
Code
Description
LB0077 Labour

EW0106

Quant
0.45880

Units
day

Excavation in foundation trenches or drains, not exceeding 1.5m in width or area 10 sq.m on plan, and
depth > 300 mm including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lift Hard Soil
Coefficient for per cu.m
Code
Description
LB0077 Labour

EW0107

Quant
0.58800

Units
day

Excavation in foundation trenches or drains, not exceeding 1.5m in width or area 10 sq.m on plan, and
depth > 300 mm including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lift Ordinary rock with or without blasting
Coefficient for per cu.m
Code
LB0077
MT0020
MT0021
MT0022

Description
Labour
Superdyne / Gelatine
Fuse Coil
Detonator

Quant
1.68380
0.22500
0.30000
0.30000

Standards & Quality Control Authority, MoWHS

Units
day
kg
each
each

Labour and Material Coefficients (Civil Works) - 2009

EW0108

14

Excavation in foundation trenches or drains, not exceeding 1.5m in width or area 10 sq.m on plan, and
depth > 300 mm including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lift Hard rock requiring blasting
Coefficient for per cu.m
Code
LB0077
MT0020
MT0021
MT0022

EW0109

Description
Labour
Superdyne / Gelatine
Fuse Coil
Detonator

Quant
2.25880
0.64200
0.70000
0.70000

Units
day
kg
each
each

Excavation in foundation trenches or drains not exceeding 1.5m in width or area 10 sq.m on plan, and
depth > 300 mm including dressing & ramming, disposal of surplus soil within 50m lead & 1.5m lift

- Hard rock requiring chiselling (where blasting is prohibited)


Coefficient for per cu.m
Code
LB0032
LB0051
LB0077
EW0115

Description
Blacksmith (metal-worker)
Mason Gd.2
Labour

Quant
0.04400
0.26500
3.31630

Units
day
day
day

Extra for every additional lift of 1.5m or part thereof - All kinds of Soils
Coefficient for per cu.m
Code
Description
LB0077 Labour

EW0116

Quant
0.05000

Units
day

Extra for every additional lift of 1.5m or part thereof - All kinds of rocks
Coefficient for per cu.m
Code
Description
LB0076 Labour

EW0125

Quant
0.08900

Units
day

Extra, for trench, pit works per cu.m per m depth - Under water
Coefficient for per cu.m
Code
Description
LB0077 Labour
MP0201 Water pump AVI type

EW0126

Quant
0.11760
0.01000

Units
day
day

Extra, for trench, pit works per cu.m per m depth - In foul conditions
Coefficient for per cu.m
Code
Description
LB0077 Labour

EW0135

Quant
0.14700

Units
day

Hand excavation and refilling in layers < 200mm, of trenches for pipes & sockets, cables, including
dressing of sides/ ramming of bottom, depth upto 1.5m, disposal of surplus material within lead of 50m:
All kinds of soil
- Pipes, cables etc. 80mm < dia < 300mm
Coefficient for per m
Code
Description
LB0077 Labour

EW0136

Quant
0.64217

Units
day

Hand excavation and refilling in layers < 200mm, of trenches for pipes & sockets, cables, including
dressing of sides/ ramming of bottom, depth upto 1.5m, disposal of surplus material within lead of 50m:
All kinds of Soil
- Pipes, cables etc. dia.>300 mm
Coefficient for per m
Code
Description
LB0077 Labour

Quant
1.00234

Standards & Quality Control Authority, MoWHS

Units
day

Labour and Material Coefficients (Civil Works) - 2009

EW0155

Hand excavation and refilling in layers < 200mm, of trenches for pipes & sockets, cables, including
dressing of sides/ ramming of bottom, depth < 1.5m, disposal of surplus material within lead of 50m:
Ordinary rock with or without blasting
- Pipes, cables etc. 80mm < dia < 300mm
Coefficient for per m
Code
LB0077
MT0020
MT0021
MT0022

EW0156

Quant
2.35878
0.26325
0.35100
0.35100

Units
day
kg
each
each

Description
Labour
Superdyne / Gelatine
Fuse Coil
Detonator

Quant
2.71413
0.30299
0.40398
0.40398

Units
day
kg
each
each

Hand excavation and refilling in layers < 200mm, of trenches for pipes & sockets, cables, including
dressing of sides, ramming of bottom, depth < 1.5m, disposal of surplus material within lead of 50m:
Hard rock requiring blasting
- Pipes, cables etc. 80mm < dia < 300mm
Coefficient for per m
Code
LB0077
MT0020
MT0021
MT0022

EW0166

Description
Labour
Superdyne / Gelatine
Fuse Coil
Detonator

Hand excavation and refilling in layers < 200mm, of trenches for pipes & sockets, cables, including
dressing of sides/ ramming of bottom, depth < 1.5m, disposal of surplus material within lead of 50m:
Ordinary rock with or without blasting
- Pipes, cables etc. dia.> 300mm
Coefficient for per m
Code
LB0077
MT0020
MT0021
MT0022

EW0165

15

Description
Labour
Superdyne / Gelatine
Fuse Coil
Detonator

Quant
3.03154
0.75114
0.81900
0.81900

Units
day
kg
each
each

Hand excavation and refilling in layers < 200mm, of trenches for pipes & sockets, cables, including
dressing of sides, ramming of bottom, depth < 1.5m, disposal of surplus material within lead of 50m:
Hard rock requiring blasting
- Pipes, cables etc. dia.> 300mm
Coefficient for per m
Code
LB0077
MT0020
MT0021
MT0022

EW0175

Description
Labour
Superdyne / Gelatine
Fuse Coil
Detonator

Quant
3.48842
0.86452
0.94262
0.94262

Units
day
kg
each
each

Hand excavation and refilling in layers < 200mm, of trenches for pipes & sockets, cables, including
dressing of sides \ramming of bottom, depth < 1.5m, disposal of surplus material within lead of 50m:
Hard rock requiring chiselling (where blasting is prohibited) - Pipes, cables etc. 80mm < dia < 300mm
Coefficient for per m
Code
LB0032
LB0051
LB0077

Description
Blacksmith (metal-worker)
Mason Gd.2
Labour

Quant
0.05148
0.31005
4.26881

Standards & Quality Control Authority, MoWHS

Units
day
day
day

Labour and Material Coefficients (Civil Works) - 2009

EW0176

16

Hand excavation and refilling in layers < 200mm, of trenches for pipes & sockets, cables, including
dressing of sides \ramming of bottom, depth < 1.5m, disposal of surplus material within lead of 50m:
Hard rock requiring chiselling (where blasting is prohibited) - Pipes, cables etc. dia.> 300mm
Coefficient for per m
Code
LB0032
LB0051
LB0077

EW0185

Description
Blacksmith (metal-worker)
Mason Gd.2
Labour

Quant
0.05925
0.35685
4.91245

Units
day
day
day

Extra for excavating trenches for pipes, cables etc., 1.5 < depth < 3m - All kinds of soil
Coefficient for per m
Code
Description
LB0077 Labour

EW0186

Units
day

Extra for excavating trenches for pipes, cables etc., 1.5 < depth < 3m - Ordinary, hard rock
Coefficient for per m
Code
LB0032
LB0051
LB0077

EW0195

Quant
1.33077

Description
Blacksmith (metal-worker)
Mason Gd.2
Labour

Quant
0.07406
0.44606
6.14056

Units
day
day
day

Filling of trenches, sides of foundations etc. in layers <200mm using selected excavated earth,
ramming etc. within lead 50 m & lift 1.5m
Coefficient for per cu.m
Code
Description
LB0077 Labour

EW0196

Quant
0.29550

Units
day

Providing & laying sand bedding, including watering, ramming, dressing


Coefficient for per cu.m
Code
Description
LB0077 Labour
MT0043 Sand

EW0197

Quant
0.28880
1.00000

Units
day
cu.m

Providing & laying dry earth bedding, including consolidating each deposited layer by watering,
ramming and dressing
Coefficient for per cu.m
Code
Description
LB0077 Labour
MT0042 Mud dry

EW0205

Quant
0.30300
1.00000

Units
day
cu.m

Open timbering over areas including lagging & strutting of trenches, cuts (per sq.m face area timbered)
- Depth not exceeding 1.5m
Coefficient for per sq.m
Code
LB0033
LB0077
MT0325
MT0330

Description
Carpenter Gd.2
Labour
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B' (Mixed Conifer)

Standards & Quality Control Authority, MoWHS

Quant
0.00330
0.00690
0.28330
0.00870

Units
day
day
m
cu.m

Labour and Material Coefficients (Civil Works) - 2009

EW0206

Open timbering over areas including lagging & strutting of trenches, cuts (per sq.m face area timbered)
- 1.5m < depth < 3 m
Coefficient for per sq.m
Code
LB0033
LB0077
MT0325
MT0330

EW0207

17

Description
Carpenter Gd.2
Labour
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B' (Mixed Conifer)

Quant
0.00690
0.01360
0.28330
0.00870

Units
day
day
m
cu.m

Open timbering over areas including lagging & strutting of trenches, cuts (per sq.m face area timbered)
- Depth > 3 m
Coefficient for per sq.m
Code
LB0033
LB0077
MT0325
MT0330

EW0215

Description
Carpenter Gd.2
Labour
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B' (Mixed Conifer)

Quant
0.01390
0.02440
0.28330
0.00870

Units
day
day
m
cu.m

Close timbering over areas including lagging & strutting of trenches, cuts ( per sq.m face area
timbered) - Depth not exceeding 1.5m
Coefficient for per sq.m
Code
LB0033
LB0077
MT0325
MT0330

EW0216

Description
Carpenter Gd.2
Labour
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B' (Mixed Conifer)

Quant
0.00690
0.01390
0.28330
0.02570

Units
day
day
m
cu.m

Close timbering over areas including lagging & strutting of trenches, cuts ( per sq.m face area
timbered) - 1.5m < depth < 3m
Coefficient for per sq.m
Code
LB0033
LB0077
MT0325
MT0330

EW0217

Description
Carpenter Gd.2
Labour
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B' (Mixed Conifer)

Quant
0.01385
0.03500
0.28330
0.02570

Units
day
day
m
cu.m

Close timbering over areas including lagging & strutting of trenches, cuts ( per sq.m face area
timbered) - 3m < depth < 4.5m
Coefficient for per sq.m
Code
LB0033
LB0077
MT0325
MT0330

EW0225

Description
Carpenter Gd.2
Labour
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B' (Mixed Conifer)

Quant
0.02080
0.05600
0.28330
0.02570

Units
day
day
m
cu.m

Close timbering including lagging & strutting of shafts, wells, cess pits, manholes (per sq.m face area
timbered) - Depth not exceeding 1.5m
Coefficient for per sq.m
Code
LB0033
LB0077
MT0325
MT0330

Description
Carpenter Gd.2
Labour
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B' (Mixed Conifer)

Standards & Quality Control Authority, MoWHS

Quant
0.01140
0.02270
0.49940
0.02240

Units
day
day
m
cu.m

Labour and Material Coefficients (Civil Works) - 2009

EW0226

18

Close timbering including lagging & strutting of shafts, wells, cess pits, manholes (per sq.m face area
timbered) - 1.5m < Depth < 3m
Coefficient for per sq.m
Code
LB0033
LB0077
MT0325
MT0330

EW0227

Description
Carpenter Gd.2
Labour
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B' (Mixed Conifer)

Quant
0.02270
0.04730
0.49940
0.02240

Units
day
day
m
cu.m

Close timbering including lagging & strutting of shafts, wells, cess pits, manholes (per sq.m face area
timbered) - 3m < Depth < 4.5m
Coefficient for per sq.m
Code
LB0033
LB0077
MT0325
MT0330

EW0235

Description
Carpenter Gd.2
Labour
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B' (Mixed Conifer)

Quant
0.03600
0.07200
0.49940
0.02240

Units
day
day
m
cu.m

Pumping out water caused by springs, river, seepage, broken water mains, drains, and alike
Coefficient for per cu.m
Code
Description
LB0077 Labour
MP0201 Water pump AVI type

EW0240

Quant
0.22910
0.03440

Units
day
day

Providing and injecting chemical emulsion for Pre-construction anti-termite treatment using aldrin
emulsifiable 0.5% concentration
Coefficient for per sq.m
Code
LB0039
LB0077
MT0030

EW0245

Description
Work Supervisor (Lajab)
Labour
Aldrin Emulsifiable Concentrate 30% (for anti-termite treatment)

Quant
0.02300
0.23000
0.15000

Units
day
day
litre

Providing and injecting chemical emulsion for Post-construction, using aldrin emulsifiable 0.5%
concentration - Along outside of foundation
Coefficient for per m
Code
LB0039
LB0077
MT0030

EW0246

Description
Work Supervisor (Lajab)
Labour
Aldrin Emulsifiable Concentrate 30% (for anti-termite treatment)

Quant
0.08100
0.74800
0.15000

Units
day
day
litre

Providing and injecting chemical emulsion for Post-construction, using aldrin emulsifiable 0.5%
concentration - Along external walls below concrete/ masonry apron
Coefficient for per m
Code
LB0036
LB0039
LB0077
MT0030

Description
Mason Gd.1
Work Supervisor (Lajab)
Labour
Aldrin Emulsifiable Concentrate 30% (for anti-termite treatment)

Standards & Quality Control Authority, MoWHS

Quant
0.05750
0.05750
0.57500
0.02500

Units
day
day
day
litre

Labour and Material Coefficients (Civil Works) - 2009

EW0247

19

Providing and injecting chemical emulsion for Post-construction, using aldrin emulsifiable 0.5%
concentration - Under existing floors including drilling & plugging 12mm holes with mortar 1:2
Coefficient for per sq.m
Code
LB0036
LB0039
LB0077
MT0030

EW0248

Description
Mason Gd.1
Work Supervisor (Lajab)
Labour
Aldrin Emulsifiable Concentrate 30% (for anti-termite treatment)

Quant
0.05750
0.05750
1.15000
0.03300

Units
day
day
day
litre

Providing and injecting chemical emulsion for Post-construction, using aldrin emulsifiable 0.5%
concentration - Voids in masonry including drilling holes at 45 degree & plugging with cement mortar
1:2)
Coefficient for per m
Code
LB0039
LB0077
MT0030

EW0249

Description
Work Supervisor (Lajab)
Labour
Aldrin Emulsifiable Concentrate 30% (for anti-termite treatment)

Quant
0.05750
0.74800
0.01600

Units
day
day
litre

Providing and injecting chemical emulsion for Post-construction, using aldrin emulsifiable 0.5%
concentration - Woodwork (using chemical in oil or kerosene based solution) including drilling &
plugging 6mm holes
Coefficient for per m
Code
LB0033
LB0039
LB0077
MT0030

Description
Carpenter Gd.2
Work Supervisor (Lajab)
Labour
Aldrin Emulsifiable Concentrate 30% (for anti-termite treatment)

Standards & Quality Control Authority, MoWHS

Quant
0.11500
0.05750
0.57500
0.00500

Units
day
day
day
litre

Labour and Material Coefficients (Civil Works) - 2009

20

CHAPTER 4

DRAINAGE

DR0001

Providing and laying 50mm thick Plinth Protection and grouted with fine sand mix including well
rammed, finishing the top smooth - With cement concrete 1:3:6, 20mm aggregates, laid over 75mm
thick layer of compacted gravel (40mm)
Coefficient for per sq.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0080
MT0145

DR0002

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Gravel\Shingles (River stone) - 40mm to 20mm
Cement (OPC / PSC)

Quant
0.00313
0.00250
0.03692
0.00350
0.41453
0.00350
0.00350
0.02950
0.04700
0.07500
0.01100

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Providing and laying 50mm thick Plinth Protection and grouted with fine sand mix including well
rammed, finishing the top smooth - With cement concrete 1:3:6, 20mm gravel or shingles laid over
75mm thick layer of compacted gravel (40mm)
Coefficient for per sq.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0080
MT0081
MT0145

DR0003

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Gravel\Shingles (River stone) - 40mm to 20mm
Gravel\Shingles (River stone) - 20mm to 10mm
Cement (OPC / PSC)

Quant
0.00313
0.00250
0.03692
0.00350
0.41452
0.00350
0.00350
0.08350
0.00600
0.04700
0.01100

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Providing and laying 50mm thick Plinth Protection and grouted with fine sand mix including well
rammed, finishing the top smooth - With cement concrete 1:3:6, 20mm aggregate, laid over 75mm thick
layer of compacted dry brick aggregate (40mm)
Coefficient for per sq.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0126
MT0145

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Brick aggregate
Cement (OPC / PSC)

Quant
0.00319
0.00255
0.03719
0.00357
0.41674
0.00357
0.00357
0.02997
0.04794
0.07500
0.01122

Standards & Quality Control Authority, MoWHS

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Labour and Material Coefficients (Civil Works) - 2009

DR0004

21

Providing and laying 50mm thick Plinth Protection and grouted with fine sand mix including well
rammed, finishing the top smooth - With cement concrete 1:3:6, 20mm gravel or shingles laid on 75mm
thick layer of compacted dry brick aggregate (40mm)
Coefficient for per sq.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0081
MT0126
MT0145

DR0010

Quant
0.00319
0.00255
0.03719
0.00357
0.41674
0.00357
0.00357
0.02997
0.04794
0.07500
0.01122

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Constructing second class brick masonry open surface drain in cement mortar 1:4 including earth
work in excavation 100 mm thick concrete bed 1:5:10, 40mm aggregate and 25mm thick cement
concrete 1:2:4,
12 mm aggregate for filling haunches including 12mm cement plastering 1:4 with a floating coat of neat
cement and disposal of surplus earth etc. complete - 100mm x 200mm depth
Coefficient for per m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0068
MT0071
MT0125
MT0145

DR0011

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Gravel\Shingles (River stone) - 20mm to 10mm
Brick aggregate
Cement (OPC / PSC)

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 40mm
Crushed Rock - 12.5 - 6mm
Bricks 2nd class
Cement (OPC / PSC)

Quant
0.10608
0.00238
0.01653
0.00333
0.37223
0.00333
0.00333
0.04298
0.04005
0.00222
0.01628
0.01571

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
1000#
tonne

Constructing second class brick masonry open surface drain in cement mortar 1:4 including earth
work in excavation 100 mm thick concrete bed 1:5:10, 40mm aggregate and 25mm thick cement
concrete 1:2:4,
12 mm aggregate for filling haunches including 12mm cement plastering 1:4 with a floating coat of neat
cement and disposal of surplus earth etc. complete - 150mm x 200mm depth
Coefficient for per m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0068
MT0071
MT0125
MT0145

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 40mm
Crushed Rock - 12.5 - 6mm
Bricks 2nd class
Cement (OPC / PSC)

Quant
0.10803
0.00270
0.01694
0.00378
0.39505
0.00378
0.00378
0.04600
0.04450
0.00356
0.01628
0.01695

Standards & Quality Control Authority, MoWHS

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
1000#
tonne

Labour and Material Coefficients (Civil Works) - 2009

DR0012

22

Constructing second class brick masonry open surface drain in cement mortar 1:4 including earth
work in excavation 100 mm thick concrete bed 1:5:10, 40mm aggregate and 25mm thick cement
concrete 1:2:4,
12 mm aggregate for filling haunches including 12mm cement plastering 1:4 with a floating coat of neat
cement and disposal of surplus earth etc. complete - 250mm x 300mm depth
Coefficient for per m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0068
MT0071
MT0125
MT0145

DR0013

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 40mm
Crushed Rock - 12.5 - 6mm
Bricks 2nd class
Cement (OPC / PSC)

Quant
0.14527
0.00330
0.02447
0.00462
0.54427
0.00462
0.00462
0.06002
0.05340
0.00534
0.02442
0.02256

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
1000#
tonne

Constructing second class brick masonry open surface drain in cement mortar 1:4 including earth
work in excavation 100 mm thick concrete bed 1:5:10, 40mm aggregate and 25mm thick cement
concrete 1:2:4,
12 mm aggregate for filling haunches including 12mm cement plastering 1:4 with a floating coat of neat
cement and disposal of surplus earth etc. complete - 300mm x 450mm depth
Coefficient for per m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0068
MT0071
MT0125
MT0145

DR0020

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 40mm
Crushed Rock - 12.5 - 6mm
Bricks 2nd class
Cement (OPC / PSC)

Quant
0.18437
0.00350
0.09257
0.00490
0.71695
0.00490
0.00490
0.07022
0.04005
0.02225
0.04680
0.02740

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
1000#
tonne

Extra, for additional depth of brick masonry drain - 100mm wide ........per metre additional depth
Coefficient for per m
Code
LB0036
LB0051
LB0077
MT0043
MT0125
MT0145

DR0021

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Bricks 2nd class
Cement (OPC / PSC)

Quant
0.33380
0.06780
0.98924
0.08432
0.08140
0.03434

Units
day
day
day
cu.m
1000#
tonne

Extra, for additional depth of brick masonry drain - 150mm wide ........per metre additional depth
Coefficient for per m
Code
LB0036
LB0051
LB0077
MT0043
MT0125
MT0145

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Bricks 2nd class
Cement (OPC / PSC)

Quant
0.33380
0.06780
1.01280
0.08432
0.08140
0.03434

Standards & Quality Control Authority, MoWHS

Units
day
day
day
cu.m
1000#
tonne

Labour and Material Coefficients (Civil Works) - 2009

DR0022

23

Extra, for additional depth of brick masonry drain - 250mm wide ........per metre additional depth
Coefficient for per m
Code
LB0036
LB0051
LB0077
MT0043
MT0125
MT0145

DR0030

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Bricks 2nd class
Cement (OPC / PSC)

Quant
0.33380
0.06780
1.05806
0.08432
0.08140
0.03434

Units
day
day
day
cu.m
1000#
tonne

Constructing random rubble masonry open surface drain in cement mortar 1:6 including earth work in
excavation, 100mm thick concrete base 1:5:10, 40 mm aggregate 25mm thick cement concrete 1:2:4,
12mm aggregate for filling haunches, including 20mm cement plaster with a floating coat of neat
cement , disposal of surplus earth - 100 x 200mm depth
Coefficient for per m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0060
MT0068
MT0071
MT0145

DR0031

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Boulder
Crushed Rock - 40mm
Crushed Rock - 12.5 - 6mm
Cement (OPC / PSC)

Quant
0.17370
0.00363
0.16510
0.00508
0.83233
0.00508
0.00508
0.10040
0.12000
0.06230
0.00231
0.03084

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
cu.m
tonne

Constructing random rubble masonry open surface drain in cement mortar 1:6 including earth work in
excavation, 100mm thick concrete base 1:5:10, 40 mm aggregate 25mm thick cement concrete 1:2:4,
12mm aggregate for filling haunches, including 20mm cement plaster with a floating coat of neat
cement , disposal of surplus earth - 150 x 200mm depth
Coefficient for per m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0060
MT0068
MT0071
MT0145

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Boulder
Crushed Rock - 40mm
Crushed Rock - 12.5 - 6mm
Cement (OPC / PSC)

Quant
0.17558
0.00395
0.16549
0.00552
0.85464
0.00552
0.00552
0.10333
0.12000
0.06675
0.00347
0.03202

Standards & Quality Control Authority, MoWHS

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
cu.m
tonne

Labour and Material Coefficients (Civil Works) - 2009

DR0032

24

Constructing random rubble masonry open surface drain in cement mortar 1:6 including earth work in
excavation, 100mm thick concrete base 1:5:10, 40 mm aggregate 25mm thick cement concrete 1:2:4,
12mm aggregate for filling haunches, including 20mm cement plaster with a floating coat of neat
cement , disposal of surplus earth - 250 x 300mm depth
Coefficient for per m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0060
MT0068
MT0071
MT0145

DR0033

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Boulder
Crushed Rock - 40mm
Crushed Rock - 12.5 - 6mm
Cement (OPC / PSC)

Quant
0.21266
0.00457
0.24655
0.00640
1.15009
0.00640
0.00640
0.13512
0.18000
0.07565
0.00570
0.04145

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
cu.m
tonne

Constructing random rubble masonry open surface drain in cement mortar 1:6 including earth work in
excavation, 100mm thick concrete base 1:5:10, 40 mm aggregate 25mm thick cement concrete 1:2:4,
12mm aggregate for filling haunches, including 20mm cement plaster with a floating coat of neat
cement , disposal of surplus earth - 300mm x 450mm depth
Coefficient for per m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0060
MT0068
MT0071
MT0145

DR0040

Quant
0.09618
0.00350
0.80718
0.00490
2.14301
0.00490
0.00490
0.25800
0.60000
0.04005
0.02225
0.06835

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
cu.m
tonne

Extra, for additional depth of random rubble masonry drain - 100mm wide ........per metre additional
depth
Coefficient for per m
Code
LB0036
LB0051
LB0077
MT0043
MT0060
MT0145

DR0041

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Boulder
Crushed Rock - 40mm
Crushed Rock - 12.5 - 6mm
Cement (OPC / PSC)

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Boulder
Cement (OPC / PSC)

Quant
0.43160
0.80280
2.58883
0.27418
0.60000
0.07735

Units
day
day
day
cu.m
cu.m
tonne

Extra, for additional depth of random rubble masonry drain - 150mm wide ........per metre additional
depth
Coefficient for per m
Code
LB0036
LB0051
LB0077
MT0043
MT0060
MT0145

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Boulder
Cement (OPC / PSC)

Quant
0.43160
0.80280
2.61177
0.27418
0.60000
0.07735

Standards & Quality Control Authority, MoWHS

Units
day
day
day
cu.m
cu.m
tonne

Labour and Material Coefficients (Civil Works) - 2009

DR0042

Extra, for additional depth of random rubble masonry drain - 250mm wide ........per metre additional
Coefficient for per m
Code
LB0036
LB0051
LB0077
MT0043
MT0060
MT0145

DR0047

25

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Boulder
Cement (OPC / PSC)

Quant
0.43160
0.80280
2.65765
0.27418
0.60000
0.07735

Units
day
day
day
cu.m
cu.m
tonne

Providing, laying and jointing glazed Stoneware pipes with stiff mixture of cement mortar 1:3 (1
cement : 3 Sand) including testing of joints complete - 100mm dia.
Coefficient for per m
Code
LB0036
LB0051
LB0077
MT0043
MT0145
MT0795

DR0048

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Cement (OPC / PSC)
Stoneware pipes 60 cm long - 100mm dia

Quant
0.04200
0.04200
0.16670
0.00117
0.00057
1.83000

Units
day
day
day
cu.m
tonne
each

Providing, laying and jointing glazed Stone Ware pipes with stiff mixture of cement mortar 1: 3 (1
cement : 3 Sand) including testing of joints complete - 150mm dia.
Coefficient for per m
Code
LB0036
LB0051
LB0077
MT0043
MT0145
MT0796

DR0049

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Cement (OPC / PSC)
Stoneware pipes 60 cm long - 150mm dia

Quant
0.06300
0.06300
0.20830
0.00175
0.00083
1.83000

Units
day
day
day
cu.m
tonne
each

Providing, laying and jointing glazed Stone Ware pipes with stiff mixture of cement mortar 1:3 (1
cement : 3 sand) including testing of joints complete - 200mm dia.
Coefficient for per m
Code
LB0036
LB0051
LB0077
MT0043
MT0145
MT0797

DR0050

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Cement (OPC / PSC)
Stoneware pipes 60 cm long - 200mm dia

Quant
0.07300
0.07300
0.24000
0.00233
0.00110
1.83000

Units
day
day
day
cu.m
tonne
each

Providing, laying and jointing glazed Stone Ware pipes with stiff mixture of cement mortar 1:1 (1
cement : 1 Sand) including testing of joints complete - 100 mm dia.
Coefficient for per m
Code
LB0036
LB0051
LB0077
MT0043
MT0145
MT0795

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Cement (OPC / PSC)
Stoneware pipes 60 cm long - 100mm dia

Standards & Quality Control Authority, MoWHS

Quant
0.04200
0.04200
0.16670
0.00127
0.00167
1.83000

Units
day
day
day
cu.m
tonne
each

Labour and Material Coefficients (Civil Works) - 2009

DR0051

26

Providing, laying and jointing glazed Stone Ware pipes with stiff mixture of cement mortar 1:1 (1
cement : 1 Sand) including testing of joints complete - 150mm dia.
Coefficient for per m
Code
LB0036
LB0051
LB0077
MT0043
MT0145
MT0796

DR0052

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Cement (OPC / PSC)
Stoneware pipes 60 cm long - 150mm dia

Quant
0.06300
0.06300
0.20830
0.00175
0.00250
1.83000

Units
day
day
day
cu.m
tonne
each

Providing, laying and jointing glazed Stone Ware pipes with stiff mixture of cement mortar 1:1 (1
cement : 1 sand) including testing of joints complete - 200mm dia.
Coefficient for per m
Code
LB0036
LB0051
LB0077
MT0043
MT0145
MT0797

DR0053

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Cement (OPC / PSC)
Stoneware pipes 60 cm long - 200mm dia

Quant
0.07300
0.07300
0.24000
0.00233
0.00330
1.83000

Units
day
day
day
cu.m
tonne
each

Providing, laying and jointing glazed Stone Ware pipes with stiff mixture of cement mortar 1:1 (1
cement : 1 sand) including testing of joints complete - 230mm dia.
Coefficient for per m
Code
LB0036
LB0051
LB0077
MT0043
MT0145
MT0778

DR0054

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Cement (OPC / PSC)
Stoneware pipes 60 cm long - 230mm dia

Quant
0.08000
0.08000
0.28000
0.00267
0.03750
1.83000

Units
day
day
day
cu.m
tonne
each

Providing, laying and jointing glazed Stone Ware pipes with stiff mixture of cement mortar 1:1 (1
cement : 1 sand) including testing of joints complete - 250mm dia.
Coefficient for per m
Code
LB0036
LB0051
LB0077
MT0043
MT0145
MT0779

DR0055

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Cement (OPC / PSC)
Stoneware pipes 60 cm long - 250mm dia

Quant
0.08500
0.08500
0.30000
0.00292
0.00417
1.83000

Units
day
day
day
cu.m
tonne
each

Providing, laying and jointing glazed Stone Ware pipes with stiff mixture of cement mortar 1:1 (1
cement : 1 sand) including testing of joints complete - 300mm dia.
Coefficient for per m
Code
LB0036
LB0051
LB0077
MT0043
MT0145
MT0780

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Cement (OPC / PSC)
Stoneware pipes 60 cm long - 300mm dia

Standards & Quality Control Authority, MoWHS

Quant
0.09200
0.09200
0.35000
0.00380
0.00542
1.83000

Units
day
day
day
cu.m
tonne
each

Labour and Material Coefficients (Civil Works) - 2009

DR0056

27

Providing, laying and jointing glazed Stone Ware pipes with stiff mixture of cement mortar 1:1 (1
cement : 1 sand) including testing of joints complete - 350 mm dia.
Coefficient for per m
Code
LB0036
LB0051
LB0077
MT0043
MT0145
MT0781

DR0057

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Cement (OPC / PSC)
Stoneware pipes 60 cm long - 350mm dia

Quant
0.10000
0.10000
0.40000
0.00533
0.00750
1.83000

Units
day
day
day
cu.m
tonne
each

Providing, laying and jointing glazed Stone Ware pipes with stiff mixture of cement mortar 1:1 (1
cement : 1 sand) including testing of joints complete - 400 mm dia.
Coefficient for per m
Code
LB0036
LB0051
LB0077
MT0043
MT0145
MT0782

DR0058

Quant
0.11000
0.11000
0.44000
0.00633
0.00917
1.83000

Units
day
day
day
cu.m
tonne
each

Providing, laying and jointing glazed Stone Ware pipes with stiff mixture of cement mortar 1:1 (1
cement : 1 sand) including testing of joints complete - 500 mm dia.
Coefficient for per m
Code
LB0036
LB0051
LB0077
MT0043
MT0145
MT0793

DR0059

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Cement (OPC / PSC)
Stoneware pipes 60 cm long - 400mm dia

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Cement (OPC / PSC)
Stoneware pipes 60 cm long - 500mm dia

Quant
0.12000
0.12000
0.50000
0.00700
0.01000
1.83000

Units
day
day
day
cu.m
tonne
each

Providing, laying and jointing glazed Stone Ware pipes with stiff mixture of cement mortar 1:1 (1
cement : 1 sand) including testing of joints complete - 600 mm dia.
Coefficient for per m
Code
LB0036
LB0051
LB0077
MT0043
MT0145
MT0794

DR0060

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Cement (OPC / PSC)
Stoneware pipes 60 cm long - 600mm dia

Quant
0.13000
0.13000
0.55000
0.00800
0.01133
1.83000

Units
day
day
day
cu.m
tonne
each

Providing and laying cement concrete 1:5:10, 40mm aggregates encasing Stone Ware pipes including
150mm concrete bed - 100mm dia. S.W pipe
Coefficient for per m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0068
MT0145

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 40mm
Cement (OPC / PSC)

Quant
0.01137
0.00910
0.01137
0.01274
0.40268
0.01274
0.01274
0.08554
0.16198
0.02384

Standards & Quality Control Authority, MoWHS

Units
day
day
day
day
day
day
day
cu.m
cu.m
tonne

Labour and Material Coefficients (Civil Works) - 2009

DR0061

28

Providing and laying cement concrete 1:5:10, 40mm aggregates encasing Stone Ware pipes including
150mm concrete bed - 150mm dia. S.W pipe
Coefficient for per m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0068
MT0145

DR0062

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 40mm
Cement (OPC / PSC)

Quant
0.01219
0.00975
0.01219
0.01365
0.43144
0.01365
0.01365
0.09165
0.17355
0.02554

Units
day
day
day
day
day
day
day
cu.m
cu.m
tonne

Providing and laying cement concrete 1:5:10, 40mm aggregates encasing Stone Ware pipes including
150mm concrete bed - 200mm dia. S.W pipe
Coefficient for per m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0068
MT0145

DR0070

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 40mm
Cement (OPC / PSC)

Quant
0.01400
0.01120
0.01400
0.01568
0.49560
0.01568
0.01568
0.10528
0.19936
0.02934

Units
day
day
day
day
day
day
day
cu.m
cu.m
tonne

P&L cement concrete 1:5:10, 40mm aggregates upto haunches of S.W pipes including 150mm
concrete bed - 100mm dia. S.W pipe
Coefficient for per m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0068
MT0145

DR0071

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 40mm
Cement (OPC / PSC)

Quant
0.00763
0.00610
0.00763
0.00854
0.26992
0.00854
0.00854
0.05734
0.10858
0.01598

Units
day
day
day
day
day
day
day
cu.m
cu.m
tonne

P&L cement concrete 1:5:10, 40mm aggregates upto haunches of S.W pipes including 150mm
concrete bed - 150mm dia. S.W pipe
Coefficient for per m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0068
MT0145

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 40mm
Cement (OPC / PSC)

Quant
0.00838
0.00670
0.00838
0.00938
0.29648
0.00938
0.00938
0.06298
0.11926
0.01755

Standards & Quality Control Authority, MoWHS

Units
day
day
day
day
day
day
day
cu.m
cu.m
tonne

Labour and Material Coefficients (Civil Works) - 2009

DR0072

29

P&L cement concrete 1:5:10, 40mm aggregates upto haunches of S.W pipes including 150mm
concrete bed - 200mm dia. S.W pipe
Coefficient for per m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0068
MT0145

DR0080

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 40mm
Cement (OPC / PSC)

Quant
0.00975
0.00780
0.00975
0.01092
0.34515
0.01092
0.01092
0.07332
0.13884
0.02044

Units
day
day
day
day
day
day
day
cu.m
cu.m
tonne

Providing & fixing square mouth S.W gully-trap A-grade including C.I grating, C.I. cover with frame of
300 x 300 mm, brick masonry chamber - 100 x 100mm P Type
Coefficient for per each
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0068
MT0070
MT0125
MT0145

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 40mm
Crushed Rock - 20mm
Bricks 2nd class
Cement (OPC / PSC)

Watertight C.I. Manhole Cover with frame, 300 x 300mm inside size Wt. of
MT0750 cover not less than 4.53 kg, wt. of frame not less than 2.72 kg
MT0766 Cast Iron - Grating
MT0800 S/W trap - P Type - 100 x 100mm
DR0081

Quant
0.08123
0.00430
0.04266
0.00602
0.44884
0.00602
0.00602
0.07416
0.07120
0.00534
0.04477
0.02370

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
1000#
tonne

1.00000
1.00000
1.00000

each
each
each

Providing & fixing square mouth S.W gully-trap A-grade including C.I grating, C.I. cover with frame of
300 x 300 mm, brick masonry chamber - 150 x 100mm P or S Type
Coefficient for per each
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0125
MT0145
MT0750

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Bricks 2nd class
Cement (OPC / PSC)
Watertight C.I. Manhole Cover with frame, 300 x 300mm inside size Wt. of
cover not less than 4.53 kg wt. of frame not less than 2.72 kg
MT0766 Cast Iron - Grating
MT0801 S\W trap - P Type - 150 x 100mm

Standards & Quality Control Authority, MoWHS

Quant
0.11485
0.00030
0.07496
0.00042
0.47939
0.00042
0.00042
0.06614
0.00534
0.08954
0.02184
1.00000

Units
day
day
day
day
day
day
day
cu.m
cu.m
1000#
tonne
each

1.00000
1.00000

each
each

Labour and Material Coefficients (Civil Works) - 2009

DR0082

30

Providing & fixing square mouth S.W gully-trap A-grade including C.I grating, C.I. cover with frame of
300 x 300 mm, brick masonry chamber - 180 x 150mm P or S Type
Coefficient for per each
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0068
MT0070
MT0125
MT0145
MT0750

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 40mm
Crushed Rock - 20mm
Bricks 2nd class
Cement (OPC / PSC)
Watertight C.I. Manhole Cover with frame, 300 x 300mm inside size Wt. of
cover not less than 4.53 kg wt. of frame not less than 2.72 kg
MT0766 Cast Iron - Grating
MT0802 SW trap - P Type - 180 x 150mm

DR0088

Quant
0.06732
0.00700
0.04604
0.00980
0.54463
0.00980
0.00980
0.09619
0.07120
0.05340
0.04477
0.03981
1.00000

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
1000#
tonne
each

1.00000
1.00000

each
each

P&L NP2 class R.C pipes, including collars, jointing in cement mortar 1:2 including testing of joints etc.
complete - 100mm dia.
Coefficient for per m
Code
LB0036
LB0051
LB0077
MT0043
MT0145
MT0768
MT0783

DR0089

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Cement (OPC / PSC)
NP2 class - 100mm dia
NP2 Class Collar - 100mm dia

Quant
0.02250
0.02250
0.09000
0.00065
0.00470
1.00000
0.40000

Units
day
day
day
cu.m
tonne
m
each

P&L NP2 class R.C pipes, including collars, jointing in cement mortar 1:2 including testing of joints etc.
complete - 150mm dia.
Coefficient for per m
Code
LB0036
LB0051
LB0077
MT0043
MT0145
MT0769
MT0784

DR0090

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Cement (OPC / PSC)
NP2 class - 150mm dia
NP2 Class Collar - 150mm dia

Quant
0.02750
0.02750
0.10000
0.00080
0.00580
1.00000
0.40000

Units
day
day
day
cu.m
tonne
m
each

P&L NP2 class R.C pipes, including collars, jointing in cement mortar 1:2 including testing of joints etc.
complete - 225mm dia.
Coefficient for per m
Code
LB0036
LB0051
LB0077
MT0043
MT0145
MT0770
MT0785

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Cement (OPC / PSC)
NP2 class - 225mm dia
NP2 Class Collar - 225mm dia

Quant
0.06750
0.06750
0.21630
0.00120
0.00090
1.00000
0.50000

Standards & Quality Control Authority, MoWHS

Units
day
day
day
cu.m
tonne
m
each

Labour and Material Coefficients (Civil Works) - 2009

DR0091

P&L NP2 class R.C pipes, including collars, jointing in cement mortar 1:2 including testing of joints etc.
complete - 300mm dia.
Coefficient for per m
Code
LB0036
LB0051
LB0077
MT0043
MT0145
MT0771
MT0786

DR0092

31

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Cement (OPC / PSC)
NP2 class - 300mm dia
NP2 Class Collar - 300mm dia

Quant
0.07400
0.07400
0.17000
0.00150
0.00110
1.00000
0.40000

Units
day
day
day
cu.m
tonne
m
each

P&L NP2 class R.C pipes, including collars, jointing in cement mortar 1:2 including testing of joints etc.
complete - 450mm dia.
Coefficient for per m
Code
LB0036
LB0051
LB0077
MT0043
MT0145
MT0772
MT0787

DR0093

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Cement (OPC / PSC)
NP2 class - 450mm dia
NP2 Class Collar - 450mm dia

Quant
0.09400
0.09400
0.22880
0.00330
0.00240
1.00000
0.40000

Units
day
day
day
cu.m
tonne
m
each

P&L NP2 class R.C pipes, including collars, jointing in cement mortar 1:2 including testing of joints etc.
complete - 600mm dia.
Coefficient for per m
Code
LB0036
LB0051
LB0077
MT0043
MT0145
MT0773
MT0788

DR0094

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Cement (OPC / PSC)
NP2 class - 600mm dia
NP2 Class Collar - 600mm dia

Quant
0.11500
0.11500
0.27000
0.00430
0.00320
1.00000
0.40000

Units
day
day
day
cu.m
tonne
m
each

P&L NP2 class R.C pipes, including collars, jointing in cement mortar 1:2 including testing of joints etc.
complete - 750mm dia.
Coefficient for per m
Code
LB0036
LB0051
LB0077
MT0043
MT0145
MT0774
MT0789

DR0095

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Cement (OPC / PSC)
NP2 class - 750mm dia
NP2 Class Collar - 750mm dia

Quant
0.10200
0.10200
0.35000
0.00360
0.00260
1.00000
0.40000

Units
day
day
day
cu.m
tonne
m
each

P&L NP2 class R.C pipes, including collars, jointing in cement mortar 1:2 including testing of joints etc.
complete - 900mm dia
Coefficient for per m
Code
LB0036
LB0051
LB0077
MT0043
MT0145
MT0775
MT0790

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Cement (OPC / PSC)
NP2 class - 900mm dia
NP2 Class Collar - 900mm dia

Quant
0.15600
0.15600
0.43750
0.00660
0.00500
1.00000
0.40000

Standards & Quality Control Authority, MoWHS

Units
day
day
day
cu.m
tonne
m
each

Labour and Material Coefficients (Civil Works) - 2009

DR0096

32

P&L NP2 class R.C pipes, including collars, jointing in cement mortar 1:2 including testing of joints etc.
complete - 1050mm dia.
Coefficient for per m
Code
LB0036
LB0051
LB0077
MT0043
MT0145
MT0776
MT0791

DR0097

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Cement (OPC / PSC)
NP2 class - 1050mm dia
NP2 Class Collar - 1050mm dia

Quant
0.04000
0.04000
0.09800
0.00060
0.00050
1.00000
0.50000

Units
day
day
day
cu.m
tonne
m
each

P&L NP2 class R.C pipes, including collars, jointing in cement mortar 1:2 including testing of joints etc.
complete - 1200mm dia.
Coefficient for per m
Code
LB0036
LB0051
LB0077
MT0043
MT0145
MT0777
MT0792

DR0105

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Cement (OPC / PSC)
NP2 class - 1200mm dia
NP2 Class Collar - 1200mm dia

Quant
0.04900
0.04900
0.50000
0.00080
0.00060
1.00000
0.50000

Units
day
day
day
cu.m
tonne
m
each

Constructing Brick masonry manhole in cement mortar 1:5, R.C.C top slab with 1:2:4 20mm
aggregates, foundation concrete 1:4:8 40mm aggregates, 12mm plaster in CM 1:3 finished with floating
coat of neat cement
and making channels in cement concrete 1:2:4 20mm aggregates, neatly finished complete - Inside
dimension 900 x 800mm & 450mm deep including C.I. cover & frame (weight >38kg.)
Coefficient for per each
Code
LB0032
LB0033
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0068
MT0070
MT0125
MT0145
MT0208
MT0325
MT0330
MT0751

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 40mm
Crushed Rock - 20mm
Bricks 2nd class
Cement (OPC / PSC)
Thermo - Mechanically Treated ( TMT ) bars (yield strength 415 MPa)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
C.I. manhole cover with frame (light duty) internal dimension 455 x 610mm
Total weight of Cover and frame not less than 38 kg. (Cover 23 kg. and frame
15 kg.)

Standards & Quality Control Authority, MoWHS

Quant
0.11413
0.24640
0.26231
0.04650
0.22906
0.05180
2.84746
0.05180
0.05180
0.42048
0.34710
0.31150
0.11803
0.20362
9.58650
0.91300
0.00739
1.00000

Units
day
day
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
1000#
tonne
kg
m
cu.m
each

Labour and Material Coefficients (Civil Works) - 2009

DR0106

33

Constructing Brick masonry manhole in cement mortar 1:5, R.C.C top slab with 1:2:4 20mm
aggregates, foundation concrete 1:4:8 40mm aggregates, 12mm plaster in CM 1:3 finished with
floating coat of neat
cement and making channels in cement concrete 1:2:4 20mm aggregates, neatly finished complete Inside dimension 900 x 800mm & 600mm deep including C.I. cover & frame (weight >38kg.)

Coefficient for per each


Code
LB0032
LB0033
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0068
MT0070
MT0125
MT0145
MT0208
MT0325
MT0330
MT0751

DR0107

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 40mm
Crushed Rock - 20mm
Bricks 2nd class
Cement (OPC / PSC)
Thermo - Mechanically Treated ( TMT ) bars (yield strength 415 MPa)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
C.I. manhole cover with frame (light duty) internal dimension 455 x 610mm
Total weight of Cover and frame not less than 38 kg. (Cover 23 kg. and frame
15 kg.)

Quant
0.11413
0.06864
0.37082
0.04650
0.26974
0.05180
3.05056
0.05180
0.05180
0.46044
0.34710
0.31150
0.16687
0.21778
9.58650
0.18480
0.00594
1.00000

Units
day
day
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
1000#
tonne
kg
m
cu.m
each

Constructing Brick masonry manhole in cement mortar 1:5, R.C.C top slab with 1:2:4 20mm
aggregates, foundation concrete 1:4:8 40mm aggregates, 12mm plaster in CM 1:3 finished with
floating coat of neat
cement and making channels in cement concrete 1:2:4 20mm aggregates, neatly finished complete Inside dimension 1200 x 900mm & 900mm deep including C.I. cover & frame (weight >116kg.)

Coefficient for per each


Code
LB0032
LB0033
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0068
MT0070
MT0125
MT0145
MT0208
MT0325
MT0330
MT0752

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 40mm
Crushed Rock - 20mm
Bricks 2nd class
Cement (OPC / PSC)
Thermo - Mechanically Treated ( TMT ) bars (yield strength 415 MPa)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
C.I. manhole cover and frame (medium duty) 500mm internal dia. Total weight
of cover and frame not less than 116 kg. (cover 58 kg. and frame 58 kg)

Standards & Quality Control Authority, MoWHS

Quant
0.28325
0.13728
0.73808
0.06600
0.44681
0.07280
5.27458
0.07280
0.07280
0.72062
0.45390
0.47170
0.32153
0.33912
23.79300
0.36960
0.01188
1.00000

Units
day
day
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
1000#
tonne
kg
m
cu.m
each

Labour and Material Coefficients (Civil Works) - 2009

DR0115

34

Extra, for additional depth of manholes - 900 x 800mm


Coefficient for per m
Code
LB0036
LB0051
LB0077
MT0043
MT0125
MT0145

DR0116

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Bricks 2nd class
Cement (OPC / PSC)

Quant
0.73696
0.28476
2.19049
0.27709
0.34188
0.09755

Units
day
day
day
cu.m
1000#
tonne

Extra, for additional depth of manholes - 1200 x 900mm


Coefficient for per m
Code
LB0036
LB0051
LB0077
MT0043
MT0125
MT0145

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Bricks 2nd class
Cement (OPC / PSC)

Quant
0.89760
0.33900
2.63549
0.33221
0.40700
0.11758

Standards & Quality Control Authority, MoWHS

Units
day
day
day
cu.m
1000#
tonne

Labour and Material Coefficients (Civil Works) - 2009

CHAPTER 5

MORTARS

MR0001

Cement mortar 1:1 (1 cement : 1 sand)

35

Coefficient for per cu.m


Code
LB0077
MT0043
MT0145
MR0002

Description
Labour
Sand
Cement (OPC / PSC)

Quant
1.12500
0.71250
1.02000

Units
day
cu.m
tonne

Cement mortar 1:2 (1 cement : 2 sand)


Coefficient for per cu.m
Code
LB0077
MT0043
MT0145

MR0003

Description
Labour
Sand
Cement (OPC / PSC)

Quant
1.12500
0.95000
0.68000

Units
day
cu.m
tonne

Cement mortar 1:3 (1 cement : 3 sand)


Coefficient for per cu.m
Code
LB0077
MT0043
MT0145

MR0004

Description
Labour
Sand
Cement (OPC / PSC)

Quant
1.12500
1.07000
0.51000

Units
day
cu.m
tonne

Cement mortar 1:4 (1 cement : 4 sand)


Coefficient for per cu.m
Code
LB0077
MT0043
MT0145

MR0005

Description
Labour
Sand
Cement (OPC / PSC)

Quant
1.12500
1.07000
0.38000

Units
day
cu.m
tonne

Cement mortar 1:5 (1 cement : 5 sand)


Coefficient for per cu.m
Code
LB0077
MT0043
MT0145

MR0006

Description
Labour
Sand
Cement (OPC / PSC)

Quant
1.12500
1.07000
0.31000

Units
day
cu.m
tonne

Cement mortar 1:6 (1 cement : 6 sand)


Coefficient for per cu.m
Code
LB0077
MT0043
MT0145

MR0010

Description
Labour
Sand
Cement (OPC / PSC)

Quant
1.12500
1.07000
0.25000

Units
day
cu.m
tonne

Lime mortar 1:2 (1 lime putty : 2 Brick Powder)


Coefficient for per cu.m
Code
LB0077
MT0120
MT0127

Description
Labour
Slaked lime
Graded brick aggregate

Quant
1.68750
270.00000
0.95000

Standards & Quality Control Authority, MoWHS

Units
day
kg
cu.m

Labour and Material Coefficients (Civil Works) - 2009

MR0011

36

Lime Mortar 1:1 :1 (1 Lime putty : 1 Brick Powder : 1 Sand)


Coefficient for per cu.m
Code
LB0077
MT0121
MT0127
MT0043

MR0015

Description
Labour
Unslaked lime
Graded brick aggregate
Sand

Quant
1.45000
301.00000
0.47500
0.47500

Units
day
kg
cu.m
cu.m

Mud mortar
Coefficient for per cu.m
Code
Description
LB0077 Labour
MT0042 Mud dry

MR0020

Quant
1.13750
1.20000

Units
day
cu.m

White Cement mortar 1:2 (1 white cement : 2 sand)


Coefficient for per cu.m
Code
LB0077
MT0146
MT0043

MR0021

Description
Labour
White Cement
sand

Quant
0.95000
0.68400
0.95000

Units
day
tonne
cu.m

White Cement mortar 1:3 (1 white cement : 3 sand)


Coefficient for per cu.m
Code
LB0077
MT0146
MT0043

MR0022

Description
Labour
White Cement
sand

Quant
0.95000
0.51000
1.07000

Units
day
tonne
cu.m

White Cement mortar 1:5 (1 white cement : 5 sand)


Coefficient for per cu.m
Code
LB0077
MT0146
MT0043

MR0025

Description
Labour
White Cement
sand

Quant
0.95000
0.31000
1.07000

Units
day
tonne
cu.m

Cement lime mortar 1:1:3 (1 cement : 1 lime putty : 3 sand)


Coefficient for per cu.m
Code
LB0077
MT0145
MT0043
MT0121

MR0026

Description
Labour
Cement
sand
unslaked lime

Quant
1.40000
0.41000
0.86000
181.00000

Units
day
tonne
cu.m
kg

Cement lime mortar 1:1:6 (1 cement : 1 lime putty : 3 sand)


Coefficient for per cu.m
Code
LB0077
MT0145
MT0043
MT0121

Description
Labour
Cement
sand
unslaked lime

Quant
1.40000
0.25000
1.07000
113.00000

Standards & Quality Control Authority, MoWHS

Units
day
tonne
cu.m
kg

Labour and Material Coefficients (Civil Works) - 2009

37

CHAPTER 6

CONCRETE WORK

CW0001

Providing and laying in position plain cement concrete 1:1:2 (1 cement : 1 sand : 2 graded crushed
rock 20 mm nominal size) excluding the cost of centering and shuttering - All work upto plinth level.
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

CW0002

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20 mm
Crushed Rock - 12.5 mm - 6 mm
Cement (OPC / PSC)

Quant
0.06250
0.05000
0.06250
0.07000
1.57500
0.07000
0.07000
0.45000
0.67500
0.22500
0.61000

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Providing and laying in position plain cement concrete 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed
rock 20 mm nominal size) excluding the cost of centering and shuttering - All work upto plinth level.
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

CW0003

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20 mm
Crushed Rock - 12.5 mm - 6 mm
Cement (OPC / PSC)

Quant
0.06250
0.05000
0.06250
0.07000
1.57500
0.07000
0.07000
0.44100
0.66150
0.22050
0.40300

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Providing and laying in position plain cement concrete 1:2:4 (1 cement : 2 sand : 4 crushed rock 20
mm nominal size) excluding the cost of centering and shuttering - All work upto plinth level.
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20 mm
Crushed Rock - 12.5 mm - 6 mm
Cement (OPC / PSC)

Quant
0.06250
0.05000
0.06250
0.07000
1.57500
0.07000
0.07000
0.47000
0.70500
0.23500
0.32130

Standards & Quality Control Authority, MoWHS

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Labour and Material Coefficients (Civil Works) - 2009

CW0004

38

Providing and laying in position plain cement concrete 1:2:4 (1 cement : 2 sand : 4 graded crushed
rock 40 mm nominal size) excluding the cost of centering and shuttering - All work upto plinth level.
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0068
MT0070
MT0071
MT0145

CW0005

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 40 mm
Crushed Rock - 20 mm
Crushed Rock - 12.5 mm- 6 mm
Cement (OPC / PSC)

Quant
0.06250
0.05000
0.06250
0.07000
1.80500
0.07000
0.07000
0.47000
0.54400
0.24100
0.12600
0.32130

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
cu.m
tonne

Providing and laying in position plain cement concrete 1:3:6 (1 cement : 3 sand : 6 graded crushed
rock 20 mm nominal size) excluding the cost of centering and shuttering - All work upto plinth level.
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

CW0006

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20 mm
Crushed Rock - 12.5 mm - 6 mm
Cement (OPC / PSC)

Quant
0.06250
0.05000
0.06250
0.07000
1.80500
0.07000
0.07000
0.48500
0.72700
0.24200
0.22000

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Providing and laying in position plain cement concrete 1:3:6 (1 cement : 3 sand : 6 graded crushed
rock 40 mm nominal size) excluding the cost of centering and shuttering - All work upto plinth level.
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0068
MT0070
MT0145

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 40 mm
Crushed Rock - 20 mm
Cement (OPC / PSC)

Quant
0.06250
0.05000
0.06250
0.07000
1.80500
0.07000
0.07000
0.48500
0.67200
0.26200
0.22000

Standards & Quality Control Authority, MoWHS

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Labour and Material Coefficients (Civil Works) - 2009

CW0007

39

Providing and laying in position plain cement concrete 1:3:6 (1 cement : 3 sand : 6 graded
gravel/shingles 40 mm nominal size) excluding the cost of centering and shuttering - All work upto
plinth level.
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0080
MT0081
MT0145

CW0008

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Gravel/Shingles ( river stone) 40 mm to 20 mm
Gravel/Shingles ( river stone) 20 mm to 10 mm
Cement (OPC / PSC)

Quant
0.06250
0.05000
0.06250
0.07000
1.80500
0.07000
0.07000
0.48500
0.67200
0.26200
0.22000

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Providing and laying in position plain cement concrete 1:4:8 (1 cement : 4 sand : 8 graded crushed
stone 40 mm nominal size) excluding the cost of centering and shuttering - All work upto plinth level.
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0068
MT0070
MT0145

CW0009

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed rock 40 mm
Crushed rock 20 mm
Cement (OPC / PSC)

Quant
0.06250
0.05000
0.06250
0.07000
1.42500
0.07000
0.07000
0.50000
0.68830
0.27500
0.17000

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Providing and laying in position plain cement concrete 1:4:8 (1 cement : 4 sand : 8 graded crushed
stone 50 mm nominal size) excluding the cost of centering and shuttering - All work upto plinth level.
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0067
MT0070
MT0145

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed rock 50 mm
Crushed rock 20 mm
Cement (OPC / PSC)

Quant
0.06250
0.05000
0.06250
0.07000
1.42500
0.07000
0.07000
0.50000
0.68830
0.27500
0.17000

Standards & Quality Control Authority, MoWHS

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Labour and Material Coefficients (Civil Works) - 2009

CW0010

Providing and laying in position plain cement concrete 1:4:8 (1 cement : 4 sand : 8 graded
gravel/shingles 40 mm nominal size) excluding the cost of centering and shuttering - All work upto
plinth level.
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0080
MT0081
MT0145

CW0011

40

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Gravel/Shingles ( river stone) 40 mm to 20 mm
Gravel/Shingles ( river stone) 20 mm to 10 mm
Cement (OPC / PSC)

Quant
0.06250
0.05000
0.06250
0.07000
1.42500
0.07000
0.07000
0.50000
0.68830
0.27500
0.17000

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Providing and laying in position plain cement concrete 1:5:10 (1 cement : 5 sand : 10 graded crushed
stone 40 mm nominal size) excluding the cost of centering and shuttering - All work upto plinth level.
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0068
MT0070
MT0145

CW0012

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed rock 40 mm
Crushed rock 20 mm
Cement (OPC / PSC)

Quant
0.06250
0.05000
0.06250
0.07000
1.42500
0.07000
0.07000
0.47500
0.66230
0.25830
0.13100

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Providing and laying in position plain cement concrete 1:5:10 (1 cement : 5 sand : 10 graded crushed
stone 50 mm nominal size) excluding the cost of centering and shuttering - All work upto plinth level.
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0067
MT0070
MT0145

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed rock 50 mm
Crushed rock 20 mm
Cement (OPC / PSC)

Quant
0.06250
0.05000
0.06250
0.07000
1.37500
0.07000
0.07000
0.47500
0.66230
0.25830
0.13100

Standards & Quality Control Authority, MoWHS

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Labour and Material Coefficients (Civil Works) - 2009

CW0013

41

Providing and laying in position plain cement concrete 1:5:10 (1 cement : 5 sand : 10 graded
gravel/shingles 40 mm nominal size) excluding the cost of centering and shuttering - All work upto
plinth level.
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0080
MT0081
MT0145

CW0020

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Gravel/Shingles ( river stone) 40 mm to 20 mm
Gravel/Shingles ( river stone) 20 mm to 10 mm
Cement (OPC / PSC)

Quant
0.06250
0.05000
0.06250
0.07000
1.37500
0.07000
0.07000
0.47500
0.66230
0.25830
0.13100

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Providing and laying in position plain cement concrete 1:1:2 (1 cement : 1 sand : 2 graded crushed
rock 20 mm nominal size) in retaining walls, return walls, walls (any thickness) including attached
pilasters, columns, piers,
abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks,
anchor blocks, plain window sills, fillets etc. upto floor five level, excluding the cost of centering and
shuttering
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

CW0021

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20 mm
Crushed Rock - 12.5 mm - 6 mm
Cement (OPC / PSC)

Quant
0.09000
0.05000
0.09000
0.07000
2.70500
0.07000
0.07000
0.45000
0.67500
0.22500
0.61000

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Providing and laying in position plain cement concrete 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed
rock 20 mm nominal size) in retaining walls, return walls, walls (any thickness) including attached
pilasters, columns,
piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed
blocks, anchor blocks, plain window sills, fillets etc. upto floor five level, excluding the cost of
centering and shuttering
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20 mm
Crushed Rock - 12.5 mm - 6mm
Cement (OPC / PSC)

Quant
0.09000
0.05000
0.09000
0.07000
2.70500
0.07000
0.07000
0.44100
0.66200
0.22100
0.40300

Standards & Quality Control Authority, MoWHS

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Labour and Material Coefficients (Civil Works) - 2009

CW0022

42

Providing and laying in position plain cement concrete 1:2:4 (1 cement : 2 sand : 4 graded crushed
rock 20 mm nominal size) in retaining walls, return walls, walls (any thickness) including attached
pilasters, columns, piers,
abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks,
anchor blocks, plain window sills, fillets etc. upto floor five level, excluding the cost of centering and
shuttering
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

CW0023

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20 mm
Crushed Rock - 12.5 mm - 6mm
Cement (OPC / PSC)

Quant
0.09000
0.05000
0.09000
0.07000
2.70500
0.07000
0.07000
0.47000
0.70500
0.23500
0.32130

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Providing and laying in position plain cement concrete 1:2:4 (1 cement : 2 sand : 4 graded crushed
rock 40 mm nominal size) in retaining walls, return walls, walls (any thickness) including attached
pilasters, columns, piers, abutments,
pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks,
plain window sills, fillets etc. upto floor five level, excluding the cost of centering and shuttering
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0068
MT0070
MT0071
MT0145

CW0024

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 40 mm
Crushed Rock - 20 mm
Crushed Rock - 12.5 mm - 6mm
Cement (OPC / PSC)

Quant
0.09000
0.05000
0.09000
0.07000
2.70500
0.07000
0.07000
0.47000
0.54400
0.24100
0.12500
0.32130

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
cu.m
tonne

Providing and laying in position plain cement concrete 1:3:6 (1 cement : 3 sand : 6 graded crushed
rock 20 mm nominal size) in retaining walls, return walls, walls (any thickness) including attached
pilasters, columns, piers,
abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks,
anchor blocks, plain window sills, fillets etc. upto floor five level, excluding the cost of centering and
shuttering
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20 mm
Crushed Rock - 12.5 mm - 6mm
Cement (OPC / PSC)

Quant
0.09000
0.05000
0.09000
0.07000
2.70500
0.07000
0.07000
0.48500
0.72700
0.24200
0.22000

Standards & Quality Control Authority, MoWHS

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Labour and Material Coefficients (Civil Works) - 2009

CW0025

43

Providing and laying in position plain cement concrete 1:3:6 (1 cement : 3 sand : 6 graded crushed
rock 40 mm nominal size) in retaining walls, return walls, walls (any thickness) including attached
pilasters, columns, piers,
abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks,
anchor blocks, plain window sills, fillets etc. upto floor five level, excluding the cost of centering and
shuttering
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0068
MT0070
MT0145

CW0026

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 40 mm
Crushed Rock - 20 mm
Cement (OPC / PSC)

Quant
0.09000
0.05000
0.09000
0.07000
2.70500
0.07000
0.07000
0.48500
0.67200
0.26200
0.22000

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Providing and laying in position plain cement concrete 1:3:6 (1 cement : 3 sand : 6 graded
gravel/shingles 40 mm nominal size) in retaining walls, return walls, walls (any thickness) including
attached pilasters, columns, piers,
abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks,
anchor blocks, plain window sills, fillets etc. upto floor five level, excluding the cost of centering and
shuttering
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0080
MT0081
MT0145

CW0050

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Gravel/Shingles ( river stone) 40 mm to 20 mm
Gravel/Shingles ( river stone) 20 mm to 10 mm
Cement (OPC / PSC)

Quant
0.09000
0.05000
0.09000
0.07000
2.70500
0.07000
0.07000
0.48500
0.67200
0.26200
0.22000

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Providing and fixing upto floor five level pre-cast cement concrete lacing courses, copings, bed plates,
anchor blocks, plain window sills, shelves, louvers, steps, staircases etc. including hoisting and setting
in position with
cement mortar 1:3 (1 cement : 3 sand) cost of required formwork and finishing smooth with 6 mm thick
cement plaster on exposed surface complete - 1:2:4 (1 cement : 2 sand : 4 graded crushed rock 20 mm
nominal size)
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20 mm
Crushed Rock - 12.5 mm - 6mm
Cement (OPC / PSC)

Quant
0.05000
0.05000
0.05000
0.07000
5.49000
0.07000
0.07000
0.50670
0.70500
0.23500
0.38000

Standards & Quality Control Authority, MoWHS

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Labour and Material Coefficients (Civil Works) - 2009

CW0051

44

Providing and fixing upto floor five level pre-cast cement concrete lacing courses, copings, bed plates,
anchor blocks, plain window sills, shelves, louvers, steps, staircases etc. including hoisting and setting
in position with
cement mortar 1:3 (1 cement : 3 sand) cost of required formwork and finishing smooth with 6 mm thick
cement plaster on exposed surface complete - 1:3:6 (1 cement : 3 sand : 6 graded crushed rock 20 mm
nominal size)
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

CW0060

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20 mm
Crushed Rock - 12.5 mm - 6mm
Cement (OPC / PSC)

Quant
0.05000
0.05000
0.05000
0.07000
5.49000
0.07000
0.07000
0.61170
0.72700
0.24200
0.28000

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Providing and fixing at or near ground level pre-cast cement concrete in kerbs, edgings etc. as per
approval pattern and setting in position with cement mortar 1:3 (1 cement : 3 sand) cost of required
formwork and finishing smooth
with 6 mm thick cement plaster on exposed surface complete - 1:2:4 (1 cement : 2 sand : 4 graded
crushed rock 20 mm nominal size)
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

CW0070

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20 mm
Crushed Rock - 12.5 mm - 6 mm
Cement (OPC / PSC)

Quant
0.35000
0.05000
0.35000
0.07000
4.17500
0.07000
0.07000
0.55820
0.70500
0.23500
0.36200

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Providing and fixing upto floor five level pre-cast cement concrete solid block including hoisting and
setting in position with cement mortar 1:3 (1 cement : 3 sand) including the cost of required formwork
and finishing
smooth with 6 mm thick cement plaster on exposed surface complete - 1:2:4 (1 cement : 2 sand : 4
graded crushed rock 20 mm nominal size)
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20 mm
Crushed Rock - 12.5 mm - 6mm
Cement (OPC / PSC)

Quant
0.37500
0.05000
0.37500
0.07000
4.67500
0.07000
0.07000
0.66530
0.70500
0.23500
0.41300

Standards & Quality Control Authority, MoWHS

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Labour and Material Coefficients (Civil Works) - 2009

CW0071

45

Providing and fixing upto floor five level pre-cast cement concrete solid block including hoisting and
setting in position with cement mortar 1:3 (1 cement : 3 sand) including the cost of required formwork
and finishing
smooth with 6 mm thick cement plaster on exposed surface complete - 1:3:6 (1 cement : 3 sand : 6
graded crushed rock 20 mm nominal size)
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

CW0080

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20 mm
Crushed Rock - 12.5 mm - 6mm
Cement (OPC / PSC)

Quant
0.37500
0.05000
0.37500
0.07000
4.67500
0.07000
0.07000
0.68030
0.72700
0.24200
0.31300

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Providing and fixing upto floor five level pre-cast cement concrete hollow block including hoisting and
setting in position with cement mortar 1:3 (1 cement : 3 sand) including the cost of required formwork
and finishing
smooth with 6 mm thick cement plaster on exposed surface complete - 1:2:4 (1 cement : 2 sand : 4
graded crushed rock 20 mm nominal size)
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

CW0081

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20 mm
Crushed Rock - 12.5 mm - 6mm
Cement (OPC / PSC)

Quant
0.37500
0.05000
0.37500
0.07000
3.70000
0.07000
0.07000
0.37570
0.42300
0.14100
0.23660

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Providing and fixing upto floor five level pre-cast cement concrete hollow block including hoisting and
setting in position with cement mortar 1:3 (1 cement : 3 sand) including the cost of required formwork
and finishing
smooth with 6 mm thick cement plaster on exposed surface complete - 1:3:6 (1 cement : 3 sand : 6
graded crushed rock 20 mm nominal size)
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20 mm
Crushed Rock - 12.5 mm - 6 mm
Cement (OPC / PSC)

Quant
0.37500
0.05000
0.37500
0.07000
3.70000
0.07000
0.07000
0.37570
0.43620
0.14520
0.17660

Standards & Quality Control Authority, MoWHS

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Labour and Material Coefficients (Civil Works) - 2009

CW0090

46

Providing and laying lime concrete, with graded stone aggregate of 40 mm and 40 % mortar comprising
of 1:1:1 lime mortar, in footings and bases for columns excluding cost of formwork
Coefficient for per cu.m
Code
LB0036
LB0051
LB0053
LB0077
MP0205
MP0206
MT0068
MR0011

CW0091

Description
Mason Gd.1
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Crushed Rock - 40 mm
Lime mortar

Quant
0.04000
0.04000
0.07000
1.40000
0.07000
0.07000
0.94000
0.40000

Units
day
day
day
day
day
day
cu.m
cu.m

Providing and laying lime concrete, with graded brick aggregate of 40 mm and 40 % mortar comprising
of 1:1:1 lime mortar, in footings and bases for columns excluding cost of formwork

Coefficient for per cu.m


Code
LB0036
LB0051
LB0053
LB0077
MP0205
MP0206
MT0127
MR0011
CW0135

Description
Mason Gd.1
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Graded brick aggregates
Lime mortar

Quant
0.04000
0.04000
0.07000
1.40000
0.07000
0.07000
0.94000
0.40000

Units
day
day
day
day
day
day
cu.m
cu.m

Extra for cement concrete work in super-structure above floor five level for each four floors or part
thereof
8% of the rates worked out for upto five floors per cu.

CW0136

Extra for laying cement concrete work in or under water, mud, including the cost of pumping or bailing
out water and removing slush etc. complete - per metre depth (concrete not leaner than 1:2:4)
Coefficient for per cu.m
Code
LB0077
MP0201
MT0145

CW0137

Description
Labour
Water pump AVI type
Cement (OPC / PSC)

Quant
1.19050
0.08930
0.02200

Units
day
day
tonne

Extra for cement concrete work under foul conditions


Coefficient for per cu.m
Code
Description
LB0077 Labour
LB0036 Mason Gd 1

CW0140

Quant
1.70000
0.30000

Units
day
day

Extra for laying cement concrete work - Providing and mixing water-proofing materials in in the
proportion 12 kg/cu.m or as prescribed by the manufacturer
Coefficient for per cu.m
Code
Description
LB0077 Labour
MT0151 Water proofing compound

Quant
0.04170
6.00000

Standards & Quality Control Authority, MoWHS

Units
day
kg

Labour and Material Coefficients (Civil Works) - 2009

47

CHAPTER 7

DAMP-PROOFING

DP0001

Providing and laying damp-proof course with cement concrete 1:2:4, 12.5mm aggregate - 25mm thick
Coefficient for per sq.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0071
MT0145

DP0002

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 12.5 - 6mm
Cement (OPC / PSC)

Quant
0.05156
0.00125
0.05156
0.00175
0.05531
0.00175
0.00175
0.01113
0.02225
0.00803

Units
day
day
day
day
day
day
day
cu.m
cu.m
tonne

Providing and laying damp-proof course with cement concrete 1:2:4, 12.5mm aggregate - 40mm thick
Coefficient for per sq.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0071
MT0145

DP0010

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 12.5 - 6mm
Cement (OPC / PSC)

Quant
0.05250
0.00200
0.05250
0.00280
0.08850
0.00280
0.00280
0.01780
0.03560
0.01285

Units
day
day
day
day
day
day
day
cu.m
cu.m
tonne

Providing and laying damp-proof course with cement concrete 1:2:4, 20mm aggregate - 50mm thick
Coefficient for per sq.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0145

DP0015

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Cement (OPC / PSC)

Quant
0.05313
0.00250
0.05313
0.00350
0.11062
0.00350
0.00350
0.02225
0.04450
0.01606

Units
day
day
day
day
day
day
day
cu.m
cu.m
tonne

Applying a coat of hot bitumen (maxphalt) 80/100 or equivalent using 1.7 kg per sq.m including the
surface cleaning
Coefficient for per sq.m
Code
LB0077
MT0001
MT0035

DP0020

Description
Labour
Bitumen 80\100
Kerosene

Quant
0.15000
0.00170
0.12300

Units
day
tonne
litre

Providing and laying moisture barrier using plastic sheeting underlay - 50 micro-metre
Coefficient for per sq.m
Code
Description
LB0077 Labour
MT0155 Plastic Sheet - 50 micro-metre

Quant
0.03380
1.05000

Standards & Quality Control Authority, MoWHS

Units
day
sq.m

Labour and Material Coefficients (Civil Works) - 2009

DP0021

48

Providing and laying moisture barrier using plastic sheeting underlay - 100 micro-metre
Coefficient for per sq.m
Code
Description
LB0077 Labour
MT0156 Plastic Sheet - 100 micro-metre

DP0022

Quant
0.03380
1.05000

Units
day
sq.m

Providing and laying moisture barrier using plastic sheeting underlay - 200 micro-metre
Coefficient for per sq.m
Code
Description
LB0077 Labour
MT0157 Plastic Sheet - 200 micro-metre

DP0030

Quant
0.03380
1.05000

Units
day
sq.m

Providing and laying Bitumen felt Type 3 in wall bases etc - Grade 2
Coefficient for per sq.m
Code
Description
LB0077 Labour
MT0006 Bitumen felt Type 3 - Grade 2

Quant
0.04000
1.05000

Standards & Quality Control Authority, MoWHS

Units
day
sq.m

Labour and Material Coefficients (Civil Works) - 2009

49

CHAPTER 8

REINFORCED CONCRETE

RC0001

P&L in position reinforced cement concrete 1:1:2 (1 cement : 1 sand : 2 graded crushed rock 20 mm
nominal size) excluding the cost of centering, shuttering and reinforcement - all work upto plinth level
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

RC0002

Quant
0.07500
0.07000
0.07500
0.07000
1.57500
0.07000
0.07000
0.45000
0.67500
0.22500
0.61000

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

P&L in position reinforced cement concrete 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20
mm nominal size) excluding the cost of centering, shuttering and reinforcement - all work upto plinth
level
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

RC0003

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Crushed Rock - 12.5mm - 6 mm
Cement (OPC / PSC)

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Crushed Rock - 12.5mm - 6 mm
Cement (OPC / PSC)

Quant
0.07500
0.07000
0.07500
0.07000
1.57500
0.07000
0.07000
0.44100
0.66150
0.22050
0.40300

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

P&L in position reinforced cement concrete 1:2:4 (1 cement : 2 sand : 4 graded crushed rock 20 mm
nominal size) excluding the cost of centering, shuttering and reinforcement - all work upto plinth level
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Crushed Rock - 12.5mm - 6 mm
Cement (OPC / PSC)

Quant
0.07500
0.07000
0.07500
0.07000
1.57500
0.07000
0.07000
0.47000
0.70500
0.23500
0.32130

Standards & Quality Control Authority, MoWHS

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Labour and Material Coefficients (Civil Works) - 2009

RC0005

50

P&L in position reinforced cement concrete 1:1:2 (1 cement : 1 sand : 2 graded crushed rock 20 mm
nominal size) work in walls (any thickness) including attached pilasters buttresses, piers, abutments
etc.
upto floor five level excluding the cost of centering, shuttering and reinforcement.
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

RC0006

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Crushed Rock - 12.5mm - 6 mm
Cement (OPC / PSC)

Quant
0.05000
0.05000
0.05000
0.07000
1.67500
0.07000
0.07000
0.45000
0.67500
0.22500
0.61000

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

P&L in position reinforced cement concrete 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20
mm nominal size) work in walls (any thickness) including attached pilasters buttresses, piers,
abutments, etc.
upto floor five level excluding the cost of centering, shuttering and reinforcement.
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

RC0007

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Crushed Rock - 12.5mm - 6 mm
Cement (OPC / PSC)

Quant
0.05000
0.05000
0.05000
0.07000
1.67500
0.07000
0.07000
0.44100
0.66150
0.22050
0.40300

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

P&L in position reinforced cement concrete 1:2:4 (1 cement : 2 sand : 4 graded crushed rock 20 mm
nominal size ) work in walls (any thickness) including attached pilasters buttresses, piers, abutments,
etc.
upto floor five level excluding the cost of centering, shuttering and reinforcement.
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Crushed Rock - 12.5mm - 6 mm
Cement (OPC / PSC)

Quant
0.05000
0.05000
0.05000
0.07000
1.57500
0.07000
0.07000
0.47000
0.70500
0.23500
0.32130

Standards & Quality Control Authority, MoWHS

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Labour and Material Coefficients (Civil Works) - 2009

RC0009

51

P&L in position reinforced cement concrete 1:1:2 (1 cement : 1 sand : 2 graded crushed rock 20 mm
nominal size) work in plinth and skirting courses, fillets, columns , pillars, posts and struts
upto floor five level excluding the cost of centering, shuttering and reinforcement.
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

RC0010

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Crushed Rock - 12.5mm - 6 mm
Cement (OPC / PSC)

Quant
0.05000
0.05000
0.05000
0.07000
1.89500
0.07000
0.07000
0.45000
0.67500
0.22500
0.61000

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

P&L in position reinforced cement concrete 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20
mm nominal size) work in plinth and skirting courses, fillets, columns , pillars, posts and struts
upto floor five level excluding the cost of centering, shuttering and reinforcement.
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

RC0011

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Crushed Rock - 12.5mm - 6 mm
Cement (OPC / PSC)

Quant
0.05000
0.05000
0.05000
0.07000
1.89500
0.07000
0.07000
0.44100
0.66150
0.22050
0.40300

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

P&L in position reinforced cement concrete 1:2:4 (1 cement : 2 sand : 4 graded crushed rock 20 mm
nominal size) work in plinth and skirting courses, fillets, columns , pillars, posts and struts
upto floor five level excluding the cost of centering, shuttering and reinforcement.
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Crushed Rock - 12.5mm - 6 mm
Cement (OPC / PSC)

Quant
0.05000
0.05000
0.05000
0.07000
1.89500
0.07000
0.07000
0.47000
0.70500
0.23500
0.32130

Standards & Quality Control Authority, MoWHS

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Labour and Material Coefficients (Civil Works) - 2009

RC0013

52

P&L in position reinforced cement concrete 1:1:2 (1 cement : 1 sand : 2 graded crushed rock 20 mm
nominal size) work in suspended floor, roofs having slope upto 15o, landings, balconies, shelves and
chajjas
upto floor five level excluding the cost of centering, shuttering and reinforcement.
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

RC0014

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Crushed Rock - 12.5mm - 6 mm
Cement (OPC / PSC)

Quant
0.12500
0.10000
0.12500
0.07000
1.95000
0.07000
0.07000
0.45000
0.67500
0.22500
0.61000

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

P&L in position reinforced cement concrete 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20
mm nominal size) work in suspended floor, roofs having slope upto 15o, landings, balconies, shelves
and chajjas
upto floor five level excluding the cost of centering, shuttering and reinforcement.
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

RC0015

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Crushed Rock - 12.5mm - 6 mm
Cement (OPC / PSC)

Quant
0.12500
0.10000
0.12500
0.07000
1.95000
0.07000
0.07000
0.44100
0.66150
0.22050
0.40300

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

P&L in position reinforced cement concrete 1:2:4 (1 cement : 2 sand : 4 graded crushed rock 20 mm
nominal size) work in suspended floor, roofs having slope upto 15o, landings, balconies, shelves and
chajjas
upto floor five level excluding the cost of centering, shuttering and reinforcement.
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Crushed Rock - 12.5mm - 6 mm
Cement (OPC / PSC)

Quant
0.12500
0.10000
0.12500
0.07000
1.95000
0.07000
0.07000
0.47000
0.70500
0.23500
0.32130

Standards & Quality Control Authority, MoWHS

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Labour and Material Coefficients (Civil Works) - 2009

RC0017

53

P&L in position reinforced cement concrete 1:1:2 (1 cement : 1 sand : 2 graded crushed rock 20 mm
nominal size) work in beams, lintels, bands, plain window sills, staircases, spiral staircases
upto floor five level excluding the cost of centering, shuttering and reinforcement.
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

RC0018

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Crushed Rock - 12.5mm - 6 mm
Cement (OPC / PSC)

Quant
0.07000
0.07000
0.07000
0.07000
1.77500
0.07000
0.07000
0.45000
0.67500
0.22500
0.61000

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

P&L in position reinforced cement concrete 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20
mm nominal size) work in beams, lintels, bands, plain window sills, staircases, spiral staircases
upto floor five level excluding the cost of centering, shuttering and reinforcement.
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

RC0019

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Crushed Rock - 12.5mm - 6 mm
Cement (OPC / PSC)

Quant
0.07000
0.07000
0.07000
0.07000
1.77500
0.07000
0.07000
0.44100
0.66150
0.22050
0.40300

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

P&L in position reinforced cement concrete 1:2:4 (1 cement : 2 sand : 4 graded crushed rock 20 mm
nominal size) work in beams, lintels, bands, plain window sills, staircases, spiral staircases
upto floor five level excluding the cost of centering, shuttering and reinforcement.
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Crushed Rock - 12.5mm - 6 mm
Cement (OPC / PSC)

Quant
0.07000
0.07000
0.07000
0.07000
1.77500
0.07000
0.07000
0.47000
0.70500
0.23500
0.32130

Standards & Quality Control Authority, MoWHS

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Labour and Material Coefficients (Civil Works) - 2009

RC0020

54

P&L in position reinforced cement concrete 1:1:2 (1 cement : 1 sand : 2 graded crushed rock 20 mm
nominal size) work in kerbs, steps and the like upto floor five level excluding the cost of centering,
shuttering and reinforcement.
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

RC0021

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Crushed Rock - 12.5mm - 6 mm
Cement (OPC / PSC)

Quant
0.07000
0.07000
0.07000
0.07000
1.77500
0.07000
0.07000
0.45000
0.67500
0.22500
0.61000

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

P&L in position reinforced cement concrete 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20
mm nominal size) work in kerbs, steps and the like upto floor five level excluding the cost of centering,
shuttering and reinforcement.
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

RC0022

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Crushed Rock - 12.5mm - 6 mm
Cement (OPC / PSC)

Quant
0.07000
0.07000
0.07000
0.07000
1.77500
0.07000
0.07000
0.44100
0.66150
0.22050
0.40300

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

P&L in position reinforced cement concrete 1:2:4 (1 cement : 2 sand : 4 graded crushed rock 20 mm
nominal size) work in kerbs, steps and the like upto floor five level excluding the cost of centering,
shuttering and reinforcement.
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Crushed Rock - 12.5mm - 6 mm
Cement (OPC / PSC)

Quant
0.07000
0.07000
0.07000
0.07000
1.77500
0.07000
0.07000
0.47000
0.70500
0.23500
0.32130

Standards & Quality Control Authority, MoWHS

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Labour and Material Coefficients (Civil Works) - 2009

RC0023

55

P&L in position reinforced cement concrete 1:1:2 (1 cement : 1 sand : 2 graded crushed rock 20 mm
nominal size) work in arches and arch ribs upto floor five level excluding the cost of centering,
shuttering and reinforcement.
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

RC0024

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Crushed Rock - 12.5mm - 6 mm
Cement (OPC / PSC)

Quant
0.50000
0.10000
0.50000
0.07000
4.80000
0.07000
0.07000
0.45000
0.67500
0.22500
0.61000

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

P&L in position reinforced cement concrete 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20
mm nominal size) work in arches and arch ribs upto floor five level excluding the cost of centering,
shuttering and reinforcement.
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

RC0025

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Crushed Rock - 12.5mm - 6 mm
Cement (OPC / PSC)

Quant
0.50000
0.10000
0.50000
0.07000
4.80000
0.07000
0.07000
0.44100
0.66150
0.22050
0.40300

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

P&L in position reinforced cement concrete 1:2:4 (1 cement : 2 sand : 4 graded crushed rock 20 mm
nominal size) work in arches and arch ribs upto floor five level excluding the cost of centering,
shuttering and reinforcement.
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Crushed Rock - 12.5mm - 6 mm
Cement (OPC / PSC)

Quant
0.50000
0.10000
0.50000
0.07000
4.80000
0.07000
0.07000
0.47000
0.70500
0.23500
0.32130

Standards & Quality Control Authority, MoWHS

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Labour and Material Coefficients (Civil Works) - 2009

RC0026

56

P&L in position reinforced cement concrete 1:1:2 (1 cement : 1 sand : 2 graded crushed rock 20 mm
nominal size) work in domes, vaults, shells folded plates and roofs having more than 15o
upto floor five level excluding the cost of centering, shuttering and reinforcement.
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

RC0027

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Crushed Rock - 12.5mm - 6 mm
Cement (OPC / PSC)

Quant
0.37500
0.10000
0.37500
0.07000
4.75000
0.07000
0.07000
0.45900
0.68850
0.25950
0.62220

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

P&L in position reinforced cement concrete 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20
mm nominal size) work in domes, vaults, shells folded plates and roofs having more than 15deg
upto floor five level excluding the cost of centering, shuttering and reinforcement.
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

RC0028

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Crushed Rock - 12.5mm - 6 mm
Cement (OPC / PSC)

Quant
0.37500
0.10000
0.37500
0.07000
4.75000
0.07000
0.07000
0.45000
0.67300
0.22500
0.41111

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

P&L in position reinforced cement concrete 1:2:4 (1 cement : 2 sand : 4 graded crushed rock 20 mm
nominal size) work in domes, vaults, shells folded plates and roofs having more than 15o
upto floor five level excluding the cost of centering, shuttering and reinforcement.
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Crushed Rock - 12.5mm - 6 mm
Cement (OPC / PSC)

Quant
0.37500
0.10000
0.37500
0.07000
4.75000
0.07000
0.07000
0.47940
0.71910
0.23970
0.32770

Standards & Quality Control Authority, MoWHS

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Labour and Material Coefficients (Civil Works) - 2009

RC0029

57

P&L in position reinforced cement concrete 1:1.5:3 (1 cement : 1.5 sand : 3 graded crushed rock 20
mm nominal size) work in vertical and horizontal fins individually or forming box louvers, fascias and
eaves
boards - upto floor five level excluding the cost of centering, shuttering and reinforcement
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0145

RC0030

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Cement (OPC / PSC)

Quant
0.02400
0.10000
0.02400
0.07000
3.28000
0.07000
0.07000
0.47600
0.95200
0.40300

Units
day
day
day
day
day
day
day
cu.m
cu.m
tonne

Bhutan type Traditional Cornices in R.C.C 1:1.5:3, 20 mm aggregate including cost of formwork
including finishing with 6mm thick plaster on the exposed surface with cement mortar 1:3 (1 cement : 3
sand) ,
excluding reinforcement & decorative painting cost as per standard design (Measurement to be taken
along the cornice and wall junction) - Single Storeyed building, including Phana
Coefficient for per m
Code
LB0021
LB0033
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0145
MT0325
MT0330

RC0031

Description
Carpenter Gd.1
Carpenter Gd.2
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Cement (OPC / PSC)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B' (Mixed Conifer)

Quant
0.75000
0.41652
0.52953
0.20362
0.27953
0.00253
2.06768
0.00253
0.00253
0.02008
0.03077
0.01683
0.46410
0.00734

Units
day
day
day
day
day
day
day
day
day
cu.m
cu.m
tonne
m
cu.m

Bhutan type Traditional Cornices in R.C.C 1:1.5:3, 20 mm aggregate including cost of formwork
including finishing with 6mm thick plaster on the exposed surface with cement mortar 1:3 (1 cement :
3 sand), excluding
reinforcement & decorative painting cost as per standard design (Measurement to be taken along the
cornice and wall junction) - Multi-Storeyed building..at floor 2 level including the cost of lhanglag and at
other floors
where Lhanglag is provided
Coefficient for per m
Code
LB0021
LB0033
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0145
MT0325
MT0330

Description
Carpenter Gd.1
Carpenter Gd.2
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Cement (OPC / PSC)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B' (Mixed Conifer)

Standards & Quality Control Authority, MoWHS

Quant
0.75000
0.40018
0.52867
0.25358
0.27867
0.00251
2.10654
0.00251
0.00251
0.01976
0.03043
0.01659
0.44590
0.00706

Units
day
day
day
day
day
day
day
day
day
cu.m
cu.m
tonne
m
cu.m

Labour and Material Coefficients (Civil Works) - 2009

RC0032

58

Bhutan type Traditional Cornices in R.C.C 1:1.5:3, 20 mm aggregate including cost of formwork
including finishing with 6mm thick plaster on the exposed surface with cement mortar 1:3 (1 cement : 3
sand), excluding
reinforcement & decorative painting cost as per standard design (Measurement to be taken along the
cornice and wall junction) - Multi-Storeyed building.. at all middle floor levels (excluding the cost of
phana)
Coefficient for per m
Code
LB0021
LB0033
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0145
MT0325
MT0330

RC0033

Description
Carpenter Gd.1
Carpenter Gd.2
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Cement (OPC / PSC)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B' (Mixed Conifer)

Quant
0.75000
0.68766
0.55303
0.25825
0.30303
0.00578
2.42256
0.00578
0.00578
0.04309
0.07013
0.03707
0.76622
0.01212

Units
day
day
day
day
day
day
day
day
day
cu.m
cu.m
tonne
m
cu.m

Bhutan type Traditional Cornices in R.C.C 1:1.5:3, 20 mm aggregate including cost of formwork
including finishing with 6mm thick plaster on the exposed surface with cement mortar 1:3 (1 cement : 3
sand), excluding
reinforcement & decorative painting cost as per standard design (Measurement to be taken along the
cornice and wall junction) - Phana
Coefficient for per m of E0827
Code
LB0021
LB0033
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0145
MT0325
MT0330

Description
Carpenter Gd.1
Carpenter Gd.2
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Cement (OPC / PSC)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B' (Mixed Conifer)

Standards & Quality Control Authority, MoWHS

Quant
0.50000
0.09523
0.51691
0.25067
0.01691
0.00047
1.36601
0.00047
0.00047
0.00587
0.00569
0.00414
0.10611
0.00168

Units
day
day
day
day
day
day
day
day
day
cu.m
cu.m
tonne
m
cu.m

Labour and Material Coefficients (Civil Works) - 2009

RC0034

59

Bhutan type Traditional Cornices in R.C.C 1:1.5:3, 20 mm aggregate including cost of formwork
including finishing with 6mm thick plaster on the exposed surface with cement mortar 1:3 (1 cement : 3
sand), excluding
reinforcement & decorative painting cost as per standard design (Measurement to be taken along the
cornice and wall junction) - Lintel Cornice (only cornice portion at external face)
Coefficient for per m of E0830
Code
LB0021
LB0033
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0145
MT0325
MT0330

RC0040

Description
Carpenter Gd.1
Carpenter Gd.2
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Cement (OPC / PSC)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B' (Mixed Conifer)

Quant
0.50000
0.20417
0.26000
0.15144
0.51000
0.00101
0.90716
0.00101
0.00101
0.00766
0.01224
0.00654
0.22750
0.00360

Units
day
day
day
day
day
day
day
day
day
cu.m
cu.m
tonne
m
cu.m

Bhutan type Traditional Cornices in R.C.C 1:2:4, 20 mm aggregate including cost of formwork including
finishing with 6mm thick plaster on the exposed surface with cement mortar 1:3 (1 cement : 3 sand ),
excluding
reinforcement & decorative painting cost as per standard design (Measurement to be taken along the
cornice and wall junction) - Single Storeyed building, including Phana
Coefficient for per m
Code
LB0021
LB0033
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0145
MT0325
MT0330

Description
Carpenter Gd.1
Carpenter Gd.2
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Cement (OPC / PSC)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B' (Mixed Conifer)

Standards & Quality Control Authority, MoWHS

Quant
0.75000
0.41652
0.52953
0.20362
0.27953
0.00253
2.06768
0.00253
0.00253
0.02081
0.03222
0.01387
0.46410
0.00734

Units
day
day
day
day
day
day
day
day
day
cu.m
cu.m
tonne
m
cu.m

Labour and Material Coefficients (Civil Works) - 2009

RC0041

60

Bhutan type Traditional Cornices in R.C.C 1:2:4, 20 mm aggregate including cost of formwork including
finishing with 6mm thick plaster on the exposed surface with cement mortar 1:3 (1 cement : 3 sand) ,
excluding
reinforcement & decorative painting cost as per standard design (Measurement to be taken along the
cornice and wall junction) - Multi-Storeyed building..at floor 2 level and at other floors where lhanglag is
provided including the cost of lhanglag
Coefficient for per m
Code
LB0021
LB0033
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0145
MT0325
MT0330

RC0042

Description
Carpenter Gd.1
Carpenter Gd.2
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Cement (OPC / PSC)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B' (Mixed Conifer)

Quant
0.75000
0.40018
0.52867
0.25358
0.27867
0.00251
2.10654
0.00251
0.00251
0.02048
0.03186
0.01367
0.44590
0.00706

Units
day
day
day
day
day
day
day
day
day
cu.m
cu.m
tonne
m
cu.m

Bhutan type Traditional Cornices in R.C.C 1:2:4, 20 mm aggregate including cost of formwork including
finishing with 6mm thick plaster on the exposed surface with cement mortar 1:3 (1 cement : 3 sand) ,
excluding
reinforcement & decorative painting cost as per standard design (Measurement to be taken along the
cornice and wall junction) - Multi-Storeyed building.. at all middle floor levels (excluding the cost of
phana)
Coefficient for per m
Code
LB0021
LB0033
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0145
MT0325
MT0330

Description
Carpenter Gd.1
Carpenter Gd.2
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Cement (OPC / PSC)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B' (Mixed Conifer)

Standards & Quality Control Authority, MoWHS

Quant
0.75000
0.68766
1.05303
0.25825
0.30303
0.00578
2.42256
0.00578
0.00578
0.04474
0.07343
0.03033
0.76622
0.01212

Units
day
day
day
day
day
day
day
day
day
cu.m
cu.m
tonne
m
cu.m

Labour and Material Coefficients (Civil Works) - 2009

RC0043

61

Bhutan type Traditional Cornices in R.C.C 1:2:4, 20 mm aggregate including cost of formwork including
finishing with 6mm thick plaster on the exposed surface with cement mortar 1:3 ( 1 cement : 3 sand) ,
excluding
reinforcement & decorative painting cost as per standard design (Measurement to be taken along the
cornice and wall junction) - Phana
Coefficient for per m
Code
LB0021
LB0033
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0145
MT0325
MT0330

RC0044

Description
Carpenter Gd.1
Carpenter Gd.2
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Cement (OPC / PSC)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B' (Mixed Conifer)

Quant
0.50000
0.09523
0.51691
0.25067
0.01691
0.00047
1.36601
0.00047
0.00047
0.00600
0.00596
0.00359
0.10611
0.00168

Units
day
day
day
day
day
day
day
day
day
cu.m
cu.m
tonne
m
cu.m

Bhutan type Traditional Cornices in R.C.C 1:2:4, 20 mm aggregate including cost of formwork including
finishing with 6mm thick plaster on the exposed surface with cement mortar 1:3 (1 cement : 3 sand),
excluding
reinforcement & decorative painting cost as per standard design (Measurement to be taken along the
cornice and wall junction) - Lintel cornice (only cornice portion at external face)
Coefficient for per m
Code
LB0021
LB0033
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0145
MT0325
MT0330

RC0050

Description
Carpenter Gd.1
Carpenter Gd.2
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Cement (OPC / PSC)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B' (Mixed Conifer)

Quant
0.50000
0.20417
0.26000
0.15144
0.51000
0.00101
0.90716
0.00101
0.00101
0.00795
0.01282
0.00536
0.22750
0.00360

Units
day
day
day
day
day
day
day
day
day
cu.m
cu.m
tonne
m
cu.m

Applying cement slurry on R.C.C slabs using 2.75 kg per sq.m for receiving C.C. floor including
roughening, cleaning & dampen the surface
Coefficient for per sq.m
Code
Description
LB0077 Labour
MT0145 Cement (OPC / PSC)

RC0051

Quant
0.03100
0.00275

Extra for R.C.C work above floor 5 level for every four floors or part thereof, excluding cost of
reinforcement
8% of respective rates per cu.m

Standards & Quality Control Authority, MoWHS

Units
day
tonne

Labour and Material Coefficients (Civil Works) - 2009

RC0052

62

Extra, for rendering in cement mortar 1:2, the top of suspended floors\landings\staircase treads and
risers
Coefficient for per sq.m
Code
LB0036
LB0051
LB0077
MT0043
MT0145

RC0053

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Cement (OPC / PSC)

Quant
0.02500
0.02500
0.03468
0.00285
0.00204

Units
day
day
day
cu.m
tonne

Rendering smooth finishing of the exposed surface with 6mm thick C.M 1:3
Coefficient for per sq.m
Code
LB0036
LB0051
LB0077
MT0043
MT0145

RC0054

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Cement (OPC / PSC)

Quant
0.04100
0.04100
0.14310
0.00770
0.00367

Units
day
day
day
cu.m
tonne

Providing throating, plastering drip and moulding to R.C.C chajjas


Coefficient for per m
Code
LB0036
LB0051
LB0077

RC0060

Description
Mason Gd.1
Mason Gd.2
Labour

Quant
0.02100
0.02100
0.04200

Units
day
day
day

Providing & fixing, below & including floor 2 level, Precast R.C.C jali 1:2:4, 12.5mm aggregate,
reinforced with mild steel wire 1.6mm dia., including roughening, cleaning, fixing, finishing in cement
mortar 1:3
excluding plastering of the jambs, sills, soffits - 50 mm thick
Coefficient for per sq.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0071
MT0145
MT0215

RC0061

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 12.5 - 6mm
Cement (OPC / PSC)
Welded Mesh - 75mmx25mm

Quant
0.25313
0.00250
0.25313
0.00350
1.01062
0.00350
0.00350
0.02225
0.04450
0.01606
1.00000

Units
day
day
day
day
day
day
day
cu.m
cu.m
tonne
sq.m

Providing & fixing, below & including floor 2 level, Precast R.C.C jali 1:2:4, 12.5mm aggregate,
reinforced with mild steel wire 1.6mm dia., including roughening, cleaning, fixing, finishing in cement
mortar 1:3
excluding plastering of the jambs, sills, soffits - 40 mm thick
Coefficient for per sq.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0071
MT0145
MT0215

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 12.5 - 6mm
Cement (OPC / PSC)
Welded Mesh - 75mmx25mm

Quant
0.20250
0.00200
0.20250
0.00280
0.92180
0.00280
0.00280
0.01780
0.03560
0.01285
1.00000

Standards & Quality Control Authority, MoWHS

Units
day
day
day
day
day
day
day
cu.m
cu.m
tonne
sq.m

Labour and Material Coefficients (Civil Works) - 2009

RC0062

63

Providing & fixing, below & including floor 2 level, Precast R.C.C jali 1:2:4, 12.5mm aggregate,
reinforced with mild steel wire 1.6mm dia., including roughening, cleaning, fixing, finishing in cement
mortar 1:3
excluding plastering of the jambs, sills, soffits - 25 mm thick
Coefficient for per sq.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0071
MT0145
MT0215

RC0070

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 12.5 - 6mm
Cement (OPC / PSC)
Welded Mesh - 75mmx25mm

Quant
0.20156
0.00125
0.20156
0.00175
0.88831
0.00175
0.00175
0.01113
0.02225
0.00803
1.00000

Units
day
day
day
day
day
day
day
cu.m
cu.m
tonne
sq.m

Providing & fixing, below & including floor 2 level, Precast R.C.C 1:2:4, 20mm aggregate including
finishing, plastering with 6mm cement plaster 1:3 and formwork, but excluding reinforcement cost
- String courses, copings, bed plates, anchor blocks, plain window sills
Coefficient for per cu.m
Code
LB0033
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0145
MT0325
MT0330

RC0071

Description
Carpenter Gd.2
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Cement (OPC / PSC)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B' (Mixed Conifer)

Quant
1.87200
0.74740
0.05000
0.74740
0.07000
6.50634
0.07000
0.07000
0.57135
0.89000
0.38152
5.04000
0.16200

Units
day
day
day
day
day
day
day
day
cu.m
cu.m
tonne
m
cu.m

Providing & fixing, below & including floor 2 level, Precast R.C.C 1:2:4, 20mm aggregate including
finishing, plastering with 6mm cement plaster 1:3 and formwork, but excluding reinforcement cost Small lintels & joists < 1.5m clear span, shelves
Coefficient for per cu.m
Code
LB0033
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0145
MT0325
MT0330

Description
Carpenter Gd.2
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Cement (OPC / PSC)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B' (Mixed Conifer)

Standards & Quality Control Authority, MoWHS

Quant
1.72224
0.54691
0.05000
0.54691
0.07000
5.65682
0.07000
0.07000
0.53367
0.89000
0.36356
4.63680
0.14904

Units
day
day
day
day
day
day
day
day
cu.m
cu.m
tonne
m
cu.m

Labour and Material Coefficients (Civil Works) - 2009

RC0072

64

Providing & fixing, below & including floor 2 level, Precast R.C.C 1:2:4, 20mm aggregate including
finishing, plastering with 6mm cement plaster 1:3 and formwork, but excluding reinforcement cost Joists, span > 1.5m, shelves
Coefficient for per cu.m
Code
LB0033
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0145
MT0325
MT0330

RC0083

Description
Carpenter Gd.2
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Cement (OPC / PSC)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B' (Mixed Conifer)

Quant
0.31793
0.91077
0.05000
0.91077
0.07000
5.52246
0.07000
0.07000
0.60204
0.89000
0.39615
0.85596
0.02751

Units
day
day
day
day
day
day
day
day
cu.m
cu.m
tonne
m
cu.m

Providing & fixing, Thermo Mechanically Treated (TMT) bars for R.C.C work including cutting, bending,
binding and placing in position complete
Coefficient for per kg
Code
LB0032
LB0077
MT0208

RC0090

Description
Blacksmith (metal-worker)
Labour
Reinforcing Bars & Mesh - Thermo Mechanically Treated Bars (TMT bars)

Quant
0.01376
0.01376
1.05000

Units
day
day
kg

Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal
of formwork - Foundation and plinth etc.
Coefficient for per sq.m
Code
LB0033
LB0077
MT0325
MT0330

RC0091

Description
Carpenter Gd.2
Labour
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B' (Mixed Conifer)

Quant
0.15600
0.15600
0.42000
0.01350

Units
day
day
m
cu.m

Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal
of formwork - Walls, pilasters, buttresses, string course etc.
Coefficient for per sq.m
Code
LB0033
LB0077
MT0325
MT0330

RC0092

Description
Carpenter Gd.2
Labour
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B' (Mixed Conifer)

Quant
0.81670
0.36080
0.91000
0.01440

Units
day
day
m
cu.m

Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal
of formwork - Lintels, beams, girders, bresummers, cantilevers etc.
Coefficient for per sq.m
Code
LB0033
LB0077
MT0325
MT0330

Description
Carpenter Gd.2
Labour
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B' (Mixed Conifer)

Standards & Quality Control Authority, MoWHS

Quant
0.20000
0.20000
1.41000
0.01650

Units
day
day
m
cu.m

Labour and Material Coefficients (Civil Works) - 2009

RC0093

65

Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal
of formwork - Columns, pillars, post, struts, etc.
Coefficient for per sq.m
Code
LB0033
LB0077
MT0325
MT0330

RC0094

Description
Carpenter Gd.2
Labour
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B' (Mixed Conifer)

Quant
0.37100
0.37100
1.20640
0.01730

Units
day
day
m
cu.m

Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal
of formwork - Staircase (except spiral staircase) excluding landing
Coefficient for per sq.m
Code
LB0033
LB0077
MT0325
MT0330

RC0095

Description
Carpenter Gd.2
Labour
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B' (Mixed Conifer)

Quant
0.37800
0.21600
0.36800
0.01550

Units
day
day
m
cu.m

Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal
of formwork - Suspended floor, roof, landing, shelves and their supports, balconies, chajjas, etc.
Coefficient for per sq.m
Code
LB0033
LB0077
MT0325
MT0330

RC0096

Description
Carpenter Gd.2
Labour
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B' (Mixed Conifer)

Quant
0.56000
0.56000
2.07500
0.01680

Units
day
day
m
cu.m

Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal
of formwork - Spiral stair case excluding landing
Coefficient for per sq.m
Code
LB0033
LB0077
MT0325
MT0330

RC0097

Description
Carpenter Gd.2
Labour
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B' (Mixed Conifer)

Quant
0.56336
0.28671
0.87841
0.01516

Units
day
day
m
cu.m

Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal
of formwork - Arches, curved surfaces
Coefficient for per sq.m
Code
LB0033
LB0077
MT0250
MT0325
MT0330

RC0098

Description
Carpenter Gd.2
Labour
Plain G.I Sheet, 24-gauge (0.63mm)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B' (Mixed Conifer)

Quant
0.98180
0.79770
0.00600
2.48000
0.05500

Units
day
day
tonne
m
cu.m

Providing & fixing centering and shuttering (formwork), including strutting, propping etc. and removal
of formwork - Domes, vaults, shell roof
Coefficient for per sq.m
Code
LB0033
LB0077
MT0250
MT0330

Description
Carpenter Gd.2
Labour
Plain G.I Sheet, 24-gauge (0.63mm)
Rough-sawn timber (urban rate) - Class 'B' (Mixed Conifer)

Standards & Quality Control Authority, MoWHS

Quant
1.00000
0.85000
0.00600
0.11800

Units
day
day
tonne
cu.m

Labour and Material Coefficients (Civil Works) - 2009

RC0105

66

Providing & filling or fixing in position in expansion joints - Blown bitumen


Coefficient for per cu.m
Code
LB0036
LB0051
LB0077
MT0001
MT0040

RC0106

Description
Mason Gd.1
Mason Gd.2
Labour
Bitumen 80/100
Firewood (stacked volume)

Quant
2.66600
2.66600
8.52900
1.05000
2.60000

Units
day
day
day
tonne
cu.m

Providing & filling or fixing in position in expansion joints - Bitumen mix filler of proportion 80 kg of hot
bitumen, 1 kg of cement and 0.25 cum of sand for expansion joints
Coefficient for per cu.m
Code
LB0036
LB0051
LB0077
MT0001
MT0040
MT0043
MT0145

RC0107

Description
Mason Gd.1
Mason Gd.2
Labour
Bitumen 80/100
Firewood (stacked volume)
Sand
Cement (OPC / PSC)

Quant
2.66600
2.66600
8.52900
0.25630
0.69550
0.80000
0.00320

Units
day
day
day
tonne
cu.m
cu.m
tonne

Providing & filling or fixing in position in expansion joints - 12 mm bitumen impregnated fibre board
Coefficient for per sq.m
Code
LB0036
LB0051
LB0077
MT0010
MT0011
MT0015

RC0115

Description
Quant
Mason Gd.1
0.01500
Mason Gd.2
0.01500
Labour
0.03200
Hot sealing compound Grade A
4.00000
Bitumen Solution primer
0.16670
Pre-moulded bitumen impregnated fibre board, 12mm thick (IS: 1838 or equivalent)1.05000

Units
day
day
day
kg
litre
sq.m

Providing and fixing sheet-covering over expansion joints with iron screws as per design to Match the
colour shade of the distemper or wall treatment - A.C. sheet 6x150mm
Coefficient for per m
Code
LB0033
LB0077
MT0335

RC0116

Description
Carpenter Gd.2
Labour
Asbestos Cement Plain Sheet 4mm thick - 1.2 m x 1.2 m

Quant
0.08300
0.08300
0.23600

Units
day
day
each

Providing and fixing sheet-covering over expansion joints with iron screws as per design to Match the
colour shade of the distemper or wall treatment - Aluminium fluted strip 3.15x150mm
Coefficient for per m
Code
LB0033
LB0077
MT0160

Description
Carpenter Gd.2
Labour
Aluminium Fluted Strips 3.15mm thick 150mm wide

Standards & Quality Control Authority, MoWHS

Quant
0.08300
0.08300
1.05000

Units
day
day
m

Labour and Material Coefficients (Civil Works) - 2009

RC0130

67

P&L in position machine batched, machine mixed and machine vibrated M-20 design mix cement
concrete for reinforced cement concrete structural elements, excluding the cost of centering,
shuttering and reinforcement.
Including admixtures in recommended proportions (as per IS 9103) to accelerate, retard setting of
concrete, improve workability without impairing strength and durability as per the direction of the
engineer
- All work upto plinth level
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

RC0131

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Crushed Rock - 12.5mm - 6 mm
Cement (OPC / PSC)

Quant
0.07500
0.50000
0.07500
0.07000
1.30000
0.07000
0.07000
0.47000
0.71910
0.23970
0.32770

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

P&L in position machine batched, machine mixed and machine vibrated M-20 design mix cement
concrete for reinforced cement concrete structural elements, excluding the cost of centering,
shuttering and reinforcement.
Including admixtures in recommended proportions (as per IS 9103) to accelerate, retard setting of
concrete, improve workability without impairing strength and durability as per the direction of the
engineer
- All work from plinth level to floor five level
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

RC0132

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Crushed Rock - 12.5mm - 6 mm
Cement (OPC / PSC)

Quant
0.15000
0.10000
0.15000
0.07000
2.30000
0.07000
0.07000
0.47000
0.71910
0.23970
0.32770

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

P&L in position machine batched, machine mixed and machine vibrated M-20 design mix cement
concrete for reinforced cement concrete structural elements, excluding the cost of centering,
shuttering and reinforcement.
Including admixtures in recommended proportions (as per IS 9103) to accelerate, retard setting of
concrete, improve workability without impairing strength and durability as per the direction of the
engineer
- Walls, Columns, Pillars, posts and struts
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Crushed Rock - 12.5mm - 6 mm
Cement (OPC / PSC)

Quant
0.15000
0.10000
0.15000
0.07000
2.55000
0.07000
0.07000
0.47000
0.71910
0.23970
0.32770

Standards & Quality Control Authority, MoWHS

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Labour and Material Coefficients (Civil Works) - 2009

RC0133

68

P&L in position machine batched, machine mixed and machine vibrated M-20 design mix cement
concrete for reinforced cement concrete structural elements, excluding the cost of centering,
shuttering and reinforcement.
Including admixtures in recommended proportions (as per IS 9103) to accelerate, retard setting of
concrete, improve workability without impairing strength and durability as per the direction of the
engineer
- Beams, Plinth beams, girders, bresummers, cantilevers, suspended floors, lintels, roofs and
staircases including spiral staircases, shelves etc.
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0071
MT0145

RC0135

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Crushed Rock - 12.5mm - 6 mm
Cement (OPC / PSC)

Quant
0.17500
0.10000
0.17500
0.07000
2.85000
0.07000
0.07000
0.47000
0.71910
0.23970
0.32770

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Add or deduct for providing richer or leaner mixes respectively at all floors: providing M-25 grade RCC
instead of M-20 grade RCC
Increase rate by 3% per cu.m

RC0136

Add or deduct for providing richer or leaner mixes respectively at all floors: providing M-30 grade RCC
instead of M-20 grade RCC
Coefficient for per cu.m
Code
Description
MT0145 Cement ( OPC/PSC)

RC0137

Quant
0.02000

Units
MT

Add or deduct for providing richer or leaner mixes respectively at all floors: providing M-35 grade RCC
instead of M-20 grade RCC
Coefficient for per cu.m
Code
Description
MT0145 Cement ( OPC/PSC)

Quant
0.04000

Standards & Quality Control Authority, MoWHS

Units
MT

Labour and Material Coefficients (Civil Works) - 2009

69

CHAPTER 9

BRICK WORK

BW0001

P&L Second-Class Brick work in Foundation & Plinth - In cement mortar 1:3
Coefficient for per cu.m
Code
LB0036
LB0051
LB0077
MT0043
MT0125
MT0145

BW0002

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Bricks 2nd class
Cement (OPC / PSC)

Quant
0.33900
0.33900
1.87025
0.26750
0.40700
0.12750

Units
day
day
day
cu.m
1000#
tonne

P&L Second-Class Brick work in Foundation & Plinth - In cement mortar 1:4
Coefficient for per cu.m
Code
LB0036
LB0051
LB0077
MT0043
MT0125
MT0145

BW0003

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Bricks 2nd class
Cement (OPC / PSC)

Quant
0.33900
0.33900
1.87025
0.26750
0.40700
0.09500

Units
day
day
day
cu.m
1000#
tonne

P&L Second-Class Brick work in Foundation & Plinth - In cement mortar 1:5
Coefficient for per cu.m
Code
LB0036
LB0051
LB0077
MT0043
MT0125
MT0145

BW0004

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Bricks 2nd class
Cement (OPC / PSC)

Quant
0.33900
0.33900
1.87025
0.26750
0.40700
0.07750

Units
day
day
day
cu.m
1000#
tonne

P&L Second-Class Brick work in Foundation & Plinth - In cement mortar 1:6
Coefficient for per cu.m
Code
LB0036
LB0051
LB0077
MT0043
MT0125
MT0145

BW0005

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Bricks 2nd class
Cement (OPC / PSC)

Quant
0.33900
0.33900
1.87025
0.26750
0.40700
0.06250

Units
day
day
day
cu.m
1000#
tonne

P&L Second-Class Brick work in Foundation & Plinth - In mud mortar


Coefficient for per cu.m

BW0010

Code

Description

LB0036
LB0051
LB0077
MT0042
MT0125

Mason Gd.1
Mason Gd.2
Labour
Mud dry
Bricks 2nd class

Quant

Units

0.33900
0.33900
1.62238
0.30000
0.40700

day
day
day
cu.m
1000#

Extra, for brick work in square or rectangular pillars


Coefficient for per cu.m
Code
LB0036
LB0051
LB0076

Description
Mason Gd.1
Mason Gd.2
Labour

Quant
0.33900
0.33900
0.33900

Standards & Quality Control Authority, MoWHS

Units
day
day
day

Labour and Material Coefficients (Civil Works) - 2009

BW0011

70

Extra, for brick in circular pillars


Coefficient for per cu.m

BW0012

Code
Description
LB0036 Mason Gd.1

Quant
0.88600

Units
day

LB0051 Mason Gd.2


LB0076 Labour
MT0125 Bricks 2nd class

0.88600
0.43800
0.14200

day
day
1000#

Extra, for brick work in superstructure above plinth level, up to floor two level
Coefficient for per cu.m
Code
LB0036
LB0051
LB0076

BW0013

Description
Mason Gd.1
Mason Gd.2
Labour

Quant
0.09900
0.09900
0.41300

Units
day
day
day

Extra, for brick work in superstructure above floor two level...per floor
Coefficient for per cu.m
Code
Description
LB0077 Labour

BW0014

Quant
0.29000

Units
day

Extra, for providing hoop iron 25x1.6mm or equivalent reinforcement in masonry at every third course,
embedded in cement mortar
Coefficient for per sq.m
Code
Description
MT0182 Rolled sections (250 MPa) - Flats

BW0015

Quant
1.03000

Units
kg

Extra, for mixing water-proofing compound in cement mortar


Coefficient for per cu.m
Code
Description
LB0077 Labour
MT0151 Water proofing compound

BW0020

Quant
0.01470
2.00000

Units
day
kg

P&L Second-Class Half-brick Masonry (125 mm) in superstructure below floor 2 level - In cement mortar
1:3
Coefficient for per sq.m

BW0021

Code

Description

LB0036
LB0051
LB0077
MT0043
MT0125
MT0145

Mason Gd.1
Mason Gd.2
Labour
Sand
Bricks 2nd class
Cement (OPC / PSC)

Quant

Units

0.09800
0.09800
0.31913
0.02675
0.05200
0.01275

day
day
day
cu.m
1000#
tonne

P&L Second-Class Half-brick Masonry (125 mm) in superstructure below floor 2 level - In cement mortar
1:4
Coefficient for per sq.m
Code

Description

LB0036
LB0051
LB0077
MT0043
MT0125
MT0145

Mason Gd.1
Mason Gd.2
Labour
Sand
Bricks 2nd class
Cement (OPC / PSC)

Standards & Quality Control Authority, MoWHS

Quant

Units

0.09800
0.09800
0.31913
0.02675
0.05200
0.00950

day
day
day
cu.m
1000#
tonne

Labour and Material Coefficients (Civil Works) - 2009

BW0030

71

Extra, for half-brick masonry in superstructure above floor 2 level...per floor


Coefficient for per sq.m
Code
Description
LB0077 Labour

BW0031

Quant
0.03400

Units
day

Extra, for mixing water-proofing compound in cement mortar


Coefficient for per sq.m
Code
Description
LB0077 Labour
MT0151 Water proofing compound

BW0032

Quant
0.01470
0.20000

Units
day
kg

75mm thick brick masonry (second class bricks) in cement mortar 1:3 in partitions etc in
superstructure below floor 2 level
Coefficient for per sq.m
Code
LB0036
LB0051
LB0077

BW0033

Description
Mason Gd.1
Mason Gd.2
Labour

Quant
0.02800
0.02800
0.08236

Units
day
day
day

MT0043 Sand
MT0125 Bricks 2nd class
MT0145 Cement (OPC / PSC)

0.01937
0.03100
0.00923

cu.m
1000#
tonne

Extra, for 75mm brick masonry in cement mortar 1:3 in partitions etc in superstructure above floor 2
level...Per floor
Coefficient for per sq.m
Code

Description

LB0077 Labour
BW0040

Units
day

P&L second class brick work in Bhutan type Traditional Cornices in cement mortar 1:3, including
12mm plaster in cement mortar 1:5, but excluding decorative painting. (Measurement to be taken along
the cornice and wall junction)
- Floor one level including lhanglag
Coefficient for per m
Code
LB0036
LB0051
LB0077
MT0043
MT0125

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Bricks 2nd class

MT0145 Cement (OPC / PSC)


BW0041

Quant
0.03400

Quant
0.63085
0.56568
1.27102
0.01713
0.01457

Units
day
day
day
cu.m
1000#

0.00783

tonne

P&L second class brick work in Bhutan type Traditional Cornices in cement mortar 1:3, including
12mm plaster in cement mortar 1:5, but excluding decorative painting. (Measurement to be taken along
the cornice and wall junction)
- Middle Floor levels excluding phana
Coefficient for per m
Code
LB0036
LB0051
LB0077
MT0043
MT0125
MT0145

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Bricks 2nd class
Cement (OPC / PSC)

Quant
0.95074
0.86486
1.43508
0.03732
0.03704
0.01536

Standards & Quality Control Authority, MoWHS

Units
day
day
day
cu.m
1000#
tonne

Labour and Material Coefficients (Civil Works) - 2009

BW0050

72

Pointing on brickwork with cement mortar 1:3 - Flush pointing


Coefficient for per sq.m

BW0051

Code

Description

LB0036
LB0051
LB0077
MT0043
MT0145

Mason Gd.1
Mason Gd.2
Labour
Sand
Cement (OPC / PSC)

Quant

Units

0.04700
0.04700
0.12038
0.00321
0.00153

day
day
day
cu.m
tonne

Pointing on brickwork with cement mortar 1:3 - Ruled pointing


Coefficient for per sq.m

BW0052

Code
Description
LB0036 Mason Gd.1

Quant
0.05000

Units
day

LB0051
LB0077
MT0043
MT0145

0.05100
0.13838
0.00321
0.00153

day
day
cu.m
tonne

Mason Gd.2
Labour
Sand
Cement (OPC / PSC)

Pointing on brickwork with cement mortar 1:3 - Cut, weather struck pointing
Coefficient for per sq.m
Code
LB0036
LB0051
LB0077
MT0043

BW0053

Description
Mason Gd.1
Mason Gd.2
Labour
Sand

Quant
0.07550
0.07550
0.18838
0.00321

Units
day
day
day
cu.m

MT0145 Cement (OPC / PSC)

0.00153

tonne

Pointing on brickwork with cement mortar 1:3 - Raised & cut pointing
Coefficient for per sq.m
Code
LB0036
LB0051
LB0077
MT0043
MT0145

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Cement (OPC / PSC)

Quant
0.10100
0.10100
0.23618
0.00492
0.00235

Standards & Quality Control Authority, MoWHS

Units
day
day
day
cu.m
tonne

Labour and Material Coefficients (Civil Works) - 2009

73

CHAPTER 10

STONE/MUD

SM0001

Constructing rammed mud walls in superstructure including the cost of form work
Coefficient for per cu.m
Code
LB0033
LB0077
MT0042
MT0325
MT0330

SM0005

Description
Carpenter Gd.2
Labour
Mud dry
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)

Quant
0.26951
1.11906
1.00000
0.30030
0.00475

Units
day
day
cu.m
m
cu.m

P&L Random Rubble Masonry with hard stone in foundation & plinth - In cement mortar 1:4
Coefficient for per cu.m

SM0006

Code
Description
LB0051 Mason Gd.2

Quant
1.33800

Units
day

LB0077
MT0043
MT0060
MT0145

2.70825
0.35310
1.00000
0.12540

day
cu.m
cu.m
tonne

Labour
Sand
Boulder
Cement (OPC / PSC)

P&L Random Rubble Masonry with hard stone in foundation & plinth - In cement mortar 1:5
Coefficient for per cu.m
Code
LB0051
LB0077
MT0043
MT0060
MT0145

SM0007

Description
Mason Gd.2
Labour
Sand
Boulder
Cement (OPC / PSC)

Quant
1.33800
2.70825
0.35310
1.00000
0.10230

Units
day
day
cu.m
cu.m
tonne

P&L Random Rubble Masonry with hard stone in foundation & plinth - In cement mortar 1:6
Coefficient for per cu.m
Code
LB0051
LB0077
MT0043
MT0060
MT0145

SM0008

Description
Mason Gd.2
Labour
Sand
Boulder
Cement (OPC / PSC)

Quant
1.33800
2.70825
0.35310
1.00000
0.08250

Units
day
day
cu.m
cu.m
tonne

P&L Random Rubble Masonry with hard stone in foundation & plinth - Hammer dressed, in mud mortar
Coefficient for per cu.m
Code
LB0051
LB0077
MT0042
MT0060

SM0015

Description
Mason Gd.2
Labour
Mud dry
Boulder

Quant
1.42000
2.85537
0.39600
1.00000

Extra for random rubble masonry with hard stone in superstructure above plinth, below & including
floor 2 level
Coefficient for per cu.m
Code
Description
LB0051 Mason Gd.2
LB0077 Labour

SM0016

Units
day
day
cu.m
cu.m

Quant
0.33900
0.48000

Units
day
day

Extra for random rubble masonry with hard stone in superstructure above floor 2 level
Coefficient for per cu.m
Code
Description
LB0077 Labour

Quant
0.29000

Standards & Quality Control Authority, MoWHS

Units
day

Labour and Material Coefficients (Civil Works) - 2009

SM0017

74

Extra for random rubble masonry work with hard stone in square or rectangular pillars
Coefficient for per cu.m

SM0018

Code
Description
LB0051 Mason Gd.2

Quant
0.33900

Units
day

LB0077 Labour

0.88000

day

Extra for random rubble masonry work with hard stone in circular pillars
Coefficient for per cu.m
Code
Description
LB0051 Mason Gd.2
LB0076 Labour

SM0019

Quant
1.77600
0.43800

Extra for random rubble masonry work with hard stone for mixing water-proofing Materials in cement
mortar
Coefficient for per cu.m
Code
Description
LB0077 Labour
MT0151 Water proofing compound

SM0025

Units
day
day

Quant
0.01470
1.90000

Units
day
kg

Providing &laying Coursed Rubble Masonry with hard stone hammer-dressed in foundation & plinth - In
cement mortar 1:3
Coefficient for per cu.m

SM0026

Code
Description
LB0051 Mason Gd.2
LB0077 Labour

Quant
2.20000
2.88650

Units
day
day

MT0043 Sand
MT0060 Boulder
MT0145 Cement (OPC / PSC)

0.32100
1.10000
0.15300

cu.m
cu.m
tonne

Providing &laying Coursed Rubble Masonry with hard stone hammer-dressed in foundation & plinth - In
cement mortar 1:4
Coefficient for per cu.m

SM0027

Code
Description
LB0051 Mason Gd.2
LB0077 Labour

Quant
2.20000
2.88650

Units
day
day

MT0043 Sand
MT0060 Boulder
MT0145 Cement (OPC / PSC)

0.32100
1.10000
0.11400

cu.m
cu.m
tonne

Providing &laying Coursed Rubble Masonry with hard stone hammer-dressed in foundation & plinth - In
cement mortar 1:5
Coefficient for per cu.m
Code
LB0051
LB0077
MT0043
MT0060
MT0145

Description
Mason Gd.2
Labour
Sand
Boulder
Cement (OPC / PSC)

Quant
2.20000
2.88650
0.32100
1.10000
0.09300

Standards & Quality Control Authority, MoWHS

Units
day
day
cu.m
cu.m
tonne

Labour and Material Coefficients (Civil Works) - 2009

SM0028

75

Providing &laying Coursed Rubble Masonry with hard stone hammer-dressed in foundation & plinth - In
cement mortar 1:6
Coefficient for per cu.m

SM0035

Code
Description
LB0051 Mason Gd.2

Quant
2.20000

Units
day

LB0077
MT0043
MT0060
MT0145

2.88650
0.32100
1.10000
0.07500

day
cu.m
cu.m
tonne

Labour
Sand
Boulder
Cement (OPC / PSC)

Extra, for C.R. masonry with hard stone in superstructure above plinth, below & including floor 2 level
Coefficient for per cu.m
Code
Description
LB0051 Mason Gd.2
LB0077 Labour

SM0036

Quant
0.33000
0.44000

Units
day
day

Extra, for C.R. masonry with hard stone in superstructure above floor 2 level
Coefficient for per cu.m
Code
Description
LB0077 Labour

SM0037

Quant
0.29000

Units
day

Extra, for C.R masonry with hard stone in square or rectangular pillars
Coefficient for per cu.m
Code
Description
LB0051 Mason Gd.2
LB0076 Labour

SM0038

Quant
0.84000
0.34000

Units
day
day

Extra, for C.R masonry with hard stone in circular pillars


Coefficient for per cu.m
Code
LB0051
LB0076
MT0060

SM0039

Description
Mason Gd.2
Labour
Boulder

Quant
2.09000
0.44000
0.32000

Units
day
day
cu.m

Extra, for C.R masonry with hard stone chisel dressed in foundations and plinth
Coefficient for per cu.m
Code
Description
LB0051 Mason Gd.2
LB0077 Labour

SM0040

Quant
0.18000
0.07000

Units
day
day

Extra, for C.R masonry with hard stone chisel dressed in superstructure above plinth, below &
including floor 2 level
Coefficient for per cu.m
Code
Description
LB0051 Mason Gd.2
LB0077 Labour

SM0041

Quant
0.37000
0.48000

Units
day
day

Extra, for C.R masonry with hard stone for mixing water-proofing Materials
Coefficient for per cu.m
Code
Description
LB0077 Labour
MT0151 Water proofing compound

Quant
0.01470
2.30000

Standards & Quality Control Authority, MoWHS

Units
day
kg

Labour and Material Coefficients (Civil Works) - 2009

SM0050

76

Dry hand packed rubble masonry with stone boulders >0.04 Cu.m
Coefficient for per cu.m
Code
LB0051
LB0077
MT0060

SM0051

Description
Mason Gd.2
Labour
Boulder

Quant
1.06000
1.77000
1.00000

Units
day
day
cu.m

Dry hand packed rubble masonry hammer dressed (facing), with stone-boulder > 0.04 Cu.m
Coefficient for per cu.m
Code
LB0051
LB0077
MT0060

SM0052

Quant
1.35000
1.77000
1.10000

Units
day
day
cu.m

Dry hand packed rubble masonry chisel dressed (facing) with stone-boulder > 0.04 Cu.m
Coefficient for per cu.m
Code

SM0060

Description
Mason Gd.2
Labour
Boulder

Description

Quant

Units

LB0051 Mason Gd.2


LB0077 Labour
MT0060 Boulder

1.60000
2.00100
1.10000

day
day
cu.m

Providing and laying with hard stone (average volume 0.008 Cu.m) hand packed stone masonry in
cement concrete mortar 1:2:4, 20mm aggregates
Coefficient for per cu.m

SM0061

Code
LB0036
LB0039
LB0051
LB0053
LB0077

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour

Quant
0.02063
0.01650
1.08062
0.02310
2.59012

Units
day
day
day
day
day

MP0205
MP0206
MT0043
MT0060
MT0070
MT0145

Concrete Mixer(7/5 cu.ft)


Concrete Vibrator(M/C5)
Sand
Boulder
Crushed Rock - 20mm
Cement (OPC / PSC)

0.02310
0.02310
0.14685
1.00000
0.29370
0.10603

day
day
cu.m
cu.m
cu.m
tonne

P&L with hard stone (average volume 0.008 Cu.m) hand packed stone masonry in cement concrete
mortar 1:3:6, 20mm aggregates
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0060
MT0070
MT0145

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Boulder
Crushed Rock - 20mm
Cement (OPC / PSC)

Quant
0.02063
0.01650
1.08062
0.02310
2.50012
0.02310
0.02310
0.15510
1.00000
0.31020
0.07260

Standards & Quality Control Authority, MoWHS

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Labour and Material Coefficients (Civil Works) - 2009

SM0062

77

Providing and laying hammer dressed stone masonry with hard stone (average volume 0.008 Cu.m) in
cement concrete mortar 1:2:4 20mm aggregates
Coefficient for per cu.m
Code
Description
LB0036 Mason Gd.1
LB0039 Work Supervisor (Lajab)

Quant
0.02063
0.01650

Units
day
day

LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0060

1.43362
0.02310
2.50012
0.02310
0.02310
0.14685
1.10000

day
day
day
day
day
cu.m
cu.m

0.29370
0.10603

cu.m
tonne

Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Boulder

MT0070 Crushed Rock - 20mm


MT0145 Cement (OPC / PSC)
SM0063

Providing and laying hammer dressed stone masonry with hard stone (average volume 0.008 Cu.m) in
concrete mortar 1:3:6 20mm aggregates
Coefficient for per cu.m
Code
Description
LB0036 Mason Gd.1

Quant
0.02063

Units
day

LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0060

0.01650
1.43362
0.02310
2.50012
0.02310
0.02310
0.15510
1.10000

day
day
day
day
day
day
cu.m
cu.m

0.31020
0.07260

cu.m
tonne

Work Supervisor (Lajab)


Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Boulder

MT0070 Crushed Rock - 20mm


MT0145 Cement (OPC / PSC)
SM0064

Providing and laying rubble masonry chisel dressed (facing) with hard stone (average volume 0.008
cu.m) in concrete mortar 1:2:4 20mm aggregates
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0060
MT0070
MT0145

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Boulder
Crushed Rock - 20mm
Cement (OPC / PSC)

Quant
2.31563
0.01650
0.02063
0.02310
3.22212
0.02310
0.02310
0.14685
1.10000
0.29370
0.10603

Standards & Quality Control Authority, MoWHS

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Labour and Material Coefficients (Civil Works) - 2009

SM0065

78

Providing and laying rubble masonry chisel dressed (facing) with hard stone (average volume 0.008
cu.m) in concrete mortar 1:3:6 20mm aggregates
Coefficient for per cu.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0060
MT0070
MT0145

SM0070

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Boulder
Crushed Rock - 20mm
Cement (OPC / PSC)

Quant
2.31563
0.01650
0.02063
0.02310
3.22212
0.02310
0.02310
0.15510
1.10000
0.31020
0.07260

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Providing and laying Hammer dressed dry stone soling


Coefficient for per cu.m

SM0071

Code
Description
LB0051 Mason Gd.2

Quant
0.83000

Units
day

LB0077 Labour
MT0060 Boulder

0.83000
1.10000

day
cu.m

Providing and laying Chisel dressed dry stone soling


Coefficient for per cu.m
Code
LB0036
LB0051
LB0077
MT0060

SM0072

Description
Mason Gd.1
Mason Gd.2
Labour
Boulder

Quant
0.18000
0.83000
0.86300
1.10000

Units
day
day
day
cu.m

Providing and laying Hand packed stone filling or soling with stones
Coefficient for per cu.m
Code

SM0073

Description

Quant

Units

LB0051 Mason Gd.2


LB0077 Labour
MT0060 Boulder

0.53000
0.53000
1.00000

day
day
cu.m

Providing and laying Hammer dressed stone edging 150 x 250 mm with stones including excavation,
refilling and disposal of surplus earth within 30 m lead
Coefficient for per m
Code
LB0036
LB0051
LB0077
MT0060

Description
Mason Gd.1
Mason Gd.2
Labour
Boulder

Quant
0.03300
0.01700
0.09900
0.04600

Standards & Quality Control Authority, MoWHS

Units
day
day
day
cu.m

Labour and Material Coefficients (Civil Works) - 2009

SM0080

79

Providing and laying hammer dressed 150mm thick flat stone pavement with hammer dressed stone
edging 150mm wide & 250mm deep on both sides, including grouting joints - With cement concrete
mortar 1:3:6, 12mm aggregate
Coefficient for per sq.m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0060
MT0071
MT0145

SM0081

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Boulder
Crushed Rock - 12.5 - 6mm
Cement (OPC / PSC)

Quant
0.06549
0.00175
0.12879
0.00245
0.32124
0.00245
0.00245
0.01645
0.19360
0.03290
0.00779

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne

Providing and laying hammer dressed 150mm thick flat stone pavement with hammer dressed stone
edging 150mm wide & 250mm deep on both sides, including grouting joints - With cement mortar 1:3

Coefficient for per sq.m


Code
LB0036
LB0051
LB0077
MT0043
MT0060
MT0145
SM0082

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Boulder
Cement (OPC / PSC)

Quant
0.13030
0.12660
0.34469
0.00246
0.19360
0.00117

Units
day
day
day
cu.m
cu.m
tonne

Providing and laying hammer dressed 150mm thick flat stone pavement with hammer dressed stone
edging 150mm wide & 250mm deep on both sides, including grouting joints - With sand or earth etc.

Coefficient for per sq.m

SM0090

Code

Description

Quant

Units

LB0036
LB0051
LB0077
MT0043
MT0060

Mason Gd.1
Mason Gd.2
Labour
Sand
Boulder

0.07260
0.14530
0.42570
0.00200
0.24420

day
day
day
cu.m
cu.m

P&L hammer dressed flat stone paving in cement mortar 1:6 on prepared bedding (excluding the cost
of bedding) - 20mm
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0060
MT0145

Description
Mason Gd.1
Labour
Sand
Boulder
Cement (OPC / PSC)

Quant
0.90000
0.20112
0.00107
0.02300
0.00025

Standards & Quality Control Authority, MoWHS

Units
day
day
cu.m
cu.m
tonne

Labour and Material Coefficients (Civil Works) - 2009

SM0091

80

P&L hammer dressed flat stone paving in cement mortar 1:6 on prepared bedding (excluding the cost
of bedding) - 30mm
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0060
MT0145

SM0092

Description
Mason Gd.1
Labour
Sand
Boulder
Cement (OPC / PSC)

Quant
1.20000
0.20112
0.00107
0.03450
0.00025

Units
day
day
cu.m
cu.m
tonne

P&L hammer dressed flat stone paving in cement mortar 1:6 on prepared bedding (excluding the cost
of bedding) - 40mm
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0060
MT0145

SM0093

Units
day
day
cu.m
cu.m
tonne

Description
Mason Gd. 1
Labour
Boulder

Coefficient for per sq.m


Quant
Units
1.20000
day
0.20000
day
0.03450
cu.m

Providing and laying hammer dressed dry dolep paving with minimum stone thickness 40mm including
preparation of bed

Code
LB0036
LB0077
MT0060
SM0100

Quant
1.50000
0.20112
0.00107
0.04600
0.00025

Providing and laying hammer dressed dry dolep paving with minimum stone thickness 30mm including
preparation of bed

Code
LB0036
LB0077
MT0060
SM0094

Description
Mason Gd.1
Labour
Sand
Boulder
Cement (OPC / PSC)

Description
Mason Gd. 1
Labour
Boulder

Coefficient for per sq.m


Quant
Units
1.50000
day
0.20000
day
0.04600
cu.m

P&L all sides chisel dressed flat stone paving in cement mortar 1:6 on prepared bedding (excluding the
cost of bedding) - 20mm
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0060
MT0145

SM0101

Description
Mason Gd.1
Labour
Sand
Boulder
Cement (OPC / PSC)

Quant
1.20000
0.20112
0.00107
0.02300
0.00025

Units
day
day
cu.m
cu.m
tonne

P&L all sides chisel dressed flat stone paving in cement mortar 1:6 on prepared bedding (excluding the
cost of bedding) - 30mm
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0060
MT0145

Description
Mason Gd.1
Labour
Sand
Boulder
Cement (OPC / PSC)

Quant
1.50000
0.20112
0.00107
0.03450
0.00025

Standards & Quality Control Authority, MoWHS

Units
day
day
cu.m
cu.m
tonne

Labour and Material Coefficients (Civil Works) - 2009

SM0102

81

P&L all sides chisel dressed flat stone paving in cement mortar 1:6 on prepared bedding (excluding the
cost of bedding) - 40mm
Coefficient for per sq.m
Code
Description
LB0036 Mason Gd.1

Quant
1.90000

Units
day

LB0077
MT0043
MT0060
MT0145

0.20112
0.00107
0.04600
0.00025

day
cu.m
cu.m
tonne

Labour
Sand
Boulder
Cement (OPC / PSC)

SM0103

Providing and laying chisel dressed dry dolep paving with minimum stone thickness 30mm including
preparation of bed
Coefficient for per sq.m
Code
Description
Quant
Units
LB0036 Mason Gd. 1
1.50000
day
LB0077 Labour
0.20000
day
MT0060 Boulder
0.03450
cu.m

SM0104

Providing and laying chisel dressed dry dolep paving with minimum stone thickness 40mm including
preparation of bed
Code
LB0036
LB0077
MT0060

SM0110

Coefficient for per sq.m


Quant
Units
1.90000
day
0.20000
day
0.04600
cu.m

Description
Mason Gd. 1
Labour
Boulder

P&L pointing on stone work with cement mortar 1:3 - Flush pointing
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0145

SM0111

Description
Mason Gd.1
Labour
Sand
Cement (OPC / PSC)

Quant
0.09400
0.12789
0.00246
0.00117

Units
day
day
cu.m
tonne

P&L pointing on stone work with cement mortar 1:3 - Ruled pointing
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0145

SM0112

Description
Mason Gd.1
Labour
Sand
Cement (OPC / PSC)

Quant
0.10100
0.13759
0.00246
0.00117

Units
day
day
cu.m
tonne

P&L pointing on stone work with cement mortar 1:3 - Raised and cut pointing
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0145

SM0120

Description
Mason Gd.1
Labour
Sand
Cement (OPC / PSC)

Quant
0.20250
0.24078
0.00407
0.00194

Units
day
day
cu.m
tonne

Providing & filling hand-packed stone in G.I mesh 4mm (8swg)including supplying and weaving of
mesh complete - Double-knotted mesh....100mm
Coefficient for per cu.m
Code
LB0051
LB0077
MT0060
MT0230

Description
Mason Gd.2
Labour
Boulder
G.I double knotted mesh - 100 x 100 x 8-gauge

Standards & Quality Control Authority, MoWHS

Quant
0.53000
1.59000
1.00000
4.00000

Units
day
day
cu.m
sq.m

Labour and Material Coefficients (Civil Works) - 2009

SM0121

82

Providing & filling hand-packed stone in G.I mesh 4mm (8swg)including supplying and weaving of
mesh complete - Double-knotted mesh....150mm
Coefficient for per cu.m
Code
LB0051
LB0077
MT0060
MT0232

SM0122

Description
Mason Gd.2
Labour
Boulder
G.I double knotted mesh - 150 x 150 x 8-gauge

Quant
0.53000
1.59000
1.00000
4.00000

Units
day
day
cu.m
sq.m

Providing & filling hand-packed stone in G.I mesh 4mm (8swg)including supplying and weaving of
mesh complete - Chain-link mesh....100mm
Coefficient for per cu.m
Code
LB0051
LB0077
MT0060
MT0240

SM0130

Description
Mason Gd.2
Labour
Boulder
G.I chain-link mesh - 100 x 100 x 8-gauge

Quant
0.53000
1.59000
1.00000
4.00000

Units
day
day
cu.m
sq.m

P&L Precast Stone Masonry blocks (1:5:8) in cement mortar 1:6 in foundation and plinth - 30 cms thick
Coefficient for per sq.m
Code
LB0036
LB0039
LB0051
LB0077
MT0043
MT0060
MT0071
MT0145

SM0131

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Labour
Sand
Boulder
Crushed Rock - 12.5 - 6mm
Cement (OPC / PSC)

Quant
0.65900
0.01030
0.01290
1.24395
0.12339
0.00500
0.18400
0.03310

Units
day
day
day
day
cu.m
cu.m
cu.m
tonne

P&L Precast Stone Masonry blocks (1:5:8) in cement mortar 1:6 in foundation and plinth - 20 cms thick
Coefficient for per sq.m
Code
LB0036
LB0039
LB0051
LB0077
MT0043
MT0060
MT0071
MT0145

SM0140

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Labour
Sand
Boulder
Crushed Rock - 12.5 - 6mm
Cement (OPC / PSC)

Quant
0.44000
0.01030
0.00900
0.82184
0.08116
0.00370
0.12900
0.02207

Units
day
day
day
day
cu.m
cu.m
cu.m
tonne

P&L Precast Stone Masonry blocks (1:5:8) in cement mortar 1:6 in superstructure up to floor two level 20 cms thick
Coefficient for per sq.m
Code
LB0036
LB0039
LB0051
LB0077
MT0043

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Labour
Sand

MT0060 Boulder
MT0071 Crushed Rock - 12.5 - 6mm
MT0145 Cement (OPC / PSC)

Standards & Quality Control Authority, MoWHS

Quant
0.44000
0.00700
0.00900
0.83568
0.08116

Units
day
day
day
day
cu.m

0.00370
0.12900
0.02207

cu.m
cu.m
tonne

Labour and Material Coefficients (Civil Works) - 2009

SM0141

SM0142

83

P&L Precast Stone Masonry blocks (1:5:8) in cement mortar 1:6 in superstructure up to floor two level 15 cms thick
Coefficient for per sq.m
Code
Description
LB0036 Mason Gd.1

Quant
0.33000

Units
day

LB0039
LB0051
LB0077
MT0043
MT0060
MT0071
MT0145

0.00525
0.00680
0.62670
0.06084
0.00270
0.09700
0.01660

day
day
day
cu.m
cu.m
cu.m
tonne

Work Supervisor (Lajab)


Mason Gd.2
Labour
Sand
Boulder
Crushed Rock - 12.5 - 6mm
Cement (OPC / PSC)

P&L Precast Stone Masonry blocks (1:5:8) in cement mortar 1:6 in superstructure up to floor two level 10 cms thick
Coefficient for per sq.m
Code
LB0036
LB0039
LB0051
LB0077
MT0043
MT0060
MT0071
MT0145

SM0150

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Labour
Sand
Boulder
Crushed Rock - 12.5 - 6mm
Cement (OPC / PSC)

Quant
0.22000
0.00350
0.00450
0.43794
0.04063
0.00150
0.06500
0.01105

Units
day
day
day
day
cu.m
cu.m
cu.m
tonne

Extra, for Precast Stone Masonry blocks in superstructure above floor two level...per floor
Coefficient for per sq.m
Code
Description
LB0077 Labour

Quant
0.29000

Standards & Quality Control Authority, MoWHS

Units
day

Labour and Material Coefficients (Civil Works) - 2009

84

CHAPTER 11

WOOD WORK

WW0001

Providing & fixing in position dressed wood work in frames of doors, windows, clerestory windows and
other frames, wrought and framed - Blue pine
Coefficient for per cu.m6
Code
LB0021
LB0033
LB0077
MT0331

WW0002

Description
Carpenter Gd.1
Carpenter Gd.2
Labour
Rough-sawn timber (urban rate) - Class 'A', (Blue pine, Champ)

Quant
6.62100
6.62100
6.62100
1.05000

Units
day
day
day
cu.m

Providing & fixing in position dressed wood work in frames of doors, windows, clerestory windows and
other frames, wrought and framed - Champ wood
Coefficient for per cu.m
Code
LB0021
LB0033
LB0077
MT0331

WW0003

Description
Carpenter Gd.1
Carpenter Gd.2
Labour
Rough-sawn timber (urban rate) - Class 'A', (Blue pine, Champ)

Quant
6.62100
6.62100
6.62100
1.05000

Units
day
day
day
cu.m

Providing & fixing in position dressed wood work in frames of doors, windows, clerestory windows and
other frames, wrought and framed - Mixed Conifer
Coefficient for per cu.m
Code
LB0021
LB0033
LB0077
MT0330

WW0010

Description
Carpenter Gd.1
Carpenter Gd.2
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)

Quant
6.62100
6.62100
6.62100
1.05000

Units
day
day
day
cu.m

Providing & fixing blue pine moulded beading to door, window frames with iron screws including plugs,
priming coat on unexposed surfaces - 50 x 12 mm
Coefficient for per m
Code
LB0021
LB0052
LB0076
MT0331
MT0714

WW0011

Description
Carpenter Gd.1
Painter Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'A', (Blue pine, Champ)
Pink primer, for wood

Quant
0.13250
0.00248
0.00248
0.00066
0.00600

Units
day
day
day
cu.m
litre

Providing & fixing blue pine moulded beading to door, window frames with iron screws including plugs,
priming coat on unexposed surfaces - 50 x 20 mm
Coefficient for per m
Code
LB0021
LB0052
LB0076
MT0331
MT0714

WW0020

Description
Carpenter Gd.1
Painter Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'A', (Blue pine, Champ)
Pink primer, for wood

Quant
0.13250
0.00279
0.00279
0.00110
0.00675

Units
day
day
day
cu.m
litre

Providing & fixing joists, including hoisting, applying wood preservative on unexposed surfaces - Blue
pine
Coefficient for per cu.m
Code
LB0033
LB0039
LB0052
LB0077
MT0331
MT0735

Description
Carpenter Gd.2
Work Supervisor (Lajab)
Painter Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'A', (Blue pine, Champ)
Wood preservative -Brown

Standards & Quality Control Authority, MoWHS

Quant
3.50000
3.50000
0.03990
7.03990
1.05000
0.21000

Units
day
day
day
day
cu.m
litre

Labour and Material Coefficients (Civil Works) - 2009

WW0021

Providing & fixing joists, including hoisting, applying wood preservative on unexposed surfaces Mixed Conifer
Coefficient for per cu.m
Code
LB0033
LB0039
LB0052
LB0077
MT0330
MT0735

WW0030

Description
Carpenter Gd.2
Work Supervisor (Lajab)
Painter Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
Wood preservative -Brown

Quant
3.50000
3.50000
0.03990
7.03990
1.05000
0.21000

Units
day
day
day
day
cu.m
litre

Providing & fixing Eaves board (225x25mm) with moulding fitted and fixed with necessary screws Mixed Conifer
Coefficient for per m
Code
LB0033
LB0077
MT0330

WW0035

85

Description
Carpenter Gd.2
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)

Quant
0.10200
0.07000
0.00610

Units
day
day
cu.m

Providing, making & fixing woodwork dressed in traditional cornices complete as per standard design
in Mixed Conifer, including applying wood preservative on unexposed surfaces, excluding decorative
painting
(Measurement to be taken along the cornice and wall junction line) - At floor one level including
lhanglag
Coefficient for per m
Code
LB0021
LB0033
LB0052
LB0077
MT0330
MT0735

WW0036

Description
Carpenter Gd.1
Carpenter Gd.2
Painter Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
Wood preservative -Brown

Quant
1.00000
1.00000
0.01900
1.01900
0.06740
0.20000

Units
day
day
day
day
cu.m
litre

Providing, making & fixing woodwork dressed in traditional cornices complete as per standard design
in Mixed Conifer, including applying wood preservative on unexposed surfaces, excluding decorative
painting
(Measurement to be taken along the cornice and wall junction line) - At all other floor levels (excluding
phana)
Coefficient for per m
Code
LB0021
LB0033
LB0052
LB0077
MT0330
MT0735

WW0037

Description
Carpenter Gd.1
Carpenter Gd.2
Painter Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
Wood preservative -Brown

Quant
1.25000
1.25000
0.03990
1.53990
0.09860
0.30000

Units
day
day
day
day
cu.m
litre

Providing, making & fixing woodwork dressed in traditional cornices complete as per standard design
in Mixed Conifer, including applying wood preservative on unexposed surfaces, excluding decorative
painting
(Measurement to be taken along the cornice and wall junction line) - For single-storeyed structure
including phana
Coefficient for per m
Code
LB0021
LB0033
LB0052
LB0077
MT0330
MT0735

Description
Carpenter Gd.1
Carpenter Gd.2
Painter Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
Wood preservative -Brown

Standards & Quality Control Authority, MoWHS

Quant
1.00000
1.00000
0.05700
1.01900
0.09790
0.33000

Units
day
day
day
day
cu.m
litre

Labour and Material Coefficients (Civil Works) - 2009

WW0038

86

Providing, making & fixing woodwork dressed in traditional cornices complete as per standard design
in Mixed Conifer, including applying wood preservative on unexposed surfaces, excluding decorative
painting
(Measurement to be taken along the cornice and wall junction line) - Phana
Coefficient for per m
Code
LB0021
LB0033
LB0052
LB0077
MT0330
MT0735

WW0039

Description
Carpenter Gd.1
Carpenter Gd.2
Painter Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
Wood preservative -Brown

Quant
0.50000
0.50000
0.03800
1.04370
0.03338
0.20000

Units
day
day
day
day
cu.m
litre

Providing, making & fixing woodwork dressed in traditional cornices complete as per standard design
in Mixed Conifer, including applying wood preservative on unexposed surfaces, excluding decorative
painting
(Measurement to be taken along the cornice and wall junction line) - Lintel level
Coefficient for per m
Code
LB0021
LB0033
LB0077
MT0330

WW0045

Description
Carpenter Gd.1
Carpenter Gd.2
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)

Quant
0.86000
0.86000
0.14300
0.07600

Units
day
day
day
cu.m

Providing & fixing traditional wooden Tshegay for windows/railing etc. as per standard design - In
mixed conifer
Coefficient for per sq.m
Code
LB0021
LB0077
MT0330

WW0046

Quant
5.05000
1.05300
0.03200

Units
day
day
cu.m

Providing & fixing traditional wooden Tshegay for windows/railing etc. as per standard design - In blue
pine
Coefficient for per sq.m
Code
LB0021
LB0077
MT0331

WW0055

Description
Carpenter Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)

Description
Carpenter Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'A', (Blue pine, Champ)

Quant
5.05000
1.05300
0.03200

Units
day
day
cu.m

Providing & fixing Mixed Conifer (undressed) in wall-frames etc


Coefficient for per cu.m
Code
LB0033
LB0077
MT0330

WW0060

Description
Carpenter Gd.2
Labour
Rough-sawn timber (urban rate) - Class 'B' (Mixed Conifer)

Quant
7.53300
7.53300
1.05000

Units
day
day
cu.m

Providing & fixing roof framing, in trusses, purlins, rafters, posts, post plates including hoisting, etc
(excluding steel items) - Mixed Conifer
Coefficient for per cu.m
Code
LB0021
LB0033
LB0077
MT0330

Description
Carpenter Gd.1
Carpenter Gd.2
Labour
Rough-sawn timber (urban rate) - Class 'B'/ (Mixed Conifer)

Standards & Quality Control Authority, MoWHS

Quant
8.30000
8.30000
8.30000
1.05000

Units
day
day
day
cu.m

Labour and Material Coefficients (Civil Works) - 2009

WW0061

87

Providing & fixing roof framing, in trusses, purlins, rafters, posts, post plates including hoisting, etc
(excluding steel items) - Blue Pine
Coefficient for per cu.m
Code
LB0021
LB0033
LB0077
MT0331

WW0070

Units
day
day
day
cu.m

Description
Carpenter Gd.2
Labour
12mm, commercial ply

Quant
0.27870
0.16630
1.05000

Units
day
day
sq.m

Providing & fixing to frames (wall or ceiling), plain 4mm A.C sheet including 50 x 12.5 mm Mixed
Conifer beading (excluding cost of frame)
Coefficient for per sq.m
Code
LB0021
LB0033
LB0077
MT0330
MT0335

WW0080

Quant
8.30000
8.30000
8.30000
1.05000

Providing & fixing gussets for timber trusses including wood preservative (coal tar) - 12mm phenolic
plywood
Coefficient for per sq.m
Code
LB0033
LB0077
MT0342

WW0075

Description
Carpenter Gd.1
Carpenter Gd.2
Labour
Rough-sawn timber (urban rate) - Class 'A'/ (Blue pine, Champ)

Description
Carpenter Gd.1
Carpenter Gd.2
Labour
Rough-sawn timber (urban rate) - Class 'B' (Mixed Conifer)
Asbestos Cement Plain Sheet 4mm thick - 1.2 m x 1.2 m

Quant
0.24000
0.27000
0.24000
0.00420
0.70600

Units
day
day
day
cu.m
each

Providing and fixing to frames (wall or ceiling) Gypsum plaster board including finishing of joints
smooth complete (excluding cost of frame) - 10mm thick
Coefficient for per sq.m
Code
LB0033
LB0077
MT0345

WW0081

Description
Carpenter Gd.2
Labour
Gypsum Wallboard - 10mm

Quant
0.27000
0.24000
1.05000

Units
day
day
sq.m

Providing and fixing to frames (wall or ceiling) Gypsum plaster board including finishing of joints
smooth complete (excluding cost of frame) - 12mm thick
Coefficient for per sq.m
Code
LB0033
LB0077
MT0346

WW0082

Description
Carpenter Gd.2
Labour
Gypsum Wallboard - 12mm

Quant
0.27000
0.24000
1.05000

Units
day
day
sq.m

Providing and fixing to frames (wall or ceiling) Gypsum plaster board including finishing of joints
smooth complete (excluding cost of frame) - 15mm thick
Coefficient for per sq.m
Code
LB0033
LB0077
MT0347

Description
Carpenter Gd.2
Labour
Gypsum Wallboard - 15mm

Quant
0.27000
0.24000
1.05000

Standards & Quality Control Authority, MoWHS

Units
day
day
sq.m

Labour and Material Coefficients (Civil Works) - 2009

WW0090

88

Providing & fixing to frames (wall or ceiling) blue pine plain lining, tongued and grooved, including
necessary fixtures, wooden plugs and priming coat on unexposed surfaces (excluding cost of frames) 12 mm thick
Coefficient for per sq.m
Code
LB0021
LB0052
LB0077
MT0331
MT0714

WW0091

Quant
0.20250
0.03100
0.13100
0.01320
0.07500

Units
day
day
day
cu.m
litre

Providing & fixing to frames (wall or ceiling) blue pine plain lining, tongued and grooved, including
necessary fixtures, wooden plugs and priming coat on unexposed surfaces (excluding cost of frames) 20 mm thick
Coefficient for per sq.m
Code
LB0033
LB0077
MT0331

WW0100

Description
Carpenter Gd.1
Painter Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'A' (Blue pine, Champ)
Pink primer, for wood

Description
Carpenter Gd.2
Labour
Rough-sawn timber (urban rate) - Class 'A' (Blue pine, Champ)

Quant
0.20250
0.10000
0.02200

Units
day
day
cu.m

Providing & fixing to frames (wall or ceiling) Plain Particle Board Lining with necessary nails etc.
complete (excluding cost of frame) - 6mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0365

WW0101

Quant
0.23800
0.23800
1.00000

Units
day
day
sq.m

Providing & fixing to frames (wall or ceiling) Plain Particle Board Lining with necessary nails etc.
complete (excluding cost of frames) - 10mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0366

WW0102

Description
Carpenter Gd.1
Labour
Plain Particle Board - 6mm

Description
Carpenter Gd.1
Labour
Plain Particle Board - 10mm

Quant
0.23800
0.23800
1.00000

Units
day
day
sq.m

Providing & fixing to frames (wall or ceiling) Plain Particle Board Lining with necessary nails etc.
complete (excluding cost of frames) - 12mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0367

WW0103

Description
Carpenter Gd.1
Labour
Plain Particle Board - 12mm

Quant
0.23800
0.23800
1.00000

Units
day
day
sq.m

Providing & fixing to frames (wall or ceiling) Plain Particle Board Lining with necessary nails etc.
complete (excluding cost of frames) - 18mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0368

Description
Carpenter Gd.1
Labour
Plain Particle Board - 18mm

Quant
0.23800
0.23800
1.00000

Standards & Quality Control Authority, MoWHS

Units
day
day
sq.m

Labour and Material Coefficients (Civil Works) - 2009

WW0110

89

Providing & fixing Pre-laminated Particle Board Lining with necessary nails etc. complete (excluding
cost of frame) - 8 mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0375

WW0111

Units
day
day
sq.m

Description
Carpenter Gd.1
Labour
Pre-laminated Particle Board (one side) - 10mm

Quant
0.23800
0.23800
1.00000

Units
day
day
sq.m

Providing & fixing Pre-laminated Particle Board Lining with necessary nails etc. complete (excluding
cost of frame) - 12 mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0377

WW0113

Quant
0.23800
0.23800
1.00000

Providing & fixing Pre-laminated Particle Board Lining with necessary nails etc. complete (excluding
cost of frame) - 10 mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0376

WW0112

Description
Carpenter Gd.1
Labour
Pre-laminated Particle Board (one side) - 8mm

Description
Carpenter Gd.1
Labour
Pre-laminated Particle Board (one side) - 12mm

Quant
0.23800
0.23800
1.00000

Units
day
day
sq.m

Providing & fixing Pre-laminated Particle Board Lining with necessary nails etc. complete (excluding
cost of frame) - 18 mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0378

WW0120

Units
day
day
sq.m

Description
Carpenter Gd.1
Labour
Pre-laminated (both sides) Bison panel - 6mm

Quant
0.23800
0.23800
1.00000

Units
day
day
sq.m

Providing & fixing bison panel (pre-laminated both sides for wall/ceiling) lining with necessary
nails/screws etc. complete, excluding the cost of frame) - 8 mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0351

WW0122

Quant
0.23800
0.23800
1.00000

Providing & fixing bison panel (pre-laminated both sides for wall/ceiling) lining with necessary
nails/screws etc. complete, excluding the cost of frame) - 6 mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0350

WW0121

Description
Carpenter Gd.1
Labour
Pre-laminated Particle Board (one side) - 18mm

Description
Carpenter Gd.1
Labour
Pre-laminated (both sides) Bison panel - 8mm

Quant
0.23800
0.23800
1.00000

Units
day
day
sq.m

Providing & fixing bison panel (pre-laminated both sides for wall/ceiling) lining with necessary
nails/screws etc. complete, excluding the cost of frame) - 10 mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0352

Description
Carpenter Gd.1
Labour
Pre-laminated (both sides) Bison panel - 10mm

Standards & Quality Control Authority, MoWHS

Quant
0.23800
0.23800
1.00000

Units
day
day
sq.m

Labour and Material Coefficients (Civil Works) - 2009

WW0123

90

Providing & fixing bison panel (pre-laminated both sides for wall/ceiling) lining with necessary
nails/screws etc. complete, excluding the cost of frame) - 12 mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0353

WW0124

Quant
0.23800
0.23800
1.00000

Units
day
day
sq.m

Providing & fixing bison panel (pre-laminated both sides for wall/ceiling) lining with necessary
nails/screws etc. complete, excluding the cost of frame) - 16 mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0354

WW0125

Description
Carpenter Gd.1
Labour
Pre-laminated (both sides) Bison panel - 12mm

Description
Carpenter Gd.1
Labour
Pre-laminated (both sides) Bison panel - 16mm

Quant
0.23800
0.23800
1.00000

Units
day
day
sq.m

Providing & fixing bison panel (pre-laminated both sides for wall/ceiling) lining with necessary
nails/screws etc. complete, excluding the cost of frame) - 20 mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0355

WW0130

Description
Carpenter Gd.1
Labour
Pre-laminated (both sides) Bison panel - 20mm

Quant
0.23800
0.23800
1.00000

Units
day
day
sq.m

Providing & fixing Plywood lining with necessary nails etc. including beading complete (excluding cost
of frame) - 4 mm, commercial
Coefficient for per sq.m
Code
LB0021
LB0033
LB0077
MT0330
MT0340

WW0131

Description
Carpenter Gd.1
Carpenter Gd.2
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
4mm, commercial ply

Quant
0.24000
0.27000
0.24000
0.00420
1.05000

Units
day
day
day
cu.m
sq.m

Providing & fixing Plywood lining with necessary nails etc. including beading complete (excluding cost
of frame) - 4 mm, teak
Coefficient for per sq.m
Code
LB0021
LB0033
LB0077
MT0330
MT0341

WW0132

Description
Carpenter Gd.1
Carpenter Gd.2
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
4mm, teak ply

Quant
0.24000
0.27000
0.24000
0.00420
1.05000

Units
day
day
day
cu.m
sq.m

Providing & fixing Plywood lining with necessary nails etc. including beading complete (excluding cost
of frame) - 6 mm, commercial
Coefficient for per sq.m
Code
LB0021
LB0033
LB0077
MT0330
MT0342

Description
Carpenter Gd.1
Carpenter Gd.2
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
6mm, commercial ply

Standards & Quality Control Authority, MoWHS

Quant
0.24000
0.27000
0.24000
0.00420
1.05000

Units
day
day
day
cu.m
sq.m

Labour and Material Coefficients (Civil Works) - 2009

WW0140

91

Providing & fixing Pre-fabricated wall panelling profiles with necessary nails etc. complete but
excluding the cost of frame) - 19 mm, blue pine
Coefficient for per sq.m
Code
LB0021
LB0077
MT0400

WW0141

Description
Carpenter Gd.1
Labour
Wall panelling - 19mm, blue pine

Quant
0.23800
0.23800
1.00000

Units
day
day
sq.m

Providing & fixing Pre-fabricated wall panelling profiles with necessary nails etc. complete but
excluding the cost of frame) - 19 mm, mixed conifer
Coefficient for per sq.m
Code
LB0021
LB0077
MT0403

WW0142

Description
Carpenter Gd.1
Labour
Wall panelling - 19mm, mixed conifer

Quant
0.23800
0.23800
1.00000

Units
day
day
sq.m

Providing & fixing Pre-fabricated wall panelling profiles with necessary nails etc. complete but
excluding the cost of frame) - 15 mm, blue pine
Coefficient for per sq.m
Code
LB0021
LB0077
MT0401

WW0150

Description
Carpenter Gd.1
Labour
Wall panelling - 15mm, blue pine

Quant
0.23800
0.23800
1.00000

Units
day
day
sq.m

Providing & fixing wooden skirting in mixed conifer with necessary nails or screws complete - 20 mm
Coefficient for per sq.m
Code
LB0021
LB0036
LB0052
LB0077
MT0330
MT0714

WW0151

Description
Carpenter Gd.1
Mason Gd.1
Painter Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
Pink primer, for wood

Quant
2.10420
0.10420
0.03100
0.60390
0.02100
0.07500

Units
day
day
day
day
cu.m
litre

Providing & fixing wooden skirting in mixed conifer with necessary nails or screws complete - 25 mm
Coefficient for per sq.m
Code
LB0021
LB0036
LB0052
LB0077
MT0330
MT0714

WW0160

Description
Carpenter Gd.1
Mason Gd.1
Painter Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
Pink primer, for wood

Quant
2.10420
0.10420
0.03100
0.60390
0.02630
0.07500

Units
day
day
day
day
cu.m
litre

Providing & fixing 75mm thick split bamboo wall including grooving frames, 20mm plaster cement
mortar 1:4 both sides (excluding cost of frame)
Coefficient for per sq.m
Code
LB0021
LB0036
LB0077
MT0043
MT0145
MT0391

Description
Carpenter Gd.1
Mason Gd.1
Labour
Sand
Cement (OPC / PSC)
Bamboo - 75mm dia

Quant
0.10760
0.27000
0.51310
0.04794
0.01702
13.30000

Standards & Quality Control Authority, MoWHS

Units
day
day
day
cu.m
tonne
m

Labour and Material Coefficients (Civil Works) - 2009

WW0161

92

Providing & fixing 75mm thick split bamboo wall including grooving frames, 20mm plaster cement
mortar 1:5 both sides (excluding cost of frame)
Coefficient for per sq.m
Code
LB0021
LB0036
LB0077
MT0043
MT0145
MT0391

WW0162

Description
Carpenter Gd.1
Mason Gd.1
Labour
Sand
Cement (OPC / PSC)
Bamboo - 75mm dia

Quant
0.10760
0.27000
0.51310
0.04794
0.01389
13.30000

Units
day
day
day
cu.m
tonne
m

Providing & fixing 75mm thick split bamboo wall including grooving frames, 20mm plaster cement
mortar 1:6 both sides ( excluding cost of frame)
Coefficient for per sq.m
Code
LB0021
LB0036
LB0077
MT0043
MT0145
MT0391

WW0163

Description
Carpenter Gd.1
Mason Gd.1
Labour
Sand
Cement (OPC / PSC)
Bamboo - 75mm dia

Quant
0.10760
0.27000
0.51310
0.04794
0.01120
13.30000

Units
day
day
day
cu.m
tonne
m

Providing & fixing 75mm thick split bamboo wall including grooving frames, 20mm mud plaster both
sides ( excluding cost of frame)
Coefficient for per sq.m
Code
LB0021
LB0077
MT0042
MT0391

WW0164

Description
Carpenter Gd.1
Labour
Mud dry
Bamboo - 75mm dia

Quant
0.10760
0.19166
0.05376
13.30000

Units
day
day
cu.m
m

Providing & fixing 150mm thick split bamboo wall including grooving frames, 60mm mud plaster both
sides (excluding cost of frame)
Coefficient for per sq.m
Code
LB0021
LB0077
MT0042
MT0391

WW0165

Description
Carpenter Gd.1
Labour
Mud dry
Bamboo - 75mm dia

Quant
0.10760
0.38750
0.14400
13.30000

Units
day
day
cu.m
m

Providing & fixing split Bamboo Matting (excluding the cost of framing and beading)
Coefficient for per sq.m
Code
Description
LB0077 Labour
MT0392 Bamboo mat

WW0170

Quant
0.04230
1.05000

Units
day
sq.m

Providing & fixing Panelled or Panelled-&-Glazed partition, single-central-panelling including frame etc
complete - 100mm framing, 38mm thick Mixed Conifer panelling
Coefficient for per sq.m
Code
LB0021
LB0033
LB0036
LB0077
MT0330
MT0655

Description
Carpenter Gd.1
Carpenter Gd.2
Mason Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
Plain Glass - 3mm thick

Standards & Quality Control Authority, MoWHS

Quant
1.56567
0.85727
0.05000
0.77397
0.05252
0.23670

Units
day
day
day
day
cu.m
sq.m

Labour and Material Coefficients (Civil Works) - 2009

WW0171

Providing & fixing Panelled or Panelled-&-Glazed partition, single-central-panelling including frame etc
complete - 75mm framing, 38mm thick Mixed Conifer panelling
Coefficient for per sq.m
Code
LB0021
LB0033
LB0036
LB0077
MT0330
MT0655

WW0172

93

Description
Carpenter Gd.1
Carpenter Gd.2
Mason Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
Plain Glass - 3mm thick

Quant
1.52793
0.81953
0.05000
0.73623
0.04654
0.23670

Units
day
day
day
day
cu.m
sq.m

Providing & fixing Panelled or Panelled-&-Glazed partition, single-central-panelling including frame etc
complete - 100mm framing, 38mm thick Champ or Blue Pine panelling
Coefficient for per sq.m
Code
LB0021
LB0033
LB0036
LB0077
MT0331
MT0655

WW0173

Quant
1.56567
0.85727
0.05000
0.77397
0.05252
0.23670

Units
day
day
day
day
cu.m
sq.m

Providing & fixing Panelled or Panelled-&-Glazed partition, single-central-panelling including frame etc
complete - 75mm framing, 38mm thick Champ or Blue Pine panelling
Coefficient for per sq.m
Code
LB0021
LB0033
LB0036
LB0077
MT0331
MT0655

WW0180

Description
Carpenter Gd.1
Carpenter Gd.2
Mason Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'A', (Blue pine, Champ)
Plain Glass - 3mm thick

Description
Carpenter Gd.1
Carpenter Gd.2
Mason Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'A', (Blue pine, Champ)
Plain Glass - 3mm thick

Quant
1.52793
0.81953
0.05000
0.73623
0.04654
0.23670

Units
day
day
day
day
cu.m
sq.m

Providing & fixing Panelled or Panelled-&-Glazed, Plywood panelling from both sides including frame 100mm framing, 4mm Commercial Ply
Coefficient for per sq.m
Code
LB0021
LB0033
LB0036
LB0052
LB0077
MT0330
MT0340
MT0714

WW0181

Description
Carpenter Gd.1
Carpenter Gd.2
Mason Gd.1
Painter Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
4mm, commercial ply
Pink primer, for wood

Quant
0.29000
0.16949
0.05000
0.10385
0.56334
0.02362
2.20000
0.25125

Units
day
day
day
day
day
cu.m
sq.m
litre

Providing & fixing Panelled or Panelled-&-Glazed, Plywood panelling from both sides including frame 75mm framing, 4mm Commercial Ply
Coefficient for per sq.m
Code
LB0021
LB0033
LB0036
LB0052
LB0077
MT0330
MT0340
MT0714

Description
Carpenter Gd.1
Carpenter Gd.2
Mason Gd.1
Painter Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
4mm, commercial ply
Pink primer, for wood

Standards & Quality Control Authority, MoWHS

Quant
0.29000
0.12655
0.05000
0.10385
0.52040
0.01764
2.20000
0.25125

Units
day
day
day
day
day
cu.m
sq.m
litre

Labour and Material Coefficients (Civil Works) - 2009

WW0182

94

Providing & fixing Panelled or Panelled-&-Glazed, Plywood panelling from both sides including frame 100mm framing, 4mm Teak Ply
Coefficient for per sq.m
Code
LB0021
LB0033
LB0036
LB0052
LB0077
MT0330
MT0341
MT0714

WW0183

Description
Carpenter Gd.1
Carpenter Gd.2
Mason Gd.1
Painter Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
4mm, teak ply
Pink primer, for wood

Quant
0.29000
0.16949
0.05000
0.10385
0.56334
0.02362
2.20000
0.25125

Units
day
day
day
day
day
cu.m
sq.m
litre

Providing & fixing Panelled or Panelled-&-Glazed, Plywood panelling from both sides including frame 75mm framing, 4mm Teak Ply
Coefficient for per sq.m
Code
LB0021
LB0033
LB0036
LB0052
LB0077
MT0330
MT0341
MT0714

WW0190

Quant
0.29000
0.12655
0.05000
0.09672
0.51327
0.01764
2.20000
0.23400

Units
day
day
day
day
day
cu.m
sq.m
litre

Providing & fixing Panelled with Pre-fabricated profiles from both sides including the frame and prime
coat on concealed face - 100mm, 12mm blue pine
Coefficient for per sq.m
Code
LB0021
LB0033
LB0036
LB0052
LB0077
MT0330
MT0402
MT0714

WW0191

Description
Carpenter Gd.1
Carpenter Gd.2
Mason Gd.1
Painter Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
4mm, teak ply
Pink primer, for wood

Description
Carpenter Gd.1
Carpenter Gd.2
Mason Gd.1
Painter Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
Wall panelling - 12mm, blue pine
Pink primer, for wood

Quant
0.30000
0.16949
0.05000
0.10385
0.57334
0.02362
2.00000
0.25125

Units
day
day
day
day
day
cu.m
sq.m
litre

Providing & fixing Panelled with Pre-fabricated profiles from both sides including the frame and prime
coat on concealed face - 75mm, 12mm blue pine
Coefficient for per sq.m
Code
LB0021
LB0033
LB0036
LB0052
LB0077
MT0330
MT0402
MT0714

Description
Carpenter Gd.1
Carpenter Gd.2
Mason Gd.1
Painter Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
Wall panelling - 12mm, blue pine
Pink primer, for wood

Standards & Quality Control Authority, MoWHS

Quant
0.30000
0.12655
0.05000
0.09672
0.52327
0.01764
2.00000
0.23400

Units
day
day
day
day
day
cu.m
sq.m
litre

Labour and Material Coefficients (Civil Works) - 2009

WW0192

Providing & fixing Panelled with Pre-fabricated profiles from both sides including the frame and prime
coat on concealed face - 100mm, 12mm mixed conifer
Coefficient for per sq.m
Code
LB0021
LB0033
LB0036
LB0052
LB0077
MT0330
MT0404
MT0714

WW0193

95

Description
Carpenter Gd.1
Carpenter Gd.2
Mason Gd.1
Painter Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
Wall panelling - 12mm, mixed conifer
Pink primer, for wood

Quant
0.30000
0.16949
0.05000
0.10385
0.57334
0.02362
2.00000
0.25125

Units
day
day
day
day
day
cu.m
sq.m
litre

Providing & fixing Panelled with Pre-fabricated profiles from both sides including the frame and prime
coat on concealed face - 75mm, 12mm mixed conifer
Coefficient for per sq.m
Code
LB0021
LB0033
LB0036
LB0052
LB0077
MT0330
MT0404
MT0714

WW0194

Description
Carpenter Gd.1
Carpenter Gd.2
Mason Gd.1
Painter Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
Wall panelling - 12mm, mixed conifer
Pink primer, for wood

Quant
0.30000
0.12655
0.05000
0.09672
0.52327
0.01764
2.00000
0.23400

Units
day
day
day
day
day
cu.m
sq.m
litre

Providing & fixing Panelled with Pre-fabricated profiles from both sides including the frame and prime
coat on concealed face - 100mm, 12mm champ wood
Coefficient for per sq.m
Code
LB0021
LB0033
LB0036
LB0052
LB0077
MT0330
MT0405
MT0714

WW0195

Description
Carpenter Gd.1
Carpenter Gd.2
Mason Gd.1
Painter Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
Wall panelling - 12mm, Champ wood
Pink primer, for wood

Quant
0.30000
0.16949
0.05000
0.10385
0.57334
0.02362
2.00000
0.25125

Units
day
day
day
day
day
cu.m
sq.m
litre

Providing & fixing Panelled with Pre-fabricated profiles from both sides including the frame and prime
coat on concealed face - 75mm, 12mm champ wood
Coefficient for per sq.m
Code
LB0021
LB0033
LB0036
LB0052
LB0077
MT0330
MT0405
MT0714

Description
Carpenter Gd.1
Carpenter Gd.2
Mason Gd.1
Painter Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
Wall panelling - 12mm, Champ wood
Pink primer, for wood

Standards & Quality Control Authority, MoWHS

Quant
0.30000
0.12655
0.05000
0.09672
0.52327
0.01764
2.00000
0.23400

Units
day
day
day
day
day
cu.m
sq.m
litre

Labour and Material Coefficients (Civil Works) - 2009

WW0200

96

Providing & fixing 25mm thick Panelled or glazed Shutters for cup-boards etc. complete including
hinges - Champ wood
Coefficient for per sq.m
Code
LB0021
LB0033
LB0039
LB0077
MT0331
MT0531
MT0655

WW0201

Description
Carpenter Gd.1
Carpenter Gd.2
Work Supervisor (Lajab)
Labour
Rough-sawn timber (urban rate) - Class 'A', (Blue pine, Champ)
Anodised Aluminium Fittings: Butt Hinges - 75mm
Plain Glass - 3mm thick

Quant
0.64000
1.16000
0.07000
0.53000
0.02400
3.00000
0.46000

Units
day
day
day
day
cu.m
each
sq.m

Providing & fixing 25mm thick Panelled or glazed Shutters for cup-boards etc. complete including
hinges - Mixed Conifer
Coefficient for per sq.m
Code
LB0021
LB0033
LB0039
LB0077
MT0330
MT0531
MT0655

WW0210

Description
Carpenter Gd.1
Carpenter Gd.2
Work Supervisor (Lajab)
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
Anodised Aluminium Fittings: Butt Hinges - 75mm
Plain Glass - 3mm thick

Quant
0.44000
0.73000
0.07000
0.47000
0.02400
3.00000
0.46000

Units
day
day
day
day
cu.m
each
sq.m

Providing & fixing 35mm thick Panelled or glazed doors and windows Shutters etc. complete including
hinges - Champ wood
Coefficient for per sq.m
Code
LB0021
LB0033
LB0077
MT0331
MT0530
MT0532
MT0655

WW0211

Description
Carpenter Gd.1
Carpenter Gd.2
Labour
Rough-sawn timber (urban rate) - Class 'A', (Blue pine, Champ)
Anodised Aluminium Fittings: Butt Hinges - 100mm
Anodised Aluminium Fittings: Butt Hinges - 50mm
Plain Glass - 3mm thick

Quant
0.66200
1.22700
0.58000
0.03200
3.00000
1.00000
0.46000

Units
day
day
day
cu.m
each
each
sq.m

Providing & fixing 35mm thick Panelled or glazed doors and windows Shutters etc. complete including
hinges - Mixed Conifer
Coefficient for per sq.m
Code
LB0021
LB0033
LB0077
MT0330
MT0530
MT0532
MT0655

WW0220

Description
Carpenter Gd.1
Carpenter Gd.2
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
Anodised Aluminium Fittings: Butt Hinges - 100mm
Anodised Aluminium Fittings: Butt Hinges - 50mm
Plain Glass - 3mm thick

Quant
0.44000
0.89400
0.44000
0.03200
3.00000
1.00000
0.46000

Units
day
day
day
cu.m
each
each
sq.m

Providing & fixing 38mm thick Panelled or glazed doors and windows Shutters etc. complete including
hinges - Champ wood
Coefficient for per sq.m
Code
LB0021
LB0033
LB0077
MT0331
MT0530
MT0532
MT0655

Description
Carpenter Gd.1
Carpenter Gd.2
Labour
Rough-sawn timber (urban rate) - Class 'A', (Blue pine, Champ)
Anodised Aluminium Fittings: Butt Hinges - 100mm
Anodised Aluminium Fittings: Butt Hinges - 50mm
Plain Glass - 3mm thick

Standards & Quality Control Authority, MoWHS

Quant
0.66200
1.22700
0.58000
0.03400
3.00000
1.00000
0.46000

Units
day
day
day
cu.m
each
each
sq.m

Labour and Material Coefficients (Civil Works) - 2009

WW0221

97

Providing & fixing 38mm thick Panelled or glazed doors and windows Shutters etc. complete including
hinges - Mixed Conifer
Coefficient for per sq.m
Code
LB0021
LB0033
LB0077
MT0330
MT0530
MT0532
MT0655

WW0230

Description
Carpenter Gd.1
Carpenter Gd.2
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
Anodised Aluminium Fittings: Butt Hinges - 100mm
Anodised Aluminium Fittings: Butt Hinges - 50mm
Plain Glass - 3mm thick

Quant
0.44000
0.89400
0.44000
0.03400
3.00000
1.00000
0.46000

Units
day
day
day
cu.m
each
each
sq.m

Providing & fixing 44mm thick Panelled or glazed doors and windows Shutters etc. complete including
hinges - Champ wood
Coefficient for per sq.m
Code
LB0021
LB0033
LB0039
LB0077
MT0331
MT0530
MT0532
MT0655

WW0231

Description
Carpenter Gd.1
Carpenter Gd.2
Work Supervisor (Lajab)
Labour
Rough-sawn timber (urban rate) - Class 'A', (Blue pine, Champ)
Anodised Aluminium Fittings: Butt Hinges - 100mm
Anodised Aluminium Fittings: Butt Hinges - 50mm
Plain Glass - 3mm thick

Quant
0.66200
1.16000
0.07000
0.58000
0.03710
3.00000
1.00000
0.46000

Units
day
day
day
day
cu.m
each
each
sq.m

Providing & fixing 44mm thick Panelled or glazed doors and windows Shutters etc. complete including
hinges - Mixed Conifer
Coefficient for per sq.m
Code
LB0021
LB0033
LB0039
LB0077
MT0330
MT0530
MT0532
MT0655

WW0240

Description
Carpenter Gd.1
Carpenter Gd.2
Work Supervisor (Lajab)
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
Anodised Aluminium Fittings: Butt Hinges - 100mm
Anodised Aluminium Fittings: Butt Hinges - 50mm
Plain Glass - 3mm thick

Quant
0.44000
0.81000
0.08300
0.44000
0.03710
3.00000
1.00000
0.46000

Units
day
day
day
day
cu.m
each
each
sq.m

Providing & fixing 50mm thick Panelled or glazed doors and windows Shutters etc. complete including
hinges - Champ wood
Coefficient for per sq.m
Code
LB0021
LB0033
LB0039
LB0077
MT0331
MT0530
MT0532
MT0655

Description
Carpenter Gd.1
Carpenter Gd.2
Work Supervisor (Lajab)
Labour
Rough-sawn timber (urban rate) - Class 'A', (Blue pine, Champ)
Anodised Aluminium Fittings: Butt Hinges - 100mm
Anodised Aluminium Fittings: Butt Hinges - 50mm
Plain Glass - 3mm thick

Standards & Quality Control Authority, MoWHS

Quant
0.66200
1.16000
0.07000
0.58000
0.04200
3.00000
1.00000
0.46000

Units
day
day
day
day
cu.m
each
each
sq.m

Labour and Material Coefficients (Civil Works) - 2009

WW0241

Providing & fixing 50mm thick Panelled or glazed doors and windows Shutters etc. complete including
hinges - Mixed Conifer
Coefficient for per sq.m
Code
LB0021
LB0033
LB0039
LB0077
MT0330
MT0530
MT0655

WW0250

98

Description
Carpenter Gd.1
Carpenter Gd.2
Work Supervisor (Lajab)
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
Anodised Aluminium Fittings: Butt Hinges - 100mm
Plain Glass - 3mm thick

Quant
0.44000
0.81000
0.08000
0.44000
0.04200
4.00000
0.46000

Units
day
day
day
day
cu.m
each
sq.m

Providing & fixing Wire-gauze Shutters 25mm for doors & windows using galvanised M.S. wire-gauze
0.56mm dia wire including the cost of hinges - Champ wood
Coefficient for per sq.m
Code
LB0021
LB0033
LB0039
LB0077
MT0331
MT0410
MT0530

WW0251

Description
Quant
Carpenter Gd.1
0.81000
Carpenter Gd.2
0.58000
Work Supervisor (Lajab)
0.06500
Labour
0.65000
Rough-sawn timber (urban rate) - Class 'A', (Blue pine, Champ)
0.01800
Galv. mild steel wire gauze, 85G (0.85mm average width of aperture), 0.56mm dia.0.66000
Anodised Aluminium Fittings: Butt Hinges - 100mm
3.00000

Units
day
day
day
day
cu.m
sq.m
each

Providing & fixing Wire-gauze Shutters 25mm for doors & windows using galvanised M.S. wire-gauze
0.56mm dia wire including the cost of hinges - Mixed Conifer
Coefficient for per sq.m
Code
LB0021
LB0033
LB0039
LB0077
MT0330
MT0410
MT0530

WW0260

Description
Quant
Carpenter Gd.1
0.44000
Carpenter Gd.2
0.35000
Work Supervisor (Lajab)
0.06500
Labour
0.33000
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
0.01800
Galv. mild steel wire gauze, 85G (0.85mm average width of aperture), 0.56mm dia.0.66000
Anodised Aluminium Fittings: Butt Hinges - 100mm
3.00000

Units
day
day
day
day
cu.m
sq.m
each

Providing & fixing Wire-gauze Shutters 35mm for doors & windows using galvanised M.S. wire-gauze
0.56mm dia wire including the cost of hinges - Champ wood
Coefficient for per sq.m
Code
LB0021
LB0033
LB0039
LB0077
MT0331
MT0410
MT0530

WW0261

Description
Quant
Carpenter Gd.1
0.81000
Carpenter Gd.2
0.58000
Work Supervisor (Lajab)
0.06500
Labour
0.65000
Rough-sawn timber (urban rate) - Class 'A', (Blue pine, Champ)
0.02410
Galv. mild steel wire gauze, 85G (0.85mm average width of aperture), 0.56mm dia.0.66000
Anodised Aluminium Fittings: Butt Hinges - 100mm
3.00000

Units
day
day
day
day
cu.m
sq.m
each

Providing & fixing Wire-gauze Shutters 35mm for doors & windows using galvanised M.S. wire-gauze
0.56mm dia wire including the cost of hinges - Mixed Conifer
Coefficient for per sq.m
Code
LB0021
LB0033
LB0039
LB0077
MT0330
MT0410
MT0530

Description
Quant
Carpenter Gd.1
0.44000
Carpenter Gd.2
0.35000
Work Supervisor (Lajab)
0.06500
Labour
0.33000
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
0.02410
Galv. mild steel wire gauze, 85G (0.85mm average width of aperture), 0.56mm dia.0.66000
Anodised Aluminium Fittings: Butt Hinges - 100mm
3.00000

Standards & Quality Control Authority, MoWHS

Units
day
day
day
day
cu.m
sq.m
each

Labour and Material Coefficients (Civil Works) - 2009

WW0270

99

Providing & fixing Wire-gauze Shutters 38mm for doors & windows using galvanised M.S. wire-gauze
0.56mm dia wire including the cost of hinges - Champ wood
Coefficient for per sq.m
Code
LB0021
LB0033
LB0039
LB0077
MT0331
MT0410
MT0530

WW0271

Description
Quant
Carpenter Gd.1
0.81000
Carpenter Gd.2
0.58000
Work Supervisor (Lajab)
0.06500
Labour
0.65000
Rough-sawn timber (urban rate) - Class 'A', (Blue pine, Champ)
0.02600
Galv. mild steel wire gauze, 85G (0.85mm average width of aperture), 0.56mm dia.0.66000
Anodised Aluminium Fittings: Butt Hinges - 100mm
3.00000

Units
day
day
day
day
cu.m
sq.m
each

Providing & fixing Wire-gauze Shutters 38mm for doors & windows using galvanised M.S. wire-gauze
0.56mm dia wire including the cost of hinges - Mixed Conifer
Coefficient for per sq.m
Code
LB0021
LB0033
LB0039
LB0077
MT0330
MT0410
MT0530

WW0280

Description
Quant
Carpenter Gd.1
0.44000
Carpenter Gd.2
0.35000
Work Supervisor (Lajab)
0.06500
Labour
0.33000
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
0.02600
Galv. mild steel wire gauze, 85G (0.85mm average width of aperture), 0.56mm dia.0.66000
Anodised Aluminium Fittings: Butt Hinges - 100mm
3.00000

Units
day
day
day
day
cu.m
sq.m
each

Providing & fixing Battened door & window shutters 20mm, with ledges and braces (25 mm), including
the cost of hinges - Champ wood
Coefficient for per sq.m
Code
LB0033
LB0039
LB0077
MT0331
MT0615

WW0281

Description
Carpenter Gd.2
Work Supervisor (Lajab)
Labour
Rough-sawn timber (urban rate) - Class 'A', (Blue pine, Champ)
Mild Steel: Butt Hinges - 100mm

Quant
1.32000
0.10000
0.33000
0.03600
2.00000

Units
day
day
day
cu.m
each

Providing & fixing Battened door & window shutters 20mm, with ledges and braces (25 mm), including
the cost of hinges - Blue pine
Coefficient for per sq.m
Code
LB0033
LB0039
LB0077
MT0331
MT0615

WW0282

Description
Carpenter Gd.2
Work Supervisor (Lajab)
Labour
Rough-sawn timber (urban rate) - Class 'A', (Blue pine, Champ)
Mild Steel: Butt Hinges - 100mm

Quant
1.32000
0.10000
0.33000
0.03600
2.00000

Units
day
day
day
cu.m
each

Providing & fixing Battened door & window shutters 20mm, with ledges and braces (25 mm), including
the cost of hinges - Mixed Conifer
Coefficient for per sq.m
Code
LB0033
LB0039
LB0077
MT0330
MT0615

Description
Carpenter Gd.2
Work Supervisor (Lajab)
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
Mild Steel: Butt Hinges - 100mm

Standards & Quality Control Authority, MoWHS

Quant
1.32000
0.10000
0.33000
0.03600
2.00000

Units
day
day
day
cu.m
each

Labour and Material Coefficients (Civil Works) - 2009

WW0290

100

Providing & fixing battened garage door with ledges and braces (38mm) in Mixed Conifer, including
mountings etc complete - 22 mm
Coefficient for per sq.m
Code
LB0033
LB0039
LB0077
MT0182
MT0330

WW0295

Units
day
day
day
kg
cu.m

Description
Carpenter Gd.2
Work Supervisor (Lajab)
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
Mild Steel: Butt Hinges - 100mm
Mild Steel: Butt Hinges - 50mm

Quant
1.10000
0.09000
0.55000
0.02960
1.88000
0.62500

Units
day
day
day
cu.m
each
each

Providing & fixing 38mm thick louvered shutters for windows, doors with fixed 12mm Venetians, in
Mixed Conifer excluding the cost of hinges
Coefficient for per sq.m
Code
LB0021
LB0033
LB0039
LB0077
MT0330
MT0616
MT0617

WW0301

Quant
1.00000
0.05200
0.21000
1.83000
0.04700

Providing & fixing battened and framed door shutters, Mixed Conifer excluding the cost of hinges 38mm
Coefficient for per sq.m
Code
LB0033
LB0039
LB0077
MT0330
MT0615
MT0617

WW0300

Description
Carpenter Gd.2
Work Supervisor (Lajab)
Labour
Rolled sections (250 MPa) - Flats
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)

Description
Carpenter Gd.1
Carpenter Gd.2
Work Supervisor (Lajab)
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
Mild Steel: Butt Hinges - 75mm
Mild Steel: Butt Hinges - 50mm

Quant
0.48000
0.68000
0.11000
0.48000
0.03000
4.30000
2.15000

Units
day
day
day
day
cu.m
each
each

Providing & fixing Mixed Conifer Venetians 50mm wide, 10mm thick at 45mm apart in ventilators above
doors (excluding frame)
Coefficient for per sq.m
Code
LB0033
LB0077
MT0330

WW0310

Description
Carpenter Gd.2
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)

Quant
0.72000
0.36000
0.00510

Units
day
day
cu.m

Providing & fixing plain trellis of 38x12mm laths with 38mm gap (excluding frames) including fixing
beading 50x12mm with Mixed Conifer
Coefficient for per sq.m
Code
LB0021
LB0033
LB0039
LB0077
MT0330

Description
Carpenter Gd.1
Carpenter Gd.2
Work Supervisor (Lajab)
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)

Standards & Quality Control Authority, MoWHS

Quant
0.43000
0.57000
0.06000
0.29000
0.01700

Units
day
day
day
day
cu.m

Labour and Material Coefficients (Civil Works) - 2009

WW0311

Providing & fixing Door & window shutters of plain trellis of 38x12mm laths with 38mm gap (excluding
frame) including fixing beading 50x12mm with Mixed conifer
Coefficient for per sq.m
Code
LB0021
LB0033
LB0039
LB0077
MT0330
MT0615
MT0617

WW0320

Description
Carpenter Gd.1
Carpenter Gd.2
Work Supervisor (Lajab)
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
Mild Steel: Butt Hinges - 100mm
Mild Steel: Butt Hinges - 50mm

Quant
0.68100
0.57000
0.06000
0.79000
0.03000
3.31000
1.32500

Units
day
day
day
day
cu.m
each
each

Providing & fixing Compound Gate including hinge-supports complete as per standard design- Mixed
Conifer
Coefficient for per sq.m
Code
LB0033
LB0039
LB0077
MT0182
MT0330

WW0325

101

Description
Carpenter Gd.2
Work Supervisor (Lajab)
Labour
Rolled sections (250 MPa) - Flats
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)

Quant
0.70000
0.02500
0.28000
8.23000
0.04000

Units
day
day
day
kg
cu.m

Providing & fixing M.S. round or square bars in window frames


Coefficient for per kg
Code
LB0032
LB0033
LB0077
MT0208

WW0326

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Labour
Thermo - Mechanically Treated ( TMT ) bars (yield strength 415 MPa)

Quant
0.04000
0.00800
0.01200
1.10000

Units
day
day
day
kg

Providing & fixing M.S. round or square bars with M.S. flats in window frames
Coefficient for per kg
Code
LB0032
LB0033
LB0077
MT0182
MT0208

WW0327

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Labour
Rolled sections (250 MPa) - Flats
Thermo - Mechanically Treated ( TMT ) bars (yield strength 415 MPa)

Quant
0.01300
0.00700
0.01700
0.20000
0.91000

Units
day
day
day
kg
kg

Providing & fixing ornamental steel grills in frames with M.S. flats & bars including round headed bolts
and nuts etc.
Coefficient for per kg
Code
LB0032
LB0077
MT0182

WW0328

Description
Blacksmith (metal-worker)
Labour
Rolled sections (250 MPa) - Flats

Quant
0.08300
0.16800
1.10000

Units
day
day
kg

Providing & fixing expanded metal 20x60mm strands 3.25x1.6mm including 60x20mm beading of Mixed
Conifer
Coefficient for per sq.m
Code
LB0033
LB0077
MT0216
MT0330

Description
Carpenter Gd.2
Labour
Welded Mesh - Expanded Metal (19mm x 3mm x 16 gauge)
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)

Standards & Quality Control Authority, MoWHS

Quant
0.27000
0.20000
1.10000
0.00450

Units
day
day
sq.m
cu.m

Labour and Material Coefficients (Civil Works) - 2009

WW0335

102

Providing & fixing Flush Door shutters with pre-laminated bison panel - 25mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0356

WW0336

Description
Carpenter Gd.1
Labour
Pre-laminated (both sides) Bison panel - 25mm

Quant
0.02270
0.02270
1.00000

Units
day
day
sq.m

Providing & fixing Flush Door shutters with pre-laminated bison panel - 30mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0357

WW0345

Description
Carpenter Gd.1
Labour
Pre-laminated (both sides) Bison panel - 30mm

Quant
0.02270
0.02270
1.00000

Units
day
day
sq.m

Providing & fixing Flush Door shutters (pre-fabricated), block-board core with commercial ply veneer 25mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0415

WW0346

Units
day
day
sq.m

Description
Carpenter Gd.1
Labour
Flush Door, block board core, commercial ply veneer, U\F bonded - 30mm

Quant
0.02270
0.02270
1.00000

Units
day
day
sq.m

Providing & fixing Flush Door shutters (pre-fabricated), block-board core with commercial ply veneer 35mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0417

WW0348

Quant
0.02270
0.02270
1.00000

Providing & fixing Flush Door shutters (pre-fabricated), block-board core with commercial ply veneer 30mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0416

WW0347

Description
Carpenter Gd.1
Labour
Flush Door, block board core, commercial ply veneer, U\F bonded - 25mm

Description
Carpenter Gd.1
Labour
Flush Door, block board core, commercial ply veneer, U\F bonded - 35mm

Quant
0.02270
0.02270
1.00000

Units
day
day
sq.m

Providing & fixing Flush Door shutters (pre-fabricated), block-board core with commercial ply veneer 40mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0418

WW0355

Description
Carpenter Gd.1
Labour
Flush Door, block board core, commercial ply veneer, U\F bonded - 40mm

Quant
0.02270
0.02270
1.00000

Units
day
day
sq.m

Providing & fixing flush door shutters (pre-fabricated), block-board core with teak ply veneer - 25mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0425

Description
Carpenter Gd.1
Labour
Flush Door, block board core, teak ply veneer, U\F bonded - 25mm

Standards & Quality Control Authority, MoWHS

Quant
0.02270
0.02270
1.00000

Units
day
day
sq.m

Labour and Material Coefficients (Civil Works) - 2009

WW0356

103

Providing & fixing flush door shutters (pre-fabricated), block-board core with teak ply veneer - 30mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0426

WW0357

Description
Carpenter Gd.1
Labour
Flush Door, block board core, teak ply veneer, U\F bonded - 30mm

Quant
0.02270
0.02270
1.00000

Units
day
day
sq.m

Providing & fixing flush door shutters (pre-fabricated), block-board core with teak ply veneer - 35mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0427

WW0358

Description
Carpenter Gd.1
Labour
Flush Door, block board core, teak ply veneer, U\F bonded - 35mm

Quant
0.02270
0.02270
1.00000

Units
day
day
sq.m

Providing & fixing flush door shutters (pre-fabricated), block-board core with teak ply veneer - 40mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0428

WW0365

Description
Carpenter Gd.1
Labour
Flush Door, block board core, teak ply veneer, U\F bonded - 40mm

Quant
0.02270
0.02270
1.00000

Units
day
day
sq.m

Providing & fixing flush door shutters (pre-fabricated), block-board core with ply veneer, chemically
treated - 25mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0435

WW0366

Description
Carpenter Gd.1
Labour
Flush Door, block board core, ply veneer, chemically treated - 25mm

Quant
0.02270
0.02270
1.00000

Units
day
day
sq.m

Providing & fixing flush door shutters (pre-fabricated), block-board core with ply veneer, chemically
treated - 30mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0436

WW0367

Description
Carpenter Gd.1
Labour
Flush Door, block board core, ply veneer, chemically treated - 30mm

Quant
0.02270
0.02270
1.00000

Units
day
day
sq.m

Providing & fixing flush door shutters (pre-fabricated), block-board core with ply veneer, chemically
treated - 35mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0437

WW0368

Description
Carpenter Gd.1
Labour
Flush Door, block board core, ply veneer, chemically treated - 35mm

Quant
0.02270
0.02270
1.00000

Units
day
day
sq.m

Providing & fixing flush door shutters (pre-fabricated), block-board core with ply veneer, chemically
treated - 40mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0438

Description
Carpenter Gd.1
Labour
Flush Door, block board core, ply veneer, chemically treated - 40mm

Standards & Quality Control Authority, MoWHS

Quant
0.02270
0.02270
1.00000

Units
day
day
sq.m

Labour and Material Coefficients (Civil Works) - 2009

WW0375

Providing & fixing panelled doors, with 12mm particle board panels with horizontal middle rail including
prime coat - 30mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0445

WW0376

104

Description
Quant
Carpenter Gd.1
0.02270
Labour
0.02270
Panelled Door, with single lock rail - 30mm, 12mm veneered particle board panel 1.00000

Units
day
day
sq.m

Providing & fixing panelled doors, with 12mm particle board panels with horizontal middle rail including
prime coat - 35mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0446

WW0377

Description
Quant
Carpenter Gd.1
0.02270
Labour
0.02270
Panelled Door, with single lock rail - 35mm, 12mm veneered particle board panel 1.00000

Units
day
day
sq.m

Providing & fixing panelled doors, with 12mm particle board panels with horizontal middle rail including
prime coat - 40mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0447

WW0385

Description
Quant
Carpenter Gd.1
0.02270
Labour
0.02270
Panelled Door, with single lock rail - 40mm, 12mm veneered particle board panel 1.00000

Units
day
day
sq.m

Providing & fixing panelled doors, with 12mm plywood panels with horizontal middle rail including
prime coat - 30mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0448

WW0386

Description
Carpenter Gd.1
Labour
Panelled Door, with single lock rail - 30mm, 12mm plywood panel

Quant
0.02270
0.02270
1.00000

Units
day
day
sq.m

Providing & fixing panelled doors, with 12mm plywood panels with horizontal middle rail including
prime coat - 35mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0449

WW0387

Description
Carpenter Gd.1
Labour
Panelled Door, with single lock rail - 35mm, 12mm plywood panel

Quant
0.02270
0.02270
1.00000

Units
day
day
sq.m

Providing & fixing panelled doors, with 12mm plywood panels with horizontal middle rail including
prime coat - 40mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0450

WW0395

Description
Carpenter Gd.1
Labour
Panelled Door, with single lock rail - 40mm, 12mm plywood panel

Quant
0.02270
0.02270
1.00000

Units
day
day
sq.m

Providing & fixing panelled doors, with 9mm plywood panels with horizontal middle rail including prime
coat - 30mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0451

Description
Carpenter Gd.1
Labour
Panelled Door, with single lock rail - 30mm, 9mm plywood panel

Standards & Quality Control Authority, MoWHS

Quant
0.02270
0.02270
1.00000

Units
day
day
sq.m

Labour and Material Coefficients (Civil Works) - 2009

WW0396

105

Providing & fixing panelled doors, with 9mm plywood panels with horizontal middle rail including prime
coat - 35mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0452

WW0397

Description
Carpenter Gd.1
Labour
Panelled Door, with single lock rail - 35mm, 9mm plywood panel

Quant
0.02270
0.02270
1.00000

Units
day
day
sq.m

Providing & fixing panelled doors, with 9mm plywood panels with horizontal middle rail including prime
coat - 40mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0453

WW0400

Description
Carpenter Gd.1
Labour
Panelled Door, with single lock rail - 40mm, 9mm plywood panel

Quant
0.02270
0.02270
1.00000

Units
day
day
sq.m

Providing & fixing panelled doors, with 12mm particle board panels with horizontal single lock rail &
stile including prime coat - 30mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0465

WW0401

Units
day
day
sq.m

Providing & fixing panelled doors, with 12mm particle board panels with horizontal single lock rail &
stile including prime coat - 35mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0466

WW0402

Description
Quant
Carpenter Gd.1
0.02270
Labour
0.02270
Panelled Door, with single lock rail & stile - 30mm, 12mm veneered particle board panel
1.00000

Description
Quant
Carpenter Gd.1
0.02270
Labour
0.02270
Panelled Door, with single lock rail & stile - 35mm, 12mm veneered particle board panel
1.00000

Units
day
day
sq.m

Providing & fixing panelled doors, with 12mm particle board panels with horizontal single lock rail &
stile including prime coat - 40mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0467

WW0410

Description
Quant
Carpenter Gd.1
0.02270
Labour
0.02270
Panelled Door, with single lock rail & stile - 40mm, 12mm veneered particle board panel
1.00000

Units
day
day
sq.m

Providing & fixing panelled doors, with 12mm plywood panels with horizontal single lock rail & stile
including prime coat - 30mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0468

WW0411

Description
Carpenter Gd.1
Labour
Panelled Door, with single lock rail & stile - 30mm, 12mm plywood panel

Quant
0.02270
0.02270
1.00000

Units
day
day
sq.m

Providing & fixing panelled doors, with 12mm plywood panels with horizontal single lock rail & stile
including prime coat - 35mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0469

Description
Carpenter Gd.1
Labour
Panelled Door, with single lock rail & stile - 35mm, 12mm plywood panel

Standards & Quality Control Authority, MoWHS

Quant
0.02270
0.02270
1.00000

Units
day
day
sq.m

Labour and Material Coefficients (Civil Works) - 2009

WW0412

106

Providing & fixing panelled doors, with 12mm plywood panels with horizontal single lock rail & stile
including prime coat - 40mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0470

WW0420

Description
Carpenter Gd.1
Labour
Panelled Door, with single lock rail & stile - 40mm, 12mm plywood panel

Quant
0.02270
0.02270
1.00000

Units
day
day
sq.m

Providing & fixing panelled doors, with 9mm plywood panels with horizontal single lock rail & stile
including prime coat - 30mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0471

WW0421

Description
Carpenter Gd.1
Labour
Panelled Door, with single lock rail & stile - 30mm, 9mm plywood panel

Quant
0.02270
0.02270
1.00000

Units
day
day
sq.m

Providing & fixing panelled doors, with 9mm plywood panels with horizontal single lock rail & stile
including prime coat - 35mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0472

WW0422

Description
Carpenter Gd.1
Labour
Panelled Door, with single lock rail & stile - 35mm, 9mm plywood panel

Quant
0.02270
0.02270
1.00000

Units
day
day
sq.m

Providing & fixing panelled doors, with 9mm plywood panels with horizontal single lock rail & stile
including prime coat - 40mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0473

WW0430

Description
Carpenter Gd.1
Labour
Panelled Door, with single lock rail & stile - 40mm, 9mm plywood panel

Quant
0.02270
0.02270
1.00000

Units
day
day
sq.m

Providing & fixing panelled doors, with 12mm particle board panels with horizontal double lock rail &
stile including prime coat - 30mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0485

WW0431

Description
Quant
Carpenter Gd.1
0.02270
Labour
0.02270
Panelled Door, with double lock rail & stile - 30mm, 12mm veneered particle board 1.00000
panel

Units
day
day
sq.m

Providing & fixing panelled doors, with 12mm particle board panels with horizontal double lock rail &
stile including prime coat - 35mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0486

WW0432

Description
Quant
Carpenter Gd.1
0.02270
Labour
0.02270
Panelled Door, with double lock rail & stile - 35mm, 12mm veneered particle board 1.00000
panel

Units
day
day
sq.m

Providing & fixing panelled doors, with 12mm particle board panels with horizontal double lock rail &
stile including prime coat - 40mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0487

Description
Quant
Carpenter Gd.1
0.02270
Labour
0.02270
Panelled Door, with double lock rail & stile - 40mm, 12mm veneered particle board 1.00000
panel

Standards & Quality Control Authority, MoWHS

Units
day
day
sq.m

Labour and Material Coefficients (Civil Works) - 2009

WW0440

107

Providing & fixing panelled doors, with 12mm plywood panels with horizontal double lock rail & stile
including prime coat - 30mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0488

WW0441

Quant
0.02270
0.02270
1.00000

Units
day
day
sq.m

Providing & fixing panelled doors, with 12mm plywood panels with horizontal double lock rail & stile
including prime coat - 35mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0489

WW0442

Description
Carpenter Gd.1
Labour
Panelled Door, with double lock rail & stile - 30mm, 12mm plywood panel

Description
Carpenter Gd.1
Labour
Panelled Door, with double lock rail & stile - 35mm, 12mm plywood panel

Quant
0.02270
0.02270
1.00000

Units
day
day
sq.m

Providing & fixing panelled doors, with 12mm plywood panels with horizontal double lock rail & stile
including prime coat - 40mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0490

WW0450

Description
Carpenter Gd.1
Labour
Panelled Door, with double lock rail & stile - 40mm, 12mm plywood panel

Quant
0.02270
0.02270
1.00000

Units
day
day
sq.m

Providing & fixing panelled doors, with 9mm plywood panels with horizontal double lock rail & stile
including prime coat - 30mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0491

WW0451

Description
Carpenter Gd.1
Labour
Panelled Door, with double lock rail & stile - 30mm, 9mm plywood panel

Quant
0.02270
0.02270
1.00000

Units
day
day
sq.m

Providing & fixing panelled doors, with 9mm plywood panels with horizontal double lock rail & stile
including prime coat - 35mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0492

WW0452

Description
Carpenter Gd.1
Labour
Panelled Door, with double lock rail & stile - 35mm, 9mm plywood panel

Quant
0.02270
0.02270
1.00000

Units
day
day
sq.m

Providing & fixing panelled doors, with 9mm plywood panels with horizontal double lock rail & stile
including prime coat - 40mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0493

WW0460

Description
Carpenter Gd.1
Labour
Panelled Door, with double lock rail & stile - 40mm, 9mm plywood panel

Quant
0.02270
0.02270
1.00000

Units
day
day
sq.m

Providing & fixing panelled doors, with 9mm plywood panels with horizontal double lock rail & stile
including prime coat - 30mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0505

Description
Quant
Units
Carpenter Gd.1
0.02270
day
Labour
0.02270
day
Prefab. fully glazed window shutters, incl. 75mm rail with preservative & one primer1.00000
coat, excl. sq.m
glass - 30mm

Standards & Quality Control Authority, MoWHS

Labour and Material Coefficients (Civil Works) - 2009

WW0461

108

Providing & fixing panelled doors, with 9mm plywood panels with horizontal double lock rail & stile
including prime coat - 35mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0506

WW0462

Providing & fixing panelled doors, with 9mm plywood panels with horizontal double lock rail & stile
including prime coat - 40mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0507

WW0470

Description
Quant
Units
Carpenter Gd.1
0.02270
day
Labour
0.02270
day
Prefab. fully glazed window shutters, incl. 75mm rail with preservative & one primer1.00000
coat, excl. sq.m
glass - 40mm

Providing & fixing 38mm thick wooden shelves supported on 40x40x6mm `T' or `L' iron brackets fixed
at suitable distance but not exceeding 75 cm apart in 7.5x7.5x15cm blocks of cement concrete 1:3:6,
20 mm aggregates - Mixed Conifer
Coefficient for per sq.m
Code
LB0032
LB0033
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0145
MT0330

WW0475

Description
Quant
Units
Carpenter Gd.1
0.02270
day
Labour
0.02270
day
Prefab. fully glazed window shutters, incl. 75mm rail with preservative & one primer1.00000
coat, excl. sq.m
glass - 35mm

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Cement (OPC / PSC)
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)

Quant
0.35000
0.25000
0.00029
0.00023
0.35029
0.00033
0.16040
0.00033
0.00033
0.00221
0.00442
0.00103
0.04100

Units
day
day
day
day
day
day
day
day
day
cu.m
cu.m
tonne
cu.m

Providing & fixing 25mm thick Cupboard (900x2000x450 mm...LxHxD) with glazed or panelled shutters,
25mm thick partitions and shelves supported on 25x25mm wooden runners, 50x20mm architraves and
25mm dia
curtain rod mounted on wooden brackets, including with Anodised Aluminium Hinges and frame in
mixed conifer - Mixed Conifer
Coefficient for per each
Code
LB0021
LB0033
LB0039
LB0052
LB0077
MT0330
MT0531
MT0655
MT0731

Description
Carpenter Gd.1
Carpenter Gd.2
Work Supervisor (Lajab)
Painter Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
Anodised Aluminium Fittings: Butt Hinges - 75mm
Plain Glass - 3mm thick
Clear synthetic varnish

Standards & Quality Control Authority, MoWHS

Quant
1.25089
2.96489
0.11200
2.20580
2.53649
0.12513
4.80000
0.73600
1.33660

Units
day
day
day
day
day
cu.m
each
sq.m
litre

Labour and Material Coefficients (Civil Works) - 2009

WW0476

109

Providing & fixing 25mm thick Cupboard (900x2000x450 mm...LxHxD) with glazed or panelled shutters,
25mm thick partitions and shelves supported on 25x25mm wooden runners, 50x20mm architraves and
25mm dia
curtain rod mounted on wooden brackets, including with Anodised Aluminium Hinges and frame in
mixed conifer - Champ wood
Coefficient for per each
Code
LB0021
LB0033
LB0039
LB0052
LB0077
MT0330
MT0331
MT0531
MT0655
MT0731

WW0485

Description
Carpenter Gd.1
Carpenter Gd.2
Work Supervisor (Lajab)
Painter Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
Rough-sawn timber (urban rate) - Class 'A', (Blue pine, Champ)
Anodised Aluminium Fittings: Butt Hinges - 75mm
Plain Glass - 3mm thick
Clear synthetic varnish

Quant
1.57089
3.65289
0.11200
2.20580
2.63249
0.08673
0.03840
4.80000
0.73600
1.33660

Units
day
day
day
day
day
cu.m
cu.m
each
sq.m
litre

Extras, for Cupboards including frame of mixed conifer - For additional depth of 50mm or part thereof
Coefficient for per 50mm
Code
LB0021
LB0033
LB0052
LB0077
MT0330
MT0731

WW0486

Description
Carpenter Gd.1
Carpenter Gd.2
Painter Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
Clear synthetic varnish

Quant
0.18237
0.04237
0.13181
0.16569
0.00672
0.07987

Units
day
day
day
day
cu.m
litre

Extras, for Cupboards including frame of mixed conifer - For additional width of 100mm or part thereof
including shutters of Mixed Conifer
Coefficient for per 100mm
Code
LB0021
LB0033
LB0052
LB0077
MT0330
MT0492
MT0731

WW0487

Description
Carpenter Gd.1
Carpenter Gd.2
Painter Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
Panelled Door, with double lock rail & stile - 35mm, 9mm plywood panel
Clear synthetic varnish

Quant
0.12477
0.03046
0.19099
0.13305
0.00483
0.19000
0.11573

Units
day
day
day
day
cu.m
sq.m
litre

Extras, for Cupboards including frame of mixed conifer - For additional width of 100mm or part thereof,
including shutters of Champ wood
Coefficient for per 100mm
Code
LB0021
LB0033
LB0052
LB0077
MT0330
MT0491
MT0731

Description
Carpenter Gd.1
Carpenter Gd.2
Painter Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
Panelled Door, with double lock rail & stile - 30mm, 9mm plywood panel
Clear synthetic varnish

Standards & Quality Control Authority, MoWHS

Quant
0.12477
0.03046
0.19099
0.13305
0.00483
0.19000
0.11573

Units
day
day
day
day
cu.m
sq.m
litre

Labour and Material Coefficients (Civil Works) - 2009

WW0488

110

Extras, for Cupboards including frame of mixed conifer - For additional height of 100mm or part
thereof, including shutters of Mixed Conifer
Coefficient for per 100mm
Code
LB0021
LB0033
LB0052
LB0077
MT0330
MT0492
MT0731

WW0489

Quant
0.11772
0.03509
0.14795
0.12712
0.00556
0.11600
0.08965

Units
day
day
day
day
cu.m
sq.m
litre

Extras, for Cupboards including frame of mixed conifer - For additional height of 100mm or part
thereof, including shutters of Champ wood
Coefficient for per 100mm
Code
LB0021
LB0033
LB0052
LB0077
MT0330
MT0491
MT0731

WW0495

Description
Carpenter Gd.1
Carpenter Gd.2
Painter Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
Panelled Door, with double lock rail & stile - 35mm, 9mm plywood panel
Clear synthetic varnish

Description
Carpenter Gd.1
Carpenter Gd.2
Painter Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
Panelled Door, with double lock rail & stile - 30mm, 9mm plywood panel
Clear synthetic varnish

Quant
0.11772
0.03509
0.14795
0.12712
0.00556
0.11600
0.08965

Units
day
day
day
day
cu.m
sq.m
litre

Providing & fixing railing with 90x60mm top & bottom rails, trellis 60x45mm including 2 coats of paint
etc. all complete - 900 mm high- Champ wood
Coefficient for per m
Code
LB0021
LB0052
LB0077
MT0331
MT0714
MT0722

WW0496

Description
Carpenter Gd.1
Painter Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'A', (Blue pine, Champ)
Pink primer, for wood
Synthetic enamel paint

Quant
0.22000
0.12139
0.34139
0.01900
0.09150
0.15250

Units
day
day
day
cu.m
litre
litre

Providing & fixing railing with 90x60mm top & bottom rails, trellis 60x45mm including 2 coats of paint
etc. all complete - 900 mm high, Mixed Conifer
Coefficient for per m
Code
LB0033
LB0052
LB0077
MT0330
MT0714
MT0722

WW0497

Description
Carpenter Gd.2
Painter Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
Pink primer, for wood
Synthetic enamel paint

Quant
0.22000
0.12139
0.34139
0.01900
0.09150
0.15250

Units
day
day
day
cu.m
litre
litre

Providing & fixing railing with 90x60mm top & bottom rails, trellis 60x45mm including 2 coats of paint
etc. all complete - 1000 mm high, Champ wood
Coefficient for per m
Code
LB0021
LB0052
LB0077
MT0331
MT0714
MT0722

Description
Carpenter Gd.1
Painter Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'A', (Blue pine, Champ)
Pink primer, for wood
Synthetic enamel paint

Standards & Quality Control Authority, MoWHS

Quant
0.25310
0.14255
0.39555
0.02170
0.10745
0.17909

Units
day
day
day
cu.m
litre
litre

Labour and Material Coefficients (Civil Works) - 2009

WW0498

Providing & fixing railing with 90x60mm top & bottom rails, trellis 60x45mm including 2 coats of paint
etc. all complete - 1000 mm high, Mixed Conifer
Coefficient for per m
Code
LB0021
LB0052
LB0077
MT0330
MT0714
MT0722

WW0499

111

Description
Carpenter Gd.1
Painter Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
Pink primer, for wood
Synthetic enamel paint

Quant
0.25310
0.14255
0.39555
0.02170
0.10745
0.17909

Units
day
day
day
cu.m
litre
litre

Providing & fixing railing with 90x60mm top & bottom rails, trellis 60x45mm including 2 coats of paint
etc. all complete - 1200 mm high, Champ wood
Coefficient for per m
Code
LB0021
LB0052
LB0077
MT0331
MT0714
MT0722

WW0500

Description
Carpenter Gd.1
Painter Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'A', (Blue pine, Champ)
Pink primer, for wood
Synthetic enamel paint

Quant
0.29980
0.16881
0.46861
0.02560
0.12725
0.21207

Units
day
day
day
cu.m
litre
litre

Providing & fixing railing with 90x60mm top & bottom rails, trellis 60x45mm including 2 coats of paint
etc. all complete - 1200 mm high, Mixed Conifer
Coefficient for per m
Code
LB0021
LB0052
LB0077
MT0330
MT0714
MT0722

WW0505

Description
Carpenter Gd.1
Painter Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
Pink primer, for wood
Synthetic enamel paint

Quant
0.29980
0.16881
0.46861
0.02560
0.12725
0.21207

Units
day
day
day
cu.m
litre
litre

Providing & fixing 100x12mm, with 25mm dia. wooden curtain rod and brackets including M.S flats
25x3x100mm and plugs etc. complete - Champ wood
Coefficient for per m
Code
LB0021
LB0039
LB0077
MT0182
MT0331

WW0506

Description
Carpenter Gd.1
Work Supervisor (Lajab)
Labour
Rolled sections (250 MPa) - Flats
Rough-sawn timber (urban rate) - Class 'A', (Blue pine, Champ)

Quant
0.12500
0.08000
0.12500
0.06000
0.00363

Units
day
day
day
kg
cu.m

Providing & fixing 100x12mm, with 25mm dia. wooden curtain rod and brackets including M.S flats
25x3x100mm and plugs etc. complete - Mixed Conifer
Coefficient for per m
Code
LB0033
LB0039
LB0077
MT0182
MT0330

Description
Carpenter Gd.2
Work Supervisor (Lajab)
Labour
Rolled sections (250 MPa) - Flats
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)

Standards & Quality Control Authority, MoWHS

Quant
0.12500
0.08000
0.12500
0.06000
0.00363

Units
day
day
day
kg
cu.m

Labour and Material Coefficients (Civil Works) - 2009

WW0515

112

Providing & fixing 150x12mm, with 25mm dia. wooden curtain rod and brackets including M.S flats
25x3x100mm and plugs etc. complete - Champ wood
Coefficient for per m
Code
LB0021
LB0039
LB0077
MT0182
MT0331

WW0516

Description
Carpenter Gd.1
Work Supervisor (Lajab)
Labour
Rolled sections (250 MPa) - Flats
Rough-sawn timber (urban rate) - Class 'A', (Blue pine, Champ)

Quant
0.12500
0.08000
0.12500
0.06000
0.00420

Units
day
day
day
kg
cu.m

Providing & fixing 150x12mm, with 25mm dia. wooden curtain rod and brackets including M.S flats
25x3x100mm and plugs etc. complete - Mixed Conifer
Coefficient for per m
Code
LB0021
LB0039
LB0077
MT0182
MT0330

WW0525

Description
Carpenter Gd.1
Work Supervisor (Lajab)
Labour
Rolled sections (250 MPa) - Flats
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)

Quant
0.12500
0.08000
0.12500
0.03000
0.00420

Units
day
day
day
kg
cu.m

Providing & fixing M.S. pressed butt hinges with necessary screws etc. complete - 100mm
Coefficient for per each
Code
LB0033
LB0077
MT0615

WW0526

Description
Carpenter Gd.2
Labour
Mild Steel: Butt Hinges - 100mm

Quant
0.01800
0.01100
1.00000

Units
day
day
each

Providing & fixing M.S. pressed butt hinges with necessary screws etc. complete - 75mm
Coefficient for per each
Code
LB0033
LB0077
MT0616

WW0527

Description
Carpenter Gd.2
Labour
Mild Steel: Butt Hinges - 75mm

Quant
0.01800
0.01100
1.00000

Units
day
day
each

Providing & fixing M.S. pressed butt hinges with necessary screws etc. complete - 50mm
Coefficient for per each
Code
LB0033
LB0077
MT0617

WW0535

Description
Carpenter Gd.2
Labour
Mild Steel: Butt Hinges - 50mm

Quant
0.01800
0.01100
1.00000

Units
day
day
each

Providing & fixing M.S. tower bolt (barrel type) with necessary screws etc. complete - 250mm
Coefficient for per each
Code
Description
LB0033 Carpenter Gd.2
MT0645 Mild Steel: Tower Bolts (Barrel Type) - 250mm

WW0536

Quant
0.01300
1.00000

Units
day
each

Providing & fixing M.S. tower bolt (barrel type) with necessary screws etc. complete - 150mm
Coefficient for per each
Code
LB0033
LB0077
MT0646

Description
Carpenter Gd.2
Labour
Mild Steel: Tower Bolts (Barrel Type) - 150mm

Standards & Quality Control Authority, MoWHS

Quant
0.01000
0.00800
1.00000

Units
day
day
each

Labour and Material Coefficients (Civil Works) - 2009

WW0537

113

Providing & fixing M.S. tower bolt (barrel type) with necessary screws etc. complete - 100mm
Coefficient for per each
Code
LB0033
LB0077
MT0647

WW0545

Description
Carpenter Gd.2
Labour
Mild Steel: Tower Bolts (Barrel Type) - 100mm

Quant
0.01000
0.00800
1.00000

Units
day
day
each

Providing & fixing M.S. sliding door bolt, bright finished, enamelled with necessary screws etc.
complete - 300mm
Coefficient for per each
Code
LB0033
MT0221
MT0640

WW0546

Description
Carpenter Gd.2
Fasteners - M.S. Bolts & Nuts, Screws etc
Mild Steel: Sliding Door Bolts - 300mm

Quant
0.03100
0.10000
1.00000

Units
day
kg
each

Providing & fixing M.S. sliding door bolt, bright finished, enamelled with necessary screws etc.
complete - 250mm
Coefficient for per each
Code
LB0033
MT0221
MT0641

WW0547

Description
Carpenter Gd.2
Fasteners - M.S. Bolts & Nuts, Screws etc
Mild Steel: Sliding Door Bolts - 250mm

Quant
0.03100
0.10000
1.00000

Units
day
kg
each

Providing & fixing M.S. sliding door bolt, bright finished, enamelled with necessary screws etc.
complete - 200mm
Coefficient for per each
Code
LB0033
MT0221
MT0642

WW0555

Description
Carpenter Gd.2
Fasteners - M.S. Bolts & Nuts, Screws etc
Mild Steel: Sliding Door Bolts - 200mm

Quant
0.03100
0.10000
1.00000

Units
day
kg
each

Providing & fixing M.S. handle with necessary screws etc. complete - 150mm
Coefficient for per each
Code
Description
LB0033 Carpenter Gd.2
MT0620 Mild Steel: Handles - 150mm

WW0556

Quant
0.00800
1.00000

Units
day
each

Providing & fixing M.S. handle with necessary screws etc. complete - 125mm
Coefficient for per each
Code
Description
LB0033 Carpenter Gd.2
MT0621 Mild Steel: Handles - 125mm

WW0557

Quant
0.00800
1.00000

Units
day
each

Providing & fixing M.S. handle with necessary screws etc. complete - 100mm
Coefficient for per each
Code
Description
LB0033 Carpenter Gd.2
MT0622 Mild Steel: Handles - 100mm

WW0558

Quant
0.00800
1.00000

Units
day
each

Providing & fixing M.S. handle with necessary screws etc. complete - 75mm
Coefficient for per each
Code
Description
LB0033 Carpenter Gd.2
MT0623 Mild Steel: Handles - 75mm

Quant
0.00800
1.00000

Standards & Quality Control Authority, MoWHS

Units
day
each

Labour and Material Coefficients (Civil Works) - 2009

WW0565

114

Providing & fixing M.S. hook-and-eye with necessary screws etc. complete - 300mm
Coefficient for per each
Code
Description
LB0033 Carpenter Gd.2
MT0630 Mild Steel: Hooks and Eyes - 300mm

WW0566

Quant
0.00800
1.00000

Units
day
each

Providing & fixing M.S. hook-and-eye with necessary screws etc. complete - 200mm
Coefficient for per each
Code
Description
LB0033 Carpenter Gd.2
MT0631 Mild Steel: Hooks and Eyes - 200mm

WW0567

Quant
0.00800
1.00000

Units
day
each

Providing & fixing M.S. hook-and-eye with necessary screws etc. complete - 150mm
Coefficient for per each
Code
Description
LB0033 Carpenter Gd.2
MT0632 Mild Steel: Hooks and Eyes - 150mm

WW0568

Quant
0.00800
1.00000

Units
day
each

Providing & fixing M.S. hook-and-eye with necessary screws etc. complete - 100mm
Coefficient for per each
Code
Description
LB0033 Carpenter Gd.2
MT0633 Mild Steel: Hooks and Eyes - 100mm

WW0575

Quant
0.00800
1.00000

Units
day
each

Providing & fixing M.S. door stopper with nuts and necessary screws complete
Coefficient for per each
Code
Description
LB0021 Carpenter Gd.1
MT0650 Mild Steel: Tower Bolts (Barrel Type) - Mild Steel: Door Stopper

WW0580

Quant
0.07000
1.00000

Providing & fixing anodised aluminium butt hinges with necessary aluminium screws etc. complete 100mm
Coefficient for per each
Code
Description
LB0021 Carpenter Gd.1
MT0530 Anodised Aluminium Fittings: Butt Hinges - 100mm

WW0581

Quant
0.01800
1.00000

Quant
0.01800
1.00000

Units
day
each

Providing & fixing anodised aluminium tower bolt (barrel type) with aluminium screws etc. complete 200mm
Coefficient for per each
Code
Description
LB0021 Carpenter Gd.1
MT0570 Anodised Aluminium Fittings: Tower Bolts (Barrel Type) - 200mm

WW0591

Units
day
each

Providing & fixing anodised aluminium butt hinges with necessary aluminium screws etc. complete 75mm
Coefficient for per each
Code
Description
LB0021 Carpenter Gd.1
MT0531 Anodised Aluminium Fittings: Butt Hinges - 75mm

WW0590

Units
day
each

Quant
0.01300
1.00000

Units
day
each

Providing & fixing anodised aluminium tower bolt (barrel type) with aluminium screws etc. complete 150mm
Coefficient for per each
Code
Description
LB0021 Carpenter Gd.1
MT0571 Anodised Aluminium Fittings: Tower Bolts (Barrel Type) - 150mm

Standards & Quality Control Authority, MoWHS

Quant
0.01000
1.00000

Units
day
each

Labour and Material Coefficients (Civil Works) - 2009

WW0592

115

Providing & fixing anodised aluminium tower bolt (barrel type) with aluminium screws etc. complete 100mm
Coefficient for per each
Code
Description
LB0021 Carpenter Gd.1
MT0572 Anodised Aluminium Fittings: Tower Bolts (Barrel Type) - 100mm

WW0600

Quant
0.01000
1.00000

Units
day
each

Providing & fixing anodised aluminium sliding door bolts with nuts and aluminium screws etc.
complete - 300mm
Coefficient for per each
Code
Description
LB0021 Carpenter Gd.1
MT0565 Anodised Aluminium Fittings: Sliding Door Bolts - 300mm

WW0601

Quant
0.06300
1.00000

Units
day
each

Providing & fixing anodised aluminium sliding door bolts with nuts and aluminium screws etc.
complete - 250mm
Coefficient for per each
Code
Description
LB0021 Carpenter Gd.1
MT0566 Anodised Aluminium Fittings: Sliding Door Bolts - 250mm

WW0602

Quant
0.06300
1.00000

Units
day
each

Providing & fixing anodised aluminium sliding door bolts with nuts and aluminium screws etc.
complete - 200mm
Coefficient for per each
Code
Description
LB0021 Carpenter Gd.1
MT0567 Anodised Aluminium Fittings: Sliding Door Bolts - 200mm

WW0610

Quant
0.06300
1.00000

Units
day
each

Providing & fixing anodised aluminium handle with necessary aluminium screws etc. complete 150mm
Coefficient for per each
Code
Description
LB0021 Carpenter Gd.1
MT0540 Anodised Aluminium Fittings: Handles - 150mm

WW0611

Quant
0.00800
1.00000

Units
day
each

Providing & fixing anodised aluminium handle with necessary aluminium screws etc. complete 125mm
Coefficient for per each
Code
Description
LB0021 Carpenter Gd.1
MT0541 Anodised Aluminium Fittings: Handles - 125mm

WW0612

Quant
0.00800
1.00000

Providing & fixing anodised aluminium handle with necessary aluminium screws etc. complete 100mm
Coefficient for per each
Code
Description
LB0021 Carpenter Gd.1
MT0542 Anodised Aluminium Fittings: Handles - 100mm

WW0613

Units
day
each

Quant
0.00800
1.00000

Units
day
each

Providing & fixing anodised aluminium handle with necessary aluminium screws etc. complete - 75mm
Coefficient for per each
Code
Description
LB0021 Carpenter Gd.1
MT0543 Anodised Aluminium Fittings: Handles - 75mm

Standards & Quality Control Authority, MoWHS

Quant
0.00800
1.00000

Units
day
each

Labour and Material Coefficients (Civil Works) - 2009

WW0620

116

Providing & fixing anodised aluminium hook-and-eye with necessary screws etc complete - 300mm
Coefficient for per each
Code
Description
LB0021 Carpenter Gd.1
MT0550 Anodised Aluminium Fittings: Hooks and Eyes - 300mm

WW0621

Quant
0.00800
1.00000

Units
day
each

Providing & fixing anodised aluminium hook-and-eye with necessary screws etc complete - 200mm
Coefficient for per each
Code
Description
LB0021 Carpenter Gd.1
MT0551 Anodised Aluminium Fittings: Hooks and Eyes - 200mm

WW0622

Quant
0.00800
1.00000

Units
day
each

Providing & fixing anodised aluminium hook-and-eye with necessary screws etc complete - 150mm
Coefficient for per each
Code
Description
LB0021 Carpenter Gd.1
MT0552 Anodised Aluminium Fittings: Hooks and Eyes - 150mm

WW0623

Quant
0.00800
1.00000

Units
day
each

Providing & fixing anodised aluminium hook-and-eye with necessary screws etc complete - 100mm
Coefficient for per each
Code
Description
LB0021 Carpenter Gd.1
MT0553 Anodised Aluminium Fittings: Hooks and Eyes - 100mm

WW0630

Quant
0.00800
1.00000

Units
day
each

Providing & fixing anodised aluminium kicking plate, 4mm thick with necessary aluminium screws etc.
complete
Coefficient for per sq.m
Code
LB0021
LB0077
MT0560

WW0635

Description
Carpenter Gd.1
Labour
Anodised Aluminium Fittings: Kicking Plate - 4mm thick

Quant
0.17600
0.12500
1.00000

Units
day
day
sq.m

Providing & fixing brass pressed butt hinges with necessary screws etc. complete - 100mm
Coefficient for per each
Code
LB0021
LB0077
MT0575

WW0636

Description
Carpenter Gd.1
Labour
Bright finished brass: Butt Hinges - 100mm

Quant
0.01800
0.01100
1.00000

Units
day
day
each

Providing & fixing brass pressed butt hinges with necessary screws etc. complete - 75mm
Coefficient for per each
Code
LB0021
LB0077
MT0576

WW0637

Description
Carpenter Gd.1
Labour
Bright finished brass: Butt Hinges - 75mm

Quant
0.01800
0.01100
1.00000

Units
day
day
each

Providing & fixing brass pressed butt hinges with necessary screws etc. complete - 50mm
Coefficient for per each
Code
LB0021
LB0077
MT0577

Description
Carpenter Gd.1
Labour
Bright finished brass: Butt Hinges - 50mm

Standards & Quality Control Authority, MoWHS

Quant
0.01800
0.01100
1.00000

Units
day
day
each

Labour and Material Coefficients (Civil Works) - 2009

WW0645

117

Providing & fixing brass tower bolt (barrel type) with necessary screws etc. complete - 250mm
Coefficient for per each
Code
Description
LB0021 Carpenter Gd.1
MT0600 Bright finished brass: Tower Bolts (Barrel Type) - 250mm

WW0646

Quant
0.01300
1.00000

Units
day
each

Providing & fixing brass tower bolt (barrel type) with necessary screws etc. complete - 150mm
Coefficient for per each
Code
Description
LB0021 Carpenter Gd.1
MT0601 Bright finished brass: Tower Bolts (Barrel Type) - 150mm

WW0647

Quant
0.01000
1.00000

Units
day
each

Providing & fixing brass tower bolt (barrel type) with necessary screws etc. complete - 100mm
Coefficient for per each
Code
Description
LB0021 Carpenter Gd.1
MT0602 Bright finished brass: Tower Bolts (Barrel Type) - 100mm

WW0655

Quant
0.01000
1.00000

Units
day
each

Providing & fixing brass sliding door bolt with nuts necessary screws etc. complete - 300mm
Coefficient for per each
Code
Description
LB0021 Carpenter Gd.1
MT0595 Bright finished brass: Sliding Door Bolts - 300mm

WW0656

Quant
0.05000
1.00000

Units
day
each

Providing & fixing brass sliding door bolt with nuts necessary screws etc. complete - 250mm
Coefficient for per each
Code
Description
LB0021 Carpenter Gd.1
MT0596 Bright finished brass: Sliding Door Bolts - 250mm

WW0657

Quant
0.05000
1.00000

Units
day
each

Providing & fixing brass sliding door bolt with nuts necessary screws etc. complete - 200mm
Coefficient for per each
Code
Description
LB0021 Carpenter Gd.1
MT0597 Bright finished brass: Sliding Door Bolts - 200mm

WW0665

Quant
0.05000
1.00000

Units
day
each

Providing & fixing brass handle with necessary screws etc. complete - 150mm
Coefficient for per each
Code
Description
LB0021 Carpenter Gd.1
MT0580 Bright finished brass: Handles - 150mm

WW0666

Quant
0.00800
1.00000

Units
day
each

Providing & fixing brass handle with necessary screws etc. complete - 125mm
Coefficient for per each
Code
Description
LB0021 Carpenter Gd.1
MT0581 Bright finished brass: Handles - 125mm

WW0667

Quant
0.00800
1.00000

Units
day
each

Providing & fixing brass handle with necessary screws etc. complete - 100mm
Coefficient for per each
Code
Description
LB0021 Carpenter Gd.1
MT0582 Bright finished brass: Handles - 100mm

Standards & Quality Control Authority, MoWHS

Quant
0.00800
1.00000

Units
day
each

Labour and Material Coefficients (Civil Works) - 2009

WW0668

118

Providing & fixing brass handle with necessary screws etc. complete - 75mm
Coefficient for per each
Code
Description
LB0021 Carpenter Gd.1
MT0583 Bright finished brass: Handles - 75mm

WW0675

Quant
0.00800
1.00000

Units
day
each

Providing & fixing bright finish brass 100 mm mortise latch & pair of levers, handles with necessary
screws etc. complete
Coefficient for per each
Code
Description
Quant
Units
LB0021 Carpenter Gd.1
0.02100
day
MT0606 Bright finished brass: Tower Bolts (Barrel Type) - Bright finished brass: Mortise Latch
1.00000
100mm each

WW0676

Providing & fixing bright finish brass spring-loaded, hinged door-closer with necessary screws etc.
complete
Coefficient for per each
Code
Description
LB0021 Carpenter Gd.1
MT0607 Door Closers - brass, hinged, spring-loaded type

WW0677

Quant
0.05000
1.00000

Units
day
each

Providing & fixing bright finish brass hydraulic door-closer


Coefficient for per each
Code
LB0021
LB0077
MT0608

WW0678

Description
Carpenter Gd.1
Labour
Door Closers - brass, over-head, hydraulic type

Quant
0.05000
0.02500
1.00000

Units
day
day
each

Providing & fixing bright finished brass door stopper with nuts and necessary screws etc. complete
Coefficient for per each
Code
Description
Quant
LB0021 Carpenter Gd.1
0.00880
MT0605 Bright finished brass: Tower Bolts (Barrel Type) - Bright finished brass: Door Stopper
1.00000

WW0685

Units
day
each

Providing & fixing bright finished brass hook-and-eye with necessary screws etc. complete - 150mm
Coefficient for per each
Code
Description
LB0021 Carpenter Gd.1
MT0590 Bright finished brass: Hooks and Eyes - 150mm

WW0686

Quant
0.00800
1.00000

Units
day
each

Providing & fixing bright finished brass hook-and-eye with necessary screws etc. complete - 100mm
Coefficient for per each
Code
Description
LB0021 Carpenter Gd.1
MT0591 Bright finished brass: Hooks and Eyes - 100mm

Standards & Quality Control Authority, MoWHS

Quant
0.00800
1.00000

Units
day
each

Labour and Material Coefficients (Civil Works) - 2009

WW0695

119

P&f 40x3mm M.S. hold fast 400mm long, fixing to frame with 10mm bolts & nuts, plugs, concrete blocks
300x100x150mm with 1:3:6, 20mm aggregate
Coefficient for per each
Code
LB0032
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0145
MT0182

WW0700

Quant
0.03800
0.03831
0.00025
0.00031
0.00034
0.04885
0.00034
0.00034
0.00230
0.00461
0.00108
0.40300

Units
day
day
day
day
day
day
day
day
cu.m
cu.m
tonne
kg

P&L dry earth in ceilings in proportion 1:5 (1 straw: 5 dry earth) including plastic underlay
Coefficient for per cu.m
Code
LB0077
MT0042
MT0155

WW0705

Description
Blacksmith (metal-worker)
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Cement (OPC / PSC)
Rolled sections (250 MPa) - Flats

Description
Labour
Mud dry
Plastic Sheet - 50 micro-metre

Quant
0.28880
1.20000
10.00000

Units
day
cu.m
sq.m

Providing & fixing skylight translucent diffuser panel including 50x12 beading etc. complete
Coefficient for per sq.m
Code
LB0021
LB0033
LB0077
MT0330
MT0385

WW0710

Description
Quant
Carpenter Gd.1
0.24000
Carpenter Gd.2
0.27000
Labour
0.24000
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
0.00420
Pre-laminated Particle Board (one side) - Translucent diffuser panel, for skylights etc
1.05000

Units
day
day
day
cu.m
sq.m

Providing & fixing Decorative Traditional Timber Carving


Coefficient for per sq.m
Code
Description
LB0021 Carpenter Gd.1

Quant
3.00000

Standards & Quality Control Authority, MoWHS

Units
day

Labour and Material Coefficients (Civil Works) - 2009

120

CHAPTER 12

STEEL

SW0001

Steel work in single section including cutting, hoisting, fixing and applying priming coat of red lead
paint - In R.S. joists
Coefficient for per kg
Code
LB0032
LB0052
LB0077
MT0183
MT0711

SW0002

Quant
0.00110
0.00079
0.02679
1.05000
0.00143

Units
day
day
day
kg
litre

Steel work in single section including cutting, hoisting, fixing and applying priming coat of red lead
paint - In Flats
Coefficient for per kg
Code
LB0032
LB0052
LB0077
MT0182
MT0711

SW0003

Description
Blacksmith (metal-worker)
Painter Gd.1
Labour
Rolled sections (250 MPa) - Joists
Synthetic red lead primer

Description
Blacksmith (metal-worker)
Painter Gd.1
Labour
Rolled sections (250 MPa) - Flats
Synthetic red lead primer

Quant
0.01250
0.00090
0.01340
1.05000
0.00162

Units
day
day
day
kg
litre

Steel work in single section including cutting, hoisting, fixing and applying priming coat of red lead
paint - In Tees, angles and channels
Coefficient for per kg
Code
LB0032
LB0052
LB0077
MT0181
MT0711

SW0010

Description
Blacksmith (metal-worker)
Painter Gd.1
Labour
Rolled sections (250 MPa) - Channels
Synthetic red lead primer

Quant
0.01400
0.00090
0.01340
1.05000
0.00162

Units
day
day
day
kg
litre

Steel work riveted or bolted, in built up sections, trusses, frame-works, including cutting, hoisting,
fixing and applying. priming coat of red lead paint - In R.S. joists
Coefficient for per kg
Code
LB0032
LB0052
LB0077
MT0183
MT0184
MT0220
MT0711

SW0011

Description
Blacksmith (metal-worker)
Painter Gd.1
Labour
Rolled sections (250 MPa) - Joists
Rolled sections (250 MPa) - Plates
Fasteners - M.S. Rivets
Synthetic red lead primer

Quant
0.00860
0.00056
0.01556
0.57100
0.45600
0.02300
0.00101

Units
day
day
day
kg
kg
kg
litre

Steel work riveted or bolted, in built up sections, trusses, frame-works, including cutting, hoisting,
fixing and applying. priming coat of red lead paint - In Tees, angles, flats and channels
Coefficient for per kg
Code
LB0032
LB0052
LB0077
MT0180
MT0182
MT0184
MT0220
MT0221
MT0711

Description
Blacksmith (metal-worker)
Painter Gd.1
Labour
Rolled sections (250 MPa) - Angles
Rolled sections (250 MPa) - Flats
Rolled sections (250 MPa) - Plates
Fasteners - M.S. Rivets
Fasteners - M.S. Bolts & Nuts, Screws etc
Synthetic red lead primer

Standards & Quality Control Authority, MoWHS

Quant
0.20000
0.00054
0.03054
0.40500
0.13800
0.48000
0.01800
0.01400
0.00097

Units
day
day
day
kg
kg
kg
kg
kg
litre

Labour and Material Coefficients (Civil Works) - 2009

SW0020

121

Steel work welded, in built up sections, trusses, frame-works including cutting, hoisting, fixing and
applying priming coat of red lead paint - In R.S. joists
Coefficient for per kg
Code
LB0032
LB0052
LB0077
MP0202
MT0183
MT0184
MT0711

SW0021

Description
Blacksmith (metal-worker)
Painter Gd.1
Labour
Welder - electric arc
Rolled sections (250 MPa) - Joists
Rolled sections (250 MPa) - Plates
Synthetic red lead primer

Quant
0.00460
0.00056
0.00976
0.01740
0.58300
0.46700
0.00100

Units
day
day
day
day
kg
kg
litre

Steel work welded, in built up sections, trusses, frame-works including cutting, hoisting, fixing and
applying priming coat of red lead paint - In Tees, angles, flats and channels
Coefficient for per kg
Code
LB0032
LB0052
LB0077
MP0202
MT0180
MT0182
MT0184
MT0221
MT0711

SW0022

Description
Blacksmith (metal-worker)
Painter Gd.1
Labour
Welder - electric arc
Rolled sections (250 MPa) - Angles
Rolled sections (250 MPa) - Flats
Rolled sections (250 MPa) - Plates
Fasteners - M.S. Bolts & Nuts, Screws etc
Synthetic red lead primer

Quant
0.00480
0.00055
0.02065
0.01740
0.41300
0.13600
0.48900
0.01360
0.00099

Units
day
day
day
day
kg
kg
kg
kg
litre

Steel work welded, in built up sections, trusses, frame-works including cutting, hoisting, fixing and
applying priming coat of red lead paint - In Tubular sections
Coefficient for per kg
Code
LB0032
LB0052
LB0077
MT0200
MT0201
MT0711

SW0030

Description
Blacksmith (metal-worker)
Painter Gd.1
Labour
Welded Tube (250 MPa) - 50mm dia
Welded Tube (250 MPa) - 40mm dia
Synthetic red lead primer

Quant
0.01580
0.00072
0.01372
0.14600
0.08400
0.00130

Units
day
day
day
m
m
litre

Providing & fixing in position with vertical channels 20x10x2mm and braced with flat iron, diagonals
20x5mm with top and bottom rails of T-iron 40x40x6mm with 38mm dia steel pulleys complete with
bolts, nuts, locking
arrangement, stoppers handles including applying a priming coat of red lead paint - Collapsible steel
shutters
Coefficient for per sq.m
Code
LB0032
LB0036
LB0051
LB0052
LB0077
MT0180
MT0181
MT0182
MT0711

Description
Blacksmith (metal-worker)
Mason Gd.1
Mason Gd.2
Painter Gd.1
Labour
Rolled sections (250 MPa) - Angles
Rolled sections (250 MPa) - Channels
Rolled sections (250 MPa) - Flats
Synthetic red lead primer

Quant
5.20800
0.17400
0.17400
0.08760
0.26160
3.61000
14.78100
16.67000
0.15768

Standards & Quality Control Authority, MoWHS

Units
day
day
day
day
day
kg
kg
kg
litre

Labour and Material Coefficients (Civil Works) - 2009

SW0035

122

Providing & fixing in position including applying a priming coat of red lead paint - Rolling shutters,
including all accessories complete but excluding top cover
Coefficient for per sq.m
Code
LB0032
LB0036
LB0051
LB0077
MT0515

SW0036

Description
Blacksmith (metal-worker)
Mason Gd.1
Mason Gd.2
Labour
Rolling shutters with all accessories, excluding top cover

Quant
0.43000
0.02000
0.02000
0.38000
1.00000

Units
day
day
day
day
sq.m

Providing & fixing in position including applying a priming coat of red lead paint - Top cover for rolling
shutters
Coefficient for per m
Code
LB0032
LB0077
MT0516

SW0045

Description
Blacksmith (metal-worker)
Labour
Top cover for Rolling shutter

Quant
0.05000
0.50000
1.00000

Units
day
day
m

Providing & fixing anodised Aluminium section for doors, windows, ventilators, partitions framing, false
ceiling framing of specified sections including all accessories such as U-rubber gasket for fixing glass
panes, weather
strips or weather seals, roller, springs, etc complete (excluding the cost of glass panes or boards in
case of partitions/doors/windows and ceiling boards in case of ceiling) - Sliding, openable and pivoted
windows
Coefficient for per kg
Code
LB0032
LB0033
LB0077
MT0165

SW0046

Description
Quant
Blacksmith (metal-worker)
0.02500
Carpenter Gd.2
0.02200
Labour
0.06500
Anodised Aluminium Section for doors, windows - Sliding, openable and pivoted windows
1.00000

Units
day
day
day
kg

Providing & fixing anodised Aluminium section for doors, windows, ventilators, partitions framing, false
ceiling framing of specified sections including all accessories such as U-rubber gasket for fixing glass
panes, weather
strips or weather seals, roller, springs, etc complete (excluding the cost of glass panes or boards in
case of partitions/doors/windows and ceiling boards in case of ceiling) - Sliding and openable doors
Coefficient for per kg
Code
LB0032
LB0033
LB0077
MT0166

SW0047

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Labour
Anodised Aluminium Section for doors, windows - Sliding and openable doors

Quant
0.03000
0.02200
0.06500
1.00000

Units
day
day
day
kg

Providing & fixing anodised Aluminium section for doors, windows, ventilators, partitions framing, false
ceiling framing of specified sections including all accessories such as U-rubber gasket for fixing glass
panes, weather
strips or weather seals, roller, springs, etc complete (excluding the cost of glass panes or boards in
case of partitions/doors/windows and ceiling boards in case of ceiling) - Partition framing
Coefficient for per kg
Code
LB0032
LB0033
LB0077
MT0167

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Labour
Anodised Aluminium Section for doors, windows - Partitions framing

Standards & Quality Control Authority, MoWHS

Quant
0.01500
0.02200
0.06500
1.00000

Units
day
day
day
kg

Labour and Material Coefficients (Civil Works) - 2009

SW0048

123

Providing & fixing anodised Aluminium section for doors, windows, ventilators, partitions framing, false
ceiling framing of specified sections including all accessories such as U-rubber gasket for fixing glass
panes, weather
strips or weather seals, roller, springs, etc complete (excluding the cost of glass panes or boards in
case of partitions/doors/windows and ceiling boards in case of ceiling) - False ceiling framing
Coefficient for per kg
Code
LB0032
LB0033
LB0077
MT0168

SW0055

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Labour
Anodised Aluminium Section for doors, windows - False ceiling framing

Quant
0.01100
0.02200
0.06500
1.00000

Units
day
day
day
kg

Extra, for providing and fixing plain glass panes on aluminium section complete (excluding the cost of
aluminium frame & accessories) - 4mm thick plain glass
Coefficient for per sq.m
Code
LB0021
LB0077
MT0656

SW0056

Description
Carpenter Gd.1
Labour
Plain Glass - 4mm thick

Quant
0.25000
0.01000
1.00000

Units
day
day
sq.m

Extra, for providing and fixing plain glass panes on aluminium section complete (excluding the cost of
aluminium frame & accessories) - 5.5mm thick, plain glass
Coefficient for per sq.m
Code
LB0021
LB0077
MT0657

SW0057

Description
Carpenter Gd.1
Labour
Plain Glass - 5.5mm thick

Quant
0.25000
0.01000
1.00000

Units
day
day
sq.m

Extra, for providing and fixing plain glass panes on aluminium section complete (excluding the cost of
aluminium frame & accessories) - 5.5mm thick frosted glass
Coefficient for per sq.m
Code
LB0021
LB0077
MT0661

SW0065

Description
Carpenter Gd.1
Labour
Frosted Glass - 5.5mm thick

Quant
0.25000
0.01000
1.00000

Units
day
day
sq.m

Providing & fixing steel glazed doors, windows, ventilators of standard rolled steel sections joints
mitred and welded with 15x3mm lugs embedded as required including p&f glass panes and a coat of
primer - Doors
Coefficient for per sq.m
Code
LB0032
LB0033
LB0036
LB0051
LB0052
LB0077
MT0510
MT0655
MT0711

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Mason Gd.1
Mason Gd.2
Painter Gd.1
Labour
Steel door with necessary hinges, lugs, glazing clips
Plain Glass - 3mm thick
Synthetic red lead primer

Standards & Quality Control Authority, MoWHS

Quant
0.14000
0.14000
0.06600
0.06600
0.03750
0.44850
1.00000
0.80000
0.06750

Units
day
day
day
day
day
day
sq.m
sq.m
litre

Labour and Material Coefficients (Civil Works) - 2009

SW0066

Providing & fixing steel glazed doors, windows, ventilators of standard rolled steel sections joints
mitred and welded with 15x3mm lugs embedded as required including p&f glass panes and a coat of
primer - Windows fixed
Coefficient for per sq.m
Code
LB0032
LB0033
LB0036
LB0051
LB0052
LB0077
MT0511
MT0655
MT0711

SW0067

124

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Mason Gd.1
Mason Gd.2
Painter Gd.1
Labour
Steel windows (fixed) with lugs and glazing clips
Plain Glass - 3mm thick
Synthetic red lead primer

Quant
0.14000
0.14000
0.06600
0.06600
0.03726
0.44826
1.00000
0.79000
0.06707

Units
day
day
day
day
day
day
sq.m
sq.m
litre

Providing & fixing steel glazed doors, windows, ventilators of standard rolled steel sections joints
mitred and welded with 15x3mm lugs embedded as required including p&f glass panes and a coat of
primer - Windows side hung
Coefficient for per sq.m
Code
LB0032
LB0033
LB0036
LB0051
LB0052
LB0077
MT0512
MT0655
MT0711

SW0068

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Mason Gd.1
Mason Gd.2
Painter Gd.1
Labour
Steel windows (side hung) with hinges, lugs and glazing clips
Plain Glass - 3mm thick
Synthetic red lead primer

Quant
0.14000
0.14000
0.06600
0.06600
0.03726
0.44826
1.00000
0.80270
0.06707

Units
day
day
day
day
day
day
sq.m
sq.m
litre

Providing & fixing steel glazed doors, windows, ventilators of standard rolled steel sections joints
mitred and welded with 15x3mm lugs embedded as required including p&f glass panes and a coat of
primer - Ventilators top hung
Coefficient for per sq.m
Code
LB0032
LB0033
LB0036
LB0051
LB0052
LB0077
MT0513
MT0655
MT0711

SW0069

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Mason Gd.1
Mason Gd.2
Painter Gd.1
Labour
Steel ventilators (top hung) with hinges, lugs and glazing clips.
Plain Glass - 3mm thick
Synthetic red lead primer

Quant
0.14000
0.14000
0.06600
0.06600
0.03726
0.44826
1.00000
0.79000
0.06707

Units
day
day
day
day
day
day
sq.m
sq.m
litre

Providing & fixing steel glazed doors, windows, ventilators of standard rolled steel sections joints
mitred and welded with 15x3mm lugs embedded as required including p&f glass panes and a coat of
primer - Ventilators centre hung
Coefficient for per sq.m
Code
LB0032
LB0033
LB0036
LB0051
LB0052
LB0077
MT0514
MT0655
MT0711

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Mason Gd.1
Mason Gd.2
Painter Gd.1
Labour
Steel ventilators (centre hung) with pivots, lugs and glazing clips
Plain Glass - 3mm thick
Synthetic red lead primer

Standards & Quality Control Authority, MoWHS

Quant
0.14000
0.14000
0.06600
0.06600
0.03726
0.44826
1.00000
0.79000
0.06707

Units
day
day
day
day
day
day
sq.m
sq.m
litre

Labour and Material Coefficients (Civil Works) - 2009

SW0075

125

Extra, for Providing & fixing. Bhutan type architraves with 24G steel sheet....per sq.m. of window area
Coefficient for per sq.m
Code
LB0032
LB0052
LB0077
MP0202
MT0190
MT0711

SW0080

Description
Blacksmith (metal-worker)
Painter Gd.1
Labour
Welder - electric arc
Sheet (250 MPa) - 1mm
Synthetic red lead primer

Quant
0.16670
0.00675
0.17345
0.05000
1.85460
0.01215

Units
day
day
day
day
kg
litre

Providing & fixing M.S. round hold-down bolts with nuts and washer plates
Coefficient for per kg
Code
LB0032
MT0184
MT0208

SW0081

Description
Blacksmith (metal-worker)
Rolled sections (250 MPa) - Plates
Thermo - Mechanically Treated ( TMT ) bars (yield strength 415 MPa)

Quant
0.01570
0.20830
0.79160

Units
day
kg
kg

Providing & fixing bolts of various sizes including nuts & washers
Coefficient for per kg
Code
LB0032
LB0077
MT0221

SW0082

Description
Blacksmith (metal-worker)
Labour
Fasteners - M.S. Bolts & Nuts, Screws etc

Quant
0.04800
0.04800
1.00000

Units
day
day
kg

Providing & fixing M.S. rivets of various sizes


Coefficient for per kg
Code
LB0032
LB0077
MT0220

SW0090

Description
Blacksmith (metal-worker)
Labour
Fasteners - M.S. Rivets

Quant
0.10400
0.10400
1.00000

Units
day
day
kg

Providing, making and fixing M.S. straps, flats, sole plates etc.
Coefficient for per kg
Code
LB0032
LB0077
MP0202
MT0182
MT0184
MT0220

SW0095

Description
Blacksmith (metal-worker)
Labour
Welder - electric arc
Rolled sections (250 MPa) - Flats
Rolled sections (250 MPa) - Plates
Fasteners - M.S. Rivets

Quant
0.00430
0.00300
0.01740
0.44690
0.54360
0.01050

Units
day
day
day
kg
kg
kg

Providing & fixing M.S. fan clamps of 16 mm dia. in R.C. slabs, including painting with red lead paint
Coefficient for per each
Code
LB0032
LB0077
MT0208

Description
Blacksmith (metal-worker)
Labour
Thermo - Mechanically Treated ( TMT ) bars (yield strength 415 MPa)

Standards & Quality Control Authority, MoWHS

Quant
0.05000
0.05000
1.70000

Units
day
day
kg

Labour and Material Coefficients (Civil Works) - 2009

126

CHAPTER 13

FLOORING

FL0001

P&L 2nd class Brick-on-edge flooring - In cement mortar 1:4


Coefficient for per sq.m
Code
LB0051
LB0077
MT0043
MT0125
MT0145

FL0002

Description
Mason Gd.2
Labour
Sand
Bricks 2nd class
Cement (OPC / PSC)

Quant
0.13450
0.26793
0.03103
0.05160
0.01102

Units
day
day
cu.m
1000#
tonne

P&L 2nd class Brick-on-edge flooring - In cement mortar 1:6


Coefficient for per sq.m
Code
LB0051
LB0077
MT0043
MT0125
MT0145

FL0003

Description
Mason Gd.2
Labour
Sand
Bricks 2nd class
Cement (OPC / PSC)

Quant
0.13450
0.26832
0.03103
0.05165
0.00725

Units
day
day
cu.m
1000#
tonne

P&L 2nd class Brick-on-edge flooring - In dry brick , including filling joints with sand on bedding of
12.5mm mud mortar
Coefficient for per sq.m
Code
LB0051
LB0077
MT0042
MT0043
MT0125

FL0010

Description
Mason Gd.2
Labour
Mud dry
Sand
Bricks 2nd class

Quant
0.11300
0.27206
0.01800
0.01500
0.05165

Units
day
day
cu.m
cu.m
1000#

P&L 2nd class Flat brick flooring - In cement mortar 1:4


Coefficient for per sq.m
Code
LB0051
LB0077
MT0043
MT0125
MT0145

FL0011

Description
Mason Gd.2
Labour
Sand
Bricks 2nd class
Cement (OPC / PSC)

Quant
0.13450
0.26284
0.02600
0.03210
0.00923

Units
day
day
cu.m
1000#
tonne

P&L 2nd class Flat brick flooring - In cement mortar 1:6


Coefficient for per sq.m
Code
LB0051
LB0077
MT0043
MT0125
MT0145

FL0012

Description
Mason Gd.2
Labour
Sand
Bricks 2nd class
Cement (OPC / PSC)

Quant
0.13450
0.26284
0.02600
0.03200
0.00607

Units
day
day
cu.m
1000#
tonne

P&L 2nd class Flat brick flooring - In dry brick, filling joints with sand, on a base of 12.5mm mud mortar
Coefficient for per sq.m
Code
LB0051
LB0077
MT0042
MT0043
MT0125

Description
Mason Gd.2
Labour
Mud dry
Sand
Bricks 2nd class

Quant
0.11290
0.14391
0.01452
0.01210
0.03200

Standards & Quality Control Authority, MoWHS

Units
day
day
cu.m
cu.m
1000#

Labour and Material Coefficients (Civil Works) - 2009

FL0020

127

P&L pointing on brick flooring with cement mortar 1:2 - Flush pointing
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0145

FL0021

Description
Mason Gd.1
Labour
Sand
Cement (OPC / PSC)

Quant
0.06750
0.10375
0.00214
0.00076

Units
day
day
cu.m
tonne

P&L pointing on brick flooring with cement mortar 1:2 - Ruled pointing
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0145

FL0030

Description
Mason Gd.1
Labour
Sand
Cement (OPC / PSC)

Quant
0.07400
0.11325
0.00214
0.00076

Units
day
day
cu.m
tonne

P&L pointing on brick flooring with cement mortar 1:4 - Flush pointing
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0145

FL0031

Description
Mason Gd.1
Labour
Sand
Cement (OPC / PSC)

Quant
0.06750
0.10375
0.00214
0.00076

Units
day
day
cu.m
tonne

P&L pointing on brick flooring with cement mortar 1:4 - Ruled pointing
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0145

FL0040

Description
Mason Gd.1
Labour
Sand
Cement (OPC / PSC)

Quant
0.07400
0.11325
0.00214
0.00076

Units
day
day
cu.m
tonne

P&L Pointing on brick flooring with cement mortar 1:6 - Flush pointing
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0145

FL0041

Description
Mason Gd.1
Labour
Sand
Cement (OPC / PSC)

Quant
0.06750
0.10375
0.00214
0.00050

Units
day
day
cu.m
tonne

P&L Pointing on brick flooring with cement mortar 1:6 - Ruled pointing
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0145

FL0050

Description
Mason Gd.1
Labour
Sand
Cement (OPC / PSC)

Quant
0.07400
0.11325
0.00214
0.00050

Units
day
day
cu.m
tonne

P&L cement concrete flooring 1:2:4, finished with floating coat of neat cement - 12mm aggregates,
25mm thick
Coefficient for per sq.m
Code
LB0051
LB0077
MT0043
MT0071
MT0145

Description
Mason Gd.2
Labour
Sand
Crushed Rock - 12.5 - 6mm
Cement (OPC / PSC)

Quant
0.13450
0.23570
0.01100
0.02200
0.01020

Standards & Quality Control Authority, MoWHS

Units
day
day
cu.m
cu.m
tonne

Labour and Material Coefficients (Civil Works) - 2009

FL0051

P&L cement concrete flooring 1:2:4, finished with floating coat of neat cement - 20mm aggregates,
40mm thick
Coefficient for per sq.m
Code
LB0051
LB0077
MT0043
MT0070
MT0145

FL0052

Description
Mason Gd.2
Labour
Sand
Crushed Rock - 20mm
Cement (OPC / PSC)

Quant
0.16890
0.26910
0.01780
0.03560
0.01506

Units
day
day
cu.m
cu.m
tonne

P&L cement concrete flooring 1:2:4, finished with floating coat of neat cement - 20mm aggregates,
50mm thick
Coefficient for per sq.m
Code
LB0051
LB0077
MT0043
MT0070
MT0145

FL0053

128

Description
Mason Gd.2
Labour
Sand
Crushed Rock - 20mm
Cement (OPC / PSC)

Quant
0.16890
0.30310
0.02224
0.04449
0.01829

Units
day
day
cu.m
cu.m
tonne

P&L cement concrete flooring 1:2:4, finished with floating coat of neat cement - 20mm aggregates,
75mm thick
Coefficient for per sq.m
Code
LB0051
LB0077
MT0043
MT0070
MT0145

FL0054

Units
day
day
cu.m
cu.m
tonne

Description
Mason Gd.2
Labour
Sand
Gravel\Shingles (River stone) - 20mm to 10mm
Cement (OPC / PSC)

Quant
0.16890
0.26910
0.17800
0.35600
0.01500

Units
day
day
cu.m
cu.m
tonne

P&L cement concrete flooring 1:2:4, finished with floating coat of neat cement - 20mm river gravel,
50mm thick
Coefficient for per sq.m
Code
LB0051
LB0077
MT0043
MT0081
MT0145

FL0060

Quant
0.18720
0.36180
0.03339
0.06679
0.02580

P&L cement concrete flooring 1:2:4, finished with floating coat of neat cement - 20mm river gravel,
40mm thick
Coefficient for per sq.m
Code
LB0051
LB0077
MT0043
MT0081
MT0145

FL0055

Description
Mason Gd.2
Labour
Sand
Crushed Rock - 20mm
Cement (OPC / PSC)

Description
Mason Gd.2
Labour
Sand
Gravel\Shingles (River stone) - 20mm to 10mm
Cement (OPC / PSC)

Quant
0.16890
0.30310
0.22200
0.44500
0.01820

Units
day
day
cu.m
cu.m
tonne

P&L cement concrete flooring 1:3:6, finished with a floating coat of neat cement - 20mm aggregates,
50mm
Coefficient for per sq.m
Code
LB0051
LB0077
MT0043
MT0070
MT0145

Description
Mason Gd.2
Labour
Sand
Crushed Rock - 20mm
Cement (OPC / PSC)

Quant
0.15700
0.29700
0.02430
0.04870
0.01380

Standards & Quality Control Authority, MoWHS

Units
day
day
cu.m
cu.m
tonne

Labour and Material Coefficients (Civil Works) - 2009

FL0061

129

P&L cement concrete flooring 1:3:6, finished with a floating coat of neat cement - 20mm river gravel,
50mm
Coefficient for per sq.m
Code
LB0051
LB0077
MT0043
MT0081
MT0145

FL0070

Description
Mason Gd.2
Labour
Sand
Gravel\Shingles (River stone) - 20mm to 10mm
Cement (OPC / PSC)

Quant
0.15700
0.29700
0.02430
0.04870
0.01380

Units
day
day
cu.m
cu.m
tonne

P&L 40mm red oxide flooring, finished with a floating coat of neat cement (red oxide mixed) including
cement slurry etc. complete - Under layer of 30mm thick cement concrete 1:2:4,
12.5mm aggregates and top layer of 10mm thick plaster of cement red oxide mixed
Coefficient for per sq.m
Code
LB0051
LB0077
MT0043
MT0071
MT0145
MT0150

FL0075

Description
Mason Gd.2
Labour
Sand
Crushed Rock - 12.5 - 6mm
Cement (OPC / PSC)
Red Oxide Pigment\other pigments

Quant
0.33750
1.16100
0.02624
0.02670
0.01792
0.58100

Units
day
day
cu.m
cu.m
tonne
kg

P&L 62mm thick flooring with sub-layer cement concrete 1:2:4 20mm aggregates, top layer with
metallic cement hardener consisting of mix 1:2 (1 cement hardener: 2 6mm stone aggregate),
the metallic hardening compound is mixed by volume in the ratio 4 parts of cement & 1 part of metallic
hardening compound including cement slurry - 50mm thick sub-layer and 12mm topping
Coefficient for per sq.m
Code
LB0051
LB0077
MT0043
MT0070
MT0071
MT0145
MT0152

FL0080

Description
Mason Gd.2
Labour
Sand
Crushed Rock - 20mm
Crushed Rock - 12.5 - 6mm
Cement (OPC / PSC)
Floor Hardener (metallic)

Quant
0.27000
0.47000
0.02220
0.03340
0.02260
0.02630
2.07000

Units
day
day
cu.m
cu.m
cu.m
tonne
kg

Extra for making chequers on concrete floors, steps, landings, pavements etc.
Coefficient for per sq.m
Code
Description
LB0051 Mason Gd.2
LB0077 Labour

FL0085

Quant
0.04400
0.04400

Units
day
day

P&L 40mm thick marble chips flooring top layer 6mm thick with white, black or black and white marble
chips of nominal size 1.5-3mm in proportion 1:2 (cement: chips), on 34mm thick concrete base in
cement concrete 1:2:4, 12.5mm aggregate ( cement and marble powder mix shall be of the ratio 3 part
of cement to 1 part of marble powder) - In grey cement
Coefficient for per sq.m
Code
LB0051
LB0077
MT0043
MT0071
MT0085
MT0145

Description
Mason Gd.2
Labour
Sand
Crushed Rock - 12.5 - 6mm
Marble Chips 6mm - Black or White
Cement (OPC / PSC)

Quant
0.27000
1.75600
0.01510
0.03029
0.00870
0.01500

Standards & Quality Control Authority, MoWHS

Units
day
day
cu.m
cu.m
tonne
tonne

Labour and Material Coefficients (Civil Works) - 2009

FL0086

130

P&L 40mm thick marble chips flooring top layer 6mm thick with white, black or black and white marble
chips of nominal size 1.5-3mm in proportion 1:2 (cement: chips), on 34mm thick concrete base in
cement concrete 1:2:4, 12.5mm aggregate ( cement and marble powder mix shall be of the ratio 3 part
of cement to 1 part of marble powder) - In white cement
Coefficient for per sq.m
Code
LB0051
LB0077
MT0043
MT0071
MT0085
MT0145
MT0146

FL0095

Description
Mason Gd.2
Labour
Sand
Crushed Rock - 12.5 - 6mm
Marble Chips 6mm - Black or White
Cement (OPC / PSC)
White Cement

Quant
0.27000
1.75600
0.01510
0.03029
0.00870
0.01180
0.00430

Units
day
day
cu.m
cu.m
tonne
tonne
tonne

Extra, for coloured chips instead of black, white or black and white chips in top 6mm layer of marble
chips flooring
Coefficient for per sq.m
Code
Description
MT0086 Marble Chips 6mm - Coloured

FL0096

Quant
0.00870

Units
tonne

Extra, for coloured chips instead of black, white or black and white chips in top 10mm layer marble
chips flooring
Coefficient for per sq.m
Code
Description
MT0086 Marble Chips 6mm - Coloured

FL0105

Quant
0.01400

Units
tonne

P&L 40mm thick marble chips flooring top layer 10mm thick with white, black or black and white marble
chips of size 6mm in proportion 1:2 (cement : chips), on 30mm cement concrete 1:2:4 base, 12.5mm
aggregate - In grey cement
Coefficient for per sq.m
Code
LB0051
LB0077
MT0043
MT0071
MT0085
MT0145

FL0106

Description
Mason Gd.2
Labour
Sand
Crushed Rock - 12.5 - 6mm
Marble Chips 6mm - Black or White
Cement (OPC / PSC)

Quant
0.27000
1.75600
0.01398
0.02800
0.01398
0.01600

Units
day
day
cu.m
cu.m
tonne
tonne

P&L 40mm thick marble chips flooring top layer 10mm thick with white, black or black and white marble
chips of size 6mm in proportion 1:2 (cement : chips), on 30mm cement concrete 1:2:4 base, 12.5mm
aggregate - In white cement
Coefficient for per sq.m
Code
LB0051
LB0077
MT0043
MT0071
MT0085
MT0145
MT0146

FL0115

Description
Mason Gd.2
Labour
Sand
Crushed Rock - 12.5 - 6mm
Marble Chips 6mm - Black or White
Cement (OPC / PSC)
White Cement

Quant
0.27000
1.75600
0.01400
0.02800
0.01400
0.01000
0.00600

Units
day
day
cu.m
cu.m
tonne
tonne
tonne

Extra, for Providing & fixing glass strips in joints of terrazzo floors
Coefficient for per m
Code
LB0051
LB0077
MT0655

Description
Mason Gd.2
Labour
Plain Glass - 3mm thick

Quant
0.03313
0.03313
0.04800

Standards & Quality Control Authority, MoWHS

Units
day
day
sq.m

Labour and Material Coefficients (Civil Works) - 2009

FL0116

131

Extra, for terrazzo flooring laid as floor borders, margins, bands, 75 < width > 300mm
Coefficient for per sq.m
Code
Description
LB0051 Mason Gd.2
LB0077 Labour

FL0117

Quant
0.02500
0.05000

Units
day
day

Extra, for laying terrazzo flooring on stair case treads, width < 300mm, including forming nosing
Coefficient for per sq.m
Code
Description
LB0051 Mason Gd.2
LB0077 Labour

FL0118

Quant
0.03750
0.07500

Units
day
day

Extra, for laying terrazzo in narrow bands width <75mm


Coefficient for per m
Code
Description
LB0051 Mason Gd.2
LB0077 Labour

FL0119

Quant
0.00315
0.00470

Units
day
day

Extra, for making moulded nosing in terrazzo, including moulded returns, ends, angles
Coefficient for per m
Code
Description
LB0036 Mason Gd.1
LB0077 Labour

FL0120

Quant
0.12500
0.15600

Units
day
day

Providing & fixing aluminium strip 40x1.6mm in joints of terrazzo floor


Coefficient for per m
Code
LB0051
LB0077
MT0161

FL0130

Description
Mason Gd.2
Labour
Aluminium Strip 40x1.6mm

Quant
0.03130
0.03130
1.00000

Units
day
day
m

P&L Cement plaster skirting < 300mm height with cement mortar 1:3 with a floating coat of neat cement
including rounding off junctions with floor - 20mm
Coefficient for per sq.m
Code
LB0051
LB0077
MT0043
MT0145

FL0131

Description
Mason Gd.2
Labour
Sand
Cement (OPC / PSC)

Quant
0.23400
0.32744
0.02514
0.01308

Units
day
day
cu.m
tonne

P&L Cement plaster skirting < 300mm height with cement mortar 1:3 with a floating coat of neat cement
including rounding off junctions with floor - 22mm
Coefficient for per sq.m
Code
LB0051
LB0077
MT0043
MT0145

Description
Mason Gd.2
Labour
Sand
Cement (OPC / PSC)

Quant
0.23400
0.33081
0.02836
0.01461

Standards & Quality Control Authority, MoWHS

Units
day
day
cu.m
tonne

Labour and Material Coefficients (Civil Works) - 2009

FL0140

132

Providing & fixing Terrazzo or Marble chips skirting < 300mm height top layer 6mm thick with white or
black, black and white marble chips size 4mm in proportion 1:2 ,laid on 12.5mm thick cement plaster
1:3 base - In grey cement
Coefficient for per sq.m
Code
LB0051
LB0077
MT0043
MT0085
MT0145

FL0141

Description
Mason Gd.2
Labour
Sand
Marble Chips 6mm - Black or White
Cement (OPC / PSC)

Quant
0.33700
1.80758
0.01862
0.00870
0.01317

Units
day
day
cu.m
tonne
tonne

Providing & fixing Terrazzo or Marble chips skirting < 300mm height top layer 6mm thick with white or
black, black and white marble chips size 4mm in proportion 1:2 ,laid on 12.5mm thick cement plaster
1:3 base - In white cement
Coefficient for per sq.m
Code
LB0051
LB0077
MT0043
MT0085
MT0145
MT0146

FL0150

Description
Mason Gd.2
Labour
Sand
Marble Chips 6mm - Black or White
Cement (OPC / PSC)
White Cement

Quant
0.33700
1.80758
0.01862
0.00870
0.00887
0.00430

Units
day
day
cu.m
tonne
tonne
tonne

P&L marble stone flooring over 20mm thick base of cement mortar 1:4, jointed with grey cement slurry
mixed with pigment where necessary, rubbing & polishing complete - 20mm thick black marble
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0090
MT0145

FL0151

Description
Mason Gd.1
Labour
Sand
Marble Slab 20mm - Black
Cement (OPC / PSC)

Quant
1.75000
2.87720
0.02397
1.15000
0.01351

Units
day
day
cu.m
sq.m
tonne

P&L marble stone flooring over 20mm thick base of cement mortar 1:4, jointed with grey cement slurry
mixed with pigment where necessary, rubbing & polishing complete - 20mm thick white marble
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0091
MT0145

FL0152

Description
Mason Gd.1
Labour
Sand
Marble Slab 20mm - White
Cement (OPC / PSC)

Quant
1.75000
2.87720
0.02397
1.15000
0.01351

Units
day
day
cu.m
sq.m
tonne

P&L marble stone flooring over 20mm thick base of cement mortar 1:4, jointed with grey cement slurry
mixed with pigment where necessary, rubbing & polishing complete - 20mm thick black and white
marble
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0092
MT0145

Description
Mason Gd.1
Labour
Sand
Marble Slab 20mm - Black and White
Cement (OPC / PSC)

Quant
1.75000
2.87720
0.02397
1.15000
0.01351

Standards & Quality Control Authority, MoWHS

Units
day
day
cu.m
sq.m
tonne

Labour and Material Coefficients (Civil Works) - 2009

FL0153

133

P&L marble stone flooring over 20mm thick base of cement mortar 1:4, jointed with grey cement slurry
mixed with pigment where necessary, rubbing & polishing complete - 20mm thick coloured marble
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0103
MT0145

FL0154

Description
Mason Gd.1
Labour
Sand
Marble Slab 40mm - Coloured
Cement (OPC / PSC)

Quant
1.75000
2.87720
0.02397
1.15000
0.01351

Units
day
day
cu.m
sq.m
tonne

P&L marble stone flooring over 20mm thick base of cement mortar 1:4, jointed with grey cement slurry
mixed with pigment where necessary, rubbing & polishing complete - 40mm thick black marble
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0100
MT0145

FL0155

Description
Mason Gd.1
Labour
Sand
Marble Slab 40mm - Black
Cement (OPC / PSC)

Quant
1.75000
2.87720
0.02397
1.15000
0.01391

Units
day
day
cu.m
sq.m
tonne

P&L marble stone flooring over 20mm thick base of cement mortar 1:4, jointed with grey cement slurry
mixed with pigment where necessary, rubbing & polishing complete - 40mm thick white marble
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0101
MT0145

FL0156

Description
Mason Gd.1
Labour
Sand
Marble Slab 40mm - White
Cement (OPC / PSC)

Quant
1.75000
1.66520
0.02397
1.15000
0.01391

Units
day
day
cu.m
sq.m
tonne

P&L marble stone flooring over 20mm thick base of cement mortar 1:4, jointed with grey cement slurry
mixed with pigment where necessary, rubbing & polishing complete - 40mm thick black and white
marble
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0102
MT0145

FL0157

Description
Mason Gd.1
Labour
Sand
Marble Slab 40mm - Black and White
Cement (OPC / PSC)

Quant
1.75000
2.87720
0.02397
1.15000
0.01391

Units
day
day
cu.m
sq.m
tonne

P&L marble stone flooring over 20mm thick base of cement mortar 1:4, jointed with grey cement slurry
mixed with pigment where necessary, rubbing & polishing complete - 40mm thick coloured marble
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0093
MT0145

Description
Mason Gd.1
Labour
Sand
Marble Slab 20mm - Coloured
Cement (OPC / PSC)

Quant
1.75000
2.87720
0.02397
1.15000
0.01351

Standards & Quality Control Authority, MoWHS

Units
day
day
cu.m
sq.m
tonne

Labour and Material Coefficients (Civil Works) - 2009

FL0160

134

P&L Kota stone flooring over 20mm thick base of cement mortar 1:4, jointed with grey cement slurry
mixed with pigment where necessary, rubbing & polishing complete - 20mm
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0110
MT0145

FL0161

Description
Mason Gd.1
Labour
Sand
Kota Stone Slab - 20mm
Cement (OPC / PSC)

Quant
1.75000
1.87720
0.02397
1.10000
0.01351

Units
day
day
cu.m
sq.m
tonne

P&L Kota stone flooring over 20mm thick base of cement mortar 1:4, jointed with grey cement slurry
mixed with pigment where necessary, rubbing & polishing complete - 40mm
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0111
MT0145

FL0170

Description
Mason Gd.1
Labour
Sand
Kota Stone Slab - 40mm
Cement (OPC / PSC)

Quant
1.75000
1.87720
0.02397
1.10000
0.01351

Units
day
day
cu.m
sq.m
tonne

Extra, for marble stone flooring for laying in step-treads, width < 300 mm
Coefficient for per m
Code
Description
LB0036 Mason Gd.1
LB0077 Labour

FL0171

Quant
0.24380
0.66630

Units
day
day

Extra, for marble stone flooring for nosing in step-treads


Coefficient for per m
Code
Description
LB0036 Mason Gd.1
LB0077 Labour

FL0180

Units
day
day

Providing & fixing bison panel flooring including nails/screws etc. complete excluding the cost of frame
- 25mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0356

FL0181

Quant
0.25000
0.50000

Description
Carpenter Gd.1
Labour
Pre-laminated (both sides) Bison panel - 25mm

Quant
0.23800
0.23800
1.05000

Units
day
day
sq.m

Providing & fixing bison panel flooring including nails/screws etc. complete excluding the cost of frame
- 30mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0357

FL0190

Description
Carpenter Gd.1
Labour
Pre-laminated (both sides) Bison panel - 30mm

Quant
0.23800
0.23800
1.05000

Units
day
day
sq.m

Providing & fixing Plain Particle-Board Flooring fixing with necessary screws etc. complete, excluding
cost of frame - 25mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0369

Description
Carpenter Gd.1
Labour
Plain Particle Board - 25mm

Quant
0.23800
0.23800
1.00000

Standards & Quality Control Authority, MoWHS

Units
day
day
sq.m

Labour and Material Coefficients (Civil Works) - 2009

FL0191

135

Providing & fixing Plain Particle-Board Flooring fixing with necessary screws etc. complete, excluding
cost of frame - 35mm
Coefficient for per sq.m
Code
LB0021
LB0077
MT0370

FL0200

Description
Carpenter Gd.1
Labour
Plain Particle Board - 35mm

Quant
0.23800
0.23800
1.00000

Units
day
day
sq.m

Providing & fixing Mixed Conifer Flooring including fixing with iron screws etc. complete, excluding the
cost of frame - 25mm thick, T&G
Coefficient for per sq.m
Code
LB0021
LB0077
MT0330

FL0201

Units
day
day
cu.m

Description
Carpenter Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)

Quant
0.21000
0.11000
0.02981

Units
day
day
cu.m

Providing & fixing Mixed Conifer Flooring including fixing with iron screws etc. complete, excluding the
cost of frame - 40mm thick, T&G
Coefficient for per sq.m
Code
LB0021
LB0077
MT0330

FL0203

Quant
0.27000
0.13500
0.02981

Providing & fixing Mixed Conifer Flooring including fixing with iron screws etc. complete, excluding the
cost of frame - 25mm thick, half-lapped
Coefficient for per sq.m
Code
LB0021
LB0077
MT0330

FL0202

Description
Carpenter Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)

Description
Carpenter Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)

Quant
0.29000
0.14300
0.04600

Units
day
day
cu.m

Providing & fixing Mixed Conifer Flooring including fixing with iron screws etc. complete, excluding the
cost of frame - 40mm thick, half-lapped
Coefficient for per sq.m
Code
LB0021
LB0077
MT0330

FL0204

Description
Carpenter Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)

Quant
0.26000
0.15600
0.04600

Units
day
day
cu.m

Providing & fixing Mixed Conifer Flooring including fixing with iron screws etc. complete, excluding the
cost of frame - 45mm thick, T&G
Coefficient for per sq.m
Code
LB0021
LB0077
MT0330

FL0205

Description
Carpenter Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)

Quant
0.31200
0.15700
0.04950

Units
day
day
cu.m

Providing & fixing Mixed Conifer Flooring including fixing with iron screws etc. complete, excluding the
cost of frame - 45mm thick, half-lapped
Coefficient for per sq.m
Code
LB0021
LB0077
MT0330

Description
Carpenter Gd.1
Labour
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)

Standards & Quality Control Authority, MoWHS

Quant
0.27200
0.16700
0.04950

Units
day
day
cu.m

Labour and Material Coefficients (Civil Works) - 2009

FL0210

136

Providing & fixing Parquet (wood block) flooring including blown bitumen underlay and iron screws
etc. complete, excluding cost of frame - 38mm thick, champ wood
Coefficient for per sq.m
Code
LB0021
LB0039
LB0077
MT0001
MT0331

FL0215

Description
Carpenter Gd.1
Work Supervisor (Lajab)
Labour
Bitumen 80\100
Rough-sawn timber (urban rate) - Class 'A', (Blue pine, Champ)

Quant
2.18700
0.12500
4.68500
0.00450
0.04180

Units
day
day
day
tonne
cu.m

Providing & fixing Pre-Fabricated Flooring Profiles in mixed conifer including necessary screws etc.
complete - 25mm thick
Coefficient for per sq.m
Code
LB0021
LB0077
MT0395

FL0216

Description
Carpenter Gd.1
Labour
Flooring - 25mm, Mixed conifer

Quant
0.23800
0.23800
1.00000

Units
day
day
sq.m

Providing & fixing Pre-Fabricated Flooring Profiles in mixed conifer including necessary screws etc.
complete - 38mm thick
Coefficient for per sq.m
Code
LB0021
LB0077
MT0396

FL0225

Description
Carpenter Gd.1
Labour
Flooring - 38mm, Blue pine

Quant
0.23800
0.23800
1.00000

Units
day
day
sq.m

Providing & fixing 2mm thick Vinyl or Linoleum sheet 1.3mm laid with special adhesive, including 2
coat of bitumen applied over subfloor on prepared surface @ 1.5 kg/sq.m each coat including the cost
of base concrete
- Over base of 25mm thick cement concrete 1:2:4 , 12.5mm aggregate
Coefficient for per sq.m
Code
LB0036
LB0051
LB0077
MT0001
MT0035
MT0043
MT0071
MT0145
MT0672

FL0230

Description
Mason Gd.1
Mason Gd.2
Labour
Bitumen 80\100
Kerosene
Sand
Crushed Rock - 12.5 - 6mm
Cement (OPC / PSC)
Linoleum sheet, 1.3mm

Quant
0.07000
0.13450
0.41070
0.00357
0.25830
0.01100
0.02200
0.01020
1.00000

Units
day
day
day
tonne
litre
cu.m
cu.m
tonne
sq.m

P&L rammed mud flooring complete


Coefficient for per sq.m
Code
LB0051
LB0077
MT0042
MT0044

Description
Mason Gd.2
Labour
Mud dry
Hay/husk

Quant
0.01000
0.03000
0.10000
0.80000

Standards & Quality Control Authority, MoWHS

Units
day
day
cu.m
kg

Labour and Material Coefficients (Civil Works) - 2009

137

CHAPTER 14

TILING - WALL & FLOOR

GL0001

Providing & fixing white/ coloured Glazed tiles, 150 x 150 mm in skirting, step risers, dado, finished
with flush-pointing in white cement
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0145
MT0665

GL0005

Description
Mason Gd.1
Labour
Sand
Cement (OPC / PSC)
Glazed tiles - white, 150 x 150mm

Quant
0.96000
0.97575
0.01498
0.01044
45.00000

Units
day
day
cu.m
tonne
each

Providing & fixing white/ coloured glazed tiles in flooring, treads of steps and landings laid on bed of
12mm thick cement mortar 1:3 finished with flush pointing in white cement: - for 150 x 150 mm
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0145
MT0665

GL0006

Description
Mason Gd.1
Labour
Sand
Cement (OPC / PSC)
Glazed tiles - white, 150 x 150mm

Quant
0.58300
0.59875
0.01498
0.01044
45.00000

Units
day
day
cu.m
tonne
each

Providing & fixing white/ coloured glazed tiles in flooring, treads of steps and landings laid on bed of
12mm thick cement mortar 1:3 finished with flush pointing in white cement: - for 100 x 100 mm
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0145
MT0671

GL0007

Description
Mason Gd.1
Labour
Sand
Cement (OPC / PSC)
Glazed tiles - White,100 x 100 mm

Quant
0.87500
0.89075
0.01498
0.01044
100.00000

Units
day
day
cu.m
tonne
each

Providing & fixing white/ coloured glazed tiles in flooring, treads of steps and landings laid on bed of
12mm thick cement mortar 1:3 finished with flush pointing in white cement: - for 200 x 100 mm
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0145
MT0670

GL0008

Description
Mason Gd.1
Labour
Sand
Cement (OPC / PSC)
Glazed tiles - White,200 x 100 mm

Quant
0.87500
0.81575
0.01498
0.01044
50.00000

Units
day
day
cu.m
tonne
each

Providing & fixing white/ coloured glazed tiles in flooring, treads of steps and landings laid on bed of
12mm thick cement mortar 1:3 finished with flush pointing in white cement: - for 200 x 200 mm
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0145
MT0669

Description
Mason Gd.1
Labour
Sand
Cement (OPC / PSC)
Glazed tiles - White,200 x 200 mm

Quant
0.73000
0.74575
0.01498
0.01044
25.00000

Standards & Quality Control Authority, MoWHS

Units
day
day
cu.m
tonne
each

Labour and Material Coefficients (Civil Works) - 2009

GL0009

138

Providing & fixing white/ coloured glazed tiles in flooring, treads of steps and landings laid on bed of
12mm thick cement mortar 1:3 finished with flush pointing in white cement: - for 300 x 300 mm
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0145
MT0668

GL0015

Description
Mason Gd.1
Labour
Sand
Cement (OPC / PSC)
Glazed tiles - White, 300 x 300 mm

Quant
0.66000
0.67575
0.01498
0.01044
12.00000

Units
day
day
cu.m
tonne
each

Extra for laying glazed tiles - In treads of steps, width <300mm


Coefficient for per sq.m
Code
Description
LB0036 Mason Gd.1
LB0077 Labour

GL0016

Quant
0.19000
0.19000

Units
day
day

Extra for laying glazed tiles - In skirting, risers of steps, dado where tiles are required to be cut (only
area of portion of cut tiles to be measured)
Coefficient for per sq.m
Code
Description
LB0036 Mason Gd.1
LB0077 Labour

Quant
1.09500
1.09500

Standards & Quality Control Authority, MoWHS

Units
day
day

Labour and Material Coefficients (Civil Works) - 2009

139

CHAPTER 15

ROOFING

RF0001

Providing & fixing Corrugated Galvanised Iron (CGI) sheeting, including bolts, hooks and nuts 8mm dia.
with bitumen and G.I limpet washers filled with white lead for connection, excluding the cost of purlins,
rafter and trusses - 24g
Coefficient for per sq.m
Code
LB0033
LB0039
LB0077
MT0275

RF0005

Description
Carpenter Gd.2
Work Supervisor (Lajab)
Labour
Corrugated G.I Sheets - 24G (0.63mm)

Quant
0.10500
0.00900
0.10500
0.00710

Units
day
day
day
tonne

Providing & fixing 600mm ridges or hips in plain G.I including bolts, hooks and nuts 8mm dia G.I limpet
and bitumen washers for connection - 24g
Coefficient for per m
Code
LB0032
LB0039
LB0077
MT0250

RF0010

Description
Blacksmith (metal-worker)
Work Supervisor (Lajab)
Labour
Plain G.I Sheet, 24-gauge (0.63mm)

Quant
0.24100
0.04800
0.29000
0.00454

Units
day
day
day
tonne

Providing & fixing 450mm over all semi-circular plain G.I gutter, including brackets, bolts, nuts,
washers & rain water pipes connections, excluding the cost of pipes - 24g sheet
Coefficient for per m
Code
LB0032
LB0033
LB0039
LB0077
MT0182
MT0250

RF0015

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Work Supervisor (Lajab)
Labour
Rolled sections (250 MPa) - Flats
Plain G.I Sheet, 24-gauge (0.63mm)

Quant
0.11600
0.08630
0.03160
0.23200
0.83000
0.00283

Units
day
day
day
day
kg
tonne

Extra, for Providing & fixing curved C.G.I sheet in roofing


Coefficient for per sq.m
Code
LB0033
LB0039
LB0077

RF0016

Description
Carpenter Gd.2
Work Supervisor (Lajab)
Labour

Quant
0.01400
0.00086
0.01400

Units
day
day
day

Extra, for Providing & fixing C.G.I sheets vertically or to a pitch >60 degrees
Coefficient for per sq.m
Code
Description
LB0077 Labour

RF0017

Quant
0.03400

Units
day

Extra, for making straight-cut openings (in 24g) for chimney, sky lights
Coefficient for per m
Code
LB0032
LB0033
LB0039
LB0077
MT0275

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Work Supervisor (Lajab)
Labour
Corrugated G.I Sheets - 24G (0.63mm)

Standards & Quality Control Authority, MoWHS

Quant
0.05000
0.01753
0.00150
0.06753
0.00119

Units
day
day
day
day
tonne

Labour and Material Coefficients (Civil Works) - 2009

RF0025

140

Extra, for making opening or recess in CGI roofing of girth < 1 metre - Area upto 0.01sq.m
Coefficient for per each
Code
Description
LB0032 Blacksmith (metal-worker)
LB0077 Labour

RF0026

Quant
0.06250
0.01550

Units
day
day

Extra, for making opening or recess in CGI roofing of girth < 1 metre - 0.01 < Area < 0.04sq.m
Coefficient for per each
Code
Description
LB0032 Blacksmith (metal-worker)
LB0077 Labour

RF0027

Quant
0.10400
0.10400

Units
day
day

Extra, for making opening or recess in CGI roofing of girth < 1 metre - Area > 0.04sq.m
Coefficient for per each
Code
Description
LB0032 Blacksmith (metal-worker)
LB0077 Labour

RF0060

Quant
0.15600
0.15600

Units
day
day

Providing & fixing wind tie of 40 x 6 mm flats


Coefficient for per m
Code
LB0032
LB0077
MT0182

RF0065

Description
Blacksmith (metal-worker)
Labour
Rolled sections (250 MPa) - Flats

Quant
0.02100
0.02100
2.00000

Units
day
day
kg

Providing & fixing 150mm thatched roofing, including straws/grass bundles, half split bamboo fillet,
tying strings complete
Coefficient for per sq.m
Code
LB0033
LB0077
MT0045
MT0390

RF0066

Description
Carpenter Gd.2
Labour
Straw, girth <100mm
Bamboo - 25mm dia

Quant
0.20600
0.37100
15.00000
23.40000

Units
day
day
bundle
m

Providing & fixing 25mm dia. bamboos at 225mm apart including moonj ban(rope) or string
Coefficient for per sq.m
Code
LB0033
LB0077
MT0390

RF0067

Description
Carpenter Gd.2
Labour
Bamboo - 25mm dia

Quant
0.16000
0.10500
18.64000

Units
day
day
m

Providing & fixing thatched coping to ridges and hips, girth < 1 metre including tying and split bamboo
wind tie complete
Coefficient for per m
Code
LB0033
LB0077
MT0044
MT0390

Description
Carpenter Gd.2
Labour
Hay/husk
Bamboo - 25mm dia

Quant
0.43800
0.40700
10.00000
25.20000

Standards & Quality Control Authority, MoWHS

Units
day
day
kg
m

Labour and Material Coefficients (Civil Works) - 2009

RF0075

141

Providing & fixing single slate roofing including bitumen felt water-proofing etc complete, excluding the
cost of wooden reapers, trusses
Coefficient for per sq.m
Code
LB0033
LB0051
LB0077
MT0005
MT0285

RF0080

Description
Carpenter Gd.2
Mason Gd.2
Labour
Bitumen felt Type 3 - Grade 1
R o o f i n g S l a t e - 600mm x 300mm

Quant
0.18600
0.18600
0.37300
1.05000
10.00000

Units
day
day
day
sq.m
each

Providing & fixing PLAIN Pantile or Roman II concrete tiles-500mm x 250mm including tying wires but
excluding the cost of frame work - 6mm
Coefficient for per sq.m
Code
LB0021
LB0033
LB0077
MT0290

RF0081

Description
Carpenter Gd.1
Carpenter Gd.2
Labour
Plain Pantile / Roman II 500mm x 250mm concrete tiles - 6mm

Quant
0.01300
0.01300
0.07000
12.50000

Units
day
day
day
each

Providing & fixing PLAIN Pantile or Roman II concrete tiles-500mm x 250mm including tying wires but
excluding the cost of frame work - 8mm
Coefficient for per sq.m
Code
LB0021
LB0033
LB0077
MT0291

RF0082

Description
Carpenter Gd.1
Carpenter Gd.2
Labour
Plain Pantile / Roman II 500mm x 250mm concrete tiles - 8mm

Quant
0.01300
0.01300
0.07000
12.50000

Units
day
day
day
each

Providing & fixing PLAIN Pantile or Roman II concrete tiles-500mm x 250mm including tying wires but
excluding the cost of frame work - 10mm
Coefficient for per sq.m
Code
LB0021
LB0033
LB0077
MT0292

RF0090

Description
Carpenter Gd.1
Carpenter Gd.2
Labour
Plain Pantile / Roman II 500mm x 250mm concrete tiles - 10mm

Quant
0.01300
0.01300
0.07000
12.50000

Units
day
day
day
each

Providing & fixing COLOURED Pantile or Roman concrete tiles-500mm x 250mm including tying wires
but excluding the cost of frame work - 6mm
Coefficient for per sq.m
Code
LB0021
LB0033
LB0077
MT0295

RF0091

Description
Carpenter Gd.1
Carpenter Gd.2
Labour
Coloured Pantile / Roman II 500mm x 250mm concrete tiles - 6mm

Quant
0.01300
0.01300
0.07000
12.50000

Units
day
day
day
each

Providing & fixing COLOURED Pantile or Roman concrete tiles-500mm x 250mm including tying wires
but excluding the cost of frame work - 8mm
Coefficient for per sq.m
Code
LB0021
LB0033
LB0077
MT0296

Description
Carpenter Gd.1
Carpenter Gd.2
Labour
Coloured Pantile / Roman II 500mm x 250mm concrete tiles - 8mm

Standards & Quality Control Authority, MoWHS

Quant
0.01300
0.01300
0.07000
12.50000

Units
day
day
day
each

Labour and Material Coefficients (Civil Works) - 2009

RF0092

142

Providing & fixing COLOURED Pantile or Roman concrete tiles-500mm x 250mm including tying wires
but excluding the cost of frame work - 10mm
Coefficient for per sq.m
Code
LB0021
LB0033
LB0077
MT0297

RF0100

Description
Carpenter Gd.1
Carpenter Gd.2
Labour
Coloured Pantile / Roman II 500mm x 250mm concrete tiles - 10mm

Quant
0.01300
0.01300
0.07000
12.50000

Units
day
day
day
each

Providing & fixing PLAIN Super Roman concrete tiles-600mm x 330mm including tying wires but
excluding the cost of frame work - 10mm
Coefficient for per sq.m
Code
LB0021
LB0033
LB0077
MT0300

RF0105

Quant
0.01000
0.01000
0.05000
8.00000

600mm x 330mm x 10mm concrete tiles - Plain

Units
day
day
day
each

Providing & fixing COLOURED Super Roman concrete tiles-600mm x 330mm including tying wires but
excluding the cost of frame work - 10mm
Coefficient for per sq.m
Code
LB0021
LB0033
LB0077
MT0301

RF0110

Description
Carpenter Gd.1
Carpenter Gd.2
Labour
Super Roman

Description
Carpenter Gd.1
Carpenter Gd.2
Labour
Super Roman

Quant
0.01000
0.01000
0.05000
8.00000

600mm x 330mm x 10mm concrete tiles - Coloured

Units
day
day
day
each

Providing & fixing PLAIN Semi-Sheet concrete tiles-600mm x 600mm including tying wires but
excluding the cost of frame work - 8mm
Coefficient for per sq.m
Code
LB0021
LB0033
LB0077
MT0305

RF0115

Description
Carpenter Gd.1
Carpenter Gd.2
Labour
Semi-sheet

Quant
0.00800
0.00800
0.05000
4.00000

600mm x 600mm x 8mm concrete tiles - Plain

Units
day
day
day
each

Providing & fixing COLOURED Semi-Sheet concrete tiles-600mm x 600mm including tying wires but
excluding the cost of frame work - 8mm
Coefficient for per sq.m
Code
LB0021
LB0033
LB0077
MT0306

RF0120

Description
Carpenter Gd.1
Carpenter Gd.2
Labour
Semi-sheet

600mm x 600mm x 8mm concrete tiles - Coloured

Quant
0.00800
0.00800
0.05000
4.00000

Units
day
day
day
each

Providing and fixing concrete tiles ridges or hips including tying wire etc. complete - Plain
Coefficient for per m
Code
LB0021
LB0033
LB0077
MT0310

Description
Carpenter Gd.1
Carpenter Gd.2
Labour
Hip/Ridge, 600mm - Plain

Quant
0.00200
0.00200
0.02500
2.00000

Standards & Quality Control Authority, MoWHS

Units
day
day
day
each

Labour and Material Coefficients (Civil Works) - 2009

RF0121

143

Providing and fixing concrete tiles ridges or hips including tying wire etc. complete - Coloured
Coefficient for per m
Code
LB0021
LB0033
LB0077
MT0311

RF0130

Description
Carpenter Gd.1
Carpenter Gd.2
Labour
Hip/Ridge, 600mm - Coloured

Quant
0.00200
0.00200
0.02500
2.00000

Units
day
day
day
each

Providing & fixing shinglep roofing with shinglep of size 1350x125x12mm in 3 layers including tying,
uplift protection complete
Coefficient for per sq.m
Code
LB0021
LB0077
MT0060
MT0315

RF0135

Description
Carpenter Gd.1
Labour
Boulder
S h i n g l e p r o o f i n g - 1500mm (approx.)

Quant
0.15000
0.15000
0.06000
10.00000

Units
day
day
cu.m
pair

Providing & fixing red mud corrugated plastic sheeting, 1.5 mm thick
Coefficient for per sq.m
Code
LB0033
LB0039
LB0077
MT0320

RF0136

Description
Carpenter Gd.2
Work Supervisor (Lajab)
Labour
Red mud plastic corrugated sheet, 1.5mm

Quant
0.10500
0.00900
0.10500
1.28000

Units
day
day
day
sq.m

Providing & fixing red mud plastic sheet 600 mm ridging, 1.3mm thick
Coefficient for per m
Code
LB0033
LB0039
LB0077
MT0321

RF0150

Description
Carpenter Gd.2
Work Supervisor (Lajab)
Labour
Red mud plastic plain sheet, 1.3mm

Quant
0.24100
0.04800
0.29000
1.18520

Units
day
day
day
m

P&f 1.2mm transparent sheet including 8mm G.I J or L hooks, bitumen & G.I limpet washers etc
complete, excluding cost of frame
Coefficient for per sq.m
Code
LB0033
LB0039
LB0077
MT0280

RF0155

Description
Carpenter Gd.2
Work Supervisor (Lajab)
Labour
Reinforced polyester transparent sheets - 1.2mm, corrugated

Quant
0.15000
0.08800
0.15000
1.05000

Units
day
day
day
sq.m

P&L lime concrete terracing on roofing , average depth 100mm - including drainage fall, ramming,
rounding at parapets
Coefficient for per sq.m
Code
LB0036
LB0039
LB0051
LB0077
MT0120
MT0126
MT0127

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Labour
Slaked lime
Brick aggregate
Graded brick aggregate

Quant
0.00600
0.00500
0.13100
1.14438
13.50000
0.10000
0.04750

Standards & Quality Control Authority, MoWHS

Units
day
day
day
day
kg
cu.m
cu.m

Labour and Material Coefficients (Civil Works) - 2009

RF0156

144

P&L lime concrete terracing on roofing , average depth 100mm - including drainage fall, ramming,
rounding at parapets and under-coat of hot bitumen 80/100
Coefficient for per sq.m
Code
LB0036
LB0039
LB0051
LB0077
MT0001
MT0035
MT0120
MT0126
MT0127

RF0165

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Labour
Bitumen 80\100
Kerosene
Slaked lime
Brick aggregate
Graded brick aggregate

Quant
0.00600
0.00500
0.13100
1.19438
0.00170
0.12300
13.50000
0.10000
0.04750

Units
day
day
day
day
tonne
litre
kg
cu.m
cu.m

P&L cement concrete terracing on roof with cement concrete 1:3:6, 20mm aggregates over a base coat
of bitumen 80/100 mixed with coarse sand - 115mm average thickness
Coefficient for per sq.m
Code
LB0036
LB0039
LB0051
LB0052
LB0053
LB0077
MP0205
MP0206
MT0001
MT0035
MT0040
MT0043
MT0070
MT0145

RF0166

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Painter Gd.1
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Bitumen 80\100
Kerosene
Firewood (stacked volume)
Sand
Crushed Rock - 20mm
Cement (OPC / PSC)

Quant
0.00863
0.00575
0.00863
0.01870
0.00805
0.31969
0.00805
0.00805
0.00170
0.12200
0.00410
0.06005
0.10810
0.02530

Units
day
day
day
day
day
day
day
day
tonne
litre
cu.m
cu.m
cu.m
tonne

P&L cement concrete terracing on roof with cement concrete 1:3:6, 20mm aggregates over a base coat
of bitumen 80/100 mixed with coarse sand - Painting roof with bitumen including spreading sand,
cleaning slab etc. complete
Coefficient for per sq.m
Code
LB0052
LB0077
MT0001
MT0035
MT0040
MT0043

RF0175

Description
Painter Gd.1
Labour
Bitumen 80\100
Kerosene
Firewood (stacked volume)
Sand

Quant
0.01870
0.04800
0.00170
0.12200
0.00041
0.00600

Units
day
day
tonne
litre
cu.m
cu.m

Providing & fixing C.I. rain water pipes & fittings with necessary screws on the wall face including filling
joints etc. complete - 100mm dia C.I pipes
Coefficient for per m
Code
LB0032
LB0077
MT0760

Description
Blacksmith (metal-worker)
Labour
Cast Iron - Pipe, 100mm dia.

Quant
0.04700
0.11600
1.05000

Standards & Quality Control Authority, MoWHS

Units
day
day
m

Labour and Material Coefficients (Civil Works) - 2009

RF0176

145

Providing & fixing C.I. rain water pipes & fittings with necessary screws on the wall face including filling
joints etc. complete - 100mm dia C.I. head for pipe
Coefficient for per each
Code
Description
LB0077 Labour
MT0762 Cast Iron - Head 100mm

RF0177

Quant
0.00773
1.00000

Providing & fixing C.I. rain water pipes & fittings with necessary screws on the wall face including filling
joints etc. complete - 100mm dia C.I bend for pipe
Coefficient for per each
Code
Description
LB0077 Labour
MT0761 Cast Iron - Bend 100mm

RF0178

Units
day
each

Quant
0.00773
1.00000

Units
day
each

Providing & fixing C.I. rain water pipes & fittings with necessary screws on the wall face including filling
joints etc. complete - 100mm dia C.I. shoes for pipe
Coefficient for per each
Code
Description
LB0077 Labour
MT0765 Cast Iron - Shoe, 100mm

RF0185

Quant
0.00773
1.00000

Units
day
each

Providing & fixing 100mm dia C.I. offset for rain water pipe on wall face including filling joints - 75mm
projection
Coefficient for per each
Code
Description
LB0077 Labour
MT0763 Cast Iron - Offset 100mm, 75mm projection

RF0186

Quant
0.00773
1.00000

Units
day
each

Providing & fixing 100mm dia C.I. offset for rain water pipe on wall face including filling joints - 150mm
projection
Coefficient for per each
Code
Description
LB0077 Labour
MT0764 Cast Iron - Offset 100mm, 150mm projection

RF0190

Quant
0.00773
1.00000

Units
day
each

Providing and fixing on wall face single socketed rigid PVC ( Working Pressure 4kgf per sq.cm) rain
water pipes including jointing with seal ring leaving 10 mm gap for thermal expansion complete - 75
mm dia
Coefficient for per m
Code
LB0038
LB0077
MT1160
MT1320

RF0191

Description
Plumber gd.1
Labour
Pipe, single socketed 3m long, 75 mm dia
seal ring - 75 mm

Quant
0.35000
0.40000
0.33333
0.33333

Units
day
day
m
each

Providing and fixing on wall face single socketed rigid PVC (Working Pressure 4kgf per sq.cm) rain
water pipes including jointing with seal ring leaving 10 mm gap for thermal expansion complete - 90
mm dia
Coefficient for per m
Code
LB0038
LB0077
MT1161
MT1321

Description
Plumber gd.1
Labour
Pipe, single socketed 3m long, 90 mm dia
seal ring - 90 mm

Standards & Quality Control Authority, MoWHS

Quant
0.35000
0.40000
0.33333
0.33333

Units
day
day
m
each

Labour and Material Coefficients (Civil Works) - 2009

RF0192

Providing and fixing on wall face single socketed rigid PVC (Working Pressure 4kgf per sq.cm) rain
water pipes including jointing with seal ring leaving 10 mm gap for thermal expansion complete - 110
mm dia
Coefficient for per m
Code
LB0038
LB0077
MT1162
MT1322

RF0195

146

Description
Plumber gd.1
Labour
Pipe, single socketed 3m long, 110 mm dia
seal ring -110 mm

Quant
0.35000
0.40000
0.33333
0.33333

Units
day
day
m
each

Providing and fixing on wall face PVC coupler for rigid rain water pipes including jointing with seal ring
leaving 10 mm gap for thermal expansion complete - 75 mm dia
Coefficient for each
Code
LB0038
LB0077
MT1205
MT1320

RF0196

Description
Plumber gd.1
Labour
Coupler - 75 mm
seal ring -75 mm

Quant
0.05000
0.05000
1.00000
2.00000

Units
day
day
each
each

Providing and fixing on wall face PVC coupler for rigid rain water pipes including jointing with seal ring
leaving 10 mm gap for thermal expansion complete - 90 mm dia
Coefficient for each
Code
LB0038
LB0077
MT1206
MT1321

RF0197

Description
Plumber gd.1
Labour
Coupler - 90 mm
seal ring -90 mm

Quant
0.05000
0.05000
1.00000
2.00000

Units
day
day
each
each

Providing and fixing on wall face PVC coupler for rigid rain water pipes including jointing with seal ring
leaving 10 mm gap for thermal expansion complete - 110 mm dia
Coefficient for each
Code
LB0038
LB0077
MT1207
MT1322

RF0200

Description
Plumber gd.1
Labour
Coupler - 110 mm
seal ring -110 mm

Quant
0.05000
0.05000
1.00000
2.00000

Units
day
day
each
each

Providing and fixing on wall face PVC single tee with door for rigid rain water pipes including jointing
with seal ring leaving 10 mm gap for thermal expansion complete - 75 mm dia
Coefficient for each
Code
LB0038
LB0077
MT1255
MT1320

RF0201

Description
Plumber gd.1
Labour
Single Tee with door- 75 mm
seal ring -75 mm

Quant
0.05000
0.05000
1.00000
2.00000

Units
day
day
each
each

Providing and fixing on wall face PVC single tee with door for rigid rain water pipes including jointing
with seal ring leaving 10 mm gap for thermal expansion complete -90 mm dia
Coefficient for each
Code
LB0038
LB0077
MT1256
MT1321

Description
Plumber gd.1
Labour
Single Tee with door- 90 mm
seal ring -90 mm

Quant
0.05000
0.05000
1.00000
2.00000

Standards & Quality Control Authority, MoWHS

Units
day
day
each
each

Labour and Material Coefficients (Civil Works) - 2009

RF0202

147

Providing and fixing on wall face PVC single tee with door for rigid rain water pipes including jointing
with seal ring leaving 10 mm gap for thermal expansion complete -110 mm dia
Coefficient for each
Code
LB0038
LB0077
MT1257
MT1322

RF0205

Description
Plumber gd.1
Labour
Single Tee with door- 110 mm
seal ring -110 mm

Quant
0.05000
0.05000
1.00000
2.00000

Units
day
day
each
each

Providing and fixing on wall face PVC plain single tee for rigid rain water pipes including jointing with
seal ring leaving 10 mm gap for thermal expansion complete - 75 mm dia
Coefficient for each
Code
LB0038
LB0077
MT1245
MT1320

RF0206

Description
Plumber gd.1
Labour
Single Tee , plain - 75 mm
seal ring -75 mm

Quant
0.05000
0.05000
1.00000
2.00000

Units
day
day
each
each

Providing and fixing on wall face PVC plain single tee for rigid rain water pipes including jointing with
seal ring leaving 10 mm gap for thermal expansion complete - 90 mm dia
Coefficient for each
Code
LB0038
LB0077
MT1246
MT1321

RF0207

Description
Plumber gd.1
Labour
Single Tee , plain - 90 mm
seal ring -90 mm

Quant
0.05000
0.05000
1.00000
2.00000

Units
day
day
each
each

Providing and fixing on wall face PVC plain single tee for rigid rain water pipes including jointing with
seal ring leaving 10 mm gap for thermal expansion complete - 110mm dia
Coefficient for each
Code
LB0038
LB0077
MT1247
MT1322

RF0210

Description
Plumber gd.1
Labour
Single Tee , plain - 110 mm
seal ring -110 mm

Quant
0.05000
0.05000
1.00000
2.00000

Units
day
day
each
each

Providing and fixing on wall face PVC bend for rigid rain water pipes including jointing with seal ring
leaving 10 mm gap for thermal expansion complete - 75 mm dia
Coefficient for each
Code
LB0038
LB0077
MT1215
MT1320

RF0211

Description
Plumber gd.1
Labour
Plain Bend - 75 mm
seal ring -75 mm

Quant
0.05000
0.05000
1.00000
2.00000

Units
day
day
each
each

Providing and fixing on wall face PVC bend for rigid rain water pipes including jointing with seal ring
leaving 10 mm gap for thermal expansion complete - 90 mm dia
Coefficient for each
Code
LB0038
LB0077
MT1216
MT1321

Description
Plumber gd.1
Labour
Plain Bend -90 mm
seal ring -90 mm

Quant
0.05000
0.05000
1.00000
2.00000

Standards & Quality Control Authority, MoWHS

Units
day
day
each
each

Labour and Material Coefficients (Civil Works) - 2009

RF0212

148

Providing and fixing on wall face PVC bend for rigid rain water pipes including jointing with seal ring
leaving 10 mm gap for thermal expansion complete - 110 mm dia
Coefficient for each
Code
LB0038
LB0077
MT1217
MT1322

RF0215

Description
Plumber gd.1
Labour
Plain Bend -110 mm
seal ring -110 mm

Quant
0.05000
0.05000
1.00000
2.00000

Units
day
day
each
each

Providing and fixing on wall face PVC bend for rigid rain water pipes including jointing with seal ring
leaving 10 mm gap for thermal expansion complete - 75 mm dia
Coefficient for each
Code
LB0038
LB0077
MT1239
MT1320

RF0216

Description
Plumber gd.1
Labour
Plain Shoe - 75 mm
seal ring -75 mm

Quant
0.05000
0.05000
1.00000
2.00000

Units
day
day
each
each

Providing and fixing on wall face PVC bend for rigid rain water pipes including jointing with seal ring
leaving 10 mm gap for thermal expansion complete - 90 mm dia
Coefficient for each
Code
LB0038
LB0077
MT1240
MT1321

RF0217

Description
Plumber gd.1
Labour
Plain Shoe - 90 mm
seal ring -90 mm

Quant
0.05000
0.05000
1.00000
2.00000

Units
day
day
each
each

Providing and fixing on wall face PVC bend for rigid rain water pipes including jointing with seal ring
leaving 10 mm gap for thermal expansion complete -110 mm dia
Coefficient for each
Code
LB0038
LB0077
MT1241
MT1322

Description
Plumber gd.1
Labour
Plain Shoe -110 mm
seal ring -110 mm

Quant
0.05000
0.05000
1.00000
2.00000

Standards & Quality Control Authority, MoWHS

Units
day
day
each
each

Labour and Material Coefficients (Civil Works) - 2009

149

CHAPTER 16

PLUMBING - INDOOR WORK

PI0001

Providing & fixing G.I pipes including G.I fittings & clamps & repair walls - 15mm
Coefficient for per m
Code
LB0038
LB0054
LB0077
MT0805

PI0002

Description
Plumber Gd.1
Plumber Gd.2
Labour
G.I pipe - 15mm

Quant
0.04200
0.08400
0.08400
1.00000

Units
day
day
day
m

Providing & fixing G.I pipes including G.I fittings & clamps & repair walls - 20mm
Coefficient for per m
Code
LB0038
LB0054
LB0077
MT0806

PI0003

Description
Plumber Gd.1
Plumber Gd.2
Labour
G.I pipe - 20mm

Quant
0.04200
0.10250
0.08400
1.00000

Units
day
day
day
m

Providing & fixing G.I pipes including G.I fittings & clamps & repair walls - 25mm
Coefficient for per m
Code
LB0038
LB0054
LB0077
MT0807

PI0004

Description
Plumber Gd.1
Plumber Gd.2
Labour
G.I pipe - 25mm

Quant
0.04200
0.12300
0.08400
1.00000

Units
day
day
day
m

Providing & fixing G.I pipes including G.I fittings & clamps & repair walls - 32mm
Coefficient for per m
Code
LB0038
LB0054
LB0077
MT0808

PI0005

Description
Plumber Gd.1
Plumber Gd.2
Labour
G.I pipe - 32mm

Quant
0.04200
0.12300
0.12300
1.00000

Units
day
day
day
m

Providing & fixing G.I pipes including G.I fittings & clamps & repair walls - 40mm
Coefficient for per m
Code
LB0038
LB0054
LB0077
MT0809

PI0006

Description
Plumber Gd.1
Plumber Gd.2
Labour
G.I pipe - 40mm

Quant
0.04200
0.16400
0.16400
1.00000

Units
day
day
day
m

Providing & fixing G.I pipes including G.I fittings & clamps & repair walls - 50mm
Coefficient for per m
Code
LB0038
LB0054
LB0077
MT0810

Description
Plumber Gd.1
Plumber Gd.2
Labour
G.I pipe - 50mm

Quant
0.04200
0.20500
0.20500
1.00000

Standards & Quality Control Authority, MoWHS

Units
day
day
day
m

Labour and Material Coefficients (Civil Works) - 2009

PI0010

150

Providing & fixing H.D.P.E pipes including clamps & repair walls etc. complete - 20mm
Coefficient for per m
Code
LB0038
LB0054
LB0077
MT0817

PI0011

Description
Plumber Gd.1
Plumber Gd.2
Labour
H.D.P.E pressure class 10kg/sq.cm - 20mm

Quant
0.04200
0.10250
0.08400
1.00000

Units
day
day
day
m

Providing & fixing H.D.P.E pipes including clamps & repair walls etc. complete - 25mm
Coefficient for per m
Code
LB0038
LB0054
LB0077
MT0818

PI0012

Description
Plumber Gd.1
Plumber Gd.2
Labour
H.D.P.E pressure class 10kg/sq.cm - 25mm

Quant
0.04200
0.12300
0.08400
1.00000

Units
day
day
day
m

Providing & fixing H.D.P.E pipes including clamps & repair walls etc. complete - 32mm
Coefficient for per m
Code
LB0038
LB0054
LB0077
MT0819

PI0013

Description
Plumber Gd.1
Plumber Gd.2
Labour
H.D.P.E pressure class 10kg/sq.cm - 32mm

Quant
0.04200
0.21300
0.21300
1.00000

Units
day
day
day
m

Providing & fixing H.D.P.E pipes including clamps & repair walls etc. complete - 40mm
Coefficient for per m
Code
LB0038
LB0054
LB0077
MT0820

PI0014

Description
Plumber Gd.1
Plumber Gd.2
Labour
H.D.P.E pressure class 10kg/sq.cm - 40mm

Quant
0.04200
0.16400
0.16400
1.00000

Units
day
day
day
m

Providing & fixing H.D.P.E pipes including clamps & repair walls etc. complete - 50mm
Coefficient for per m
Code
LB0038
LB0054
LB0077
MT0821

Description
Plumber Gd.1
Plumber Gd.2
Labour
H.D.P.E pressure class 10kg/sq.cm - 50mm

Standards & Quality Control Authority, MoWHS

Quant
0.04200
0.20500
0.20500
1.00000

Units
day
day
day
m

Labour and Material Coefficients (Civil Works) - 2009

PI0020

151

Providing & fixing storage tank of M.S. sheet welded all round, including 40mm G.I scour pipe, 25mm
G.I overflow , 15mm ball valve , pads for inlet and outlet pipes , red lead primer & two coats of
bitumastic paint - 270 litre capacity of 2mm steel sheet

Coefficient for per each

PI0021

Code
LB0032
LB0052
LB0077
MP0202
MT0191
MT0711
MT0726

Description
Blacksmith (metal-worker)
Painter Gd.1
Labour
Welder - electric arc
Sheet (250 MPa) - 2mm
Synthetic red lead primer
Black\White bitumen enamel

MT0753
MT0807
MT0809
MT1440

C.I manhole cover 400mm dia. inside, mosquito proof with locking
arrangement (Wt of cover not less than 7kg).
G.I pipe - 25mm
G.I pipe - 40mm
15mm ball valve with plastic float

Quant
0.94000
0.28224
2.15724
4.70400
46.00000
0.15552
0.27360

Units
day
day
day
day
kg
litre
litre

1.00000
1.50000
0.30000
1.00000

each
m
m
each

Providing & fixing storage tank of M.S. sheet welded all round, including 40mm G.I scour pipe, 25mm
G.I overflow , 15mm ball valve , pads for inlet and outlet pipes , red lead primer & two coats of
bitumastic paint
- 810 litre capacity of 2.8mm steel sheet
Coefficient for per each
Code
LB0032
LB0052
LB0077
MP0202
MT0192
MT0711
MT0726
MT0753

Description
Quant
Units
Blacksmith (metal-worker)
1.25000
day
Painter Gd.1
0.58212
day
Labour
3.08212
day
Welder - electric arc
6.72000
day
Sheet (250 MPa) - 2.8mm
134.00000
kg
Synthetic red lead primer
0.32076
litre
Black\White bitumen enamel
0.56430
litre
C.I manhole cover 400mm dia. inside, mosquito proof with locking arrangement (Wt1.00000
of cover noteach
less
than 7kg).
MT0807 G.I pipe - 25mm
1.50000
m
MT0809 G.I pipe - 40mm
0.30000
m
MT1440 15mm ball valve with plastic float
1.00000
each
PI0022

Providing & fixing storage tank of M.S. sheet welded all round, including 40mm G.I scour pipe, 25mm
G.I overflow , 15mm ball valve , pads for inlet and outlet pipes , red lead primer & two coats of
bitumastic paint
- 1620 litre capacity of 3.15mm steel sheet
Coefficient for per each
Code
LB0032
LB0052
LB0077
MP0202
MT0193
MT0711
MT0726
MT0753

Description
Blacksmith (metal-worker)
Painter Gd.1
Labour
Welder - electric arc
Sheet (250 MPa) - 3.5mm
Synthetic red lead primer
Black\White bitumen enamel
C.I manhole cover 400mm dia. inside, mosquito proof with locking
arrangement (Wt of cover not less than 7kg)

MT0807 G.I pipe - 25mm


MT0809 G.I pipe - 40mm
MT1440 15mm ball valve with plastic float

Standards & Quality Control Authority, MoWHS

Quant
2.18750
0.84672
5.22172
8.06400
219.00000
0.46656
0.82080

Units
day
day
day
day
kg
litre
litre

1.00000
1.50000
0.30000
1.00000

each
m
m
each

Labour and Material Coefficients (Civil Works) - 2009

PI0030

152

Providing & fixing plastic tank including all accessories complete - 270 litre capacity
Coefficient for per each
Code
LB0054
LB0077
MT1440
MT1665

PI0031

Description
Plumber Gd.2
Labour
15mm ball valve with plastic float
H.D.P.E water storage tank - 270 litres

Quant
0.16670
0.33330
1.00000
1.00000

Units
day
day
each
each

Providing & fixing plastic tank including all accessories complete - 500 litre capacity
Coefficient for per each
Code
LB0054
LB0077
MT1440
MT1666

PI0032

Description
Plumber Gd.2
Labour
15mm ball valve with plastic float
H.D.P.E water storage tank - 500 litres

Quant
0.20000
0.40000
1.00000
1.00000

Units
day
day
each
each

Providing & fixing plastic tank including all accessories complete - 1000 litre capacity
Coefficient for per each
Code
LB0054
LB0077
MT1440
MT1667

PI0033

Description
Plumber Gd.2
Labour
15mm ball valve with plastic float
H.D.P.E water storage tank - 1000 litres

Quant
0.25000
0.50000
1.00000
1.00000

Units
day
day
each
each

Providing & fixing plastic tank including all accessories complete - 2000 litre capacity
Coefficient for per each
Code
LB0054
LB0077
MT1440
MT1668

PI0034

Description
Plumber Gd.2
Labour
15mm ball valve with plastic float
H.D.P.E water storage tank - 2000 litres

Quant
0.20000
0.60000
1.00000
1.00000

Units
day
day
each
each

Providing & fixing plastic tank including all accessories complete - 3000 litre capacity
Coefficient for per each
Code
LB0054
LB0077
MT1440
MT1669

PI0040

Description
Plumber Gd.2
Labour
15mm ball valve with plastic float
H.D.P.E water storage tank - 3000 litres

Quant
0.20000
0.80000
1.00000
1.00000

Units
day
day
each
each

Providing & fixing Indian-type vitreous china w.c squatting pan, including 100 mm H.C.I. P or S trap,
10l low level vitreous china cistern & fittings, repair walls - 500mm, white
Coefficient for per each
Code
LB0036
LB0038
LB0077
MT1142
MT1402
MT1430
MT1585

Description
Mason Gd.1
Plumber Gd.1
Labour
P-type Nahani Trap - C.I. P-trap 100mm
W.C. P a n s - Vitreous China Indian type - 500mm, white
Vitreous China cistern - low level, incl. fittings & flush-bend - 10 litres, white
Brackets - R.S. or C.I Brackets

Standards & Quality Control Authority, MoWHS

Quant
0.63000
1.56000
1.25000
1.00000
1.00000
1.00000
1.00000

Units
day
day
day
each
each
each
pair

Labour and Material Coefficients (Civil Works) - 2009

PI0041

153

Providing & fixing Indian-type vitreous china w.c squatting pan, including 100 mm H.C.I. P or S trap,
10l low level vitreous china cistern & fittings, repair walls - 580mm, white Orissa-model
Coefficient for per each
Code
LB0036
LB0038
LB0077
MT1142
MT1403
MT1430
MT1585

PI0042

Description
Mason Gd.1
Plumber Gd.1
Labour
P-type Nahani Trap - C.I. P-trap 100mm
W.C. P a n s - Vitreous China Indian type - 580mm Orissa, white
Vitreous China cistern - low level, incl. fittings & flush-bend - 10 litres, white
Brackets - R.S. or C.I Brackets

Quant
0.63000
1.56000
1.25000
1.00000
1.00000
1.00000
1.00000

Units
day
day
day
each
each
each
pair

Providing & fixing Indian-type vitreous china w.c squatting pan, including 100 mm H.C.I. P or S trap,
10l low level vitreous china cistern & fittings, repair walls - 580mm, colour Orissa-model
Coefficient for per each
Code
LB0036
LB0038
LB0077
MT1142
MT1404
MT1430
MT1585

PI0050

Description
Mason Gd.1
Plumber Gd.1
Labour
P-type Nahani Trap - C.I. P-trap 100mm
W.C. P a n s - Vitreous China Indian type - 580mm Orissa, colour
Vitreous China cistern - low level, incl. fittings & flush-bend - 10 litres, white
Brackets - R.S. or C.I Brackets

Quant
0.63000
1.56000
1.25000
1.00000
1.00000
1.00000
1.00000

Units
day
day
day
each
each
each
pair

Providing & fixing European-type vitreous china w.c pedestal including seat and lid with c.p. brass
hinges, 15l white vitreous china low level cistern, fittings, brackets, repair walls - white, with plastic
seat & lid
Coefficient for per each
Code
LB0038
LB0051
LB0077
MT1400
MT1405
MT1430
MT1585

PI0051

Description
Plumber Gd.1
Mason Gd.2
Labour
W.C. P a n s - Vitreous China European - white
W.C. P a n s - Plastic seat & lid for European pan
Vitreous China cistern - low level, incl. fittings & flush-bend - 10 litres, white
Brackets - R.S. or C.I Brackets

Quant
1.25000
1.25000
1.25000
1.00000
1.00000
1.00000
1.00000

Units
day
day
day
each
each
each
pair

Providing & fixing European-type vitreous china w.c pedestal including seat and lid with c.p. brass
hinges, 15l white vitreous china low level cistern, fittings, brackets, repair walls - coloured, with plastic
seat & lid
Coefficient for per each
Code
LB0038
LB0051
LB0077
MT1401
MT1405
MT1431
MT1585

PI0060

Description
Plumber Gd.1
Mason Gd.2
Labour
W.C. P a n s - Vitreous China European - colour
W.C. P a n s - Plastic seat & lid for European pan
Vitreous China cistern - low level, incl. fittings & flush-bend - 10 litres, colour
Brackets - R.S. or C.I Brackets

Quant
1.25000
1.25000
1.25000
1.00000
1.00000
1.00000
1.00000

Units
day
day
day
each
each
each
pair

Providing & fixing white vitreous china foot rests (250x130x30mm) for Indian W.C
Coefficient for per pair
Code
Description
LB0036 Mason Gd.1
MT1406 W.C. P a n s - Vitreous China Footrests (250 x 130 x 30), for Indian pan

Standards & Quality Control Authority, MoWHS

Quant
0.07500
1.00000

Units
day
pair

Labour and Material Coefficients (Civil Works) - 2009

PI0065

154

Providing & fixing white vitreous china flat back, lipped front urinal basin 430x260x350mm including C.I
cistern & fittings, brackets, G.I flush pipe & spreaders, brass unions, G.I clamps, painting, repair walls One bowl-5 litres. C.I. cistern
Coefficient for per each
Code
LB0036
LB0038
LB0077
MT1420
MT1445
MT1585

PI0066

Description
Mason Gd.1
Plumber Gd.1
Labour
C.I. Automatic flushing Cistern with fittings - 5 litres
White vitreous China flat-back lipped-front type urinals, 430 x 260 x 350mm
Brackets - R.S. or C.I Brackets

Quant
1.10000
1.10000
1.88000
1.00000
1.00000
1.00000

Units
day
day
day
each
each
pair

Providing & fixing white vitreous china flat back, lipped front urinal basin 430x260x350mm including C.I
cistern & fittings, brackets, G.I flush pipe & spreaders, brass unions, G.I clamps, painting, repair walls Two bowls-10 litres. C.I. cistern
Coefficient for per each
Code
LB0036
LB0038
LB0077
MT1421
MT1445
MT1585

PI0067

Description
Mason Gd.1
Plumber Gd.1
Labour
C.I. Automatic flushing Cistern with fittings - 10 litres
White vitreous China flat-back lipped-front type urinals, 430 x 260 x 350mm
Brackets - R.S. or C.I Brackets

Quant
1.88000
1.88000
2.50000
1.00000
2.00000
1.00000

Units
day
day
day
each
each
pair

Providing & fixing white vitreous china flat back, lipped front urinal basin 430x260x350mm including C.I
cistern & fittings, brackets, G.I flush pipe & spreaders, brass unions, G.I clamps, painting, repair walls Three bowls-10 litres. C.I. cistern
Coefficient for per each
Code
LB0036
LB0038
LB0077
MT1421
MT1445
MT1585

PI0075

Description
Mason Gd.1
Plumber Gd.1
Labour
C.I. Automatic flushing Cistern with fittings - 10 litres
White vitreous China flat-back lipped-front type urinals, 430 x 260 x 350mm
Brackets - R.S. or C.I Brackets

Quant
2.50000
2.50000
3.75000
1.00000
3.00000
1.00000

Units
day
day
day
each
each
pair

Providing and fixing bath tubs with fittings and accessories complete - Porcelain, white enamelled, with
a pair of 20mm C.P pillar tap, 40mm C.P brass waste, 32mm C.P brass over flow, rubber plug, 40mm
C.P trap etc.
Coefficient for per each
Code
LB0038
LB0077
MT0922
MT1355
MT1541
MT1591
MT1601

Description
Plumber Gd.1
Labour
M.I. Fittings Union - 40mm
Porcelain bath tub, white enamelled, 1700x740x440mm
C.p Mixers - basin, elbow action, surgical, 15mm
C.p. brass waste - 40mm
C.p. brass chain with plug - 40mm

Standards & Quality Control Authority, MoWHS

Quant
0.63000
1.25000
1.00000
1.00000
1.00000
1.00000
1.00000

Units
day
day
each
each
each
each
each

Labour and Material Coefficients (Civil Works) - 2009

PI0076

155

Providing and fixing bath tubs with fittings and accessories complete - Fibreglass tub, white
Coefficient for per each
Code
LB0036
LB0038
LB0077
MT0922
MT1356
MT1541
MT1591
MT1601

PI0077

Description
Mason Gd.1
Plumber Gd.1
Labour
M.I. Fittings Union - 40mm
Fibreglass bath tub
C.p Mixers - basin, elbow action, surgical, 15mm
C.p. brass waste - 40mm
C.p. brass chain with plug - 40mm

Quant
0.41250
0.28000
0.70000
1.00000
1.00000
1.00000
1.00000
1.00000

Units
day
day
day
each
each
each
each
each

Providing and fixing bath tubs with fittings and accessories complete - P-Trap, heavy duty, for bath-tub
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1581 Traps, c.p - for bath

PI0085

Quant
0.10000
1.00000

Units
day
each

Providing & fixing white vitreous china wash basin, including C.I brackets, 15mm C.P. brass pillar taps,
c.p. chain & rubber plug, 32mm pvc. waste, 32mm dia. trap & union, repair walls
- Flat back wash basin 630x450mm with a pair of 15mm c.p. brass pillar taps
Coefficient for per each
Code
LB0036
LB0038
LB0077
MT0921
MT1360
MT1460
MT1580
MT1585
MT1590
MT1600

PI0086

Description
Mason Gd.1
Plumber Gd.1
Labour
M.I. Fittings Union - 32mm
Flat-back wash basin, white vitreous - 630 x 450mm
15mm pillar cock
Traps, c.p - 32mm
Brackets - R.S. or C.I Brackets
C.p. brass waste - 32mm
C.p. brass chain with plug - 32mm

Quant
0.41000
0.41000
0.84000
1.00000
1.00000
2.00000
1.00000
1.00000
1.00000
1.00000

Units
day
day
day
each
each
each
each
pair
each
each

Providing & fixing white vitreous china wash basin, including C.I brackets, 15mm C.P. brass pillar taps,
c.p. chain & rubber plug, 32mm pvc. waste, 32mm dia. trap & union, repair walls
- Flat back wash basin 630x450mm with single 15mm c.p. brass pillar tap.
Coefficient for per each
Code
LB0036
LB0038
LB0077
MT0921
MT1360
MT1460
MT1580
MT1585
MT1590
MT1600

Description
Mason Gd.1
Plumber Gd.1
Labour
M.I. Fittings Union - 32mm
Flat-back wash basin, white vitreous - 630 x 450mm
15mm pillar cock
Traps, c.p - 32mm
Brackets - R.S. or C.I Brackets
C.p. brass waste - 32mm
C.p. brass chain with plug - 32mm

Standards & Quality Control Authority, MoWHS

Quant
0.41000
0.38000
0.80000
1.00000
1.00000
1.00000
1.00000
1.00000
1.00000
1.00000

Units
day
day
day
each
each
each
each
pair
each
each

Labour and Material Coefficients (Civil Works) - 2009

PI0087

156

Providing & fixing white vitreous china wash basin, including C.I brackets, 15mm C.P. brass pillar taps,
c.p. chain & rubber plug, 32mm pvc. waste, 32mm dia. trap & union, repair walls
- Flat back wash basin 550x400mm with a pair of 15mm c.p. brass pillar taps
Coefficient for per each
Code
LB0036
LB0038
LB0077
MT0921
MT1361
MT1460
MT1580
MT1585
MT1590
MT1600

PI0088

Description
Mason Gd.1
Plumber Gd.1
Labour
M.I. Fittings Union - 32mm
Flat-back wash basin, white vitreous - 550 x 400mm
15mm pillar cock
Traps, c.p - 32mm
Brackets - R.S. or C.I Brackets
C.p. brass waste - 32mm
C.p. brass chain with plug - 32mm

Quant
0.41000
0.41000
0.84000
1.00000
1.00000
2.00000
1.00000
1.00000
1.00000
1.00000

Units
day
day
day
each
each
each
each
pair
each
each

Providing & fixing white vitreous china wash basin, including C.I brackets, 15mm C.P. brass pillar taps,
c.p. chain & rubber plug, 32mm pvc. waste, 32mm dia. trap & union, repair walls
- Flat back wash basin 550x400mm with single 15mm c.p. brass pillar tap
Coefficient for per each
Code
LB0036
LB0038
LB0077
MT0921
MT1361
MT1460
MT1580
MT1585
MT1590
MT1600

PI0095

Description
Mason Gd.1
Plumber Gd.1
Labour
M.I. Fittings Union - 32mm
Flat-back wash basin, white vitreous - 550 x 400mm
15mm pillar cock
Traps, c.p - 32mm
Brackets - R.S. or C.I Brackets
C.p. brass waste - 32mm
C.p. brass chain with plug - 32mm

Quant
0.41000
0.38000
0.80000
1.00000
1.00000
1.00000
1.00000
1.00000
1.00000
1.00000

Units
day
day
day
each
each
each
each
pair
each
each

Providing & fixing white vitreous china angle back wash basin 400x400mm including brackets, 15mm
c.p. brass pillar taps, c.p. brass chain & rubber plug, 32mm c.p. brass waste, 32mm dia c.p. brass trap
and M.I. union and repair
walls - With single 15mm c.p. brass pillar tap
Coefficient for per each
Code
LB0036
LB0038
LB0077
MT0921
MT1365
MT1460
MT1580
MT1585
MT1590
MT1600

Description
Mason Gd.1
Plumber Gd.1
Labour
M.I. Fittings Union - 32mm
Angle back wash basin - 400mm x 400mm, white vitreous china
15mm pillar cock
Traps, c.p - 32mm
Brackets - R.S. or C.I Brackets
C.p. brass waste - 32mm
C.p. brass chain with plug - 32mm

Standards & Quality Control Authority, MoWHS

Quant
0.41000
0.38000
0.80000
1.00000
1.00000
1.00000
1.00000
1.00000
1.00000
1.00000

Units
day
day
day
each
each
each
each
pair
each
each

Labour and Material Coefficients (Civil Works) - 2009

PI0096

Providing & fixing white vitreous china angle back wash basin 400x400mm including brackets, 15mm
c.p. brass pillar taps, c.p. brass chain & rubber plug, 32mm c.p. brass waste, 32mm dia c.p. brass trap
and M.I. union and repair
walls - With pair of 15mm c.p. brass pillar taps
Coefficient for per each
Code
LB0036
LB0038
LB0077
MT0921
MT1365
MT1460
MT1580
MT1585
MT1590
MT1600

PI0105

157

Description
Mason Gd.1
Plumber Gd.1
Labour
M.I. Fittings Union - 32mm
Angle back wash basin - 400mm x 400mm, white vitreous china
15mm pillar cock
Traps, c.p - 32mm
Brackets - R.S. or C.I Brackets
C.p. brass waste - 32mm
C.p. brass chain with plug - 32mm

Quant
0.41000
0.41000
0.84000
1.00000
1.00000
2.00000
1.00000
1.00000
1.00000
1.00000

Units
day
day
day
each
each
each
each
pair
each
each

Providing & fixing c.p. flush valve, 32mm with 40mm outlet
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1450 Flush fittings - c.p flush valve, 32mm

PI0106

Quant
0.10000
1.00000

Units
day
each

Providing & fixing c.p. concealed flush valve, 32mm with 40mm outlet
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1451 Flush fittings - c.p flush valve, 32mm, concealed

PI0107

Quant
0.10000
1.00000

Units
day
each

Providing & fixing c.p. flush bend, long


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1452 Flush fittings - c.p flush bend, long

PI0108

Quant
0.10000
1.00000

Units
day
each

Providing & fixing c.p. flush valve elbow


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1453 Flush fittings - c.p flush valve elbow

Quant
0.10000
1.00000

Standards & Quality Control Authority, MoWHS

Units
day
each

Labour and Material Coefficients (Civil Works) - 2009

PI0115

158

Providing & fixing pedestals for basins, white vitreous china, recessed back for pipes and necessary
fittings
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1370 Pedestal for wash basin - white vitreous china

PI0120

Quant
0.05000
1.00000

Units
day
each

Providing & fixing Kitchen Sinks including all connections and fittings - White glazed vitreous china
600 x 450 x 250 mm including accessories and repairs to walls etc.
Coefficient for per each
Code
LB0036
LB0038
LB0077
MT0922
MT1375
MT1585
MT1600

PI0121

Description
Mason Gd.1
Plumber Gd.1
Labour
M.I. Fittings Union - 40mm
Sinks White glazed vitreous China - 600 x 450 x 250
Brackets - R.S. or C.I Brackets
C.p. brass chain with plug - 32mm

Quant
0.41000
0.28000
0.70000
1.00000
1.00000
1.00000
1.00000

Units
day
day
day
each
each
pair
each

Providing & fixing Kitchen Sinks including all connections and fittings - Stainless steel, 450 x 400 x 150
mm, single bowl
Coefficient for per each
Code
LB0021
LB0038
LB0077
MT1380

PI0122

Description
Carpenter Gd.1
Plumber Gd.1
Labour
Stainless Steel Kitchen Sinks - single bowl, 450 x 400 x 150mm

Quant
0.20500
0.14000
0.35000
1.00000

Units
day
day
day
each

Providing & fixing Kitchen Sinks including all connections and fittings - Stainless steel, 580 x 480 x 175
mm, single bowl
Coefficient for per each
Code
LB0021
LB0038
LB0077
MT1381

PI0123

Quant
0.20500
0.14000
0.35000
1.00000

Units
day
day
day
each

Providing & fixing Kitchen Sinks including all connections and fittings - Stainless steel, 940 x 460 x 160
mm, single bowl & drain-board
Coefficient for per each
Code
LB0021
LB0038
LB0077
MT1382

PI0124

Description
Carpenter Gd.1
Plumber Gd.1
Labour
Stainless Steel Kitchen Sinks - single bowl, 580 x 480 x 175mm

Description
Carpenter Gd.1
Plumber Gd.1
Labour
Stainless Steel Kitchen Sinks - single bowl & drain-board, 940 x 460 x 160mm

Quant
0.30750
0.21000
0.52500
1.00000

Units
day
day
day
each

Providing & fixing Kitchen Sinks including all connections and fittings - Stainless steel, 1080 x 520 x
175 mm, single bowl & drain-board
Coefficient for per each
Code
LB0021
LB0038
LB0077
MT1383

Description
Carpenter Gd.1
Plumber Gd.1
Labour
Stainless Steel Kitchen Sinks - single bowl & drain-board, 1080 x 520 x 175mm

Standards & Quality Control Authority, MoWHS

Quant
0.30750
0.21000
0.52500
1.00000

Units
day
day
day
each

Labour and Material Coefficients (Civil Works) - 2009

PI0125

Providing & fixing Kitchen Sinks including all connections and fittings - Stainless steel, 1150 x 515 x
175 mm, single bowl & drain-board
Coefficient for per each
Code
LB0021
LB0038
LB0077
MT1384

PI0126

Quant
0.30750
0.21000
0.52500
1.00000

Units
day
day
day
each

Description
Quant
Carpenter Gd.1
0.41000
Plumber Gd.1
0.28000
Labour
0.70000
Stainless Steel Kitchen Sinks - single bowl & double drain-board, 1740 x 520 x 200mm
1.00000

Units
day
day
day
each

Providing & fixing Kitchen Sinks including all connections and fittings - Stainless steel, 940 x 460 x 160
mm, double bowl
Coefficient for per each
Code
LB0021
LB0038
LB0077
MT1386

PI0128

Description
Carpenter Gd.1
Plumber Gd.1
Labour
Stainless Steel Kitchen Sinks - single bowl & drain-board, 1150 x 515 x 175mm

Providing & fixing Kitchen Sinks including all connections and fittings - Stainless steel, 1740 x 520 x
200 mm, single bowl & double drain-board
Coefficient for per each
Code
LB0021
LB0038
LB0077
MT1385

PI0127

159

Description
Carpenter Gd.1
Plumber Gd.1
Labour
Stainless Steel Kitchen Sinks - double bowl, 940 x 460 x 160mm

Quant
0.30750
0.21000
0.52500
1.00000

Units
day
day
day
each

Providing & fixing Kitchen Sinks including all connections and fittings - Stainless steel, 1150 x 520 x
160 mm, single bowl
Coefficient for per each
Code
LB0021
LB0038
LB0077
MT1387

PI0129

Description
Carpenter Gd.1
Plumber Gd.1
Labour
Stainless Steel Kitchen Sinks - double bowl, 1150 x 520 x 150mm

Quant
0.30750
0.21000
0.52500
1.00000

Units
day
day
day
each

Providing & fixing Kitchen Sinks including all connections and fittings - Stainless steel, 1740 x 520 x
200 mm, double bowl & single drain-board
Coefficient for per each
Code
LB0021
LB0038
LB0077
MT1388

PI0130

Description
Quant
Carpenter Gd.1
0.41000
Plumber Gd.1
0.28000
Labour
0.70000
Stainless Steel Kitchen Sinks - double bowl & single drain-board, 1740 x 520 x 200mm
1.00000

Units
day
day
day
each

Providing & fixing Kitchen Sinks including all connections and fittings - Stainless steel, 1740 x 520 x
200 mm, double bowl & double drain-board
Coefficient for per each
Code
LB0021
LB0038
LB0077
MT1389

Description
Quant
Carpenter Gd.1
0.41000
Plumber Gd.1
0.28000
Labour
0.70000
Stainless Steel Kitchen Sinks - double bowl & double drain-board, 1740 x 520 x 165mm
1.00000

Standards & Quality Control Authority, MoWHS

Units
day
day
day
each

Labour and Material Coefficients (Civil Works) - 2009

PI0140

160

Providing & fixing stainless steel drain-board, 610 x 460 mm with all necessary fittings
Coefficient for per each
Code
LB0021
LB0038
LB0077
MT1390

PI0141

Description
Carpenter Gd.1
Plumber Gd.1
Labour
Stainless Steel Kitchen Sinks - single drain-board, 610 x 460mm

Quant
0.22000
0.07500
0.28000
1.00000

Units
day
day
day
each

Providing & fixing c.p. brass chain & rubber plug for basin and sink
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1600 C.p. brass chain with plug - 32mm

PI0150

Quant
0.05000
1.00000

Units
day
each

Providing & fixing 32mm dia pvc. waste


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1595 PVC waste - 32mm

PI0151

Quant
0.05000
1.00000

Units
day
each

Providing & fixing 32mm c.p. brass waste


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1590 C.p. brass waste - 32mm

PI0152

Quant
0.05000
1.00000

Units
day
each

Providing & fixing 40mm c.p. brass waste


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1591 C.p. brass waste - 40mm

PI0160

Quant
0.05000
1.00000

Units
day
each

Providing & fixing Electric water heater including necessary fittings - 10 litres
Coefficient for per each
Code
LB0038
LB0077
MT0043
MT0145
MT1645

PI0161

Description
Plumber Gd.1
Labour
Sand
Cement (OPC / PSC)
Electric Water Heaters - 10 litres, vertical

Quant
0.10000
0.01271
0.01209
0.00576
1.00000

Units
day
day
cu.m
tonne
each

Providing & fixing Electric water heater including necessary fittings - 15 litres
Coefficient for per each
Code
LB0038
LB0077
MT0043
MT0145
MT1646

Description
Plumber Gd.1
Labour
Sand
Cement (OPC / PSC)
Electric Water Heaters - 15 litres, vertical

Standards & Quality Control Authority, MoWHS

Quant
0.10000
0.01541
0.01466
0.00699
1.00000

Units
day
day
cu.m
tonne
each

Labour and Material Coefficients (Civil Works) - 2009

PI0162

161

Providing & fixing Electric water heater including necessary fittings - 25 litres
Coefficient for per each
Code
LB0038
LB0077
MT0043
MT0145
MT1647

PI0163

Description
Plumber Gd.1
Labour
Sand
Cement (OPC / PSC)
Electric Water Heaters - 25 litres, vertical

Quant
0.10000
0.01620
0.01541
0.00734
1.00000

Units
day
day
cu.m
tonne
each

Providing & fixing Electric water heater including necessary fittings - 35 litres
Coefficient for per each
Code
LB0038
LB0077
MT0043
MT0145
MT1648

PI0164

Description
Plumber Gd.1
Labour
Sand
Cement (OPC / PSC)
Electric Water Heaters - 35 litres, vertical

Quant
0.10000
0.01620
0.01541
0.00734
1.00000

Units
day
day
cu.m
tonne
each

Providing & fixing Electric water heater including necessary fittings - 50 litres
Coefficient for per each
Code
LB0038
LB0077
MT0043
MT0145
MT1649

PI0165

Description
Plumber Gd.1
Labour
Sand
Cement (OPC / PSC)
Electric Water Heaters - 50 litres, vertical

Quant
0.10000
0.02025
0.01926
0.00918
1.00000

Units
day
day
cu.m
tonne
each

Providing & fixing Electric water heater including necessary fittings - 70 litres
Coefficient for per each
Code
LB0038
LB0077
MT0043
MT0145
MT1650

PI0166

Description
Plumber Gd.1
Labour
Sand
Cement (OPC / PSC)
Electric Water Heaters - 75 litres, vertical

Quant
0.10000
0.02025
0.01926
0.00918
1.00000

Units
day
day
cu.m
tonne
each

Providing & fixing Electric water heater including necessary fittings - 100 litres
Coefficient for per each
Code
LB0038
LB0077
MT0043
MT0145
MT1651

PI0175

Description
Plumber Gd.1
Labour
Sand
Cement (OPC / PSC)
Electric Water Heaters - 100 litres, vertical

Quant
0.10000
0.02149
0.02044
0.00974
1.00000

Units
day
day
cu.m
tonne
each

Providing & fixing C.P. Brass shower fittings - Shower with revolving joint, 15mm
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1513 C.p Brass Shower fittings for 15 to 20mm inlet - shower, revolving joint

PI0176

Quant
0.10000
1.00000

Units
day
each

Providing & fixing C.P. Brass shower fittings - Adjustable shower, with locking key, 15mm
Coefficient for per each
Code
Description
Quant
LB0038 Plumber Gd.1
0.10000
MT1514 C.p Brass Shower fittings for 15 to 20mm inlet - shower, adjustable with locking key1.00000

Standards & Quality Control Authority, MoWHS

Units
day
each

Labour and Material Coefficients (Civil Works) - 2009

PI0177

162

Providing & fixing C.P. Brass shower fittings - Shower arm, standard 15mm
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1515 C.p Brass Shower fittings for 15 to 20mm inlet - shower arm, 15mm

PI0178

Quant
0.10000
1.00000

Units
day
each

Providing & fixing C.P. Brass shower fittings - Shower arm, heavy duty 15mm
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1516 C.p Brass Shower fittings for 15 to 20mm inlet - shower arm, 15mm, heavy duty

PI0179

Quant
0.10000
1.00000

Units
day
each

Providing & fixing C.P. Brass shower fittings - Flexible shower tube & shower
Coefficient for per each
Code
LB0038
LB0077
MT1512

PI0185

Description
Plumber Gd.1
Labour
C.p Brass Shower fittings for 15 to 20mm inlet - shower, with flex tube

Quant
0.25000
0.25000
1.00000

Units
day
day
each

Providing & fixing c.p. brass stop cock - 15mm, standard, c.p knob
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1468 15mm stop cock, c.p knob

PI0186

Quant
0.10000
1.00000

Units
day
each

Providing & fixing c.p. brass stop cock - 20mm, standard, c.p knob
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1469 20mm stop cock, c.p knob

PI0187

Quant
0.10000
1.00000

Units
day
each

Providing & fixing c.p. brass stop cock - 20mm, heavy-duty, c.p knob
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1472 20mm stop cock, H\D concealed, c.p knob

PI0188

Quant
0.10000
1.00000

Units
day
each

Providing & fixing c.p. brass stop cock - 15mm, concealed, c.p knob
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1470 15mm stop cock, concealed, c.p knob

PI0189

Quant
0.10000
1.00000

Units
day
each

Providing & fixing c.p. brass stop cock - 15mm, angle, c.p knob
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1473 15mm angle stop cock, c.p knob

Quant
0.10000
1.00000

Standards & Quality Control Authority, MoWHS

Units
day
each

Labour and Material Coefficients (Civil Works) - 2009

PI0195

163

Providing & fixing c.p. brass pillar-cock - 15mm, standard, c.p knob
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1460 15mm pillar cock

PI0196

Quant
0.10000
1.00000

Units
day
each

Providing & fixing c.p. brass pillar-cock - 15mm, swan neck, c.p knob
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1461 15mm pillar cock, swan neck, c.p knob

PI0205

Quant
0.10000
1.00000

Units
day
each

Providing & fixing c.p. brass bibcock - 15mm, standard vertical, c.p knob
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1464 15mm bib cock, vertical, c.p knob

PI0206

Quant
0.10000
1.00000

Units
day
each

Providing & fixing c.p. brass bibcock - 15mm, inclined, c.p. knob
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1465 15mm bib cock, inclined, c.p knob

PI0207

Quant
0.10000
1.00000

Units
day
each

Providing & fixing c.p. brass bibcock - 15mm, long nose, c.p. knob
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1466 15mm bib cock, long nose, c.p knob

PI0208

Quant
0.10000
1.00000

Units
day
each

Providing & fixing c.p. brass bibcock - 15mm, long body, c.p. knob
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1467 15mm bib cock, long body, c.p knob

PI0215

Quant
0.10000
1.00000

Units
day
each

Providing & fixing c.p. brass mixers, 15mm - For basin, single-hole, casted spout
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1530 C.p Mixers - basin, single-hole, casted spout, 15mm

PI0216

Quant
0.10000
1.00000

Units
day
each

Providing & fixing c.p. brass mixers, 15mm - For basin, close-hole
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1531 C.p Mixers - basin, close-hole, 15mm

PI0217

Quant
0.10000
1.00000

Units
day
each

Providing & fixing c.p. brass mixers, 15mm - For basin, elbow action, surgical
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1541 C.p Mixers - basin, elbow action, surgical, 15mm

Standards & Quality Control Authority, MoWHS

Quant
0.10000
1.00000

Units
day
each

Labour and Material Coefficients (Civil Works) - 2009

PI0218

164

Providing & fixing c.p. brass mixers, 15mm - For basin, elbow action, surgical with shower
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1542 C.p Mixers - basin, elbow action, surgical with shower, 15mm

PI0219

Quant
0.10000
1.00000

Units
day
each

Providing & fixing c.p. brass mixers, 15mm - For sink, with spout J pipe
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1532 C.p Mixers - sink, with spout J pipe, 15mm

PI0220

Quant
0.10000
1.00000

Units
day
each

Providing & fixing c.p. brass mixers, 15mm - For sink, with casted spout swinging
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1533 C.p Mixers - sink, with casted spout swinging, 15mm

PI0221

Quant
0.10000
1.00000

Units
day
each

Providing & fixing c.p. brass mixers, 15mm - For sink, with swivel spout
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1546 C.p Mixers - sink, with swivel spout, 15mm

PI0222

Quant
0.10000
1.00000

Units
day
each

Providing & fixing c.p. brass mixers, 15mm - For wall, non-telephonic type
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1534 C.p Mixers - wall, non-telephonic type, 15mm

PI0223

Quant
0.10000
1.00000

Units
day
each

Providing & fixing c.p. brass mixers, 15mm - For wall, telephonic type with crutch and tel. shower
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1535 C.p Mixers - wall, telephonic type with crutch and tel. shower, 15mm

PI0224

Quant
0.10000
1.00000

Units
day
each

Providing & fixing c.p. brass mixers, 15mm - For wall, telephonic type without crutch and tel. shower
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1536 C.p Mixers - wall, telephonic type without crutch and tel. shower, 15mm

PI0225

Quant
0.10000
1.00000

Providing & fixing c.p. brass mixers, 15mm - For wall, telephonic type with crutch and without tel.
shower
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1537 C.p Mixers - wall, telephonic type with crutch and without tel. shower, 15mm

PI0226

Units
day
each

Quant
0.10000
1.00000

Units
day
each

Providing & fixing c.p. brass mixers, 15mm - For wall, telephonic type with C.P bend & flanges
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1538 C.p Mixers - wall, telephonic type with C.P bend & flanges, 15mm

Standards & Quality Control Authority, MoWHS

Quant
0.10000
1.00000

Units
day
each

Labour and Material Coefficients (Civil Works) - 2009

PI0227

165

Providing & fixing c.p. brass mixers, 15mm - For wall, with telephonic shower arrangement with 115mm
long bend pipe for over head shower connection
Coefficient for per each
Code
Description
Quant
Units
LB0038 Plumber Gd.1
0.10000
day
MT1544 C.p Mixers - wall, with telephonic shower arrangement with 115mm long bend pipe 1.00000
for over head
each
shower
connection, 15mm

PI0228

Providing & fixing c.p. brass mixers, 15mm - Three hole mixer without pop-up
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1539 C.p Mixers - Three hole mixer without pop-up, 15mm

PI0229

Quant
0.10000
1.00000

Units
day
each

Providing & fixing c.p. brass mixers, 15mm - Three hole mixer with pop-up
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1540 C.p Mixers - Three hole mixer with pop-up, 15mm

PI0230

Quant
0.10000
1.00000

Units
day
each

Providing & fixing c.p. brass mixers, 15mm - For bath, with exposed adjustable legs with telephone
shower arrangement with crutch
Coefficient for per each
Code
Description
Quant
Units
LB0038 Plumber Gd.1
0.10000
day
1.00000
with crutch,each
15mm
MT1543 C.p Mixers - bath, with exposed adjustable legs with telephone shower arrangement

PI0231

Providing & fixing c.p. brass mixers, 15mm - For shower, three in one, with bend flexible tube, and
shower & hook
Coefficient for per each
Code
Description
Quant
LB0038 Plumber Gd.1
0.10000
MT1545 C.p Mixers - shower, three in one, with bend flexible tube, and shower & hook, 15mm
1.00000

PI0240

Units
day
each

Providing & fixing Wall Spouts - C.p., standard, 15mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1474 Wall spout, std, 15mm

PI0241

Quant
0.05000
1.00000

Units
day
each

Providing & fixing Wall Spouts - With diverter, for use with single lever mixers
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1476 Wall spout, with diverter, used with single-lever mixers

PI0250

Quant
0.05000
1.00000

Units
day
each

Providing & fixing 600x450mm bevelled edge mirror (superior glass) fixed to wooden cleats
Coefficient for per each
Code
LB0033
LB0077
MT1631

Description
Carpenter Gd.2
Labour
Mirror (Bevelled edge) 600mm x 450mm

Standards & Quality Control Authority, MoWHS

Quant
0.42000
0.42000
1.00000

Units
day
day
each

Labour and Material Coefficients (Civil Works) - 2009

PI0251

166

Providing & fixing 450x120mm glass shelf, including c.p brass brackets fixed to wooden cleats
Coefficient for per each
Code
LB0033
LB0077
MT1630

PI0252

Description
Carpenter Gd.2
Labour
Glass Shelf

Quant
0.32000
0.32000
1.00000

Units
day
day
each

Providing & fixing c.p. towel rail 750 x 20mm with c.p brass brackets fixed to wooden cleats
Coefficient for per each
Code
LB0033
LB0077
MT1617

PI0253

Description
Carpenter Gd.2
Labour
C.p Towel Rails - 20mm x 750mm

Quant
0.22000
0.22000
1.00000

Units
day
day
each

Providing & fixing c.p. towel rail 600 x 20mm with c.p brass brackets fixed to wooden cleats
Coefficient for per each
Code
LB0033
LB0077
MT1616

PI0254

Description
Carpenter Gd.2
Labour
C.p Towel Rails - 20mm x 600mm

Quant
0.22000
0.22000
1.00000

Units
day
day
each

Providing & fixing c.p. towel rail 450 x 20mm with c.p brass brackets fixed to wooden cleats
Coefficient for per each
Code
LB0033
LB0077
MT1615

PI0255

Description
Carpenter Gd.2
Labour
C.p Towel Rails - 20mm x 450mm

Quant
0.22000
0.22000
1.00000

Units
day
day
each

Providing & fixing c.p. towel ring


Coefficient for per each
Code
LB0033
LB0077
MT1618

PI0260

Description
Carpenter Gd.2
Labour
C.p Towel Rails - C.p Towel Ring

Quant
0.11000
0.11000
1.00000

Units
day
day
each

Providing & fixing toilet paper holder - C.P. brass


Coefficient for per each
Code
LB0033
LB0077
MT1635

PI0261

Description
Carpenter Gd.2
Labour
Toilet paper holders - C.P. brass

Quant
0.15000
0.15000
1.00000

Units
day
day
each

Providing & fixing toilet paper holder - Recessed ceramic, 200 x 100 mm, coloured
Coefficient for per each
Code
LB0033
LB0077
MT1637

PI0262

Description
Carpenter Gd.2
Labour
Toilet paper holders - recessed ceramic (coloured), 200 x 100mm

Quant
0.15000
0.15000
1.00000

Units
day
day
each

Providing & fixing toilet paper holder - Recessed ceramic, 200 x 100 mm, white
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1636 Toilet paper holders - recessed ceramic (white), 200 x 100mm

Standards & Quality Control Authority, MoWHS

Quant
0.10000
1.00000

Units
day
each

Labour and Material Coefficients (Civil Works) - 2009

PI0263

167

Providing & fixing toilet paper holder - Recessed ceramic, roll-type, 150 x 150 mm
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1638 Toilet paper holders - recessed ceramic (roll-type), 150 x 150mm

PI0270

Quant
0.10000
1.00000

Units
day
each

Providing & fixing Liquid soap container, c.p, including c.p brass lid & brackets, wooden cleats, c.p
brass screws
Coefficient for per each
Code
LB0033
LB0077
MT1606

PI0275

Description
Carpenter Gd.2
Labour
Soap Containers - c.p Liquid Soap Container

Quant
0.15000
0.15000
1.00000

Units
day
day
each

Providing & fixing soap dish - including brackets, wooden cleats, c.p. brass screws
Coefficient for per each
Code
LB0033
LB0077
MT1605

PI0276

Description
Carpenter Gd.2
Labour
Soap Containers - c.p brass with bracket

Quant
0.15000
0.15000
1.00000

Units
day
day
each

Providing & fixing soap dish - Recessed, ceramic, 150x150 mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1608 Soap Containers - Recessed ceramic, 150 x 150mm

PI0277

Quant
0.10000
1.00000

Units
day
each

Providing & fixing soap dish - Recessed, ceramic, 200x100 mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1607 Soap Containers - Recessed ceramic, 200 x 100mm

PI0285

Quant
0.10000
1.00000

Units
day
each

Providing & fixing c.p. coat hook - Single


Coefficient for per each
Code
LB0033
LB0077
MT1625

PI0286

Description
Carpenter Gd.2
Labour
C.p Coat Hooks - single

Quant
0.11000
0.11000
1.00000

Units
day
day
each

Providing & fixing c.p. coat hook - Double


Coefficient for per each
Code
LB0033
LB0077
MT1626

Description
Carpenter Gd.2
Labour
C.p Coat Hooks - double

Quant
0.11000
0.11000
1.00000

Standards & Quality Control Authority, MoWHS

Units
day
day
each

Labour and Material Coefficients (Civil Works) - 2009

168

CHAPTER 17

PLUMBING - OUTDOOR WORK

PO0001

P&L G.I pipes including G.I fittings (excluding trenching, refilling & thrust block) - 15mm
Coefficient for per m
Code
LB0038
LB0077
MT0805

PO0002

Description
Plumber Gd.1
Labour
G.I pipe - 15mm

Quant
0.01000
0.02000
1.00000

Units
day
day
m

P&L G.I pipes including G.I fittings (excluding trenching, refilling & thrust block) - 20mm
Coefficient for per m
Code
LB0038
LB0077
MT0806

PO0003

Description
Plumber Gd.1
Labour
G.I pipe - 20mm

Quant
0.01000
0.02000
1.00000

Units
day
day
m

P&L G.I pipes including G.I fittings (excluding trenching, refilling & thrust block) - 25mm
Coefficient for per m
Code
LB0038
LB0077
MT0807

PO0004

Description
Plumber Gd.1
Labour
G.I pipe - 25mm

Quant
0.01500
0.03100
1.00000

Units
day
day
m

P&L G.I pipes including G.I fittings (excluding trenching, refilling & thrust block) - 32mm
Coefficient for per m
Code
LB0038
LB0077
MT0808

PO0005

Description
Plumber Gd.1
Labour
G.I pipe - 32mm

Quant
0.01500
0.03600
1.00000

Units
day
day
m

P&L G.I pipes including G.I fittings (excluding trenching, refilling & thrust block) - 40mm
Coefficient for per m
Code
LB0038
LB0077
MT0809

PO0006

Description
Plumber Gd.1
Labour
G.I pipe - 40mm

Quant
0.02000
0.04100
1.00000

Units
day
day
m

P&L G.I pipes including G.I fittings (excluding trenching, refilling & thrust block) - 50mm
Coefficient for per m
Code
LB0038
LB0077
MT0810

PO0007

Description
Plumber Gd.1
Labour
G.I pipe - 50mm

Quant
0.02000
0.04100
1.00000

Units
day
day
m

P&L G.I pipes including G.I fittings (excluding trenching, refilling & thrust block) - 65mm
Coefficient for per m
Code
LB0038
LB0077
MT0811

Description
Plumber Gd.1
Labour
G.I pipe - 65mm

Quant
0.03200
0.08300
1.00000

Standards & Quality Control Authority, MoWHS

Units
day
day
m

Labour and Material Coefficients (Civil Works) - 2009

PO0008

169

P&L G.I pipes including G.I fittings (excluding trenching, refilling & thrust block) - 80mm
Coefficient for per m
Code
LB0038
LB0077
MT0812

PO0009

Description
Plumber Gd.1
Labour
G.I pipe - 80mm

Quant
0.03200
0.08300
1.00000

Units
day
day
m

P&L G.I pipes including G.I fittings (excluding trenching, refilling & thrust block) - 100mm
Coefficient for per m
Code
LB0038
LB0077
MT0813

PO0010

Description
Plumber Gd.1
Labour
G.I pipe - 100mm

Quant
0.04160
0.10800
1.00000

Units
day
day
m

P&L G.I pipes including G.I fittings (excluding trenching, refilling & thrust block) - 150mm
Coefficient for per m
Code
LB0038
LB0077
MT0814

PO0015

Description
Plumber Gd.1
Labour
G.I pipe - 150mm

Quant
0.06560
0.17000
1.00000

Units
day
day
m

P&L H.D.P.E pipes, pressure class 10kg/sq.m, including H.D.P.E fittings (excluding trenching, refilling &
thrust block) -25mm
Coefficient for per m
Code
LB0038
LB0077
MT0818

PO0016

Description
Plumber Gd.1
Labour
H.D.P.E pressure class 10kg/sq.cm - 25mm

Quant
0.01500
0.03100
1.00000

Units
day
day
m

P&L H.D.P.E pipes, pressure class 10kg/sq.m, including H.D.P.E fittings (excluding trenching, refilling &
thrust block) - 32mm
Coefficient for per m
Code
LB0038
LB0077
MT0819

PO0017

Description
Plumber Gd.1
Labour
H.D.P.E pressure class 10kg/sq.cm - 32mm

Quant
0.01500
0.03600
1.00000

Units
day
day
m

P&L H.D.P.E pipes, pressure class 10kg/sq.m, including H.D.P.E fittings (excluding trenching, refilling &
thrust block) - 40mm
Coefficient for per m
Code
LB0038
LB0077
MT0820

PO0018

Description
Plumber Gd.1
Labour
H.D.P.E pressure class 10kg/sq.cm - 40mm

Quant
0.02000
0.04100
1.00000

Units
day
day
m

P&L H.D.P.E pipes, pressure class 10kg/sq.m, including H.D.P.E fittings (excluding trenching, refilling &
thrust block) - 50mm
Coefficient for per m
Code
LB0038
LB0077
MT0821

Description
Plumber Gd.1
Labour
H.D.P.E pressure class 10kg/sq.cm - 50mm

Standards & Quality Control Authority, MoWHS

Quant
0.02000
0.04100
1.00000

Units
day
day
m

Labour and Material Coefficients (Civil Works) - 2009

PO0019

170

P&L H.D.P.E pipes, pressure class 10kg/sq.m, including H.D.P.E fittings (excluding trenching, refilling &
thrust block) - 63mm
Coefficient for per m
Code
LB0038
LB0077
MT0822

PO0020

Description
Plumber Gd.1
Labour
H.D.P.E pressure class 10kg/sq.cm - 63mm

Quant
0.03200
0.08300
1.00000

Units
day
day
m

P&L H.D.P.E pipes, pressure class 10kg/sq.m, including H.D.P.E fittings (excluding trenching, refilling &
thrust block) - 75mm
Coefficient for per m
Code
LB0038
LB0077
MT0823

PO0021

Description
Plumber Gd.1
Labour
H.D.P.E pressure class 10kg/sq.cm - 75mm

Quant
0.03200
0.08300
1.00000

Units
day
day
m

P&L H.D.P.E pipes, pressure class 10kg/sq.m, including H.D.P.E fittings (excluding trenching, refilling &
thrust block) - 90mm
Coefficient for per m
Code
LB0038
LB0077
MT0824

PO0022

Description
Plumber Gd.1
Labour
H.D.P.E pressure class 10kg/sq.cm - 90mm

Quant
0.03680
0.10800
1.00000

Units
day
day
m

P&L H.D.P.E pipes, pressure class 10kg/sq.m, including H.D.P.E fittings (excluding trenching, refilling &
thrust block) - 110mm
Coefficient for per m
Code
LB0038
LB0077
MT0825

PO0023

Description
Plumber Gd.1
Labour
H.D.P.E pressure class 10kg/sq.cm - 110mm

Quant
0.04780
0.10800
1.00000

Units
day
day
m

P&L H.D.P.E pipes, pressure class 10kg/sq.m, including H.D.P.E fittings (excluding trenching, refilling &
thrust block) - 140mm
Coefficient for per m
Code
LB0038
LB0077
MT0826

PO0024

Description
Plumber Gd.1
Labour
H.D.P.E pressure class 10kg/sq.cm - 140mm

Quant
0.06560
0.17000
1.00000

Units
day
day
m

P&L H.D.P.E pipes, pressure class 10kg/sq.m, including H.D.P.E fittings (excluding trenching, refilling &
thrust block) - 160mm
Coefficient for per m
Code
LB0038
LB0077
MT0827

PO0025

Description
Plumber Gd.1
Labour
H.D.P.E pressure class 10kg/sq.cm - 160mm

Quant
0.06560
0.17000
1.00000

Units
day
day
m

P&L H.D.P.E pipes, pressure class 10kg/sq.m, including H.D.P.E fittings (excluding trenching, refilling &
thrust block) - 225mm
Coefficient for per m
Code
LB0038
LB0077
MT0828

Description
Plumber Gd.1
Labour
H.D.P.E pressure class 10kg/sq.cm - 225mm

Standards & Quality Control Authority, MoWHS

Quant
0.06560
0.17000
1.00000

Units
day
day
m

Labour and Material Coefficients (Civil Works) - 2009

PO0030

P&L H.D.P.E Pipes including H.D.P.E fittings pressure class 6 kg/sq.cm (excluding trenching, refilling &
thrust block) - 32 mm
Coefficient for per m
Code
LB0038
LB0077
MT0830

PO0031

171

Description
Plumber Gd.1
Labour
H.D.P.E Pipes of pressure class 6kg/sq.cm - 32mm

Quant
0.01500
0.03600
1.00000

Units
day
day
m

P&L H.D.P.E Pipes including H.D.P.E fittings pressure class 6 kg/sq.cm (excluding trenching, refilling &
thrust block) - 40mm
Coefficient for per m
Code
LB0038
LB0077
MT0831

PO00032

Description
Plumber Gd.1
Labour
H.D.P.E Pipes of pressure class 6kg/sq.cm - 40mm

Quant
0.02000
0.04100
1.00000

Units
day
day
m

P&L H.D.P.E Pipes including H.D.P.E fittings pressure class 6 kg/sq.cm (excluding trenching, refilling &
thrust block) - 50mm
Coefficient for per m
Code
LB0038
LB0077
MT0832

PO0033

Description
Plumber Gd.1
Labour
H.D.P.E Pipes of pressure class 6kg/sq.cm - 50mm

Quant
0.02000
0.04100
1.00000

Units
day
day
m

P&L H.D.P.E Pipes including H.D.P.E fittings pressure class 6 kg/sq.cm (excluding trenching, refilling &
thrust block) - 63mm
Coefficient for per m
Code
LB0038
LB0077
MT0833

PO0034

Description
Plumber Gd.1
Labour
H.D.P.E Pipes of pressure class 6kg/sq.cm - 63mm

Quant
0.03200
0.08300
1.00000

Units
day
day
m

P&L H.D.P.E Pipes including H.D.P.E fittings pressure class 6 kg/sq.cm (excluding trenching, refilling &
thrust block) - 75mm
Coefficient for per m
Code
LB0038
LB0077
MT0834

PO0035

Description
Plumber Gd.1
Labour
H.D.P.E Pipes of pressure class 6kg/sq.cm - 75mm

Quant
0.03200
0.08300
1.00000

Units
day
day
m

P&L H.D.P.E Pipes including H.D.P.E fittings pressure class 6 kg/sq.cm (excluding trenching, refilling &
thrust block) - 90mm
Coefficient for per m
Code
LB0038
LB0077
MT0835

PO0036

Description
Plumber Gd.1
Labour
H.D.P.E Pipes of pressure class 6kg/sq.cm - 90mm

Quant
0.03680
0.10800
1.00000

Units
day
day
m

P&L H.D.P.E Pipes including H.D.P.E fittings pressure class 6 kg/sq.cm (excluding trenching, refilling &
thrust block) - 110mm
Coefficient for per m
Code
LB0038
LB0077
MT0836

Description
Plumber Gd.1
Labour
H.D.P.E Pipes of pressure class 6kg/sq.cm - 110mm

Standards & Quality Control Authority, MoWHS

Quant
0.04780
0.10800
1.00000

Units
day
day
m

Labour and Material Coefficients (Civil Works) - 2009

PO0037

172

P&L H.D.P.E Pipes including H.D.P.E fittings pressure class 6 kg/sq.cm (excluding trenching, refilling &
thrust block) - 140mm
Coefficient for per m
Code
LB0038
LB0077
MT0837

PO0038

Description
Plumber Gd.1
Labour
H.D.P.E Pipes of pressure class 6kg/sq.cm - 140mm

Quant
0.06560
0.17000
1.00000

Units
day
day
m

P&L H.D.P.E Pipes including H.D.P.E fittings pressure class 6 kg/sq.cm (excluding trenching, refilling &
thrust block) - 160mm
Coefficient for per m
Code
LB0038
LB0077
MT0838

PO0039

Description
Plumber Gd.1
Labour
H.D.P.E Pipes of pressure class 6kg/sq.cm - 160mm

Quant
0.06560
0.17000
1.00000

Units
day
day
m

P&L H.D.P.E Pipes including H.D.P.E fittings pressure class 6 kg/sq.cm (excluding trenching, refilling &
thrust block) - 225mm
Coefficient for per m
Code
LB0038
LB0077
MT0839

PO0045

Description
Plumber Gd.1
Labour
H.D.P.E Pipes of pressure class 6kg/sq.cm - 225mm

Quant
0.06560
0.17000
1.00000

Units
day
day
m

P&L H.D.P.E Pipes including H.D.P.E fittings pressure class 4 kg/sq.cm (excluding trenching, refilling &
thrust block) - 40mm
Coefficient for per m
Code
LB0038
LB0077
MT0841

PO0046

Description
Plumber Gd.1
Labour
H.D.P.E Pipes of pressure class 4kg/sq.cm - 40mm

Quant
0.02000
0.04100
1.00000

Units
day
day
m

P&L H.D.P.E Pipes including H.D.P.E fittings pressure class 4 kg/sq.cm (excluding trenching, refilling &
thrust block) - 50mm
Coefficient for per m
Code
LB0038
LB0077
MT0842

PO0047

Description
Plumber Gd.1
Labour
H.D.P.E Pipes of pressure class 4kg/sq.cm - 50mm

Quant
0.02000
0.04100
1.00000

Units
day
day
m

P&L H.D.P.E Pipes including H.D.P.E fittings pressure class 4 kg/sq.cm (excluding trenching, refilling &
thrust block) - 63mm
Coefficient for per m
Code
LB0038
LB0077
MT0843

PO0048

Description
Plumber Gd.1
Labour
H.D.P.E Pipes of pressure class 4kg/sq.cm - 63mm

Quant
0.03200
0.08300
1.00000

Units
day
day
m

P&L H.D.P.E Pipes including H.D.P.E fittings pressure class 4 kg/sq.cm (excluding trenching, refilling &
thrust block) - 75mm
Coefficient for per m
Code
LB0038
LB0077
MT0844

Description
Plumber Gd.1
Labour
H.D.P.E Pipes of pressure class 4kg/sq.cm - 75mm

Standards & Quality Control Authority, MoWHS

Quant
0.03200
0.08300
1.00000

Units
day
day
m

Labour and Material Coefficients (Civil Works) - 2009

PO0049

173

P&L H.D.P.E Pipes including H.D.P.E fittings pressure class 4 kg/sq.cm (excluding trenching, refilling &
thrust block) - 90mm
Coefficient for per m
Code
LB0038
LB0077
MT0845

PO0050

Description
Plumber Gd.1
Labour
H.D.P.E Pipes of pressure class 4kg/sq.cm - 90mm

Quant
0.03680
0.10800
1.00000

Units
day
day
m

P&L H.D.P.E Pipes including H.D.P.E fittings pressure class 4 kg/sq.cm (excluding trenching, refilling &
thrust block) - 110mm
Coefficient for per m
Code
LB0038
LB0077
MT0846

PO0051

Description
Plumber Gd.1
Labour
H.D.P.E Pipes of pressure class 4kg/sq.cm - 110mm

Quant
0.04780
0.10800
1.00000

Units
day
day
m

P&L H.D.P.E Pipes including H.D.P.E fittings pressure class 4 kg/sq.cm (excluding trenching, refilling &
thrust block) - 140mm
Coefficient for per m
Code
LB0038
LB0077
MT0847

PO0052

Description
Plumber Gd.1
Labour
H.D.P.E Pipes of pressure class 4kg/sq.cm - 140mm

Quant
0.06560
0.17000
1.00000

Units
day
day
m

P&L H.D.P.E Pipes including H.D.P.E fittings pressure class 4 kg/sq.cm (excluding trenching, refilling &
thrust block) - 160mm
Coefficient for per m
Code
LB0038
LB0077
MT0848

PO0053

Description
Plumber Gd.1
Labour
H.D.P.E Pipes of pressure class 4kg/sq.cm - 160mm

Quant
0.06560
0.17000
1.00000

Units
day
day
m

P&L H.D.P.E Pipes including H.D.P.E fittings pressure class 4 kg/sq.cm (excluding trenching, refilling &
thrust block) - 225mm
Coefficient for per m
Code
LB0038
LB0077
MT0849

PO0060

Description
Plumber Gd.1
Labour
H.D.P.E Pipes of pressure class 4kg/sq.cm - 225mm

Quant
0.06560
0.17000
1.00000

Units
day
day
m

P&L H.D.P.E Pipes including H.D.P.E fittings pressure class 2.5 kg/sq.cm (excluding trenching, refilling
& thrust block) - 110mm
Coefficient for per m
Code
LB0038
LB0077
MT0852

PO0061

Description
Plumber Gd.1
Labour
H.D.P.E Pipes of pressure class 2.5kg/sq.cm - 110mm

Quant
0.04780
0.10800
1.00000

Units
day
day
m

P&L H.D.P.E Pipes including H.D.P.E fittings pressure class 2.5 kg/sq.cm (excluding trenching, refilling
& thrust block) - 140mm
Coefficient for per m
Code
LB0038
LB0077
MT0853

Description
Plumber Gd.1
Labour
H.D.P.E Pipes of pressure class 2.5kg/sq.cm - 140mm

Standards & Quality Control Authority, MoWHS

Quant
0.06560
0.17000
1.00000

Units
day
day
m

Labour and Material Coefficients (Civil Works) - 2009

PO0062

P&L H.D.P.E Pipes including H.D.P.E fittings pressure class 2.5 kg/sq.cm (excluding trenching, refilling
& thrust block) - 160mm
Coefficient for per m
Code
LB0038
LB0077
MT0854

PO0063

174

Description
Plumber Gd.1
Labour
H.D.P.E Pipes of pressure class 2.5kg/sq.cm - 160mm

Quant
0.06560
0.17000
1.00000

Units
day
day
m

P&L H.D.P.E Pipes including H.D.P.E fittings pressure class 2.5 kg/sq.cm (excluding trenching, refilling
& thrust block) - 225mm
Coefficient for per m
Code
LB0038
LB0077
MT0855

PO0065

Description
Plumber Gd.1
Labour
H.D.P.E Pipes of pressure class 2.5kg/sq.cm - 225mm

Quant
0.06560
0.17000
1.00000

Units
day
day
m

Providing and Laying Ductile Iron K - 9 pipes - 80 mm


Coefficient for per m
Code
LB0038
LB0077
MT0856

PO0066

Description
Plumber Gd.1
Labour
DI pipe - 80 mm

Quant
0.01818
0.04545
1.00000

Units
day
day
m

Providing and Laying Ductile Iron K - 9 pipes - 100 mm


Coefficient for per m
Code
LB0038
LB0077
MT0857

PO0067

Description
Plumber Gd.1
Labour
DI pipe - 100 mm

Quant
0.01818
0.04545
1.00000

Units
day
day
m

Providing and Laying Ductile Iron K - 9 pipes - 150 mm


Coefficient for per m
Code
LB0038
LB0077
MT0858

PO0068

Description
Plumber Gd.1
Labour
DI pipe - 150 mm

Quant
0.03182
0.06818
1.00000

Units
day
day
m

Providing and Laying Ductile Iron K - 9 pipes - 200 mm


Coefficient for per m
Code
LB0038
LB0077
MT0859

PO0069

Description
Plumber Gd.1
Labour
DI pipe - 200 mm

Quant
0.04318
0.07955
1.00000

Units
day
day
m

Providing and Laying Ductile Iron K - 9 pipes - 250 mm


Coefficient for per m
Code
LB0038
LB0077
MT0860

Description
Plumber Gd.1
Labour
DI pipe - 250 mm

Quant
0.05682
0.10227
1.00000

Standards & Quality Control Authority, MoWHS

Units
day
day
m

Labour and Material Coefficients (Civil Works) - 2009

PO0070

175

Providing and Laying Ductile Iron K - 9 pipes - 300 mm


Coefficient for per m
Code
LB0038
LB0077
MT0861

PO0071

Description
Plumber Gd.1
Labour
DI pipe - 300 mm

Quant
0.06820
0.13636
1.00000

Units
day
day
m

Providing and Laying Ductile Iron K - 9 pipes - 350 mm


Coefficient for per m
Code
LB0038
LB0077
MT0862

PO0072

Description
Plumber Gd.1
Labour
DI pipe - 350 mm

Quant
0.08400
0.15900
1.00000

Units
day
day
m

Providing and Laying Ductile Iron K - 9 pipes - 400 mm


Coefficient for per m
Code
LB0038
LB0077
MT0863

PO0073

Description
Plumber Gd.1
Labour
DI pipe - 350 mm

Quant
0.11360
0.20450
1.00000

Units
day
day
m

Providing and Laying Ductile Iron K - 9 pipes - 450 mm


Coefficient for per m
Code
LB0038
LB0077
MT0864

PO0074

Description
Plumber Gd.1
Labour
DI pipe - 450 mm

Quant
0.13636
0.23860
1.00000

Units
day
day
m

Providing and Laying Ductile Iron K - 9 pipes - 500 mm


Coefficient for per m
Code
LB0038
LB0077
MT0865

PO0075

Description
Plumber Gd.1
Labour
DI pipe - 500 mm

Quant
0.16346
0.27272
1.00000

Units
day
day
m

Providing and Laying Ductile Iron K - 9 pipes - 600 mm


Coefficient for per m
Code
LB0038
LB0077
MT0866

PO0077

Description
Plumber Gd.1
Labour
DI pipe - 600 mm

Quant
0.19318
0.38600
1.00000

Units
day
day
m

Providing and Laying Ductile Iron K - 7 pipes - 80 mm


Coefficient for per m
Code
LB0038
LB0077
MT0870

PO0078

Description
Plumber Gd.1
Labour
DI pipe - 80 mm

Quant
0.01818
0.04545
1.00000

Units
day
day
m

Providing and Laying Ductile Iron K - 7 pipes -100 mm


Coefficient for per m
Code
LB0038
LB0077
MT0871

Description
Plumber Gd.1
Labour
DI pipe - 100 mm

Quant
0.01818
0.04545
1.00000

Standards & Quality Control Authority, MoWHS

Units
day
day
m

Labour and Material Coefficients (Civil Works) - 2009

PO0079

176

Providing and Laying Ductile Iron K - 7 pipes -150 mm


Coefficient for per m
Code
LB0038
LB0077
MT0872

PO0080

Description
Plumber Gd.1
Labour
DI pipe - 150 mm

Quant
0.03182
0.06818
1.00000

Units
day
day
m

Providing and Laying Ductile Iron K - 7 pipes -200mm


Coefficient for per m
Code
LB0038
LB0077
MT0873

PO0081

Description
Plumber Gd.1
Labour
DI pipe - 200 mm

Quant
0.04318
0.07955
1.00000

Units
day
day
m

Providing and Laying Ductile Iron K - 7 pipes -250mm


Coefficient for per m
Code
LB0038
LB0077
MT0874

PO0082

Description
Plumber Gd.1
Labour
DI pipe - 250 mm

Quant
0.05682
0.10227
1.00000

Units
day
day
m

Providing and Laying Ductile Iron K - 7 pipes -300mm


Coefficient for per m
Code
LB0038
LB0077
MT0875

PO0083

Description
Plumber Gd.1
Labour
DI pipe - 300 mm

Quant
0.06820
0.13636
1.00000

Units
day
day
m

Providing and Laying Ductile Iron K - 7 pipes -350mm


Coefficient for per m
Code
LB0038
LB0077
MT0876

PO0084

Description
Plumber Gd.1
Labour
DI pipe - 350 mm

Quant
0.08400
0.15900
1.00000

Units
day
day
m

Providing and Laying Ductile Iron K - 7 pipes -400mm


Coefficient for per m
Code
LB0038
LB0077
MT0877

PO0085

Description
Plumber Gd.1
Labour
DI pipe - 400 mm

Quant
0.11360
0.20450
1.00000

Units
day
day
m

Providing and Laying Ductile Iron K - 7 pipes -450mm


Coefficient for per m
Code
LB0038
LB0077
MT0878

Description
Plumber Gd.1
Labour
DI pipe - 450 mm

Quant
0.13636
0.23860
1.00000

Standards & Quality Control Authority, MoWHS

Units
day
day
m

Labour and Material Coefficients (Civil Works) - 2009

PO0086

177

Providing and Laying Ductile Iron K - 7 pipes -500mm


Coefficient for per m
Code
LB0038
LB0077
MT0879

PO0087

Description
Plumber Gd.1
Labour
DI pipe - 500 mm

Quant
0.16346
0.27272
1.00000

Units
day
day
m

Providing and Laying Ductile Iron K - 7 pipes -600mm


Coefficient for per m
Code
LB0038
LB0077
MT0880

PO0090

Description
Plumber Gd.1
Labour
DI pipe - 600 mm

Quant
0.19318
0.38600
1.00000

Units
day
day
m

Providing and Laying Double Flanged(Screwed or Welded) Ductile Iron K-9 Pipes -100mm
Coefficient for per m
Code
LB0038
LB0077
MT0882

PO0091

Description
Plumber Gd.1
Labour
DI pipe - 100 mm

Quant
0.03410
0.07286
1.00000

Units
day
day
m

Providing and Laying Double Flanged(Screwed or Welded) Ductile Iron K-9 Pipes -150mm
Coefficient for per m
Code
LB0038
LB0077
MT0883

PO0092

Description
Plumber Gd.1
Labour
DI pipe - 150 mm

Quant
0.05237
0.09563
1.00000

Units
day
day
m

Providing and Laying Double Flanged(Screwed or Welded) Ductile Iron K-9 Pipes -200mm
Coefficient for per m
Code
LB0038
LB0077
MT0884

PO0093

Description
Plumber Gd.1
Labour
DI pipe - 200 mm

Quant
0.06489
0.12980
1.00000

Units
day
day
m

Providing and Laying Double Flanged(Screwed or Welded) Ductile Iron K-9 Pipes -250mm
Coefficient for per m
Code
LB0038
LB0077
MT0885

PO0094

Description
Plumber Gd.1
Labour
DI pipe - 250 mm

Quant
0.08424
0.17076
1.00000

Units
day
day
m

Providing and Laying Double Flanged(Screwed or Welded) Ductile Iron K-9 Pipes -300mm
Coefficient for per m
Code
LB0038
LB0077
MT0886

PO0095

Description
Plumber Gd.1
Labour
DI pipe - 300 mm

Quant
0.11156
0.21860
1.00000

Units
day
day
m

Providing and Laying Double Flanged(Screwed or Welded) Ductile Iron K-9 Pipes -350mm
Coefficient for per m
Code
LB0038
LB0077
MT0887

Description
Plumber Gd.1
Labour
DI pipe - 350 mm

Quant
0.15030
0.26640
1.00000

Standards & Quality Control Authority, MoWHS

Units
day
day
m

Labour and Material Coefficients (Civil Works) - 2009

PO0096

178

Providing and Laying Double Flanged(Screwed or Welded) Ductile Iron K-9 Pipes - 400mm
Coefficient for per m
Code
LB0038
LB0077
MT0888

PO0097

Description
Plumber Gd.1
Labour
DI pipe - 400 mm

Quant
0.17530
0.33700
1.00000

Units
day
day
m

Providing and Laying Double Flanged(Screwed or Welded) Ductile Iron K-9 Pipes - 450mm
Coefficient for per m
Code
LB0038
LB0077
MT0889

PO0098

Description
Plumber Gd.1
Labour
DI pipe - 450 mm

Quant
0.23910
0.47810
1.00000

Units
day
day
m

Providing and Laying Double Flanged(Screwed or Welded) Ductile Iron K-9 Pipes -500mm
Coefficient for per m
Code
LB0038
LB0077
MT0890

PO0099

Description
Plumber Gd.1
Labour
DI pipe - 500 mm

Quant
0.32560
0.64210
1.00000

Units
day
day
m

Providing and Laying Double Flanged(Screwed or Welded) Ductile Iron K-9 Pipes -600mm
Coefficient for per m
Code
LB0038
LB0077
MT0891

PO0100

Description
Plumber Gd.1
Labour
DI pipe - 600 mm

Quant
0.42120
1.00870
1.00000

Units
day
day
m

Providing & fixing brass stop cock - 15mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT0930 Stopcock - 15mm nom-bore

PO0101

Quant
0.02000
1.00000

Units
day
each

Providing & fixing brass stop cock - 20mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT0931 Stopcock - 20mm nom-bore

PO0102

Quant
0.02000
1.00000

Units
day
each

Providing & fixing brass stop cock - 25mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT0932 Stopcock - 25mm nom-bore

PO0105

Quant
0.02000
1.00000

Units
day
each

Providing & fixing brass full way valve with wheel - 32mm
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT0940 Wheel valve - 32mm nom-bore

Quant
0.02000
1.00000

Standards & Quality Control Authority, MoWHS

Units
day
each

Labour and Material Coefficients (Civil Works) - 2009

PO0106

179

Providing & fixing brass full way valve with wheel - 40mm
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT0941 Wheel valve - 40mm nom-bore

PO0107

Quant
0.02000
1.00000

Units
day
each

Providing & fixing brass full way valve with wheel - 50mm
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT0942 Wheel valve - 50mm nom-bore

PO0108

Quant
0.02000
1.00000

Units
day
each

Providing & fixing brass full way valve with wheel - 65mm
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT0943 Wheel valve - 65mm nom-bore

PO0109

Quant
0.02000
1.00000

Units
day
each

Providing & fixing brass full way valve with wheel - 80mm
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT0944 Wheel valve - 80mm nom-bore

PO0110

Quant
0.02000
1.00000

Units
day
each

Providing & fixing non-return valve - 50mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT0950 Non return valve - 50mm nom-bore

PO0111

Quant
0.02000
1.00000

Units
day
each

Providing & fixing non-return valve - 65mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT0951 Non return valve - 65mm nom-bore

PO0112

Quant
0.02000
1.00000

Units
day
each

Providing & fixing non-return valve - 80mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT0952 Non return valve - 80mm nom-bore

PO0114

Quant
0.02000
1.00000

Units
day
each

Providing & fixing brass bibcock - 15mm, brass


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT0925 Brass Fittings Bibcock - 15mm

PO0115

Quant
0.02000
1.00000

Units
day
each

Providing & fixing H.D.P.E, Equal Tee butt-welded-type fittings - 20mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT0895 H.D.P.E welded-type fittings - TEE, 20mm

Standards & Quality Control Authority, MoWHS

Quant
0.02000
1.00000

Units
day
each

Labour and Material Coefficients (Civil Works) - 2009

PO0116

180

Providing & fixing H.D.P.E, Equal Tee butt-welded-type fittings - 25mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT0896 H.D.P.E welded-type fittings - TEE, 25mm

PO0117

Quant
0.02000
1.00000

Units
day
each

Providing & fixing H.D.P.E, Equal Tee butt-welded-type fittings - 32mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT0897 H.D.P.E welded-type fittings - TEE, 32mm

PO0118

Quant
0.02000
1.00000

Units
day
each

Providing & fixing H.D.P.E, Equal Tee butt-welded-type fittings - 50mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT0898 H.D.P.E welded-type fittings - TEE, 50mm

PO0119

Quant
0.02000
1.00000

Units
day
each

Providing & fixing H.D.P.E, Equal Tee butt-welded-type fittings - 63mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT0899 H.D.P.E welded-type fittings - TEE, 63mm

PO0120

Quant
0.02000
1.00000

Units
day
each

Providing & fixing H.D.P.E, Equal Tee butt-welded-type fittings - 90mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT0900 H.D.P.E welded-type fittings - TEE, 90mm

PO0121

Quant
0.02000
1.00000

Units
day
each

Providing & fixing H.D.P.E, Equal Tee butt-welded-type fittings - 110mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT0901 H.D.P.E welded-type fittings - TEE, 110mm

PO0122

Quant
0.02000
1.00000

Units
day
each

Providing & fixing H.D.P.E, Equal Tee butt-welded-type fittings - 160mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT0902 H.D.P.E welded-type fittings - TEE, 160mm

PO0125

Quant
0.02000
1.00000

Units
day
each

Providing & fixing H.D.P.E Elbow - 32mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT0903 H.D.P.E welded-type fittings - Elbow, 32mm

PO0126

Quant
0.02000
1.00000

Units
day
each

Providing & fixing H.D.P.E Elbow - 50mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT0904 H.D.P.E welded-type fittings - Elbow, 50mm

Standards & Quality Control Authority, MoWHS

Quant
0.02000
1.00000

Units
day
each

Labour and Material Coefficients (Civil Works) - 2009

PO0127

181

Providing & fixing H.D.P.E Elbow - 63mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT0905 H.D.P.E welded-type fittings - Elbow, 63mm

PO0128

Quant
0.02000
1.00000

Units
day
each

Providing & fixing H.D.P.E Elbow - 90mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT0906 H.D.P.E welded-type fittings - Elbow, 90mm

PO0129

Quant
0.02000
1.00000

Units
day
each

Providing & fixing H.D.P.E Elbow - 110mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT0907 H.D.P.E welded-type fittings - Elbow, 110mm

PO0130

Quant
0.02000
1.00000

Units
day
each

Providing & fixing H.D.P.E Reducer - 90 x 50mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT0908 H.D.P.E welded-type fittings - Reducer, 90 x 50mm

PO0131

Quant
0.02000
1.00000

Units
day
each

Providing & fixing H.D.P.E Reducer - 90 x 63mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT0909 H.D.P.E welded-type fittings - Reducer, 90 x 63mm

PO0132

Quant
0.02000
1.00000

Units
day
each

Providing & fixing H.D.P.E Reducer - 110 x 63mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT0910 H.D.P.E welded-type fittings - Reducer, 110 x 63mm

PO0133

Quant
0.02000
1.00000

Units
day
each

Providing & fixing H.D.P.E Reducer - 110 x 90mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT0911 H.D.P.E welded-type fittings - Reducer, 160 x 90mm

PO0140

Quant
0.02000
1.00000

Units
day
each

Providing & fixing H.D.P.E Blank End (Cap) - 50mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT0912 H.D.P.E welded-type fittings - Blank end, 50mm

PO0141

Quant
0.02000
1.00000

Units
day
each

Providing & fixing H.D.P.E Blank End (Cap) - 63mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT0913 H.D.P.E welded-type fittings - Blank end, 63mm

Standards & Quality Control Authority, MoWHS

Quant
0.02000
1.00000

Units
day
each

Labour and Material Coefficients (Civil Works) - 2009

PO0142

182

Providing & fixing H.D.P.E Blank End (Cap) - 90mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT0914 H.D.P.E welded-type fittings - Blank end, 90mm

PO0143

Quant
0.02000
1.00000

Units
day
each

Providing & fixing H.D.P.E Blank End (Cap) - 110mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT0915 H.D.P.E welded-type fittings - Blank end, 110mm

PO0144

Quant
0.02000
1.00000

Units
day
each

Providing & fixing H.D.P.E Blank End (Cap) - 160mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT0916 H.D.P.E welded-type fittings - Blank end, 160mm

PO0150

Quant
0.02000
1.00000

Units
day
each

Providing push-on joints to Centrifugally Spun D.I pipes including the cost of rubber gaskets - 80 mm
Coefficient for per each
Code
LB0038
LB0077
MT0960

PO0151

Description
Plumber Gd.1
Labour
Rubber Gasket - 80 mm

Quant
0.01600
0.03000
1.00000

Units
day
day
each

Providing push-on joints to Centrifugally Spun D.I pipes including the cost of rubber gaskets - 100 mm
Coefficient for per each
Code
LB0038
LB0077
MT0961

PO0152

Description
Plumber Gd.1
Labour
Rubber Gasket - 100 mm

Quant
0.02200
0.04000
1.00000

Units
day
day
each

Providing push-on joints to Centrifugally Spun D.I pipes including the cost of rubber gaskets - 150 mm
Coefficient for per each
Code
LB0038
LB0077
MT0962

PO0153

Description
Plumber Gd.1
Labour
Rubber Gasket - 150 mm

Quant
0.04300
0.08000
1.00000

Units
day
day
each

Providing push-on joints to Centrifugally Spun D.I pipes including the cost of rubber gaskets - 200 mm

Coefficient for per each


Code
LB0038
LB0077
MT0963
PO0154

Description
Plumber Gd.1
Labour
Rubber Gasket - 200 mm

Quant
0.05900
0.11000
1.00000

Units
day
day
each

Providing push-on joints to Centrifugally Spun D.I pipes including the cost of rubber gaskets - 250 mm
Coefficient for per each
Code
LB0038
LB0077
MT0964

Description
Plumber Gd.1
Labour
Rubber Gasket - 250 mm

Quant
0.07500
0.14000
1.00000

Standards & Quality Control Authority, MoWHS

Units
day
day
each

Labour and Material Coefficients (Civil Works) - 2009

PO0155

183

Providing push-on joints to Centrifugally Spun D.I pipes including the cost of rubber gaskets - 300 mm
Coefficient for per each
Code
LB0038
LB0077
MT0965

PO0156

Description
Plumber Gd.1
Labour
Rubber Gasket - 300 mm

Quant
0.08600
0.16000
1.00000

Units
day
day
each

Providing push-on joints to Centrifugally Spun D.I pipes including the cost of rubber gaskets - 350 mm
Coefficient for per each
Code
LB0038
LB0077
MT0966

PO0157

Description
Plumber Gd.1
Labour
Rubber Gasket - 350 mm

Quant
0.09000
0.16000
1.00000

Units
day
day
each

Providing push-on joints to Centrifugally Spun D.I pipes including the cost of rubber gaskets - 400 mm
Coefficient for per each
Code
LB0038
LB0077
MT0967

PO0158

Description
Plumber Gd.1
Labour
Rubber Gasket - 400 mm

Quant
0.13000
0.23000
1.00000

Units
day
day
each

Providing push-on joints to Centrifugally Spun D.I pipes including the cost of rubber gaskets - 450 mm
Coefficient for per each
Code
LB0038
LB0077
MT0968

PO0159

Description
Plumber Gd.1
Labour
Rubber Gasket - 450 mm

Quant
0.15000
0.25000
1.00000

Units
day
day
each

Providing push-on joints to Centrifugally Spun D.I pipes including the cost of rubber gaskets - 500 mm
Coefficient for per each
Code
LB0038
LB0077
MT0969

PO0160

Description
Plumber Gd.1
Labour
Rubber Gasket - 500 mm

Quant
0.16500
0.26000
1.00000

Units
day
day
each

Providing push-on joints to Centrifugally Spun D.I pipes including the cost of rubber gaskets - 600 mm
Coefficient for per each
Code
LB0038
LB0077
MT0970

PO0162

Description
Plumber Gd.1
Labour
Rubber Gasket - 600 mm

Quant
0.23000
0.36000
1.00000

Units
day
day
each

Providing lead-caulked joints to C.I pipes and fittings - 50mm dia pipe
Coefficient for per each
Code
LB0038
LB0054
LB0077
MT1145

Description
Plumber Gd.1
Plumber Gd.2
Labour
Pig lead

Quant
0.05000
0.06250
0.06250
0.77000

Standards & Quality Control Authority, MoWHS

Units
day
day
day
kg

Labour and Material Coefficients (Civil Works) - 2009

PO0163

184

Providing lead-caulked joints to C.I pipes and fittings - 75mm dia pipe
Coefficient for per each
Code
LB0038
LB0054
LB0077
MT1145

PO0164

Description
Plumber Gd.1
Plumber Gd.2
Labour
Pig lead

Quant
0.06250
0.06250
0.11200
0.88000

Units
day
day
day
kg

Providing lead-caulked joints to C.I pipes and fittings - 100mm dia pipe
Coefficient for per each
Code
LB0038
LB0054
LB0077
MT1145

PO0165

Description
Plumber Gd.1
Plumber Gd.2
Labour
Pig lead

Quant
0.07500
0.07500
0.15000
0.98000

Units
day
day
day
kg

Providing lead-caulked joints to C.I pipes and fittings - 150mm dia pipe
Coefficient for per each
Code
LB0038
LB0054
LB0077
MT1145

PO0166

Description
Plumber Gd.1
Plumber Gd.2
Labour
Pig lead

Quant
0.09000
0.09000
0.18000
1.76000

Units
day
day
day
kg

Providing & fixing C.I Soil Waste and Vent pipes - 50mm dia
Coefficient for per m
Code
LB0038
LB0054
LB0077
MT0975

PO0167

Description
Plumber Gd.1
Plumber Gd.2
Labour
Cast Iron Pipes, Single Socketted, 1.83m long - 50mm

Quant
0.02100
0.01000
0.04200
0.58000

Units
day
day
day
each

Providing & fixing C.I Soil Waste and Vent pipes - 75mm dia
Coefficient for per m
Code
LB0038
LB0054
LB0077
MT0976

PO0168

Description
Plumber Gd.1
Plumber Gd.2
Labour
Cast Iron Pipes, Single Socketted, 1.83m long - 75mm

Quant
0.02600
0.13000
0.05200
0.58000

Units
day
day
day
each

Providing & fixing C.I Soil Waste and Vent pipes - 100mm dia
Coefficient for per m
Code
LB0038
LB0054
LB0077
MT0977

PO0169

Description
Plumber Gd.1
Plumber Gd.2
Labour
Cast Iron Pipes, Single Socketted, 1.83m long - 100mm

Quant
0.03100
0.01600
0.06200
0.58000

Units
day
day
day
each

Providing & fixing C.I Soil Waste and Vent pipes - 150mm dia
Coefficient for per m
Code
LB0038
LB0054
LB0077
MT0978

Description
Plumber Gd.1
Plumber Gd.2
Labour
Cast Iron Pipes, Single Socketted, 1.83m long - 150mm

Standards & Quality Control Authority, MoWHS

Quant
0.04100
0.02200
0.08200
0.58000

Units
day
day
day
each

Labour and Material Coefficients (Civil Works) - 2009

PO0170

185

Providing & fixing C.I door bend including fittings - 50mm dia
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT0990 Door bend - 50mm

PO0171

Quant
0.02000
1.00000

Units
day
each

Providing & fixing C.I door bend including fittings - 75mm dia
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT0991 Door bend - 75mm

PO0172

Quant
0.02000
1.00000

Units
day
each

Providing & fixing C.I door bend including fittings - 100mm dia
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT0992 Door bend - 100mm

PO0180

Quant
0.02000
1.00000

Units
day
each

Providing & fixing C.I plain bend including fittings - 50mm dia
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT0985 Plain bend - 50mm

PO0181

Quant
0.02000
1.00000

Units
day
each

Providing & fixing C.I plain bend including fittings - 75mm dia
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT0986 Plain bend - 75mm

PO0182

Quant
0.02000
1.00000

Units
day
each

Providing & fixing C.I plain bend including fittings - 100mm dia
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT0987 Plain bend - 100mm

PO0190

Quant
0.02000
1.00000

Units
day
each

Providing & fixing C.I heel rest bend - 50mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1010 Heel rest bend - 50mm

PO0191

Quant
0.02000
1.00000

Units
day
each

Providing & fixing C.I heel rest bend - 75mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1011 Heel rest bend - 75mm

PO0192

Quant
0.02000
1.00000

Units
day
each

Providing & fixing C.I heel rest bend - 100mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1012 Heel rest bend - 100mm

Quant
0.02000
1.00000

Standards & Quality Control Authority, MoWHS

Units
day
each

Labour and Material Coefficients (Civil Works) - 2009

PO0200

186

Providing & fixing C.I double equal door junction including fittings - 100mm
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1052 Double equal junction, door - 100mm

PO0201

Quant
0.02000
1.00000

Units
day
each

Providing & fixing C.I double equal door junction including fittings - 75mm
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1051 Double equal junction, door - 75mm

PO0202

Quant
0.02000
1.00000

Units
day
each

Providing & fixing C.I double equal door junction including fittings - 50mm
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1050 Double equal junction, door - 50mm

PO0210

Quant
0.02000
1.00000

Units
day
each

Providing & fixing C.I double equal plain junction including fittings - 100mm
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1042 Double equal junction, plain - 100mm

PO0211

Quant
0.02000
1.00000

Units
day
each

Providing & fixing C.I double equal plain junction including fittings - 75mm
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1041 Double equal junction, plain - 75mm

PO0212

Quant
0.02000
1.00000

Units
day
each

Providing & fixing C.I double equal plain junction including fittings - 50mm
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1040 Double equal junction, plain - 50mm

PO0220

Quant
0.02000
1.00000

Units
day
each

Providing & fixing C.I single equal door junction including fittings - 150mm
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1033 Single equal junction, door - 150mm

PO0221

Quant
0.02000
1.00000

Units
day
each

Providing & fixing C.I single equal door junction including fittings - 100mm
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1032 Single equal junction, door - 100mm

PO0222

Quant
0.02000
1.00000

Units
day
each

Providing & fixing C.I single equal door junction including fittings - 75mm
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1031 Single equal junction, door - 75mm

Quant
0.02000
1.00000

Standards & Quality Control Authority, MoWHS

Units
day
each

Labour and Material Coefficients (Civil Works) - 2009

PO0223

187

Providing & fixing C.I single equal door junction including fittings - 50mm
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1030 Single equal junction, door - 50mm

PO0230

Quant
0.02000
1.00000

Units
day
each

Providing & fixing C.I single equal plain junction including fittings - 100mm
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1022 Single equal junction - plain - 100mm

PO0231

Quant
0.02000
1.00000

Units
day
each

Providing & fixing C.I single equal plain junction including fittings - 75mm
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1021 Single equal junction - plain - 75mm

PO0232

Quant
0.02000
1.00000

Units
day
each

Providing & fixing C.I single equal plain junction including fittings - 50mm
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1020 Single equal junction - plain - 50mm

PO0240

Quant
0.02000
1.00000

Units
day
each

Providing & fixing C.I double unequal door junction including fittings - 100x75mm
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1086 Double unequal junction, door - 100 x 75

PO0241

Quant
0.02000
1.00000

Units
day
each

Providing & fixing C.I double unequal door junction including fittings - 100x50mm
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1085 Double unequal junction, door - 100 x 50

PO0250

Quant
0.02000
1.00000

Units
day
each

Providing & fixing C.I double unequal plain junction - 100x75mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1081 Double unequal junction, plain - 100 x 75

PO0251

Quant
0.02000
1.00000

Units
day
each

Providing & fixing C.I double unequal plain junction - 100x50mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1080 Double unequal junction, plain - 100 x 50

PO0260

Quant
0.02000
1.00000

Units
day
each

Providing & fixing C.I single unequal door junction - 100x75mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1072 Single unequal junction, door - 100 x 75mm

Standards & Quality Control Authority, MoWHS

Quant
0.02000
1.00000

Units
day
each

Labour and Material Coefficients (Civil Works) - 2009

PO0261

188

Providing & fixing C.I single unequal door junction - 100x50mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1071 Single unequal junction, door - 100 x 50mm

PO0262

Quant
0.02000
1.00000

Units
day
each

Providing & fixing C.I single unequal door junction - 75x50mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1070 Single unequal junction, door - 75 x 50mm

PO0270

Quant
0.02000
1.00000

Units
day
each

Providing & fixing C.I single unequal plain junction - 100x75mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1062 Single unequal junction, plain - 100 x 75mm

PO0271

Quant
0.02000
1.00000

Units
day
each

Providing & fixing C.I single unequal plain junction - 100x50mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1061 Single unequal junction, plain - 100 x 50mm

PO0272

Quant
0.02000
1.00000

Units
day
each

Providing & fixing C.I single unequal plain junction - 75x50mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1060 Single unequal junction, plain - 75 x 50mm

PO0280

Quant
0.02000
1.00000

Units
day
each

Providing & fixing C.I double equal Y-Junction - 100mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1102 Double equal Y-Junction - 100mm

PO0281

Quant
0.02000
1.00000

Units
day
each

Providing & fixing C.I double equal Y-Junction - 75mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1101 Double equal Y-Junction - 75mm

PO0282

Quant
0.02000
1.00000

Units
day
each

Providing & fixing C.I double equal Y-Junction - 50mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1100 Double equal Y-Junction - 50mm

PO0290

Quant
0.02000
1.00000

Units
day
each

Providing & fixing C.I single equal Y-Junction - 100mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1092 Single equal Y-Junction - 100mm

Quant
0.02000
1.00000

Standards & Quality Control Authority, MoWHS

Units
day
each

Labour and Material Coefficients (Civil Works) - 2009

PO0291

189

Providing & fixing C.I single equal Y-Junction - 75mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1091 Single equal Y-Junction - 75mm

PO0292

Quant
0.02000
1.00000

Units
day
each

Providing & fixing C.I single equal Y-Junction - 50mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1090 Single equal Y-Junction - 50mm

PO0300

Quant
0.02000
1.00000

Units
day
each

Providing & fixing single unequal plain in vertical branch - 100x50mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1111 Single unequal invert branch - 100 x 50mm

PO0301

Quant
0.02000
1.00000

Units
day
each

Providing & fixing single unequal plain in vertical branch - 75x50mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1110 Single unequal invert branch - 75 x 50mm

PO0310

Quant
0.02000
1.00000

Units
day
each

Providing & fixing S.C.I offsets - 100mm Offsets - 75mm projection


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1120 100mm dia offset - with 75mm projection

PO0311

Quant
0.02000
1.00000

Units
day
each

Providing & fixing S.C.I offsets - 100mm Offsets - 150mm projection


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1126 100mm dia offset - with 150mm projection

PO0320

Quant
0.02000
1.00000

Units
day
each

Providing & fixing S.C.I offsets - 75mm offset - 75mm projection


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1120 75mm dia offset - with 75mm projection

PO0321

Quant
0.02000
1.00000

Units
day
each

Providing & fixing S.C.I offsets - 75mm offset - 150mm projection


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1121 75mm dia offset - with 150mm projection

PO0330

Quant
0.02000
1.00000

Units
day
each

Providing & fixing S.C.I offsets - 50 mm offset - 75mm projection


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1115 Offsets 50mm dia offset - with 75mm projection

Standards & Quality Control Authority, MoWHS

Quant
0.02000
1.00000

Units
day
each

Labour and Material Coefficients (Civil Works) - 2009

PO0331

190

Providing & fixing S.C.I offsets - 50 mm offset - 150mm projection


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1116 Offsets 50mm dia offset - with 150mm projection

PO0340

Quant
0.02000
1.00000

Units
day
each

Providing & fixing C.I terminal guard - 150mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1133 Terminal Guard - 150mm

PO0341

Quant
0.02000
1.00000

Units
day
each

Providing & fixing C.I terminal guard - 100mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1132 Terminal Guard - 100mm

PO0342

Quant
0.02000
1.00000

Units
day
each

Providing & fixing C.I terminal guard - 75mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1131 Terminal Guard - 75mm

PO0343

Quant
0.02000
1.00000

Units
day
each

Providing & fixing C.I terminal guard - 50mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1130 Terminal Guard - 50mm

PO0350

Quant
0.02000
1.00000

Units
day
each

Providing & fixing C.I collar - 100mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1002 Collar - 100mm

PO0351

Quant
0.02000
1.00000

Units
day
each

Providing & fixing C.I collar - 75mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1001 Collar - 75mm

PO0352

Quant
0.02000
1.00000

Units
day
each

Providing & fixing C.I collar - 50mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1000 Collar - 50mm

PO0360

Quant
0.02000
1.00000

Units
day
each

Providing & fixing C.I P-Type Nahani trap - 100mm inlet & 75mm outlet
Coefficient for per each
Code
LB0036
LB0038
MT1141

Description
Mason Gd.1
Plumber Gd.1
P-type Nahani Trap - 100mm inlet & 75mm outlet

Standards & Quality Control Authority, MoWHS

Quant
0.30000
0.30000
1.00000

Units
day
day
each

Labour and Material Coefficients (Civil Works) - 2009

PO0361

191

Providing & fixing C.I P-Type Nahani trap - 100mm inlet & 50mm outlet
Coefficient for per each
Code
LB0036
LB0038
MT1140

PO0370

Description
Mason Gd.1
Plumber Gd.1
P-type Nahani Trap - 100mm inlet & 50mm outlet

Quant
0.30000
0.30000
1.00000

Units
day
day
each

Providing & fixing P.V.C soil waste and vent pipes, single or double socketed, including pipe clip
complete (excluding the cost of PVC fittings) - 75mm dia
Coefficient for per m
Code
LB0038
LB0054
LB0077
MT1150

PO0371

Quant
0.02100
0.01000
0.04200
0.56000

Units
day
day
day
each

Providing & fixing P.V.C soil waste and vent pipes, single or double socketed, including pipe clip
complete (excluding the cost of PVC fittings) - 90mm dia
Coefficient for per m
Code
LB0038
LB0054
LB0077
MT1151

PO0372

Description
Plumber Gd.1
Plumber Gd.2
Labour
Pipes, Single Socketed 1.83 m long - 75mm

Description
Plumber Gd.1
Plumber Gd.2
Labour
Pipes, Single Socketed 1.83 m long - 90mm

Quant
0.02600
0.01300
0.05200
0.56000

Units
day
day
day
each

Providing & fixing P.V.C soil waste and vent pipes, single or double socketed, including pipe clip
complete (excluding the cost of PVC fittings) - 110mm dia
Coefficient for per m
Code
LB0038
LB0054
LB0077
MT1152

PO0380

Description
Plumber Gd.1
Plumber Gd.2
Labour
Pipes, Single Socketed 1.83 m long - 110mm

Quant
0.03100
0.01600
0.06200
0.56000

Units
day
day
day
each

Providing & fixing P.V.C Pipe connector - 110mm dia


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1190 Pipe Connector - 110mm

PO0385

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C Coupler - 75mm dia


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1205 Coupler - 75mm

PO0386

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C Coupler - 90mm dia


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1206 Coupler - 90mm

Quant
0.02000
1.00000

Standards & Quality Control Authority, MoWHS

Units
day
each

Labour and Material Coefficients (Civil Works) - 2009

PO0387

192

Providing & fixing P.V.C Coupler - 110mm dia


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1207 Coupler - 110mm

PO0395

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C Reducer - 90x75mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1195 Reducer - 90x75mm

PO0396

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C Reducer - 110x75mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1196 Reducer - 110x75mm

PO0397

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C Reducer - 110x90mm


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1197 Reducer - 110x90mm

PO0405

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C plain bend - 75mm dia


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1215 Plain bend - 75mm

PO0406

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C plain bend - 90mm dia


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1216 Plain bend - 90mm

PO0407

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C plain bend - 110mm dia


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1217 Plain bend - 110mm

PO0415

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C door bend - 75mm dia


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1225 Door bend - 75mm

PO0416

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C door bend - 90mm dia


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1226 Door bend - 90mm

Quant
0.02000
1.00000

Standards & Quality Control Authority, MoWHS

Units
day
each

Labour and Material Coefficients (Civil Works) - 2009

PO0417

193

Providing & fixing P.V.C door bend - 110mm dia


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1227 Door bend - 110mm

PO0425

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C Long arm bend with door - 75mm dia
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1235 Long Arm Bend - 75mm

PO0426

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C Long arm bend with door - 90mm dia
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1236 Long Arm Bend - 90mm

PO0427

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C Long arm bend with door - 110mm dia
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1237 Long Arm Bend - 110mm

PO0435

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C Single Tee plain - 75mm dia


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1245 Single Tee, Plain - 75mm

PO0436

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C Single Tee plain - 90mm dia


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1246 Single Tee, Plain - 90mm

PO0437

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C Single Tee plain - 110mm dia


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1247 Single Tee, Plain - 110mm

PO0445

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C Single Tee with door - 75mm dia
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1255 Single Tee, With Door - 75mm

PO0446

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C Single Tee with door - 90mm dia
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1256 Single Tee, With Door - 90mm

Quant
0.02000
1.00000

Standards & Quality Control Authority, MoWHS

Units
day
each

Labour and Material Coefficients (Civil Works) - 2009

PO0447

194

Providing & fixing P.V.C Single Tee with door - 110mm dia
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1257 Single Tee, With Door - 110mm

PO0455

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C Double Tee plain - 75mm dia


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1265 Double Tee, Plain - 75mm

PO0456

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C Double Tee plain - 90mm dia


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1266 Double Tee, Plain - 90mm

PO0457

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C Double Tee plain - 110mm dia


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1267 Double Tee, Plain - 110mm

PO0465

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C Double Tee with door - 75mm dia
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1275 Double Tee, With Door - 75mm

PO0466

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C Double Tee with door - 90mm dia
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1276 Double Tee, With Door - 90mm

PO0467

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C Double Tee with door - 110mm dia
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1277 Double Tee, With Door - 110mm

PO0475

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C Single Y, plain - 75mm dia


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1285 Single Y, Plain - 75mm

PO0476

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C Single Y, plain - 90mm dia


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1286 Single Y, Plain - 90mm

Quant
0.02000
1.00000

Standards & Quality Control Authority, MoWHS

Units
day
each

Labour and Material Coefficients (Civil Works) - 2009

PO0477

195

Providing & fixing P.V.C Single Y, plain - 110mm dia


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1287 Single Y, Plain - 110mm

PO0485

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C Single Y, with door - 75mm dia


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1295 Single Y, With Door - 75mm

PO0486

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C Single Y, with door - 90mm dia


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1296 Single Y, With Door - 90mm

PO0487

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C Single Y, with door - 110mm dia


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1297 Single Y, With Door - 110mm

PO0495

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C Double Y, plain - 75mm dia


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1305 Double Y, Plain - 75mm

PO0496

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C Double Y, plain - 90mm dia


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1306 Double Y, Plain - 90mm

PO0497

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C Double Y, plain - 110mm dia


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1307 Double Y, Plain - 110mm

PO0505

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C Double Y, with door - 75mm dia


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1315 Double Y, With Door - 75mm

PO0506

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C Double Y, with door - 90mm dia


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1316 Double Y, With Door - 90mm

Quant
0.02000
1.00000

Standards & Quality Control Authority, MoWHS

Units
day
each

Labour and Material Coefficients (Civil Works) - 2009

PO0507

196

Providing & fixing P.V.C Double Y, with door - 110mm dia


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1317 Double Y, With Door - 110mm

PO0515

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C Offset, 75mm dia - With 75mm projection
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1325 75mm dia. offset - With 75mm projection

PO0516

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C Offset, 75mm dia - With 150mm projection
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1326 75mm dia. offset - With 150mm projection

PO0525

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C Offset, 90mm dia - With 75mm projection
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1330 90mm dia. offset - With 75mm projection

PO0526

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C Offset, 90mm dia - With 150mm projection
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1331 90mm dia. offset - With 150mm projection

PO0535

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C Offset, 110mm dia - With 75mm projection
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1335 110mm dia. offset - With 75mm projection

PO0536

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C Offset, 110mm dia - With 150mm projection
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1336 110mm dia. offset - With 150mm projection

PO0545

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C Terminal guard - 75mm dia


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1340 Terminal Guard - 75mm

PO0546

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C Terminal guard - 90mm dia


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1341 Terminal Guard - 90mm

Quant
0.02000
1.00000

Standards & Quality Control Authority, MoWHS

Units
day
each

Labour and Material Coefficients (Civil Works) - 2009

PO0547

197

Providing & fixing P.V.C Terminal guard - 110mm dia


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1342 Terminal Guard - 110mm

PO0555

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C P-Trap, without air vent - Big


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1350 P-Trap without air vent - Big

PO0556

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C P-Trap, without air vent - Small


Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1351 P-Trap without air vent - Small

PO0565

Quant
0.02000
1.00000

Units
day
each

Providing & fixing P.V.C Nahani Trap - 110mm inlet & 75mm outlet
Coefficient for per each
Code
Description
LB0038 Plumber Gd.1
MT1345 Nahani Trap - 100mm inlet & 75mm outlet

PO0570

Quant
0.02000
1.00000

Units
day
each

Painting G.I pipes and fittings including primer & white coat, for new work - 15mm dia pipe
Coefficient for per m
Code
LB0052
LB0067
LB0077
MT0712
MT0723

PO0571

Description
Painter Gd.1
Painter Gd.2
Labour
Red oxide primer, for metals
High gloss synthetic enamel

Quant
0.00141
0.00317
0.00458
0.00254
0.00564

Units
day
day
day
litre
litre

Painting G.I pipes and fittings including primer & white coat, for new work - 20mm dia pipe
Coefficient for per m
Code
LB0052
LB0067
LB0077
MT0712
MT0723

PO0572

Description
Painter Gd.1
Painter Gd.2
Labour
Red oxide primer, for metals
High gloss synthetic enamel

Quant
0.00189
0.00425
0.00614
0.00340
0.00756

Units
day
day
day
litre
litre

Painting G.I pipes and fittings including primer & white coat, for new work - 25mm dia pipe
Coefficient for per m
Code
LB0052
LB0067
LB0077
MT0712
MT0723

Description
Painter Gd.1
Painter Gd.2
Labour
Red oxide primer, for metals
High gloss synthetic enamel

Quant
0.00234
0.00527
0.00761
0.00421
0.00936

Standards & Quality Control Authority, MoWHS

Units
day
day
day
litre
litre

Labour and Material Coefficients (Civil Works) - 2009

PO0573

198

Painting G.I pipes and fittings including primer & white coat, for new work - 32mm dia pipe
Coefficient for per m
Code
LB0052
LB0067
LB0077
MT0712
MT0723

PO0580

Quant
0.00300
0.00675
0.00975
0.00540
0.01200

Units
day
day
day
litre
litre

Painting C.I spun soil waste vent pipes & fittings including primer, top coat (any colour), for new work 50mm
Coefficient for per m
Code
LB0052
LB0067
LB0077
MT0711
MT0723

PO0581

Description
Painter Gd.1
Painter Gd.2
Labour
Red oxide primer, for metals
High gloss synthetic enamel

Description
Painter Gd.1
Painter Gd.2
Labour
Synthetic red lead primer
High gloss synthetic enamel

Quant
0.00480
0.01080
0.01560
0.00864
0.01920

Units
day
day
day
litre
litre

Painting C.I spun soil waste vent pipes & fittings including primer, top coat (any colour), for new work 75mm
Coefficient for per m
Code
LB0052
LB0077
MT0711
MT0726

PO0582

Quant
0.02352
0.02352
0.01296
0.02280

Units
day
day
litre
litre

Painting C.I spun soil waste vent pipes & fittings including primer, top coat (any colour), for new work 100mm
Coefficient for per m
Code
LB0052
LB0067
LB0077
MT0711
MT0723

PO0590

Description
Painter Gd.1
Labour
Synthetic red lead primer
Black\White bitumen enamel

Description
Painter Gd.1
Painter Gd.2
Labour
Synthetic red lead primer
High gloss synthetic enamel

Quant
0.00960
0.02160
0.03120
0.01728
0.03840

Units
day
day
day
litre
litre

Repainting C.I spun soil waste vent pipes & fittings including paints of any colour - 50mm
Coefficient for per m
Code
LB0067
LB0077
MT0723

PO0591

Quant
0.00720
0.00720
0.01280

Units
day
day
litre

Repainting C.I spun soil waste vent pipes & fittings including paints of any colour - 75mm
Coefficient for per m
Code
LB0067
LB0077
MT0723

PO0592

Description
Painter Gd.2
Labour
High gloss synthetic enamel

Description
Painter Gd.2
Labour
High gloss synthetic enamel

Quant
0.01080
0.01080
0.01920

Units
day
day
litre

Repainting C.I spun soil waste vent pipes & fittings including paints of any colour - 100mm
Coefficient for per m
Code
LB0067
LB0077
MT0723

Description
Painter Gd.2
Labour
High gloss synthetic enamel

Quant
0.01440
0.01440
0.02560

Standards & Quality Control Authority, MoWHS

Units
day
day
litre

Labour and Material Coefficients (Civil Works) - 2009

PO0600

199

Constructing Soak Pit - Size 1200x1200x1200mm, filled with brick bats including 100mm S. W drainpipe x 1200mm long
Coefficient for per each
Code
LB0036
LB0051
LB0077
MT0125
MT0126
MT0795

PO0601

Description
Mason Gd.1
Mason Gd.2
Labour
Bricks 2nd class
Brick aggregate
Stoneware pipes 60 cm long - 100mm dia

Quant
0.07800
0.07800
1.58622
0.06000
1.73000
2.00000

Units
day
day
day
1000#
cu.m
each

Constructing Soak Pit - Size 2500 dia. x 3000mm depth including 450x450mm dry brick honeycomb
shaft and 100mm S.W drain x 1800mm long
Coefficient for per each
Code
LB0032
LB0033
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0125
MT0126
MT0145
MT0208
MT0325
MT0330
MT0795

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Bricks 2nd class
Brick aggregate
Cement (OPC / PSC)
Thermo - Mechanically Treated ( TMT ) bars (yield strength 415 MPa)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
Stoneware pipes 60 cm long - 100mm dia

Standards & Quality Control Authority, MoWHS

Quant
0.02000
0.03744
0.63995
0.00100
0.63995
0.00140
15.65825
0.00140
0.00140
0.01143
0.01780
0.23600
13.78000
0.00763
1.68000
0.10080
0.00324
3.00000

Units
day
day
day
day
day
day
day
day
day
cu.m
cu.m
1000#
cu.m
tonne
kg
m
cu.m
each

Labour and Material Coefficients (Civil Works) - 2009

PO0610

200

Constructing Septic Tanks, in R.R Masonry in cement mortar 1:6, including fittings, C.I cover with
frame, 40mm thick concrete flooring (40mm aggregates) cement plaster concrete base in C.M 1:4:8 etc.
complete as per standard design - 15 users
Coefficient for per each

PO0611

Code
LB0032
LB0033
LB0036
LB0038
LB0039
LB0051
LB0053
LB0054
LB0077
MP0205
MP0206
MT0043
MT0060
MT0068
MT0070
MT0145
MT0208
MT0325
MT0330
MT0751

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Mason Gd.1
Plumber Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Plumber Gd.2
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Boulder
Crushed Rock - 40mm
Crushed Rock - 20mm
Cement (OPC / PSC)
Thermo - Mechanically Treated ( TMT ) bars (yield strength 415 MPa)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
C.I. manhole cover with frame (light duty) internal dimension 455 x 610mm
Total weight of Cover and frame not less than 38 kg. (Cover 23 kg. and frame
15 kg.)

MT0795
MT0975
MT1031
MT1130

Stoneware pipes 60 cm long - 100mm dia


Cast Iron Pipes, Single Socketted, 1.83m long - 50mm
Single equal junction, door - 100mm
Terminal Guard - 50mm

Quant
0.16250
0.69264
1.89631
0.10473
0.08600
5.26711
0.12040
0.02130
24.18409
0.12040
0.12040
2.28400
3.43000
1.20150
0.36953
0.76793
13.65000
1.86480
0.05994

Units
day
day
day
day
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
cu.m
tonne
kg
m
cu.m

2.00000
5.01000
1.23540
2.00000
1.00000

each
each
each
each
each

Constructing Septic Tanks, in R.R Masonry in cement mortar 1:6, including fittings, C.I cover with
frame, 40mm thick concrete flooring (40mm aggregates) cement plaster concrete base in C.M 1:4:8 etc.
complete as per standard design - 25 users
Coefficient for per each
Code
LB0032
LB0033
LB0036
LB0038
LB0039
LB0051
LB0053
LB0054
LB0077
MP0205
MP0206
MT0043
MT0060
MT0068
MT0070
MT0145
MT0208
MT0325
MT0330
MT0751

MT0795
MT0976
MT1031
MT1131

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Mason Gd.1
Plumber Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Plumber Gd.2
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Boulder
Crushed Rock - 40mm
Crushed Rock - 20mm
Cement (OPC / PSC)
Thermo - Mechanically Treated ( TMT ) bars (yield strength 415 MPa)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
C.I. manhole cover with frame (light duty) internal dimension 455 x 610mm
Total weight of Cover and frame not less than 38 kg. (Cover 23 kg. and frame
15 kg.)
Stoneware pipes 60 cm long - 100mm dia
Cast Iron Pipes, Single Socketted, 1.83m long - 75mm
Single equal junction, door - 100mm
Terminal Guard - 75mm

Standards & Quality Control Authority, MoWHS

Quant
0.20000
0.82368
2.47511
0.11538
0.09900
7.01278
0.13860
0.27690
31.05563
0.13860
0.13860
2.92144
4.64000
1.37060
0.44500
0.96554
16.80000
2.21760
0.07128
2.00000

Units
day
day
day
day
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
cu.m
tonne
kg
m
cu.m
each

5.01000
1.23540
2.00000
1.00000

each
each
each
each

Labour and Material Coefficients (Civil Works) - 2009

PO0612

201

Constructing Septic Tanks, in R.R Masonry in cement mortar 1:6, including fittings, C.I cover with
frame, 40mm thick concrete flooring(40mm aggregates) cement plaster concrete base in C.M 1:4:8 etc.
complete as per standard design - 50 users
Coefficient for per each

PO0613

Code
LB0032
LB0033
LB0036
LB0038
LB0039
LB0051
LB0053
LB0054
LB0077
MP0205
MP0206
MT0043
MT0060
MT0068
MT0070
MT0145
MT0208
MT0325
MT0330
MT0751

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Mason Gd.1
Plumber Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Plumber Gd.2
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Boulder
Crushed Rock - 40mm
Crushed Rock - 20mm
Cement (OPC / PSC)
Thermo - Mechanically Treated ( TMT ) bars (yield strength 415 MPa)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
C.I. manhole cover with frame (light duty) internal dimension 455 x 610mm
Total weight of Cover and frame not less than 38 kg. (Cover 23 kg. and frame
15 kg.)

MT0796
MT0977
MT1033
MT1132

Stoneware pipes 60 cm long - 150mm dia


Cast Iron Pipes, Single Socketted, 1.83m long - 100mm
Single equal junction, door - 150mm
Terminal Guard - 100mm

Quant
0.27500
1.14192
3.66114
0.12603
0.15900
10.39309
0.22260
0.03408
46.44651
0.22260
0.22260
4.43757
6.85000
2.28730
0.63190
1.46627
23.10000
3.07440
0.09882

Units
day
day
day
day
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
cu.m
tonne
kg
m
cu.m

2.00000
5.01000
1.23540
2.00000
1.00000

each
each
each
each
each

Constructing Septic Tanks, in R.R Masonry in cement mortar 1:6, including fittings, C.I cover with
frame, 40mm thick concrete flooring(40mm aggregates) cement plaster concrete base in C.M 1:4:8 etc.
complete as per standard design - 75 users
Coefficient for per each
Code
LB0032
LB0033
LB0036
LB0038
LB0039
LB0051
LB0053
LB0054
LB0077
MP0205
MP0206
MT0043
MT0060
MT0068
MT0070
MT0145
MT0208
MT0325
MT0330
MT0751

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Mason Gd.1
Plumber Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Plumber Gd.2
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Boulder
Crushed Rock - 40mm
Crushed Rock - 20mm
Cement (OPC / PSC)
Thermo - Mechanically Treated ( TMT ) bars (yield strength 415 MPa)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
C.I. manhole cover with frame (light duty) internal dimension 455 x 610mm
Total weight of Cover and frame not less than 38 kg. (Cover 23 kg. and frame
15 kg.)

MT0796
MT0977
MT1033
MT1132

Stoneware pipes 60 cm long - 150mm dia


Cast Iron Pipes, Single Socketted, 1.83m long - 100mm
Single equal junction, door - 150mm
Terminal Guard - 100mm

Standards & Quality Control Authority, MoWHS

Quant
0.31250
1.32912
4.65440
0.12603
0.14850
13.19085
0.20790
0.03408
57.10320
0.20790
0.20790
5.18914
8.81000
2.01140
0.74618
1.68463
26.25000
3.57840
0.11502

Units
day
day
day
day
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
cu.m
tonne
kg
m
cu.m

2.00000
5.01000
1.23540
2.00000
1.00000

each
each
each
each
each

Labour and Material Coefficients (Civil Works) - 2009

PO0614

202

Constructing Septic Tanks, in R.R Masonry in cement mortar 1:6, including fittings, C.I cover with
frame, 40mm thick concrete flooring(40mm aggregates) cement plaster concrete base in C.M 1:4:8 etc.
complete as per standard design - 100 users
Coefficient for per each

PO0620

Code
LB0032
LB0033
LB0036
LB0038
LB0039
LB0051
LB0053
LB0054
LB0077
MP0205
MP0206
MT0043
MT0060
MT0068
MT0070
MT0145
MT0208
MT0325
MT0330
MT0751

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Mason Gd.1
Plumber Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Plumber Gd.2
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Boulder
Crushed Rock - 40mm
Crushed Rock - 20mm
Cement (OPC / PSC)
Thermo - Mechanically Treated ( TMT ) bars (yield strength 415 MPa)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
C.I. manhole cover with frame (light duty) internal dimension 455 x 610mm
Total weight of Cover and frame not less than 38 kg. (Cover 23 kg. and frame
15 kg.)

MT0797
MT0978
MT1033
MT1133

Stoneware pipes 60 cm long - 200mm dia


Cast Iron Pipes, Single Socketted, 1.83m long - 150mm
Single equal junction, door - 150mm
Terminal Guard - 150mm

Quant
0.35000
1.46016
5.50235
0.14733
0.19850
15.52316
0.27790
0.04686
68.27673
0.27790
0.27790
6.33432
10.38000
2.83910
0.82770
2.05572
29.40000
3.93120
0.12636

Units
day
day
day
day
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
cu.m
tonne
kg
m
cu.m

2.00000
5.01000
1.23540
2.00000
1.00000

each
each
each
each
each

Constructing Septic Tanks, in R.R Masonry in cement mortar 1:4, including fittings, C.I cover with
frame, 40mm thick concrete flooring(40mm aggregates) cement plaster concrete base in C.M 1:4:8 etc.
complete as per standard design - 15 users
Coefficient for per each
Code
LB0032
LB0033
LB0036
LB0038
LB0039
LB0051
LB0053
LB0054
LB0077
MP0205
MP0206
MT0043
MT0068
MT0070
MT0125
MT0145
MT0208
MT0325
MT0330
MT0751

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Mason Gd.1
Plumber Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Plumber Gd.2
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 40mm
Crushed Rock - 20mm
Bricks 2nd class
Cement (OPC / PSC)
Thermo - Mechanically Treated ( TMT ) bars (yield strength 415 MPa)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
C.I. manhole cover with frame (light duty) internal dimension 455 x 610mm
Total weight of Cover and frame not less than 38 kg. (Cover 23 kg. and frame
15 kg.)

MT0795
MT0975
MT1031
MT1130

Stoneware pipes 60 cm long - 100mm dia


Cast Iron Pipes, Single Socketted, 1.83m long - 50mm
Single equal junction, door - 100mm
Terminal Guard - 50mm

Standards & Quality Control Authority, MoWHS

Quant
0.12500
0.48672
2.57199
0.10473
0.08450
1.35079
0.11830
0.02130
17.02730
0.11830
0.11830
1.54889
1.27270
0.27163
0.78629
0.63399
10.50000
1.31040
0.04212
2.00000

Units
day
day
day
day
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
1000#
tonne
kg
m
cu.m
each

4.34200
1.23540
2.00000
1.00000

each
each
each
each

Labour and Material Coefficients (Civil Works) - 2009

PO0621

203

Constructing Septic Tanks, in R.R Masonry in cement mortar 1:4, including fittings, C.I cover with
frame, 40mm thick concrete flooring(40mm aggregates) cement plaster concrete base in C.M 1:4:8 etc.
complete as per standard design - 25 users
Coefficient for per each

PO0622

Code
LB0032
LB0033
LB0036
LB0038
LB0039
LB0051
LB0053
LB0054
LB0077
MP0205
MP0206
MT0043
MT0068
MT0070
MT0125
MT0145
MT0208
MT0325
MT0330
MT0751

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Mason Gd.1
Plumber Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Plumber Gd.2
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 40mm
Crushed Rock - 20mm
Bricks 2nd class
Cement (OPC / PSC)
Thermo - Mechanically Treated ( TMT ) bars (yield strength 415 MPa)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
C.I. manhole cover with frame (light duty) internal dimension 455 x 610mm
Total weight of Cover and frame not less than 38 kg. (Cover 23 kg. and frame
15 kg.)

MT0795
MT0976
MT1031
MT1131

Stoneware pipes 60 cm long - 100mm dia


Cast Iron Pipes, Single Socketted, 1.83m long - 75mm
Single equal junction, door - 100mm
Terminal Guard - 75mm

Quant
0.15000
0.59904
3.41801
0.11538
0.09550
1.74470
0.13370
0.27690
21.68204
0.13370
0.13370
1.93373
1.41510
0.33820
1.08749
0.79192
12.60000
1.61280
0.05184
2.00000

Units
day
day
day
day
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
1000#
tonne
kg
m
cu.m
each

4.34200
1.23540
2.00000
1.00000

each
each
each
each

Constructing Septic Tanks, in R.R Masonry in cement mortar 1:4, including fittings, C.I cover with
frame, 40mm thick concrete flooring(40mm aggregates) cement plaster concrete base in C.M 1:4:8 etc.
complete as per standard design - 50 users
Coefficient for per each
Code
LB0032
LB0033
LB0036
LB0038
LB0039
LB0051
LB0053
LB0054
LB0077
MP0205
MP0206
MT0043
MT0068
MT0070
MT0125
MT0145
MT0208
MT0325
MT0330
MT0751

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Mason Gd.1
Plumber Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Plumber Gd.2
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 40mm
Crushed Rock - 20mm
Bricks 2nd class
Cement (OPC / PSC)
Thermo - Mechanically Treated ( TMT ) bars (yield strength 415 MPa)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
C.I. manhole cover with frame (light duty) internal dimension 455 x 610mm
Total weight of Cover and frame not less than 38 kg. (Cover 23 kg. and frame
15 kg.)

MT0796
MT0977
MT1033
MT1132

Stoneware pipes 60 cm long - 150mm dia


Cast Iron Pipes, Single Socketted, 1.83m long - 100mm
Single equal junction, door - 150mm
Terminal Guard - 100mm

Standards & Quality Control Authority, MoWHS

Quant
0.21250
0.87984
5.01521
0.12603
0.11300
2.57920
0.15820
0.03408
31.20809
0.15820
0.15820
2.62265
1.59310
0.50730
1.63402
1.08722
17.85000
2.36880
0.07614
2.00000

Units
day
day
day
day
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
1000#
tonne
kg
m
cu.m
each

4.34200
1.23540
2.00000
1.00000

each
each
each
each

Labour and Material Coefficients (Civil Works) - 2009

PO0623

204

Constructing Septic Tanks, in R.R Masonry in cement mortar 1:4, including fittings, C.I cover with
frame, 40mm thick concrete flooring(40mm aggregates) cement plaster concrete base in C.M 1:4:8 etc.
complete as per standard design - 75 users
Coefficient for per each
Code
LB0032
LB0033
LB0036
LB0038
LB0039
LB0051
LB0053
LB0054
LB0077
MP0205
MP0206
MT0043
MT0068
MT0070
MT0125
MT0145
MT0208
MT0325
MT0330
MT0751

MT0796
MT0977
MT1033
MT1132
PO0624

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Mason Gd.1
Plumber Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Plumber Gd.2
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 40mm
Crushed Rock - 20mm
Bricks 2nd class
Cement (OPC / PSC)
Thermo - Mechanically Treated ( TMT ) bars (yield strength 415 MPa)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
C.I. manhole cover with frame (light duty) internal dimension 455 x 610mm
Total weight of Cover and frame not less than 38 kg. (Cover 23 kg. and frame
15 kg.)
Stoneware pipes 60 cm long - 150mm dia
Cast Iron Pipes, Single Socketted, 1.83m long - 100mm
Single equal junction, door - 150mm
Terminal Guard - 100mm

Quant
0.25000
1.04832
6.51974
0.12603
0.14900
3.26575
0.20860
0.03408
34.55444
0.20860
0.20860
3.42050
2.15380
0.61268
2.10749
1.40722
21.00000
2.82240
0.09072
2.00000

Units
day
day
day
day
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
1000#
tonne
kg
m
cu.m
each

4.34200
1.23540
2.00000
1.00000

each
each
each
each

Constructing Septic Tanks, in R.R Masonry in cement mortar 1:4, including fittings, C.I cover with
frame, 40mm thick concrete flooring(40mm aggregates) cement plaster concrete base in C.M 1:4:8 etc.
complete as per standard design - 100 users
Coefficient for per each
Code
LB0032
LB0033
LB0036
LB0038
LB0039
LB0051
LB0053
LB0054
LB0077
MP0205
MP0206
MT0043
MT0068
MT0070
MT0125
MT0145
MT0208
MT0325
MT0330
MT0751

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Mason Gd.1
Plumber Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Plumber Gd.2
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 40mm
Crushed Rock - 20mm
Bricks 2nd class
Cement (OPC / PSC)
Thermo - Mechanically Treated ( TMT ) bars (yield strength 415 MPa)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
C.I. manhole cover with frame (light duty) internal dimension 455 x 610mm
Total weight of Cover and frame not less than 38 kg. (Cover 23 kg. and frame
15 kg.)

MT0797
MT0978
MT1033
MT1133

Stoneware pipes 60 cm long - 200mm dia


Cast Iron Pipes, Single Socketted, 1.83m long - 150mm
Single equal junction, door - 150mm
Terminal Guard - 150mm

Standards & Quality Control Authority, MoWHS

Quant
0.27500
1.16064
7.67268
0.14733
0.16750
3.80107
0.23450
0.04686
47.38435
0.23450
0.23450
3.95589
2.42970
0.68530
2.48378
1.62512
23.10000
3.12480
0.10044
2.00000

Units
day
day
day
day
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
1000#
tonne
kg
m
cu.m
each

4.34200
1.23540
2.00000
1.00000

each
each
each
each

Labour and Material Coefficients (Civil Works) - 2009

PO0630

205

Constructing Septic Tanks, in reinforced concrete 1:2:4 (20mm aggregates) including fittings, C.I cover
with frame, 40mm thick concrete flooring (40mm aggregates) cement plaster concrete base in C.M
1:4:8 etc. complete as per standard design - 15 users
Coefficient for per each
Code
LB0032
LB0033
LB0036
LB0038
LB0039
LB0051
LB0053
LB0054
LB0077
MP0205
MP0206
MT0043
MT0068
MT0070
MT0145
MT0208
MT0325
MT0330
MT0751

MT0795
MT0975
MT1031
MT1130
PO0631

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Mason Gd.1
Plumber Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Plumber Gd.2
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 40mm
Crushed Rock - 20mm
Cement (OPC / PSC)
Thermo - Mechanically Treated ( TMT ) bars (yield strength 415 MPa)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
C.I. manhole cover with frame (light duty) internal dimension 455 x 610mm
Total weight of Cover and frame not less than 38 kg. (Cover 23 kg. and frame
15 kg.)
Stoneware pipes 60 cm long - 100mm dia
Cast Iron Pipes, Single Socketted, 1.83m long - 50mm
Single equal junction, door - 100mm
Terminal Guard - 50mm

Quant
0.81250
13.80673
2.07570
0.10473
0.17750
0.44618
0.13230
0.02130
19.88881
0.13230
0.13230
1.10372
0.03560
1.64650
0.72279
68.25000
15.94530
0.26795
2.00000

Units
day
day
day
day
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne
kg
m
cu.m
each

4.00800
1.23540
2.00000
1.00000

each
each
each
each

Constructing Septic Tanks, in reinforced concrete 1:2:4 (20mm aggregates) including fittings, C.I cover
with frame, 40mm thick concrete flooring (40mm aggregates) cement plaster concrete base in C.M
1:4:8 etc. complete as per standard design - 25 users
Coefficient for per each
Code
LB0032
LB0033
LB0036
LB0038
LB0039
LB0051
LB0053
LB0054
LB0077
MP0205
MP0206
MT0043
MT0068
MT0070
MT0145
MT0208
MT0325
MT0330
MT0751

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Mason Gd.1
Plumber Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Plumber Gd.2
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 40mm
Crushed Rock - 20mm
Cement (OPC / PSC)
Thermo - Mechanically Treated ( TMT ) bars (yield strength 415 MPa)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
C.I. manhole cover with frame (light duty) internal dimension 455 x 610mm
Total weight of Cover and frame not less than 38 kg. (Cover 23 kg. and frame
15 kg.)

MT0795
MT0976
MT1031
MT1131

Stoneware pipes 60 cm long - 100mm dia


Cast Iron Pipes, Single Socketted, 1.83m long - 75mm
Single equal junction, door - 100mm
Terminal Guard - 75mm

Standards & Quality Control Authority, MoWHS

Quant
1.07500
18.81686
2.72521
0.11538
0.23400
0.54955
0.17360
0.27690
27.44991
0.17360
0.17360
1.45144
0.03560
2.17160
0.95061
90.30000
21.67550
0.36274
2.00000

Units
day
day
day
day
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne
kg
m
cu.m
each

4.00800
1.23540
2.00000
1.00000

each
each
each
each

Labour and Material Coefficients (Civil Works) - 2009

PO0632

206

Constructing Septic Tanks, in reinforced concrete 1:2:4 (20mm aggregates) including fittings, C.I cover
with frame, 40mm thick concrete flooring (40mm aggregates) cement plaster concrete base in C.M
1:4:8 etc. complete as per standard design - 50 users
Coefficient for per each
Code
LB0032
LB0033
LB0036
LB0038
LB0039
LB0051
LB0053
LB0054
LB0077
MP0205
MP0206
MT0043
MT0068
MT0070
MT0145
MT0208
MT0325
MT0330
MT0751

MT0796
MT0977
MT1033
MT1132
PO0633

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Mason Gd.1
Plumber Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Plumber Gd.2
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 40mm
Crushed Rock - 20mm
Cement (OPC / PSC)
Thermo - Mechanically Treated ( TMT ) bars (yield strength 415 MPa)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
C.I. manhole cover with frame (light duty) internal dimension 455 x 610mm
Total weight of Cover and frame not less than 38 kg. (Cover 23 kg. and frame
15 kg.)
Stoneware pipes 60 cm long - 150mm dia
Cast Iron Pipes, Single Socketted, 1.83m long - 100mm
Single equal junction, door - 150mm
Terminal Guard - 100mm

Quant
1.58750
28.05209
4.09987
0.12603
0.34650
0.82661
0.25760
0.03408
41.39547
0.25760
0.25760
2.16261
0.05340
3.22180
1.41440
133.34999
32.34980
0.54234
2.00000

Units
day
day
day
day
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne
kg
m
cu.m
each

4.00800
1.23540
2.00000
1.00000

each
each
each
each

Constructing Septic Tanks, in reinforced concrete 1:2:4 (20mm aggregates) including fittings, C.I cover
with frame, 40mm thick concrete flooring (40mm aggregates) cement plaster concrete base in C.M
1:4:8 etc. complete as per standard design - 75 users
Coefficient for per each
Code
LB0032
LB0033
LB0036
LB0038
LB0039
LB0051
LB0053
LB0054
LB0077
MP0205
MP0206
MT0043
MT0068
MT0070
MT0145
MT0208
MT0325
MT0330
MT0751

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Mason Gd.1
Plumber Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Plumber Gd.2
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 40mm
Crushed Rock - 20mm
Cement (OPC / PSC)
Thermo - Mechanically Treated ( TMT ) bars (yield strength 415 MPa)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
C.I. manhole cover with frame (light duty) internal dimension 455 x 610mm
Total weight of Cover and frame not less than 38 kg. (Cover 23 kg. and frame
15 kg.)

MT0796
MT0977
MT1033
MT1132

Stoneware pipes 60 cm long - 150mm dia


Cast Iron Pipes, Single Socketted, 1.83m long - 100mm
Single equal junction, door - 150mm
Terminal Guard - 100mm

Standards & Quality Control Authority, MoWHS

Quant
1.98750
36.49952
5.31868
0.12603
0.43450
0.98966
0.32200
0.03408
53.45296
0.32200
0.32200
2.73456
0.05340
4.04060
1.78295
166.95000
41.99860
0.70160
2.00000

Units
day
day
day
day
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne
kg
m
cu.m
each

4.00800
1.23540
2.00000
1.00000

each
each
each
each

Labour and Material Coefficients (Civil Works) - 2009

PO0634

207

Constructing Septic Tanks, in reinforced concrete 1:2:4 (20mm aggregates) including fittings, C.I cover
with frame, 40mm thick concrete flooring (40mm aggregates) cement plaster concrete base in C.M
1:4:8 etc. complete as per standard design - 100 users
Coefficient for per each
Code
LB0032
LB0033
LB0036
LB0038
LB0039
LB0051
LB0053
LB0054
LB0077
MP0205
MP0206
MT0043
MT0068
MT0070
MT0145
MT0208
MT0325
MT0330
MT0751

MT0797
MT0978
MT1033
MT1133

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Mason Gd.1
Plumber Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Plumber Gd.2
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 40mm
Crushed Rock - 20mm
Cement (OPC / PSC)
Thermo - Mechanically Treated ( TMT ) bars (yield strength 415 MPa)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
C.I. manhole cover with frame (light duty) internal dimension 455 x 610mm
Total weight of Cover and frame not less than 38 kg. (Cover 23 kg. and frame
15 kg.)
Stoneware pipes 60 cm long - 200mm dia
Cast Iron Pipes, Single Socketted, 1.83m long - 150mm
Single equal junction, door - 150mm
Terminal Guard - 150mm

Standards & Quality Control Authority, MoWHS

Quant
2.30000
48.85418
6.26724
0.14733
0.50350
1.13975
0.37310
0.04686
65.72349
0.37310
0.37310
3.18427
0.07120
4.67250
2.07196
193.20000
55.94190
0.92718
2.00000

Units
day
day
day
day
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne
kg
m
cu.m
each

4.00800
1.23540
2.00000
1.00000

each
each
each
each

Labour and Material Coefficients (Civil Works) - 2009

208

CHAPTER 18

PLASTERING

PL0001

P&L mud plaster including neat finish - 15mm


Coefficient for per sq.m
Code
LB0051
LB0077
MT0042

PL0002

Description
Mason Gd.2
Labour
Mud dry

Quant
0.11700
0.17956
0.02064

Units
day
day
cu.m

P&L mud plaster including neat finish - 20mm


Coefficient for per sq.m
Code
LB0051
LB0077
MT0042

PL0010

Description
Mason Gd.2
Labour
Mud dry

Quant
0.13500
0.17548
0.02688

Units
day
day
cu.m

P&L 6mm cement plaster (in ceilings) - C.M 1:3


Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0145

PL0011

Description
Mason Gd.1
Labour
Sand
Cement (OPC / PSC)

Quant
0.08125
0.14330
0.00770
0.00367

Units
day
day
cu.m
tonne

P&L 6mm cement plaster (in ceilings) - C.M 1:4


Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0145

PL0012

Description
Mason Gd.1
Labour
Sand
Cement (OPC / PSC)

Quant
0.08125
0.14335
0.00770
0.00274

P&L 6mm cement plaster (in ceilings) - Extra, for plaster to ceiling height > 5m ......per additional metre.
ht
Coefficient for per sq.m
Code
Description
LB0077 Labour

PL0020

Units
day
day
cu.m
tonne

Quant
0.00800

Units
day

P&L 12mm cement plaster - C.M 1:3


Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0145

PL0021

Description
Mason Gd.1
Labour
Sand
Cement (OPC / PSC)

Quant
0.10200
0.15120
0.01541
0.00734

Units
day
day
cu.m
tonne

P&L 12mm cement plaster - C.M 1:4


Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0145

Description
Mason Gd.1
Labour
Sand
Cement (OPC / PSC)

Quant
0.10200
0.15120
0.01541
0.00547

Standards & Quality Control Authority, MoWHS

Units
day
day
cu.m
tonne

Labour and Material Coefficients (Civil Works) - 2009

PL0022

209

P&L 12mm cement plaster - C.M 1:5


Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0145

PL0023

Description
Mason Gd.1
Labour
Sand
Cement (OPC / PSC)

Quant
0.10200
0.15120
0.01541
0.00446

Units
day
day
cu.m
tonne

P&L 12mm cement plaster - C.M 1:6


Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0145

PL0030

Description
Mason Gd.1
Labour
Sand
Cement (OPC / PSC)

Quant
0.10200
0.15120
0.01541
0.00360

Units
day
day
cu.m
tonne

P&L 15mm cement plaster on rough side of single or half-brick wall - C.M 1:3
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0145

PL0031

Description
Mason Gd.1
Labour
Sand
Cement (OPC / PSC)

Quant
0.11700
0.17835
0.01840
0.00877

Units
day
day
cu.m
tonne

P&L 15mm cement plaster on rough side of single or half-brick wall - C.M 1:4
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0145

PL0032

Description
Mason Gd.1
Labour
Sand
Cement (OPC / PSC)

Quant
0.11700
0.17835
0.01840
0.00654

Units
day
day
cu.m
tonne

P&L 15mm cement plaster on rough side of single or half-brick wall - C.M 1:5
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0145

PL0033

Description
Mason Gd.1
Labour
Sand
Cement (OPC / PSC)

Quant
0.11700
0.17835
0.01840
0.00533

Units
day
day
cu.m
tonne

P&L 15mm cement plaster on rough side of single or half-brick wall - C.M 1:6
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0145

PL0040

Description
Mason Gd.1
Labour
Sand
Cement (OPC / PSC)

Quant
0.11700
0.17835
0.01840
0.00430

Units
day
day
cu.m
tonne

P&L 20mm cement plaster - C.M 1:3


Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0145

Description
Mason Gd.1
Labour
Sand
Cement (OPC / PSC)

Quant
0.13500
0.21620
0.02397
0.01142

Standards & Quality Control Authority, MoWHS

Units
day
day
cu.m
tonne

Labour and Material Coefficients (Civil Works) - 2009

PL0041

210

P&L 20mm cement plaster - C.M 1:4


Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0145

PL0042

Description
Mason Gd.1
Labour
Sand
Cement (OPC / PSC)

Quant
0.13500
0.21620
0.02397
0.00851

Units
day
day
cu.m
tonne

P&L 20mm cement plaster - C.M 1:5


Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0145

PL0043

Description
Mason Gd.1
Labour
Sand
Cement (OPC / PSC)

Quant
0.13500
0.21620
0.02397
0.00694

Units
day
day
cu.m
tonne

P&L 20mm cement plaster - C.M 1:6


Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0145

PL0050

Description
Mason Gd.1
Labour
Sand
Cement (OPC / PSC)

Quant
0.13500
0.21620
0.02397
0.00560

Units
day
day
cu.m
tonne

P&L 12mm plain cement mortar band in C.M 1:4 - Flush band
Coefficient for per sq.m
Code
LB0036
LB0051
LB0077
MT0043
MT0145

PL0051

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Cement (OPC / PSC)

Quant
0.16900
0.16900
0.41625
0.01498
0.00532

Units
day
day
day
cu.m
tonne

P&L 12mm plain cement mortar band in C.M 1:4 - Sunk band
Coefficient for per sq.m
Code
LB0036
LB0051
LB0077
MT0043
MT0145

PL0052

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Cement (OPC / PSC)

Quant
0.18800
0.18800
0.45375
0.01498
0.00532

Units
day
day
day
cu.m
tonne

P&L 12mm plain cement mortar band in C.M 1:4 - Raised band
Coefficient for per sq.m
Code
LB0036
LB0051
LB0077
MT0043
MT0145

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Cement (OPC / PSC)

Quant
0.21900
0.21900
0.51675
0.01498
0.00532

Standards & Quality Control Authority, MoWHS

Units
day
day
day
cu.m
tonne

Labour and Material Coefficients (Civil Works) - 2009

PL0060

211

P&L 20mm plain cement mortar band in C.M 1:4 - Flush band
Coefficient for per sq.m
Code
LB0036
LB0051
LB0077
MT0043
MT0145

PL0061

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Cement (OPC / PSC)

Quant
0.20300
0.20300
0.50250
0.02140
0.00760

Units
day
day
day
cu.m
tonne

P&L 20mm plain cement mortar band in C.M 1:4 - Sunk band
Coefficient for per sq.m
Code
LB0036
LB0051
LB0077
MT0043
MT0145

PL0062

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Cement (OPC / PSC)

Quant
0.22500
0.22500
0.54750
0.02140
0.00760

Units
day
day
day
cu.m
tonne

P&L 20mm plain cement mortar band in C.M 1:4 - Raised band
Coefficient for per sq.m
Code
LB0036
LB0051
LB0077
MT0043
MT0145

PL0070

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Cement (OPC / PSC)

Quant
0.26300
0.26300
0.62250
0.02140
0.00760

Units
day
day
day
cu.m
tonne

P&L cement plaster, finished with floating coat of neat cement - 12mm plaster in C.M 1:3
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0145

PL0071

Units
day
day
cu.m
tonne

Description
Mason Gd.1
Labour
Sand
Cement (OPC / PSC)

Quant
0.14800
0.20935
0.01840
0.01097

Units
day
day
cu.m
tonne

P&L cement plaster, finished with floating coat of neat cement - 20mm plaster in C.M 1:3
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0145

PL0073

Quant
0.13300
0.18220
0.01541
0.00954

P&L cement plaster, finished with floating coat of neat cement - 15mm plaster in C.M 1:3
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0145

PL0072

Description
Mason Gd.1
Labour
Sand
Cement (OPC / PSC)

Description
Mason Gd.1
Labour
Sand
Cement (OPC / PSC)

Quant
0.16600
0.24720
0.02397
0.01362

Units
day
day
cu.m
tonne

P&L cement plaster, finished with floating coat of neat cement - 12mm plaster in C.M 1:4
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0145

Description
Mason Gd.1
Labour
Sand
Cement (OPC / PSC)

Quant
0.13300
0.18220
0.01541
0.00767

Standards & Quality Control Authority, MoWHS

Units
day
day
cu.m
tonne

Labour and Material Coefficients (Civil Works) - 2009

PL0074

P&L cement plaster, finished with floating coat of neat cement - 15mm plaster in C.M 1:4
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0145

PL0075

Description
Mason Gd.1
Labour
Sand
Cement (OPC / PSC)

Quant
0.14800
0.20935
0.01840
0.00874

Units
day
day
cu.m
tonne

P&L cement plaster, finished with floating coat of neat cement - 20mm plaster in C.M 1:4
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0145

PL0076

212

Description
Mason Gd.1
Labour
Sand
Cement (OPC / PSC)

Quant
0.16600
0.24720
0.02397
0.01071

Units
day
day
cu.m
tonne

P&L cement plaster, finished with floating coat of neat cement - 6mm cement plaster in C.M 1:3,
including lime wash on top of wall when dry for bearing R.C slabs and beams
Coefficient for per sq.m
Code
LB0036
LB0067
LB0077
MT0043
MT0121
MT0145

PL0080

Description
Mason Gd.1
Painter Gd.2
Labour
Sand
Unslaked lime
Cement (OPC / PSC)

Quant
0.11225
0.00800
0.18230
0.00770
0.10000
0.00587

Units
day
day
day
cu.m
kg
tonne

Rough cast plaster with a mixture of sand and gravel or crushed stone 2-12mm including plaster in 2
layers-12mm 1:4, & 10mm 1:3 hydrated lime cement - Grey cement
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0071
MT0120
MT0145

PL0081

Description
Mason Gd.1
Labour
Sand
Crushed Rock - 12.5 - 6mm
Slaked lime
Cement (OPC / PSC)

Quant
0.28800
0.31770
0.02825
0.01000
0.92900
0.01159

Units
day
day
cu.m
cu.m
kg
tonne

Rough cast plaster with a mixture of sand and gravel or crushed stone 2-12mm including plaster in 2
layers-12mm 1:4, & 10mm 1:3 hydrated lime cement - White cement
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0071
MT0120
MT0145
MT0146

Description
Mason Gd.1
Labour
Sand
Crushed Rock - 12.5 - 6mm
Slaked lime
Cement (OPC / PSC)
White Cement

Quant
0.28800
0.31770
0.02825
0.01000
0.92900
0.01159
0.00510

Standards & Quality Control Authority, MoWHS

Units
day
day
cu.m
cu.m
kg
tonne
tonne

Labour and Material Coefficients (Civil Works) - 2009

PL0090

213

Pebble dash plaster with a mixture of washed pebble or crushed stone 6mm to 12mm nominal size
dashed over fresh plaster in the layers, under layer 12mm cement plaster 1:4 and top layer 10mm
cement
plasterhydrated
mixed with
finely ground
lime by volume of cement - Grey cement
Coefficient for per sq.m
Code
LB0036
LB0077
MT0043
MT0071
MT0120
MT0145

PL0091

Description
Mason Gd.1
Labour
Sand
Crushed Rock - 12.5 - 6mm
Slaked lime
Cement (OPC / PSC)

Quant
0.25750
0.35120
0.02825
0.01000
0.92900
0.01159

Units
day
day
cu.m
cu.m
kg
tonne

18 mm cement plaster in two coats; under layer 12 mm C.P 1:5 ( 1 cement : 5 sand) and top layer 6 mm
thick C.P 1:4 ( 1 cement : 6 sand) finished even and smooth and curing etc. complete
Coefficient for per sq.m
Code
LB0051
LB0077
PL0022
PL0011

PL0092

Description
Mason Gd.2
Labour
12 mm C.P in C.M 1:5
6 mm C.P in C.M 1:4

Quant
0.11500
0.25000
0.01440
0.00720

Units
day
day
cu.m
cu.m

18 mm cement plaster in two coats; under layer 12 mm C.P 1:5 ( 1 cement : 5 sand) and top layer 6 mm
thick C.P 1:3 ( 1 cement : 6 sand) finished even and smooth and curing etc. complete
Coefficient for per sq.m
Code
LB0051
LB0077
PL0022
PL0010

PL0095

Description
Mason Gd.2
Labour
12 mm C.P in C.M 1:5
6 mm C.P in C.M 1:3

Quant
0.11500
0.25000
0.01440
0.00720

Units
day
day
cu.m
cu.m

12 mm cement lime plaster of mix on fair side of brick work - 1:1:6 ( 1 cement :1 lime : 6 sand) finished
even and smooth and curing etc. complete
Coefficient for per sq.m
Code
LB0051
LB0077
MR0026

PL0096

Description
Mason Gd.2
Labour
Cement Lime mortar 1:1:6

Quant
0.17500
0.16500
0.01440

Units
day
day
cu.m

12 mm cement lime plaster of mix on rough side of brick work - 1:1:6 ( 1 cement :1 lime : 6 sand)
finished even and smooth and curing etc. complete
Coefficient for per sq.m
Code
LB0051
LB0077
MR0026

PL0100

Description
Mason Gd.2
Labour
Cement Lime mortar 1:1:6

Quant
0.08500
0.18000
0.01720

Units
day
day
cu.m

Extra, for providing and mixing water-proofing Materials in proportion recommended by the
manufacturers - 12mm plaster in C.M 1:3
Coefficient for per sq.m
Code
Description
LB0077 Labour
MT0151 Water proofing compound

Quant
0.01000
0.14800

Standards & Quality Control Authority, MoWHS

Units
day
kg

Labour and Material Coefficients (Civil Works) - 2009

PL0101

214

Extra, for providing and mixing water-proofing Materials in proportion recommended by the
manufacturers - 12mm plaster in C.M 1:4
Coefficient for per sq.m
Code
Description
LB0077 Labour
MT0151 Water proofing compound

PL0102

Quant
0.01000
0.11500

Units
day
kg

Extra, for providing and mixing water-proofing Materials in proportion recommended by the
manufacturers - 15mm plaster in C.M 1:3
Coefficient for per sq.m
Code
Description
LB0077 Labour
MT0151 Water proofing compound

PL0103

Quant
0.01000
0.16450

Units
day
kg

Extra, for providing and mixing water-proofing Materials in proportion recommended by the
manufacturers - 15mm plaster in C.M 1:4
Coefficient for per sq.m
Code
Description
LB0077 Labour
MT0151 Water proofing compound

PL0104

Quant
0.01000
0.13200

Units
day
kg

Extra, for providing and mixing water-proofing Materials in proportion recommended by the
manufacturers - 20mm plaster in C.M 1:3
Coefficient for per sq.m
Code
Description
LB0077 Labour
MT0151 Water proofing compound

PL0105

Quant
0.01000
0.20430

Units
day
kg

Extra, for providing and mixing water-proofing Materials in proportion recommended by the
manufacturers - 20mm plaster in C.M 1:4
Coefficient for per sq.m
Code
Description
LB0077 Labour
MT0151 Water proofing compound

PL0110

Quant
0.01000
0.16100

Units
day
kg

Neat cement punning


Coefficient for per sq.m
Code
LB0036
LB0076
MT0145

Description
Mason Gd.1
Labour
Cement (OPC / PSC)

Quant
0.03100
0.03100
0.00220

Standards & Quality Control Authority, MoWHS

Units
day
day
tonne

Labour and Material Coefficients (Civil Works) - 2009

PL0120

215

Providing & fixing 12mm Plaster of Paris (gypsum anhydrous) tiles, rendered smooth with Plaster of
Paris - Height above floor < 5m
Coefficient for per sq.m
Code
LB0021
LB0036
LB0077
MT0685

PL0121

Description
Carpenter Gd.1
Mason Gd.1
Labour
Plaster of Paris

Quant
0.20100
0.34000
0.34000
16.10000

Units
day
day
day
kg

Providing & fixing 12mm Plaster of Paris (gypsum anhydrous) tiles, rendered smooth with Plaster of
Paris - Extra, for heights-above-floor > 5m.....per metre height
Coefficient for per sq.m
Code
Description
LB0021 Carpenter Gd.1
LB0077 Labour

Quant
0.06250
0.06250

Standards & Quality Control Authority, MoWHS

Units
day
day

Labour and Material Coefficients (Civil Works) - 2009

216

CHAPTER 19

PAINTING & WALL PAPER

PT0001

Surface preparation removing by scraping, sand papering, including scratch repairs - White colourwash
Coefficient for per sq.m
Code
Description
LB0077 Labour

PT0002

Quant
0.02130

Surface preparation removing by scraping, sand papering, including scratch repairs - Dry oil bound
distemper
Coefficient for per sq.m
Code
Description
LB0077 Labour

PT0010

Units
day

Quant
0.02630

Units
day

Providing & applying one coat of primers - Cement primer


Coefficient for per sq.m
Code
LB0052
LB0076
MT0710

PT0011

Description
Painter Gd.1
Labour
Cement primer

Quant
0.03400
0.03400
0.07000

Units
day
day
litre

Providing & applying one coat of primers - Metal work - synthetic red oxide primer
Coefficient for per sq.m
Code
LB0052
LB0076
MT0712

PT0012

Description
Painter Gd.1
Labour
Red oxide primer, for metals

Quant
0.03000
0.03000
0.05400

Units
day
day
litre

Providing & applying one coat of primers - Wood work - pink primer
Coefficient for per sq.m
Code
LB0052
LB0076
MT0714

PT0013

Description
Painter Gd.1
Labour
Pink primer, for wood

Quant
0.03100
0.03100
0.07500

Units
day
day
litre

Providing & applying one coat of primers - Wood work - white primer
Coefficient for per sq.m
Code
LB0052
LB0076
MT0713

PT0014

Description
Painter Gd.1
Labour
White primer, for wood

Quant
0.03000
0.03000
0.05400

Units
day
day
litre

Providing & applying one coat of primers - Red lead primer


Coefficient for per sq.m
Code
LB0052
LB0076
MT0711

PT0020

Description
Painter Gd.1
Labour
Synthetic red lead primer

Quant
0.03000
0.03000
0.05400

Units
day
day
litre

Providing & applying white or colour washing - White washing with lime-new work-three coats
Coefficient for per sq.m
Code
LB0067
LB0076
MT0120

Description
Painter Gd.2
Labour
Unslaked lime

Quant
0.02300
0.02300
0.30000

Standards & Quality Control Authority, MoWHS

Units
day
day
kg

Labour and Material Coefficients (Civil Works) - 2009

PT0021

217

Providing & applying white or colour washing - White washing with lime, old work, two coats
Coefficient for per sq.m
Code
LB0067
LB0076
MT0120

PT0022

Description
Painter Gd.2
Labour
Unslaked lime

Quant
0.01300
0.01300
0.20000

Units
day
day
kg

Providing & applying white or colour washing - White washing with lime, old work, one coat
Coefficient for per sq.m
Code
LB0067
LB0076
MT0120

PT0023

Description
Painter Gd.2
Labour
Unslaked lime

Quant
0.00800
0.00800
0.10000

Units
day
day
kg

Providing & applying white or colour washing - Colour washing\new work, two coats, including base
coat of white-wash with lime
Coefficient for per sq.m
Code
LB0067
LB0076
MT0120

PT0024

Description
Painter Gd.2
Labour
Unslaked lime

Quant
0.02300
0.02300
0.30000

Units
day
day
kg

Providing & applying white or colour washing - Colour washing with lime, old work, two coats
Coefficient for per sq.m
Code
LB0067
LB0076
MT0120

PT0025

Description
Painter Gd.2
Labour
Unslaked lime

Quant
0.01300
0.01300
0.20000

Units
day
day
kg

Providing & applying white or colour washing - Colour washing with lime, old work, one coat
Coefficient for per sq.m
Code
LB0067
LB0076
MT0120

PT0030

Description
Painter Gd.2
Labour
Unslaked lime

Quant
0.00800
0.00800
0.10000

Units
day
day
kg

Finishing wall with Water-Proof Cement Paint - New work, three coats
Coefficient for per sq.m
Code
LB0052
LB0076
MT0692

PT0031

Description
Painter Gd.1
Labour
Water proofing Cement paint

Quant
0.05000
0.05000
0.54700

Units
day
day
kg

Finishing wall with Water-Proof Cement Paint - Old work, one coats
Coefficient for per sq.m
Code
LB0052
LB0076
MT0692

Description
Painter Gd.1
Labour
Water proofing Cement paint

Quant
0.02800
0.02800
0.22000

Standards & Quality Control Authority, MoWHS

Units
day
day
kg

Labour and Material Coefficients (Civil Works) - 2009

PT0040

218

Providing and applying finishing coats - Dry distemper, two coats on new work, including white priming
coat
Coefficient for per sq.m
Code
LB0052
LB0076
MT0120
MT0690

PT0041

Description
Painter Gd.1
Labour
Unslaked lime
Dry Distemper

Quant
0.06600
0.06600
0.10000
0.15000

Units
day
day
kg
kg

Providing and applying finishing coats - Dry distemper, one coat on old work
Coefficient for per sq.m
Code
LB0052
LB0076
MT0690

PT0042

Description
Painter Gd.1
Labour
Dry Distemper

Quant
0.02800
0.02800
0.10000

Units
day
day
kg

Providing and applying finishing coats - Acrylic washable distemper, two coats on new work, including
cement primer coat
Coefficient for per sq.m
Code
LB0052
LB0076
MT0691
MT0710

PT0043

Description
Painter Gd.1
Labour
Acrylic washable distemper
Cement primer

Quant
0.08400
0.08400
0.15000
0.07000

Units
day
day
kg
litre

Providing and applying finishing coats - Acrylic washable distemper, one coat on old work
Coefficient for per sq.m
Code
LB0052
LB0076
MT0691

PT0044

Description
Painter Gd.1
Labour
Acrylic washable distemper

Quant
0.02800
0.02800
0.10000

Units
day
day
kg

Providing and applying finishing coats - Bituminastic enamel, for steel work, two coats on new work
Coefficient for per sq.m
Code
LB0052
LB0076
MT0726

PT0045

Description
Painter Gd.1
Labour
Black\White bitumen enamel

Quant
0.06800
0.06800
0.09500

Units
day
day
litre

Providing and applying finishing coats - Bituminastic enamel, for steel work, one coat on old work
Coefficient for per sq.m
Code
LB0052
LB0076
MT0726

PT0046

Description
Painter Gd.1
Labour
Black\White bitumen enamel

Quant
0.04500
0.04500
0.05700

Units
day
day
litre

Providing and applying finishing coats - Synthetic enamel, for steel & wood work\one coat on old work
Coefficient for per sq.m
Code
LB0052
LB0076
MT0722

Description
Painter Gd.1
Labour
Synthetic enamel paint

Quant
0.04500
0.04500
0.07500

Standards & Quality Control Authority, MoWHS

Units
day
day
litre

Labour and Material Coefficients (Civil Works) - 2009

PT0047

Providing and applying finishing coats - Synthetic enamel, for steel & wood work, two coats on new
work
Coefficient for per sq.m
Code
LB0052
LB0076
MT0722

PT0048

219

Description
Painter Gd.1
Labour
Synthetic enamel paint

Quant
0.06850
0.06850
0.12500

Units
day
day
litre

Providing and applying finishing coats - High gloss synthetic enamel/for steel & wood work, two coats
on new work
Coefficient for per sq.m
Code
LB0067
LB0076
MT0723

PT0049

Description
Painter Gd.2
Labour
High gloss synthetic enamel

Quant
0.06750
0.06750
0.12000

Units
day
day
litre

Providing and applying finishing coats - High gloss synthetic enamel, for steel & wood work/one coat
on old work
Coefficient for per sq.m
Code
LB0067
LB0076
MT0723

PT0050

Quant
0.04500
0.04500
0.08000

Units
day
day
litre

Providing and applying finishing coats - Red corrugal, ready mixed/on G.I sheets, two coats on new
work
Coefficient for per sq.m
Code
LB0052
LB0076
MT0721

PT0051

Description
Painter Gd.2
Labour
High gloss synthetic enamel

Description
Painter Gd.1
Labour
Red Corrugal paint

Quant
0.06800
0.06800
0.08000

Units
day
day
litre

Providing and applying finishing coats - Red corrugal, ready mixed, on G.I sheets/one coat on old work
Coefficient for per sq.m
Code
LB0052
LB0076
MT0721

PT0052

Description
Painter Gd.1
Labour
Red Corrugal paint

Quant
0.04500
0.04500
0.04600

Units
day
day
litre

Providing and applying finishing coats - Vinyl plastic emulsion paint, for cement, masonry, plaster, two
coats on new work
Coefficient for per sq.m
Code
LB0052
LB0076
MT0725

PT0053

Description
Painter Gd.1
Labour
Vinyl plastic emulsion paint (for cement plaster)

Quant
0.06750
0.06750
0.12100

Units
day
day
litre

Providing and applying finishing coats - Acrylic emulsion, one coat


Coefficient for per sq.m
Code
LB0052
LB0076
MT0724

Description
Painter Gd.1
Labour
Acrylic emulsion

Quant
0.03400
0.03400
0.08100

Standards & Quality Control Authority, MoWHS

Units
day
day
litre

Labour and Material Coefficients (Civil Works) - 2009

PT0054

220

Providing and applying finishing coats - Aluminium paint, one coat on old work
Coefficient for per sq.m
Code
LB0052
LB0076
MT0720

PT0055

Description
Painter Gd.1
Labour
Aluminium paint

Quant
0.04400
0.04400
0.04700

Units
day
day
litre

Providing and applying finishing coats - Aluminium paint, two coats on new work
Coefficient for per sq.m
Code
LB0052
LB0076
MT0720

PT0060

Description
Painter Gd.1
Labour
Aluminium paint

Quant
0.06800
0.06800
0.08000

Units
day
day
litre

Providing and applying wood stains, varnishes & polishes - Wood stain (various colours), one coat
Coefficient for per sq.m
Code
LB0052
LB0076
MT0730

PT0061

Quant
0.06800
0.06800
0.07000

Units
day
day
litre

Providing and applying wood stains, varnishes & polishes - Synthetic varnish (clear) - one coat, on old
work
Coefficient for per sq.m
Code
LB0052
LB0076
MT0731

PT0062

Description
Painter Gd.1
Labour
Wood Stain (various colours)

Description
Painter Gd.1
Labour
Clear synthetic varnish

Quant
0.13500
0.04500
0.10000

Units
day
day
litre

Providing and applying wood stains, varnishes & polishes - Synthetic varnish (clear) - two coats,
including coat of wood filler on new work
Coefficient for per sq.m
Code
LB0052
LB0077
MT0731

PT0063

Description
Painter Gd.1
Labour
Clear synthetic varnish

Quant
0.26900
0.06800
0.16300

Units
day
day
litre

Providing and applying wood stains, varnishes & polishes - French polish - one coat, on old work
Coefficient for per sq.m
Code
LB0052
LB0077
MT0732

PT0064

Description
Painter Gd.1
Labour
French Polish

Quant
0.13500
0.04500
0.10000

Units
day
day
litre

Providing and applying wood stains, varnishes & polishes - French polish - two coats, on new work
Coefficient for per sq.m
Code
LB0052
LB0077
MT0732

PT0070

Description
Painter Gd.1
Labour
French Polish

Quant
0.26900
0.06800
0.16300

Units
day
day
litre

Providing and applying wood preservatives - Brown, two coats on new work
Coefficient for per sq.m
Code
LB0052
LB0076
MT0735

Description
Painter Gd.1
Labour
Wood preservative -Brown

Quant
0.01900
0.01900
0.10000

Standards & Quality Control Authority, MoWHS

Units
day
day
litre

Labour and Material Coefficients (Civil Works) - 2009

PT0071

221

Providing and applying wood preservatives - Brown, one coat on old work
Coefficient for per sq.m
Code
LB0052
LB0076
MT0735

PT0072

Description
Painter Gd.1
Labour
Wood preservative -Brown

Quant
0.01400
0.01400
0.08100

Units
day
day
litre

Providing and applying wood preservatives - Coal tar, two coats on new work
Coefficient for per sq.m
Code
LB0077
MT0035
MT0736

PT0073

Description
Labour
Kerosene
Crude Coal Tar

Quant
0.05400
0.05000
0.28000

Units
day
litre
litre

Providing and applying wood preservatives - Coal tar, one coat on old work
Coefficient for per sq.m
Code
Description
LB0077 Labour
MT0736 Crude Coal Tar

PT0080

Quant
0.04500
0.12000

Units
day
litre

Providing & fixing wall paper - Standard Quality


Coefficient for per sq.m
Code
LB0067
LB0077
MT0745

PT0081

Description
Painter Gd.2
Labour
Wall paper: - Standard

Quant
0.04500
0.04500
1.05000

Units
day
day
sq.m

Providing & fixing wall paper - High Quality


Coefficient for per sq.m
Code
LB0067
LB0077
MT0746

PT0090

Description
Painter Gd.2
Labour
Wall paper: - High Quality

Quant
0.04500
0.04500
1.05000

Units
day
day
sq.m

Providing, preparing and applying Sumdang painting (Not washable) - Rab


Coefficient for per sq.m
Code
LB0052
LB0067
MT0691
MT0695
MT0696
MT0697
MT0698
MT0699
MT0700
MT0720

Description
Painter Gd.1
Painter Gd.2
Acrylic washable distemper
Mud Paint for Bhutanese traditional painting
Animal glue
Cloth for Bhutanese painting
Paper for Bhutanese painting
Colour powder(excluding gold powder)
Gold powder
Aluminium paint

Standards & Quality Control Authority, MoWHS

Quant
0.84000
0.84000
0.04020
0.16200
0.04020
0.00120
0.00480
0.07002
0.00498
0.04020

Units
day
day
kg
kg
kg
sq.m
sq.m
kg
kg
litre

Labour and Material Coefficients (Civil Works) - 2009

PT0091

222

Providing, preparing and applying Sumdang painting (Not washable) - Ding


Coefficient for per sq.m
Code
LB0052
LB0067
MT0695
MT0696
MT0697
MT0698
MT0699

PT0092

Description
Painter Gd.1
Painter Gd.2
Mud Paint for Bhutanese traditional painting
Animal glue
Cloth for Bhutanese painting
Paper for Bhutanese painting
Colour powder(excluding gold powder)

Quant
0.60000
0.60000
0.16200
0.04020
0.00120
0.00480
0.07002

Units
day
day
kg
kg
sq.m
sq.m
kg

Providing, preparing and applying Sumdang painting (Not washable) - Thamar


Coefficient for per sq.m
Code
LB0052
LB0067
MT0695
MT0696
MT0697
MT0698
MT0699

PT0100

Description
Painter Gd.1
Painter Gd.2
Mud Paint for Bhutanese traditional painting
Animal glue
Cloth for Bhutanese painting
Paper for Bhutanese painting
Colour powder(excluding gold powder)

Quant
0.42000
0.42000
0.16200
0.04020
0.00120
0.00480
0.07002

Units
day
day
kg
kg
sq.m
sq.m
kg

Providing, preparing and applying Dangtshon painting (Not washable) - Rab


Coefficient for per sq.m
Code
LB0052
LB0067
MT0691
MT0695
MT0696
MT0697
MT0698
MT0699
MT0700
MT0720

PT0101

Description
Painter Gd.1
Painter Gd.2
Acrylic washable distemper
Mud Paint for Bhutanese traditional painting
Animal glue
Cloth for Bhutanese painting
Paper for Bhutanese painting
Colour powder(excluding gold powder)
Gold powder
Aluminium paint

Quant
1.20000
1.20000
0.04020
0.16200
0.04020
0.00120
0.00480
0.07002
0.00498
0.04020

Units
day
day
kg
kg
kg
sq.m
sq.m
kg
kg
litre

Providing, preparing and applying Dangtshon painting (Not washable) - Ding


Coefficient for per sq.m
Code
LB0052
LB0067
MT0695
MT0696
MT0697
MT0698
MT0699

PT0102

Description
Painter Gd.1
Painter Gd.2
Mud Paint for Bhutanese traditional painting
Animal glue
Cloth for Bhutanese painting
Paper for Bhutanese painting
Colour powder(excluding gold powder)

Quant
0.90000
0.90000
0.16200
0.04020
0.00120
0.00480
0.07002

Units
day
day
kg
kg
sq.m
sq.m
kg

Providing, preparing and applying Dangtshon painting (Not washable) - Thamar


Coefficient for per sq.m
Code
LB0052
LB0067
MT0695
MT0696
MT0697
MT0698
MT0699

Description
Painter Gd.1
Painter Gd.2
Mud Paint for Bhutanese traditional painting
Animal glue
Cloth for Bhutanese painting
Paper for Bhutanese painting
Colour powder(excluding gold powder)

Standards & Quality Control Authority, MoWHS

Quant
0.60000
0.60000
0.16200
0.04020
0.00120
0.00480
0.07002

Units
day
day
kg
kg
sq.m
sq.m
kg

Labour and Material Coefficients (Civil Works) - 2009

PT0110

223

Providing, preparing and applying Sumdang washable painting - Rab


Coefficient for per sq.m
Code
LB0052
LB0067
MT0691
MT0695
MT0697
MT0698
MT0700
MT0720
MT0722

PT0111

Description
Painter Gd.1
Painter Gd.2
Acrylic washable distemper
Mud Paint for Bhutanese traditional painting
Cloth for Bhutanese painting
Paper for Bhutanese painting
Gold powder
Aluminium paint
Synthetic enamel paint

Quant
0.97800
0.97800
0.04020
0.16200
0.00120
0.00480
0.00498
0.04020
0.04020

Units
day
day
kg
kg
sq.m
sq.m
kg
litre
litre

Providing, preparing and applying Sumdang washable painting - Ding


Coefficient for per sq.m
Code
LB0052
LB0067
MT0695
MT0697
MT0698
MT0722

PT0112

Description
Painter Gd.1
Painter Gd.2
Mud Paint for Bhutanese traditional painting
Cloth for Bhutanese painting
Paper for Bhutanese painting
Synthetic enamel paint

Quant
0.75600
0.75600
0.16200
0.00120
0.00480
0.04020

Units
day
day
kg
sq.m
sq.m
litre

Providing, preparing and applying Sumdang washable painting - Thamar


Coefficient for per sq.m
Code
LB0052
LB0067
MT0695
MT0697
MT0698
MT0722

PT0120

Description
Painter Gd.1
Painter Gd.2
Mud Paint for Bhutanese traditional painting
Cloth for Bhutanese painting
Paper for Bhutanese painting
Synthetic enamel paint

Quant
0.55800
0.55800
0.16200
0.00120
0.00480
0.04020

Units
day
day
kg
sq.m
sq.m
litre

Providing, preparing and applying Dangtshon washable painting - Rab


Coefficient for per sq.m
Code
LB0052
LB0067
MT0691
MT0695
MT0697
MT0698
MT0700
MT0720
MT0722

PT0121

Description
Painter Gd.1
Painter Gd.2
Acrylic washable distemper
Mud Paint for Bhutanese traditional painting
Cloth for Bhutanese painting
Paper for Bhutanese painting
Gold powder
Aluminium paint
Synthetic enamel paint

Quant
1.26000
1.26000
0.04020
0.16200
0.00120
0.00480
0.00498
0.04020
0.04020

Units
day
day
kg
kg
sq.m
sq.m
kg
litre
litre

Providing, preparing and applying Dangtshon washable painting - Ding


Coefficient for per sq.m
Code
LB0052
LB0067
MT0695
MT0697
MT0698
MT0722

Description
Painter Gd.1
Painter Gd.2
Mud Paint for Bhutanese traditional painting
Cloth for Bhutanese painting
Paper for Bhutanese painting
Synthetic enamel paint

Standards & Quality Control Authority, MoWHS

Quant
0.97800
0.97800
0.16200
0.00120
0.00480
0.04020

Units
day
day
kg
sq.m
sq.m
litre

Labour and Material Coefficients (Civil Works) - 2009

PT0122

224

Providing, preparing and applying Dangtshon washable painting - Thamar


Coefficient for per sq.m
Code
LB0052
LB0067
MT0695
MT0697
MT0698
MT0722

PT0130

Description
Painter Gd.1
Painter Gd.2
Mud Paint for Bhutanese traditional painting
Cloth for Bhutanese painting
Paper for Bhutanese painting
Synthetic enamel paint

Quant
0.70200
0.70200
0.16200
0.00120
0.00480
0.04020

Units
day
day
kg
sq.m
sq.m
litre

Providing, preparing and applying Yutshon painting (plain) - Washable


Coefficient for per sq.m
Code
LB0052
LB0067
MT0695
MT0722

PT0131

Description
Painter Gd.1
Painter Gd.2
Mud Paint for Bhutanese traditional painting
Synthetic enamel paint

Quant
0.24000
0.24000
0.16200
0.04020

Units
day
day
kg
litre

Providing, preparing and applying Yutshon painting (plain) - Not Washable


Coefficient for per sq.m
Code
LB0052
LB0067
MT0695

PT0140

Description
Painter Gd.1
Painter Gd.2
Mud Paint for Bhutanese traditional painting

Quant
0.21000
0.21000
0.16200

Units
day
day
kg

Providing, preparing and applying flower natural painting for wall decoration design such as
Tashitagey symbols, Tashi Zeegay, Za-Tshering, etc.. - Dangtshon - Rab
Coefficient for per Sq.m
Code
LB0052
LB0067
MT0691
MT0695
MT0697
MT0698
MT0700
MT0720

PT0142

Description
Painter Gd.1
Painter Gd.2
Acrylic washable distemper
Mud Paint for Bhutanese traditional painting
Cloth for Bhutanese painting
Paper for Bhutanese painting
Gold powder
Aluminium paint

Quant
0.08700
0.08700
0.04020
0.16200
0.40020
0.30000
0.00498
0.04020

Units
day
day
kg
kg
sq.m
sq.m
kg
litre

Providing, preparing and applying flower natural painting for wall decoration design such as
Tashitagey symbols, Tashi Zeegay, Za-Tshering, etc.. - Sumdang - Rab
Coefficient for per Sq.m
Code
LB0052
LB0067
MT0691
MT0695
MT0697
MT0698
MT0700
MT0720

Description
Painter Gd.1
Painter Gd.2
Acrylic washable distemper
Mud Paint for Bhutanese traditional painting
Cloth for Bhutanese painting
Paper for Bhutanese painting
Gold powder
Aluminium paint

Standards & Quality Control Authority, MoWHS

Quant
0.07800
0.07800
0.04020
0.16200
0.40020
0.30000
0.00498
0.04020

Units
day
day
kg
kg
sq.m
sq.m
kg
litre

Labour and Material Coefficients (Civil Works) - 2009

225

CHAPTER 20

ADDITIONS, ALTERATIONS & REPAIRS

AA0001

Repair to plaster including cutting to shape, surface preparation, proving and applying cement plaster
to the surface, disposal rubbish within 50m lead - Patch area <2.5sq.m
Coefficient for per sq.m
Code
LB0051
LB0077
MT0043
MT0145

AA0005

Description
Mason Gd.2
Labour
Sand
Cement (OPC / PSC)

Quant
0.16800
0.29025
0.01926
0.00684

Units
day
day
cu.m
tonne

Providing & fixing glass panes with putty, nails including remaining. broken glass panes - 3mm thick
plain
Coefficient for per sq.m
Code
LB0021
LB0077
MT0655
MT0740

AA0006

Units
day
day
sq.m
kg

Description
Carpenter Gd.1
Labour
Plain Glass - 4mm thick
Putty

Quant
0.29000
0.29000
1.10000
0.68000

Units
day
day
sq.m
kg

Providing & fixing glass panes with putty, nails including remaining. broken glass panes - 5.5mm thick
plain
Coefficient for per sq.m
Code
LB0021
LB0077
MT0657
MT0740

AA0008

Quant
0.29000
0.29000
1.10000
0.68000

Providing & fixing glass panes with putty, nails including remaining. broken glass panes - 4mm thick
plain
Coefficient for per sq.m
Code
LB0021
LB0077
MT0656
MT0740

AA0007

Description
Carpenter Gd.1
Labour
Plain Glass - 3mm thick
Putty

Description
Carpenter Gd.1
Labour
Plain Glass - 5.5mm thick
Putty

Quant
0.29000
0.29000
1.10000
0.68000

Units
day
day
sq.m
kg

Providing & fixing glass panes with putty, nails including remaining. broken glass panes - 3mm thick
frosted
Coefficient for per sq.m
Code
LB0021
LB0077
MT0660
MT0740

AA0009

Description
Carpenter Gd.1
Labour
Frosted Glass - 3mm thick
Putty

Quant
0.29000
0.29000
1.10000
0.68000

Units
day
day
sq.m
kg

Providing & fixing glass panes with putty, nails including remaining. broken glass panes - 5.5mm thick
frosted
Coefficient for per sq.m
Code
LB0021
LB0077
MT0661
MT0740

Description
Carpenter Gd.1
Labour
Frosted Glass - 5.5mm thick
Putty

Quant
0.29000
0.29000
1.10000
0.68000

Standards & Quality Control Authority, MoWHS

Units
day
day
sq.m
kg

Labour and Material Coefficients (Civil Works) - 2009

AA0015

226

Cutting holes < 300x300mm in brick walls including repair wall


Coefficient for per each
Code
LB0036
LB0051
LB0077
MT0043
MT0125
MT0145

AA0016

Description
Mason Gd.1
Mason Gd.2
Labour
Sand
Bricks 2nd class
Cement (OPC / PSC)

Quant
0.10206
0.08610
0.25552
0.00666
0.00733
0.00263

Units
day
day
day
cu.m
1000#
tonne

Cutting holes < 150x150mm in R.C. floors or roof including making leak proofing with concrete 1:2:4,
20mm aggregates
Coefficient for per each
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0145

AA0017

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Cement (OPC / PSC)

Quant
0.10414
0.00011
0.10414
0.00015
0.21387
0.00015
0.00015
0.00098
0.00196
0.00071

Units
day
day
day
day
day
day
day
cu.m
cu.m
tonne

Making chases < 75x75mm in walls including repair after fixing G.I pipe etc.
Coefficient for per m
Code
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0145

AA0025

Description
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Cement (OPC / PSC)

Quant
0.03128
0.00019
0.03128
0.00027
0.13369
0.00027
0.00027
0.00179
0.00357
0.00084

Units
day
day
day
day
day
day
day
cu.m
cu.m
tonne

Providing & fixing Aluminium strip edging to staircases including rawl plugs and screws, a thin layer
of cement mortar 1:3 - 57mm x 12mm x 3mm
Coefficient for per m
Code
LB0033
LB0036
LB0077
MT0160

AA0026

Description
Carpenter Gd.2
Mason Gd.1
Labour
Aluminium Strip Edging - 57mmx12mmx1.6mm

Quant
0.03750
0.10400
0.10400
1.05000

Units
day
day
day
m

Providing & fixing Aluminium strip edging to staircases including rawl plugs and screws, a thin layer
of cement mortar 1:3 - 38mm x 12mm x 3mm
Coefficient for per m
Code
LB0033
LB0036
LB0077
MT0176

Description
Carpenter Gd.2
Mason Gd.1
Labour
Aluminium Strip Edging - 38mmx12mmx1.6mm

Standards & Quality Control Authority, MoWHS

Quant
0.03750
0.10400
0.10400
1.05000

Units
day
day
day
m

Labour and Material Coefficients (Civil Works) - 2009

227

CHAPTER 21

ROAD WORKS

RW0001

Installation of Labour camps: Installation of Labour camps including water supply, pit latrines, solid
waste disposal etc. according to Environment Code of Practice

RW0002

Restoration of Labour camps: Restoration of camp sites including disposal of wreckage, rubbish,
restoration of site using Bioengineering, enclosure of temporary access according to Environment
Code of Practice

RW0006

Earth work in excavation over areas, exceeding 300 mm in depth 1.5 m in width as well as 10 sq.m. On
plan, including disposal of excavated earth, (disposed earth to be levelled and neatly dressed) ordinary soil

RW0007

Earth work in excavation over areas, exceeding 300 mm in depth 1.5 m in width as well as 10 sq.m. On
plan, including disposal of excavated earth, (disposed earth to be levelled and neatly dressed) - hard
soil

RW0008

Earth work in excavation over areas, exceeding 300 mm in depth 1.5 m in width as well as 10 sq.m. On
plan, including disposal of excavated earth, (disposed earth to be levelled and neatly dressed) ordinary rock with or without blasting

RW0009

Earth work in excavation over areas, exceeding 300 mm in depth 1.5 m in width as well as 10 sq.m. On
plan, including disposal of excavated earth, (disposed earth to be levelled and neatly dressed) - hard
rock requiring blasting

RW0010

Earth work in excavation over areas, exceeding 300 mm in depth 1.5 m in width as well as 10 sq.m. On
plan, including disposal of excavated earth, (disposed earth to be levelled and neatly dressed) - hard
rock requiring chiselling ( blasting prohibited)

RW0011

Excavation of road formation/trace/box cutting, with bulldozer including separate deposition of soil,
rocks and stones within 50m for reuse - all kinds of soil

RW0012

Excavation of road formation/trace/box cutting, with bull dozer including separate deposition of soil,
rocks and stones within 50m for reuse - all kinds of rock

RW0013

Excavation of road formation/trace/box cutting, with excavator including separate deposition of soil,
rocks and stones within 50m for reuse - all kinds of soil
Coefficient for per cu.m
Code
Description
MP0124 Excavator ( cat 320)

RW0014

Quant
0.00350

Units
day

Excavation of road formation/trace/box cutting, with excavator including separate deposition of soil,
rocks and stones within 50m for reuse - all kinds of rocks
Coefficient for per cu.m
Code
LB0047
LB0077
MP0124
MP0212
MP0158
MT0020
MT0021
MT0022
MT0023

Description
Blaster
Labour
Excavator ( cat 320)
Compressor ( cps - 300)
Jack Hammer
Gelatine/Superdyne
Fuse coil
Detonator
Drill rod - 8'

Quant
0.00500
0.00500
0.00350
0.00800
0.00800
0.33200
0.40000
0.40000
0.00500

Units
day
day
day
day
day
kg
each
each
each

RW0015

Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of
bottom, disposal of surplus excavated soil within 50m lead - ordinary soil

RW0016

Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of
bottom, disposal of surplus excavated soil within 50m lead - hard soil

Standards & Quality Control Authority, MoWHS

Labour and Material Coefficients (Civil Works) - 2009

228

RW0017

Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of
bottom, disposal of surplus excavated soil within 50m lead - Ordinary rock with or without blasting

RW0018

Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of
bottom, disposal of surplus excavated soil within 50m lead - Hard rock requiring blasting

RW0019

Transport of loose spoil materials in designated locations including loading/unloading. Dressing of


dump sites and plantation of vegetation after completion of dumping - beyond 50 up to 200 m

RW0020

Transport of loose spoil materials in designated locations including loading/unloading. Dressing of


dump sites and plantation of vegetation after completion of dumping - beyond 200 up to 500 m

RW0021

Transport of loose spoil materials in designated locations including loading/unloading. Dressing of


dump sites and plantation of vegetation after completion of dumping - beyond 500 up to 1000 m

RW0035

Filling of trenches, sides of foundations, walls, etc including filter material ( 600 mm wide) with 100 to
200 mm stones wherever applicable including filling with selected suitable excavated material in layer
not
200 exceeding
mm in depth (compacted), consolidating each layer with power roller or portable compactor,
watering etc. within 50 m lead

RW0040

Opening, running and restoration of quarries according to Environmental Code of Practice (ECP) and
as per technical specification

RW0041

Opening, running and restoration of sand quarries according to Environmental Code of Practice (ECP)
for Highways & Roads and as per technical specification

RW0044

Supplying/collection and stacking stone aggregate - 100 mm


Coefficient for per cu.m
Code
Description
LB0077 Labour
MT0064 Crushed Rock - 100mm

RW0045

Quant
0.55000
1.00000

Units
day
cu.m

Supplying/collection and stacking stone aggregate - 75 mm


Coefficient for per cu.m
Code
Description
LB0077 Labour
MT0065 Crushed Rock - 75mm

RW0046

Quant
0.35000
1.00000

Units
day
cu.m

Supplying/collection and stacking stone aggregate - 50 mm


Coefficient for per cu.m
Code
Description
LB0077 Labour
MT0067 Crushed Rock - 50mm

RW0047

Quant
0.40000
1.00000

Units
day
cu.m

Supplying/collection and stacking stone aggregate - 63 - 40 mm


Coefficient for per cu.m
Code
LB0077
MT0066
MT0067
MT0068

RW0048

Description
Labour
Crushed Rock - 63mm
Crushed Rock - 50mm
Crushed Rock - 40mm

Quant
0.40000
0.35000
0.32500
0.32500

Units
day
cu.m
cu.m
cu.m

Supplying/collection and stacking stone aggregate - 20 mm


Coefficient for per cu.m
Code
Description
LB0077 Labour
MT0070 Crushed Rock - 20mm

Quant
0.45000
1.00000

Standards & Quality Control Authority, MoWHS

Units
day
cu.m

Labour and Material Coefficients (Civil Works) - 2009

RW0049

229

Supplying/collection and stacking stone aggregate - 12 - 6 mm


Coefficient for per cu.m
Code
Description
LB0077 Labour
MT0071 Crushed Rock - 12.5 - 6mm

RW0050

Quant
0.50000
1.00000

Units
day
cu.m

Supplying/collection and stacking stone aggregate - 50 - 20 mm


Coefficient for per cu.m
Code
LB0077
MT0067
MT0068
MT0069
MT0070

RW0055

Description
Labour
Crushed Rock - 50mm
Crushed Rock - 40mm
Crushed Rock - 25mm
Crushed Rock - 20mm

Quant
0.42500
0.30000
0.30000
0.20000
0.20000

Units
day
cu.m
cu.m
cu.m
cu.m

Supplying/collection and stacking at site - Blinding Materials


Coefficient for per cu.m
Code
LB0077
MP0203
MP0211
MT0042

RW0056

Description
Labour
Pay Loader ( Cat -910)
Truck/Tipper (Tata,1210SK32)
Mud dry

Quant
0.20900
0.00410
0.01200
1.00000

Units
day
day
day
cu.m

Supplying/collection and stacking at site - Boulder


Coefficient for per cu.m
Code
LB0047
LB0077
MP0203
MP0211
MP0212
MT0020
MT0021
MT0022
MT0023
MT0041

RW0057

Description
Blaster
Labour
Pay Loader ( Cat -910)
Truck/Tipper (Tata,1210SK32)
Compressor (CPS - 300)
Superdyne / Gelatine
Fuse Coil
Detonator
Drill rod
- 8'
Royalty for earth, mud, boulder, sand & gravel

Quant
0.00500
0.10420
0.00700
0.03240
0.03240
0.16200
0.22700
0.32400
0.00500
0.18200

Units
day
day
day
day
day
kg
each
each
each
truck

Supplying/collection and stacking at site - Gravel/coarse sand


Coefficient for per cu.m
Code
LB0077
MP0203
MP0211
MT0041

RW0065

Description
Labour
Pay Loader ( Cat -910)
Truck/Tipper (Tata,1210SK32)
Royalty for earth, mud, boulder, sand & gravel

Quant
0.33670
0.00410
0.03240
0.18200

Units
day
day
day
truck

Construction of gabion wall, height up to 1.00 mm with dry stone masonry (hammer dressed facing)
including delivery of materials, weaving of gabion mesh with GI wire 2.70mm dia, fixing of selvedged
wire
3.4 mm dia,
binding/lacing
wire 2.40 mm dia complete
Coefficient for per metre
Code
SM0051
LB0077
LB0051
LB0039
MT0256

Description
Quant
Dry hand packed rubble masonry hammer dressed (facing), with stone boulder > 0.04
1.00000
cu.m
Labour
0.84900
Mason Gd. II
0.42500
Supervisor
0.10000
G.I wire ( assorted diameters)
11.00000

Standards & Quality Control Authority, MoWHS

Units
cu.m
day
day
day
kgs

Labour and Material Coefficients (Civil Works) - 2009

RW0066

230

Construction of gabion wall, height up to 2.00 mm with dry stone masonry (hammer dressed facing)
including delivery of materials, weaving of gabion mesh with GI wire 2.70mm dia, fixing of selvedged
wire 3.4 mm dia,
binding/lacing
wire 2.40 mm dia complete
Coefficient for per metre
Code
SM0051
LB0077
LB0051
LB0039
MT0256

RW0067

Description
Quant
Units
Dry hand packed rubble masonry hammer dressed (facing), with stone boulder > 0.04
2.00000
cu.m
cu.m
Labour
1.72900
day
Mason Gd. II for weaving & assembling, placing in position/fixing binding wires, closing
0.86500
and finishing
day
Supervisor
0.10000
day
G.I wire ( assorted diameters)
22.40000
kgs

Construction of gabion wall, height up to 3.00 mm with dry stone masonry (hammer dressed facing)
including delivery of materials, weaving of gabion mesh with GI wire 2.70mm dia, fixing of selvedged
wire 3.4 mm dia,
binding/lacing
wire 2.40 mm dia complete
Coefficient for per metre
Code
SM0051
LB0077
LB0051
LB0039
MT0256

RW0068

Description
Quant
Units
Dry hand packed rubble masonry hammer dressed (facing), with stone boulder
> 0.04 cu.m
3.50000
cu.m
Labour
3.11900
day
Mason Gd. II for weaving & assembling, placing in position/fixing binding wires, closing
1.55900
and finishing
day
Supervisor
0.12500
day
G.I wire ( assorted diameters)
40.40000
kgs

Construction of gabion wall, height up to 4.00 mm with dry stone masonry (hammer dressed facing)
including delivery of materials, weaving of gabion mesh with GI wire 2.70mm dia, fixing of selvedged
wire 3.4 mm dia,
binding/lacing wire 2.40 mm dia complete
Coefficient for per metre
Code
SM0051
LB0077
LB0051
LB0039
MT0256

RW0069

Description
Quant
Units
Dry hand packed rubble masonry hammer dressed (facing), with stone boulder > 0.04
5.50000
cu.m
cu.m
Labour
4.81700
day
Mason Gd. II for weaving & assembling, placing in position/fixing binding wires, closing
2.40900
and finishing
day
Supervisor
0.15000
day
G.I wire ( assorted diameters)
6.24000
kgs

Construction of gabion wall, height up to 5.00 mm with dry stone masonry (hammer dressed facing)
including delivery of materials, weaving of gabion mesh with GI wire 2.70mm dia, fixing of selvedged
wire 3.4 mm dia,
binding/lacing wire 2.40 mm dia complete
Coefficient for per metre
Code
SM0051
LB0077
LB0051
LB0039
MT0256

Description
Quant
Units
Dry hand packed rubble masonry hammer dressed (facing), with stone boulder > 0.04
8.00000
cu.m
cu.m
Labour
7.05600
day
Mason Gd. II for weaving & assembling, placing in position/fixing binding wires, closing
3.52800
and finishing
day
Supervisor
0.15000
day
G.I wire ( assorted diameters)
91.40000
kgs

Standards & Quality Control Authority, MoWHS

Labour and Material Coefficients (Civil Works) - 2009

RW0070

231

Construction of gabion wall, height up to 6.00 mm with dry stone masonry (hammer dressed facing)
including delivery of materials, weaving of gabion mesh with GI wire 2.70mm dia, fixing of selvedged
wire 3.4 mm dia,
binding/lacing wire 2.40 mm dia complete
Coefficient for per metre
Code
SM0051
LB0077
LB0051
LB0039
MT0256

RW0071

Description
Quant
Units
Dry hand packed rubble masonry hammer dressed (facing), with stone boulder > 0.04
11.00000
cu.m
cu.m
Labour
9.65000
day
Mason Gd. II for weaving & assembling, placing in position/fixing binding wires, closing
4.82500
and finishing
day
Supervisor
0.15000
day
G.I wire ( assorted diameters)
125.00000
kgs

Construction of gabion wall, height up to 7.00 mm with dry stone masonry (hammer dressed facing)
including delivery of materials, weaving of gabion mesh with GI wire 2.70mm dia, fixing of selvedged
wire 3.4 mm dia,
binding/lacing wire 2.40 mm dia complete
Coefficient for per metre
Code
SM0051
LB0077
LB0051
LB0039
MT0256

RW0072

Description
Quant
Units
Dry hand packed rubble masonry hammer dressed (facing), with stone boulder
> 0.04 cu.m
14.50000
cu.m
Labour
12.73800
day
Mason Gd. II for weaving & assembling, placing in position/fixing binding wires, closing
6.36900
and finishing
day
Supervisor
0.16000
day
G.I wire ( assorted diameters)
165.00000
kgs

Construction of gabion wall, height up to 8.00 mm with dry stone masonry (hammer dressed facing)
including delivery of materials, weaving of gabion mesh with GI wire 2.70mm dia, fixing of selvedged
wire 3.4 mm dia,
binding/lacing wire 2.40 mm dia complete
Coefficient for per metre

RW0073

Code

Description

SM0051
LB0077
LB0051
LB0039
MT0256

Dry hand packed rubble masonry hammer dressed (facing), with stone boulder
> 0.04 cu.m
18.50000
cu.m
Labour
15.98000
day
Mason Gd. II for weaving & assembling, placing in position/fixing binding wires, closing
7.99000
and finishing
day
Supervisor
0.17000
day
G.I wire ( assorted diameters)
207.00000
kgs

Quant

Units

Construction of gabion wall, height up to 9.00 mm with dry stone masonry (hammer dressed facing)
including delivery of materials, weaving of gabion mesh with GI wire 2.70mm dia, fixing of selvedged
wire 3.4 mm dia,
binding/lacing wire 2.40 mm dia complete
Coefficient for per metre
Code
SM0051
LB0077
LB0051
LB0039
MT0256

RW0075

Description
Quant
Units
Dry hand packed rubble masonry hammer dressed (facing), with stone boulder > 0.04
23.00000
cu.m
cu.m
Labour
19.96400
day
Mason Gd. II for weaving & assembling, placing in position/fixing binding wires, closing
9.98200
and finishing
day
Supervisor
0.18000
day
G.I wire ( assorted diameters)
258.60000
kgs

Providing and Construction of light timber crib walls with timber section of 100 to 150 mm diameter
including backfilling with suitable materials, ramming/compacting complete
Coefficient for per sq.m
Code

Description

Filling of trenches, sides of foundations etc. in layers < 200mm using selected
EW0195
excavated earth, ramming etc within lead 50 m & lift 200 mm
LB0077
LB0033
LB0039
MT0208
MT0325

Labour
Carpenter Gd. II
Work Supervisor - Lajab
Thermo - Mechanically Treated ( TMT ) bars (yield strength 415 MPa)
Timber ballies 100 to 150 mm dia

Standards & Quality Control Authority, MoWHS

Quant

Units

1.50000
0.41670
0.08300
0.03300
1.44000
21.24100

cu.m
day
day
day
Kg
m

Labour and Material Coefficients (Civil Works) - 2009

RW0076

232

Providing and Construction of heavy timber crib walls with timber section of 250 to 300 mm diameter
including backfilling with suitable materials, ramming/compacting complete
Coefficient for per sq.m
Code
EW0195
LB0077
LB0033
LB0039
MT0208
MT0326

RW0081

Description
Filling of trenches, sides of foundations etc. in layers < 200mm using selected
excavated earth, ramming etc within lead 50 m & lift 200 mm
Labour
Carpenter Gd. I
Supervisor
Thermo - Mechanically Treated ( TMT ) bars (yield strength 415 MPa)
Timber ballies 250 to 300 mm dia

Quant

Units

3.00000
0.66250
0.12500
0.05000
2.98625
6.62300

cu.m
day
day
day
Kg
m

Providing and constructing boulder barriers, width not less than 900 mm, height not exceeding 1.5 m,
20 deg. Maximum inclination to the road alignment within 50 m lead
Coefficient for per metre
Code
LB0077
LB0039
LB0036

RW0095

Description
Labour
Work Supervisor ( Lajab)
Mason - Gd 1

Quant
0.30000
0.05000
0.05000

Units
day
day
day

Construction of French Drain ( Size = 600 mm & 1000 mm deep), including clearing jungle, earthwork in
excavation in trenches (all types of soil), levelling the excavated earth, filling the trench with stone 50
to 100 mm size complete as per drawing
Coefficient for per metre

RW0096

Code

Description

CG0002
EW0106
RW0045
LB0077

Jungle clearance
Earthwork in Foundation Trenches - All kinds of soil
Supplying/Collection and Stacking stone aggregates - 75 mm
Labour

Quant

Units

1.00000
0.70000
0.64750
0.69300

sq.m
cu.m
cu.m
day

Construction of French Drain ( Size = 1000 mm & 1500 mm deep), including clearing jungle, earthwork
in excavation in trenches (all types of soil), levelling the excavated earth, filling the trench with stone 50
to 100 mm size complete as per drawing
Coefficient for per metre
Code
CG0002
EW0106
RW0045
LB0077

RW0100

Description
Jungle clearance
Earthwork in Foundation Trenches - All kinds of soil
Supplying/Collection and Stacking stone aggregates - 75 mm
Labour

Quant
1.50000
1.65000
1.52630
0.69300

Units
sq.m
cu.m
cu.m
day

Construction of Foundation Drain (minimum size = 200 mm wide & 250 mm deep), including clearing
jungle, earthwork in excavation in trenches (all types of soil), levelling the excavated earth, filling the
trench with stone
50 to 100 mm size complete as per drawing
Coefficient for per metre
Code
EW0106
RW0045
LB0077

Description
Earthwork in Foundation Trenches - All kinds of soil
Supplying/Collection and Stacking stone aggregates - 75 mm
Labour

Standards & Quality Control Authority, MoWHS

Quant
0.05000
0.04630
0.69300

Units
cu.m
cu.m
day

Labour and Material Coefficients (Civil Works) - 2009

RW0105

233

Construction of V-shaped dry stone pitched drain ( finished size = 600 mm wide X 300 mm deep)
including excavation, levelling and disposal of surplus excavated earth within 50 m
Coefficient for per metre
Code
EW0106
SM0072
SM0050

RW0106

Description
Earthwork in foundation trenches - All kinds of soil
Providing and Laying hand packed stone filling or soling with stones
Dry hand packed rubble masonry with stone boulders > 0.04 cu.m

Quant
0.20000
0.12000
0.10000

Units
cu.m
sq.m
cu.m

Providing and laying V-shaped drain with stone dry pitch, bedding of stone to the profile as per
standard design - 450mm wide x 300mm deep, including disposal of rubbish within 50m lead
Coefficient for per m
Code
LB0036
LB0051
LB0077
MT0060

RW0107

Description
Mason Gd.1
Mason Gd.2
Labour
Boulder

Quant
0.04200
0.04200
0.25032
0.10000

Units
day
day
day
cu.m

Construction of V-shaped dry earthen drain ( finished size = 600 mm wide X 500 mm deep) including
excavation, levelling and disposal of surplus excavated earth within 50 m
Coefficient for per metre
Code
Description
EW0106 Earthwork in foundation trenches - All kinds of soil

RW0108

Quant
0.15000

Units
cu.m

Construction of lined V-shaped drain ( finished size = 600 mm wide & 300 mm deep) with 50mm thick
PCC 1:2:4, 150 mm thick stone soling, RRM in CM 1:5 on sides, finished with 20 mm thick, 1:4 cement
plaster including
excavation, levelling and disposal of surplus earth within 50m
Coefficient for per metre
Code
EW0106
SM0072
SM0006
CW0045

Description
Earthwork in foundation trenches
Providing and Laying hand packed stone filling or soling with stones
Providing and Laying Random Rubble Masonry with hard stone in CM 1:5
Providing and Laying Plain Cement Concrete 1:2:4 with stone aggregate 20
mm down gauge
PL0041 Providing and Laying Cement Plaster 20 mm thick in cement mortar 1:4

RW0120

Quant
0.20000
0.12000
0.10000

Units
cu.m
cu.m
cu.m

0.04000
0.30000

cu.m
sq.m

Providing and laying Hammer dressed stone edging 150 x 250 mm with stones including excavation,
refilling and disposal of surplus earth within 30 m lead
Coefficient for per m
Code
LB0036
LB0051
LB0077
MT0060

RW0121

Description
Mason Gd.1
Mason Gd.2
labourer
Boulder

Quant
0.03300
0.01700
0.09900
0.04600

Units
day
day
day
cu.m

Preparation of sub grade with proper camber by excavating earth to depth equal to pavement
thickness, consolidation with roller, disposal of surplus earth up to 50m - All kinds of soil
Coefficient for per cu.m
Code
Description
LB0077 Labour
MP0200 Roller, CAT -CS551

RW0122

Units
day
day

Preparation of sub grade with proper camber by excavating earth to depth equal to pavement
thickness, consolidation with roller, disposal of surplus earth up to 50m - Blasted Rock
Code
Description
LB0077 Labour
MP0200 Roller, CAT -CS551

RW0123

Quant
0.11772
0.00054

Coefficient for per cu.m


Quant
Units
0.48131
day
0.00054
day

Consolidation of sub-grade with roller, and making good the undulation with earth and re-rolling the
sub grade
Coefficient for per sq.m
Code
Description
LB0077 Labour
MP0200 Roller, CAT -CS551

Quant
0.00054
0.00054

Standards & Quality Control Authority, MoWHS

Units
day
day

Labour and Material Coefficients (Civil Works) - 2009

RW0124

234

Extra for compaction of earth in embankments under suitable moisture conditions to give at least 95%
of the proctor density
Coefficient for per cu.m
Code
Description
LB0077 Labour
MP0200 Roller, CAT -CS551

RW0130

Quant
0.02180
0.00080

Units
day
day

Providing and laying Granular sub-base course ( GSB) to required degree of compaction with proper
formation of cross fall using motor grader for laying and compacted to required density as per material
gradation and aggregate quality specified
Coefficient for per cu.m
Code
LB0077
MP0133
MP0146
MP0168
MP0200
MP0212
MP0210
MT0080
MT0081
MT0043

RW0131

Description
Labour
Pay loader ( cat 928F)
Tanker ( TATA)
TATA tipper 1612SE
Roller, CAT - CS551
Compressor ( CPS 300)
Motor Grader ( CAT - 130G)
Gravel/Shingles 40mm - 20 mm
Gravel / Shingles 20mm to 10mm
sand

Quant
0.10372
0.00741
0.00741
0.04444
0.00741
0.00741
0.00741
0.18
0.66
0.36

Units
day
day
day
day
day
day
day
cu.m
cu.m
cu.m

Providing and laying wet mix macadam graded aggregate base course to required degree of
compaction with proper formation of cross fall by using well graded crushed aggregates premixed
with OMC using suitable mixer,
motor grader as per material gradation and aggregate quality specified
Coefficient for per cu.m
Code
LB0077
MP0205
MP0200
MT0080
MT0071
MT0043

RW0132

Description
Labour
Concrete Mixer ( 7/5 cu.ft)
Roller, CAT - CS551
Gravels/Shingles, 40mm - 20 mm
Crushed rock , 12.5 - 6 mm
sand

Quant
0.75
0.05
0.05
0.4
0.5
0.1

Units
day
day
day
cu.m
cu.m
cu.m

Providing and Laying Dense Bituminous Macadam ( DBM) to required degree of compaction based on
mixture design (job mix formula) approved by the supervising engineer including preparation of
surface with
road broom, application of prime coat @ 0.75 kg/sq.m by mechanized method using asphalt plant,
paver, steel roller, tyre roller etc complete - 50mm
Coefficient for sq.m
Code
LB0077
MP0213
MP0153
MP0157
MP0214
MP0118
MP0111
MP0140
MP0139
MP0133
MP0168
MP0114
MT0001
MT0070
MT0071
MT0043

Description
Labour
Road Broom ( TD -96)
Tractor with trailer, Toyota
Asphalt/Bitumen Heating kettle, India make
Asphalt/Bitumen Sprayer ( Hino)
Spot Mix Plant, 10/16 TPH
Asphalt Paver
Road Roller ( SV91, Sakai)
Road Roller ( Pneumatic tyre), TS - 300
Pay loader ( cat 928F)
TATA tipper 1612SE
Compactor, plate type
Bitumen 80/100
Crushed rock, 20 mm
Crushed rock , 12.5 mm to 6mm ( preferably 10 mm)
sand

Standards & Quality Control Authority, MoWHS

Quant
0.05120
0.00007
0.00007
0.00062
0.00045
0.00165
0.00014
0.00045
0.00045
0.00091
0.00180
0.00330
0.00735
0.01602
0.01602
0.02136

Units
day
Day
Day
day
day
day
day
day
day
day
day
day
MT
cu.m
cu.m
cu.m

Labour and Material Coefficients (Civil Works) - 2009

RW0133

235

Providing and Laying Dense Bituminous Macadam ( DBM) to required degree of compaction based on
mixture design (job mix formula) approved by the supervising engineer including preparation of
surface with
road broom, application of prime coat @ 0.75 kg/sq.m by mechanized method using asphalt plant,
paver, steel roller, tyre roller etc complete - 60mm
Coefficient for sq.m
Code
LB0077
MP0213
MP0153
MP0157
MP0214
MP0118
MP0111
MP0140
MP0139
MP0133
MP0168
MP0114
MT0001
MT0070
MT0071
MT0043

RW0134

Description
Labour
Road Broom ( TD -96)
Tractor with trailer, Toyota
Asphalt/Bitumen Heating kettle, India make
Asphalt/Bitumen Sprayer ( Hino)
Spot Mix Plant, 10/16 TPH
Asphalt Paver
Road Roller ( SV91, Sakai)
Road Roller ( Pneumatic tyre), TS - 300
Pay loader ( cat 928F)
TATA tipper 1612SE
Compactor, plate type
Bitumen 80/100
Crushed rock, 20 mm
Crushed rock , 12.5 mm to 6mm ( preferably 10 mm)
sand

Quant
0.05120
0.00007
0.00007
0.00062
0.00045
0.00200
0.00014
0.00045
0.00045
0.00091
0.00180
0.00330
0.00867
0.01922
0.01922
0.02563

Units
day
Day
Day
day
day
day
day
day
day
day
day
day
MT
cu.m
cu.m
cu.m

Providing and Laying Dense Bituminous Macadam ( DBM) to required degree of compaction based on
mixture design (job mix formula) approved by the supervising engineer including preparation of
surface with
road broom, application of prime coat @ 0.75 kg/sq.m by mechanized method using asphalt plant,
paver, steel roller, tyre roller etc complete - 70mm
Coefficient for sq.m
Code
LB0077
MP0213
MP0153
MP0157
MP0214
MP0118
MP0111
MP0140
MP0139
MP0133
MP0168
MP0114
MT0001
MT0070
MT0071
MT0043

Description
Labour
Road Broom ( TD -96)
Tractor with trailer, Toyota
Asphalt/Bitumen Heating kettle, India make
Asphalt/Bitumen Sprayer ( Hino)
Spot Mix Plant, 10/16 TPH
Asphalt Paver
Road Roller ( SV91, Sakai)
Road Roller ( Pneumatic tyre), TS - 300
Pay loader ( cat 928F)
TATA tipper 1612SE
Compactor, plate type
Bitumen 80/100
Crushed rock, 20 mm
Crushed rock , 12.5 mm to 6mm ( preferably 10 mm)
sand

Standards & Quality Control Authority, MoWHS

Quant
0.05120
0.00007
0.00007
0.00062
0.00045
0.00231
0.00014
0.00045
0.00045
0.00091
0.00180
0.00330
0.00999
0.02243
0.02243
0.02990

Units
day
Day
Day
day
day
day
day
day
day
day
day
day
MT
cu.m
cu.m
cu.m

Labour and Material Coefficients (Civil Works) - 2009

RW0135

236

Providing and Laying Dense Bituminous Macadam ( DBM) to required degree of compaction based on
mixture design (job mix formula) approved by the supervising engineer including preparation of
surface with
road broom, application of prime coat @ 0.75 kg/sq.m by mechanized method using asphalt plant,
paver, steel roller, tyre roller etc complete - 80mm
Coefficient for sq.m
Code
LB0077
MP0213
MP0153
MP0157
MP0214
MP0118
MP0111
MP0140
MP0139
MP0133
MP0168
MP0114
MT0001
MT0070
MT0071
MT0043

RW0136

Description
Labour
Road Broom ( TD -96)
Tractor with trailer, Toyota
Asphalt/Bitumen Heating kettle, India make
Asphalt/Bitumen Sprayer ( Hino)
Spot Mix Plant, 10/16 TPH
Asphalt Paver
Road Roller ( SV91, Sakai)
Road Roller ( Pneumatic tyre), TS - 300
Pay loader ( cat 928F)
TATA tipper 1612SE
Compactor, plate type
Bitumen 80/100
Crushed rock, 20 mm
Crushed rock , 12.5 mm to 6mm ( preferably 10 mm)
sand

Quant
0.05120
0.00007
0.00007
0.00062
0.00045
0.00264
0.00014
0.00045
0.00045
0.00091
0.00180
0.00330
0.01131
0.02563
0.02563
0.03418

Units
day
Day
Day
day
day
day
day
day
day
day
day
day
MT
cu.m
cu.m
cu.m

Providing and Laying Asphalt/Bituminous Concrete to required degree of compaction based on the job
mixture design approved by the supervising engineer using asphalt plant, paver, steel roller, tyre roller
etc. as per
material gradation and aggregate quality specified : 25mm
Coefficient for sq.m
Code
LB0077
MP0213
MP0153
MP0157
MP0214
MP0118
MP0111
MP0140
MP0139
MP0133
MP0168
MP0114
MT0001
MT0071
MT0043

Description
Labour
Road Broom ( TD -96)
Tractor with trailer, Toyota
Asphalt/Bitumen Heating kettle, India make
Asphalt/Bitumen Sprayer ( Hino)
Spot Mix Plant, 10/16 TPH
Asphalt Paver
Road Roller ( SV91, Sakai)
Road Roller ( Pneumatic tyre), TS - 300
Pay loader ( cat 928F)
TATA tipper 1612SE
Compactor, plate type
Bitumen 80/100
Crushed rock , 12.5 mm to 6mm ( preferably 10 mm)
sand

Standards & Quality Control Authority, MoWHS

Quant
0.01081
0.00007
0.00007
0.00044
0.00045
0.00083
0.00014
0.00045
0.00045
0.00091
0.00180
0.00330
0.00426
0.01302
0.01302

Units
day
Day
Day
day
day
day
day
day
day
day
day
day
MT
cu.m
cu.m

Labour and Material Coefficients (Civil Works) - 2009

RW0137

237

Providing and Laying Asphalt/Bituminous Concrete to required degree of compaction based on the job
mixture design approved by the supervising engineer using asphalt plant, paver, steel roller, tyre roller
etc. as per
material gradation and aggregate quality specified : 30mm
Coefficient for sq.m
Code
LB0077
MP0213
MP0153
MP0157
MP0214
MP0118
MP0111
MP0140
MP0139
MP0133
MP0168
MP0114
MT0001
MT0071
MT0043

RW0138

Description
Labour
Road Broom ( TD -96)
Tractor with trailer, Toyota
Asphalt/Bitumen Heating kettle, India make
Asphalt/Bitumen Sprayer ( Hino)
Spot Mix Plant, 10/16 TPH
Asphalt Paver
Road Roller ( SV91, Sakai)
Road Roller ( Pneumatic tyre), TS - 300
Pay loader ( cat 928F)
TATA tipper 1612SE
Compactor, plate type
Bitumen 80/100
Crushed rock , 12.5 mm to 6mm ( preferably 10 mm)
sand

Quant
0.01190
0.00007
0.00007
0.00044
0.00045
0.00099
0.00014
0.00045
0.00045
0.00091
0.00180
0.00330
0.00505
0.01562
0.01562

Units
day
Day
Day
day
day
day
day
day
day
day
day
day
MT
cu.m
cu.m

Providing and Laying Asphalt/Bituminous Concrete to required degree of compaction based on the job
mixture design approved by the supervising engineer using asphalt plant, paver, steel roller, tyre roller
etc. as per
material gradation and aggregate quality specified : 35mm
Coefficient for sq.m
Code
LB0077
MP0213
MP0153
MP0157
MP0214
MP0118
MP0111
MP0140
MP0139
MP0133
MP0168
MP0114
MT0001
MT0071
MT0043

RW0139

Description
Labour
Road Broom ( TD -96)
Tractor with trailer, Toyota
Asphalt/Bitumen Heating kettle, India make
Asphalt/Bitumen Sprayer ( Hino)
Spot Mix Plant, 10/16 TPH
Asphalt Paver
Road Roller ( SV91, Sakai)
Road Roller ( Pneumatic tyre), TS - 300
Pay loader ( cat 928F)
TATA tipper 1612SE
Compactor, plate type
Bitumen 80/100
Crushed rock , 12.5 mm to 6mm ( preferably 10 mm)
sand

Quant
0.01311
0.00007
0.00007
0.00044
0.00045
0.00116
0.00014
0.00045
0.00045
0.00091
0.00180
0.00330
0.00584
0.01823
0.01823

Units
day
Day
Day
day
day
day
day
day
day
day
day
day
MT
cu.m
cu.m

Providing and Laying Asphalt/Bituminous Concrete to required degree of compaction based on the job
mixture design approved by the supervising engineer using asphalt plant, paver, steel roller, tyre roller
etc. as per
material gradation and aggregate quality specified : 40mm
Coefficient for sq.m
Code
LB0077
MP0213
MP0153
MP0157
MP0214
MP0118
MP0111
MP0140
MP0139
MP0133
MP0168
MP0114
MT0001
MT0071
MT0043

Description
Labour
Road Broom ( TD-96)
Tractor with trailer, Toyota
Asphalt/Bitumen Heating kettle, India make
Asphalt/Bitumen Sprayer ( Hino)
Spot Mix Plant, 10/16 TPH
Asphalt Paver
Road Roller ( SV91, Sakai)
Road Roller ( Pneumatic tyre), TS - 300
Pay loader ( cat 928F)
TATA tipper 1612SE
Compactor, plate type
Bitumen 80/100
Crushed rock , 12.5 mm to 6mm ( preferably 10 mm)
sand

Standards & Quality Control Authority, MoWHS

Quant
0.01431
0.00007
0.00007
0.00044
0.00045
0.00130
0.00014
0.00045
0.00045
0.00091
0.00180
0.00330
0.00663
0.02083
0.02083

Units
day
Day
Day
day
day
day
day
day
day
day
day
day
MT
cu.m
cu.m

Labour and Material Coefficients (Civil Works) - 2009

RW0145

238

Scarifying metalled (water bound) road surface disposal of rubbish up to 50m and consolidation of the
aggregate received from scarifying
Coefficient for per sq.m
Code
Description
LB0077 Labour
MP0200 Roller, CAT -CS551

RW0146

Quant
0.03223
0.00183

Units
day
day

Cutting and repairing of roads, including supply of required quantities of aggregates complete - Water
bound macadam road
Coefficient for per sq.m
Code
LB0077
MP0203
MP0211
MT0042
MT0067

RW0147

Description
Labour
Pay Loader ( Cat -910)
Truck/Tipper (Tata,1210SK32)
Mud dry
Crushed Rock - 50mm

Quant
0.63541
0.00005
0.00015
0.01250
0.02500

Units
day
day
day
cu.m
cu.m

Laying wearing course including screening, sorting, spreading to template and consolidation
(measurement of wearing course to be taken equal to the quantity of aggregate used, excluding
blinding materials) - With stone aggregates and blinding materials
Coefficient for per cu.m
Code
Description
LB0077 Labour (Male)
MP0200 Roller, CAT -CS551

RW0150

Quant
1.02300
0.03300

Units
day
day

Cutting & repairing bituminous road including supply of required quantity of aggregate & bitumen
emulsion - Manually
Coefficient for per sq.m
Code
LB0077
MP0200
MT0002
MT0043
MT0068

RW0151

Description
Labour
Roller, CAT -CS551
Bitumen Emulsion
Sand
Crushed Rock - 40mm

Quant
1.35000
0.00300
0.00270
0.00500
0.03000

Units
day
day
tonne
cu.m
cu.m

Cutting bituminous road along with W.B.M layer & soling and making good the same including supply
of extra quantities of aggregate, grit & bitumen emulsion required complete - Manually
Coefficient for per cu.m
Code
LB0077
MP0200
MT0002
MT0068

RW0152

Description
Labour
Roller, CAT -CS551
Bitumen Emulsion
Crushed Rock - 40mm

Quant
2.69800
0.00300
0.00315
0.12500

Units
day
day
tonne
cu.m

Painting two coats with bitumen emulsion (coat 1 - 12 kg emulsion and 0.1 cu.m, 12 mm aggregates per
10 sq.m, coat 2 - 16 kg emulsion 0.06 cu.m, 10 mm aggregates per 10 sq.m) complete - Mechanized
Coefficient for per sq.m
Code
LB0077
MP0200
MP0203
MP0211
MP0213
MP0214
MT0002
MT0071

Description
Labour
Roller, CAT -CS551
Pay Loader ( Cat -910)
Truck/Tipper (Tata,1210SK32)
Road Broom ( TD - 96 )
Asphalt/Bitumen Sprayer ( Hino)
Bitumen Emulsion
Crushed Rock - 12.5 - 6mm

Quant
0.00320
0.00045
0.00068
0.00136
0.00023
0.00045
0.00280
0.01600

Standards & Quality Control Authority, MoWHS

Units
day
day
day
day
day
day
tonne
cu.m

Labour and Material Coefficients (Civil Works) - 2009

RW0153

239

Repainting one coat with bitumen emulsion @ 2.3 kg of emulsion and 0.002 cu.m of 10 mm nominal
size stone chips per sq.m of surface area complete - Mechanized
Coefficient for per sq.m
Code
LB0077
MP0200
MP0203
MP0211
MP0213
MP0214
MT0002
MT0071

RW0154

Description
Labour
Roller, CAT -CS551
Pay Loader ( Cat -910)
Truck/Tipper (Tata,1210SK32)
Road Broom ( TD - 96 )
Asphalt/Bitumen Sprayer ( Hino)
Bitumen Emulsion
Crushed Rock - 12.5 - 6mm

Quant
0.00182
0.00045
0.00027
0.00125
0.00022
0.00045
0.00230
0.00200

Units
day
day
day
day
day
day
tonne
cu.m

Premix consolidated carpet surfacing including a tack coat @ 0.75 kg bitumen emulsion per sq.m of
road surface - 50mm thick with 6.0 cu.m of aggregate 10mm nominal size per 100 sq.m using 96 kg of
emulsion of approved
quality per cu.m of stone aggregate (Mechanized)
Coefficient for per sq.m
Code
LB0039
LB0077
MP0200
MP0203
MP0211
MP0213
MP0214
MT0002
MT0068

RW0155

Description
Work Supervisor (Lajab)
Labour
Roller, CAT -CS551
Pay Loader ( Cat -910)
Truck/Tipper (Tata,1210SK32)
Road Broom ( TD - 96 )
Asphalt/Bitumen Sprayer ( Hino)
Bitumen Emulsion
Crushed Rock - 40mm

Quant
0.00240
0.00320
0.00045
0.00091
0.00180
0.00022
0.00045
0.00591
0.05400

Units
day
day
day
day
day
day
day
tonne
cu.m

Premix consolidated carpet surfacing including a tack coat @ 0.75 kg bitumen emulsion per sq.m of
road surface - 25 mm thick with 2.7 cu.m of stone aggregate, 10 mm nominal size per 100 sq.m using
149 kg of bitumen
emulsion per cu.m of stone aggregate (Mechanized)
Coefficient for per sq.m
Code
LB0077
MP0200
MP0203
MP0211
MP0213
MP0214
MT0002
MT0071

RW0156

Description
Labour
Roller, CAT -CS551
Pay Loader ( Cat -910)
Truck/Tipper (Tata,1210SK32)
Road Broom ( TD - 96 )
Asphalt/Bitumen Sprayer ( Hino)
Bitumen Emulsion
Crushed Rock - 12.5 - 6mm

Quant
0.00320
0.00045
0.00045
0.00091
0.00023
0.00045
0.00477
0.03000

Units
day
day
day
day
day
day
tonne
cu.m

Premix consolidated carpet surfacing including a tack coat @ 0.75 kg bitumen emulsion per sq.m of
road surface - 20 mm thick with 2.10 cu.m of stone aggregate, 10 mm nominal size per 100 sq.m using
147 kg of bitumen
emulsion per cu.m of stone aggregate (Mechanized)
Coefficient for per sq.m
Code
LB0077
MP0200
MP0203
MP0211
MP0213
MP0214
MT0002
MT0071

Description
Labour
Roller, CAT -CS551
Pay Loader ( Cat -910)
Truck/Tipper (Tata,1210SK32)
Road Broom ( TD - 96 )
Asphalt/Bitumen Sprayer ( Hino)
Bitumen Emulsion
Crushed Rock - 12.5 - 6mm

Quant
0.00320
0.00045
0.00045
0.00091
0.00023
0.00045
0.00383
0.02400

Standards & Quality Control Authority, MoWHS

Units
day
day
day
day
day
day
tonne
cu.m

Labour and Material Coefficients (Civil Works) - 2009

RW0157

Providing seal coat with bitumen emulsion - Using 1.3 kg of emulsion and 0.80 cu.m stone aggregate of
10mm per 10 sq.m of road surface complete
Coefficient for per sq.m
Code
LB0077
MP0200
MP0203
MP0211
MP0213
MP0214
MT0002
MT0071

RW0158

240

Description
Labour
Roller, CAT -CS551
Pay Loader ( Cat -910)
Truck/Tipper (Tata,1210SK32)
Road Broom ( TD - 96 )
Asphalt/Bitumen Sprayer ( Hino)
Bitumen Emulsion
Crushed Rock - 12.5 - 6mm

Quant
0.00320
0.00045
0.00034
0.00068
0.00015
0.00034
0.00130
0.00800

Units
day
day
day
day
day
day
tonne
cu.m

Providing seal coat of premixed sand with bitumen emulsion - Using 5.3 kg of emulsion and 0.045 cu.m
coarse sand per 10 sq.m of road surface complete
Coefficient for per sq.m
Code
LB0039
LB0077
MP0200
MT0002
MT0043

RW0160

Description
Work Supervisor (Lajab)
Labour
Roller, CAT -CS551
Bitumen Emulsion
Sand

Quant
0.00080
0.04360
0.00060
0.00053
0.00450

Units
day
day
day
tonne
cu.m

Cutting and repairing of roads, including supply of required quantities of aggregate,


grit and bitumen - Bituminous road
Coefficient for per sq.m
Code
LB0077
MP0200
MP0203
MP0211
MT0001
MT0040
MT0042
MT0066
MT0067
MT0068
MT0071

RW0161

Quant
1.36371
0.00300
0.00005
0.00015
0.00306
0.00780
0.01250
0.00875
0.00812
0.00812
0.02560

Units
day
day
day
day
tonne
cu.m
cu.m
cu.m
cu.m
cu.m
cu.m

Cutting bituminous road and making good the same including supply of extra quantities of aggregate,
grit & bitumen required complete- Bituminous road along with W.B.M layer & soling (mechanized)
Coefficient for per sq.m
Code
LB0077
MP0200
MT0001
MT0040
MT0068

RW0165

Description
labourer
Roller, CAT -CS551
Pay Loader ( Cat -910)
Truck/Tipper (Tata,1210SK32)
Bitumen 80\100
Firewood (stacked volume)
Mud dry
Crushed Rock - 63mm
Crushed Rock - 50mm
Crushed Rock - 40mm
Crushed Rock - 12.5 - 6mm

Description
Labour
Roller, CAT -CS551
Bitumen 80\100
Firewood (stacked volume)
Crushed Rock - 40mm

Quant
2.69800
0.00300
0.00315
0.00780
0.12500

Units
day
day
tonne
cu.m
cu.m

Painting two coats with bitumen 80/100 (coat 1 - 2 kg bitumen per sq.m, 1.5 cu.m, 12.5 mm aggregates
per 100 sq.m; coat 2 - 1 kg bitumen per sq.m, 0.9 cu.m, 10 mm aggregates per 100 sq.m) complete Mechanised
Coefficient for per sq.m
Code
LB0077
MP0200
MP0203
MP0211
MP0213
MP0214
MT0001
MT0071

Description
Labour
Roller, CAT -CS551
Pay Loader ( Cat -910)
Truck/Tipper (Tata,1210SK32)
Road Broom ( TD - 96 )
Asphalt/Bitumen Sprayer ( Hino)
Bitumen 80\100
Crushed Rock - 12.5 - 6mm

Quant
0.00320
0.00045
0.00045
0.00091
0.00045
0.00045
0.00300
0.02400

Standards & Quality Control Authority, MoWHS

Units
day
day
day
day
day
day
tonne
cu.m

Labour and Material Coefficients (Civil Works) - 2009

RW0166

241

Painting two coats of bitumen 80\100 (coat 1 - 2 kg of bitumen, 0.015 cu.m, 12.5mm aggregate per
sq.m; coat 2 - 1 kg of bitumen, 0.009 cu.m, 10 mm aggregates, per sq.m complete) - Manually
Coefficient for per sq.m
Code
LB0039
LB0077
MP0200
MT0001
MT0040
MT0071

RW0167

Description
Work Supervisor (Lajab)
Labour
Roller, CAT -CS551
Bitumen 80\100
Firewood (stacked volume)
Crushed Rock - 12.5 - 6mm

Quant
0.00160
0.12800
0.00170
0.00300
0.00780
0.02400

Units
day
day
day
tonne
cu.m
cu.m

Premix carpet surfacing including a tack coat @ 0.75 kg bitumen per sq.m of road surface - 50mm thick
with 6 cu.m of aggregate 10mm nominal size per 100 sq.m using 51.5 kg of bitumen 80/100 grade per
cu.m of stone aggregate (Mechanized)
Coefficient for per sq.m
Code
LB0039
LB0077
MP0200
MP0203
MP0211
MP0213
MP0214
MT0001
MT0071

RW0168

Description
Work Supervisor (Lajab)
Labour
Roller, CAT -CS551
Pay Loader ( Cat -910)
Truck/Tipper (Tata,1210SK32)
Road Broom ( TD - 96 )
Asphalt/Bitumen Sprayer ( Hino)
Bitumen 80\100
Crushed Rock - 12.5 - 6mm

Quant
0.00240
0.00320
0.00045
0.00091
0.00180
0.00022
0.00045
0.00384
0.06000

Units
day
day
day
day
day
day
day
tonne
cu.m

Premix carpet surfacing including a tack coat @ 0.75 kg bitumen per sq.m of road surface - 25mm thick
with 3 cu.m of stone aggregate per 100 sq.m and 51.5 kg of bitumen 80/100 grade per cu.m of stone
aggregate (Mechanised)
Coefficient for per sq.m
Code
LB0077
MP0200
MP0203
MP0211
MP0213
MP0214
MT0001
MT0071

RW0169

Description
Labour
Roller, CAT -CS551
Pay Loader ( Cat -910)
Truck/Tipper (Tata,1210SK32)
Road Broom ( TD - 96 )
Asphalt/Bitumen Sprayer ( Hino)
Bitumen 80\100
Crushed Rock - 12.5 - 6mm

Quant
0.00320
0.00045
0.00045
0.00091
0.00045
0.00045
0.00267
0.03000

Units
day
day
day
day
day
day
tonne
cu.m

Premix carpet surfacing including a tack coat @ 0.75 kg bitumen per sq.m of road surface - 20mm thick
with 2.40 cu.m of stone aggregate 10mm nominal size per 100 sq.m and 51.5 kg of bitumen 80/100
grade per cu.m of stone aggregate (Mechanized)
Coefficient for per sq.m
Code
LB0077
MP0200
MP0203
MP0211
MP0213
MP0214
MT0001
MT0068

Description
Labour
Roller, CAT -CS551
Pay Loader ( Cat -910)
Truck/Tipper (Tata,1210SK32)
Road Broom ( TD - 96 )
Asphalt/Bitumen Sprayer ( Hino)
Bitumen 80\100
Crushed Rock - 40mm

Quant
0.00320
0.00045
0.00045
0.00091
0.00045
0.00045
0.00200
0.02400

Standards & Quality Control Authority, MoWHS

Units
day
day
day
day
day
day
tonne
cu.m

Labour and Material Coefficients (Civil Works) - 2009

RW0170

242

Premix Carpeting with 64 kg of bitumen 80\100 per cu.m of aggregates including a tack coat with
bitumen of same quality @ 0.75 kg per sq.m of road surface - 20 mm thick with 2.4 cu.m, 10mm
aggregate per 100 sq.m (Manually)
Coefficient for per sq.m
Code
LB0039
LB0077
MP0200
MT0001
MT0040
MT0071

RW0171

Description
Work Supervisor (Lajab)
Labour
Roller, CAT -CS551
Bitumen 80\100
Firewood (stacked volume)
Crushed Rock - 12.5 - 6mm

Quant
0.00240
0.11290
0.00110
0.00230
0.00600
0.02400

Units
day
day
day
tonne
cu.m
cu.m

Premix Carpeting with 64 kg of bitumen 80\100 per cu.m of aggregates including a tack coat with
bitumen of same quality @ 0.75 kg per sq.m of road surface - 25 mm thick with 3.0 cu.m, 10mm
aggregate per 100 sq.m (Manually)
Coefficient for per sq.m
Code
LB0039
LB0077
MP0200
MT0001
MT0040
MT0071

RW0175

Description
Work Supervisor (Lajab)
Labour
Roller, CAT -CS551
Bitumen 80\100
Firewood (stacked volume)
Crushed Rock - 12.5 - 6mm

Quant
0.00240
0.13180
0.00110
0.00267
0.00700
0.03000

Units
day
day
day
tonne
cu.m
cu.m

Repainting, one coat of bitumen 80\100 @ 1 kg of bitumen; 0.009 cu.m, 10mm aggregate per sq.m of
road surface - Manually
Coefficient for per sq.m
Code
LB0039
LB0077
MP0200
MT0001
MT0040
MT0071

RW0176

Description
Work Supervisor (Lajab)
Labour
Roller, CAT -CS551
Bitumen 80\100
Firewood (stacked volume)
Crushed Rock - 12.5 - 6mm

Quant
0.00060
0.05200
0.00060
0.00100
0.00260
0.00900

Units
day
day
day
tonne
cu.m
cu.m

Repainting one coat of bitumen 80/100 at a rate of 1 kg bitumen/sq.m & 0.9 cu.m of 10mm stone
aggregate per 100 sq.m - Mechanised
Coefficient for per sq.m
Code
LB0077
MP0200
MP0203
MP0211
MP0213
MP0214
MT0001
MT0071

Description
Labour
Roller, CAT -CS551
Pay Loader ( Cat -910)
Truck/Tipper (Tata,1210SK32)
Road Broom ( TD - 96 )
Asphalt/Bitumen Sprayer ( Hino)
Bitumen 80\100
Crushed Rock - 12.5 - 6mm

Quant
0.00182
0.00015
0.00015
0.00030
0.00015
0.00015
0.00100
0.00900

Standards & Quality Control Authority, MoWHS

Units
day
day
day
day
day
day
tonne
cu.m

Labour and Material Coefficients (Civil Works) - 2009

RW0177

Providing seal coat with bitumen 80/100 grade of approved quality using 1.12 cu.m of stone aggregate
10mm size per 100 sq.m and 56 kg of bitumen 80/100 grade per cu.m of stone aggregate with a tack
coat of 0.75
of of road surface complete - Mechanized
bitumen
per kg
sq.m
Coefficient for per sq.m
Code
LB0077
MP0200
MP0203
MP0211
MP0213
MP0214
MT0001
MT0071

RW0178

243

Description
Labour
Roller, CAT -CS551
Pay Loader ( Cat -910)
Truck/Tipper (Tata,1210SK32)
Road Broom ( TD - 96 )
Asphalt/Bitumen Sprayer ( Hino)
Bitumen 80\100
Crushed Rock - 12.5 - 6mm

Quant
0.00320
0.00034
0.00034
0.00091
0.00015
0.00034
0.00138
0.01120

Units
day
day
day
day
day
day
tonne
cu.m

Providing seal coat with bitumen 80\100 using 1.5 kg of bitumen per sq.m with 1.05 cu.m, 10mm
aggregate per 100 sq.m of road surface - Manually
Coefficient for per sq.m
Code
LB0039
LB0077
MP0200
MT0001
MT0040
MT0071

RW0179

Description
Work Supervisor (Lajab)
Labour
Roller, CAT -CS551
Bitumen 80\100
Firewood (stacked volume)
Crushed Rock - 12.5 - 6mm

Quant
0.00060
0.05080
0.00060
0.00150
0.00390
0.01050

Units
day
day
day
tonne
cu.m
cu.m

Providing seal coat of premixed sand with bitumen 80\100 using 128 kg of bitumen per cu.m of sand
and 0.75 cu.m of coarse sand per 100 sq.m of road surface - Manually
Coefficient for per sq.m
Code
LB0039
LB0077
MP0200
MT0001
MT0040
MT0043

RW0180

Description
Work Supervisor (Lajab)
Labour
Roller, CAT -CS551
Bitumen 80\100
Firewood (stacked volume)
Sand

Quant
0.00080
0.04360
0.00060
0.00096
0.00250
0.00750

Units
day
day
day
tonne
cu.m
cu.m

Providing & fixing RC name board including primer and white zinc paint - Rectangular with post
Coefficient for per each
Code
LB0032
LB0033
LB0036
LB0039
LB0051
LB0052
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0145
MT0208
MT0325
MT0330
MT0710
MT0725

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Painter Gd.1
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Cement (OPC / PSC)
Thermo - Mechanically Treated ( TMT ) bars (yield strength 415 MPa)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
Cement primer
Vinyl plastic emulsion paint (for cement plaster)

Standards & Quality Control Authority, MoWHS

Quant
0.10550
0.15600
0.54324
0.00300
0.54324
0.02741
0.00210
2.13796
0.00210
0.00210
0.02460
0.02670
0.01500
8.86200
0.42000
0.01350
0.01890
0.03267

Units
day
day
day
day
day
day
day
day
day
day
cu.m
cu.m
tonne
kg
m
cu.m
litre
litre

Labour and Material Coefficients (Civil Works) - 2009

RW0181

244

Providing & fixing RC name board including primer and white zinc paint - Flat without post for one
direction only
Coefficient for per each
Code
LB0032
LB0033
LB0036
LB0039
LB0051
LB0052
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0145
MT0208
MT0325
MT0330
MT0710
MT0725

RW0182

Quant
0.10013
0.31512
0.63598
0.01000
0.63598
0.09237
0.00700
2.94526
0.00700
0.00700
0.07170
0.08900
0.04509
8.41050
0.84840
0.02727
0.06370
0.11011

Units
day
day
day
day
day
day
day
day
day
day
cu.m
cu.m
tonne
kg
m
cu.m
litre
litre

Providing & fixing RC name board including primer and white zinc paint - Flat without post for two
directions only
Coefficient for per each
Code
LB0032
LB0033
LB0036
LB0039
LB0051
LB0052
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0145
MT0208
MT0325
MT0330
MT0710
MT0725

RW0183

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Painter Gd.1
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Cement (OPC / PSC)
Thermo - Mechanically Treated ( TMT ) bars (yield strength 415 MPa)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
Cement primer
Vinyl plastic emulsion paint (for cement plaster)

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Painter Gd.1
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Cement (OPC / PSC)
Thermo - Mechanically Treated ( TMT ) bars (yield strength 415 MPa)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)
Cement primer
Vinyl plastic emulsion paint (for cement plaster)

Quant
0.11013
0.33540
0.64818
0.01100
0.64818
0.11165
0.00770
3.09828
0.00770
0.00770
0.07823
0.09790
0.04930
9.25050
0.90300
0.02903
0.07700
0.13310

Units
day
day
day
day
day
day
day
day
day
day
cu.m
cu.m
tonne
kg
m
cu.m
litre
litre

Engraving letters on hard stone.......per letter per centimetre height


Coefficient for per each
Code
Description
LB0036 Mason Gd.1

Quant
0.01240

Standards & Quality Control Authority, MoWHS

Units
day

Labour and Material Coefficients (Civil Works) - 2009

RW0185

245

Providing & fixing precast boundary stone of RC 1:2:4 (20mm aggregate) including finishing with
mortar 1:3 (cost of excavation, refilling etc to be paid separately) - 150mm dia x 900mm high
Coefficient for per each
Code
LB0032
LB0033
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0145
MT0208
MT0325
MT0330

RW0186

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Cement (OPC / PSC)
Thermo - Mechanically Treated ( TMT ) bars (yield strength 415 MPa)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)

Quant
0.01650
0.07800
0.02275
0.00200
0.02275
0.00140
0.36780
0.00140
0.00140
0.01275
0.01780
0.00826
1.38600
0.21000
0.00675

Units
day
day
day
day
day
day
day
day
day
cu.m
cu.m
tonne
kg
m
cu.m

Providing & fixing precast kilometre stone of RC 1:2:4 (20mm aggregate) including finishing with
mortar 1:3 complete as per standard design (cost of excavation, concreting, painting etc. shall be paid
separately) - 35cm x 111cm x 25cm
Coefficient for per each
Code
LB0032
LB0033
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0145
MT0208
MT0325
MT0330

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Cement (OPC / PSC)
Thermo - Mechanically Treated ( TMT ) bars (yield strength 415 MPa)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)

Standards & Quality Control Authority, MoWHS

Quant
0.06013
0.17004
0.07193
0.01000
0.07193
0.00700
0.95070
0.00700
0.00700
0.05590
0.08900
0.03756
5.05050
0.45780
0.01472

Units
day
day
day
day
day
day
day
day
day
cu.m
cu.m
tonne
kg
m
cu.m

Labour and Material Coefficients (Civil Works) - 2009

RW0187

246

Providing & fixing precast kilometre stone of RC 1:2:4 (20mm aggregate) including finishing with
mortar 1:3 complete as per standard design (cost of excavation, concreting, painting etc. shall be paid
separately) - 50cm x 152.5cm x 25cm
Coefficient for per each
Code
LB0032
LB0033
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0145
MT0208
MT0325
MT0330

RW0188

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Cement (OPC / PSC)
Thermo - Mechanically Treated ( TMT ) bars (yield strength 415 MPa)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)

Quant
0.11413
0.26832
0.12265
0.01900
0.12265
0.01330
1.47753
0.01330
0.01330
0.10358
0.16910
0.07012
9.58650
0.72240
0.02322

Units
day
day
day
day
day
day
day
day
day
cu.m
cu.m
tonne
kg
m
cu.m

Providing & fixing precast kilometre stone of RC 1:2:4 (20mm aggregate) including finishing with
mortar 1:3 complete as per standard design (cost of excavation, concreting, painting etc. shall be paid
separately) - 35cm x 93.5cm x 18cm
Coefficient for per each
Code
LB0032
LB0033
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0145
MT0208
MT0325
MT0330

RW0189

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Cement (OPC / PSC)
Thermo - Mechanically Treated ( TMT ) bars (yield strength 415 MPa)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)

Quant
0.03600
0.12636
0.05390
0.00600
0.05390
0.00420
0.60718
0.00420
0.00420
0.03556
0.05340
0.02350
3.02400
0.34020
0.01094

Units
day
day
day
day
day
day
day
day
day
cu.m
cu.m
tonne
kg
m
cu.m

Lettering with paint of approved brand and manufacture......per letter per centimetre ht
Coefficient for per each
Code
Description
LB0052 Painter Gd.1
MT0722 Synthetic enamel paint

RW0190

Quant
0.00400
0.00040

Units
day
litre

Relettering with paint of approved brand and manufacture......per letter per centimetre ht
Coefficient for per each
Code
LB0052
LB0076
MT0722

Description
Painter Gd.1
Labour
Synthetic enamel paint

Quant
0.00260
0.00060
0.00030

Standards & Quality Control Authority, MoWHS

Units
day
day
litre

Labour and Material Coefficients (Civil Works) - 2009

RW0195

247

Supplying posts & struts - Local ballies, 250 mm min. girth


Coefficient for per m
Code
Description
LB0077 Labour
MT0326 Ballies 250 to 300mm dia

RW0196

Quant
0.09000
1.00000

Units
day
m

Supplying posts & struts - Local ballies 250 mm min girth , 1.8m long
Coefficient for per each
Code
Description
LB0077 Labour
MT0326 Ballies 250 to 300 mm dia

RW0197

Quant
0.34200
1.80000

Units
day
m

Supplying posts & struts - Precast R.C posts, 1.8 m long


Coefficient for per each
Code
LB0032
LB0033
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0145
MT0208
MT0325
MT0330

RW0198

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Cement (OPC / PSC)
Thermo - Mechanically Treated ( TMT ) bars (yield strength 415 MPa)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)

Quant
0.04625
0.25933
0.04471
0.00336
0.04471
0.00235
0.54599
0.00235
0.00235
0.02256
0.02990
0.01442
3.88500
0.84327
0.01209

Units
day
day
day
day
day
day
day
day
day
cu.m
cu.m
tonne
kg
m
cu.m

Supplying posts & struts - Precast R.C struts 2.0 m long


Coefficient for per each
Code
LB0032
LB0033
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0070
MT0145
MT0208
MT0325
MT0330

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 20mm
Cement (OPC / PSC)
Thermo - Mechanically Treated ( TMT ) bars (yield strength 415 MPa)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)

Standards & Quality Control Authority, MoWHS

Quant
0.02875
0.23447
0.03674
0.00210
0.03674
0.00147
0.44418
0.00147
0.00147
0.01575
0.01869
0.00980
2.41500
0.76244
0.01093

Units
day
day
day
day
day
day
day
day
day
cu.m
cu.m
tonne
kg
m
cu.m

Labour and Material Coefficients (Civil Works) - 2009

RW0199

248

Supplying posts & struts - RCC posts & struts, 1.8m long
Coefficient for per m
Code
LB0032
LB0033
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0067
MT0070
MT0145
MT0208
MT0325
MT0330

RW0200

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 50mm
Crushed Rock - 20mm
Cement (OPC / PSC)
Thermo - Mechanically Treated ( TMT ) bars (yield strength 415 MPa)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)

Quant
0.04625
0.25933
0.05054
0.00802
0.05054
0.00888
0.84180
0.00888
0.00888
0.06641
0.08304
0.02990
0.02665
3.88500
0.84327
0.01209

Units
day
day
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne
kg
m
cu.m

Supplying posts & struts - RCC posts & struts, 2m long


Coefficient for per m
Code
LB0032
LB0033
LB0036
LB0039
LB0051
LB0053
LB0077
MP0205
MP0206
MT0043
MT0067
MT0070
MT0145
MT0208
MT0325
MT0330

RW0202

Description
Blacksmith (metal-worker)
Carpenter Gd.2
Mason Gd.1
Work Supervisor (Lajab)
Mason Gd.2
Plant Operator Gd.3
Labour
Concrete Mixer(7/5 cu.ft)
Concrete Vibrator(M/C5)
Sand
Crushed Rock - 50mm
Crushed Rock - 20mm
Cement (OPC / PSC)
Thermo - Mechanically Treated ( TMT ) bars (yield strength 415 MPa)
Ballies 75 to 125mm dia
Rough-sawn timber (urban rate) - Class 'B', (Mixed Conifer)

Quant
0.02875
0.23447
0.03757
0.00276
0.03757
0.00240
0.56622
0.00240
0.00240
0.02201
0.01184
0.01869
0.01154
2.41500
0.76244
0.01093

Units
day
day
day
day
day
day
day
day
day
cu.m
cu.m
cu.m
tonne
kg
m
cu.m

Providing & fixing G.I barbed Wire Netting including fixing of post or struts, G.I staples, coal tarring in
case of ballies complete (posts/struts, earthwork, concrete paid separately) - 2.5mm , (12 SWG), 4
barbs form by
twisting two point wires, each two turns, pitch of barbs 75mm
Coefficient for per m
Code
LB0032
LB0036
LB0051
LB0077
MT0225

RW0205

Description
Blacksmith (metal-worker)
Mason Gd.1
Mason Gd.2
Labour
Barbed Wire

Quant
0.00460
0.00060
0.00060
0.00230
1.00000

Units
day
day
day
day
m

Providing & fixing G.I double knotted mesh including fixing of post or struts, G.I staples, coal tarring in
case of ballies complete (excluding the cost of posts/struts, earthwork, concrete) - 4mm (8 SWG) x
100mm
Coefficient for per sq.m
Code
LB0032
LB0036
LB0051
LB0077
MT0230

Description
Blacksmith (metal-worker)
Mason Gd.1
Mason Gd.2
Labour
G.I double knotted mesh - 100 x 100 x 8-gauge

Standards & Quality Control Authority, MoWHS

Quant
0.03480
0.00420
0.00420
0.01730
1.00000

Units
day
day
day
day
sq.m

Labour and Material Coefficients (Civil Works) - 2009

RW0206

249

Providing & fixing G.I double knotted mesh including fixing of post or struts, G.I staples, coal tarring in
case of ballies complete (excluding the cost of posts/struts, earthwork, concrete) - 2.5mm (12 SWG) x
100mm
Coefficient for per sq.m
Code
LB0032
LB0036
LB0051
LB0077
MT0281

RW0207

Description
Blacksmith (metal-worker)
Mason Gd.1
Mason Gd.2
Labour
G.I double knotted mesh - 100 x 100 x 12-gauge

Quant
0.03480
0.00420
0.00420
0.01730
1.00000

Units
day
day
day
day
sq.m

Providing & fixing G.I double knotted mesh including fixing of post or struts, G.I staples, coal tarring in
case of ballies complete (excluding the cost of posts/struts, earthwork, concrete) - 4mm (8 SWG) x
150mm
Coefficient for per sq.m
Code
LB0032
LB0036
LB0051
LB0077
MT0232

RW0208

Description
Blacksmith (metal-worker)
Mason Gd.1
Mason Gd.2
Labour
G.I double knotted mesh - 150 x 150 x 8-gauge

Quant
0.03480
0.00420
0.00420
0.01730
1.00000

Units
day
day
day
day
sq.m

Providing & fixing G.I double knotted mesh including fixing of post or struts, G.I staples, coal tarring in
case of ballies complete (excluding the cost of posts/struts, earthwork, concrete) - 2.5mm (12 SWG) x
150mm
Coefficient for per sq.m
Code
LB0032
LB0036
LB0051
LB0077
MT0233

RW0209

Description
Blacksmith (metal-worker)
Mason Gd.1
Mason Gd.2
Labour
G.I double knotted mesh - 150 x 150 x 12-gauge

Quant
0.03480
0.00420
0.00420
0.01730
1.00000

Units
day
day
day
day
sq.m

Providing & fixing G.I chain-link mesh including fixing of post or struts, G.I staples (excluding the cost
of posts/struts, earthwork, concrete etc.) - 4mm (8 SWG) x 50mm
Coefficient for per sq.m
Code
LB0032
LB0036
LB0051
LB0077
MT0244

RW0210

Description
Blacksmith (metal-worker)
Mason Gd.1
Mason Gd.2
Labour
G.I chain-link mesh - 50 x 50 x 8-gauge

Quant
0.03480
0.00420
0.00420
0.01730
1.00000

Units
day
day
day
day
sq.m

Providing & fixing G.I chain-link mesh including fixing of post or struts, G.I staples (excluding the cost
of posts/struts, earthwork, concrete etc.) - 2.5mm (12 SWG) x 50mm
Coefficient for per sq.m
Code
LB0032
LB0036
LB0051
LB0077
MT0245

Description
Blacksmith (metal-worker)
Mason Gd.1
Mason Gd.2
Labour
G.I chain-link mesh - 50 x 50 x 12-gauge

Standards & Quality Control Authority, MoWHS

Quant
0.03480
0.00420
0.00420
0.01730
1.00000

Units
day
day
day
day
sq.m

Labour and Material Coefficients (Civil Works) - 2009

RW0211

250

Providing & fixing G.I chain-link mesh including fixing of post or struts, G.I staples (excluding the cost
of posts/struts, earthwork, concrete etc.) - 4mm (8 SWG) x 75mm
Coefficient for per sq.m
Code
LB0032
LB0036
LB0051
LB0077
MT0242

RW0212

Description
Blacksmith (metal-worker)
Mason Gd.1
Mason Gd.2
Labour
G.I chain-link mesh - 75 x 75 x 8-gauge

Quant
0.03480
0.00420
0.00420
0.01730
1.00000

Units
day
day
day
day
sq.m

Providing & fixing G.I chain-link mesh including fixing of post or struts, G.I staples (excluding the cost
of posts/struts, earthwork, concrete etc.) - 2.5mm (12 SWG) x 75mm
Coefficient for per sq.m
Code
LB0032
LB0036
LB0051
LB0077
MT0243

RW0213

Description
Blacksmith (metal-worker)
Mason Gd.1
Mason Gd.2
Labour
G.I chain-link mesh - 75 x 75 x 12-gauge

Quant
0.03480
0.00420
0.00420
0.01730
1.00000

Units
day
day
day
day
sq.m

Providing & fixing G.I chain-link mesh including fixing of post or struts, G.I staples (excluding the cost
of posts/struts, earthwork, concrete etc.) - 4mm (8 SWG) x 100mm
Coefficient for per sq.m
Code
LB0032
LB0036
LB0051
LB0077
MT0240

RW0214

Description
Blacksmith (metal-worker)
Mason Gd.1
Mason Gd.2
Labour
G.I chain-link mesh - 100 x 100 x 8-gauge

Quant
0.03480
0.00420
0.00420
0.01730
1.00000

Units
day
day
day
day
sq.m

Providing & fixing G.I chain-link mesh including fixing of post or struts, G.I staples (excluding the cost
of posts/struts, earthwork, concrete etc.) - 2.5mm (12 SWG) x 100mm
Coefficient for per sq.m
Code
LB0032
LB0036
LB0051
LB0077
MT0231

RW0215

Description
Blacksmith (metal-worker)
Mason Gd.1
Mason Gd.2
Labour
G.I chain-link mesh - 100 x 100 x 12-gauge

Quant
0.03480
0.00420
0.00420
0.01730
1.00000

Units
day
day
day
day
sq.m

Providing & fixing 1.2 m high fencing with 1.8 m R.C.C posts of standard design placed every 3 m
apart, embedded in cement concrete blocks, every 15th post, last but one end post and corner post
shall be strutted
on both sides and end post one side only, provided with nine horizontal lines and two diagonals of
barbed wire 10 kg per 100 m ( min) between two posts fitted and fixed with GI staples on wooden plugs
or GI binding wire
tied to 6mm bars nibs fixed while casting the post (cost of RCC posts, struts, earthwork and concrete
to be paid for separately)
Coefficient for per m
Code
LB0051
LB0077
MT0225

Description
Mason Gd.2
Labour
G.I Barbed Wire

Quant
0.00830
0.06333
11.17000

Standards & Quality Control Authority, MoWHS

Units
day
day
m

Labour and Material Coefficients (Civil Works) - 2009

RW0216

251

Providing & fixing 1.2 m high fencing with 1.8 m balli posts 250 mm girth ( min.) placed every 2.5 m
apart, embedded in cement concrete blocks, every 15th post, last but one end post and corner post
shall be strutted
on both sides and end post one side only, provided with six horizontal lines and two diagonals of
barbed wire 10 kg per 100 m ( min) between two posts fitted and fixed with GI staples driven into the
posts complete
(cost of RCC posts, struts, earthwork and concrete to be paid for separately)
Coefficient for per m
Code
LB0051
LB0077
LB0033
MT0225
MT0736
MT0035

RW0217

Description
Mason Gd.2
Labour
carpenter Gd. 2
G.I Barbed Wire
crude coal tar
kerosene

Quant
0.01000
0.06333
0.01300
8.15200
0.07333
0.01300

Units
day
day
day
m
litre
litre

Providing & fixing 2.4 m high fencing with 3.3 m balli posts 250 mm girth (min.) placed every 2.5 m
apart, embedded in cement concrete blocks, every 15th post, last but one end post and corner post
shall be strutted
on both sides and end post one side only, provided with twelve horizontal lines and two diagonals of
barbed wire 10 kg per 100 m ( min) between two posts fitted and fixed with GI staples driven into the
posts complete
(cost of RCC posts, struts, earthwork and concrete to be paid for separately)
Coefficient for per m
Code
LB0051
LB0077
LB0033
MT0225
MT0736
MT0035

RW0218

Description
Mason Gd.2
Labour
carpenter Gd. 2
G.I Barbed Wire
crude coal tar
kerosene

Quant
0.01670
0.09000
0.02160
14.64000
0.12570
0.02260

Units
day
day
day
m
litre
litre

Providing & fixing 1.3 m high concrete rail and pale fencing with 1.8 m R.C.C posts 2.2 m rails and 1.25
m pales placed every 2.5 m apart, embedded in cement concrete blocks ( 450 mm x 450 mm x 700 mm),
of mix 1:5:10 ( 1 cement : 5 sand : 10 graded crushed rock 40 mm nominal size ) ( cost of earthwork in
excavation, concrete work, posts, rails and pales to be paid for separately)

Coefficient for per m


Code
Description
LB0051 Mason Gd.2
LB0077 Labour
RW0219

Quant
0.33000
0.03300

Units
day
day

Providing & fixing 1.2 m high fencing with 1.2 m angle posts ( 40mm x 40 mm x 6 mm) placed every 3
m centre to centre , embedded in cement concrete blocks, every 15th post, last but one end post and
corner post shall be
strutted on both sides and end post one side only, provided with nine horizontal lines and two
diagonals interwoven with horizontal wires of barbed wire 10 kg per 100 m ( min) between two posts
fitted and fixed with GI staples, turn buckles complete
( cost of posts, struts, earthwork and concrete to be paid for separately)
Coefficient for per m
Code
LB0051
LB0077
MT0225

Description
Mason Gd.2
Labour
G.I Barbed Wire

Quant
0.00833
0.05670
11.10000

Standards & Quality Control Authority, MoWHS

Units
day
day
m

Labour and Material Coefficients (Civil Works) - 2009

RW0220

252

Providing & fixing 1.8 m high fencing with 1.8 m angle posts ( 50mm x 50 mm x 6 mm) placed every 3
m centre to centre , embedded in cement concrete blocks, every 15th post, last but one end post and
corner post shall be
strutted on both sides and end post one side only, provided with nine horizontal lines and two
diagonals interwoven with horizontal wires of barbed wire 10 kg per 100 m ( min) between two posts
fitted and fixed with GI staples, turn buckles complete
(cost of posts, struts, earthwork and concrete to be paid for separately)
Coefficient for per m
Code
LB0051
LB0077
MT0225

RW0230

Description
Mason Gd.2
Labour
G.I Barbed Wire

Quant
0.01160
0.09000
14.27000

Units
day
day
m

Collection of Grass and pioneer plant seed, including separation, drying in the sun and storing
Coefficient for per kg
Code
Description
LB0077 Labour
MT0122 Sealed bag

RW0231

Quant
1.23000
1.00000

Broadcasting of Grass/pioneer species seeds on slopes at the rate of 25 grams per sq.m
Coefficient for per 100.00 sq.m
Code
Description
LB0077 Labour

RW0232

Units
day
each

Quant
0.17000

Units
day

Direct Seeding of shrubs or tree seeds at 30 cm spacing including digging holes up to 5 cm depth and
covering with soil, with two seeds per planting hole
Coefficient for per 1.00 sq.m
Code
Description
LB0077 Labour

RW0233

Quant
0.17000

Units
day

Collection and Preparation of materials (woody cuttings 2-4 cm diameter and 50 cm length ) and
staking them 3/4 of the cuttings in the soil
Coefficient for per 1.00 sq.m (at the rate of 11.00 number of cuttings per running meter)
Code
Description
LB0077 Labour
MT0046 Cuttings

RW0234

Quant
0.20000
11.00000

Units
day
each

Collection and Preparation of materials (woody cuttings 2-4 cm diameter and 60 cm length ) and
staking them 3/4 of the cuttings in the soil
Coefficient for per 1.00 sq.m (at the rate of 21.00 number of cuttings per running meter)
Code
Description
LB0077 Labour
MT0046 Cuttings

RW0235

Quant
0.22000
40.00000

Units
day
each

Planting of wildlings (including the collection if wildlings from the wild) and planting them in pit size 30
cm x 30 cm
Coefficient for per 10 nos.
Code
Description
LB0077 Labour
MT0047 seedling

Quant
0.33000
10.00000

Standards & Quality Control Authority, MoWHS

Units
day
each

Labour and Material Coefficients (Civil Works) - 2009

RW0236

253

Sodding on slopes with sods, eg. Lemon grass (30 cms centre to centre), titepati (1 metre centre to
centre) in contour lines. The sods should be placed even closer to each other if the slope is greater
than 25 degree
Coefficient for per sq.m.
Code
Description
LB0077 Labour
MT0393 cane baskets for carrying sods

RW0237

Quant
0.12860
0.05000

Units
day
each

Turfing of embankment with 30x30 cm turfs and fixed to the ground with wooden pegs, if slope is
greater than 25 degrees
Coefficient for per sq.m.
Code
Description
LB0077 Labour
MT0049 turf including transportation

RW0238

Quant
0.20000
1.00000

Units
day
sq.m

Grass slip planting on slopes ( random or in line) at 10 cm apart and 5 cm deep


Coefficient for per sq.m.
Code
Description
LB0077 Labour
MT0048 Grass Slips

Quant
0.05000
100.00000

Standards & Quality Control Authority, MoWHS

Units
day
each

LabourandMaterialsCoefficients(CivilWorks)2009

DATASHEET1CARRIAGEOFMATERIALSBYMECHANICALTRANSPORTBYHILLROADS

Lead Average No of Trips in 8 No of Kms


in K.M Speed
hours
X
Covered in 8
d
hours shift =
2xd + 8

Hire
Total Cost
Cost of
Loading,
Charges of = total of 5
&6
Unloading
Truck with
fuel @ Rs
and
Stacking. 4 3936 per day
Labourers
for 8 Hours
@ Rs 108
Per day

Cost per
trip = Col
7/col 3

increase in
cost per km
in
comparision
to previous
KM.

20

7.27

22.55

453.60

3936.0

4389.60

603.57

21

6.72

34.88

453.60

3936.0

4389.60

653.21

49.64

21.5

6.25

45.53

453.60

3936.0

4389.60

701.83

48.61

22

5.87

54.93

453.60

3936.0

4389.60

748.23

46.40

22.5

5.54

63.38

453.60

3936.0

4389.60

792.57

44.34

23

5.26

71.09

453.60

3936.0

4389.60

834.98

42.41

23.5

5.01

78.19

453.60

3936.0

4389.60

875.59

40.61

24

4.80

84.80

453.60

3936.0

4389.60

914.50

38.91

24.5

4.61

91.01

453.60

3936.0

4389.60

951.83

37.33

10

25

4.44

96.89

453.60

3936.0

4389.60

987.66

35.83

11

25.5

4.29

102.48

453.60

3936.0

4389.60

1022.09

34.43

12

26

4.16

107.84

453.60

3936.0

4389.60

1055.19

33.10

13

26.5

4.04

112.99

453.60

3936.0

4389.60

1087.05

31.85

14

27

3.93

117.96

453.60

3936.0

4389.60

1117.72

30.68

15

27.5

3.83

122.78

453.60

3936.0

4389.60

1147.28

29.56

16

28

3.73

127.47

453.60

3936.0

4389.60

1175.79

28.50

17

28.5

3.65

132.03

453.60

3936.0

4389.60

1203.29

27.50

18

29

3.57

136.49

453.60

3936.0

4389.60

1229.84

26.56

19

29.5

3.50

140.86

453.60

3936.0

4389.60

1255.50

25.66

20

30

3.43

145.14

453.60

3936.0

4389.60

1280.30

24.80

21

30

3.33

148.00

453.60

3936.0

4389.60

1316.88

36.58

22

30

3.24

150.70

453.60

3936.0

4389.60

1353.46

36.58

23

30

3.16

153.26

453.60

3936.0

4389.60

1390.04

36.58

24

30

3.08

155.69

453.60

3936.0

4389.60

1426.62

36.58

25

30

3.00

158.00

453.60

3936.0

4389.60

1463.20

36.58

LabourandMaterialsCoefficients(CivilWorks)2009

26

30

2.93

160.20

453.60

3936.0

4389.60

1499.78

36.58

27

30

2.86

162.29

453.60

3936.0

4389.60

1536.36

36.58

28

30

2.79

164.28

453.60

3936.0

4389.60

1572.94

36.58

29

30

2.73

166.18

453.60

3936.0

4389.60

1609.52

36.58

30

30

2.67

168.00

453.60

3936.0

4389.60

1646.10

36.58

31

30

2.61

169.74

453.60

3936.0

4389.60

1682.68

36.58

32

30

2.55

171.40

453.60

3936.0

4389.60

1719.26

36.58

33

30

2.50

173.00

453.60

3936.0

4389.60

1755.84

36.58

34

30

2.45

174.53

453.60

3936.0

4389.60

1792.42

36.58

35

30

2.40

176.00

453.60

3936.0

4389.60

1829.00

36.58

36

30

2.35

177.41

453.60

3936.0

4389.60

1865.58

36.58

37

30

2.31

178.77

453.60

3936.0

4389.60

1902.16

36.58

38

30

2.26

180.08

453.60

3936.0

4389.60

1938.74

36.58

39

30

2.22

181.33

453.60

3936.0

4389.60

1975.32

36.58

40

30

2.18

182.55

453.60

3936.0

4389.60

2011.90

36.58

Note :
1. No of trips in 8 Hrs Shift
x = 8/ ( a+1)
where a = 2d/s
d = distance/lead in Km
S = Average Speed Per Hour
1 hour is added for time spent for loading and unloading
2 Diesel Consumption of truck is assumed as 5 Km per litre for hill roads, hire charge of TATA LB 1612 = Nu. 3936
3. Consumption of Mobil is assumed as 1 litre for a run of 250 Km
4. In col 4 : Distance covered in 8 hours includes 8 kms to cover additional distance normally covered by the truck to reach
quarry/crusher from place of halting
5. Cost of diesel as per existing in Market, BSR 2007 = Nu. 31.29
6. Cost of Mobil as per existing in market = Nu. 220 per litre
7. Actual Cost of Hire charge after deducting the cost of mobil oil.
9. Labour Cost as per BSR 2007 = Nu. 108 per day

LabourandMaterialsCoefficients(CivilWorks)2009

DATA SHEET 2 - MECHANICAL TRANSPORTATION OF MATERIALS IN PLAIN ROADS


Lead in
K.M d

Average
Speed

No of Trips No of Kms
in 8 hours = Covered
x
in 8 hours
shift = 2xd
+8

Cost of
Loading,
Unloading
and
Stacking. 4
Labourers
for 8 Hours
@ Rs 108
Per day

Hire Charges Total Cost =


of Truck with total of 5 & 6
fuel @ Rs
3936 per day

25

7.41

22.81

453.60

3936.0

4389.60

592.60

25.5

6.92

35.66

453.60

3936.0

4389.60

634.77

42.17

26

6.50

47.00

453.60

3936.0

4389.60

675.32

40.55

26.5

6.14

57.16

453.60

3936.0

4389.60

714.35

39.02

27

5.84

66.38

453.60

3936.0

4389.60

751.92

37.58

27.5

5.57

74.84

453.60

3936.0

4389.60

788.13

36.21

28

5.33

82.67

453.60

3936.0

4389.60

823.05

34.92

28.5

5.12

89.98

453.60

3936.0

4389.60

856.74

33.69

29

4.94

96.85

453.60

3936.0

4389.60

889.27

32.53

10

29.5

4.77

103.35

453.60

3936.0

4389.60

920.70

31.43

11

30

4.62

109.54

453.60

3936.0

4389.60

951.08

30.38

12

30.5

4.48

115.45

453.60

3936.0

4389.60

980.46

29.38

13

31

4.35

121.12

453.60

3936.0

4389.60

1008.90

28.44

14

31.5

4.24

126.59

453.60

3936.0

4389.60

1036.43

27.53

15

32

4.13

131.87

453.60

3936.0

4389.60

1063.11

26.67

16

32.5

4.03

136.99

453.60

3936.0

4389.60

1088.96

25.85

17

33

3.94

141.97

453.60

3936.0

4389.60

1114.03

25.07

18

33.5

3.86

146.82

453.60

3936.0

4389.60

1138.35

24.32

19

34

3.78

151.56

453.60

3936.0

4389.60

1161.95

23.61

20

34.5

3.70

156.19

453.60

3936.0

4389.60

1184.87

22.92

21

35

3.64

160.73

453.60

3936.0

4389.60

1207.14

22.27

22

35.5

3.57

165.18

453.60

3936.0

4389.60

1228.78

21.64

23

36

3.51

169.56

453.60

3936.0

4389.60

1249.82

21.04

24

36.5

3.46

173.87

453.60

3936.0

4389.60

1270.28

20.46

25

37

3.40

178.11

453.60

3936.0

4389.60

1290.19

19.91

26

37.5

3.35

182.30

453.60

3936.0

4389.60

1309.56

19.38

27

38

3.30

186.43

453.60

3936.0

4389.60

1328.43

18.87

28

38.5

3.26

190.52

453.60

3936.0

4389.60

1346.81

18.38

29

39

3.22

194.56

453.60

3936.0

4389.60

1364.72

17.91

30

39.5

3.18

198.55

453.60

3936.0

4389.60

1382.17

17.45

1. No of trips in 8 Hrs Shift


x = 8/ ( a+1)
where a = 2d/s
d = distance/lead in Km
S = Average Speed Per Hour

increase in Average increase in


cost per km cost for 5 km dis., 5
in
to 10 km, 10 km to
comparisio
20 km etc.
n to
previous
KM.

Note :

Cost per trip


= Col 7/col 3

10

33.76

26.42

19.73

LabourandMaterialsCoefficients(CivilWorks)2009

1 hour is added for time spent for loading and unloading


2 Diesel Consumption of truck is assumed as 7 km per litre for plain roads, Hire charge with fuel of TATA LB 1612 is Nu. 3936
3. Consumption of Mobil is assumed as 1 litre for a run of 250 Km
4. In col 4 : Distance covered in 8 hours includes 8 kms to cover additional distance normally covered by the truck to reach the
quarry/crusher from place of halting
5. Cost of diesel as per existing in Market, BSR 2009 = Nu. 31.29
6. Cost of Mobil as per existing in market = Nu. 220 per litre
7. Actual Cost of Hire charge after deducting the cost of mobil oil.
8. Average Speed is assumed as 30 kmph for hill roads and 50 kmph for plain roads.
9. Labour Cost as per BSR -2009 is Nu. 108 per day

LabourandMaterialsCoefficients(CivilWorks)2009

11

DATASHEETAnalysesofratesforcarriageofMaterialsbyMechanicalTransportfordifferentmaterials

Sl.no

Net
quantity
Carrying
payable
Capacityof
after
Truckper deduction
trip
ofvoids

Materials

costpertripasarrivedfromcolumn12ofdatasheets costpertripasarrivedfromcolumn
1and2
12ofdatasheets1and12
costpertripwithleadfrom5to30
kms
costpertripwithleadfrom1.0kmto5.0km
unitofrate

1 Lime,moorum,buildingrubbish

6cu.m

6cu.m

percu.m

2 Dryearth

6cu.m

4.8cu.m

percu.m

3 ManureorSludge

6cu.m

5.7cu.m

percu.m

4 ExcavatedRock

6cu.m

3cu.m

percu.m

Sand,stoneaggregatesoflessthan
5 40mmsize

5cu.m

5cu.m

percu.m

Stoneaggregatesofmorethan40
6 mmsize

5cu.m

4.6cu.m

percu.m

7 stoneboulders

5cu.m

4.25cu.m

percu.m

8 bricks

2000nos

2000nos

per1000nos

9 tiles

3000nos

3000nos

per1000nos

10 cement

8tonnes

8tonnes

pertonne

11 GI,CIPipes

7tonnes

7tonnes

pertonne

12 Concrete

7tonnes

7tonnes

pertonne

13 steel

8tonnes

8tonnes

pertonne

14 bitumen

4.5tonnes 4.5tonnes

pertonne

15 timber

7.5cu.m

percu.m

7.5cu.m

Costper
trip

rateperunit
col14/col4

5 5to10km 10to20km 20to30km


10

11

12

13

14

15

LabourandMaterialsCoefficient(CivilWorks)2009

Carriage of materials by manual labour including loading, unloading and stacking


for lead less than 0.5 km
1. Normal Carrying capacity of selected building materials up to a lead of first 50 m
by 8 nos labourers in an 8 hour shift is as below:
a.
b.
c.
d.
e.
f.
g.
h.

Lime, moorum, building rubbish 25 cum


Earth 25 cum
Excavated rock 25 cum
Sand or stone aggregate of less than 40 mm size 20 cum
Stone aggregate of size 40 mm or more 20 cum
Soling stone 18 cum
Bricks 9000 nos
Brick tiles 15000 nos

For carrying the above quantity of materials to every further lead of 50 m or part
thereof upto a distance of 0.5 km within a shift of 8 hours approximately, 1.75
extra. Labourers would be required. Add 10% for stacking the quantity of
materials conveyed in 8 hours shift
2. Normal Carrying capacity of selected building materials up to a lead of first 50 m
by 9.5 nos labourers in an 8 hour shift is as below:
a. Stone blocks and other heavy materials like GI, CI pipes less than 100 mm
dia 36 tonnes
b. cement 45 tonnes
c. steel 20 tonnes
d. timber - 35 cum
e. stone ware pipes 600 mm long
100 mm dia 1785 m or 2975 nos
150 mm dia 1086 m or 1810 nos
200 mm dia 777 m or 1295 nos
230 mm dia 607.2 m or 1012 nos
250 mm dia 465 m or 775 nos
300 mm dia 327 m or 545 nos
f. RCC pipes, steel cylinder RC pipes, CI and unreinforced cement pipes
3.66 m long
100 mm dia 1317.6 m or 360 nos
125 mm dia 1083.36 m or 296 nos
150 mm dia 933.3 m or 255 nos
200 mm dia 629.50 m or 172 nos
For carrying the above quantity of materials to every further lead of 50 m or part
thereof upto a distance of 0.5 km within a shift of 8 hours approximately, 1.5 nos
extra labourers would be required.
Add 10% for stacking the quantity of materials conveyed in 8 hours shift