Anda di halaman 1dari 142

Dalam bahasa Indonesia

Masukan Angka di sini


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

Satu
Dua
Tiga
Empat
Lima
Enam
Tujuh
Delapan
Sembilan
Sepuluh
Sebelas
Dua belas
Tiga Belas
Empat Belas
Lima Belas
Enam Belas
Tujuh Belas
Delapan belas
Sembilan Belas
Puluh
Ratus

0
0
85
85,820
85,820,000
0
0
0
8
0
0
0
8
2
0
0
0
5
0
0
0

85,820,000.00
0
0
85
820
0

Delapan Ratus

Delapan Puluh
Dua Puluh

Lima

Delapan Puluh Lima Juta


Delapan Ratus Dua Puluh Ribu

Juta
Ribu

Rupiah
Terbilang :
Delapan Puluh Lima Juta Delapan Ratus Dua Puluh Ribu Rupiah

In English

Enter number here


1
2
3
4
5
6
7
8
9
10

One
Two
Three
Four
Five
Six
Seven
Eight
Nine
Ten

85,820,000.00

0
0
85
85,820
85,820,000
0
0
0
8 Eight Hundred
0
0

0
0
85
820
0

11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65

Eleven
Twelve
Thirteen
Forteen
Fifteen
Sixteen
Seventeen
Eighteen
Nineteen
Twenty
Twenty One
Twenty Two
Twenty Three
Twenty Four
Twenty Five
Twenty Six
Twenty Seven
Twenty Eight
Twenty Nine
Thirty
Thirty One
Thirty Two
Thirty Three
Thirty Four
Thirty Five
Thirty Six
Thirty Seven
Thirty Eight
Thirty Nine
Forty
Forty One
Forty Two
Forty Three
Forty Four
Forty Five
Forty Six
Forty Seven
Forty Eight
Forty Nine
Fifty
Fifty One
Fifty Two
Fifty Three
Fifty Four
Fifty Five
Fifty Six
Fifty Seven
Fifty Eight
Fifty Nine
Sixty
Sixty One
Sixty Two
Sixty Three
Sixty Four
Sixty Five

0
85 Eighty Five
20 Twenty
0
0

66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99

Sixty Six
Sixty Seven
Sixty Eight
Sixty Nine
Seventy
Seventy One
Seventy Two
Seventy Three
Seventy Four
Seventy Five
Seventy Six
Seventy Seven
Seventy Eight
Seventy Nine
Eighty
Eighty One
Eighty Two
Eighty Three
Eighty Four
Eighty Five
Eighty Six
Eighty Seven
Eighty Eight
Eighty Nine
Ninety
Ninety One
Ninety Two
Ninety Three
Ninety Four
Ninety Five
Ninety Six
Ninety Seven
Ninety Eight
Ninety Nine
Hundred

Million
Thousand

Eighty Five Million


Eight Hundred Twenty Thousand
Rupiah

in Words :
Eighty Five Million Eight Hundred Twenty Thousand Rupiah

REKAPITULASI BIAYA
PEKERJAAN
LOKASI
TAHUN

URAIAN

NO

JUMLAH HARGA (Rp)

2,200,000.00

I PEKERJAAN PERSIAPAN

73,821,376.27

II PEKERJAAN PERBAIKAN DRAENASE DAERAH I

2,000,000.00

III PEKERJAAN LAIN-LAIN

Terbilang :

Sub Total Rp.

78,021,376.27

PPn (10%) Rp.

7,802,137.63

Total Rp.

85,823,513.90

Pembulatan

85,820,000.00

Delapan Puluh Lima Juta Delapan Ratus Dua Puluh Ribu Rupiah

Belawan,

2012

Dibuat Oleh :
STAF FASILITAS

RIZALDY HASIAN HARAHAP

OWNERS ESTIMATE (OE)


PEKERJAAN
LOKASI
TAHUN

No.

Uraian

Satuan

Volume

I PEKERJAAN PERSIAPAN
1 Survey lokasi
2 Mobilisasi dan Demobilisasi Alat

II
1
2
3
4
5
6
7

PEKERJAAN PERBAIKAN DRAENASE DAERAH I


Pekerjaan perbaikan beton dudukan grill
Pekerjaan bongkar beton
Pekerjaan bongkar pasangan bata
Pekerjaan beton bertulang dinding drainase
Pekerjaan besi siku pinggir 40.40.4
Pekerjaan besi pelat strip 5.30
Pekerjaan besi kotak 40x40 t 1,2

III PEKERJAAN LAIN-LAIN


1 Pembersihan akhir
2 Dokumentasi dan laporan

1.00
1.00

1.00
3.13
6.28
13.46
309.33
128.00
676.45

1.00
1.00

ls
ls

ls
m
m
m
kg
kg
kg

ls
ls

Harga satuan (Rp)


Upah
5

200,000.00
2,000,000.00

200,000.00
464,000.00
165,500.00
508,679.60
8,880.00
8,880.00
8,880.00

1,000,000.00
1,000,000.00

Bahan
6

Jumlah harga (Rp)


Upah + Bahan
7

0.00
0.00

300,000.00
0.00
0.00
2,866,161.24
13,915.00
13,915.00
13,915.00

0.00
0.00

200,000.00
2,000,000.00

500,000.00
464,000.00
165,500.00
3,374,840.84
22,795.00
22,795.00
22,795.00

1,000,000.00
1,000,000.00

Upah
8

Bahan
9

200,000.00
2,000,000.00

200,000.00
1,453,248.00
1,039,298.63
6,849,040.17
2,746,880.00
1,136,640.00
6,006,915.07

Upah + Bahan
10

0.00
0.00

200,000.00
2,000,000.00

JUMLAH

2,200,000.00

300,000.00
0.00
0.00
38,590,998.09
4,304,373.33
1,781,120.00
9,412,862.98

500,000.00
1,453,248.00
1,039,298.63
45,440,038.26
7,051,253.33
2,917,760.00
15,419,778.05

JUMLAH

73,821,376.27

0.00
0.00

1,000,000.00
1,000,000.00

JUMLAH

2,000,000.00

1,000,000.00
1,000,000.00

Belawan,

2012

Dibuat Oleh :
STAF FASILITAS

RIZALDY HASIAN HARAHAP

DAFTAR UPAH DAN BAHAN


PEKERJAAN
LOKASI
TAHUN

KODE

NO.

NAMA BARANG / BAHAN / TENAGA

SATUAN

UPH
UPH
UPH
UPH
UPH
UPH
UPH
UPH
UPH
UPH
UPH
UPH
UPH
UPH
UPH
UPH
UPH
UPH
UPH
UPH
UPH
UPH
UPH
UPH
UPH
UPH
UPH
UPH
UPH
UPH
UPH
UPH

UPH1
UPH2
UPH3
UPH4
UPH5
UPH6
UPH7
UPH8
UPH9
UPH10
UPH11
UPH12
UPH13
UPH14
UPH15
UPH16
UPH17
UPH18
UPH19
UPH20
UPH21
UPH22
UPH23
UPH24
UPH25
UPH26
UPH27
UPH28
UPH29
UPH30
UPH31

UPAH
Tukang kayu
Tukang batu
Tukang alumunium
Tukang besi
Tukang las
Tukang cat
Tukang plitur
Tukang bor
Tukang listrik
Tukang pipa ledeng
Tukang Pancang
Kepala tukang
Tukan gali/timbun
Pekerja
Mandor
Pengawas
Ahli ukur
Asisten ahli ukur
Sopir
Masinis
Kernet / pembantu sopir
Mekanik terlatih
Operator tak terlatih
Operator terlatih
Pembantu Operator
Operator semi terlatih
Penjaga
Penyelam
Tukang Grouting
Operator mesin sondir
Analis test sondir

OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH

ASB
ASB

ASB1

ASBES
Asbes plat ( 100 x 100 x 0,3 )

lbr

ASB
ASB
ASB
ASB
ASB
ASB
ASB
ASB
ASB
ASB
ASB
ASB
ASB
ASB

ASB2
ASB3
ASB4
ASB5
ASB6
ASB7
ASB8
ASB9
ASB10
ASB11
ASB12
ASB13
ASB14
ASB15

Asbes gelombang besar ( 225 x 92 x 0,5 )


Asbes gelombang besar ( 200 x 92 x 0,5 )
Asbes gelombang besar ( 180 x 92 x 0,5 )
Asbes gelombang besar ( 240 x 108 x 0,6 )
Asbes gelombang besar ( 210 x 108 x 0,6 )
Asbes gelombang besar ( 180 x 108 x 0,6 )
Asbes gelombang kecil ( 210 x 105 x 0,4 )
Asbes gelombang kecil ( 180 x 105 x 0,4 )
Asbes gelombang kecil ( 150 x 105 x 0,4 )
Asbes gelombang kecil ( 240 x 105 x 0,4 )
Asbes nok gelombang besar
Asbes nok gelombang kecil
Nok paten (Rabung)
Nok stel rata

lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr

ASP
ASP
ASP
ASP
ASP
ASP

ASP1
ASP2
ASP3
ASP4
ASP5

ASPAL
Aspal cair
Aspal curah
Aspal drum
Aspal modifer / asphalt joint
Drum aspal bekas

ASP
ASP

ASP6
ASP7

Rubber Filler
Filler

kg
kg
kg
kg
bh
m1
kg

HARGA SATUAN
(Rp.)

80,000

80,000
80,000

80,000
80,000

80,000
80,000

90,000
55,000

80,000

9,400

KODE

NO.

NAMA BARANG / BAHAN / TENAGA

SATUAN

ASP

ASP8

Karosene

ATP
ATP
ATP
ATP
ATP
ATP
ATP

ATP1
ATP2
ATP3
ATP4
ATP5
ATP6

GENTENG
Genteng beton besar natural 1m 9 biji
Genteng beton besar warna 1m 9 biji
Genteng beton kecil natural 1m 11 biji
Genteng beton kecil warna 1m 11 biji
Genteng beton kecil natural 1m 20 biji
Genteng beton kecil warna 1m 20 biji

ATP
ATP
ATP
ATP
ATP
ATP
ATP
ATP
ATP
ATP
ATP

ATP7
ATP8
ATP9
ATP10
ATP11
ATP12
ATP13
ATP14
ATP15
ATP16
ATP17

Genteng metal
Genteng bubungan beton
Bubung stel gelombang
Genteng bubungan warna
GENTENG & RABUNG
Genteng keramik lengkung cekung / vlaams
Genteng keramik lengkung rata
Genteng keramik rata / kodok
Genteng keramik berglasir KIA, Kanmuri Natural
Nok metal
ATAP GENTENG METAL

ATP
ATP
ATP

ATP18
ATP19
ATP20

Atap metal gelombang t 0,35 mm


Nok standar 40 cm 18 SWG 22
Paku anti karat

ATP

ATP21

Atap alumunium gelombang tebal 0,55

ATP
ATP
ATP

ATP22
ATP23
ATP24

Atap polykarbonat
Paku skrup anti karat atap metal/polykarbonat
Rabung Atap spandek

ATP
ATP
ATP
ATP
ATP
ATP
ATP

ATP25
ATP26
ATP27
ATP28
ATP29
ATP30
ATP31

Atap spandek
Baut + Hak Spandek
SENG BJLS
Seng BJLS 0,20 gelombang P = 180 cm
Seng BJLS 0,20 gelombang P = 240 cm
Seng plat 3" x 6" BJLS 28
Seng gelombang 2" - 5" BJLS 24

ATP

ATP32

Alumunium gelombang tebal 0,55

lbr
lbr
lbr
lbr
m2

ATP

ATP33

Alumunium foil

HARGA SATUAN
(Rp.)

ltr

bh
bh
bh
bh
bh
bh
m2
bh
lbr
bh
bh
bh
bh
bh
bh
2

m
m'
kg
m2
m2
bh
m'
2
m
bh
51,000.00

ATP

ATP34

Rabung alumunium standar 40 cm 18 SWG 22

BBM
BBM
BBM
BBM
BBM
BBM
BBM
BBM
BBM
BBM

BBM1
BBM2
BBM3
BBM4
BBM5
BBM6
BBM7
BBM8
BBM9

BAHAN PELARUT, PELUMAS


Oli SAE 30
Minyak bakar / kerosene
Minyak bekisting
Bensin premium
Solar
Minyak pelumas
Vet
Gas Elpiji
Minyak bekisting

ltr
ltr
ltr
ltr
ltr
ltr
kg
kg
ltr

BKM
BKM
BKM
BKM
BKM
BKM
BKM
BKM

BKM1
BKM2
BKM3
BKM4
BKM5
BKM6
BKM7

BAHAN KIMIA PEMBANTU UNTUK BETON


Bahan kimia B (kuat ikat cepat )
Bahan kimia E (kuat ikat cepat )

kg
kg

BAHAN PENGAWET DAN BITUMEN


Teer kayu
Residu
Flincoat

box
ltr
ltr

BSI
BSI
BSI
BSI
BSI
BSI

BSI1
BSI2
BSI3
BSI4
BSI5

BESI BETON
Besi beton polos
Besi beton ulir
Besi baja profil
Besi tuang / cor
Besi plat lembaran

kg
kg
kg
kg
kg

18,900.00
6,000

11,600
12,300

12,500.00

KODE

NO.

NAMA BARANG / BAHAN / TENAGA

BSI
BSI
BSI
BSI
BSI
BSI
BSI
BSI
BSI
BSI
BSI
BSI
BSI
BSI
BSI
BSI

BSI6
BSI7
BSI8
BSI9
BSI10
BSI11
BSI12
BSI13
BSI14
BSI15
BSI16
BSI17
BSI18
BSI19
BSI20
BSI21

Besi scuare tube


Besi lis kaca (1 x 1) cm
Besi gording canal
Baja profil IWF
Besi strip
Besi profil
Besi siku rata-rata
Besi angkur dia. 8mm
Plat baja t = 3 mm
Formite/penjaga jarak bekisting/spacer
Scafolding
Profil alumunium
Skrup fixer
Sealent
Alumunium strip
Besi pelat/baja tulangan dia 19 mm

BSI

Al. Composite Panel (Alucopan)

BSI
BSI
BSI

BSI22
BSI23
BSI24
BSI25
BSI26

BSI

BSI27

Kawat nyamuk

BSI
BSI
BSI
BSI
BSI

BSI28
BSI29
BSI30
BSI31
BSI32

Kawat jaring
Kawat las
Kawat galvanis
Kawat duri
Besi jaring kawat baja

BSI

BSI33

Kawat harmonika

m
kg
kg
kg
kg
m2

BSI

BSI34

Kawat penggantung rangka hollow

BSI
BSI

BSI35
BSI36

Profil Alumunium "T"


Baja ringan

BSI

BSI37

Pipa hollow

m1
m2
1
m

BSI
BSI

BSI38
BSI39

Kusen alumunium uk 2"x4" tebal 1.2 mm sekualitas YKK putih


Jendela nako

BSI

BSI40

Pintu besi baja

m1
bh
2
m

BSI

BSI41

Jendela besi baja

m2

BSI

BSI42

Jendela besi tahan api

BSI

BSI43

Pintu gulung besi

m2

BSI

BSI44

Pintu lipat besi

BSI

BSI45

Sunscreen alumunium

m2

BSI

BSI46

Roll door

m2

BSI

BSI47

Pintu alumunium

KAWAT
Kawat beton / bindrat
Kawat bronjong

SATUAN
ml
ml
kg
kg
kg
kg
kg
kg
Kg
bh
unit
m1
bh
tube
ml
kg
2
m

kg
kg
m2

BSI

BSI48

Vertikal blind

BSI

BSI49
BSI50
BSI51
BSI52
BSI53
BSI54
BSI55
BSI56
BSI57
BSI58
BSI59
BSI60
BSI61

Wall paper

m2

Scafolding
Main Frame (MF-1219/h = 190 cm)
Ladder Frame (LF-1209/h =90)
Join Pin (JP-42)
Cross Brase (CB-1218/I = 220 cm)-MF
Cross Brase (CB-0618/I = 193)-LF
Head Jack (HJ-60)
Base Jack (BJ-60)
Balok 8/12 (10x pakai)
Papan Alas 3/20 (3x pakai)
Kawat Pengikat

bh
bh
bh
bh
bh
bh
bh
m3
m3
kg

BTN
BTN
BTN
BTN
BTN

BUIS BETON / KERB


BTN1
BTN2
BTN3
BTN4

Buis beton bulat dia. 80 cm P=0,5 m


BETON DAN BARANG DARI BETON (BATAKO)
Panel beton pracetak
Kolom beton pracetak

12,100

13,300
12,100
13,300

7,500.00

239,400.00

20,000

m2

BSI
BSI
BSI
BSI
BSI
BSI
BSI
BSI
BSI
BSI
BSI

HARGA SATUAN
(Rp.)

m1
lbr
btg

20,000

NAMA BARANG / BAHAN / TENAGA

SATUAN

HARGA SATUAN
(Rp.)

KODE

NO.

BTN
BTN

BTN5
BTN6

Tiang Pancang Beton dia cm (bottom)


Tiang Pancang Beton dia cm (upper)

m'
m'

BTU
BTU
BTU
BTU
BTU
BTU
BTU
BTU
BTU

BTU1
BTU2
BTU3
BTU4
BTU5
BTU6
BTU7

BATU ALAM / AGREGAT / BAHAN TUMBUHAN


BATU ALAM
Batu kali
Batu apung
Batu Granit
Batu hias tempel
Batu hias bulat putih
Ubin granit uk. 40/40
Ubin granit uk. 30/30

m
Kg
3
m
2
m
3
m
2
m
2
m

BTU

BTU8

Ubin keramik artistik

m2

BTU

BTU9

Ubin marmer ( 40 x 40 x 2 ) Baitik/Citatah

BTU

BTU10

Ubin marmer ( 40 x 60 x 2 ) Baitik

BTU
BTU
BTU
BTU

BTU11
BTU12
BTU13
BTU14

Ubin marmer ( 15 x 30 x 2 ) Baitik


Vinyl
Riol 20 cm
Floor hardener

BTU

BTU15

Agregat hakus/pasir klas A ( Uk. butir 5 mm )

m2
bh
bh
kg
m3

BTU

BTU16

Agregat kasar/krikil/pasir klas B ( Uk. 20 - 40 )

BTU

BTU17

Agregat kasar/krikil/pasir klas C ( Uk. 4 - 19 )

m3

BTU

BTU18

Batu tempel

BTU
BTU

BTU19
BTU20

Bata pelapis dinding


Batu Bata 5 x 11 x 22

BTU

BTU21

Batu pecah 2/3 ( split )

m2
bh
3
m

214,200

BTU

BTU22

Batu pecah 3/4

m3

214,200

BTU

BTU23

Batu pecah 4/6

m3

214,200

BTU

BTU24

Batu pecah 5/7

m3

214,200

BTU

BTU25

Batu pecah 1/2

BTU

BTU26

Batu belah hitam

BTU

BTU27

Batu belah putih

BTU

BTU28

Sirtu Klas A lewat ayakan 1"

BTU

BTU29

Sirtu klas B lewat ayakan 2"

m3

BTU

BTU30

Pasir urug darat

m3

94,500

BTU

BTU31

Pasir beton

m3

120,000

BTU

BTU32

Pasir pasang ( progo )

BTU

BTU33

Pasir pasang ( krasak )

BTU

BTU34

Krikil beton

m3

BTU

BTU35

Kerikil tidak tersaring

m3

BTU

BTU36

Split D 30 - 40 mm

m3

BTU

BTU37

Split D 10 - 20 mm

m3

BTU
BTU
BTU

BTU38
BTU39
BTU40

Split D 1 - 2 cm
Batu merah ( 5x11x23 )
Batu merah ( 4x9x19 )

BTU

BTU41

Tanah liat

m3
bj
bj
m3

BTU

BTU42

Tanah urug

BTU

BTU43

Tanah timbun

m3

BTU
BTU
BTU
BTU

BTU44
BTU45
BTU46
BTU47

Sirtu
Batako
Bata expose 5 x 11 x 24 cm
Terawang / roster 12x11x24 cm

m3
bh
bh
bh

BTU

BTU48

Roster 25/25

bh

CAT
CAT
CAT
CAT
CAT

CAT1
CAT2
CAT3
CAT4

CAT
Cat dasar meni
Cat tembok melamin
Cat dasar meni kayu
Cat alkali resisting primer

kg
kg
kg
kg

195,300.00

72,000
66,000

288,000
276,000

600

214,200

120,000
170,100

214,200
214,200

100,800
100,800

110,900.00

35,300
24,000
35,300

KODE

NO.

CAT
CAT
CAT
CAT
CAT
CAT
CAT
CAT
CAT
CAT
CAT
CAT
CAT
CAT
CAT
CAT
CAT
CAT
CAT
CAT

CAT5
CAT6
CAT7
CAT8
CAT9
CAT10
CAT11
CAT12
CAT13
CAT14
CAT15
CAT16
CAT17
CAT18
CAT19
CAT20
CAT21
CAT22
CAT23
CAT24

CBK
CBK

NAMA BARANG / BAHAN / TENAGA


Cat ICI Weathershield
Cat penutup
Cat kayu
Cat Epoxy/Tar
Dempul kayu typa A (putih) Jago
Plamur Fuji
Kalkarium
Politur jadi
Teak oil Fuji
Pernis
Minyak cat
Thinner
Kuas roll
Kuas ukuran 3,5"
Kuas ukuran 2,5"
Kuas ukuran kecil 1"
Soda api
Sabun deterjen
Amplas
Perekat

SATUAN
kg
kg
kg
kg
kg
kg
kg
ltr
ltr
ltr
ltr
ltr
bh
bh
bh
bh
kg
kg
lbr
kg

51,800
59,200

22,700.00

44,100.00
12,000
12,000

7,800
4,800

BATA HALAMAN / PAVING BLOCK


WARNA NATURAL / ABU-ABU

CBK

CBK1

Tipe segi empat, uni, segi 6 tebal = 8 cm K 400

m2

CBK

CBK2

Tipe uni dan segi empat tebal = 8 cm K 300

m2

CBK

CBK3

Tipe segi empat tebal = 6 cm K 200

CBK

CBK4

Tipe segi empat tebal = 8 cm K 200

m2

CBK

CBK5

Tipe segi enam tebal = 6 cm K 200

CBK

CBK6

Tipe segi enam tebal = 8 cm K 200

m2

CBK
CBK
CBK
CBK

CBK7
CBK8
CBK9
CBK10

Conblock t=10 cm
HB 10
HB 15
HB 20

CBK
CBK
CBK

CBK11
CBK12
CBK13

Conblock tipe segi-empat, abu-abu 10 cm, K-450

m2
bh
bh
bh
2
m

CBK

CBK14

Tipe grass blok bulat tebal = 10 cm

m2

CBK

CBK15

Tipe grass blok tebal = 10 cm

DLL
DLL
DLL
DLL
DLL
DLL
DLL
DLL

DLL1
DLL2
DLL3
DLL4
DLL5
DLL6
DLL7
DLL8

LAIN-LAIN
Tiang bendera
-Pondasi umpak
-Ompak ornamen
-Tiang galvanis 3"
-Bendera 120 x 180
Rambu lalu lintas (terpasang)
Papan nama jalan (terpasang)
Sumur peresapan 5 m

DLL

DLL9

Air minum, instalasi dalam dengan pipa pralon 1" medium, acesories dihitung sendiri

DLL
DLL
DLL
DLL

DLL10
DLL11
DLL12
DLL13

Air minum, instalasi luar dengan pipa pralon 1" medium, acesoris dihitung sendiri
Asbuton
Tumpuan konstruksi
Geotextile Polyfelt. TS 70

DLL

DLL14

Pelapisan kedap air lantai dengan coating ( terpasang )

m1
kg
m
m2
m2

DLL

DLL15

Pelapisan kedap air lantai dengan membran ( terpasang )

m2

KCA

193,600.00

WARNA MERAH / HITAM


2

buah
buah
m'
buah
buah
buah
buah
m1

BAHAN KACA

KCA

KCA1

Kaca polos

m2

KCA
KCA
KCA

KCA2
KCA3
KCA4

Kaca patri
Fiber glass
Profil kaca

m2
lbr
ml

KCI

HARGA SATUAN
(Rp.)

PENGGANTUNG / PENGUNCI

60,900.00

KODE

NO.

KCI
KCI
KCI
KCI
KCI
KCI
KCI
KCI
KCI
KCI
KCI
KCI
KCI
KCI
KCI
KCI
KCI
KCI
KCI
KCI

KCI1
KCI2
KCI3
KCI4
KCI5
KCI6
KCI7
KCI8
KCI9
KCI10
KCI11
KCI12
KCI13
KCI14
KCI15
KCI16
KCI17
KCI18
KCI19
KCI20

KPG

NAMA BARANG / BAHAN / TENAGA


Engsel pintu
Engsel jendela
Grendel
Hak angin
Engsel angin
Kait angin
Door holder
Door stop
Penggantung + rel pintu dorong
Kunci tanam
Kunci tanam antik
Kunci tanam biasa
Kunci kamar mandi
Kunci gembok
Kunci selot
Kunci silinder
Kunci lemari
Spring knip
Door closer
Ramset / dina bolt

SATUAN
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

HARGA SATUAN
(Rp.)
31,500.00
22,100.00
16,800.00
12,600.00

69,300.00
157,500.00
69,300.00
69,300.00
8,200.00

KAPUR & GIPS


3

KPG

KPG1

Kapur pasang

KPG
KPG
KPG
KPG

KPG2
KPG3
KPG4
KPG5

Kapur sirih
Tepung Gypsum
Gypsum board
Kasa gypsum

KPG

KPG6

List profil gypsum lebar sampai 5 cm

m3
kg
lbr
roll
m1

KPG

KPG7

List profil gypsum lebar sampai 6 - 10 cm

KPG
KPG
KPG

KPG8
KPG9
KPG10

List profil gypsum lebar lebih 10 cm


Kalsiboard ( 122 x 244 x 0,35 ) cm
Kalsiboard ( 122 x 244 x 0,60 ) cm

m1
lbr
lbr

KYU

68,000.00

63,000.00
78,800.00

KAYU

KYU

KYU1

Kayu Kelas III

m3

KYU

KYU2

Damar Laut (Kelas I)

KYU

KYU3

Kayu meranti balok

KYU

KYU4

Kayu meranti papan

m3

KYU

KYU5

Papan kayu damar laut

KYU
KYU
KYU

KYU6
KYU7
KYU8

Papan cetakan / bekesting


Kayu dolken
Kayu dolken 8 - 10/400 cm

KYU
KYU
KYU

KYU9
KYU10
KYU11

Perancah kayu

m3
btg
btg
m3

KYU

KYU12

List kayu profil

m1

KYU
KYU
KYU
KYU
KYU
KYU
KYU
KYU
KYU
KYU
KYU
KYU
KYU

KYU13
KYU14
KYU15
KYU16
KYU17
KYU18
KYU19
KYU20
KYU21
KYU22
KYU23
KYU24
KYU25

Kayu plepet eternit 1/5 cm

m1

KAYU LAPIS
Akustik soft board 60 x 120
Akustik soft board 40 x 60
Akustik soft board 30 x 60
Melamin wood 90 x 120 cm
Melamin wood 120 x 240 cm
Formika 4" x 8" x 0,3 cm
Triplek
Teak wood ( 90 x 240 )
Plywood 4 mm
Multiplek

lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr

LNT
LNT
LNT

LNT1
LNT2

TEGEL / KERAMIK
Plint tegel abu-abu 15/20
Plint tegel abu-abu 10/20

bh
bh

5,937,500
15,625,000
9,200,000
9,200,000

5,937,500
15,800

LIST KAYU PROFIL

56,100.00
62,400.00

79,200

KODE

NO.

NAMA BARANG / BAHAN / TENAGA

SATUAN

LNT
LNT
LNT
LNT
LNT
LNT
LNT
LNT
LNT
LNT
LNT
LNT
LNT
LNT
LNT
LNT
LNT
LNT

LNT3
LNT4
LNT5
LNT6
LNT7
LNT8
LNT9
LNT10
LNT11
LNT12
LNT13
LNT14
LNT15
LNT16
LNT17
LNT18
LNT19
LNT20

Plint tegel abu-abu 10/30


Plint tegel abu-abu 10/40
Plint tegel warna 10/20
Plint tegel warna 10/30
Plint tegel warna 10/40
Plint ubin teraso 10/30
Plint ubin teraso 10/40
Plint ubin granit 10/30
Plint ubin granit 10/40
Plint ubin teralux marmer 10/60
Plint ubin teralux marmer 10/40
Plint ubin teralux marmer 10/30
Tegel keramik 5/20 berglasir
Tegel keramik 10/20 berglasir
Tegel keramik 10/30 berglasir
Tegel keramik 20/20 berglasir
Tegel keramik 30/30 berglasir
Tegel keramik 40/40 berglasir

LNT
LNT

LNT21
LNT22

Tegel keramik mosaik


Marmer

LNT
LNT
LNT
LNT

LNT23
LNT24
LNT25
LNT26

Tegel porselin
Stepnosing granito
List keramik dinding motif 5/20
Plint keramik artistik

LNT
LNT

LNT27
LNT28

Keramik dinding 20/25


Internal cove

LNT

LNT29

Bahan teraso cor

LST
LST
LST
LST
LST
LST
LST
LST

LST1
LST2
LST3
LST4
LST5
LST6
LST7

LISTRIK
Pasang instalasi / titik
Penyambungan beban
Kabel Snoor 2 x 0,23 "Supreme"
Kabel NYA 2,5 sqmm "Supreme"
Kabel NYA 1,5 sqmm "Supreme"
Kabel NYA 2,5 sqmm "Supreme"
Kabel NYA 1,5 sqmm "Supreme"

LST

LST8

Kabel NYM 2 x 1,5 sqmm "Supreme"

titik
ls
roll
roll
roll
m'
m'
1
m

LST

LST9

Kabel NYM 2 x 2,5 sqmm "Supreme"

m1

LST

LST10

Kabel NYM 2 x 4 sqmm "Supreme"

m1

LST

LST11

Kabel NYM 3 x 1,5 sqmm "Supreme"

m1

LST

LST12

Kabel NYM 3 x 2,5 sqmm "Supreme"

LST

LST13

Kabel NYM 3 x 4 sqmm "Supreme"

LST

LST14

Kabel NYY 3 x 6 sqmm "Supreme"

m1

LST

LST15

Kabel NYY 3 x 1,5 sqmm "Supreme"

m1

LST

LST16

Kabel NYY 3 x 2,5 sqmm "Supreme"

m1

LST

LST17

Kabel NYY 3 x 4 sqmm "Supreme"

m1

LST

LST18

Kabel NYY 3 x 6 sqmm "Supreme"

m1

LST

LST19

Kabel NYY 3 x 10 sqmm "Supreme"

m1

LST

LST20

Kabel NYY 4 x 10 sqmm "Supreme"

m1

LST

LST21

Kabel NYFGBY 3 x 10 sqmm "Supreme"

m1

LST

LST22

Kabel DX 2 x 10 sqmm "Supreme"

m1

LST

LST23

Kabel DX 2 x 16 sqmm "Supreme"

m1

LST
LST
LST
LST
LST
LST
LST
LST
LST
LST

LST24
LST25
LST26
LST27
LST28
LST29
LST30
LST31
LST32
LST33

Kabel DX 2 x 25 sqmm "Supreme"


Kapasitor 12,5 uF
MCB 10 Ampere + box "MG"
MCB 6 Ampere "MG"
Tutup panel 30x30
Pipa pralon 3"
Pasang panel kontrol
Penyetelan dan penyalaan
Alat bantu
Retur material existing

m1
buah
buah
buah
buah
m'
unit / ls
titik
set
unit

HARGA SATUAN
(Rp.)

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m2
bh
2
m
bh
bh
bh
2
m
bh
m3

498,800.00
354,400.00
498,800.00
354,400.00

NAMA BARANG / BAHAN / TENAGA

SATUAN

HARGA SATUAN
(Rp.)

KODE

NO.

LST

LST34

Angkutan

jam

PKB
PKB
PKB
PKB
PKB
PKB
PKB
PKB
PKB
PKB
PKB
PKB
PKB
PKB
PKB
PKB
PKB
PKB
PKB
PKB
PKB

PKB1
PKB2
PKB3
PKB4
PKB5
PKB6
PKB7
PKB8
PKB9
PKB10
PKB11
PKB12
PKB13
PKB14
PKB15
PKB16
PKB17
PKB18
PKB19
PKB20

PERALATAN KEBERSIHAN
Sapu lidi
Tangkai Sapu
Seragam
Sarung tangan
Masker
Gerobak (alat baru)
Gerobak (sewa)
Serok
Gunting pangkas
Mesin potong rumput
Garpu tanah
Arit
Sepatu
Ember
Pacul
Sewa kendaraan untuk membuang lumpur
Gas oksigen 5 kg
Pipa dia. 3/8" - 15 cm
Nitobond EC
Conbextra EP

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
ps
bh
bh
hr
tb
bh
kg
kg

PKU
PKU
PKU
PKU
PKU
PKU
PKU
PKU
PKU
PKU
PKU
PKU
PKU
PKU
PKU
PKU

PKU1
PKU2
PKU3
PKU4
PKU5
PKU6
PKU7
PKU8
PKU9
PKU10
PKU11
PKU12
PKU13
PKU14
PKU15

PAKU
Paku gording 125 x 5,1 mm
Paku usuk 80 x 3,8 mm
Paku reng 55 x 3,1 mm
Paku eternit 20 x 1,5 mm
Water mur
Angkur / baut
Paku biasa
Paku asbes
Paku sumbat
Paku sekrup 3.5"
Paku skrup
Paku triplek
Paku gypsum
Paku hak panjang 15 cm
Paku biasa 1/2" - 1"

kg
kg
kg
kg
kg
bh
kg
bh
bh
bh
kg
kg
kg
kg
kg

PPA
PPA
PPA
PPA

PPA1
PPA2
PPA3
PPA4

PIPA
Pipa beton 20 x 30 Panjang 1 m
Pipa beton 15 x 30 Panjang 1 m
Pipa tanah dia. 15 cm
Pipa tanah dia. 20 cm

PPA

PPA5

Pipa galvanis dia. 1/2"

m
m
bh
bh
m1

PPA

PPA6

Pipa galvanis dia. 3/4"

m1

PPA

PPA7

Pipa galvanis dia. 1"

m1

PPA

PPA8

Pipa galvanis dia. 1 1/2"

m1

PPA

PPA9

Pipa galvanis dia. 3"

m1

PPA
PPA
PPA
PPA
PPA
PPA
PPA
PPA
PPA
PPA
PPA
PPA

PPA10
PPA11
PPA12
PPA13
PPA14
PPA15
PPA16
PPA17
PPA18
PPA19
PPA20
PPA21

Pipa galvanis dia. 4"


Riol 20 cm
Riol RCP 60 t 10 cm
BAHAN PLASTIK
Pipa PVC abu-abu dia. 1/2" Wavin
Pipa PVC abu-abu dia. 3/4" Wavin
Pipa PVC abu-abu dia. 1" Wavin
Pipa PVC abu-abu dia. 1 1/2" Wavin
Pipa PVC abu-abu dia. 2" Wavin
Pipa PVC abu-abu dia. 2 1/2" Wavin
Pipa PVC abu-abu dia. 3" Wavin
Pipa PVC abu-abu dia. 4" Wavin

m
bh
bh

820,000.00

btg
btg
btg
btg
btg
btg
btg
btg

13,700.00
18,900.00
25,900.00
44,500.00
56,900.00
83,100.00
112,100.00
185,800.00

3,900.00
17,100.00

16,300

16,300.00

KODE

NO.

NAMA BARANG / BAHAN / TENAGA

SATUAN

PRK
PRK
PRK
PRK
PRK
PRK
PRK
PRK

PRK1
PRK2
PRK3
PRK4
PRK5
PRK6
PRK7

BAHAN PEREKAT HIDROLIS & ORGANIK


Portland Cement (PC)
Semen putih
Semen warna
Lem kayu (putih) Fox
Lem plastik Acrylic
Lem plastik Vinyl
Lem Aica Aibon

PRK

PRK8

Semen batu bata

SNT
SNT
SNT
SNT
SNT
SNT
SNT
SNT
SNT
SNT
SNT
SNT
SNT
SNT
SNT
SNT
SNT
SNT
SNT
SNT
SNT
SNT
SNT

SNT1
SNT2
SNT3
SNT4
SNT5
SNT6
SNT7
SNT8
SNT9
SNT10
SNT11
SNT12
SNT13
SNT14
SNT15
SNT16
SNT17
SNT18
SNT19
SNT20
SNT21
SNT22

BAK MANDI
Bak mandi fiber glass 1,00 m3
Bak mandi fiber glass 0,30 m3
KLOSET
Kloset jongkok porselin type CE8 standar
Kloset duduk standar / porselin ( dengan tangki KIA standart) "Toto"
Kloset duduk putih dengan tangki "Toto"
Kloset jongkok teraso
WASTAFEL
Wastafel putih (KIA)
Badkip
Bak cuci teraso
Bak cuci stainless steel
Water drain + asesories
Shower dinding
URINOIR
Urinoir putih
Kran air diameter 3/4" atau 1/2" exs. Toto
Seal tape
Floordrain
Kran air angsa
Perlengkapan
Tempat sabun

TNM
TNM

TNM1

BAHAN TUMBUHAN
Bambu petung

TNM

TNM2

Gedek bambu kulit

btg
2
m

TNM

TNM3

Gedek bambu daging

m2

TNM
TNM

TNM4
TNM5

Ijuk
Tali ijuk

TNM

TNM6

Gebalan rumput

m
kg
m2

ALT
ALT
ALT
ALT
ALT
ALT
ALT
ALT
ALT
ALT
ALT
ALT
ALT
ALT
ALT
ALT
ALT
ALT
ALT
ALT
ALT
ALT

ALT1
ALT2
ALT3
ALT4
ALT5
ALT6
ALT7
ALT8
ALT9
ALT10
ALT11
ALT12
ALT13
ALT14
ALT15
ALT16
ALT17
ALT18
ALT19
ALT20
ALT21

ALAT
Crane Kap. 35 ton
Crane Kap. 10-15 Ton
Hammer + Pile driver
Crawler Crane Kap. 35 ton
Alat Pancang Pile Compactor
Generator 150 kVA
Piling Barge Driving
Ponton Kap. 1000 ton
Work Boat
Kotrek 2,5 ton
Kunci
Perancah
Waterpass
Theodolite
Genset
Bor beton
Sewa alat las
Sewa alat sondir
Sewa alat perakitan tulangan
Sewa Scaffolding
Biaya tes beton per benda uji

hari
hari
hari
hari
hari
hari
hari
hari
hari
bh
set
hari
unit
unit
hari
hari
hr
hr
hr
unit
bh

HARGA SATUAN
(Rp.)

kg
kg
kg
kg
kg
kg
kg
3
m

1,375
1,875

bh
bh

459,400.00
360,900.00

bh
bh
set
bh

1,890,000.00
113,400.00

set
bh
bh
bh
set
set
set
bh
bh
bh
bh
set
bh

535,500.00

19,700.00
78,100.00
206,700.00
52,500.00

3,900,000.00
2,800,000.00
1,850,000.00

4,000,000.00
1,000,000.00
200,000.00
125,000.00
350,000.00

275,000.00

KODE

NO.

NAMA BARANG / BAHAN / TENAGA

SATUAN

ALT

ALT22

Vienetions dan vertikal blinds (tirai)

ALT
ALT

ALT23
ALT24

Karpet
Biaya analisis tes beton perbeda uji

m
bh

ALT
ALT

ALT25
ALT26

Sewa Compressor untuk pekerjaan grouting


Sewa Mesin Grouting

hr
hr

ALT
ALT
ALT
ALT
ALT
ALT
ALT
ALT
ALT
ALT
ALT

ALT27
ALT28
ALT29
ALT30
ALT31
ALT32
ALT33
ALT34
ALT35
ALT36
ALT37
ALT37

Sewa mesin gerinda untuk pekerjaan grouting


Sewa mixer ubtuk pekerjaan grouting
Sewa alar bor
Sewa Alat Ukur
Sewa Motor Walls
Alat bantu pekerjaan grouting
Alat bantu pekerjaan pekerjaan marka
Alat bantu pekerjaan pekerjaan expantion joint
Waterstop lebar 230 mm - 320 mm
Waterstop lebar 200 mm
Waterstop lebar 150 mm

hr
hr
hr
hr
hr
ls
ls
ls
m'
m'
m'

HARGA SATUAN
(Rp.)

2
2

Medan, Maret 2012

ANALISA HARGA SATUAN


PEKERJAAN
LOKASI
TAHUN
KODE
(1)

Macam Pekerjaan
(2)

Upah
(3)

Bahan
(4)

Jumlah
(5)

PEKERJAAN PERSIAPAN
PPS1

100 M Pekerjaan Pengukuran Gedung


Pekerja
Mandor
Pengawas
Asisten Ahli Ukur
Sewa Alat Ukur

8.0000
2.0000
0.5000
2.0000
1.0000

OH X Rp.
OH X Rp.
OH X Rp.
OH X Rp.
hr X Rp.

0.0100

55,000.00
80,000.00
-

JUMLAH
Pekerjaan Pengukuran
PPS2

1 M' Pengukuran dan pemasangan bouwplank untuk gedung dan saluran


Kayu meranti balok
0.0120
m3 X Rp.
Paku reng 55 x 3,1 mm
0.0200
kg X Rp.
Kayu meranti papan
0.0070
m3 X Rp.
Tukang kayu
0.1000
OH X Rp.
Kepala tukang
0.0100
OH X Rp.
Pekerja
0.1000
OH X Rp.
Mandor
0.0050
OH X Rp.
JUMLAH

PPS3

1 M Membersihkan lapangan dan perataan


Pekerja
Mandor
JUMLAH

0.1000
0.0500

PPS4

1 bh Membuat Papan Nama Proyek 80x120 cm


Kayu meranti balok
Seng BJLS 0,20 gelombang P = 180 cm
Paku biasa 1/2" - 1"
Cat kayu
Portland Cement (PC)
Pasir beton
Krikil beton
Tukang batu
Tukang kayu
Tukang cat
Pekerja
Mandor
JUMLAH

0.0350
1.4000
0.6000
1.5000
16.8000
0.0270
0.0405
0.0175
1.0000
1.0000
2.1000
1.0050

PPS5

1,00 m2 Pembuatan jalan sementara, tebal 25 cm


Batu belah hitam
Krikil beton
Pasir beton
Pekerja
Mandor
JUMLAH

0.2750
0.0300
0.0500
1.0000
0.1000

PPS6

1,00 m2 Pembuatan kantor sementara, dengan lantai plesteran


Kayu dolken 8 - 10/400
Kayu meranti balok
Paku biasa
Besi strip
Portland Cement (PC)
Pasir pasang ( progo )
Pasir beton
Krikil beton
Batu merah ( 5x11x23 )
Seng plat 3" x 6" BJLS 28
Jendela nako
Kaca polos
Kunci tanam
Plywood 4 mm
Tukang kayu
Tukang batu
Kepala tukang
Pekerja
Mandor

cm

1.2500
0.1800
0.8500
1.1000
35.0000
0.1500
0.1000
0.1500
30.0000
0.2500
2.0000
0.0800
0.1500
0.0600
2.0000
1.0000
0.3000
2.0000
0.0500

org X Rp.
org X Rp.

m3
lbr
kg
kg
kg
m3
m3
OH
OH
OH
OH
OH

55,000.00
80,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

9,200,000.00
51,000.00
16,300.00
59,200.00
1,375.00
120,000.00
170,100.00
80,000.00
80,000.00
80,000.00
55,000.00
80,000.00

m3 X Rp.
m3 X Rp.
m3 X Rp.
OH X Rp.
OH X Rp.

170,100.00
120,000.00
55,000.00
80,000.00

btg
m3
kg
kg
kg
m3
m3
m3
bj
lbr
bh
m2
bh
lbr
OH
OH
OH
OH
OH

X
X
X
X
X
X
X
X
X
X
X
X

600,000.00

9,200,000.00
9,200,000.00
80,000.00
90,000.00
55,000.00
80,000.00

X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

9,200,000.00
16,300.00
13,300.00
1,375.00
120,000.00
120,000.00
170,100.00
60,900.00
69,300.00
80,000.00
80,000.00
90,000.00
55,000.00
80,000.00

btg
kg
lbr
m3
m3
m3
kg
kg
OH
OH
OH
OH

X
X
X
X
X
X
X
X
X
X
X
X

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,375.00
120,000.00
170,100.00
9,200,000.00
16,300.00
35,300.00
80,000.00
90,000.00
55,000.00
80,000.00

1.0000
2.0000
25.0000
0.0050
0.0090
0.0600
0.2000
0.0200
0.3000
0.0200

btg
kg
kg
m3
m3
kg
OH
OH
OH
OH

X
X
X
X
X
X
X
X
X
X

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,375.00
120,000.00
170,100.00
16,300.00
80,000.00
90,000.00
55,000.00
80,000.00

1.7000
0.2100
0.3000
10.5000
0.0300
0.0500
1.5000
2.0000
0.2000
1.0000
0.0500

btg
m3
kg
kg
m3
m3
lbr
OH
OH
OH
OH

X
X
X
X
X
X
X
X
X
X
X

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,937,500.00
16,300.00
1,375.00
120,000.00
170,100.00
80,000.00
90,000.00
55,000.00
80,000.00

3.0000
0.2760
0.7000
1.5000
1.5000
0.1500
1.0000
0.0500

btg
3
m
kg
lbr
org
org
org
org

X
X
X
X
X
X
X
X

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,937,500.00
16,300.00
80,000.00
90,000.00
55,000.00
80,000.00

btg X Rp.
3
m X Rp.
kg X Rp.
kg X Rp.

5,937,500.00
16,300.00
1,375.00

JUMLAH
PPS7

1.2500
2.5000
1.2000
0.0050
0.0090
0.0250
0.0600
0.4000
0.2000
0.0200
0.4000
0.0200
JUMLAH

cm

JUMLAH

6,000.00

5,500.00
4,000.00
9,500.00

189,600.00

0.00

9,500.00

322,000.00
71,400.00
9,780.00
88,800.00
23,100.00
3,240.00
6,889.05
1,400.00
80,000.00
80,000.00
115,500.00
80,400.00
357,300.00

525,209.05

55,000.00
8,000.00
63,000.00

11,103.00

882,509.05

0.00
5,103.00
6,000.00

74,103.00

0.00
1,656,000.00
13,855.00
14,630.00
1,203.13
18,000.00
12,000.00
25,515.00
0.00
0.00
0.00
4,872.00
10,395.00
0.00
160,000.00
80,000.00
27,000.00
110,000.00
4,000.00
381,000.00

1,756,470.13

2,137,470.13

16,000.00
1,800.00
22,000.00
1,600.00
41,400.00

0.00
3,437.50
0.00
600.00
1,530.90
230,000.00
978.00
14,120.00
16,000.00
1,800.00
22,000.00
1,600.00
292,066.40

333,466.40

0.00
2,750.00
0.00
600.00
1,530.90
978.00
16,000.00
1,800.00
16,500.00
1,600.00
35,900.00

5,858.90

41,758.90

JUMLAH

0.00
1,246,875.00
4,890.00
14,437.50
3,600.00
8,505.00
0.00
160,000.00
18,000.00
55,000.00
4,000.00
237,000.00

1,278,307.50

1,515,307.50

1 m2 Pembuatan rumah jaga/konstruksi kayu


Kayu dolken 8 - 10/400 cm
Kayu Kelas III
Paku biasa
Seng gelombang 2" - 5" BJLS 24
Tukang kayu
Kepala tukang
Pekerja
Mandor
JUMLAH

PPS11

600,000.00

174,800.00

1 m2 Pembuatan gudang semen dan alat-alat


Kayu dolken 8 - 10/400 cm
Kayu Kelas III
Paku biasa
Portland Cement (PC)
Pasir beton
Krikil beton
Seng gelombang 2" - 5" BJLS 24
Tukang kayu
Kepala tukang
Pekerja
Mandor

PPS10

0.00
0.00

110,400.00
0.00
64,400.00

1 M' Pembuatan pagar sementara dari kawat duri tinggi 1,80 meter
Kayu dolken 8 - 10/400
Portland Cement (PC)
Kawat duri
Pasir beton
Krikil beton
Paku biasa
Tukang kayu
Kepala tukang
Pekerja
Mandor

PPS9

6,000.00

8,000.00
900.00
5,500.00
400.00
14,800.00

1 M' Pembuatan pagar sementara dari seng gelombang tinggi 2 meter


Kayu dolken 8 - 10/400 cm
Portland Cement (PC)
Seng gelombang 2" - 5" BJLS 24
Pasir beton
Krikil beton
Kayu meranti balok
Paku biasa
Cat dasar meni
Tukang kayu
Kepala tukang
Pekerja
Mandor

PPS8

440,000.00
160,000.00
0.00
0.00
0.00
600,000.00

0.00
1,638,750.00
11,410.00
0.00
120,000.00
13,500.00
55,000.00
4,000.00
192,500.00

1,650,160.00

1,842,660.00

1 m2 Pembuatan bedeng buruh


Kayu dolken 8 - 10/400
Kayu Kelas III
Paku biasa
Portland Cement (PC)

cm

1.2500
0.1860
0.3000
18.0000

Pasir beton

0.0300

X Rp.

120,000.00

Krikil beton
Seng gelombang 2" - 5" BJLS 24
Plywood 4 mm
Tukang kayu
Kepala tukang
Pekerja
Mandor

0.0500
1.5000
4.3500
2.0000
0.2000
1.0000
0.0500

m X Rp.
lbr X Rp.
lbr X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

170,100.00
80,000.00
90,000.00
55,000.00
80,000.00

PPS12

1 M' Pasang pagar kawat jaring galvanis, tinggi 1,00 m


Kawat jaring
0.4340
Tukang besi
0.0420
Kepala tukang
0.0040
Pekerja
0.0420
Mandor
0.0020
JUMLAH

lbr X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

PPS13

1 M' Pasang pagar beton pracetak ( 5 x 50 x 213 ) cm


Panel beton pracetak
Kolom beton pracetak

JUMLAH

Pasir beton
Batu pecah 2/3 ( split )
Portland Cement (PC)
Tukang batu
Kepala tukang
Pekerja
Mandor

0.9860
0.5250

lbr X Rp.
btg X Rp.

0.0740
0.1460
45.0000
0.1250
0.0120
0.3750
0.0190

m X Rp.
3
m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

120,000.00
214,200.00
1,375.00
80,000.00
90,000.00
55,000.00
80,000.00

0.00
1,104,375.00
4,890.00
24,750.00
3,600.00
8,505.00
0.00
0.00
160,000.00
18,000.00
55,000.00
4,000.00
237,000.00

JUMLAH

1,146,120.00

1,383,120.00

0.00
3,360.00
360.00
2,310.00
160.00
6,190.00

0.00

6,190.00

0.00
0.00
8,880.00
31,273.20
61,875.00
10,000.00
1,080.00
20,625.00
1,520.00
33,225.00

102,028.20

135,253.20

PTN1

1 m3 Galian tanah biasa sedalam sampai 1 meter


Pekerja
Mandor
JUMLAH

0.7500
0.0250

org X Rp.
org X Rp.

55,000.00
80,000.00

41,250.00
2,000.00
43,250.00

0.00

43,250.00

PTN2

1 M Galian tanah biasa sedalam 1 - 2 meter


Pekerja
Mandor
JUMLAH

0.9000
0.0450

org X Rp.
org X Rp.

55,000.00
80,000.00

49,500.00
3,600.00
53,100.00

0.00

53,100.00

1 M3 Galian tanah biasa sedalam 2 - 3 meter


Pekerja
Mandor
JUMLAH

1.0500
0.0670

57,750.00
5,360.00
63,110.00

0.00

63,110.00

1 m3 Galian tanah keras sedalam sampai 1 meter


Pekerja
Mandor
JUMLAH

1.0000
0.0320

55,000.00
2,560.00
57,560.00

0.00

57,560.00

1 m3 Galian tanah cadas sedalam sampai 1 meter


Pekerja
Mandor
JUMLAH

1.5000
0.0600

82,500.00
4,800.00
87,300.00

0.00

87,300.00

1 M3 Galian tanah lumpur sedalam 1 meter


Pekerja
Mandor
JUMLAH

1.2000
0.0450

66,000.00
3,600.00
69,600.00

0.00

69,600.00

2,750.00
400.00
3,150.00

0.00

PEKERJAAN TANAH

PTN3

PTN4

PTN5

PTN6

PTN7

1 M3 Stripping tebing setinggi 1 meter


Pekerja
Mandor

0.0500
0.0050

org X Rp.
org X Rp.

org X Rp.
org X Rp.

org X Rp.
org X Rp.

org X Rp.
org X Rp.

org X Rp.
org X Rp.

55,000.00
80,000.00

55,000.00
80,000.00

55,000.00
80,000.00

55,000.00
80,000.00

55,000.00
80,000.00

JUMLAH
PTN8

PTN9

1 m3 Pengangkutan tanah sejauh 15 meter


Pekerja
Mandor
JUMLAH
1 m3 Pemadatkan tanah per 20 cm
Pekerja
Mandor

org X Rp.
org X Rp.

55,000.00
80,000.00

18,150.00
800.00
18,950.00

18,950.00

0.5000
0.0500

org X Rp.
org X Rp.

55,000.00
80,000.00

27,500.00
4,000.00
31,500.00

31,500.00

JUMLAH
PTN10

PTN11

1 m3 Urug kembali bekas galian (dihitung 1/3 kali galian tanah)


Pekerja
0.2500
Mandor
0.0083
JUMLAH

org X Rp.
org X Rp.

55,000.00
80,000.00

94,500.00
55,000.00
80,000.00

110,900.00
55,000.00
80,000.00

1.2000
0.3000
0.0100

m X Rp.
org X Rp.
org X Rp.

1 m3 Urugan sirtu padat untuk peninggian lantai bangunan


Sirtu
1.2000
Pekerja
0.2500
Mandor
0.0250
JUMLAH

m X Rp.
org X Rp.
org X Rp.

JUMLAH

PTN13

1 M3 Urug tanah mendatangkan


Tanah urug
Pekerja
Mandor

m X Rp.
org X Rp.
org X Rp.

100,800.00
55,000.00
80,000.00

PTN14

1 M3 Memasang Lapisan pudel campuran 1 KP : 5 TL untuk stabilisasi


3
Kapur pasang
0.2480
m X Rp.
Tanah liat
1.2400
m3 X Rp.
Tukang Batu
0.4000
org X Rp.
Kepala Tukang
0.0400
org X Rp.
Pekerja
0.8000
org X Rp.
Mandor
0.0800
org X Rp.
JUMLAH

80,000.00
90,000.00
55,000.00
80,000.00

1.2000
0.3000
0.0100
JUMLAH

PTN15

1 M2 Gebalan rumput
Bambu petung
Gebalan rumput
Pekerja
Mandor

0.2000
1.0000
0.5000
0.0250

btg X Rp.
2
m X Rp.
org X Rp.
org X Rp.

55,000.00
80,000.00

PTN16

1 M3 Pemasangan lapisan ijuk tebal 10cm untuk peresapan


Ijuk
6.0000
Pekerja
0.1500
Mandor
0.0150
JUMLAH

kg X Rp.
org X Rp.
org X Rp.

55,000.00
80,000.00

1 m3 Pembuangan Tanah sampai dengan sejauh 150 meter


Pekerja
0.5160
Mandor
0.0500
JUMLAH

org X Rp.
org X Rp.

55,000.00
80,000.00

JUMLAH

PTN17

PTN18

13,750.00
664.00
14,414.00

14,414.00

1 M3 Urugan pasir
Pasir urug darat
Pekerja
Mandor

PTN12

3,150.00

0.3300
0.0100

1 ttk Mengerjakan Sondir Tanah


Sewa alat sondir
Operator mesin sondir
Analis test sondir
Pekerja
Mandor

0.50
1.00
0.50
2.00
0.10

hr X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

55,000.00
80,000.00

JUMLAH

113,400.00
16,500.00
800.00
17,300.00

113,400.00

130,700.00

133,080.00
13,750.00
2,000.00
15,750.00

133,080.00

148,830.00

120,960.00
16,500.00
800.00
17,300.00

120,960.00

138,260.00

0.00
0.00
32,000.00
3,600.00
44,000.00
6,400.00
86,000.00

0.00

86,000.00

0.00
0.00
27,500.00
2,000.00
29,500.00

0.00

29,500.00

0.00
8,250.00
1,200.00
9,450.00

0.00

9,450.00

28,380.00
4,000.00
32,380.00

0.00

32,380.00

0.00
0.00
0.00
110,000.00
8,000.00
118,000.00

0.00

118,000.00

PTN19

1 m3 Membuang lumpur SAL sejauh 15 km


Pekerja
Mandor
Sewa kendaraan untuk membuang lumpur
JUMLAH

0.50
0.02
0.41

org X Rp.
org X Rp.
hr X Rp.

55,000.00
80,000.00
-

27,500.00
1,600.00
0.00
29,100.00

0.00

29,100.00

PTN20

1 m3 Mengangkut lumpur SAL sejauh 30 m


Pekerja
Mandor
Gerobak (sewa)
JUMLAH

0.40
0.02
0.50

org X Rp.
org X Rp.
hr X Rp.

55,000.00
80,000.00
-

22,000.00
1,200.00
0.00
23,200.00

0.00

23,200.00

PEKERJAAN PASANGAN
Pasangan pondasi
PPO1

PPO2

PPO3

1 M3 Pasangan pondasi batu kosong (anstamping)


Batu belah hitam
Pasir urug darat
Tukang Batu
Kepala Tukang
Pekerja
Mandor
JUMLAH

1.2000
0.4320
0.3900
0.0390
0.7800
0.0390

m X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1 M3 Pasangan pondasi 1 Kp : 1 Sm : 1 Ps
Batu belah putih
Kapur pasang
Semen warna
Pasir pasang ( progo )
Tukang Batu
Kepala Tukang
Pekerja
Mandor
JUMLAH

1.2000
0.2290
0.2290
0.5440
0.7500
0.0750
1.5000
0.0750

m
3
m
3
m
3
m
org
org
org
org

X
X
X
X
X
X
X
X

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1 M3 Pasangan pondasi 1 Kp : 1 Sm : 2 Ps
Batu belah putih
Kapur pasang
Semen warna

1.2000
0.1700
0.1700

m X Rp.
3
m X Rp.
3
m X Rp.

Pasir pasang ( progo )


Tukang Batu
Kepala Tukang
Pekerja
Mandor

0.3400
0.7500
0.0750
1.5000
0.0750

m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

94,500.00
80,000.00
90,000.00
55,000.00
80,000.00

120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

1 M3 Pasangan pondasi 1 Pc : 3 Kp : 5 Ps
Batu belah putih
Portland Cement (PC)

1.2000
95.4200

Kapur pasang
Pasir pasang ( progo )
Tukang Batu
Kepala Tukang
Pekerja
Mandor

0.2290
0.3820
0.7500
0.0750
1.5000
0.0750

X Rp.
X Rp.

1,375.00

m X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

m
kg

120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH
PPO5

1.2000
61.0000
0.1470
0.4920
0.7500
0.0750
1.5000
0.0750

m X Rp.
kg X Rp.
3
m X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH
1 M3 Pasangan pondasi 1/4 Pc : 1 Kp : 4 Ps
Batu belah putih
Portland Cement (PC)
Kapur pasang
Pasir pasang ( progo )
Tukang Batu
Kepala Tukang
Pekerja
Mandor

1,375.00
-

120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

1.2000
41.0000
0.1310

m X Rp.
kg X Rp.
3
m X Rp.

0.5230
0.7500
0.0750
1.5000
0.0750

m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

JUMLAH
PPO7

1 M3 Pasangan pondasi 1 Pc : 4 Ps
Batu belah putih
Portland Cement (PC)
Pasir pasang ( progo )
Tukang Batu
Kepala Tukang
Pekerja
Mandor

1.2000
163.0000
0.5200
0.7500
0.0750
1.5000
0.0750

m X Rp.
kg X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH
PPO8

1 M3 Pasangan pondasi 1 Pc : 3 Ps
Batu belah putih
Portland Cement (PC)
Pasir pasang ( progo )
Tukang Batu
Kepala Tukang
Pekerja
Mandor

1.2000
202.0000
0.4850
0.7500
0.0750
1.5000
0.0750

m X Rp.
kg X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH
PPO9

1 M3 Pasangan pondasi 1 Pc : 1 Ps
Batu belah putih
Portland Cement (PC)
Pasir pasang ( progo )
Tukang Batu
Kepala Tukang
Pekerja
Mandor

1.2000
392.0000
0.3140
0.7500
0.0750
1.5000
0.0750

m X Rp.
kg X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH
PPO10

1 M3 Pasangan pondasi 1 Pc : 2 Ps
Batu belah putih
Portland Cement (PC)
Pasir pasang ( progo )
Tukang Batu
Kepala Tukang
Pekerja
Mandor

1.2000
267.0000
0.4270
0.7500
0.0750
1.5000
0.0750

m X Rp.
kg X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH
PPO11

1 M3 Pasangan pondasi 1 Pc : 5 Ps
Batu belah putih
Portland Cement (PC)
Pasir pasang ( progo )
Tukang Batu
Kepala Tukang
Pekerja
Mandor

1.2000
136.0000
0.5440
0.7500
0.0750
1.5000
0.0750

m X Rp.
kg X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1.2000
117.0000
0.5610
0.7500
0.0750
1.5000
0.0750

m X Rp.
kg X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH
PPO12

1 M3 Pasangan pondasi 1 Pc : 6 Ps
Batu belah putih
Portland Cement (PC)
Pasir pasang ( progo )
Tukang Batu
Kepala Tukang
Pekerja
Mandor

PPO13

1 M3 Pasangan pondasi 1 Pc : 8 Ps
Batu belah putih
Portland Cement (PC)
Pasir pasang ( progo )
Tukang Batu
Kepala Tukang
Pekerja
Mandor

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH

1.2000
91.0000
0.5840
0.7500
0.0750
1.5000
0.0750

m X Rp.
kg X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH
PPO14

PPO15

121,554.00

65,280.00

220,530.00

0.00
0.00
0.00
40,800.00
60,000.00
6,750.00
82,500.00
6,000.00
155,250.00

40,800.00

196,050.00

0.00
131,202.50
0.00
45,840.00
60,000.00
6,750.00
82,500.00
6,000.00
155,250.00

177,042.50

332,292.50

1 M3 Pasangan pondasi 1 Pc : 3 Kp : 10 Ps
Batu belah putih
Portland Cement (PC)
Kapur pasang
Pasir pasang ( progo )
Tukang Batu
Kepala Tukang
Pekerja
Mandor

PPO6

40,824.00

0.00
0.00
0.00
65,280.00
60,000.00
6,750.00
82,500.00
6,000.00
155,250.00

120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH
PPO4

0.00
40,824.00
31,200.00
3,510.00
42,900.00
3,120.00
80,730.00

1 M3 Beton cyclope 60% beton camp. 1pc:2ps:3kr, 40% batu belah


3
Batu belah putih
0.4800
m X
Portland Cement (PC)
194.0000
kg X
3
Pasir beton
0.3120
m X
3
Krikil beton
0.4680
m X
Besi beton polos
126.0000
kg X
Kawat beton / bindrat
1.8000
kg X
Tukang batu
0.8500
org X
Kepala Tukang
0.0850
org X
Pekerja
3.4000
org X
Mandor
0.1700
org X
JUMLAH
1 M3 Pasangan pondasi sumuran dia. 100 cm
Batu belah putih
Portland Cement (PC)
Pasir beton
Krikil beton
Tukang Batu
Kepala Tukang
Pekerja
Mandor
JUMLAH

0.4500
194.0000
312.0000
0.4680
0.8000
0.0800
2.4000
0.1190

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,375.00
120,000.00
170,100.00
11,600.00
20,000.00
80,000.00
90,000.00
55,000.00
80,000.00

m X Rp.
kg X Rp.
3
m X Rp.
m3 X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
120,000.00
170,100.00
80,000.00
90,000.00
55,000.00
80,000.00

0.00
83,875.00
0.00
59,040.00
60,000.00
6,750.00
82,500.00
6,000.00
155,250.00

142,915.00

60,000.00
6,750.00
82,500.00
6,000.00
155,250.00

119,135.00

298,165.00

0.00
56,375.00
0.00
62,760.00

274,385.00

0.00
224,125.00
62,400.00
60,000.00
6,750.00
82,500.00
6,000.00
155,250.00

286,525.00

441,775.00

0.00
277,750.00
58,200.00
60,000.00
6,750.00
82,500.00
6,000.00
155,250.00

335,950.00

491,200.00

0.00
539,000.00
37,680.00
60,000.00
6,750.00
82,500.00
6,000.00
155,250.00

576,680.00

731,930.00

0.00
367,125.00
51,240.00
60,000.00
6,750.00
82,500.00
6,000.00
155,250.00

418,365.00

573,615.00

0.00
187,000.00
65,280.00
60,000.00
6,750.00
82,500.00
6,000.00
155,250.00

252,280.00

407,530.00

0.00
160,875.00
67,320.00
60,000.00
6,750.00
82,500.00
6,000.00
155,250.00

228,195.00

383,445.00

0.00
125,125.00
70,080.00
60,000.00
6,750.00
82,500.00
6,000.00
155,250.00

195,205.00

350,455.00

0.00
266,750.00
37,440.00
79,606.80
1,461,600.00
36,000.00
68,000.00
7,650.00
187,000.00
13,600.00
276,250.00

1,881,396.80

2,157,646.80

0.00
266,750.00
37,440,000.00
79,606.80
64,000.00
7,200.00
132,000.00
9,520.00
212,720.00

37,786,356.80

37,999,076.80

PASANGAN DINDING
PPD1

1 m2 Pasangan dinding HB/CB 10, camp. 1pc : 4ps


HB 10
Portland Cement (PC)
Pasir pasang ( progo )
Besi angkur dia. 8mm
Tukang Batu
Kepala Tukang
Pekerja
Mandor
JUMLAH

12.5000
12.1300
0.3880
0.2800
0.1000
0.0100
0.3000
0.0150

bh X Rp.
kg X Rp.
3
m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

PPD2

1 m2 Pasangan dinding HB/CB 10, camp. 1pc : 3ps


HB 10
Portland Cement (PC)
Pasir pasang ( progo )
Besi angkur dia. 8mm
Tukang Batu
Kepala Tukang
Pekerja
Mandor
JUMLAH

12.5000
15.1600
0.3640
0.2800
0.1000
0.0100
0.3000
0.0150

bh X Rp.
kg X Rp.
3
m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

1 M2 Pasangan dinding HB/CB 15, camp. 1pc : 4ps


HB 15
Portland Cement (PC)
Pasir pasang ( progo )
Besi angkur dia. 8mm
Tukang Batu
Kepala Tukang
Pekerja
Mandor
JUMLAH

12.5000
18.2000
0.5820
0.2800
0.1200
0.0120
0.3200
0.0160

bh X Rp.
kg X Rp.
3
m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

PPD4

1 m2 Pasangan dinding HB/CB 15, camp. 1pc : 3ps


HB 15
Portland Cement (PC)
Pasir pasang ( progo )
Besi angkur dia. 8mm
Tukang Batu
Kepala Tukang
Pekerja
Mandor
JUMLAH

12.5000
22.7400
0.5500
0.2800
0.1200
0.0120
0.3200
0.0160

bh X Rp.
kg X Rp.
3
m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

PPD5

1 m2 Pasangan dinding HB/CB 20, camp. 1pc : 4ps


HB 20
Portland Cement (PC)
Pasir pasang ( progo )
Besi angkur dia. 8mm
Tukang Batu
Kepala Tukang
Pekerja
Mandor
JUMLAH

12.5000
24.2600
0.7720
0.2800
0.1500
0.0150
0.3500
0.0175

bh
kg
3
m
kg
org
org
org
org

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

1 m2 Pasangan dinding HB/CB 20, camp. 1pc : 3ps


HB 20
Portland Cement (PC)
Pasir pasang ( progo )
Besi angkur dia. 8mm
Tukang Batu
Kepala Tukang
Pekerja
Mandor
JUMLAH

12.5000
30.3200
0.7280
0.2800
0.1500
0.0150
0.3500
0.0175

bh X Rp.
kg X Rp.
3
m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

PPD3

PPD6

PPD7

X
X
X
X
X
X
X
X

1 m2 Pasangan bata merah tebal 1/2 bata, 1 Kp : 1 Sm : 2Ps


Batu Bata 5 x 11 x 22
70.0000
Kapur pasang
0.0140
Semen warna
0.0140
Pasir pasang ( progo )
0.0280
Tukang Batu
0.1000
Kepala Tukang
0.0100
Pekerja
0.3000
Mandor
0.0150
JUMLAH

bh X Rp.
3
m X Rp.
3
m X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

600.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

1 m2 Pasangan bata merah tebal 1/2 bata, 1 Kp : 1 Sm : 1Ps


Batu Bata 5 x 11 x 22
70.0000
Kapur pasang
0.0180
Semen warna
0.0180
Pasir pasang ( progo )
0.0180
Tukang Batu
0.1000
Kepala Tukang
0.0100
Pekerja
0.3000
Mandor
0.0150
JUMLAH

bh X Rp.
3
m X Rp.
3
m X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

600.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Kp : 10 Ps


Batu Bata 5 x 11 x 22
70.0000
Portland Cement (PC)
4.5000
Kapur pasang
0.0150
Pasir pasang ( progo )
0.0500
Tukang Batu
0.1000
Kepala Tukang
0.0100
Pekerja
0.3000
Mandor
0.0150
JUMLAH

bh X Rp.
kg X Rp.
3
m X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

600.00
1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

PPD10

1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 8 Ps


Batu Bata 5 x 11 x 22
70.0000
Portland Cement (PC)
6.5000
Pasir pasang ( progo )
0.0500
Tukang Batu
0.1000
Kepala Tukang
0.0100
Pekerja
0.3000
Mandor
0.0150
JUMLAH

bh X Rp.
kg X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

600.00
1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

PPD11

1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps


Batu Bata 5 x 11 x 22
70.0000
Portland Cement (PC)
8.3200
Pasir pasang ( progo )
0.0490
Tukang Batu
0.1000
Kepala Tukang
0.0100
Pekerja
0.3000
Mandor
0.0150
JUMLAH

bh X Rp.
kg X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

PPD12

1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 5 Ps


Batu Bata 5 x 11 x 22
70.0000
Portland Cement (PC)
9.6800
Pasir pasang ( progo )
0.0450
Tukang Batu
0.1000
Kepala Tukang
0.0100
Pekerja
0.3000
Mandor
0.0150
JUMLAH

bh X Rp.
kg X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

PPD13

1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps


Batu Bata 5 x 11 x 22
70.0000
Portland Cement (PC)
11.5000
Pasir pasang ( progo )
0.0430
Tukang Batu
0.1000
Kepala Tukang
0.0100
Pekerja
0.3000
Mandor
0.0150
JUMLAH

bh X Rp.
kg X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

PPD14

1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps


Batu Bata 5 x 11 x 22
70.0000
Portland Cement (PC)
14.3700

bh X Rp.
kg X Rp.

Pasir pasang ( progo )


Tukang Batu
Kepala Tukang
Pekerja
Mandor

m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

PPD8

PPD9

0.0400
0.1000
0.0100
0.3000
0.0150

600.00
1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

600.00
1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

600.00
1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

1 M2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 2 Ps


Batu Bata 5 x 11 x 22
70.0000
Portland Cement (PC)
18.9500
Pasir pasang ( progo )
0.0380
Tukang Batu
0.1000

bh X Rp.
kg X Rp.
3
m X Rp.
org X Rp.

600.00
1,375.00
120,000.00
80,000.00

63,238.75

89,838.75

0.00
20,845.00
43,680.00
0.00
8,000.00
900.00
16,500.00
1,200.00
26,600.00

64,525.00

91,125.00

0.00
25,025.00
69,840.00
0.00
9,600.00
1,080.00
17,600.00
1,280.00
29,560.00

94,865.00

124,425.00

0.00
31,267.50
66,000.00
0.00
9,600.00
1,080.00
17,600.00
1,280.00
29,560.00

97,267.50

126,827.50

0.00
33,357.50
92,640.00
0.00
12,000.00
1,350.00
19,250.00
1,400.00
34,000.00

125,997.50

12,000.00
1,350.00
19,250.00
1,400.00
34,000.00

129,050.00

159,997.50

0.00
41,690.00
87,360.00
0.00

163,050.00

42,000.00
0.00
0.00
3,360.00
8,000.00
900.00
16,500.00
1,200.00
26,600.00

45,360.00

71,960.00

42,000.00
0.00
0.00
2,160.00
8,000.00
900.00
16,500.00
1,200.00
26,600.00

44,160.00

70,760.00

42,000.00
6,187.50
0.00
6,000.00
8,000.00
900.00
16,500.00
1,200.00
26,600.00

54,187.50

80,787.50

42,000.00
8,937.50
6,000.00
8,000.00
900.00
16,500.00
1,200.00
26,600.00

56,937.50

83,537.50

42,000.00
11,440.00
5,880.00
8,000.00
900.00
16,500.00
1,200.00
26,600.00

59,320.00

85,920.00

42,000.00
13,310.00
5,400.00
8,000.00
900.00
16,500.00
1,200.00
26,600.00

60,710.00

87,310.00

42,000.00
15,812.50
5,160.00
8,000.00
900.00
16,500.00
1,200.00
26,600.00

600.00
1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH
PPD15

0.00
16,678.75
46,560.00
0.00
8,000.00
900.00
16,500.00
1,200.00
26,600.00

62,972.50

89,572.50

42,000.00
19,758.75
4,800.00
8,000.00
900.00
16,500.00
1,200.00
26,600.00

66,558.75

42,000.00
26,056.25
4,560.00
8,000.00

93,158.75

Kepala Tukang
Pekerja
Mandor

0.0100
0.3000
0.0150

org X Rp.
org X Rp.
org X Rp.

90,000.00
55,000.00
80,000.00

JUMLAH
PPD16

1 M2 Pasangan bata merah tebal 1 bata, 1 Pc : 3 Kp : 10 Ps


Batu Bata 5 x 11 x 22
140.0000
Portland Cement (PC)
10.0800

bh X Rp.
kg X Rp.

Kapur pasang
Pasir pasang ( progo )
Tukang Batu
Kepala Tukang
Pekerja
Mandor

m X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

0.0275
0.0925
0.2000
0.0200
0.6000
0.0300

JUMLAH
PPD17

1 M2 Pasangan bata merah tebal 1 bata, 1 Pc : 6 Ps


Batu Bata 5 x 11 x 22
Portland Cement (PC)
Pasir pasang ( progo )
Tukang Batu
Kepala Tukang
Pekerja
Mandor
JUMLAH

PPD18

1 M2 Pasangan bata merah tebal 1 bata, 1 Pc : 5 Ps


Batu Bata 5 x 11 x 22
Portland Cement (PC)
Pasir pasang ( progo )
Tukang Batu
Kepala Tukang
Pekerja
Mandor

140.0000
18.5000
0.1220
0.2000
0.0200
0.6000
0.0300

bh X Rp.
kg X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

600.00
1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

140.0000
22.2000

bh X Rp.
kg X Rp.

600.00
1,375.00

0.1020
0.2000
0.0200
0.6000
0.0300

m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH
PPD19

PPD20

1 M2 Pasangan bata merah tebal 1 bata, 1 Pc : 4 Ps


Batu Bata 5 x 11 x 22
Portland Cement (PC)
Pasir pasang ( progo )
Tukang Batu
Kepala Tukang
Pekerja
Mandor
JUMLAH
1 M2 Pasangan bata merah tebal 1 bata, 1 Pc : 3 Ps
Batu Bata 5 x 11 x 22
Portland Cement (PC)
Pasir pasang ( progo )
Tukang Batu
Kepala Tukang
Pekerja
Mandor

140.0000
26.5500
0.0930
0.2000
0.0200
0.6000
0.0300

bh X Rp.
kg X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

600.00
1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

140.0000
32.9500

bh X Rp.
kg X Rp.

0.0910
0.2000
0.0200
0.6000
0.0300

m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH
1 M2 Pasangan bata merah tebal 1 bata, 1 Pc : 2 Ps
Batu Bata 5 x 11 x 22
Portland Cement (PC)
Pasir pasang ( progo )
Tukang Batu
Kepala Tukang
Pekerja
Mandor
JUMLAH

140.0000
43.5000
0.0800
0.2000
0.0200
0.6000
0.0300

bh X Rp.
kg X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

600.00
1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

PPD22

1 M2 Pasangan roster 12 x 11 x 24 cm, camp. 1pc : 4ps


Terawang / roster 12x11x24 cm
30.0000
Portland Cement (PC)
11.0000

bh X Rp.
kg X Rp.

1,375.00

Pasir pasang ( progo )


Tukang Batu
Kepala Tukang
Pekerja
Mandor

m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

0.0350
0.1000
0.0100
0.3000
0.0150

120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH
1 M2 Pasangan roster 12 x 11 x 24 cm, camp. 1pc : 3ps
Terawang / roster 12x11x24 cm
30.0000
Portland Cement (PC)
14.0000
Pasir pasang ( progo )
0.0320
Tukang Batu
0.1000
Kepala Tukang
0.0100
Pekerja
0.3000
Mandor
0.0150
JUMLAH

PPD24

1 m2 Pasangan bata merah expose (5 x 11 x 24 cm), camp. 1 Pc : 3 Ps


Bata expose 5 x 11 x 24 cm
70.0000
bh X Rp.
Portland Cement (PC)
14.0000
kg X Rp.
3
Pasir pasang ( progo )
0.0320
m X Rp.
Tukang Batu
0.1500
org X Rp.
Kepala Tukang
0.0150
org X Rp.
Pekerja
0.3000
org X Rp.
Mandor
0.0150
org X Rp.
JUMLAH

PPD25

1 m2 Pasangan dinding bataco


Batako
Portland Cement (PC)
Pasir pasang ( progo )
Tukang batu
Kepala tukang
Pekerja
Mandor

bh X Rp.
kg X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

12.5000
12.5000

bh X Rp.
kg X Rp.

0.0400
0.1000
0.0100
0.5000
0.0250

m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

1 M2 Pasangan roster 25/25 cm


Roster 25/25
Portland Cement (PC)
Pasir pasang ( progo )
Tukang batu
Kepala tukang
Pekerja
Mandor

16.0000
12.5000
0.0400
0.1000
0.0100
0.5000
0.0250

bh X Rp.
kg X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

108,960.00

16,000.00
1,800.00
33,000.00
2,400.00
53,200.00

124,077.50

16,000.00
1,800.00
33,000.00
2,400.00
53,200.00

126,765.00

16,000.00
1,800.00
33,000.00
2,400.00
53,200.00

131,666.25

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH

99,216.25

84,000.00
13,860.00
0.00
11,100.00

162,160.00

84,000.00
25,437.50
14,640.00

177,277.50

84,000.00
30,525.00
12,240.00

179,965.00

84,000.00
36,506.25
11,160.00

184,866.25

84,000.00
45,306.25
10,920.00
16,000.00
1,800.00
33,000.00
2,400.00
53,200.00

140,226.25

16,000.00
1,800.00
33,000.00
2,400.00
53,200.00

153,412.50

193,426.25

84,000.00
59,812.50
9,600.00

206,612.50

0.00
15,125.00
4,200.00
8,000.00
900.00
16,500.00
1,200.00
26,600.00

19,325.00

45,925.00

0.00
19,250.00
3,840.00
8,000.00
900.00
16,500.00
1,200.00
26,600.00

23,090.00

49,690.00

0.00
19,250.00
3,840.00
12,000.00
1,350.00
16,500.00
1,200.00
31,050.00

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH
PPD26

72,616.25

16,000.00
1,800.00
33,000.00
2,400.00
53,200.00

600.00
1,375.00

PPD21

PPD23

900.00
16,500.00
1,200.00
26,600.00

600.00
1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

23,090.00

54,140.00

0.00
17,187.50
4,800.00
8,000.00
900.00
27,500.00
2,000.00
38,400.00

21,987.50

60,387.50

0.00
17,187.50
4,800.00
8,000.00
900.00
27,500.00
2,000.00
0.00

21,987.50

21,987.50

PEKERJAAN BETON
PBT1

1 M3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr


Portland Cement (PC)
Pasir beton
Krikil beton
Tukang batu
Kepala tukang
Pekerja
Mandor

336.0000
0.5400

kg X Rp.
3
m X Rp.

0.8100
0.2500
0.0250
1.6500
0.0800

m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

170,100.00
80,000.00
90,000.00
55,000.00
80,000.00

218.0000
0.5200
0.8700
0.2500
0.0250
1.6500
0.0800

kg X Rp.
3
m X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
120,000.00
170,100.00
80,000.00
90,000.00
55,000.00
80,000.00

1,375.00
120,000.00

JUMLAH
PBT2

1 M3 Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr


Portland Cement (PC)
Pasir beton
Krikil beton
Tukang batu
Kepala tukang
Pekerja
Mandor
JUMLAH

PBT3

1 M3 Beton mutu f'c = 7,4 MPa (K 100), slump (12 2) cm, w/c = 0,87
Portland Cement (PC)
247.000
kg
Pasir beton
0.621
m3
Split D 1 - 2 cm
0.740
m3
Pekerja
1.650
OH
Tukang Batu
0.275
OH
Kepala Tukang
0.028
OH
Mandor
0.083
OH
JUMLAH

X Rp.
X Rp.
X Rp.
X Rp.
X Rp.
X Rp.
X Rp.

PBT4

1 M3 Beton mutu f = 9,8 MPa (K 125), slump (12 2) cm, w/c = 0,78
Portland Cement (PC)
276.000
kg
Pasir beton
0.591
m3
Split D 1 - 2 cm
0.750
m3
Pekerja
1.650
OH
Tukang Batu
0.275
OH
Kepala Tukang
0.028
OH
Mandor
0.083
OH
JUMLAH

X Rp.
X Rp.
X Rp.
X Rp.
X Rp.
X Rp.
X Rp.

PBT5

1 M3 Beton mutu f'c = 12,2 MPa (K 150), slump (12 2) cm, w/c = 0,72
Portland Cement (PC)
299.000
kg
Pasir beton
0.571
m3
Split D 1 - 2 cm
0.753
m3
Pekerja
1.650
OH
Tukang Batu
0.275
OH
Kepala Tukang
0.028
OH
Mandor
0.083
OH
JUMLAH

X Rp.
X Rp.
X Rp.
X Rp.
X Rp.
X Rp.
X Rp.

PBT6

1 M3 Lantai kerja Beton mutu f'c = 7,4 MPa (K 100), slump (3-6) cm w/c = 0,87
Portland Cement (PC)
230.000
kg
X Rp.
Pasir beton
0.638
m3
X Rp.
Split D 1 - 2 cm
0.761
m3
X Rp.
Pekerja
1.200
OH
X Rp.
Tukang Batu
0.200
OH
X Rp.
Kepala Tukang
0.020
OH
X Rp.
Mandor
0.060
OH
X Rp.
JUMLAH

1,375.00
120,000.00
214,200.00
55,000.00
80,000.00
90,000.00
80,000.00

PBT7

1 M3 Beton mutu f'c = 14,5 MPa (K 175), slump (12 2) cm, w/c = 0,66
Portland Cement (PC)
326.000
kg
Pasir beton
0.543
m3
Split D 1 - 2 cm
0.762
m3
Pekerja
1.650
OH
Tukang Batu
0.275
OH
Kepala Tukang
0.028
OH
Mandor
0.083
OH
JUMLAH

X Rp.
X Rp.
X Rp.
X Rp.
X Rp.
X Rp.
X Rp.

1,375.00
120,000.00
214,200.00
55,000.00
80,000.00
90,000.00
80,000.00

PBT8

1 M3 Beton mutu f'c = 16,9 MPa (K 200), slump (12 2) cm, w/c = 0,61
Portland Cement (PC)
352.000
kg
Pasir beton
0.522
m3
Split D 1 - 2 cm
0.764
m3
Pekerja
1.650
OH
Tukang Batu
0.275
OH
Kepala Tukang
0.028
OH
Mandor
0.083
OH
JUMLAH

X Rp.
X Rp.
X Rp.
X Rp.
X Rp.
X Rp.
X Rp.

PBT9

1 M3 Beton mutu f'c = 19,3 MPa (K 225), slump (12 2) cm, w/c = 0,58
Portland Cement (PC)
371.000
kg
Pasir beton
0.499
m3
Split D 1 - 2 cm
0.776
m3
Pekerja
1.650
OH
Tukang Batu
0.275
OH
Kepala Tukang
0.028
OH
Mandor
0.083
OH
JUMLAH

X Rp.
X Rp.
X Rp.
X Rp.
X Rp.
X Rp.
X Rp.

PBT10

1 M3 Beton mutu f'c = 21,7 MPa (K 250), slump (12 2) cm, w/c = 0,56
Portland Cement (PC)
384.000
kg
Pasir beton
0.494
m3
Split D 1 - 2 cm
0.770
m3
Pekerja
1.650
OH
Tukang Batu
0.275
OH
Kepala Tukang
0.028
OH
Mandor
0.083
OH
JUMLAH

X Rp.
X Rp.
X Rp.
X Rp.
X Rp.
X Rp.
X Rp.

PBT11

1 M3 Beton mutu f'c = 24,0 MPa (K 275), slump (12 2) cm, w/c = 0,53
Portland Cement (PC)
406.000
kg
Pasir beton
0.489
m3
Split D 1 - 2 cm
0.760
m3
Pekerja
1.650
OH
Tukang Batu
0.275
OH
Kepala Tukang
0.028
OH
Mandor
0.083
OH
JUMLAH

X Rp.
X Rp.
X Rp.
X Rp.
X Rp.
X Rp.
X Rp.

PBT12

1 M3 Beton mutu f'c = 26,4 MPa (K 300), slump (12 2) cm, w/c = 0,52
Portland Cement (PC)
413.000
kg
Pasir beton
0.486
m3
Split D 1 - 2 cm
0.756
m3
Pekerja
1.650
OH
Tukang Batu
0.275
OH
Kepala Tukang
0.028
OH
Mandor
0.083
OH
JUMLAH

X Rp.
X Rp.
X Rp.
X Rp.
X Rp.
X Rp.
X Rp.

PBT13

1 M3 Beton mutu f'c = 28,8 MPa (K 325), slump (12 2) cm, w/c = 0,49
Portland Cement (PC)
439.000
kg
Pasir beton
0.479
m3
Split D 1 - 2 cm
0.745
m3
Pekerja
2.100
OH
Tukang Batu
0.350
OH
Kepala Tukang
0.035
OH
Mandor
0.105
OH
JUMLAH

X Rp.
X Rp.
X Rp.
X Rp.
X Rp.
X Rp.
X Rp.

PBT14

1 M3 Beton mutu f'c = 31,2 MPa (K 350), slump (12 2) cm, w/c = 0,48
Portland Cement (PC)
448.000
kg
Pasir beton
0.476
m3
Split D 1 - 2 cm
0.741
m3
Pekerja
2.100
OH
Tukang Batu
0.350
OH
Kepala Tukang
0.035
OH
Mandor
0.105
OH
JUMLAH

X Rp.
X Rp.
X Rp.
X Rp.
X Rp.
X Rp.
X Rp.

PBT15

1 M3 Membongkar cetakan
Pekerja

4.0000

org X Rp.

PBT16

Stutwerk untuk 1 m beton, tinggi 3 - 4 m ( memakai dolken )


Kayu dolken 8 - 10/400 cm
0.7000
Tukang kayu
10.5000
Kepala Tukang
1.0500
Pekerja
3.5000
Mandor
0.1750
JUMLAH

m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
120,000.00
214,200.00
55,000.00
80,000.00
90,000.00
80,000.00

1,375.00
120,000.00
214,200.00
55,000.00
80,000.00
90,000.00
80,000.00

1,375.00
120,000.00
214,200.00
55,000.00
80,000.00
90,000.00
80,000.00

1,375.00
120,000.00
214,200.00
55,000.00
80,000.00
90,000.00
80,000.00

1,375.00
120,000.00
214,200.00
55,000.00
80,000.00
90,000.00
80,000.00

1,375.00
120,000.00
214,200.00
55,000.00
80,000.00
90,000.00
80,000.00

1,375.00
120,000.00
214,200.00
55,000.00
80,000.00
90,000.00
80,000.00

1,375.00
120,000.00
214,200.00
55,000.00
80,000.00
90,000.00
80,000.00

1,375.00
120,000.00
214,200.00
55,000.00
80,000.00
90,000.00
80,000.00

1,375.00
120,000.00
214,200.00
55,000.00
80,000.00
90,000.00
80,000.00

55,000.00

JUMLAH

PBT18

1 m' PVC Waterstop lebar 150 mm


Waterstop lebar 150 mm
Pekerja
Tukang Batu
Kepala Tukang
Mandor

80,000.00
90,000.00
55,000.00
80,000.00

unit X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

1.050
0.060
0.030
0.003
0.003

m'
OH
OH
OH
OH

X Rp.
X Rp.
X Rp.
X Rp.
X Rp.

55,000.00
80,000.00
90,000.00
80,000.00

1.050
0.070
0.035
0.004
0.007

m'
OH
OH
OH
OH

X Rp.
X Rp.
X Rp.
X Rp.
X Rp.

55,000.00
80,000.00
90,000.00
80,000.00

JUMLAH
1 m' PVC Waterstop lebar 200 mm
Waterstop lebar 200 mm
Pekerja
Tukang Batu
Kepala Tukang
Mandor
JUMLAH
PBT20

1 m' PVC Waterstop lebar 230 mm - 320 mm


Waterstop lebar 230 mm - 320 mm
Pekerja
Tukang Batu
Kepala Tukang
Mandor
JUMLAH

PBT21

1 Kg Pembesian dengan besi polos


Besi beton polos
Kawat beton / bindrat
Tukang Besi
Kepala Tukang
Pekerja
Mandor

1.050
0.080
0.040
0.004
0.004

1.0500
0.0150
0.0070
0.0007
0.0070
0.0004

m'
OH
OH
OH
OH

X Rp.
X Rp.
X Rp.
X Rp.
X Rp.

55,000.00
80,000.00
90,000.00
80,000.00

kg X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

11,600.00
20,000.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH
PBT22

1 Kg Pembesian dengan besi ulir


Besi beton ulir
Kawat beton / bindrat
Tukang Besi
Kepala Tukang
Pekerja
Mandor

1.0500
0.0150
0.0070
0.0007
0.0070
0.0004

kg X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

12,300.00
20,000.00
80,000.00
90,000.00
55,000.00
80,000.00

PBT23

1 Kg Memasang kabel presstressed polos/strands


Besi beton polos
Kawat beton / bindrat
Tukang Besi
Kepala Tukang
Pekerja
Mandor
JUMLAH

1.0500
0.0100
0.0050
0.0005
0.0050
0.0003

kg X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

11,600.00
20,000.00
80,000.00
90,000.00
55,000.00
80,000.00

1 Kg Memasang jaring kawat baja/wire mesh


Besi beton polos
Kawat beton / bindrat
Tukang Besi
Kepala Tukang
Pekerja
Mandor
JUMLAH

1.0200
0.0050
0.0025
0.0025
0.0025
0.0001

kg X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

11,600.00
20,000.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH

PBT25

1 M2 Cetakan beton / begisting memakai papan


Kayu meranti balok
Kayu meranti papan
Paku biasa 1/2" - 1"
Tukang kayu
Kepala Tukang
Pekerja
Mandor
JUMLAH
2 kali pemakaian

PBT26

1 M2 Cetakan beton / begisting memakai multiplek


Kayu meranti balok
Multiplek
Paku biasa 1/2" - 1"
Tukang kayu
Kepala Tukang
Pekerja
Mandor
JUMLAH
2 kali pemakaian

PBT27

1 M2 Begesting untuk pondasi


Papan cetakan / bekesting
Paku biasa 1/2" - 1"
Minyak bekisting
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0170
0.0240
0.4000
0.5000
0.0500
0.2000
0.0100

m X Rp.
3
m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

9,200,000.00
9,200,000.00
16,300.00
80,000.00
90,000.00
55,000.00
80,000.00

0.0170
0.3470
0.4000
0.5000
0.0500
0.2000
0.0100

m X Rp.
lbr X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

9,200,000.00
79,200.00
16,300.00
80,000.00
90,000.00
55,000.00
80,000.00

0.0400
0.3000
0.1000
0.5200
0.2600
0.0260
0.0260

m3 X Rp.
kg X Rp.
ltr X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

5,937,500.00
16,300.00
6,000.00
55,000.00
80,000.00
90,000.00
80,000.00

JUMLAH
2 kali pemakaian
PBT28

1 M2 Begesting untuk sloof


Papan cetakan / bekesting
Paku biasa 1/2" - 1"
Minyak bekisting
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0450
0.3000
0.1000
0.5200
0.2600
0.0260
0.0260

m3 X Rp.
kg X Rp.
ltr X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

5,937,500.00
16,300.00
6,000.00
55,000.00
80,000.00
90,000.00
80,000.00

JUMLAH
2 kali pemakaian
PBT29

1 M2 Begesting untuk kolom


Papan cetakan / bekesting
Paku biasa 1/2" - 1"
Minyak bekisting
Kayu meranti balok
Multiplek
Kayu dolken
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.0400
0.4000
0.2000
0.0150
0.3500
2.0000
0.6600
0.3300
0.0330
0.0330

m3
kg
ltr
m3
lbr
btg
org
org
org
org

X
X
X
X
X
X
X
X
X
X

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,937,500.00
16,300.00
6,000.00
9,200,000.00
79,200.00
15,800.00
55,000.00
80,000.00
90,000.00
80,000.00

0.0400
0.4000
0.2000
0.0180
0.3500
2.0000
0.6600
0.3300
0.0330
0.0330

m3 X Rp.
kg X Rp.
ltr X Rp.
m3 X Rp.
lbr X Rp.
btg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

5,937,500.00
16,300.00
6,000.00
9,200,000.00
79,200.00
15,800.00
55,000.00
80,000.00
90,000.00
80,000.00

0.0400
0.4000
0.2000
0.0150
0.3500
6.0000
0.6600
0.3300
0.0330
0.0330

m3 X Rp.
kg X Rp.
ltr X Rp.
m3 X Rp.
lbr X Rp.
btg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

5,937,500.00
16,300.00
6,000.00
9,200,000.00
79,200.00
15,800.00
55,000.00
80,000.00
90,000.00
80,000.00

0.0300
0.4000
0.2000
0.0200
0.3500
3.0000
4.0000
0.6600
0.3300
0.0330
0.0330

m3
kg
ltr
m3
lbr
btg
bh
org
org
org
org

X
X
X
X
X
X
X
X
X
X
X

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,937,500.00
16,300.00
6,000.00
9,200,000.00
79,200.00
15,800.00
55,000.00
80,000.00
90,000.00
80,000.00

0.0300
0.4000
0.1500
0.0150
0.3500
2.0000
0.6600
0.3300
0.0330
0.0330

m3
kg
ltr
m3
lbr
btg
org
org
org
org

X
X
X
X
X
X
X
X
X
X

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,937,500.00
16,300.00
6,000.00
9,200,000.00
79,200.00
15,800.00
55,000.00
80,000.00
90,000.00
80,000.00

0.0264
0.6000
0.5000
0.1500
0.0500
0.0500
0.0075

m3 X Rp.
kg X Rp.
btg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

5,937,500.00
16,300.00
15,800.00
55,000.00
80,000.00
90,000.00
80,000.00

JUMLAH
2 kali pemakaian
PBT30

1 M2 Begesting untuk balok


Papan cetakan / bekesting
Paku biasa 1/2" - 1"
Minyak bekisting
Kayu meranti balok
Multiplek
Kayu dolken
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
JUMLAH
2 kali pemakaian

PBT31

1 M2 Begesting untuk lantai


Papan cetakan / bekesting
Paku biasa 1/2" - 1"
Minyak bekisting
Kayu meranti balok
Multiplek
Kayu dolken
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
JUMLAH
2 kali pemakaian

PBT32

1 M2 Begesting untuk dinding


Papan cetakan / bekesting
Paku biasa 1/2" - 1"
Minyak bekisting
Kayu meranti balok
Multiplek
Kayu dolken
Formite/penjaga jarak bekisting/spacer
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
JUMLAH
2 kali pemakaian

PBT33

1 M2 Begesting untuk tangga


Papan cetakan / bekesting
Paku biasa 1/2" - 1"
Minyak bekisting
Kayu meranti balok
Multiplek
Kayu dolken
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
JUMLAH
2 kali pemakaian

PBT34

664,581.00

510,137.00

Jembatan untuk pengecoran beton


Papan cetakan / bekesting
Paku biasa 1/2" - 1"
Kayu dolken
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
JUMLAH

PBT36

PBT37

PBT38

629,537.00

339,625.00
74,485.71
158,508.00
90,750.00
22,000.00
2,475.00
6,600.00
121,825.00

572,618.71

694,443.71

379,500.00
70,971.43
160,570.67
90,750.00
22,000.00
2,475.00
6,600.00
121,825.00

611,042.10

732,867.10

411,125.00
68,485.71
161,364.00
90,750.00
22,000.00
2,475.00
6,600.00
121,825.00

640,974.71

762,799.71

316,250.00
76,542.86
162,950.67
66,000.00
16,000.00
1,800.00
4,800.00
88,600.00

555,743.52

644,343.52

448,250.00
65,142.86
163,268.00
90,750.00
22,000.00
2,475.00
6,600.00
121,825.00

676,660.86

798,485.86

484,000.00
62,657.14
163,585.33
90,750.00
22,000.00
2,475.00
6,600.00
121,825.00

710,242.48

832,067.48

510,125.00
59,828.57
166,124.00
90,750.00
22,000.00
2,475.00
6,600.00
121,825.00

736,077.57

857,902.57

528,000.00
59,314.29
164,854.67
90,750.00
22,000.00
2,475.00
6,600.00
121,825.00

752,168.95

873,993.95

558,250.00
58,628.57
162,792.00
90,750.00
22,000.00
2,475.00
6,600.00
121,825.00

779,670.57

901,495.57

567,875.00
58,371.43
161,998.67
90,750.00
22,000.00
2,475.00
6,600.00
121,825.00

788,245.10

910,070.10

603,625.00
57,428.57
159,618.67
115,500.00
28,000.00
3,150.00
8,400.00
155,050.00

820,672.24

975,722.24

616,000.00
57,171.43
158,666.67
115,500.00
28,000.00
3,150.00
8,400.00
155,050.00

831,838.10

220,000.00
220,000.00

0.00

986,888.10

220,000.00

0.00
840,000.00
94,500.00
192,500.00
14,000.00
1,141,000.00

0.00

1,141,000.00

0.00
280,000.00
31,500.00
121,000.00
9,600.00
442,100.00

0.00

1 m' Kolom praktis beton bertulang (11 x 11) cm


Papan cetakan / bekesting
Paku biasa 1/2" - 1"
Besi beton polos
Kawat beton / bindrat
Portland Cement (PC)
Pasir beton
Split D 1 - 2 cm
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
JUMLAH

0.0020
0.0100
3.0000
0.4500
4.0000
0.0060
0.0090
0.1800
0.0200
0.0200
0.0200
0.0060
0.0090

m3
kg
kg
kg
kg
m3
m3
OH
OH
OH
OH
OH
OH

X
X
X
X
X
X
X
X
X
X
X
X
X

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,937,500.00
16,300.00
11,600.00
20,000.00
1,375.00
120,000.00
214,200.00
55,000.00
80,000.00
80,000.00
80,000.00
90,000.00
80,000.00

1 m' Ring balok beton bertulang (10 x 15) cm


Papan cetakan / bekesting
Paku biasa 1/2" - 1"
Besi beton polos
Kawat beton / bindrat
Portland Cement (PC)
Pasir beton
Split D 1 - 2 cm
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
JUMLAH

0.0030
0.0200
3.6000
0.0500
5.5000
0.0090
0.0150
0.2970
0.0330
0.0330
0.0330
0.0100
0.0150

m3
kg
kg
kg
kg
m3
m3
OH
OH
OH
OH
OH
OH

X
X
X
X
X
X
X
X
X
X
X
X
X

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,937,500.00
16,300.00
11,600.00
20,000.00
1,375.00
120,000.00
214,200.00
55,000.00
80,000.00
80,000.00
80,000.00
90,000.00
80,000.00

1 m' Pembuatan tiang pancang (40 x 40) cm, beton bertulang


Pasir urug darat
0.0190
Pasir beton
0.0940
Batu pecah 2/3 ( split )
0.1500
Portland Cement (PC)
60.5000
Besi beton polos
45.0000
Kawat beton / bindrat
0.9000
Kayu meranti balok
0.0320
Paku reng 55 x 3,1 mm
0.1200
Minyak bekisting
0.0900
Plamur Fuji
0.2400
Tukang batu
0.6700
Kepala tukang
0.0670
Pekerja
1.0000
Mandor
0.0500
JUMLAH

m
3
m
3
m
kg
kg
kg
3
m
kg
ltr
kg
org
org
org
org

X
X
X
X
X
X
X
X
X
X
X
X
X
X

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

94,500.00
120,000.00
214,200.00
1,375.00
11,600.00
20,000.00
9,200,000.00
80,000.00
90,000.00
55,000.00
80,000.00

1 m' Pembuatan tiang pancang (35 x 35) cm, beton bertulang


Pasir urug darat
0.0160
Pasir beton
0.0800
Batu pecah 2/3 ( split )
0.1250
Portland Cement (PC)
49.0000
Besi beton polos
34.5000
Kawat beton / bindrat
0.7000
Kayu meranti balok
0.0270
Paku reng 55 x 3,1 mm
0.1200
Minyak bekisting
0.0900
Plamur Fuji
0.2000
Tukang batu
0.5000
Kepala tukang
0.0500
Pekerja
0.8000
Mandor
0.0400
JUMLAH

m
3
m
3
m
kg
kg
kg
3
m
kg
ltr
kg
org
org
org
org

X
X
X
X
X
X
X
X
X
X
X
X
X
X

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

94,500.00
120,000.00
214,200.00
1,375.00
11,600.00
20,000.00
9,200,000.00
80,000.00
90,000.00
55,000.00
80,000.00

120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

442,100.00

0.00
3,300.00
2,400.00
270.00
240.00
6,210.00

0.00

6,210.00

0.00
3,850.00
2,800.00
315.00
560.00
7,525.00

0.00

7,525.00

0.00
4,400.00
3,200.00
360.00
320.00
8,280.00

0.00

8,280.00

12,180.00
300.00
560.00
63.00
385.00
28.00
1,036.00

12,480.00

13,516.00

12,915.00
300.00
560.00
63.00
385.00
28.00
1,036.00

13,215.00

14,251.00

12,180.00
200.00
400.00
45.00
275.00
20.00
740.00

12,380.00

13,120.00

11,832.00
100.00
200.00
225.00
137.50
10.00
572.50

11,932.00

12,504.50

156,400.00
220,800.00
6,520.00
40,000.00
4,500.00
11,000.00
800.00
56,300.00
28,150.00

383,720.00
191,860.00

440,020.00
220,010.00

156,400.00
27,482.40
6,520.00
40,000.00
4,500.00
11,000.00
800.00
56,300.00
28,150.00

190,402.40
95,201.20

246,702.40
123,351.20

237,500.00
4,890.00
600.00
28,600.00
20,800.00
2,340.00
2,080.00
53,820.00
26,910.00

242,990.00
121,495.00

296,810.00
148,405.00

267,187.50
4,890.00
600.00
28,600.00
20,800.00
2,340.00
2,080.00
53,820.00
26,910.00

272,677.50
136,338.75

326,497.50
163,248.75

237,500.00
6,520.00
1,200.00
138,000.00
27,720.00
31,600.00
36,300.00
26,400.00
2,970.00
2,640.00
68,310.00
34,155.00

442,540.00
221,270.00

510,850.00
255,425.00

237,500.00
6,520.00
1,200.00
165,600.00
27,720.00
31,600.00
36,300.00
26,400.00
2,970.00
2,640.00
68,310.00
34,155.00

470,140.00
235,070.00

538,450.00
269,225.00

237,500.00
6,520.00
1,200.00
138,000.00
27,720.00
94,800.00
36,300.00
26,400.00
2,970.00
2,640.00
68,310.00
34,155.00

505,740.00
252,870.00

574,050.00
287,025.00

178,125.00
6,520.00
1,200.00
184,000.00
27,720.00
47,400.00
0.00
36,300.00
26,400.00
2,970.00
2,640.00
68,310.00
34,155.00

444,965.00
222,482.50

513,275.00
256,637.50

178,125.00
6,520.00
900.00
138,000.00
27,720.00
31,600.00
36,300.00
26,400.00
2,970.00
2,640.00
68,310.00
34,155.00

382,865.00
191,432.50

451,175.00
225,587.50

156,750.00
9,780.00
7,900.00
8,250.00
4,000.00
4,500.00
600.00
17,350.00

174,430.00

JASA 10 %
PBT35

783,981.00

299,750.00
62,400.00
147,987.00
20,000.00
2,250.00
90,750.00
6,400.00
119,400.00

Stutwerk untuk 1 m beton, tinggi 3 - 4 m ( memakai scafolding )


Scafolding
32.0000
Tukang kayu
3.5000
Kepala Tukang
0.3500
Pekerja
2.2000
Mandor
0.1200
JUMLAH

PBT24

137,781.00

PBT17

PBT19

462,000.00
64,800.00
20,000.00
2,250.00
90,750.00
6,400.00
119,400.00

191,780.00
19,178.00

11,875.00
163.00
34,800.00
9,000.00
5,500.00
720.00
1,927.80
9,900.00
1,600.00
1,600.00
1,600.00
540.00
720.00
15,960.00

63,985.80

79,945.80

17,812.50
326.00
41,760.00
1,000.00
7,562.50
1,080.00
3,213.00
16,335.00
2,640.00
2,640.00
2,640.00
900.00
1,200.00
26,355.00

72,754.00

99,109.00

1,795.50
11,280.00
32,130.00
83,187.50
522,000.00
18,000.00
294,400.00
0.00
0.00
0.00
53,600.00
6,030.00
55,000.00
4,000.00
118,630.00

962,793.00

1,081,423.00

1,512.00
9,600.00
26,775.00
67,375.00
400,200.00
14,000.00
248,400.00
0.00
0.00
0.00
40,000.00
4,500.00
44,000.00
3,200.00
91,700.00

767,862.00

859,562.00

PEKERJAAN PELESTERAN
PPT1

PPT2

PPT3

PPT4

1 M2 Plesteran 1 Sm : 1 Kp : 1 Ps, tebal 15 mm


Semen warna
Kapur pasang
Pasir pasang ( progo )
Tukang Batu
Kepala Tukang
Pekerja
Mandor
JUMLAH

0.0090
0.0090
0.0090
0.1200
0.0120
0.3600
0.0180

m X Rp.
3
m X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1 M2 Plesteran 1 Sm : 1 Kp : 2 Ps, tebal 15 mm


Semen warna
Kapur pasang
Pasir pasang ( progo )
Tukang Batu
Kepala Tukang
Pekerja
Mandor
JUMLAH

0.0070
0.0070
0.0150
0.1200
0.0120
0.3600
0.0180

m X Rp.
3
m X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1 m2 Plesteran 1 Pc : 1/2 Kp : 3 Ps, tebal 15 mm


Portland Cement (PC)
Kapur pasang
Pasir pasang ( progo )
Tukang Batu
Kepala Tukang
Pekerja
Mandor
JUMLAH

5.7600
0.0030
0.0130
0.1200
0.0120
0.3600
0.0180

1 m2 Plesteran 1 Pc : 2 Kp : 8 Ps, tebal 15 mm


Portland Cement (PC)
Kapur pasang
Pasir pasang ( progo )
Tukang Batu
Kepala Tukang
Pekerja
Mandor
JUMLAH

3.0000
0.0050
0.0200
0.1200
0.0120
0.3600
0.0180

kg X Rp.
3
m X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

15.5040
0.0160
0.1500
0.0150
0.3000
0.0150

kg X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
120,000.00
90,000.00
55,000.00
80,000.00

10.2240
0.0200
0.1500
0.0150
0.3000
0.0150

kg X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
120,000.00
90,000.00
55,000.00
80,000.00

PPT5

1 m2 Plesteran 1 Pc : 1 Ps, tebal 15 mm


Portland Cement (PC)
Kapur pasang
Pasir pasang ( progo )
Kepala Tukang
Pekerja
Mandor

PPT6

1 m2 Plesteran 1 Pc : 2 Ps, tebal 15 mm


Portland Cement (PC)
Kapur pasang
Pasir pasang ( progo )
Kepala Tukang
Pekerja
Mandor

kg X Rp.
3
m X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH

JUMLAH
PPT7

1 m2 Plesteran 1 Pc : 3 Ps, tebal 15 mm


Portland Cement (PC)
Pasir pasang ( progo )
Tukang Batu
Kepala Tukang
Pekerja
Mandor

PPT8

1 m2 Plesteran 1 Pc : 4 Ps, tebal 15 mm


Portland Cement (PC)

7.7760
0.0230
0.1500
0.0150
0.3000
0.0150

kg X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH

Pasir pasang ( progo )


Tukang Batu
Kepala Tukang
Pekerja
Mandor

6.2400

kg

X Rp.

1,375.00

0.0240
0.1500
0.0150
0.3000
0.0150

m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH
PPT9

1 m2 Plesteran 1 Pc : 5 Ps, tebal 15 mm


Portland Cement (PC)
Pasir pasang ( progo )
Tukang Batu
Kepala Tukang
Pekerja

5.1840
0.0260
0.1500
0.0150
0.3000

kg X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00

0.00
0.00
1,080.00
9,600.00
1,080.00
19,800.00
1,440.00
31,920.00

1,080.00

33,000.00

0.00
0.00
1,800.00
9,600.00
1,080.00
19,800.00
1,440.00
31,920.00

1,800.00

33,720.00

7,920.00
0.00
1,560.00
9,600.00
1,080.00
19,800.00
1,440.00
31,920.00

9,480.00

41,400.00

4,125.00
0.00
2,400.00
9,600.00
1,080.00
19,800.00
1,440.00
31,920.00

6,525.00

38,445.00

21,318.00
0.00
18,000.00
1,350.00
16,500.00
1,200.00
37,050.00

21,318.00

58,368.00

14,058.00
0.00
18,000.00
1,350.00
16,500.00
1,200.00
37,050.00

14,058.00

51,108.00

10,692.00
2,760.00
12,000.00
1,350.00
16,500.00
1,200.00
31,050.00

13,452.00

12,000.00
1,350.00
16,500.00
1,200.00
31,050.00

11,460.00

44,502.00

8,580.00
2,880.00

7,128.00
3,120.00
12,000.00
1,350.00
16,500.00

42,510.00

Mandor

0.0150

org X Rp.

80,000.00

JUMLAH
PPT10

1 m2 Plesteran 1 Pc : 6 Ps, tebal 15 mm


Portland Cement (PC)
Pasir pasang ( progo )
Tukang Batu
Kepala Tukang
Pekerja
Mandor

4.4160

kg

X Rp.

1,375.00

0.0270
0.1500
0.0150
0.3000
0.0150

m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH
PPT11

1 m2 Plesteran granit 1 Pc : 2 Batu granit, tebal 10 mm


Portland Cement (PC)
10.0000
Batu granit
15.0000
Tukang Batu
0.2250
Kepala Tukang
0.0225
Pekerja
0.4500
Mandor
0.0225
JUMLAH

kg X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

PPT12

1 m2 Plesteran traso 1 Pc : 2 Batu traso, tebal 10 mm


Portland Cement (PC)
10.0000
Batu granit
15.0000
Tukang Batu
0.2250
Kepala Tukang
0.0225
Pekerja
0.4500
Mandor
0.0225
JUMLAH

kg X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
80,000.00
90,000.00
55,000.00
80,000.00

PPT13

1 m2 Finishing siar pas. Bata merah (=20m')


Portland Cement (PC)
Tukang Batu
Kepala Tukang
Pekerja
Mandor
JUMLAH

3.1080
0.0750
0.0075
0.1500
0.0075

kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
80,000.00
90,000.00
55,000.00
80,000.00

PPT14

1 m2 Finishing siar pas. Batu kali 1 pc : 2 ps


Portland Cement (PC)
Pasir pasang ( progo )
Tukang Batu
Kepala Tukang
Pekerja
Mandor
JUMLAH

6.3400
0.0120
0.1500
0.0150
0.3000
0.0150

kg X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

PPT15

1 m2 Plesteran Ciprat, 1 Pc : 2 Ps
Portland Cement (PC)
Pasir pasang ( progo )
Tukang Batu
Kepala Tukang
Pekerja
Mandor

4.3200
0.0060
0.1000
0.0100
0.3000
0.0150

kg X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

3.2500
0.1000
0.0100
0.2000
0.0100

kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
80,000.00
90,000.00
55,000.00
80,000.00

1,375.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH
PPT16

1 m2 Acian
Portland Cement (PC)
Tukang Batu
Kepala Tukang
Pekerja
Mandor
JUMLAH

PPT17

1 m2 Plesteran batu kali 1pc:1/2kp:5ps tebal 10 mm


Portland Cement (PC)
Kapur pasang
Pasir pasang ( progo )
Tukang batu
Kepala Tukang
Pekerja
Mandor
JUMLAH

PPT18

1 m2 Plesteran batu kali 1pc:3ps


Portland Cement (PC)
Pasir pasang ( progo )
Tukang batu
Kepala Tukang
Pekerja
Mandor

5.1000
0.0014
0.0136
0.2000
0.0200
0.4000
0.0200

kg X Rp.
3
m X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

8.1600

kg

X Rp.

1,375.00

0.0194
0.2000
0.0200
0.4000
0.0200

m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH
PPT19

1 m2 Plesteran batu kali 1pc:4ps


Portland Cement (PC)
Pasir pasang ( progo )
Tukang batu
Kepala Tukang
Pekerja
Mandor

6.5110
0.0209
0.2000
0.0200
0.4000
0.0200

kg X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH

1,200.00
31,050.00

10,248.00

41,298.00

6,072.00
3,240.00
12,000.00
1,350.00
16,500.00
1,200.00
31,050.00

9,312.00

40,362.00

13,750.00
0.00
18,000.00
2,025.00
24,750.00
1,800.00
46,575.00

13,750.00

60,325.00

13,750.00
0.00
18,000.00
2,025.00
24,750.00
1,800.00
46,575.00

13,750.00

60,325.00

4,273.50
6,000.00
675.00
8,250.00
600.00
15,525.00

4,273.50

12,000.00
1,350.00
16,500.00
1,200.00
31,050.00

10,157.50

19,798.50

8,717.50
1,440.00

41,207.50

5,940.00
720.00
8,000.00
900.00
16,500.00
1,200.00
26,600.00

6,660.00

33,260.00

4,468.75
8,000.00
900.00
11,000.00
800.00
20,700.00

4,468.75

25,168.75

7,012.50
0.00
1,632.00
16,000.00
1,800.00
22,000.00
1,600.00
41,400.00

8,644.50

50,044.50

11,220.00
2,328.00
16,000.00
1,800.00
22,000.00
1,600.00
41,400.00

13,548.00

16,000.00
1,800.00
22,000.00
1,600.00
41,400.00

11,460.63

54,948.00

8,952.63
2,508.00

52,860.63

PEKERJAAN PASANG LANTAI


Pasang ubin granit, teralux dan marmer
PPL1

1 M2 Pasang lantai ubin granit 40/40


Ubin granit uk. 40/40
Portland Cement (PC)

6.6300
9.8000

bh X Rp.
kg X Rp.

Pasir pasang ( progo )


Semen warna
Tukang Batu
Kepala Tukang
Pekerja
Mandor

0.0450
1.3000
0.1250
0.0125
0.2500
0.0125

m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

72,000.00
1,375.00

477,360.00
13,475.00

120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

5,400.00
0.00

JUMLAH
PPL2

1 M2 Pasang lantai ubin granit 30/30


Ubin granit uk. 30/30
Portland Cement (PC)
Pasir pasang ( progo )
Semen warna
Tukang Batu
Kepala Tukang
Pekerja
Mandor

11.8700
10.0000

bh X Rp.
kg X Rp.

0.0450
1.5000
0.1300
0.0130
0.2600
0.0130

m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

10,000.00
1,125.00
13,750.00
1,000.00
25,875.00

66,000.00
1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH

496,235.00

522,110.00

783,420.00
13,750.00
5,400.00
0.00
10,400.00
1,170.00
14,300.00
1,040.00
26,910.00

802,570.00

829,480.00

Pasang plint tegel dan teraso


PPL3

1 M' Pasang plint ubin PC abu-abu ukuran 15 x 20 cm


Plint tegel abu-abu 15/20
Portland Cement (PC)

5.3000
1.6500

bh X Rp.
kg X Rp.

Pasir pasang ( progo )


Tukang Batu
Kepala Tukang
Pekerja
Mandor

0.0040
0.0900
0.0090
0.0900
0.0045

m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

3.5300
1.2400
0.0030
0.0900
0.0090
0.0900
0.0045

bh X Rp.
kg X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

1,375.00

JUMLAH
PPL4

PPL5

1 M' Pasang plint ubin PC abu-abu ukuran 10 x 30 cm


Plint tegel abu-abu 10/30
Portland Cement (PC)
Pasir pasang ( progo )
Tukang Batu
Kepala Tukang
Pekerja
Mandor
JUMLAH
1 M' Pasang plint ubin PC abu-abu ukuran 10 x 40 cm
Plint tegel abu-abu 10/40
Portland Cement (PC)

2.6500
1.2400

bh X Rp.
kg X Rp.

Pasir pasang ( progo )


Tukang Batu
Kepala Tukang
Pekerja
Mandor

0.0030
0.0900
0.0090
0.0900
0.0045

m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

PPL7

1 M' Pasang plint ubin PC warna ukuran 10 x 20 cm


Plint tegel warna 10/20
Portland Cement (PC)
Pasir pasang ( progo )
Semen warna
Tukang Batu
Kepala Tukang
Pekerja
Mandor
JUMLAH

5.3000
1.1400
0.0030
0.1000
0.0900
0.0090
0.0900
0.0045

bh X Rp.
kg X Rp.
3
m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1 M' Pasang plint ubin PC warna ukuran 10 x 30 cm


Plint tegel warna 10/30
Portland Cement (PC)

3.5300
1.1400

bh X Rp.
kg X Rp.

Pasir pasang ( progo )


Semen warna
Tukang Batu
Kepala Tukang
Pekerja
Mandor

0.0030
0.1000
0.0900
0.0090
0.0900
0.0045

m X Rp.
kg X Rp.
oh X Rp.
oh X Rp.
oh X Rp.
oh X Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

PPL9

PPL10

1 M' Pasang plint ubin PC warna ukuran 10 x 40 cm


Plint tegel warna 10/40
Portland Cement (PC)
Pasir pasang ( progo )
Semen warna
Tukang Batu
Kepala Tukang
Pekerja
Mandor
JUMLAH

2.6500
1.1400
0.0030
0.1000
0.0900
0.0090
0.0900
0.0045

bh X Rp.
kg X Rp.
3
m X Rp.
kg X Rp.
oh X Rp.
oh X Rp.
oh X Rp.
oh X Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

1 M' Pasang plint ubin traso ukuran 10 x 30 cm


Plint ubin teraso 10/30
Portland Cement (PC)
Pasir pasang ( progo )
Semen warna
Tukang Batu
Kepala Tukang
Pekerja
Mandor
JUMLAH

3.5300
1.1400
0.0030
0.1000
0.0900
0.0090
0.0900
0.0045

bh X Rp.
kg X Rp.
3
m X Rp.
kg X Rp.
oh X Rp.
oh X Rp.
oh X Rp.
oh X Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

1 M' Pasang plint ubin traso ukuran 10 x 40 cm


Plint ubin teraso 10/40
Portland Cement (PC)

2.6500
1.1400

bh X Rp.
kg X Rp.

Pasir pasang ( progo )


Semen warna
Tukang Batu
Kepala Tukang
Pekerja
Mandor

0.0030
0.1000
0.0900
0.0090
0.0900
0.0045

m X Rp.
kg X Rp.
oh X Rp.
oh X Rp.
oh X Rp.
oh X Rp.

2,065.00

16,068.75

15,385.00

0.00
1,705.00
360.00
7,200.00
810.00
4,950.00
360.00
13,320.00

2,065.00

15,385.00

0.00
1,567.50
360.00
0.00
7,200.00
810.00
4,950.00
360.00
13,320.00

1,927.50

15,247.50

0.00
1,567.50
360.00
0.00
7,200.00
810.00
4,950.00
360.00
13,320.00

1,927.50

15,247.50

0.00
1,567.50
360.00
0.00
7,200.00
810.00
4,950.00
360.00
13,320.00

1,927.50

15,247.50

0.00
1,567.50
360.00
0.00
7,200.00
810.00
4,950.00
360.00
13,320.00

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH

2,748.75

0.00
1,705.00
360.00
7,200.00
810.00
4,950.00
360.00
13,320.00

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH
PPL8

480.00

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH
PPL6

0.00
2,268.75
7,200.00
810.00
4,950.00
360.00
13,320.00

1,927.50

15,247.50

0.00
1,567.50
360.00
0.00
7,200.00
810.00
4,950.00
360.00
13,320.00

1,927.50

15,247.50

Pasang plint ubin dan marmer


PPL11

PPL12

PPL13

1 M' Pasang plint ubin granit ukuran 10 x 30 cm


Plint ubin granit 10/30
Portland Cement (PC)
Pasir pasang ( progo )
Semen warna
Tukang Batu
Kepala Tukang
Pekerja
Mandor
JUMLAH

3.5300
1.1400
0.0030
0.1000
0.0900
0.0090
0.0900
0.0045

bh
kg
3
m
kg
oh
oh
oh
oh

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

1 M' Pasang plint ubin granit ukuran 10 x 40 cm


Plint ubin granit 10/40
Portland Cement (PC)
Pasir pasang ( progo )
Semen warna
Tukang Batu
Kepala Tukang
Pekerja
Mandor
JUMLAH

2.6500
1.1400
0.0030
0.1000
0.0900
0.0090
0.0900
0.0045

bh X Rp.
kg X Rp.
3
m X Rp.
kg X Rp.
oh X Rp.
oh X Rp.
oh X Rp.
oh X Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

X
X
X
X
X
X
X
X

1 m' Pasang plint ubin teralux marmer ukuran 10 x 60 cm


Plint ubin teralux marmer 10/60
1.7000
Portland Cement (PC)
1.1400

bh X Rp.
kg X Rp.

Pasir pasang ( progo )


Semen warna
Tukang Batu
Kepala Tukang
Pekerja
Mandor

0.0030
0.1000
0.0900
0.0090
0.0900
0.0045

m X Rp.
kg X Rp.
oh X Rp.
oh X Rp.
oh X Rp.
oh X Rp.

120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

1 m' Pasang plint ubin teralux marmer ukuran 10 x 40 cm


Plint ubin teralux marmer 10/40
2.6500
Portland Cement (PC)
1.1400
Pasir pasang ( progo )
0.0030
Semen warna
0.1000
Tukang Batu
0.0900
Kepala Tukang
0.0090
Pekerja
0.0900
Mandor
0.0045
JUMLAH

bh X Rp.
kg X Rp.
3
m X Rp.
kg X Rp.
oh X Rp.
oh X Rp.
oh X Rp.
oh X Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

1 m' Pasang plint ubin teralux marmer ukuran 10 x 30 cm


Plint ubin teralux marmer 10/30
3.5300
Portland Cement (PC)
1.1400
Pasir pasang ( progo )
0.0030
Semen warna
0.1000
Tukang Batu
0.0900
Kepala Tukang
0.0090
Pekerja
0.0900
Mandor
0.0045
JUMLAH

bh X Rp.
kg X Rp.
3
m X Rp.
kg X Rp.
oh X Rp.
oh X Rp.
oh X Rp.
oh X Rp.

1 m' Pasang lantai teraso cor ditempat tebal 3 cm


Bahan teraso cor
Tukang Batu
Kepala Tukang
Pekerja
Mandor
JUMLAH

m3 X Rp.
oh X Rp.
oh X Rp.
oh X Rp.
oh X Rp.

PPL15

PPL16

0.0360
0.1800
0.0180
0.3600
0.0180

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

80,000.00
90,000.00
55,000.00
80,000.00

1,927.50

15,247.50

0.00
1,567.50
360.00
0.00
7,200.00
810.00
4,950.00
360.00
13,320.00

1,375.00

JUMLAH
PPL14

0.00
1,567.50
360.00
0.00
7,200.00
810.00
4,950.00
360.00
13,320.00

1,927.50

15,247.50

0.00
1,567.50
360.00
0.00
7,200.00
810.00
4,950.00
360.00
13,320.00

1,927.50

15,247.50

0.00
1,567.50
360.00
0.00
7,200.00
810.00
4,950.00
360.00
13,320.00

1,927.50

15,247.50

0.00
1,567.50
360.00
0.00
7,200.00
810.00
4,950.00
360.00
13,320.00

1,927.50

15,247.50

0.00
14,400.00
1,620.00
19,800.00
1,440.00
37,260.00

0.00

37,260.00

PEKERJAAN KERAMIK
PPL17

PPL18

1 m2 Pasang lantai keramik artistik uk. 10 x 20 cm


Ubin keramik artistik
Portland Cement (PC)
Pasir pasang ( progo )
Semen warna
Tukang Batu
Kepala Tukang
Pekerja
Mandor
JUMLAH

53.0000
8.1900
0.0450
2.7500
0.3500
0.0350
0.7000
0.0350

bh
kg
3
m
kg
org
org
org
org

X
X
X
X
X
X
X
X

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1 m2 Pasang lantai keramik artistik uk. 10 x 10 cm atau 5 x 20 cm


Ubin keramik artistik
106.0000
Portland Cement (PC)
8.1900

bh X Rp.
kg X Rp.

Pasir pasang ( progo )


Semen warna
Tukang Batu
Kepala Tukang
Pekerja
Mandor

m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

0.0450
3.2000
0.3500
0.0350
0.7000
0.0350

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH
PPL19

PPL20

PPL21

1 m2 Pasang ubin porselin uk. 11 x 11 cm


Tegel porselin
Portland Cement (PC)
Pasir pasang ( progo )
Semen warna
Tukang Batu
Kepala Tukang
Pekerja
Mandor
JUMLAH

86.0000
9.3000
0.0180
1.5000
0.5000
0.0500
0.1000
0.0500

bh X Rp.
kg X Rp.
3
m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

1 m2 Pasang ubin porselin uk. 10 x 20 cm


Tegel porselin
Portland Cement (PC)
Pasir pasang ( progo )
Semen warna
Tukang Batu
Kepala Tukang
Pekerja
Mandor
JUMLAH

53.0000
9.3000
0.0180
2.7500
0.4500
0.0450
0.9000
0.0450

bh X Rp.
kg X Rp.
3
m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

1 m2 Pasang ubin porselin uk. 20 x 20 cm


Tegel porselin
Portland Cement (PC)
Pasir pasang ( progo )
Pasir pasang ( progo )
Tukang Batu
Kepala Tukang
Pekerja
Mandor

26.5000
9.3000

bh X Rp.
kg X Rp.
3

1 m2 Pasang tegel keramik uk. 33/33


Tegel keramik 30/30 berglasir
Portland Cement (PC)
Pasir pasang ( progo )
Semen warna
Tukang Batu
Kepala Tukang
Pekerja
Mandor

m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

120,000.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

bh X Rp.
kg X Rp.
3
m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

11.8700
10.0000
0.0450
1.5000
0.3500
0.0350
0.7000
0.0350

bh X Rp.
kg X Rp.
3
m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH
PPL23

1 m2 Pasang tegel keramik uk. 30/30


Tegel keramik 30/30 berglasir
Portland Cement (PC)
Pasir pasang ( progo )
Semen warna
Tukang Batu
Kepala Tukang
Pekerja
Mandor
JUMLAH

PPL24

1 m2 Pasang tegel keramik uk. 20/20


Tegel keramik 20/20 berglasir
Portland Cement (PC)
Pasir pasang ( progo )
Semen warna
Tukang Batu
Kepala Tukang
Pekerja
Mandor

26.5000
10.4000
0.0450
1.6200
0.3500
0.0350
0.7000
0.0350

bh X Rp.
kg X Rp.
3
m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH
PPL25

PPL26

PPL27

PPL28

PPL29

1 m2 Pasang tegel keramik uk. 10 x 33 cm (variasi/border)


Tegel keramik 10/30 berglasir
33.0000
Portland Cement (PC)
9.8000
Pasir pasang ( progo )
0.0450
Semen warna
4.3700
Tukang Batu
0.5250
Kepala Tukang
0.0525
Pekerja
1.0500
Mandor
0.0525
JUMLAH

bh X Rp.
kg X Rp.
3
m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

Pasang lantai mozaik uk. 30 x 30 cm, camp. 1pc : 3ps


Tegel keramik 30/30 berglasir
11.8700
Portland Cement (PC)
14.1500
Pasir pasang ( progo )
0.0390
Semen warna
2.0000
Tukang Batu
0.3500
Kepala Tukang
0.0350
Pekerja
0.7000
Mandor
0.0350
JUMLAH

bh X Rp.
kg X Rp.
3
m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

1 m' Pasang plint keramik ukuran 10 x 30 cm


Plint keramik artistik
Portland Cement (PC)
Pasir pasang ( progo )
Semen warna
Tukang Batu
Kepala Tukang
Pekerja
Mandor
JUMLAH

5.3000
1.1400
0.0030
0.0250
0.0900
0.0090
0.0900
0.0045

bh X Rp.
kg X Rp.
3
m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1 m' Pasang plint keramik ukuran 10 x 40 cm


Plint keramik artistik
Portland Cement (PC)
Pasir pasang ( progo )
Semen warna
Tukang Batu
Kepala Tukang
Pekerja
Mandor
JUMLAH

10.6000
1.1400
0.0030
0.0500
0.0900
0.0090
0.0900
0.0045

1 m' Pasang plint keramik 5 x 20 cm


Plint keramik artistik
Portland Cement (PC)
Pasir pasang ( progo )
Semen warna
Tukang Batu
Kepala Tukang
Pekerja
Mandor

5.3000
0.5700
0.0015
0.0130
0.0900
0.0090
0.0900
0.0045

bh
kg
3
m
kg
org
org
org
org

X
X
X
X
X
X
X
X

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

bh X Rp.
kg X Rp.
3
m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH
PPL30

PPL31

1 m' Pasang plint internal cove artistik 5 x 5 x 20 cm


Internal cove
Portland Cement (PC)
Pasir pasang ( progo )
Semen warna
Tukang Batu
Kepala Tukang
Pekerja
Mandor
JUMLAH

5.3000
1.1400
0.0030
0.1000
0.7500
0.0750
0.7500
0.0375

bh X Rp.
kg X Rp.
3
m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

1 m' Pasang lantai marmer uk. 100 x 100 cm


Marmer
Portland Cement (PC)
Pasir pasang ( progo )
Semen warna
Tukang Batu
Kepala Tukang
Pekerja
Mandor
JUMLAH

1.0600
8.1900
0.0450
0.6500
0.3500
0.0350
0.7000
0.0350

bh
kg
3
m
kg
org
org
org
org

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

X
X
X
X
X
X
X
X

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

PPL32

1 m2 Pasang lantai karpet


Karpet
Lem Aica Aibon
Tukang Kayu
Kepala Tukang
Pekerja
Mandor

PPL33

1 m2 Pasang keramik dinding artistik 10 x 20 cm


Tegel keramik 20/20 berglasir
Portland Cement (PC)
Pasir pasang ( progo )
Semen warna
Tukang Batu
Kepala Tukang
Pekerja
Mandor
JUMLAH

53.0000
9.3000
0.0180
2.7500
0.4500
0.0450
0.9000
0.0450

PPL34

1 m2 Pasang keramik dinding artistik 5 x 20 cm


Tegel keramik 5/20 berglasir
Portland Cement (PC)
Pasir pasang ( progo )
Semen warna
Tukang Batu
Kepala Tukang
Pekerja
Mandor
JUMLAH

106.0000
9.3000
0.0180
2.7500
0.4500
0.0450
0.9000
0.0450

bh X Rp.
kg X Rp.
3
m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

PPL35

1 m2 Pasang keramik dinding 10 x 20 cm


Tegel keramik 10/20 berglasir
Portland Cement (PC)
Pasir pasang ( progo )
Semen warna
Tukang Batu
Kepala Tukang
Pekerja
Mandor
JUMLAH

53.0000
9.3000
0.0180
2.7500
0.4500
0.0450
0.9000
0.0450

bh X Rp.
kg X Rp.
3
m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

1 m2 Pasang keramik dinding 20 x 20 cm


Tegel keramik 20/20 berglasir
Portland Cement (PC)
Pasir pasang ( progo )
Semen warna
Tukang Batu
Kepala Tukang
Pekerja
Mandor
JUMLAH

26.5000
9.3000
0.0180
1.9400
0.4500
0.0450
0.9000
0.0450

bh X Rp.
kg X Rp.
3
m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

1.0500
0.3500
0.1700
0.0170
0.1700
0.0085

m2 X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH

PPL36

PPL37

1 m2 Pasang keramik dinding 20/25


Tegel keramik 20/20 berglasir
Portland Cement (PC)
Pasir pasang ( progo )
Semen putih
Tukang batu
Kepala Tukang
Pekerja
Mandor

bh X Rp.
kg X Rp.
3
m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

1.0000
9.3000
0.0180
1.5000
0.6500
0.0650
0.3200
0.0160

m X Rp.
kg X Rp.
3
m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
120,000.00
1,875.00
80,000.00
90,000.00
55,000.00
80,000.00

bh
kg
3
m
kg
org
org
org
org

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH
PPL38

1 m' Pasang keramik stepnosing granito 5/30


Stepnosing granito
Portland Cement (PC)
Pasir pasang ( progo )
Semen warna
Tukang batu
Kepala Tukang
Pekerja
Mandor
JUMLAH

3.6000
0.4080
0.0009
0.0600
0.1000
0.0100
0.0500
0.0025

PPL39

1 m2 Pasang dinding marmer uk. 100 x 100 cm


Marmer
Paku biasa
Portland Cement (PC)
Pasir pasang ( progo )
Semen warna
Tukang Batu
Kepala Tukang
Pekerja
Mandor
JUMLAH

1.0600
3.0030
12.4400
0.0250
0.6500
0.6500
0.0650
1.3000
0.0650

m2 X Rp.
kg X Rp.
kg X Rp.
3
m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

16,300.00
1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

PPL40

1 m2 Pasang lantai vinyl uk. 30 x 30 cm kls 1


Vinyl
Lem plastik Vinyl
Tukang Kayu
Kepala Tukang
Pekerja
Mandor
JUMLAH

11.8700
0.3500
0.1500
0.0150
0.1500
0.0075

bh X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

PPL41

1 m2 Pasang wallpaper lebar 50 cm


Wall paper
Lem Aica Aibon
Tukang Kayu
Kepala Tukang
Pekerja
Mandor

2.2000
0.2500
0.1750
0.0170
0.3500
0.0018

m2 X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

X
X
X
X
X
X
X
X

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

JUMLAH
PPL42

1 m2 Pasang floor hardener


Floor hardener
Tukang Kayu
Kepala Tukang
Pekerja
Mandor

5.0000
0.1200
0.0120
0.1200
0.0060

kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

PPL43

1 m' Pasang plint vinyl karet uk. 15 x 30 cm dengan perekat


Vinyl
1.7600
Lem plastik Vinyl
0.0800
Tukang Kayu
0.0800
Kepala Tukang
0.0080
Pekerja
0.0800
Mandor
0.0040
JUMLAH

bh X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

1 m' Pasang plint kayu klas II tebal 2cm, lebar 10cm


Papan kayu damar laut
Paku skrup
Tukang Kayu
Kepala Tukang
Pekerja
Mandor
JUMLAH

m3 X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

JUMLAH

PPL44

0.0030
0.0500
0.1200
0.0120
0.1200
0.0060

80,000.00
90,000.00
55,000.00
80,000.00

16,661.25

89,111.25

0.00
11,261.25
5,400.00
0.00
28,000.00
3,150.00
38,500.00
2,800.00
72,450.00

16,661.25

89,111.25

0.00
12,787.50
2,160.00
0.00
40,000.00
4,500.00
5,500.00
4,000.00
54,000.00

14,947.50

68,947.50

0.00
12,787.50
2,160.00
0.00
36,000.00
4,050.00
49,500.00
3,600.00
93,150.00

1,375.00

0.0180
1.9400
0.4500
0.0450
0.9000
0.0450

10.0000
8.1900
0.0450
1.6200
0.3500
0.0350
0.7000
0.0350

JUMLAH
PPL22

0.00
11,261.25
5,400.00
0.00
28,000.00
3,150.00
38,500.00
2,800.00
72,450.00

14,947.50

108,097.50

0.00
12,787.50
2,160.00
232,800.00
36,000.00
4,050.00
49,500.00
3,600.00
93,150.00

247,747.50

340,897.50

0.00
11,261.25
5,400.00
0.00
28,000.00
3,150.00
38,500.00
2,800.00
72,450.00

16,661.25

89,111.25

0.00
13,750.00
5,400.00
0.00
28,000.00
3,150.00
38,500.00
2,800.00
72,450.00

19,150.00

91,600.00

0.00
14,300.00
5,400.00
0.00
28,000.00
3,150.00
38,500.00
2,800.00
72,450.00

19,700.00

92,150.00

0.00
13,475.00
5,400.00
0.00
42,000.00
4,725.00
57,750.00
4,200.00
108,675.00

18,875.00

127,550.00

0.00
19,456.25
4,680.00
0.00
28,000.00
3,150.00
38,500.00
2,800.00
72,450.00

24,136.25

96,586.25

0.00
1,567.50
360.00
0.00
7,200.00
810.00
4,950.00
360.00
13,320.00

1,927.50

15,247.50

0.00
1,567.50
360.00
0.00
7,200.00
810.00
4,950.00
360.00
13,320.00

1,927.50

15,247.50

0.00
783.75
180.00
0.00
7,200.00
810.00
4,950.00
360.00
13,320.00

963.75

14,283.75

0.00
1,567.50
360.00
0.00
60,000.00
6,750.00
41,250.00
3,000.00
111,000.00

1,927.50

112,927.50

0.00
11,261.25
5,400.00
0.00
28,000.00
3,150.00
38,500.00
2,800.00
72,450.00

16,661.25

89,111.25

0.00
0.00
13,600.00
1,530.00
9,350.00
680.00
25,160.00

0.00

25,160.00

0.00
12,787.50
2,160.00
0.00
36,000.00
4,050.00
49,500.00
3,600.00
93,150.00

14,947.50

108,097.50

0.00
12,787.50
2,160.00
0.00
36,000.00
4,050.00
49,500.00
3,600.00
93,150.00

14,947.50

108,097.50

0.00
12,787.50
2,160.00
0.00
36,000.00
4,050.00
49,500.00
3,600.00
93,150.00

14,947.50

108,097.50

0.00
12,787.50
2,160.00
0.00
36,000.00
4,050.00
49,500.00
3,600.00
93,150.00

14,947.50

108,097.50

0.00
12,787.50
2,160.00
2,812.50
52,000.00
5,850.00
17,600.00
1,280.00
76,730.00

17,760.00

94,490.00

0.00
561.00
108.00
0.00
8,000.00
900.00
2,750.00
200.00
11,850.00

669.00

12,519.00

0.00
48,948.90
17,105.00
3,000.00
0.00
52,000.00
5,850.00
71,500.00
5,200.00
134,550.00

69,053.90

203,603.90

0.00
0.00
12,000.00
1,350.00
8,250.00
600.00
22,200.00

0.00

22,200.00

0.00
0.00
14,000.00
1,530.00
19,250.00
140.00
34,920.00

0.00

34,920.00

0.00
9,600.00
1,080.00
6,600.00
480.00
17,760.00

0.00

17,760.00

0.00
0.00
6,400.00
720.00
4,400.00
320.00
11,840.00

0.00

11,840.00

0.00
0.00
9,600.00
1,080.00
6,600.00
480.00
17,760.00

0.00

17,760.00

PEKERJAAN CONBLOCK/PAVING BLOCK


PCB1

PCB2

1 m2 Pasang conblock tipe segi-empat, uni, segi-enam abu-abu 8 cm, K-400


2
Tipe segi empat, uni, segi 6 tebal = 8 cm K 400
1.0000
m X Rp.
3
Pasir urug darat
0.0500
m X Rp.
Tukang batu
0.2500
org X Rp.
Kepala Tukang
0.0250
org X Rp.
Pekerja
0.5000
org X Rp.
Mandor
0.0250
org X Rp.
JUMLAH

94,500.00
80,000.00
90,000.00
55,000.00
80,000.00

1 m2 Pasang conblock tipe segi-empat abu-abu 8 cm, K-200


Tipe segi empat tebal = 8 cm K 200
1.0000
Pasir urug darat
0.0500
Tukang batu
0.2500
Kepala Tukang
0.0250
Pekerja
0.5000
Mandor
0.0250
JUMLAH

94,500.00
80,000.00
90,000.00
55,000.00
80,000.00

m X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

PCB3

1 m2 Pasang conblock tipe segi-empat, uni, segi-enam warna 8 cm, K-400


2
Tipe segi empat, uni, segi 6 tebal = 8 cm K 400
1.0000
m X Rp.
3
Pasir urug darat
0.0500
m X Rp.
Tukang batu
0.2500
org X Rp.
Kepala Tukang
0.0250
org X Rp.
Pekerja
0.5000
org X Rp.
Mandor
0.0250
org X Rp.
JUMLAH

PCB4

1 m2 Pasang conblock tipe segi-empat warna 8 cm, K-200


Tipe segi enam tebal = 8 cm K 200
1.0000

Pasir urug darat


Tukang batu
Kepala Tukang
Pekerja
Mandor

m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

0.0500
0.2500
0.0250
0.5000
0.0250

X Rp.

94,500.00
80,000.00
90,000.00
55,000.00
80,000.00

1 m2 Pasang grassblock bulat tebal 10 cm


Tipe grass blok bulat tebal = 10 cm
Pasir urug darat
Tukang batu
Kepala Tukang
Pekerja

1.0000
0.0500
0.2500
0.0250
0.5000

m X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.

94,500.00
80,000.00
90,000.00
55,000.00

4,725.00

56,475.00

0.00
4,725.00
20,000.00
2,250.00
27,500.00
2,000.00
51,750.00

4,725.00

56,475.00

0.00
4,725.00
20,000.00
2,250.00
27,500.00
2,000.00
51,750.00

94,500.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH
PCB5

0.00
4,725.00
20,000.00
2,250.00
27,500.00
2,000.00
51,750.00

4,725.00

56,475.00

0.00
4,725.00
20,000.00
2,250.00
27,500.00
2,000.00
51,750.00

4,725.00

0.00
4,725.00
20,000.00
2,250.00
27,500.00

56,475.00

Mandor

0.0250

org X Rp.

1.0000
0.0500
0.2500
0.0250
0.5000
0.0250

m X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00

JUMLAH
PCB6

94,500.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH
PCB7

3 m3 Bronjong kawat galvanis


Penganyaman
Kawat galvanis
Pekerja
Mandor
Pengisian
Batu kali
Pekerja
Mandor

70.0000
2.0000
0.0800
3.0000
4.5000
0.0750

A
kg X Rp.
org X Rp.
org X Rp.
B
3
m
org X Rp.
org X Rp.

55,000.00
80,000.00

55,000.00
80,000.00

JUMLAH
PCB8

1 bh Pasang buis beton dia. 80 cm


Buis beton bulat dia. 80 cm P=0,5 m
Tukang batu
Kepala Tukang
Pekerja

PCB9

1 m3 Langsiran batu kali


Pekerja
Mandor
Gerobak (sewa)

1 m3 Langsiran kerikil
Pekerja
Mandor
Gerobak (sewa)

56,475.00

56,475.00

0.00
110,000.00
6,400.00

247,500.00
6,000.00
369,900.00

0.00

369,900.00

bh X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00

10,000.00
1,125.00
13,750.00
24,875.00

0.00

24,875.00

org X Rp.
org X Rp.
hr X Rp.

55,000.00
80,000.00
-

11,000.00
1,600.00
0.00
12,600.00

0.00

12,600.00

0.1200
0.0120
1.0000

org X Rp.
org X Rp.
hr X Rp.

55,000.00
80,000.00
-

6,600.00
960.00
0.00
7,560.00

0.00

7,560.00

2,750.00
400.00
0.00
3,150.00

0.00

3,150.00

JUMLAH
1 m3 Langsiran pasir
Pekerja
Mandor
Gerobak (sewa)

4,725.00

0.2000
0.0200
1.0000
JUMLAH

PCB11

4,725.00

0.00
4,725.00
20,000.00
2,250.00
27,500.00
2,000.00
51,750.00

1.0000
0.1250
0.0125
0.2500
JUMLAH

PCB10

2,000.00
51,750.00

1 m2 Pasang grassblock tebal 10 cm


Tipe grass blok bulat tebal = 10 cm
Pasir urug darat
Tukang batu
Kepala Tukang
Pekerja
Mandor

0.0500
0.0050
1.0000

org X Rp.
org X Rp.
hr X Rp.

55,000.00
80,000.00
-

JUMLAH

0.00

PEKERJAAN KAYU
Pasang kuda-kuda konvensional
PKY1

1 m3 Pasang konstruksi kuda-kuda konvensional


Kayu meranti balok
Besi strip
Paku biasa
Tukang Kayu
Kepala Tukang
Pekerja
Mandor
JUMLAH

1.1000
15.0000
5.6000
12.0000
1.2000
4.0000
0.2000

m X Rp.
kg X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

9,200,000.00
13,300.00
16,300.00
80,000.00
90,000.00
55,000.00
80,000.00

1.1000
15.0000
3.0000
7.2000
0.7200
2.4000
0.1200

m X Rp.
kg X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

9,200,000.00
13,300.00
16,300.00
80,000.00
90,000.00
55,000.00
80,000.00

1 m2 Pasang usuk 5/7 Kayu meranti, reng 2/3 Kayu damar laut
Kayu meranti balok
0.0140
Damar Laut (Kelas I)
0.0036
Paku biasa 1/2" - 1"
0.1500
Paku reng 55 x 3,1 mm
0.1000
Tukang Kayu
0.1000
Kepala Tukang
0.0100
Pekerja
0.1000
Mandor
0.0050
JUMLAH

m3 X Rp.
m3 X Rp.
kg X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

9,200,000.00
15,625,000.00
16,300.00
80,000.00
90,000.00
55,000.00
80,000.00

m3
m3
kg
kg
org
org
org
org

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

9,200,000.00
15,625,000.00
80,000.00
90,000.00
55,000.00
80,000.00

m3 X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

9,200,000.00
80,000.00
90,000.00
55,000.00
80,000.00

10,120,000.00
199,500.00
91,280.00
960,000.00
108,000.00
220,000.00
16,000.00
1,304,000.00

10,410,780.00

11,714,780.00

Pasang gording
PKY2

1 m3 Pasang gording Kayu meranti


Kayu meranti balok
Besi strip
Paku biasa
Tukang Kayu
Kepala Tukang
Pekerja
Mandor

JUMLAH

10,120,000.00
199,500.00
48,900.00
576,000.00
64,800.00
132,000.00
9,600.00
782,400.00

10,368,400.00

11,150,800.00

Pasang usuk dan reng untuk genteng keramik


PKY3

128,800.00
56,250.00
2,445.00
0.00
8,000.00
900.00
5,500.00
400.00
14,800.00

187,495.00

202,295.00

Pasang usuk dan reng untuk genteng beton


PKY4

PKY5

1 m2 Pasang usuk 5/7 Kayu meranti, reng 2/3 Kayu damar laut
Kayu meranti balok
0.0140
Damar Laut (Kelas I)
0.0072
Paku usuk 80 x 3,8 mm
0.1500
Paku reng 55 x 3,1 mm
0.1000
Tukang Kayu
0.1000
Kepala Tukang
0.0100
Pekerja
0.1000
Mandor
0.0050
JUMLAH
1 m2 Pasang rangka atap sirap
Kayu meranti balok
Paku usuk 80 x 3,8 mm
Tukang Kayu
Kepala Tukang
Pekerja
Mandor

0.1650
0.2000
0.1200
0.0120
0.1200
0.0060

X
X
X
X
X
X
X
X

JUMLAH

128,800.00
112,500.00
0.00
0.00
8,000.00
900.00
5,500.00
400.00
14,800.00

241,300.00

256,100.00

1,518,000.00
0.00
9,600.00
1,080.00
6,600.00
480.00
17,760.00

1,518,000.00

1,535,760.00

Rangka langit-langit
PKY6

1 m2 Pasang rangka langit-langit (50 x 100) cm, Kayu jati


Kayu meranti balok
0.0154
Paku usuk 80 x 3,8 mm
0.2000
Tukang Kayu
0.3000
Kepala Tukang
0.0300
Pekerja
0.1500
Mandor
0.0750
JUMLAH

m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

9,200,000.00
80,000.00
90,000.00
55,000.00
80,000.00

141,680.00
0.00
24,000.00
2,700.00
8,250.00
6,000.00
40,950.00

141,680.00

16,000.00
1,800.00
5,500.00
400.00
23,700.00

100,990.00

182,630.00

Pasang Listplank
PKY7

1 m' Pasang lisplank ukuran (3 x 20) cm


Kayu meranti papan
Paku biasa
Tukang Kayu
Kepala Tukang
Pekerja
Mandor

0.0108
0.1000
0.2000
0.0200
0.1000
0.0050

m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

9,200,000.00
16,300.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH
PKY8

1 m' Pasang lisplank ukuran (3 x 30) cm


Kayu meranti papan
Paku biasa
Tukang Kayu
Kepala Tukang
Pekerja
Mandor

0.0110
0.0500
0.2000
0.0200
0.1000
0.0050

m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

9,200,000.00
16,300.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH
PKY9

124,690.00

101,200.00
815.00
16,000.00
1,800.00
5,500.00
400.00
23,700.00

102,015.00

125,715.00

1 m' Pasang lisplank ukuran (2 x 20) cm


Kayu meranti papan
Paku biasa
Tukang kayu
Kepala tukang
Pekerja
Mandor

0.0048
0.0600
0.1000
0.0100
0.1000
0.0050

m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

9,200,000.00
16,300.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH
PKY10

1 m' Pasang lisplank ukuran (2 x 25) cm


Kayu meranti papan
Paku biasa
Tukang kayu
Kepala tukang
Pekerja
Mandor

PKY11

1 m' Pasang lisplank ukuran 2 x (3 x 20) cm

0.0060
0.0600
0.1000
0.0100
0.1000
0.0050

m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

9,200,000.00
16,300.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH

Kayu meranti papan


Paku biasa
Tukang kayu
Kepala tukang
Pekerja
Mandor

9,200,000.00
16,300.00
80,000.00
90,000.00
55,000.00
80,000.00

9,200,000.00
16,300.00
80,000.00
90,000.00
55,000.00
80,000.00

9,200,000.00
16,300.00
80,000.00
90,000.00
55,000.00
80,000.00

0.0145
0.0600
0.2500
0.0250
0.1500
0.0075

m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

0.0086
0.0600
0.1000
0.0100
0.1000
0.0050

m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

0.0040
0.0200
0.0800
0.0080
0.0280
0.0014

m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

JUMLAH
PKY12

99,360.00
1,630.00

1 m' Pasang lisplank ukuran 2 x (2 x 20) cm


Kayu meranti papan
Paku biasa
Tukang kayu
Kepala tukang
Pekerja
Mandor
JUMLAH

44,160.00
978.00
8,000.00
900.00
5,500.00
400.00
14,800.00

45,138.00

59,938.00

55,200.00
978.00
8,000.00
900.00
5,500.00
400.00
14,800.00

56,178.00

70,978.00

133,400.00
978.00
20,000.00
2,250.00
8,250.00
600.00
31,100.00

134,378.00

165,478.00

79,120.00
978.00
8,000.00
900.00
5,500.00
400.00
14,800.00

80,098.00

94,898.00

Pasang papan ruiter

PKY13

1 m' Mengerjakan papan ruiter


Kayu meranti papan
Paku biasa
Tukang kayu
Kepala tukang
Pekerja
Mandor
JUMLAH

PKY14

9,200,000.00
16,300.00
80,000.00
90,000.00
55,000.00
80,000.00

9,200,000.00
16,300.00
80,000.00
90,000.00
55,000.00
80,000.00

0.0280
0.1500
0.4500
0.0450
0.1500
0.0075

m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

0.0280
0.8600
0.5600
0.1500
0.4500
0.0450
0.1500
0.0075

m X Rp.
lbr X Rp.
kg X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

0.0280
0.8600
0.5600
0.1500
0.6000
0.0600
0.2000
0.0100

m X Rp.
lbr X Rp.
kg X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

JUMLAH

JUMLAH

PKY17

1 m2 Pasang dinding pemisah plywood rangkap


Kayu meranti balok
Plywood 4 mm
Lem kayu (putih) Fox
Paku biasa
Tukang Kayu
Kepala Tukang
Pekerja
Mandor
JUMLAH
1 m2 Pasang dinding lambiziring
Kayu meranti papan
Paku biasa
Paku sekrup 3.5"
Tukang Kayu
Kepala Tukang
Pekerja
Mandor

0.0070
0.1000
0.1500
1.8000
0.1800
0.6000
0.0300

PKY18

1 m2 Pasang dinding bilik bambu, rangka kayu klas III, IV


Bambu petung
1.5000
Damar Laut (Kelas I)
0.0140
List kayu profil
0.0120
Paku biasa
0.0030
Tukang Kayu
0.0500
Kepala Tukang
0.0050
Pekerja
0.1000
Mandor
0.0050
JUMLAH

PKY19

1 m3 Membuat dan memasang kusen pintu / jendela


Kayu meranti balok
Paku usuk 80 x 3,8 mm
Tukang Kayu
Kepala Tukang
Pekerja
Mandor
JUMLAH
1 m3 Membuat dan memasang kusen pintu / jendela
Damar Laut (Kelas I)
Paku usuk 80 x 3,8 mm
Tukang Kayu
Kepala Tukang
Pekerja
Mandor

m X Rp.
kg X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

16,300.00
80,000.00
90,000.00
55,000.00
80,000.00

9,200,000.00
16,300.00
80,000.00
90,000.00
55,000.00
80,000.00

1.1000
1.2500
21.0000
2.1000
7.0000
0.3500

m2 X Rp.
m3 X Rp.
kg X Rp.
m3 X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

15,625,000.00
16,300.00
80,000.00
90,000.00
55,000.00
80,000.00

9,200,000.00
80,000.00
90,000.00
55,000.00
80,000.00

15,625,000.00
80,000.00
90,000.00
55,000.00
80,000.00

15,625,000.00
16,300.00
80,000.00
90,000.00
55,000.00
80,000.00

1.1000
1.2500
18.0000
1.8000
6.0000
0.3000

m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1 m2 Membuat dan memasang pintu klamp standar


Damar Laut (Kelas I)
Paku biasa
Tukang Kayu
Kepala Tukang
Pekerja
Mandor
JUMLAH

0.0400
0.0500
1.0500
0.1050
0.3500
0.0175

m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1 m2 Membuat dan memasang daun pintu panil


Kayu meranti papan
Lem kayu (putih) Fox
Tukang Kayu
Kepala Tukang
Pekerja
Mandor
JUMLAH

0.0400
0.5000
3.0000
0.3000
1.0000
0.0500

m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

JUMLAH
PKY21

PKY22

PKY23

PKY24

PKY25

1 m2 Membuat dan memasang daun pintu dan jendela jalusi


Kayu meranti papan
0.0640
Lem kayu (putih) Fox
0.5000
Tukang Kayu
3.0000
Kepala Tukang
0.3000
Pekerja
1.0000
Mandor
0.0500
JUMLAH

m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

9,200,000.00
80,000.00
90,000.00
55,000.00
80,000.00

9,200,000.00
80,000.00
90,000.00
55,000.00
80,000.00

1 m2 Membuat daun pintu kayu lapis plywood rangkap, rangka tertutup kayu
3
Kayu meranti papan
0.0250
m X Rp.
Paku biasa 1/2" - 1"
0.0300
kg X Rp.
Lem kayu (putih) Fox
0.5000
kg X Rp.
Plywood 4 mm
1.0000
lbr X Rp.
Tukang kayu
2.1000
org X Rp.
Kepala tukang
0.2100
org X Rp.
Pekerja
0.7000
org X Rp.
Mandor
0.0350
org X Rp.
JUMLAH

9,200,000.00
16,300.00
80,000.00
90,000.00
55,000.00
80,000.00

1 m2 Membuat pintu plywood rangkap, rangka expose


Kayu meranti papan
0.0256
Paku biasa 1/2" - 1"
0.0300
Lem kayu (putih) Fox
0.5000
Plywood 4 mm
1.0000
Tukang kayu
2.4000
Kepala tukang
0.2400
Pekerja
0.8000
Mandor
0.0400
JUMLAH

9,200,000.00
16,300.00
80,000.00
90,000.00
55,000.00
80,000.00

PKY26

1m2 Memasang jalusi kusen


Kayu meranti papan
Paku biasa 1/2" - 1"
Tukang kayu
Kepala tukang
Pekerja
Mandor

PKY27

1 m2 Memasang teakwood rangkap, rangka expose


Kayu meranti papan
Paku biasa 1/2" - 1"
Lem kayu (putih) Fox
Teak wood ( 90 x 240 )
Tukang kayu
Kepala tukang
Pekerja
Mandor
JUMLAH

m X Rp.
kg X Rp.
kg X Rp.
lbr X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

0.0600
0.1500
2.0000
0.2000
0.6700
0.3350

m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

0.0250
0.0300
0.3000
1.0000
2.4000
0.2400
0.8000
0.0400

m
kg
kg
lbr
org
org
org
org

9,200,000.00
16,300.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH

PKY28

260,045.00

308,945.00

1 m2 Memasang teakwood rangkap lapis formika, rangka expose


Kayu meranti papan
0.0250
Paku biasa 1/2" - 1"
0.0300
Lem kayu (putih) Fox
0.8000
Teak wood ( 90 x 240 )
1.0000
Formika 4" x 8" x 0,3 cm
0.5000
Tukang kayu
2.5500
Kepala tukang
0.2550
Pekerja
0.8500
Mandor
0.0425
JUMLAH

257,600.00
0.00
0.00
2,445.00
36,000.00
4,050.00
8,250.00
600.00
48,900.00

JUMLAH

PKY20

45,898.00

257,600.00
2,445.00
36,000.00
4,050.00
8,250.00
600.00
48,900.00

1 m2 Pasang dinding pemisah teakwood rangkap


Kayu meranti balok
Teak wood ( 90 x 240 )
Lem kayu (putih) Fox
Paku biasa
Tukang Kayu
Kepala Tukang
Pekerja
Mandor

PKY16

37,126.00

1 m2 Pasang rangka dinding pemisah ukuran (60 x 120) cm


Kayu meranti balok
Paku biasa
Tukang Kayu
Kepala Tukang
Pekerja
Mandor

PKY15

36,800.00
326.00
6,400.00
720.00
1,540.00
112.00
8,772.00

X
X
X
X
X
X
X
X

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

9,200,000.00
16,300.00
80,000.00
90,000.00
55,000.00
80,000.00

m X Rp.
kg X Rp.
kg X Rp.
lbr X Rp.
lbr X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

9,200,000.00
16,300.00
56,100.00
80,000.00
90,000.00
55,000.00
80,000.00

260,045.00

308,945.00

0.00
0.00
0.00
2,445.00
48,000.00
5,400.00
11,000.00
800.00
65,200.00

2,445.00

67,645.00

64,400.00
1,630.00
0.00
144,000.00
16,200.00
33,000.00
2,400.00
195,600.00

66,030.00

261,630.00

0.00
218,750.00
0.00
48.90
4,000.00
450.00
5,500.00
400.00
10,350.00

218,798.90

229,148.90

10,120,000.00
0.00
1,680,000.00
189,000.00
385,000.00
28,000.00
2,282,000.00

10,120,000.00

12,402,000.00

17,187,500.00
0.00
1,440,000.00
162,000.00
330,000.00
24,000.00
1,956,000.00

17,187,500.00

19,143,500.00

625,000.00
815.00
84,000.00
9,450.00
19,250.00
1,400.00
114,100.00

625,815.00

739,915.00

368,000.00
0.00
240,000.00
27,000.00
55,000.00
4,000.00
326,000.00

368,000.00

694,000.00

588,800.00
0.00
240,000.00
27,000.00
55,000.00
4,000.00
326,000.00

588,800.00

914,800.00

230,000.00
489.00
0.00
0.00
168,000.00
18,900.00
38,500.00
2,800.00
228,200.00

230,489.00

458,689.00

235,520.00
489.00
0.00
0.00
192,000.00
21,600.00
44,000.00
3,200.00
260,800.00

236,009.00

496,809.00

552,000.00
2,445.00
160,000.00
18,000.00
36,850.00
26,800.00
241,650.00

554,445.00

796,095.00

230,000.00
489.00
0.00
0.00
192,000.00
21,600.00
44,000.00
3,200.00
260,800.00

230,489.00

491,289.00

230,000.00
489.00
0.00
0.00
28,050.00
204,000.00
22,950.00
46,750.00
3,400.00
305,150.00

230,489.00

535,639.00

PEKERJAAN BESI DAN ALUMUNIUM


PBS1

1 kg Pasang besi profil


Besi profil
Tukang las
Kepala tukang
Pekerja
Mandor

1.1500
0.0600
0.0060
0.0600
0.0030

kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

12,100.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH
PBS2

1 kg Pasang kuda-kuda baja IWF


Baja profil IWF
Tukang las
Kepala tukang
Pekerja
Mandor

PBS3

100 kg Kuda-kuda baja siku


Besi siku rata-rata
Pekerja
Tukang besi
Kepala Tukang
Mandor

PBS4

100 kg Plat besi lembaran


Besi plat lembaran
Pekerja
Tukang besi
Kepala Tukang
Mandor

PBS5

100 kg Gording baja


Besi gording canal
Pekerja
Tukang besi
Kepala Tukang
Mandor

1.1500
0.0600
0.0060
0.0600
0.0030

kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH

115.0000
6.0000
6.0000
0.6000
0.3000

kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

13,300.00
55,000.00
80,000.00
90,000.00
80,000.00

JUMLAH
Peralatan
1 Kg

115.0000
6.0000
6.0000
0.6000
0.3000

5%
0.01

kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

12,500.00
55,000.00
80,000.00
90,000.00
80,000.00

JUMLAH
Peralatan
1 Kg

115.0000
6.0000
6.0000
0.6000
0.3000

5%
0.01

kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

12,100.00
55,000.00
80,000.00
90,000.00
80,000.00

JUMLAH
Peralatan
1 Kg
PBS6

100 kg Ikatan angin diameter 16 mm dan water mur


Besi beton polos
115.0000
Water mur
3.0000
Pekerja
6.0000
Tukang besi
6.0000
Kepala Tukang
0.6000
Mandor
0.3000
JUMLAH
Peralatan

1 Kg
PBS7

100 kg Trekstang diameter 12 mm


Besi beton polos
Pekerja
Tukang besi
Kepala Tukang
Mandor

115.0000
6.0000
6.0000
0.6000
0.3000

5%
0.01

kg X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

11,600.00
55,000.00
80,000.00
90,000.00
80,000.00

5%
0.01

kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

11,600.00
55,000.00
80,000.00
90,000.00
80,000.00

JUMLAH
Peralatan
1 Kg
PBS8

1 unit Manhole uk. 70 x 70 cm


Besi siku rata-rata
Plat baja t = 3 mm
Besi angkur dia. 8mm
Engsel pintu
Kunci gembok
Cat dasar meni
Pekerja

6.4000
11.5400
8.0000
2.0000
1.0000
1.1250
1.0000

5%
0.01

kg X Rp.
kg X Rp.
bh X Rp.
bh X Rp.
bh X Rp.
m2 X Rp.
oh X Rp.

13,300.00
31,500.00
8,200.00
35,300.00
55,000.00

JUMLAH
PBS9

1 unit Grill dari besi beton 16mm rangka baja 50.50.5 uk 1 x 1 m


Besi siku rata-rata
24.1280
kg X Rp.
Besi beton polos
31.6000
kg X Rp.
Besi angkur dia. 8mm
2.0000
bh X Rp.
Cat dasar meni
1.8850
m2 X Rp.
Tukang Las
0.1000
oh X Rp.
Pekerja
1.0000
oh X Rp.
JUMLAH

PBS10

100 kg Pekerjaan perakitan


Solar
Minyak pelumas
Tukang besi
Kepala tukang
Pekerja
Mandor
Sewa alat perakitan tulangan

1.0000
0.1000
0.1000
0.0010
0.1000
0.0050
0.8000

13,300.00
11,600.00
35,300.00
80,000.00
55,000.00

ltr X Rp.
ltr X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.
jam X Rp.

80,000.00
90,000.00
55,000.00
80,000.00
-

JUMLAH
1.00
PBS11

kg

1 m2 Membuat pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
Besi siku rata-rata
15.0000
kg X Rp.
Plat baja t = 3 mm
32.8000
kg X Rp.
Kawat las
0.0500
kg X Rp.
Tukang las
1.0500
org X Rp.
Kepala tukang
0.1050
org X Rp.
Pekerja
1.0500
org X Rp.
Mandor
0.0520
org X Rp.
JUMLAH

PBS12

10 cm Pengelasan dengan las listrik


Kawat las
Solar
Minyak pelumas
Tukang besi
Kepala tukang
Pekerja
Mandor
Sewa alat las

PBS13

1 m2 Rangka jendela besi square tube (25 x 5) cm


Besi scuare tube
Besi lis kaca (1 x 1) cm
Tukang las
Kepala tukang
Pekerja
Mandor
JUMLAH

0.4000
0.3000
0.0400
0.0200
0.0020
0.0400
0.0020
0.1700

13,300.00
80,000.00
90,000.00
55,000.00
80,000.00

kg X Rp.
ltr X Rp.
ltr X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.
jam X Rp.

80,000.00
90,000.00
55,000.00
80,000.00
-

JUMLAH
1.00

4.7600
4.5220
0.6500
0.0650
0.6500
0.0320

m1 X Rp.
m1 X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

PBS14

1 m2 Pasang Rolling door besi


Pintu gulung besi
Tukang las
Kepala tukang
Pekerja
Mandor

1.0000
1.2000
0.1200
1.2000
0.0060

m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

PBS15

1 m2 Pasang pintu lipat (folding door) bahan plastik/PVC


Pintu lipat besi
1.0000
Tukang besi
0.4400
Kepala tukang
0.0440
Pekerja
0.4400
Mandor
0.0220
JUMLAH

m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1 m2 Pasang pintu Sunscreen alumunium


Sunscreen alumunium
Tukang besi
Kepala tukang
Pekerja
Mandor
JUMLAH

m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

80,000.00
90,000.00
55,000.00
80,000.00

80,000.00
90,000.00
55,000.00
80,000.00

PBS17

1 m2 Pasang Rolling door alumunium


Pintu alumunium
Tukang alumunium
Kepala tukang
Pekerja
Mandor

PBS18

1 m' Pasang kusen pintu alumunium


Profil alumunium
Skrup fixer
Sealent
Tukang alumunium
Kepala tukang
Pekerja
Mandor

1.0000
0.8000
0.0800
0.0800
0.0040

80,000.00
90,000.00
55,000.00
80,000.00

1.0000
1.0000
0.1000
1.0000
0.0500

m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

1.1000
2.0000
0.0600
0.0430
0.0043
0.0430
0.0021

m1 X Rp.
bh X Rp.
tube X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

7,500.00
80,000.00
90,000.00
55,000.00
80,000.00

1 m2 Pasang pintu alumunium strip lebar 8 cm


Profil alumunium
Alumunium strip
Tukang alumunium
Kepala tukang
Pekerja
Mandor
JUMLAH

4.4000
14.6000
0.0850
0.0085
0.0850
0.0042

m1 X Rp.
m1 X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

PBS20

1 m2 Pasang pintu kaca rangka alumunium


Pintu alumunium
Profil kaca
Sealent
Tukang alumunium
Kepala tukang
Pekerja
Mandor
JUMLAH

4.4000
4.5000
0.2700
0.0850
0.0090
0.0850
0.0050

m1 X Rp.
m1 X Rp.
tube X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

7,500.00
80,000.00
90,000.00
55,000.00
80,000.00

PBS21

1 m2 Pasang vienetions dan vertikal blinds


Vienetions dan vertikal blinds (tirai)
Tukang kayu
Kepala tukang
Pekerja
Mandor
JUMLAH

1.0000
0.3500
0.0350
0.3500
0.0175

m2 X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

6.1770
1.6700
0.1670
1.6700
0.0830

kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

13,300.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH

JUMLAH
PBS19

PBS22

1 m2 Pasang terali besi strip (2 x 3) mm


Besi strip
Tukang las
Kepala tukang
Pekerja
Mandor
JUMLAH

PBS23

1 m2 Pasang kawat nyamuk


Kawat nyamuk
Besi strip
Tukang las
Kepala tukang
Pekerja
Mandor

PBS24

1 m2 Pasang jendela nako & tralis


Jendela nako
Paku skrup
Besi strip
Tukang kayu
Kepala tukang
Pekerja
Mandor

1.1000
1.7160
0.1000
0.0100
0.1000
0.0050

m2 X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1.1000
10.0000
7.0000
0.2000
0.0200
0.2000
0.0010

m X Rp.
bh X Rp.
m1 X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

13,300.00
80,000.00
90,000.00
55,000.00
80,000.00

13,300.00
80,000.00
90,000.00
55,000.00
80,000.00

1 m' Pasang talang datar/jurai, seng plat BJLS 28 lebar 90 cm, papan Kayu jati
Seng plat 3" x 6" BJLS 28
1.0500
m1 X Rp.
Paku biasa 1/2" - 1"
0.0150
kg3 X Rp.
Kayu meranti papan
0.0190
m X Rp.
Tukang kayu
0.4000
org X Rp.
Kepala tukang
0.0250
org X Rp.
Pekerja
0.2000
org X Rp.
Mandor
0.0100
org X Rp.
JUMLAH

16,300.00
9,200,000.00
80,000.00
90,000.00
55,000.00
80,000.00

1 m' Pasang talang lingkaran D - 15 cm, seng plat BJLS 30 lebar 45 cm


Seng plat 3" x 6" BJLS 28
1.0500
lbr X Rp.
Paku biasa 1/2" - 1"
0.0100
kg X Rp.
Besi strip
0.5000
kg X Rp.
Tukang kayu
0.3000
org X Rp.
Kepala tukang
0.0300
org X Rp.
Pekerja
0.1500
org X Rp.
Mandor
0.0075
org X Rp.
JUMLAH

16,300.00
13,300.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH

JUMLAH
PBS25

PBS26

13,915.00

22,795.00

0.00
4,800.00
540.00
3,300.00
240.00
8,880.00

0.00

8,880.00

1,529,500.00
330,000.00
480,000.00
54,000.00
24,000.00
888,000.00
44,400.00
8,436.00

1,529,500.00
76,475.00
14,530.25

2,417,500.00
120,875.00
22,966.25

1,437,500.00
330,000.00
480,000.00
54,000.00
24,000.00
888,000.00
44,400.00
8,436.00

1,437,500.00
71,875.00
13,656.25

2,325,500.00
116,275.00
22,092.25

1,391,500.00
330,000.00
480,000.00
54,000.00
24,000.00
888,000.00
44,400.00
8,436.00

1,391,500.00
69,575.00
13,219.25

2,279,500.00
113,975.00
21,655.25

1,334,000.00
0.00
330,000.00
480,000.00
54,000.00
24,000.00
888,000.00
44,400.00
8,436.00

1,334,000.00
66,700.00
12,673.00

2,222,000.00
111,100.00
21,109.00

1,334,000.00
330,000.00
480,000.00
54,000.00
24,000.00
888,000.00
44,400.00
8,436.00

1,334,000.00
66,700.00
12,673.00

55,000.00
55,000.00

196,032.50

2,222,000.00
111,100.00
21,109.00

85,120.00
0.00
0.00
63,000.00
8,200.00
39,712.50
251,032.50

320,902.40
366,560.00
0.00
66,540.50
8,000.00
55,000.00
63,000.00

754,002.90

817,002.90

0.00
0.00
8,000.00
90.00
5,500.00
400.00
0.00
13,990.00
139.90

0.00
0.00
0.00

13,990.00
139.90

199,500.00
0.00
0.00
84,000.00
9,450.00
57,750.00
4,160.00
155,360.00

199,500.00

354,860.00

0.00
0.00
0.00
1,600.00
180.00
2,200.00
160.00
4,140.00
414.00

cm

JUMLAH

PBS16

13,915.00
4,800.00
540.00
3,300.00
240.00
8,880.00

0.00
0.00
0.00

4,140.00
414.00

0.00
0.00
52,000.00
5,850.00
35,750.00
2,560.00
96,160.00

0.00

96,160.00

0.00
96,000.00
10,800.00
66,000.00
480.00
173,280.00

0.00

173,280.00

0.00
35,200.00
3,960.00
24,200.00
1,760.00
65,120.00

0.00

65,120.00

0.00
64,000.00
7,200.00
4,400.00
320.00
75,920.00

0.00

75,920.00

0.00
80,000.00
9,000.00
55,000.00
4,000.00
148,000.00

0.00

148,000.00

0.00
0.00
450.00
3,440.00
387.00
2,365.00
168.00
6,360.00

450.00

6,810.00

0.00
0.00
6,800.00
765.00
4,675.00
336.00
12,576.00

0.00

12,576.00

0.00
0.00
2,025.00
6,800.00
810.00
4,675.00
400.00
12,685.00

2,025.00

14,710.00

0.00
28,000.00
3,150.00
19,250.00
1,400.00
51,800.00

0.00

51,800.00

82,154.10
133,600.00
15,030.00
91,850.00
6,640.00
247,120.00

82,154.10

329,274.10

0.00
22,822.80
8,000.00
900.00
5,500.00
400.00
14,800.00

22,822.80

37,622.80

0.00
0.00
93,100.00
16,000.00
1,800.00
11,000.00
80.00
28,880.00

93,100.00

121,980.00

0.00
244.50
174,800.00
32,000.00
2,250.00
11,000.00
800.00
46,050.00

175,044.50

221,094.50

0.00
163.00
6,650.00
24,000.00
2,700.00
8,250.00
600.00
35,550.00

6,813.00

42,363.00

PEKERJAAN ATAP
PAT1

PAT2

1 m2 Langit-langit asbes semen tebal 4, 5 dan 6 mm


Asbes plat ( 100 x 100 x 0,3 )
Paku triplek
Tukang kayu
Kepala tukang
Pekerja
Mandor
JUMLAH

1.1000
0.0100
0.0700
0.0070
0.0300
0.0040

m2 X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1 m2 Langit-langit asbes (1,00 x 1,00) m memakai plepet


Asbes plat ( 100 x 100 x 0,3 )
1.1000
Kayu plepet eternit 1/5 cm
2.6000
Paku eternit 20 x 1,5 mm
0.0100
Tukang kayu
0.0700
Kepala tukang
0.0070
Pekerja
0.0300
Mandor
0.0015
JUMLAH

lbr X Rp.
1
m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

PAT3

1 m2 Langit-langit akustik ukuran (30 x 30) cm


Akustik soft board 60 x 120
Paku triplek
Tukang kayu
Kepala tukang
Pekerja
Mandor
JUMLAH

lbr X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

PAT4

1 m2 Langit-langit akustik ukuran (30 x 60) cm


Akustik soft board 30 x 60
Paku triplek

12.0000
0.0500
0.1200
0.0120
0.1200
0.0060

5.8000
0.0500

lbr X Rp.
kg X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

80,000.00
90,000.00
55,000.00
80,000.00

80,000.00
90,000.00
55,000.00
80,000.00

0.00
0.00
5,600.00
630.00
1,650.00
320.00
8,200.00

0.00

8,200.00

0.00
0.00
0.00
5,600.00
630.00
1,650.00
120.00
8,000.00

0.00

8,000.00

0.00
0.00
9,600.00
1,080.00
6,600.00
480.00
17,760.00

0.00

0.00
0.00

17,760.00

Tukang kayu
Kepala tukang
Pekerja
Mandor

0.1000
0.0100
0.1000
0.0050

org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

1.5000
0.0500
0.1000
0.0100
0.1000
0.0050

lbr X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH
PAT5

1 m2 Langit-langit akustik ukuran (60 x 120) cm


Akustik soft board 60 x 120
Paku triplek
Tukang kayu
Kepala tukang
Pekerja
Mandor
JUMLAH

PAT6

1 m2 Langit-langit triplek ukuran (120 x 240) cm tebal 3mm, 4mm, dan 6 mm


Triplek
0.3750
lbr X Rp.
Paku triplek
0.0300
kg X Rp.
Tukang kayu
0.1000
org X Rp.
Kepala tukang
0.0100
org X Rp.
Pekerja
0.1000
org X Rp.
Mandor
0.0050
org X Rp.
JUMLAH

PAT7

1 m2 Langit-langit lambriziring Kayu jati tebal 9 mm


Kayu meranti papan
Paku triplek
Tukang kayu
Kepala tukang
Pekerja
Mandor
JUMLAH

PAT8

PAT9

62,400.00
80,000.00
90,000.00
55,000.00
80,000.00

0.0150
0.0300
0.8000
0.0800
0.8000
0.0400

m3 X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

9,200,000.00
80,000.00
90,000.00
55,000.00
80,000.00

1 m2 Langit-langit gypsum board ukuran (1200 x 2400 x 9) mm


Gypsum board
0.3640
Paku skrup
0.1100
Tukang kayu
0.0500
Kepala tukang
0.0050
Pekerja
0.1000
Mandor
0.0050
JUMLAH

lbr X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

68,000.00
80,000.00
90,000.00
55,000.00
80,000.00

1.0500
0.1500
0.0600
0.0060
0.0600
0.0030

m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH

3.6000
0.1500
1.0500
1.5000
0.5000
0.0500
0.5000
0.0250

m X Rp.
kg X Rp.
bh X Rp.
lbr X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

20,000.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH
PAT11

1 m' List langit-langit kayu profil


List kayu profil
Paku biasa 1/2" - 1"
Tukang kayu
Kepala tukang
Pekerja
Mandor

PAT12

1 m2 Pasang rangka langit-langit (1,00 x 1,00) m


Kayu meranti balok
Paku biasa
Tukang kayu
Kepala tukang
Pekerja
Mandor
JUMLAH

16,300.00
80,000.00
90,000.00
55,000.00
80,000.00

9,200,000.00
16,300.00
80,000.00
90,000.00
55,000.00
80,000.00

1.0500
0.0100
0.0500
0.0050
0.0500
0.0030

m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

0.0120
0.1000
0.2500
0.0250
0.1500
0.0075

m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

9,200,000.00
16,300.00
80,000.00
90,000.00
55,000.00
80,000.00

80,000.00
90,000.00
55,000.00
80,000.00

0.0130
0.1200
0.2700
0.0270
0.1700
0.0085

m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

4.5000
0.0400
5.0000
0.3200
0.0320
0.1400
0.0070

m X Rp.
kg X Rp.
1
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

JUMLAH
1 m2 Langit-langit rangka hollow
Pipa hollow
Paku skrup
Kawat penggantung rangka hollow
Tukang kayu
Kepala tukang
Pekerja
Mandor
JUMLAH

bh X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1 m2 Pasang genteng beton besar Natural ( isi 9 / m ) untuk rumah tingkat


Genteng beton besar natural 1m 9 biji
9.0000
bh X Rp.
Tukang batu
0.1000
org X Rp.
Kepala Tukang
0.0100
org X Rp.
Pekerja
0.3000
org X Rp.
Mandor
0.0150
org X Rp.
JUMLAH
1 m2 Pasang genteng beton besar Warna ( isi 9 / m )
Genteng beton besar warna 1m 9 biji
Tukang batu
Kepala Tukang
Pekerja
Mandor
JUMLAH

9.0000
0.1000
0.0100
0.2000
0.0100

80,000.00
90,000.00
55,000.00
80,000.00

80,000.00
90,000.00
55,000.00
80,000.00

bh X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

PAT19

1 m2 Pasang genteng keramik berglasir KIA, Kanmuri Natural


Genteng keramik berglasir KIA, Kanmuri Natural
14.5000
Tukang batu
0.1000
Kepala Tukang
0.0100
Pekerja
0.2000
Mandor
0.0100

80,000.00
90,000.00
55,000.00
80,000.00

80,000.00
90,000.00
55,000.00
80,000.00

bh X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

1 m2 Pasang genteng keramik berglasir KIA, Kanmuri Natural untuk rumah tingkat
Genteng beton besar natural 1m 9 biji
14.5000
bh X Rp.
Tukang batu
0.1000
org X Rp.
Kepala Tukang
0.0100
org X Rp.
Pekerja
0.3000
org X Rp.
Mandor
0.0150
org X Rp.
JUMLAH
1 m' Pasang bubungan genteng paris
Genteng bubungan beton

5.0000

bh X Rp.

Kapur pasang
Pasir pasang ( progo )
Portland Cement (PC)
Tukang batu
Kepala Tukang
Pekerja
Mandor

0.0152
0.0152
1.5240
0.2000
0.0200
0.4000
0.0200

m X Rp.
3
m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

120,000.00
1,375.00
80,000.00
90,000.00
55,000.00
80,000.00

1 m' Pasang bubungan genteng beton Warna


Genteng bubungan warna
Kapur pasang

4.0000
0.0152

bh X Rp.
3
m X Rp.

Pasir pasang ( progo )


Portland Cement (PC)
Tukang batu
Kepala Tukang
Pekerja
Mandor

0.0152
1.5240
0.2000
0.0200
0.4000
0.0200

m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

120,000.00
1,375.00
80,000.00
90,000.00
55,000.00
80,000.00

PAT23

1 m2 Pasang atap asbes gelombang (2,25 x 0,92 m) x 5 mm


Asbes gelombang besar ( 225 x 92 x 0,5 )
0.6000
Paku biasa 1/2" - 1"
0.1200
Tukang kayu
0.0750
Kepala tukang
0.0080
Pekerja
0.1400
Mandor
0.0080
JUMLAH

lbr X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

16,300.00
80,000.00
90,000.00
55,000.00
80,000.00

PAT24

1 m2 Pasang atap asbes gelombang (2,00 x 0,92 m) x 5 mm


Asbes gelombang besar ( 200 x 92 x 0,5 )
0.6000
Paku biasa 1/2" - 1"
0.1200
Tukang kayu
0.0700
Kepala tukang
0.0070
Pekerja
0.1400
Mandor
0.0070
JUMLAH

lbr X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

16,300.00
80,000.00
90,000.00
55,000.00
80,000.00

1 m2 Pasang atap asbes gelombang (1,80 x 0,92 m) x 5 mm


Asbes gelombang besar ( 180 x 92 x 0,5 )
0.7500
Paku biasa 1/2" - 1"
0.1200
Tukang kayu
0.0700
Kepala tukang
0.0070
Pekerja
0.1400
Mandor
0.0070
JUMLAH

lbr X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

16,300.00
80,000.00
90,000.00
55,000.00
80,000.00

PAT26

1 m2 Pasang atap asbes gelombang (2,40 x 1,05 m) x 4 mm


Asbes gelombang kecil ( 240 x 105 x 0,4 )
0.4400
Paku biasa 1/2" - 1"
0.1200
Tukang kayu
0.0670
Kepala tukang
0.0070
Pekerja
0.1400
Mandor
0.0070
JUMLAH

lbr X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

PAT27

1 m2 Pasang atap asbes gelombang (2,10 x 1,05 m) x 4 mm


Asbes gelombang besar ( 210 x 108 x 0,6 )
0.5100
Paku biasa 1/2" - 1"
0.1200
Tukang kayu
0.0670
Kepala tukang
0.0070
Pekerja
0.1400
Mandor
0.0070
JUMLAH

lbr X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

16,300.00
80,000.00
90,000.00
55,000.00
80,000.00

PAT28

1 m2 Pasang atap asbes gelombang (1,50 x 1,05 m) x 4 mm


Asbes gelombang kecil ( 150 x 105 x 0,4 )
0.8000
Paku biasa 1/2" - 1"
0.1200
Tukang kayu
0.0670
Kepala tukang
0.0070
Pekerja
0.1400
Mandor
0.0070
JUMLAH

lbr X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

16,300.00
80,000.00
90,000.00
55,000.00
80,000.00

PAT29

1 m2 Pasang atap sbes gelombang (2,40 x 1,08 m) x 6 mm


Asbes gelombang besar ( 240 x 108 x 0,6 )
0.4600
Paku biasa 1/2" - 1"
0.1200
Tukang kayu
0.0670
Kepala tukang
0.0070
Pekerja
0.1400
Mandor
0.0070
JUMLAH

lbr X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

PAT30

1 m2 Pasang atap asbes gelombang (2,10 x 1,08 m) x 6 mm


Asbes gelombang besar ( 210 x 108 x 0,6 )
0.4900
Paku biasa 1/2" - 1"
0.1200
Tukang kayu
0.0670
Kepala tukang
0.0070
Pekerja
0.1400
Mandor
0.0070
JUMLAH

lbr X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

16,300.00
80,000.00
90,000.00
55,000.00
80,000.00

PAT31

1 m2 Pasang atap asbes gelombang (1,80 x 1,08 m) x 6 mm


Asbes gelombang besar ( 180 x 108 x 0,6 )
0.5700
Paku biasa 1/2" - 1"
0.1200
Tukang kayu
0.0670
Kepala tukang
0.0070
Pekerja
0.1400
Mandor
0.0070
JUMLAH

lbr X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

16,300.00
80,000.00
90,000.00
55,000.00
80,000.00

PAT32

1 m' Pasang bubung stel gelombang 0,92 m


Bubung stel gelombang
Paku skrup
Tukang kayu
Kepala tukang
Pekerja
Mandor
JUMLAH

lbr X Rp.
bh X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

PAT33

1 m' Pasang nok stel rata 0,92 m


Nok stel rata
Paku skrup
Tukang kayu
Kepala tukang
Pekerja
Mandor

PAT34

1 m' Pasang nok stel rata 1,09 m


Nok stel rata
Paku skrup
Tukang kayu
Kepala tukang
Pekerja
Mandor

2.4000
6.0000
0.1250
0.0130
0.0840
0.0040

16,300.00
80,000.00
90,000.00
55,000.00
80,000.00

16,300.00
80,000.00
90,000.00
55,000.00
80,000.00

80,000.00
90,000.00
55,000.00
80,000.00

1.1000
6.0000
0.1500
0.0130
0.1000
0.0040

lbr X Rp.
bh X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

1.1000
6.0000
0.1250
0.0130
0.0840
0.0040

lbr X Rp.
bh X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

0.3000
0.0400
0.0700
0.0080
0.1500
0.0060

lbr X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

16,300.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH

JUMLAH
1 m' Pasang nok atap seng
Seng plat 3" x 6" BJLS 28
Paku biasa 1/2" - 1"
Tukang kayu
Kepala tukang
Pekerja
Mandor
JUMLAH
PAT36

1 m2 Pasang atap genteng metal zinc alume type prima roof


Genteng metal
1.0200
Paku anti karat
0.2000
Tukang kayu
0.1000
Kepala tukang
0.0100
Pekerja
0.2000
Mandor
0.0010
JUMLAH

PAT37

1 m2 Pasang atap metal gelombang


Atap metal gelombang t 0,35 mm
Paku anti karat
Tukang kayu
Kepala tukang
Pekerja
Mandor

m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

1.0200
4.0000
0.1000
0.0100
0.2000
0.0010

m X Rp.
bh X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

1.1000
0.0500
0.1500
0.0150
0.2500
0.0130

bh X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH

PAT39

1 m' Pasang nok genteng metal U type prima roof


Nok metal
Paku anti karat
Tukang kayu
Kepala tukang
Pekerja
Mandor
JUMLAH
1 m2 Pasang atap alumunium
Atap alumunium gelombang tebal 0,55
Paku hak panjang 15 cm
Tukang kayu
Kepala tukang
Pekerja
Mandor

1.0500
0.0200
0.7500
0.0080
0.1500
0.0060

m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH
PAT40

1 m' Pasang nok alumunium


Nok standar 40 cm 18 SWG 22
Paku hak panjang 15 cm
Tukang kayu
Kepala tukang
Pekerja
Mandor

PAT41

1 m2 Pasang alumunium foil / sisalation


Alumunium foil
Tukang kayu
Kepala tukang
Pekerja
Mandor

PAT42

1 m2 Pasang atap polikarbonat


Atap polykarbonat
Besi profil
Paku skrup
Tukang besi
Kepala tukang
Pekerja
Mandor

1.2000
0.0400
1.0000
0.0100
0.1000
0.0100

m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH

80,000.00
90,000.00
55,000.00
80,000.00

12,100.00
80,000.00
90,000.00
55,000.00
80,000.00

1.0500
0.0500
0.0050
0.1500
0.0080

m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1.0500
7.0000
9.0000
0.5000
0.0500
0.5000
0.0025

m X Rp.
kg X Rp.
bh X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

JUMLAH

JUMLAH
PAT43

1 M2 Rangka atap baja ringan atap genteng metal:


Paku biasa 1/2" - 1"
Baja ringan
Tukang kayu
Kepala Tukang
Pekerja
Mandor
JUMLAH

0.100
1.000
0.145
0.015
0.218
0.011

Kg
X Rp.
m2
X Rp.
org/hr X Rp.
org/hr X Rp.
org/hr X Rp.
org/hr X Rp.

16,300.00
80,000.00
90,000.00
55,000.00
80,000.00

PAT44

1 M2 Atap spandek tebal 0,50 mm uk. 0.75X1.33 m2 :


Atap spandek
Baut + Hak Spandek
Kepala tukang
Tukang besi
Pekerja
Mandor
Sewa alar bor
JUMLAH

1.200
4.000
0.030
0.300
0.380
0.019
1.000

M2
X Rp.
Bh
X Rp.
org/hr X Rp.
org/hr X Rp.
org/hr X Rp.
org/hr X Rp.
ls
X Rp.

90,000.00
80,000.00
55,000.00
80,000.00
-

PAT45

24,752.00

35,102.00

0.00
0.00
4,800.00
540.00
3,300.00
240.00
8,880.00

0.00

8,880.00

0.00
3,000.00
0.00
0.00
40,000.00
4,500.00
27,500.00
2,000.00
3,000.00

77,000.00

0.00
163.00
4,000.00
450.00
2,750.00
240.00
7,440.00

163.00

7,603.00

110,400.00
1,630.00
20,000.00
2,250.00
8,250.00
600.00
31,100.00

112,030.00

143,130.00

119,600.00
1,956.00
21,600.00
2,430.00
9,350.00
680.00
34,060.00

121,556.00

155,616.00

0.00
0.00
0.00
25,600.00
2,880.00
7,700.00
560.00
36,740.00

0.00

36,740.00

0.00
8,000.00
900.00
11,000.00
800.00
20,700.00

0.00

20,700.00

0.00
8,000.00
900.00
16,500.00
1,200.00
26,600.00

0.00

26,600.00

0.00
8,000.00
900.00
11,000.00
800.00
20,700.00

0.00

20,700.00

10 M' Rabung atap spandek :


Rabung Atap spandek
Baut + Hak Spandek
Tukang besi
Kepala tukang
Pekerja

0.00
8,000.00
900.00
16,500.00
1,200.00
26,600.00

10.000
20.000
0.250
0.025
0.250

m'
X Rp.
Bh
X Rp.
org/hr X Rp.
org/hr X Rp.
org/hr X Rp.

80,000.00
90,000.00
55,000.00
Per M'

26,600.00

0.00

0.00
8,000.00
900.00
16,500.00
1,200.00
26,600.00

0.00

26,600.00

0.00
0.00
1,824.00
2,095.50
16,000.00
1,800.00
22,000.00
1,600.00
41,400.00

3,919.50

45,319.50

0.00
0.00
1,824.00
2,095.50
16,000.00
1,800.00
22,000.00
1,600.00
41,400.00

3,919.50

45,319.50

0.00
1,956.00
6,000.00
720.00
7,700.00
640.00
15,060.00

1,956.00

17,016.00

0.00
1,956.00
5,600.00
630.00
7,700.00
560.00
14,490.00

1,956.00

16,446.00

0.00
1,956.00
5,600.00
630.00
7,700.00
560.00
14,490.00

1,956.00

16,446.00

0.00
1,956.00
5,360.00
630.00
7,700.00
560.00
14,250.00

1,956.00

16,206.00

0.00
1,956.00
5,360.00
630.00
7,700.00
560.00
14,250.00

1,956.00

16,206.00

0.00
1,956.00
5,360.00
630.00
7,700.00
560.00
14,250.00

1,956.00

16,206.00

0.00
1,956.00
5,360.00
630.00
7,700.00
560.00
14,250.00

1,956.00

16,206.00

0.00
1,956.00
5,360.00
630.00
7,700.00
560.00
14,250.00

1,956.00

16,206.00

0.00
1,956.00
5,360.00
630.00
7,700.00
560.00
14,250.00

1,956.00

16,206.00

0.00
0.00
10,000.00
1,170.00
4,620.00
320.00
16,110.00

0.00

16,110.00

0.00
0.00
12,000.00
1,170.00
5,500.00
320.00
18,990.00

0.00

18,990.00

0.00
0.00
10,000.00
1,170.00
4,620.00
320.00
16,110.00

0.00

16,110.00

0.00
652.00
5,600.00
720.00
8,250.00
480.00
15,050.00

652.00

15,702.00

0.00
0.00
8,000.00
900.00
11,000.00
80.00
19,980.00

0.00

19,980.00

0.00
0.00
8,000.00
900.00
11,000.00
80.00
19,980.00

0.00

19,980.00

0.00
0.00
12,000.00
1,350.00
13,750.00
1,040.00
28,140.00

0.00

28,140.00

0.00
0.00
60,000.00
720.00
8,250.00
480.00
69,450.00

0.00

69,450.00

0.00
0.00
80,000.00
900.00
5,500.00
800.00
87,200.00

0.00

87,200.00

0.00
4,000.00
450.00
8,250.00
640.00
13,340.00

0.00

13,340.00

0.00
84,700.00
0.00
40,000.00
4,500.00
27,500.00
200.00
72,200.00

84,700.00

156,900.00

1,630.00
0.00
11,600.00
1,305.00
11,962.50
870.00
25,737.50

1,630.00

27,367.50

0.00
0.00
2,700.00
24,000.00
20,900.00
1,520.00
49,120.00

JUMLAH

0.00

8,000.00
900.00
11,000.00
800.00

JUMLAH

PAT38

4,000.00
450.00
5,500.00
400.00
10,350.00

JUMLAH

PAT35

38,200.00

256,400.00

24,752.00
0.00

1 m2 Pasang genteng beton besar Warna ( isi 9 / m ) untuk rumah tingkat


Genteng beton besar warna 1m 9 biji
9.0000
bh X Rp.
Tukang batu
0.1000
org X Rp.
Kepala Tukang
0.0100
org X Rp.
Pekerja
0.3000
org X Rp.
Mandor
0.0150
org X Rp.
JUMLAH

PAT25

138,000.00

PAT18

PAT22

64,000.00
7,200.00
44,000.00
3,200.00
118,400.00

PAT17

PAT21

14,800.00

1 m2 Pasang genteng beton besar Natural ( isi 9 / m )


Genteng beton besar natural 1m 9 biji
9.0000
Tukang batu
0.1000
Kepala Tukang
0.0100
Pekerja
0.2000
Mandor
0.0100
JUMLAH

PAT16

PAT20

23,400.00

138,000.00
0.00

1 m2 Pasang rangka langit-langit (60 x 120) cm


Kayu meranti balok
Paku biasa 1/2" - 1"
Tukang kayu
Kepala tukang
Pekerja
Mandor

PAT15

14,800.00

23,400.00
0.00
8,000.00
900.00
5,500.00
400.00
14,800.00

74,000.00

JUMLAH

PAT14

0.00

1 m2 Langit-langit akustik ukuran 60 x 120 cm + rangka alumunium


Profil alumunium
Kawat beton / bindrat
Ramset / dina bolt
Akustik soft board 60 x 120
Tukang besi
Kepala tukang
Pekerja
Mandor

PAT13

0.00

0.00
0.00
8,000.00
900.00
5,500.00
400.00
14,800.00

1 m' Pasang list plafond gypsum profil


List profil gypsum lebar sampai 5 cm
Tepung gypsum
Tukang kayu
Kepala tukang
Pekerja
Mandor

PAT10

8,000.00
900.00
5,500.00
400.00
14,800.00

0.00

49,120.00

0.00
0.00
20,000.00
2,250.00
13,750.00
36,000.00
3,600.00

0.00
0.00

36,000.00
3,600.00

PEKERJAAN PENGECATAN
PPC1

10 m2 Mengecat kerb 3 kali


Cat dasar meni
Minyak cat
Tukang cat
Kepala Tukang
Pekerja
Mandor

4.2500
0.5700
3.0000
0.3000
2.0000
0.1000

kg X Rp.
ltr X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

35,300.00
12,000.00
80,000.00
90,000.00
55,000.00
80,000.00

0.0500
0.1500
0.0025

kg X Rp.
org X Rp.
org X Rp.

55,000.00
80,000.00

TIAP 1 M ( 3 kali )
2
TIAP 1 M ( 2 kali )
2
TIAP 1 M ( 1 kali )
PPC2

Mengikis / mengerok permukaan cat tembok lama


Soda api
Pekerja
Mandor
JUMLAH

PPC3

1 m2 Mengerok karat cat lama permukaan baja dengan cara manual


Sabun deterjen
0.0500
kg X Rp.
Pekerja
0.1500
org X Rp.
Mandor
0.0025
org X Rp.
JUMLAH

PPC4

1 m2 Mendempul dan menggosok kayu


Dempul kayu typa A (putih) Jago
Minyak cat
Batu apung
Tukang cat
Kepala tukang
Pekerja
Mandor

0.0800
0.0200
0.0100
0.0400
0.0040
0.0400
0.0025

kg X Rp.
kg X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

55,000.00
80,000.00

22,700.00
12,000.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH

150,025.00
6,840.00
240,000.00
27,000.00
110,000.00
8,000.00
385,000.00
38,500.00
25,666.67
12,833.33

6,000.00
675.00
3,850.00
200.00
10,725.00

14,807.00

1 m2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup
Cat dasar meni kayu
0.2000
kg X Rp.
35,300.00
Plamur Fuji
0.1500
kg X Rp.
Cat dasar meni kayu
0.1700
kg X Rp.
35,300.00
Cat penutup
0.2600
kg X Rp.
51,800.00
Tukang cat
0.0900
org X Rp.
80,000.00
Kepala tukang
0.0060
org X Rp.
90,000.00
Pekerja
0.0700
org X Rp.
55,000.00
Mandor
0.0025
org X Rp.
80,000.00
JUMLAH

540.00
3,850.00
200.00
4,590.00

PPC7

1 m2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 3 lapis cat penutup
Cat dasar meni kayu
0.2000
kg X Rp.
35,300.00
Plamur Fuji
0.1500
kg X Rp.
Cat kayu
0.1700
kg X Rp.
59,200.00
Cat penutup
0.3500
kg X Rp.
51,800.00
Tukang cat
0.1050
org X Rp.
80,000.00
Kepala tukang
0.0040
org X Rp.
90,000.00
Pekerja
0.0700
org X Rp.
55,000.00
Mandor
0.0025
org X Rp.
80,000.00
JUMLAH

8,400.00
360.00
3,850.00
200.00
12,810.00

PPC8

1 m2 Pelaburan bidang kayu dengan teak oil


Teak oil Fuji
Tukang cat
Kepala tukang
Pekerja
Mandor
JUMLAH

0.3600
0.0630
0.0630
0.0400
0.0025

5,040.00
5,670.00
2,200.00
200.00
13,110.00

PPC9

1 m2 Pelaburan bidang kayu dengan politur


Politur jadi
Politur jadi
Amplas
Tukang cat
Kepala tukang
Mandor
JUMLAH

0.1500
0.3720
2.0000
0.0600
0.0160
0.0025

ltr X Rp.
ltr X Rp.
lbr X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
80,000.00

PPC10

1 m2 Pelaburan bidang kayu dengan cat residu atau ter


Residu
0.3500
Pekerja
0.1000
Mandor
0.0060
JUMLAH

ltr X Rp.
org X Rp.
org X Rp.

55,000.00
80,000.00

1 m2 Pelaburan bidang kayu dengan vernis


Pernis
Dempul kayu typa A (putih) Jago
Amplas
Kuas ukuran 3,5"
Tukang cat
Kepala tukang
Pekerja
Mandor
JUMLAH

ltr X Rp.
kg X Rp.
lbr X Rp.
bh X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

44,100.00
22,700.00
80,000.00
90,000.00
55,000.00
80,000.00

35,300.00
51,800.00
80,000.00
90,000.00
55,000.00
80,000.00

PPC11

0.1500
0.0500
0.1000
0.0100
0.1600
0.0160
0.1600
0.0025

ltr X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

PPC12

1 m2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
Plamur Fuji
0.1000
kg X Rp.
Cat dasar meni kayu
0.1000
kg X Rp.
Cat penutup
0.2600
kg X Rp.
Tukang cat
0.0630
org X Rp.
Kepala tukang
0.0063
org X Rp.
Pekerja
0.0200
org X Rp.
Mandor
0.0025
org X Rp.
JUMLAH

35,300.00
51,800.00
80,000.00
90,000.00
55,000.00
80,000.00

PPC13

1 m2 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup)


Cat dasar meni kayu
0.1200
kg X Rp.
Cat penutup
0.1800
kg X Rp.
Tukang cat
0.0420
org X Rp.
Kepala tukang
0.0042
org X Rp.
Pekerja
0.0280
org X Rp.
Mandor
0.0025
org X Rp.
JUMLAH

35,300.00
51,800.00
80,000.00
90,000.00
55,000.00
80,000.00

PPC14

1 m2 Pengecatan tembok tidak terlindung dari panas dan hujan


Cat alkali resisting primer
0.1000
Cat ICI Weathershield
0.3600
Tukang cat
0.0630
Kepala tukang
0.0063
Pekerja
0.0200
Mandor
0.0025
JUMLAH

80,000.00
90,000.00
55,000.00
80,000.00

PPC15

1 m2 Melabur tembok dengan kalkarium


Kalkarium
Tukang cat
Kepala tukang
Pekerja
Mandor

PPC16

1 m2 Pengecatan bidang besi ( 3 x )


Cat dasar meni
Thinner
Tukang cat
Kepala tukang
Pekerja
Mandor

kg X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

0.1000
0.0420
0.0042
0.0280
0.0025

kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

0.1670
0.1500
0.1050
0.0040
0.0700
0.0025

kg X Rp.
ltr X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

35,300.00
12,000.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH

JUMLAH
PPC17

1 m2 Melamin
Cat tembok melamin
Kuas ukuran 3,5"
Pekerja
Tukang cat
Kepala Tukang
Mandor

PPC18

1 m2 Pemasangan wall paper


Wall paper
Perekat
Tukang cat
Kepala tukang
Pekerja
Mandor

0.2000
0.0150
0.2000
0.1000
0.0050
0.0005

kg X Rp.
bh X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1.2000
0.2000
0.2000
0.0020
0.0200
0.0025

m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

24,000.00
55,000.00
80,000.00
90,000.00
80,000.00

80,000.00
90,000.00
55,000.00
80,000.00

1 m2 Pengecacatan permukaan baja dengan meni besi


Cat dasar meni
0.1000
Kuas ukuran 3,5"
0.0100
Tukang cat
0.2000
Kepala tukang
0.0200
Pekerja
0.0200
Mandor
0.0100
JUMLAH

kg X Rp.
bh X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

35,300.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH

JUMLAH
PPC19

PPC20

1 m2 Pengecacatan permukaan baja dengan meni besi memakai perancah


Cat dasar meni
0.1000
kg X Rp.
Kuas ukuran 3,5"
0.0100
bh X Rp.
3
Perancah kayu
0.0020
m X Rp.
Tukang cat
0.2250
org X Rp.
Kepala tukang
0.0225
org X Rp.
Pekerja
0.2250
org X Rp.
Mandor
0.0075
org X Rp.
JUMLAH

PPC21

1 m2 Pengetiran kayu ( 2 x )
Teer kayu
Pekerja
Mandor

PPC22

1 m2 Mengecat genteng
Cat ICI Weathershield
Tukang cat
Kepala Tukang
Pekerja
Mandor

35,300.00
80,000.00
90,000.00
55,000.00
80,000.00

0.3500
0.1000
0.0050

kg X Rp.
org X Rp.
org X Rp.

55,000.00
80,000.00

0.3600
0.0630
0.0063
0.0200
0.0025

kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH

JUMLAH
PPC23

1 m2 Mengerjakan Cat Sungging


Mengerjakan cat dasar
Cat dasar meni kayu
Tukang cat
Kepala Tukang
Pekerja
Mandor

0.1200
0.0400
0.0040
0.0667
0.0033

kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

35,300.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH ( A )
Mengecat dan membuat gradasi tutulan berkali-kali
Cat kayu
Minyak cat
Tukang cat
Kepala Tukang
Pekerja
Mandor
JUMLAH ( B )
JUMLAH A + B

0.4250
0.1000
5.0000
0.5000
0.2000
0.0100

kg X Rp.
ltr X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

59,200.00
12,000.00
80,000.00
90,000.00
55,000.00
80,000.00

4.0000
0.4000

org X Rp.
org X Rp.

1 m3 Membongkar pasangan batu merah dan membersihkan


Tukang batu
2.0000
Pekerja
0.1000
JUMLAH

org X Rp.
org X Rp.

0.00

2,056.00

PPC6

kg X Rp.
kg X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

541,865.00
54,186.50
36,124.33
18,062.17

8,450.00

8,450.00

1,816.00
240.00
0.00
3,200.00
360.00
2,200.00
200.00
5,960.00

1 m2 Pengecatan bidang kayu lama


Plamur Fuji
Cat dasar meni kayu
Cat penutup
Tukang cat
Kepala tukang
Pekerja
Mandor

0.1500
0.1700
0.1700
0.0750
0.0075
0.0700
0.0025

0.00

0.00
8,250.00
200.00
8,450.00

PPC5

JUMLAH

156,865.00
15,686.50
10,457.67
5,228.83

0.00
8,250.00
200.00
8,450.00

8,016.00

0.00
6,001.00
8,806.00

25,532.00

7,060.00
0.00
6,001.00
13,468.00
7,200.00

33,729.00

38,319.00

7,060.00
0.00
10,064.00
18,130.00

35,254.00

48,064.00

0.00

0.00

13,110.00

0.00
0.00
0.00
4,800.00
1,440.00
200.00
6,440.00

0.00

6,440.00

0.00
5,500.00
480.00
5,980.00

0.00

5,980.00

6,615.00
1,135.00
0.00
0.00
12,800.00
1,440.00
8,800.00
200.00
23,240.00

7,750.00

30,990.00

0.00
3,530.00
13,468.00
5,040.00
567.00
1,100.00
200.00
6,907.00

16,998.00

3,360.00
378.00
1,540.00
200.00
5,478.00

13,560.00

23,905.00

4,236.00
9,324.00

19,038.00

0.00
0.00
5,040.00
567.00
1,100.00
200.00
6,907.00

0.00

6,907.00

0.00
3,360.00
378.00
1,540.00
200.00
5,478.00

0.00

5,478.00

5,895.10
1,800.00
8,400.00
360.00
3,850.00
200.00
12,810.00

7,695.10

20,505.10

4,800.00
0.00
11,000.00
8,000.00
450.00
40.00
19,490.00

4,800.00

24,290.00

0.00
0.00
16,000.00
180.00
1,100.00
200.00
17,480.00

0.00

17,480.00

3,530.00
0.00
16,000.00
1,800.00
1,100.00
800.00
19,700.00

3,530.00

23,230.00

3,530.00
0.00
0.00
18,000.00
2,025.00
12,375.00
600.00
33,000.00

3,530.00

36,530.00

0.00
5,500.00
400.00
5,900.00

0.00

5,900.00

0.00
5,040.00
567.00
1,100.00
200.00
6,907.00

0.00

6,907.00

4,236.00
3,200.00
360.00
3,668.50
264.00
7,492.50

4,236.00

11,728.50

25,160.00
1,200.00
400,000.00
45,000.00
11,000.00
800.00
456,800.00
464,292.50

26,360.00
30,596.00

483,160.00
494,888.50

80,000.00
55,000.00

320,000.00
22,000.00
342,000.00

0.00

342,000.00

80,000.00
55,000.00

160,000.00
5,500.00
165,500.00

0.00

165,500.00

org X Rp.
org X Rp.
org X Rp.

80,000.00
55,000.00
80,000.00

16,000.00
440,000.00
8,000.00
464,000.00

0.00

464,000.00

org X Rp.
org X Rp.

55,000.00
80,000.00

110,000.00
8,000.00
118,000.00
11,800.00

0.00
0.00

118,000.00
11,800.00

PEKERJAAN BONGKARAN
PBK1

1 m3 Membongkar pasangan batu kali


Tukang batu
Pekerja

PBK2

1 m3 Membongkar beton bertulang dan membersihkan


Tukang batu
0.2000
Pekerja
8.0000
Mandor
0.1000
JUMLAH

JUMLAH

PBK3

PBK4

10 m2 Pekerjaan bongkar lantai tegel untuk dipergunakan lagi


Pekerja
2.0000
Mandor
0.1000
JUMLAH
TIAP 1M2

PBK5

10 m2 Mengupas plesteran lama


Pekerja
Mandor

PBK6

10 m2 Membongkar genteng / sirap untuk dipergunakan lagi


Pekerja
2.0000
Mandor
0.1000
JUMLAH
TIAP 1M2

1.2500
0.1250

org X Rp.
org X Rp.

55,000.00
80,000.00

68,750.00
10,000.00
78,750.00
7,875.00

0.00
0.00

78,750.00
7,875.00

org X Rp.
org X Rp.

55,000.00
80,000.00

110,000.00
8,000.00
118,000.00
11,800.00

0.00
0.00

118,000.00
11,800.00

org X Rp.
org X Rp.

80,000.00
55,000.00

40,000.00
55,000.00
95,000.00
9,500.00

0.00
0.00

95,000.00
9,500.00

48,000.00
5,400.00
110,000.00
8,000.00
171,400.00
17,140.00

0.00
0.00

171,400.00
17,140.00

JUMLAH
TIAP 1M2

PBK7

10 m2 Membongkar atap seng


Tukang besi
Pekerja

0.5000
1.0000
JUMLAH
TIAP 1M2

PBK8

10 m2 Membongkar usuk / reng dipakai lagi


Tukang kayu
Kepala Tukang
Pekerja
Mandor
JUMLAH
TIAP 1M2

0.6000
0.0600
2.0000
0.1000

org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

PBK9

10 m2 Membongkar usuk / reng tidak dipakai lagi


Pekerja
Mandor
JUMLAH
TIAP 1M2

110,000.00
8,000.00
118,000.00
11,800.00

0.00
0.00

118,000.00
11,800.00

PBK10

1 m3 Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan untuk digunakan lagi
Tukang kayu
6.0000
org X Rp.
80,000.00
Kepala Tukang
0.6000
org X Rp.
90,000.00
Pekerja
4.0000
org X Rp.
55,000.00
Mandor
0.2000
org X Rp.
80,000.00
JUMLAH

480,000.00
54,000.00
220,000.00
16,000.00
770,000.00

0.00

770,000.00

PBK11

1 m3 Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan tidak digunakan lagi
Pekerja
1.0000
org X Rp.
55,000.00
Mandor
0.2000
org X Rp.
80,000.00
JUMLAH

55,000.00
16,000.00
71,000.00

0.00

71,000.00

0.00

1,304,000.00

PBK12

2.0000
0.1000

1 m3 Mengerjakan kembali bangunan kayu yang telah dibongkar


Tukang kayu
12.0000
Kepala Tukang
1.2000
Pekerja
4.0000
Mandor
0.2000
JUMLAH

org X Rp.
org X Rp.

55,000.00
80,000.00

org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

1.0000
6%
1.1000
0.0010
3.3000
0.1600

bh X Rp.
x X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,890,000.00
113,400.00
80,000.00
90,000.00
55,000.00
80,000.00

1.0000
6.0000
0.0100
1.5000
1.5000
1.0000
0.1600

bh X Rp.
kg X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

960,000.00
108,000.00
220,000.00
16,000.00
1,304,000.00

PEKERJAAN SANITASI
PSI1

1 bh Memasang kloset duduk/monoblock


Kloset duduk putih dengan tangki "Toto"
Harga kloset (Perlengkapan)
Tukang batu
Kepala tukang
Pekerja
Mandor
JUMLAH

PSI2

1 bh Memasang kloset jongkok porselen


Kloset jongkok porselin type CE8 standar
Portland Cement (PC)
Pasir pasang ( progo )
Tukang batu
Kepala tukang
Pekerja
Mandor
JUMLAH

PSI3

1 bh Memasang kloset jongkok teraso


Kloset jongkok teraso
Batu merah ( 5x11x23 )
Portland Cement (PC)
Pasir pasang ( progo )
Tukang batu
Kepala tukang
Pekerja
Mandor

1.0000
7.0000
6.0000

bh X Rp.
bh X Rp.
kg X Rp.

0.0100
1.5000
0.3000
1.0000
0.1100

m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1 bh Memasang urinoir
Urinoir putih
Harga urinoir (Perlengkapan)
Portland Cement (PC)
Pasir pasang ( progo )
Tukang batu
Kepala tukang
Pekerja
Mandor

1.0000
30%
6.0000
0.0100
1.0000
0.1000
1.0000
0.1000

bh
x
kg
3
m
org
org
org
org

X
X
X
X
X
X
X
X

120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

1.0000
12%
6.0000

bh X Rp.
x X Rp.
kg X Rp.

535,500.00
64,260.00
1,375.00

0.0100
1.4500
0.1500
1.2000
0.1000

m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

JUMLAH
PSI5

1 bh Memasang wastafel
Wastafel putih (KIA)
Harga wastafel (Perlengkapan)
Portland Cement (PC)
Pasir pasang ( progo )
Tukang batu
Kepala tukang
Pekerja
Mandor

120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH
PSI6

1 bh Memasang bak mandi fiberglass volume 0,30 m


Bak mandi fiber glass 0,30 m3
Harga bak(Perlengkapan)
Tukang batu
Kepala tukang
Pekerja
Mandor
JUMLAH

1.0000
18%
2.7000
0.5400
1.8000
0.1100

bh X Rp.
x X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

360,900.00
64,962.00
80,000.00
90,000.00
55,000.00
80,000.00

1 bh Memasang badkip porselen


Badkip
Harga badkip (Perlengkapan)
Tukang batu
Kepala tukang
Pekerja
Mandor

PSI8

1 m2 Memasang bak fiberglass volume 1 m air


Bak mandi fiber glass 1,00 m3
Harga bak (Perlengkapan)
Tukang batu
Kepala tukang
Pekerja
Mandor
JUMLAH

bh X Rp.
x X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

459,400.00
55,128.00
80,000.00
90,000.00
55,000.00
80,000.00

PSI9

Memasang pipa penyalur air limbah jenis pipa tanah, diameter 15 cm


Pipa tanah dia. 15 cm
1.6000
bh X Rp.
Portland Cement (PC)
0.6800
kg X Rp.

1,375.00

1.0000
20%
0.0750
0.7500
0.2500

bh X Rp.
x X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH

1.0000
12%
4.5000
0.9000
3.0000
0.9000

0.0130
0.0110
0.0300
0.0030
0.0600
0.0025

m X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

120,000.00
94,500.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH
1 m' Memasang pipa penyalur air limbah jenis pipa tanah, diameter 20 cm
Pipa tanah dia. 20 cm
1.6000
bh X Rp.
Portland Cement (PC)
0.8700
kg X Rp.
Pasir pasang ( progo )
Pasir urug darat
Tukang batu
Kepala tukang
Pekerja
Mandor

0.0140
0.1400
0.0400
0.0040
0.0800
0.0070

m X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1 m' Memasang pipa beton, diameter 15 cm - 20 cm


Pipa beton 15 x 30 Panjang 1 m
Batu merah ( 5x11x23 )
Portland Cement (PC)
Pasir pasang ( progo )
Pasir urug darat
Tukang batu
Kepala tukang
Pekerja
Mandor

1.1000
16.0000
3.9200
0.0560

bh X Rp.
bh X Rp.
kg X Rp.
3
m X Rp.

0.0240
0.0700
0.0070
0.1400
0.0070

m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1 m' Memasang pipa beton, diameter 30 cm - 100 cm


Pipa beton 20 x 30 Panjang 1 m
1.1000
Batu merah ( 5x11x23 )
330.0000
Portland Cement (PC)
10.3000
Pasir pasang ( progo )
0.0610

bh X Rp.
bh X Rp.
kg X Rp.
3
m X Rp.

Pasir urug darat


Tukang batu
Kepala tukang
Pekerja
Mandor

m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

0.0690
0.1900
0.0190
0.3800
0.0190

94,500.00
80,000.00
90,000.00
55,000.00
80,000.00

0.0600
1.0150
0.0015
3.2000
0.0160

m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

94,500.00
80,000.00
90,000.00
55,000.00
80,000.00

0.0200
2.6000
0.0900
0.4730
0.0470
1.4200
0.0710

m X Rp.
kg X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

170,100.00
11,600.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

m
3
m
kg
3
m
org
org
org
org

X
X
X
X
X
X
X
X

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

120,000.00
170,100.00
11,600.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

1.2000
35%
0.0900
0.0090
0.0540
0.0270

m X Rp.
x X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH

Pipa galvanis dia. 3/4"

80,000.00
90,000.00
55,000.00
80,000.00

80,000.00
90,000.00
55,000.00
80,000.00

1.2000
35%
0.0900
0.0090
0.0540
0.0270

m X Rp.
x X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1.2000
35%
0.0900
0.0090
0.0540
0.0270

m X Rp.
x X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

JUMLAH

JUMLAH
1 m' Memasang pipa galvanis diameter 1 1/2"
Pipa galvanis dia. 1 1/2"
Harga pipa (Perlengkapan)
Tukang batu
Kepala tukang
Pekerja
Mandor
JUMLAH

1.2000
35%
0.1800
0.0180
0.1080
0.0054

PSI20

1 m' Memasang pipa galvanis diameter 3"


Pipa galvanis dia. 3"
Harga pipa (Perlengkapan)
Tukang batu
Kepala tukang
Pekerja
Mandor
JUMLAH

1.2000
35%
0.1800
0.0180
0.1080
0.0054

PSI21

1 m' Memasang pipa galvanis diameter 4"


Pipa galvanis dia. 4"
Harga pipa (Perlengkapan)
Tukang batu
Kepala tukang
Pekerja
Mandor
JUMLAH

1.2000
35%
0.2250
0.0225
0.1350
0.0068

m X Rp.
x X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

PSI22

1 m' Memasang pipa PVC tipe AW diameter 1/2"


Pipa PVC abu-abu dia. 1/2" Wavin
Harga pipa (Perlengkapan)
Tukang batu
Kepala tukang
Pekerja
Mandor
JUMLAH

1.2000
35%
0.0600
0.0060
0.0360
0.0018

m X Rp.
x X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1 m' Memasang pipa PVC tipe AW diameter 3/4"


Pipa PVC abu-abu dia. 3/4" Wavin
Harga pipa (Perlengkapan)
Tukang batu
Kepala tukang
Pekerja
Mandor
JUMLAH

1.2000
35%
0.0600
0.0060
0.0360
0.0018

m X Rp.
x X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

PSI24

1 m' Memasang pipa PVC tipe AW diameter 1"


Pipa PVC abu-abu dia. 1" Wavin
Harga pipa (Perlengkapan)
Tukang batu
Kepala tukang
Pekerja
Mandor
JUMLAH

1.2000
35%
0.0600
0.0060
0.0360
0.0018

PSI25

1 m' Memasang pipa PVC tipe AW diameter 1 1/2"


Pipa PVC abu-abu dia. 1 1/2" Wavin
Harga pipa (Perlengkapan)
Tukang batu
Kepala tukang
Pekerja
Mandor
JUMLAH

1.2000
35%
0.0600
0.0060
0.0360
0.0018

PSI26

1 m' Memasang pipa PVC tipe AW diameter 2"


Pipa PVC abu-abu dia. 2" Wavin
Harga pipa (Perlengkapan)
Tukang batu
Kepala tukang
Pekerja
Mandor

m X Rp.
x X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

m X Rp.
x X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

80,000.00
90,000.00
55,000.00
80,000.00

80,000.00
90,000.00
55,000.00
80,000.00

13,700.00
4,795.00
80,000.00
90,000.00
55,000.00
80,000.00

18,900.00
6,615.00
80,000.00
90,000.00
55,000.00
80,000.00

m X Rp.
x X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

m X Rp.
x X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

25,900.00
9,065.00
80,000.00
90,000.00
55,000.00
80,000.00

44,500.00
15,575.00
80,000.00
90,000.00
55,000.00
80,000.00

56,900.00
19,915.00
80,000.00
90,000.00
55,000.00
80,000.00

83,100.00
29,085.00
80,000.00
90,000.00
55,000.00
80,000.00

1.2000
35%
0.0900
0.0090
0.0544
0.0027

m X Rp.
x X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1.2000
35%
0.0600
0.0060
0.0360
0.0018

m X Rp.
x X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

JUMLAH
PSI27

1 m' Memasang pipa PVC tipe AW diameter 2 1/2"


Pipa PVC abu-abu dia. 2 1/2" Wavin
Harga pipa (Perlengkapan)
Tukang batu
Kepala tukang
Pekerja
Mandor
JUMLAH

0.00

93,500.00

459,400.00
6,615.36
360,000.00
81,000.00
165,000.00
72,000.00
678,000.00

466,015.36

1,144,015.36

0.00
935.00
1,560.00
1,039.50
2,400.00
270.00
3,300.00
200.00
6,170.00

3,534.50

9,704.50

0.00
1,196.25
1,680.00
13,230.00
3,200.00
360.00
4,400.00
560.00
8,520.00

16,106.25

5,600.00
630.00
7,700.00
560.00
14,490.00

14,378.00

24,626.25

0.00
0.00
5,390.00
6,720.00
2,268.00

28,868.00

0.00
0.00
14,162.50
7,320.00
6,520.50
15,200.00
1,710.00
20,900.00
1,520.00
39,330.00

28,003.00

67,333.00

0.00
60,500.00
8,400.00
11,907.00
18,560.00
7,200.00
81,200.00
135.00
176,000.00
1,280.00
258,615.00

106,567.00

365,182.00

0.00
105,875.00
15,600.00
3,402.00
30,160.00
10,800.00
37,840.00
4,230.00
78,100.00
5,680.00
125,850.00

165,837.00

291,687.00

0.00
156,750.00
22,080.00
5,613.30
56,260.00
14,400.00
57,600.00
6,480.00
118,800.00
8,000.00
190,880.00

255,103.30

445,983.30

0.00
0.00
7,200.00
810.00
2,970.00
2,160.00
13,140.00

0.00

13,140.00

0.00
0.00
7,200.00
810.00
2,970.00
2,160.00
13,140.00

0.00

13,140.00

1 m' Memasang pipa PVC tipe AW diameter 3"


Pipa PVC abu-abu dia. 3" Wavin
Harga pipa (Perlengkapan)
Tukang batu
Kepala tukang
Pekerja
Mandor
JUMLAH

1.2000
35%
0.1350
0.0135
0.0810
0.0410

m X Rp.
x X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

PSI29

1 m' Memasang pipa PVC tipe AW diameter 4"


Pipa PVC abu-abu dia. 4" Wavin
Harga pipa (Perlengkapan)
Tukang batu
Kepala tukang
Pekerja
Mandor
JUMLAH

1.2000
35%
0.1350
0.0135
0.0810
0.0410

m X Rp.
x X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

PSI30

1 bh Memasang bak cuci piring stainless steel


Bak cuci stainless steel
Water drain + asesories
Tukang batu
Kepala tukang
Pekerja
Mandor
JUMLAH

1.0000
1.0000
0.3000
0.0300
0.0300
0.0015

bh X Rp.
set X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

PSI31

1 bh Memasang bak cuci piring teraso


Bak cuci teraso
Water drain + asesories
Portland Cement (PC)
Pasir pasang ( progo )
Tukang batu
Kepala tukang
Pekerja
Mandor

1.0000
1.0000
20.0000
0.0500
0.5000
0.0500
0.0500
0.0025

bh X Rp.
set X Rp.
kg X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

1.0000
0.0250
0.1000
0.0100
0.0100
0.0050

bh X Rp.
bh X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

19,700.00
80,000.00
90,000.00
55,000.00
80,000.00

1.0000
0.1000
0.0100
0.0100
0.0050

bh X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

78,100.00
80,000.00
90,000.00
55,000.00
80,000.00

112,100.00
39,235.00
80,000.00
90,000.00
55,000.00
80,000.00

185,800.00
65,030.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH
PSI32

1 bh Memasang kran diameter 3/4" atau 1/2"


Kran air diameter 3/4" atau 1/2" exs. Toto
Seal tape
Tukang batu
Kepala tukang
Pekerja
Mandor
JUMLAH

PSI33

1 bh Memasang floor drain


Floordrain
Tukang batu
Kepala tukang
Pekerja
Mandor
JUMLAH

PSI34

1 bh Memasang shower dinding


Shower dinding
Pekerja
Tukang pipa ledeng

PSI35

1 bh Memasang kran air angsa


Kran air angsa
Perlengkapan
Pekerja
Tukang pipa ledeng

7,200.00
810.00
2,970.00
2,160.00
13,140.00

0.00

0.00

22,392.00

0.00
0.00
14,400.00
1,620.00
5,940.00
432.00
22,392.00

0.00

22,392.00

0.00
0.00
18,000.00
2,025.00
7,425.00
544.00
27,994.00

0.00

27,994.00

16,440.00
1,678.25
4,800.00
540.00
1,980.00
144.00
7,464.00

18,118.25

25,582.25

22,680.00
2,315.25
4,800.00
540.00
1,980.00
144.00
7,464.00

24,995.25

32,459.25

31,080.00
3,172.75
4,800.00
540.00
1,980.00
144.00
7,464.00

34,252.75

41,716.75

53,400.00
5,451.25
4,800.00
540.00
1,980.00
144.00
7,464.00

58,851.25

66,315.25

68,280.00
6,970.25
7,200.00
810.00
2,992.00
216.00
11,218.00

75,250.25

86,468.25

99,720.00
10,179.75
4,800.00
540.00
1,980.00
144.00
109,899.75

117,363.75

134,520.00
13,732.25
10,800.00
1,215.00
4,455.00
3,280.00
19,750.00

148,252.25

168,002.25

222,960.00
22,760.50
10,800.00
1,215.00
4,455.00
3,280.00
19,750.00

245,720.50

265,470.50

0.00
0.00
24,000.00
2,700.00
1,650.00
120.00
28,470.00

0.00

28,470.00

0.00
0.00
27,500.00
6,000.00
40,000.00
4,500.00
2,750.00
200.00
47,450.00

33,500.00

80,950.00

19,700.00
0.00
8,000.00
900.00
550.00
400.00
9,850.00

19,700.00

29,550.00

78,100.00
8,000.00
900.00
550.00
400.00
9,850.00

78,100.00

0.00

550.00

0.00

207,250.00

bh
X Rp.
org/hr X Rp.
org/hr X Rp.

55,000.00
-

0.00
550.00
0.00
550.00

1.000
1.000
0.010
0.100

bh
X Rp.
set
X Rp.
org/hr X Rp.
org/hr X Rp.

206,700.00
55,000.00
-

206,700.00
0.00
550.00
0.00
207,250.00

1
0.01
0.1

bh
X Rp.
org/hr X Rp.
org/hr X Rp.

52,500.00
55,000.00
-

1.0000
0.6000
0.0600
0.0600
0.0030

bh X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

157,500.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH

13,140.00

0.00
0.00
14,400.00
1,620.00
5,940.00
432.00
22,392.00

1.000
0.010
0.100
JUMLAH

1 bh Memasang tempat sabun


Tempat sabun
Pekerja
Tukang pipa ledeng

0.00
0.00

7,464.00

PSI28

PSI36

744,993.16

0.00
0.00
6,000.00
67,500.00
0.00
20,000.00
93,500.00

1 m' Memasang pipa galvanis diameter 1"


Pipa galvanis dia. 1"
Harga pipa (Perlengkapan)
Tukang batu
Kepala tukang
Pekerja
Mandor

PSI23

372,593.16

1 m' Memasang pipa galvanis diameter 3/4"


Harga pipa (Perlengkapan)
Tukang batu
Kepala tukang
Pekerja
Mandor

PSI19

756,161.20

360,900.00
11,693.16
216,000.00
48,600.00
99,000.00
8,800.00
372,400.00

1,375.00

0.1840
0.0330
4.8500
0.1200
0.7200
0.0720
2.1600
0.1000
JUMLAH

PSI18

161,450.00

1,200.00

552,661.20

1 m' Memasang pipa galvanis diameter 1/2"


Pipa galvanis dia. 1/2"
Harga pipa (Perlengkapan)
Tukang batu
Kepala tukang
Pekerja
Mandor

PSI17

9,450.00

535,500.00
7,711.20
8,250.00
116,000.00
13,500.00
66,000.00
8,000.00
203,500.00

1,375.00
120,000.00

JUMLAH
1 bh Memasang bak kontrol pasangan batu bata ukuran (60 x 60) cm, tingg 65 cm
Batu merah ( 5x11x23 )
222.0000
bh X Rp.
Portland Cement (PC)
114.0000
kg X Rp.
Pasir pasang ( progo )
Krikil beton
Besi beton polos
Pasir beton
Tukang batu
Kepala tukang
Pekerja
Mandor

PSI16

333,650.00

0.00
0.00
8,250.00
1,200.00
80,000.00
9,000.00
55,000.00
8,000.00
152,000.00

1,375.00
120,000.00
170,100.00
11,600.00

JUMLAH
1 bh Memasang bak kontrol pasangan batu bata ukuran (45 x 45) cm, tinggi 50 cm
Batu merah ( 5x11x23 )
150.0000
bh X Rp.
Portland Cement (PC)
77.0000
kg X Rp.
3
Pasir pasang ( progo )
0.1300
m X Rp.
Krikil beton
Besi beton polos
Pasir beton
Tukang batu
Kepala tukang
Pekerja
Mandor

PSI15

1,200.00

122,850.00

1,375.00
120,000.00

JUMLAH
1 bh Memasang bak kontrol pasangan batu bata ukuran (30 x 30) cm, tinggi 35 cm
Batu merah ( 5x11x23 )
87.0000
bh X Rp.
Portland Cement (PC)
44.0000
kg X Rp.
3
Pasir pasang ( progo )
0.0700
m X Rp.
3
Krikil beton
0.0700
m X Rp.
Besi beton polos
1.6000
kg X Rp.
Pasir beton
Tukang batu
Kepala tukang
Pekerja
Mandor

PSI14

332,250.00

113,400.00
0.00
8,250.00
120,000.00
27,000.00
55,000.00
8,800.00
210,800.00

1,375.00
120,000.00

JUMLAH

PSI13

9,450.00

1,375.00
120,000.00
94,500.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH

PSI12

2,179,194.00

0.00
8,250.00
1,200.00

Pasir pasang ( progo )


Pasir urug darat
Tukang batu
Kepala tukang
Pekerja
Mandor

PSI11

1,896,804.00

120,000.00
135,000.00
55,000.00
12,800.00
322,800.00

PSI7

PSI10

88,000.00
90.00
181,500.00
12,800.00
282,390.00

113,400.00
1,375.00

JUMLAH
PSI4

1,890,000.00
6,804.00

87,950.00

52,500.00
550.00
0.00
550.00

52,500.00

53,050.00

PEKERJAAN KUNCI DAN KACA


PPG1

1 bh Pasang kunci tanam antik


Kunci tanam antik
Tukang kayu
Kepala tukang
Pekerja
Mandor

PPG2

1 bh Pasang kunci tanam biasa


Kunci tanam biasa
Tukang kayu
Kepala tukang
Pekerja
Mandor

PPG3

1 bh Pasang kunci tanam kamar mandi


Kunci tanam
Tukang kayu
Kepala tukang
Pekerja
Mandor

JUMLAH

1.0000
0.5000
0.0100
0.0100
0.0050

bh X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

69,300.00
80,000.00
90,000.00
55,000.00
80,000.00

1.0000
0.5000
0.0050
0.0050
0.0025

bh X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

69,300.00
80,000.00
90,000.00
55,000.00
80,000.00

1.0000
0.5000
0.0050
0.0050
0.0003

bh X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH

JUMLAH
PPG4

1 bh Pasang kunci tanam silinder


Kunci silinder
Tukang kayu
Kepala tukang
Pekerja
Mandor
JUMLAH

PPG5

1 bh Pasang engsel pintu


Engsel pintu
Tukang kayu
Kepala tukang
Pekerja
Mandor

PPG6

1 bh Pasang engsel jendela kupu-kupu


Engsel jendela
Tukang kayu
Kepala tukang
Pekerja
Mandor

1.0000
0.1500
0.0150
0.0150
0.0008

bh X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

31,500.00
80,000.00
90,000.00
55,000.00
80,000.00

1.0000
0.1000
0.0100
0.0100
0.0050

bh X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

22,100.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH

JUMLAH
PPG7

1 bh Pasang engsel angin


Engsel angin
Tukang kayu
Kepala tukang
Pekerja
Mandor

PPG8

1 bh Pasang spring knip


Spring knip
Tukang kayu
Kepala tukang
Pekerja
Mandor

1.0000
0.2000
0.0200
0.0200
0.0100

bh X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

1.0000
0.1500
0.0150
0.0150
0.0008

bh X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

1.0000
0.1500
0.0150
0.0150
0.0008

bh X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH

JUMLAH
PPG9

1 bh Pasang kait angin


Kait angin
Tukang kayu
Kepala tukang
Pekerja
Mandor
JUMLAH

PPG10

1 m' Pasang door closer


Door closer
Tukang kayu
Kepala tukang
Pekerja
Mandor

PPG11

1 bh Pasang kunci selot


Kunci selot
Tukang kayu
Kepala tukang
Pekerja
Mandor

1.0000
0.5000
0.0500
0.0500
0.0025

bh X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

1.0000
0.2000
0.0200
0.0200
0.0010

bh X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH

JUMLAH
PPG12

1 bh Pasang pegangan pintu / door holder


Door holder
Tukang kayu
Kepala tukang
Pekerja
Mandor
JUMLAH

PPG13

1 bh Pasang door stop


Door stop
Tukang kayu
Kepala tukang
Pekerja
Mandor

1.0000
0.5000
0.0500
0.0500
0.0025

bh X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

1.0000
0.1000
0.0100
0.0100
0.0005

bh X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

1.0000
0.6000
0.0600
0.0600
0.0030

bh X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH
PPG14

1 bh Pasang rel pintu dorong


Penggantung + rel pintu dorong
Tukang kayu
Kepala tukang
Pekerja
Mandor
JUMLAH

PPG15

1 bh Pasang kunci lemari


Kunci lemari
Tukang kayu
Kepala tukang
Pekerja
Mandor

PPG16

1 m2 Pasang kaca
Kaca polos
Tukang kayu
Kepala tukang
Pekerja
Mandor

1.0000
0.2500
0.0250
0.0250
0.0013

bh X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

1.1000
0.1500
0.0150
0.0150
0.0008

m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH

60,900.00
80,000.00
90,000.00
55,000.00
80,000.00

JUMLAH
PPG17

PTM1

1 m' Pasang kusen alumunium


Kusen alumunium uk 2"x4" tebal 1.2 mm sekualitas YKK putih 1.1000
Harga kusen (Perlengkapan)
15%
Tukang alumunium
0.1500
Kepala tukang
0.0150
Pekerja
0.0150
Mandor
0.0008
JUMLAH

m X Rp.
x X Rp.
oh X Rp.
oh X Rp.
oh X Rp.
oh X Rp.

PEKERJAAN TAMAN
10 m2 Penyapuan Jalan Dan Trotoar
Sapu lidi
Tangkai Sapu
Serok
Seragam
Sarung tangan
Masker
Gerobak (sewa)
Pekerja
Mandor
JUMLAH
2
BIAYA TIAP 1M / HARI :

447.00
14.00
8.0000
16.00
14.00
14.00
4.00
2,555.00
365.00

bh X Rp.
bh X Rp.
bh X Rp.
bh X Rp.
bh X Rp.
bh X Rp.
bh X Rp.
org X Rp.
org X Rp.

0.1506
0.0109
0.0082
0.0009
1.0000
0.1428

bh X Rp.
bh X Rp.
bh X Rp.
bh X Rp.
org X Rp.
org X Rp.

/
PTM2

1 m2 Pembersihan / Penyapuan halaman


Sapu lidi
Serok
Seragam
Gerobak (sewa)
Pekerja
Mandor
JUMLAH
2
BIAYA TIAP 1M / HARI :

/
PTM3

1000 m2 Pemangkasan teh-tehan


Gunting pangkas
Gerobak (sewa)
Pekerja
Mandor
JUMLAH
DIBULATKAN
2
BIAYA TIAP 1M / HARI :

0.0280
0.0030
5.0000
0.5000

bh X Rp.
bh X Rp.
org X Rp.
org X Rp.

/
PTM4

PTM5

1 m2 Pangkas bentuk tanaman perdu


Gunting pangkas
Gerobak (sewa)
Pekerja
Mandor
JUMLAH
DIKERJAKAN 2 KALI ( Dalam 1 bulan )
2
BIAYA TIAP 1M / HARI :
1,040,000.00
1 m2 Pangkas rumput
Mesin potong rumput
Sapu lidi
Gerobak (sewa)
Bensin premium
Pekerja
Mandor
JUMLAH
DIKERJAKAN 2 KALI ( Dalam 1 bulan )
2
BIAYA TIAP 1M / HARI :

0.0890
0.0060
8.0000
1.0000

0.0010
1.0000
0.0030
6.0000
1.0000
0.5000

190,000.00
PTM6

bh X Rp.
bh X Rp.
org X Rp.
org X Rp.

bh X Rp.
bh X Rp.
bh X Rp.
ltr X Rp.
org X Rp.
org X Rp.

1 m2 Penyiangan tanaman semak dan penggemburan tanah


Garpu tanah
0.0230
Arit
0.0230
Pekerja
4.0000
Mandor
1.0000
JUMLAH
DIKERJAKAN 2 KALI ( Dalam 1 bulan )
2
BIAYA TIAP 1M / HARI :
600,000.00

bh X Rp.
bh X Rp.
org X Rp.
org X Rp.

80,000.00
90,000.00
55,000.00
80,000.00

3,900.00
17,100.00
55,000.00
80,000.00

3,650,000.00

55,000.00
80,000.00

1,000.00

55,000.00
80,000.00

30,000.00

55,000.00
80,000.00

30,000.00

55,000.00
80,000.00

30,000.00

55,000.00
80,000.00

30,000.00

157,500.00
48,000.00
5,400.00
3,300.00
240.00
56,940.00

157,500.00

69,300.00
40,000.00
900.00
550.00
400.00
41,850.00

69,300.00

1 m2 PASANG STOOT WERK (SCAFOLDING)


Main Frame (MF-1219/h = 190 cm)
Ladder Frame (LF-1209/h =90)
Join Pin (JP-42)
Cross Brase (CB-1218/I = 220 cm)-MF
Cross Brase (CB-0618/I = 193)-LF

4.0000
2.0000
4.0000
2.0000
2.0000

bh X Rp.
bh X Rp.
bh X Rp.
bh X Rp.
bh X Rp.

111,150.00

69,300.00
40,000.00
450.00
275.00
200.00
40,925.00

69,300.00

110,225.00

0.00
40,000.00
450.00
275.00
20.00
40,745.00

0.00

40,745.00

31,500.00
12,000.00
1,350.00
825.00
60.00
14,235.00

31,500.00

45,735.00

22,100.00
8,000.00
900.00
550.00
400.00
9,850.00

22,100.00

31,950.00

0.00
16,000.00
1,800.00
1,100.00
800.00
19,700.00

0.00

19,700.00

0.00
12,000.00
1,350.00
825.00
60.00
14,235.00

0.00

14,235.00

0.00
12,000.00
1,350.00
825.00
60.00
14,235.00

0.00

14,235.00

0.00
40,000.00
4,500.00
2,750.00
200.00
47,450.00

0.00

47,450.00

0.00
16,000.00
1,800.00
1,100.00
80.00
18,980.00

0.00

18,980.00

0.00
40,000.00
4,500.00
2,750.00
200.00
47,450.00

0.00

47,450.00

0.00
8,000.00
900.00
550.00
40.00
9,490.00

0.00

9,490.00

0.00
48,000.00
5,400.00
3,300.00
240.00
56,940.00

0.00

56,940.00

0.00
20,000.00
2,250.00
1,375.00
100.00
23,725.00

0.00

23,725.00

66,990.00
12,000.00
1,350.00
825.00
60.00
14,235.00

66,990.00

81,225.00

0.00
0.00
12,000.00
1,350.00
825.00
60.00
14,235.00

0.00

14,235.00

0.00
0.00
0.00
0.00
54,600.00
239,400.00
0.00
140,525,000.00
29,200,000.00
169,725,000.00
46.50

294,000.00
0.08

170,019,000.00
46.58

0.00
0.00
0.00
0.00
55,000.00
11,424.00
66,424.00
66.42

0.00
0.00

66,424.00
66.42

0.00
0.00
275,000.00
40,000.00
315,000.00

10.50

0.00

0.00

315,000.00
315,000.00
10.50

0.00
0.00
440,000.00
80,000.00
520,000.00
1,040,000.00

0.00
0.00

34.67

0.00

520,000.00
1,040,000.00
34.67

0.00
0.00
0.00
0.00
55,000.00
40,000.00
95,000.00
190,000.00
6.33

0.00
0.00
0.00

95,000.00
190,000.00
6.33

0.00
0.00
220,000.00
80,000.00
300,000.00
600,000.00
20.00

0.00
0.00
0.00

300,000.00
600,000.00
20.00

ANALISA TAMBAHAN (SUPLEMEN)


SPL1

214,440.00

0.00
0.00
0.00
0.00
0.00

Head Jack (HJ-60)


Base Jack (BJ-60)
Balok 8/12 (10x pakai)
Papan Alas 3/20 (3x pakai)
Kawat Pengikat
Pekerja
Mandor

4.0000
4.0000
0.0500
0.0030
1.5000
2.0000
0.2000

bh X Rp.
bh X Rp.
m3 X Rp.
m3 X Rp.
kg X Rp.
org X Rp.
org X Rp.

55,000.00
80,000.00

0.1
0.02
0.02
1.05
1

org/hr X Rp.
org/hr X Rp.
org/hr X Rp.
m2
X Rp.
ls
X Rp.

55,000.00
80,000.00
-

JUMLAH
4 m2 Scafolding 2x Pakai
SPL2

1 m2 Pemasangan Geotextile
Pekerja
Tukan gali/timbun
Mandor
Geotextile Polyfelt. TS 70
Alat bantu
JUMLAH

SPL3

1 m3 Timbunan tanah merah dipadatkan


Tanah timbun
Pekerja
Mandor
Buldozer 100 - 150 HP
Mesin Gilas 3 Roda 8 - 10 ton (Three Wheel Roller)
Mesin Gilas getar otomatis 5 - 8 T
Truk tangki air 100 HP 4000 L (Water Tank Truck )
JUMLAH

1.200
0.500
0.250
0.006
0.007
0.007
0.007

SPL4

1 m3 Lapisan Base coarse Agregat kelas A dipadatkan


Agregat hakus/pasir klas A ( Uk. butir 5 mm )
Pekerja
Mandor
Motor Grader > 100 HP
Mesin Gilas getar otomatis 5 - 8 T
Truk tangki air 100 HP 4000 L (Water Tank Truck )
JUMLAH

1.100
0.500
0.125
0.002
0.003
0.004

m3
X Rp.
org/hr X Rp.
org/hr X Rp.
hr
X Rp.
hr
X Rp.
hr
X Rp.

288,000.00
55,000.00
80,000.00
384,919.36
236,640.05
167,998.54

SPL5

1 m3 Lapisan Sub Base coarse Agregat kelas B dipadatkan


Agregat kasar/krikil/pasir klas B ( Uk. 20 - 40 )
1.200
Pekerja
0.500
Mandor
0.125
Motor Grader > 100 HP
0.002
Mesin Gilas getar otomatis 5 - 8 T
0.003
Truk tangki air 100 HP 4000 L (Water Tank Truck )
0.004
JUMLAH

m3
X Rp.
org/hr X Rp.
org/hr X Rp.
hr
X Rp.
hr
X Rp.
hr
X Rp.

276,000.00
55,000.00
80,000.00
384,919.36
236,640.05
167,998.54

SPL6

1 m3 Lapisan Sub Base coarse Agregat Kelas C dipadatkan


Agregat kasar/krikil/pasir klas C ( Uk. 4 - 19 )
1.200
Pekerja
0.500
Mandor
0.125
Motor Grader > 100 HP
0.002
Mesin Gilas getar otomatis 5 - 8 T
0.004
Truk tangki air 100 HP 4000 L (Water Tank Truck )
0.004
JUMLAH

m3
X Rp.
org/hr X Rp.
org/hr X Rp.
hr
X Rp.
hr
X Rp.
hr
X Rp.

SPL7

100 Kg memasang gelagar-gelagar besi :


Tukang besi
Kepala tukang
Pekerja
Mandor

SPL8

100 Kg Menurunkan gelagar-gelagar besi jembatan :


Pekerja
Mandor

m3
X Rp.
org/hr X Rp.
org/hr X Rp.
hr
X Rp.
hr
X Rp.
hr
X Rp.
hr
X Rp.

100,800.00
55,000.00
80,000.00
369,999.61
113,261.36
236,640.05
167,998.54

0.00
0.00
0.00
0.00
0.00
110,000.00
16,000.00
126,000.00
504,000.00

316,800.00

751.46
844.77
590.36
2,186.58

39,686.58

0.00
0.00

38,400.00
384.00

0.00
0.00

84,500.00
845.00

8,000.00
900.00
27,500.00
2,000.00
38,400.00
384.00

82,500.00
2,000.00
84,500.00
845.00

1 M2 Mengerjakan lantai jembatan (papan yang dipakukan diatas gelagar kayu) :


Paku biasa 1/2" - 1"
0.075 kg
X Rp.
Papan kayu damar laut
0.025
X Rp.
Tukang kayu
0.500 org/hr X Rp.
Kepala tukang
0.050 org/hr X Rp.
Pekerja
0.200 org/hr X Rp.
Mandor
0.010 org/hr X Rp.
JUMLAH

16,300.00
80,000.00
90,000.00
55,000.00
80,000.00

SPL10

Memasang 1 Kg jaring kawat baja/wire mesh


Kawat jaring
Kawat beton / bindrat
Sewa alat Las
Pekerja
Tukang besi
Kepala tukang
Mandor
JUMLAH

20,000.00
55,000.00
80,000.00
90,000.00
80,000.00

SPL11

1 M2 memasang lantai cone block t.10 cm dipadatkan denganVibratory Roller kapasitas 10-15 ton
Conblock t=10 cm
44.000 Bh
X Rp.
Pasir pasang ( progo )
0.050 M3
X Rp.
120,000.00
Pasir pasang ( krasak )
0.015 M3
X Rp.
Tukang batu
0.100 org/hr X Rp.
80,000.00
Pekerja
0.400 org/hr X Rp.
55,000.00
Kepala tukang
0.010 org/hr X Rp.
90,000.00
Mandor
0.040 org/hr X Rp.
80,000.00
0.002 hr
Mesin Gilas getar otomatis 5 - 8 T
X Rp.
236,640.05
JUMLAH

10.000
2.660
0.760
1.200
0.120
2.400
0.120

Bh
X Rp.
Zak X Rp.
M3
X Rp.
org/hr X Rp.
org/hr X Rp.
org/hr X Rp.
org/hr X Rp.

1.050
6.000
0.125
0.500

M2
X Rp.
Bh
X Rp.
org/hr X Rp.
org/hr X Rp.

1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

80,000.00
55,000.00

10.5
0.025
0.125
0.5

M'
X Rp.
Kg
X Rp.
org/hr X Rp.
org/hr X Rp.

16,300.00
80,000.00
55,000.00

JUMLAH
Per M'

JUMLAH
SPL14

1 M2 memasang kawat duri :


Kawat duri
Paku biasa 1/2" - 1"
Tukang besi
Pekerja
JUMLAH

SPL15

Mobilisasi dan Demobilisasi Peralatan


Crane Kap. 35 ton
Hammer + Pile driver
Piling Barge Driving
Ponton Kap. 1000 ton
Work Boat
Alat Pancang Pile Compactor
Generator 150 kVA

SPL17

Pengadaan Tiang Pancang Beton dia . Cm (Bottom)


Tiang Pancang Beton dia cm (bottom)

1.000

X Rp.

SPL18

Pengadaan Tiang Pancang Beton dia . Cm (Upper/Middle)


Tiang Pancang Beton dia cm (upper)
1.000

X Rp.

SPL19

1 bh Handling dan Transport tiang pancang dan penimbunan ke titik pancang


Pekerja
8.400
oh X Rp.
Tukang Pancang
0.800
oh X Rp.
Alat Bantu
1.000
ls X Rp.
JUMLAH

1.000
1.000
1.000
1.000
1.000
1.000
1.000

Unit X Rp.
Unit X Rp.
Unit X Rp.
Unit X Rp.
Unit X Rp.
Unit X Rp.
Unit X Rp.

3,900,000.00
1,850,000.00
4,000,000.00
1,000,000.00
-

JUMLAH

SPL20

1 m Pemancangan tiang pancang (Darat)


Asumsi : Pemancangan tiang 120 m/hari
Pekerja
Operator terlatih
Pembantu Operator
Mandor
Ahli ukur
Crane Kap. 35 ton
Hammer + Pile driver
Waterpass
Alat Bantu

6.000
4.000
4.000
1.000
2.000
1.000
1.000
1.000
1.000

Org/hr X Rp.
Org/hr X Rp.
Org/hr X Rp.
Org/hr X Rp.
Org/hr X Rp.
hr
X Rp.
hr
X Rp.
unit
X Rp.
unit
X Rp.

5.000
3.000
5.000
5.000
1.000
2.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000

Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
hr
hr
hr
hr
hr
hr
unit
unit

55,000.00
80,000.00
3,900,000.00
1,850,000.00
-

1 m Pemancangan tiang (Laut)


Asumsi : Pemancangan tiang 80 m/hari
Pekerja
Penyelam
Operator terlatih
Pembantu Operator
Mandor
Ahli ukur
Crane Kap. 35 ton
Hammer + Pile driver
Piling Barge Driving
Ponton Kap. 1000 ton
Work Boat
Generator 150 kVA
Theodolite
Alat Bantu

X
X
X
X
X
X
X
X
X
X
X
X
X
X

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

55,000.00
80,000.00
3,900,000.00
1,850,000.00
4,000,000.00
1,000,000.00
-

JUMLAH
per M'
Pengangkatan 1 m Tiang Pancang ke titik pancang (Darat)
Asumsi : Pengangkatan ke titik pancang 200 m Tiang Pancang/hari
Pekerja
2.000 org/hr X Rp.
Operator terlatih
1.000 org/hr X Rp.
Pembantu Operator
1.000 org/hr X Rp.
Mandor
1.000 org/hr X Rp.
Crane Kap. 10-15 Ton
0.500 hr
X Rp.
Alat Bantu
1.000 unit
X Rp.
JUMLAH

55,000.00
80,000.00
2,800,000.00
per M'

SPL23

Pengangkatan 1 m Sheet Pile ke titik pancang (laut)


Asumsi : Pengangkatan ke titik pancang = 300 m sheet pile/hari
Pekerja
4.000
Operator terlatih
2.000
Pembantu Operator
2.000
Mandor
1.000
Crane Kap. 10-15 Ton
0.050
Alat Bantu
1.000
JUMLAH

org/hr X Rp.
org/hr X Rp.
org/hr X Rp.
org/hr X Rp.
hr
X Rp.
unit
X Rp.

per M'

SPL24

1,222.50

1 m' Pemancangan Sheet Pile


Asumsi : Pemancangan tiang 120 m'/hari
Pekerja
Operator terlatih
Pembantu Operator
Mandor
Crawler Crane Kap. 35 ton
Alat Pancang Pile Compactor
Alat Bantu
JUMLAH

6.000
2.000
2.000
1.000
1.000
1.000
1.000

Org/hr X Rp.
Org/hr X Rp.
Org/hr X Rp.
Org/hr X Rp.
hr
X Rp.
hr
X Rp.
unit
X Rp.

55,000.00
80,000.00
per M'

57,522.50

0.00
1,000.00
0.00
1,485.00
2,160.00
675.00
300.00
4,620.00

1,000.00

5,620.00

0.00
6,000.00
0.00
8,000.00
22,000.00
900.00
3,200.00
473.28
34,573.28

6,000.00

40,573.28

0.00
3,657.50
91,200.00
96,000.00
10,800.00
132,000.00
9,600.00
248,400.00
24,840.00

94,857.50
9,485.75

343,257.50
34,325.75

0.00
0.00
10,000.00
27,500.00
37,500.00

0.00

37,500.00

0.00
407.50
10,000.00
27,500.00
37,500.00

407.50

37,907.50

251,370.00
363,000.00
0.00
0.00

614,370.00

3,900,000.00
1,850,000.00
0.00
4,000,000.00
1,000,000.00
0.00
0.00
10,750,000.00

0.00

717,870.00

10,750,000.00

0.00

55,000.00
-

per m'

SPL22

40,000.00
4,500.00
11,000.00
800.00
56,300.00

JUMLAH

SPL21

1,222.50
0.00

1 m2 Pasang Aluminium Composite Panel (Alucopan) : (Jumlah volume besi disesuaikan terhadap rencana design)
Al. Composite Panel (Alucopan)
1.05 m2
X Rp.
239,400.00
Besi Profil
30 Kg
X Rp.
12,100.00
Ramset / dina bolt
8 Bh
X Rp.
Sewa alat las
1 ls
X Rp.
Tukang alumunium
0.5 org/hr X Rp.
80,000.00
40,000.00
Kepala Tukang
0.05 org/hr X Rp.
90,000.00
4,500.00
Pekerja
1 org/hr X Rp.
55,000.00
55,000.00
Mandor
0.05 org/hr X Rp.
80,000.00
4,000.00
JUMLAH
103,500.00

SPL16

370,745.79

0.00

37,500.00

55,000.00
80,000.00

1 M2 memasang kawat harmonica :


Besi jaring kawat baja
Angkur / baut
Tukang besi
Pekerja

751.46
703.97
590.36
333,245.79

27,500.00
10,000.00

80,000.00
90,000.00
55,000.00
80,000.00

Kg
X Rp.
Kg
X Rp.
ls
X Rp.
Org/hr X Rp.
Org/hr X Rp.
Org/hr X Rp.
Org/hr X Rp.

356,345.79

331,200.00

org/hr X Rp.
org/hr X Rp.

10 M' memasang riol 20 cm :


Riol 20 cm
Portland Cement (PC)
Pasir pasang ( progo )
Tukang batu
Kepala tukang
Pekerja
Mandor

751.46
703.97
590.36
318,845.79

27,500.00
10,000.00

org/hr X Rp.
org/hr X Rp.
org/hr X Rp.
org/hr X Rp.

1.100
0.050
1.000
0.027
0.027
0.008
0.004

174,112.08

27,500.00
10,000.00

1.500
0.025

SPL13

2,055.55
786.54
1,643.33
1,166.66
126,612.08

37,500.00

JUMLAH per Kg

7,100.00

120,960.00
27,500.00
20,000.00

0.100
0.010
0.500
0.025

SPL12

0.00

37,500.00

55,000.00
80,000.00
384,919.36
236,640.05
167,998.54

126,000.00
504,000.00

0.00
0.00
7,100.00

47,500.00

JUMLAH per Kg

SPL9

0.00
0.00

5,500.00
0.00
1,600.00

0.00

0.00

0.00

462,000.00
0.00
0.00
462,000.00

0.00

462,000.00

330,000.00
0.00
0.00
80,000.00
0.00
3,900,000.00
1,850,000.00
0.00
0.00
6,160,000.00
51,333.33

0.00
0.00

6,160,000.00
51,333.33

275,000.00
0.00
0.00
0.00
80,000.00
0.00
3,900,000.00
1,850,000.00
0.00
4,000,000.00
1,000,000.00
0.00
0.00
0.00
11,105,000.00
138,812.50

0.00
0.00

11,105,000.00
138,812.50

110,000.00
0.00
0.00
80,000.00
1,400,000.00
0.00
13,833,812.50
69,169.06

0.00
0.00

13,833,812.50
69,169.06

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00

0.00
0.00

330,000.00
0.00
0.00
80,000.00
0.00
0.00
0.00
410,000.00
3,416.67

0.00
0.00

410,000.00
3,416.67

SPL25

1 bh Sambungan tiang pancang beton/spun pile dia 50 cm


Pengelasan 3x
471
Pengecatan Epoxy/Tar
0.628
JUMLAH

cm
m2

X Rp.
X Rp.

414.00
52,020.00

194,994.00
32,668.56
227,662.56

0.00

227,662.56

SPL26

1 bh Sambungan tiang pancang baja dia 50 cm


Besi pelat/baja tulangan dia 19 mm
Pengelasan 3x
Pengecatan Epoxy/Tar
JUMLAH

kg
cm
m2

X Rp.
X Rp.
X Rp.

414.00
52,020.00

0.00
194,994.00
32,668.56
227,662.56

0.00

227,662.56

SPL27

1 bh Memotong tiang pancang beton/ spun pile dia 50 cm


Pekerja
1
mandor
0.390
memotong baja
157.000
Pengecatan Epoxy/Tar
0.100
JUMLAH

oh
oh
cm
m2

X Rp.
X Rp.
X Rp.
X Rp.

55,000.00
80,000.00
414.00
52,020.00

55,000.00
31,200.00
64,998.00
5,202.00
156,400.00

0.00

156,400.00

1 m' Pembuatan tiang pancang (40 x 40) cm, beton bertulang


Beton mutu f'c = 26,4 MPa (K 300)
0.1760
Besi beton polos
30.0000
Bekisting
1.6000
Minyak bekisting
0.1600
Bongkar bekisting
1.0000
JUMLAH

m3 X Rp.
kg X Rp.
m2 X Rp.
ltr X Rp.
ls X Rp.

910,070.10
13,516.00
220,010.00
220,000.00
0.00

160,172.34
405,480.00
352,016.00
0.00
220,000.00
1,137,668.34

1,137,668.34

1 m' Pembuatan tiang pancang (35 x 35) cm, beton bertulang


Beton mutu f'c = 26,4 MPa (K 300)
0.1348
Besi beton polos
20.0000
Bekisting
1.4000
Minyak bekisting
0.1400
Bongkar bekisting
1.0000
JUMLAH

m3 X Rp.
kg X Rp.
m2 X Rp.
ltr X Rp.
ls X Rp.

910,070.10
13,516.00
220,010.00
220,000.00
0.00

122,631.95
270,320.00
308,014.00
0.00
220,000.00
920,965.95

920,965.95

165,000.00
0.00
0.00
80,000.00
0.00
0.00
245,000.00
2,041.67

0.00
0.00

245,000.00
2,041.67

55,000.00
80,000.00
80,000.00
-

220,000.00
80,000.00
32,000.00
0.00
332,000.00

0.00

332,000.00

80,000.00
90,000.00
55,000.00
80,000.00
275,000.00
350,000.00

20,000.00
2,250.00
13,750.00
2,000.00
0.00
68,750.00
0.00
87,500.00
194,250.00

0.00

194,250.00

400,000.00
125,000.00
160,000.00
18,000.00
110,000.00
8,000.00
0.00
350,000.00
1,171,000.00

0.00

1,171,000.00

SPL28

SPL29

SPL30

6.000
471.000
0.628

1 m Pemancangan Cerucuk kayu laut dia. 3" - 4" panjang 5 m


Asumsi : 120 m Pemancangan Cerucuk kayu laut dia. 3" - 4" panjang 5 m per hari
Pekerja
3.000 Org/hr X Rp.
Operator terlatih
1.000 Org/hr X Rp.
Pembantu Operator
1.000 Org/hr X Rp.
Mandor
1.000 Org/hr X Rp.
Alat Pancang Pile Compactor
1.000 hr
X Rp.
Alat Bantu
1.000 unit
X Rp.
JUMLAH

55,000.00
80,000.00
per M'

SPL31

1 bh Membongkar dan melepas fender


Pekerja
Tukang batu
mandor
Alat Bantu

SPL32

1 Bh Mengebor beton dermaga untuk lobang baut fender '(dihitung 120 menit).
Tukang besi
0.250 org/hr X Rp.
Kepala tukang
0.025 org/hr X Rp.
Pekerja
0.250 org/hr X Rp.
Mandor
0.025 org/hr X Rp.
Mekanik terlatih
1.000 org/hr X Rp.
Genset
0.250 hr
X Rp.
Bor beton
0.250 hr
X Rp.
Perancah
0.250 hr
X Rp.
JUMLAH

4.000
1.000
0.400
1.000

oh
oh
oh
ls

X Rp.
X Rp.
X Rp.
X Rp.

JUMLAH

SPL33

1 Bh Memasang fender karet :


Kotrek 2,5 ton
Kunci
Tukang besi
Kepala tukang
Pekerja
Mandor
Mekanik terlatih
Perancah

2.000
1.000
2.000
0.200
2.000
0.100
1.000
1.000

Bh
X Rp.
Set
X Rp.
org/hr X Rp.
org/hr X Rp.
org/hr X Rp.
org/hr X Rp.
org/hr X Rp.
hr
X Rp.

200,000.00
125,000.00
80,000.00
90,000.00
55,000.00
80,000.00
350,000.00

JUMLAH
SPL34

1 m' Pasang pipa beton oval dia. 25/37,5 dalam 0 - 1 m


Pipa beton 20 x 30 Panjang 1 m
Pekerja
Tukang batu
Mandor
JUMLAH

1.000
0.750
0.150
0.015

bh
org
org
Org

X Rp.
X Rp.
X Rp.
X Rp.

55,000.00
80,000.00
80,000.00

SPL35

1 m' Pasang pipa beton oval dia. 25/37,5 dalam 1 - 2 m


Pipa beton 20 x 30 Panjang 1 m
Pekerja
Tukang batu
Mandor
JUMLAH

1.000
1.500
0.150
0.015

bh
org
org
Org

X Rp.
X Rp.
X Rp.
X Rp.

55,000.00
80,000.00
80,000.00

1 bh Membongkar perkerasan lama (serifying) tebal 10 cm


Pekerja
0.008
Tukang besi
0.010
Kepala tukang
0.001
mandor
0.0004
JUMLAH

oh
oh
oh
oh

X Rp.
X Rp.
X Rp.
X Rp.

oh
oh
oh
kg
ltr
ltr
ls

X Rp.
X Rp.
X Rp.
X Rp.
X Rp.
X Rp.
X Rp.

SPL36

SPL37

1 M2 Pelapisan epoxy/tar tiang pancang


Pekerja
Tukang cat
Mandor
Cat Epoxy/Tar
Minyak cat
Thinner
Alat Bantu

0.500
0.250
0.025
0.460
0.140
0.070
1.000

0.00

440.00
800.00
90.00
32.00
1,362.00

0.00

1,362.00

55,000.00
80,000.00
80,000.00
12,000.00
12,000.00
-

27,500.00
20,000.00
2,000.00
0.00
1,680.00
840.00
0.00
2,520.00

52,020.00

1 m' Pekerjaan Grouting / Injeksi retakan dinding bata dengan Semen Slurry (Cebex 100)
Pipa PVC abu-abu dia. 1/2" Wavin
3.000
bh X Rp.
13,700.00
Nitobond EC
0.050
kg X Rp.
Sewa Mesin Grouting
0.150
hr X Rp.
Sewa mesin gerinda untuk pekerjaan grouting
0.075
hr X Rp.
Alat bantu
1.000
ls X Rp.
Tukang grouting
0.3125
org X Rp.
Kepala Tukang
0.0312
org X Rp.
90,000.00
Pekerja
1.2500
org X Rp.
55,000.00
Mandor
0.1562
org X Rp.
80,000.00
JUMLAH

SPL39

1 M2 Pelapisan epoxy/tar tiang pancang


Pekerja
Tukang cat
Mandor
Cat Epoxy/Tar
Minyak cat
Thinner
Alat Bantu

SPL40

1 m' Cor beton kerb ( 15 x 30 ) cm, dengan 1pc:2ps:3kr


Portland Cement (PC)
15.3000
Pasir pasang ( progo )
0.0243
Krikil beton
0.0369

kg X Rp.
3
m X Rp.
3
m X Rp.

Papan cetakan / bekesting


Paku biasa 1/2" - 1"
Tukang kayu
Tukang batu
Kepala tukang
Pekerja
Mandor

m X Rp.
kg X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

5,937,500.00
16,300.00
80,000.00
80,000.00
90,000.00
55,000.00
80,000.00

kg
3
m
3
m
3
m
kg
org
org
org
org
org

1,375.00
120,000.00
170,100.00
5,937,500.00
16,300.00
80,000.00
80,000.00
90,000.00
55,000.00
80,000.00

X Rp.
X Rp.
X Rp.
X Rp.
X Rp.
X Rp.
X Rp.

55,000.00
80,000.00
80,000.00
12,000.00
12,000.00
-

JUMLAH

JUMLAH
SPL41

1 m' Cor beton Devider ( 30 x 30 ) cm, dengan 1pc:2ps:3kr


Portland Cement (PC)
30.6000
Pasir pasang ( progo )
0.0486
Krikil beton
0.0738
Papan cetakan / bekesting
0.0027
Paku biasa 1/2" - 1"
0.0272
Tukang kayu
0.0340
Tukang batu
0.0315
Kepala tukang
0.0066
Pekerja
0.2499
Mandor
0.0116
JUMLAH

SPL42

1m2 Membongkar Paving Block


Pekerja
mandor

SPL43

10 M' memasang Riol RCP 60 t 10 cm :


Riol RCP 60 t 10 cm
Portland Cement (PC)
Pasir pasang ( progo )
Tukang batu
Kepala tukang
Pekerja
Mandor
JUMLAH

0.100
0.010

oh
oh

X
X
X
X
X
X
X
X
X
X

0.00
49,500.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

X Rp.
X Rp.

55,000.00
80,000.00

JUMLAH

820,000.00
1,375.00
120,000.00
80,000.00
90,000.00
55,000.00
80,000.00

95,700.00

41,100.00
0.00
0.00
0.00
0.00
0.00
2,808.00
68,750.00
12,496.00
84,054.00

41,100.00

125,154.00

0.00
1,680.00
840.00
0.00
2,520.00

52,020.00

27,500.00
20,000.00
2,000.00

0.00
49,500.00

1,375.00
120,000.00
170,100.00

0.0027
0.0272
0.0340
0.0158
0.0050
0.1374
0.0063

54,450.00

0.00

55,000.00
80,000.00
90,000.00
80,000.00

SPL38

oh
oh
oh
kg
ltr
ltr
ls

0.00

82,500.00
12,000.00
1,200.00
95,700.00

JUMLAH

0.500
0.250
0.025
0.460
0.140
0.070
1.000

0.00
41,250.00
12,000.00
1,200.00
54,450.00

21,037.50
2,916.00
6,276.69
16,031.25
443.36
2,720.00
1,264.00
450.00
7,557.00
504.00
12,495.00

46,704.80

59,199.80

42,075.00
5,832.00
12,553.38
16,031.25
443.36
2,720.00
2,520.00
594.00
13,744.50
928.00
20,506.50

5,500.00
800.00
6,300.00

76,934.99

97,441.49

0.00

6,300.00

10.000
106.400
0.760
1.200
0.120
2.400
0.120

Bh
X Rp.
kg
X Rp.
M3
X Rp.
org/hr X Rp.
org/hr X Rp.
org/hr X Rp.
org/hr X Rp.

SPL44

1 m2 Pasang conblock tipe segi-empat, abu-abu 10 cm, K-450


Conblock tipe segi-empat, abu-abu 10 cm, K-450
1.0000
Pasir urug darat
0.0500
Tukang batu
0.2500
Kepala Tukang
0.0250
Pekerja
0.5000
Mandor
0.0250
JUMLAH

m X Rp.
3
m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

SPL45

1 m2 Pasang kembali conblock bekas


Pasir urug darat
Tukang batu
Kepala Tukang
Pekerja
Mandor

SPL46

1 m3 Beton bertulang K225 pondasi pagar


Beton K-225
Besi
Bekisting
JUMLAH

1.000
115.033
5.333

m3
kg
m2

121,825.00
119,174.53
143,520.00
384,519.53

736,077.57
1,435,616.00
647,973.33
2,819,666.90

3,204,186.44

1 m3 Beton bertulang K225 kolom pagar


Beton K-225
Besi
Bekisting
JUMLAH

1.000
141.888
10.000

m3
kg
m2

121,825.00
146,995.97
341,550.00
610,370.97

736,077.57
1,770,762.24
2,212,700.00
4,719,539.81

5,329,910.78

SPL48

1 m3 Beton bertulang K225 balok pagar


Beton K-225
Besi
Bekisting
JUMLAH

1.000
180.060
13.333

m3
kg
m2

121,825.00
186,541.64
358,800.00
667,166.64

736,077.57
2,247,142.56
1,817,850.00
4,801,070.13

5,468,236.77

SPL49

1 m3 Beton tanpa tulangan K225 pondasi menerus


Beton K-225
1.000
Besi
0.000
Bekisting
0.000
JUMLAH

m3
kg
m2

121,825.00
0.00
0.00
121,825.00

736,077.57
0.00
0.00
736,077.57

857,902.57

1 m3 Beton bertulang K225 manhole


Beton K-225
Besi
Bekisting
JUMLAH

1.000
61.054
3.577

m3
kg
m2

121,825.00
63,251.81
96,264.68
281,341.50

736,077.57
761,952.35
487,722.28
1,985,752.21

2,267,093.70

1 m3 Beton bertulang 1:2:3 dinding drainase


Beton 1:2:3
Besi
Bekisting
JUMLAH

1.000
98.600
5.100

m3
kg
m2

119,400.00
102,149.60
287,130.00
508,679.60

664,581.00
1,230,528.00
971,052.24
2,866,161.24

Per M'

0.0500
0.2500
0.0250
0.5000
0.0250

m X Rp.
org X Rp.
org X Rp.
org X Rp.
org X Rp.

JUMLAH

SPL47

SPL50

SPL51

193,600.00
94,500.00
80,000.00
90,000.00
55,000.00
80,000.00

94,500.00
80,000.00
90,000.00
55,000.00
80,000.00

8,200,000.00
146,300.00
91,200.00
96,000.00
10,800.00
132,000.00
9,600.00
248,400.00
24,840.00

8,437,500.00
843,750.00

8,685,900.00
868,590.00

193,600.00
4,725.00
20,000.00
2,250.00
27,500.00
2,000.00
51,750.00

198,325.00

250,075.00

4,725.00
20,000.00
2,250.00
27,500.00
2,000.00
51,750.00

4,725.00

Belawan,

56,475.00

3,374,840.84

2012

Disetujui Oleh :
MENEJER TEKNIK

Diperiksa Oleh :
ASMEN FASILITAS

Dibuat Oleh :
STAF FASILITAS

SADARUDDIN

SAMSU RIZAL

RIZALDY HASIAN HARAHAP

PT Pelabuhan Indonesia I (Persero)

REKAPITULASI ANALISA HARGA SATUAN


KODE

SATUAN

MACAM PEKERJAAN

PP

PPS1

1 M2

Pekerjaan Pengukuran Gedung

PPS2

1 M1

Pengukuran dan pemasangan bouwplank untuk gedung dan saluran

PPS3
PPS4

1 M2
1 buah

Membersihkan lapangan dan perataan


Membuat Papan Nama Proyek 80x120 cm

PPS5

1 M2

Pembuatan jalan sementara, tebal 25 cm

PPS6

1 M2

Pembuatan kantor sementara, dengan lantai plesteran

PPS7

1 M1

PPS8

1 M1

PPS9

1 M2

PPS10
PPS11

UPAH

HARGA SATUAN
BAHAN
TOTAL

PEKERJAAN PERSIAPAN

6,000

6,000

14,800

174,800

189,600

9,500
357,300

525,209

9,500
882,509

63,000

11,103

74,103

381,000

1,756,470

2,137,470

Pembuatan pagar sementara dari seng gelombang tinggi 2 meter

41,400

292,066

333,466

Pembuatan pagar sementara dari kawat duri tinggi 1,80 meter

35,900

5,859

41,759

Pembuatan gudang semen dan alat-alat

237,000

1,278,308

1,515,308

1 M2

Pembuatan rumah jaga/konstruksi kayu

192,500

1,650,160

1,842,660

1 M2

Pembuatan bedeng buruh

237,000

1,146,120

1,383,120

PPS12

1 M2

Pasang pagar kawat jaring galvanis, tinggi 1,00 m

6,190

6,190

PPS13

1 M1

Pasang pagar beton pracetak ( 5 x 50 x 213 ) cm

33,225

102,028

135,253

PTN

PEKERJAAN TANAH

PTN1

1 M3

Galian tanah biasa sedalam sampai 1 meter

43,250

43,250

PTN2

1 M3

Galian tanah biasa sedalam 1 - 2 meter

53,100

53,100

PTN3

1 M3

Galian tanah biasa sedalam 2 - 3 meter

63,110

63,110

PTN4

1 M3

Galian tanah keras sedalam sampai 1 meter

57,560

57,560

PTN5

1 M3

Galian tanah cadas sedalam sampai 1 meter

87,300

87,300

PTN6

1 M3

Galian tanah lumpur sedalam 1 meter

69,600

69,600

PTN7

1 M3

Stripping tebing setinggi 1 meter

3,150

3,150

PTN8

1 M3

Pengangkutan tanah sejauh 15 meter

18,950

18,950
31,500

PTN9

1 M3

Pemadatkan tanah per 20 cm

31,500

PTN10

1 M3

Urug kembali bekas galian (dihitung 1/3 kali galian tanah)

14,414

14,414

PTN11

1 M3

Urugan pasir

17,300

113,400

130,700

PTN12

1 M3

Urugan sirtu padat untuk peninggian lantai bangunan

15,750

133,080

148,830

PTN13

1 M3

Urug tanah mendatangkan

17,300

120,960

138,260

PTN14

1 M2

Memasang Lapisan pudel campuran 1 KP : 5 TL untuk stabilisasi

86,000

86,000

PTN15
PTN16
PTN17
PTN18
PTN19
PTN20

1 M2
1 M3
1 M3
1 Ttk
1 M3
1 M3

Gebalan rumput
Pemasangan lapisan ijuk tebal 10cm untuk peresapan
Pembuangan Tanah sampai dengan sejauh 150 meter
Mengerjakan Sondir Tanah
Membuang lumpur SAL sejauh 15 km
Mengangkut lumpur SAL sejauh 30 m

29,500
9,450
32,380
118,000
29,100
23,200

29,500
9,450
32,380
118,000
29,100
23,200

PPO

PEKERJAAN PASANGAN PONDASI

PPO1

1 M3

Pasangan pondasi batu kosong (anstamping)

80,730

40,824

121,554

PPO2

1 M3

Pasangan pondasi 1 Kp : 1 Sm : 1 Ps

155,250

65,280

220,530

PPO3

1 M3

asangan pondasi 1 Kp : 1 Sm : 2 Ps

155,250

40,800

196,050

PPO4

1 M3

Pasangan pondasi 1 Pc : 3 Kp : 5 Ps

155,250

177,043

332,293

PPO5

1 M3

Pasangan pondasi 1 Pc : 3 Kp : 10 Ps

155,250

142,915

298,165

PPO6

1 M3

Pasangan pondasi 1/4 Pc : 1 Kp : 4 Ps

155,250

119,135

274,385

PPO7

1 M3

Pasangan pondasi 1 Pc : 4 Ps

155,250

286,525

441,775

PPO8

1 M3

Pasangan pondasi 1 Pc : 3 Ps

155,250

335,950

491,200

PPO9

1 M3

Pasangan pondasi 1 Pc : 1 Ps

155,250

576,680

731,930

PPO10

1 M3

Pasangan pondasi 1 Pc : 2 Ps

155,250

418,365

573,615

PPO11

1 M2

Pasangan pondasi 1 Pc : 5 Ps

155,250

252,280

407,530

PPO12

1 M2

Pasangan pondasi 1 Pc : 6 Ps

155,250

228,195

383,445

PPO13

1 M2

Pasangan pondasi 1 Pc : 8 Ps

155,250

195,205

350,455

PPO14

1 M2

Beton cyclope 60% beton camp. 1pc:2ps:3kr, 40% batu belah

276,250

1,881,397

2,157,647

PPO15

1 M2

Pasangan pondasi sumuran dia. 100 cm

212,720

########

37,999,077

89,839

PPD

PASANGAN DINDING

PPD1

1 M2

Pasangan dinding HB/CB 10, camp. 1pc : 4ps

26,600

63,239

PPD2

1 M2

Pasangan dinding HB/CB 10, camp. 1pc : 3ps

26,600

64,525

91,125

PPD3

1 M2

Pasangan dinding HB/CB 15, camp. 1pc : 4ps

29,560

94,865

124,425

PPD4

1 M2

Pasangan dinding HB/CB 15, camp. 1pc : 3ps

29,560

97,268

126,828

PPD5

1 M2

Pasangan dinding HB/CB 20, camp. 1pc : 4ps

34,000

125,998

159,998

Analisa Harga Satuan Pekerjaan Tahun 2012

Hal :23

PT Pelabuhan Indonesia I (Persero)

HARGA SATUAN
BAHAN
TOTAL

KODE

SATUAN

PPD6

1 M2

Pasangan dinding HB/CB 20, camp. 1pc : 3ps

34,000

129,050

163,050

PPD7

1 M2

Pasangan bata merah tebal 1/2 bata, 1 Kp : 1 Sm : 2Ps

26,600

45,360

71,960

PPD8

1 M2

Pasangan bata merah tebal 1/2 bata, 1 Kp : 1 Sm : 1Ps

26,600

44,160

70,760

PPD9

1 M2

Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Kp : 10 Ps

26,600

54,188

80,788

PPD10

1 M2

Pasangan bata merah tebal 1/2 bata, 1 Pc : 8 Ps

26,600

56,938

83,538

PPD11

1 M2

Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps

26,600

59,320

85,920

PPD12

1 M2

Pasangan bata merah tebal 1/2 bata, 1 Pc : 5 Ps

26,600

60,710

87,310

PPD13

1 M2

Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps

26,600

62,973

89,573

PPD14

1 M2

Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps

26,600

66,559

93,159

PPD15

1 M2

Pasangan bata merah tebal 1/2 bata, 1 Pc : 2 Ps

26,600

72,616

99,216

PPD16

1 M2

Pasangan bata merah tebal 1 bata, 1 Pc : 3 Kp : 10 Ps

53,200

108,960

162,160

PPD17

1 M2

Pasangan bata merah tebal 1 bata, 1 Pc : 6 Ps

53,200

124,078

177,278

PPD18

1 M2

Pasangan bata merah tebal 1 bata, 1 Pc : 5 Ps

53,200

126,765

179,965

PPD19

1 M2

Pasangan bata merah tebal 1 bata, 1 Pc : 4 Ps

53,200

131,666

184,866

PPD20

1 M2

Pasangan bata merah tebal 1 bata, 1 Pc : 3 Ps

53,200

140,226

193,426

PPD21

1 M2

Pasangan bata merah tebal 1 bata, 1 Pc : 2 Ps

53,200

153,413

206,613

PPD22

1 M2

Pasangan roster 12 x 11 x 24 cm, camp. 1pc : 4ps

26,600

19,325

45,925

PPD23

1 M2

Pasangan roster 12 x 11 x 24 cm, camp. 1pc : 3ps

26,600

23,090

49,690

PPD24

1 M2

Pasangan bata merah expose (5 x 11 x 24 cm), camp. 1 Pc : 3 Ps

31,050

23,090

54,140

PPD25

1 M2

Pasangan dinding bataco

38,400

21,988

60,388

PPD26

1 M2

Pasangan roster 25/25 cm

21,988

21,988

PBT

MACAM PEKERJAAN

UPAH

PEKERJAAN BETON

PBT1

1 M3

Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr

119,400

664,581

783,981

PBT2

1 M3

Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr

119,400

510,137

629,537

PBT3

1 M3

Beton mutu f'c = 7,4 MPa (K 100), slump (12 2) cm, w/c = 0,87

121,825

572,619

694,444

PBT4

1 M3

Beton mutu f = 9,8 MPa (K 125), slump (12 2) cm, w/c = 0,78

121,825

611,042

732,867

PBT5

1 M3

Beton mutu f'c = 12,2 MPa (K 150), slump (12 2) cm, w/c = 0,72

121,825

640,975

762,800

PBT6

1 M3

Lantai kerja Beton mutu f'c = 7,4 MPa (K 100), slump (3-6) cm w/c = 0,87

88,600

555,744

644,344

PBT7

1 M3

Beton mutu f'c = 14,5 MPa (K 175), slump (12 2) cm, w/c = 0,66

121,825

676,661

798,486

PBT8

1 M3

Beton mutu f'c = 16,9 MPa (K 200), slump (12 2) cm, w/c = 0,61

121,825

710,242

832,067

PBT9

1 M3

Beton mutu f'c = 19,3 MPa (K 225), slump (12 2) cm, w/c = 0,58

121,825

736,078

857,903

PBT10

1 M3

Beton mutu f'c = 21,7 MPa (K 250), slump (12 2) cm, w/c = 0,56

121,825

752,169

873,994

PBT11

1 M3

Beton mutu f'c = 24,0 MPa (K 275), slump (12 2) cm, w/c = 0,53

121,825

779,671

901,496

PBT12

1 M3

Beton mutu f'c = 26,4 MPa (K 300), slump (12 2) cm, w/c = 0,52

121,825

788,245

910,070

PBT13

1 M3

Beton mutu f'c = 28,8 MPa (K 325), slump (12 2) cm, w/c = 0,49

155,050

820,672

975,722

PBT14

1 M3

Beton mutu f'c = 31,2 MPa (K 350), slump (12 2) cm, w/c = 0,48

155,050

831,838

986,888

PBT15

1 M3

Membongkar cetakan

220,000

220,000

PBT16

1 M3

Stutwerk untuk 1 m3 beton, tinggi 3 - 4 m ( memakai dolken )

1,141,000

1,141,000

PBT17
PBT18
PBT19
PBT20
PBT21
PBT22
PBT23
PBT24
PBT25
PBT26
PBT27
PBT28
PBT29
PBT30
PBT31
PBT32
PBT33
PBT34

1 M3
1 M1
1 M1
1 M1
1 KG
1 KG
1 KG
1 KG
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M1

Stutwerk untuk 1 m3 beton, tinggi 3 - 4 m ( memakai scafolding )


PVC Waterstop lebar 150 mm
PVC Waterstop lebar 200 mm
PVC Waterstop lebar 230 mm - 320 mm
Pembesian dengan besi polos
Pembesian dengan besi ulir
Memasang kabel presstressed polos/strands
Memasang jaring kawat baja/wire mesh
Cetakan beton / begisting memakai papan
Cetakan beton / begisting memakai multiplek
Begesting untuk pondasi
Begesting untuk sloof
Begesting untuk kolom
Begesting untuk balok
Begesting untuk lantai
Begesting untuk dinding
Begesting untuk tangga
Jembatan untuk pengecoran beton

442,100
6,210
7,525
8,280
1,036
1,036
740
573
28,150
28,150
26,910
26,910
34,155
34,155
34,155
34,155
34,155
17,350

12,480
13,215
12,380
11,932
191,860
95,201
121,495
136,339
221,270
235,070
252,870
222,483
191,433
174,430

442,100
6,210
7,525
8,280
13,516
14,251
13,120
12,505
220,010
123,351
148,405
163,249
255,425
269,225
287,025
256,638
225,588
191,780

Analisa Harga Satuan Pekerjaan Tahun 2012

Hal :24

PT Pelabuhan Indonesia I (Persero)

KODE

SATUAN

PBT35
PBT36
PBT37
PBT38

1 M1
1 M1
1 M1
1 M1

PPT

MACAM PEKERJAAN
Kolom praktis beton bertulang (11 x 11) cm
Ring balok beton bertulang (10 x 15) cm
Pembuatan tiang pancang (40 x 40) cm, beton bertulang
Pembuatan tiang pancang (35 x 35) cm, beton bertulang

HARGA SATUAN
UPAH
BAHAN
TOTAL
15,960
63,986
79,946
26,355
72,754
99,109
118,630
962,793
1,081,423
91,700
767,862
859,562

PEKERJAAN PLESTERAN

PPT1

1 M2

Plesteran 1 Sm : 1 Kp : 1 Ps, tebal 15 mm

31,920

1,080

33,000

PPT2

1 M2

Plesteran 1 Sm : 1 Kp : 2 Ps, tebal 15 mm

31,920

1,800

33,720

PPT3

1 M2

Plesteran 1 Pc : 1/2 Kp : 3 Ps, tebal 15 mm

31,920

9,480

41,400

PPT4

1 M2

Plesteran 1 Pc : 2 Kp : 8 Ps, tebal 15 mm

31,920

6,525

38,445

PPT5

1 M2

Plesteran 1 Pc : 1 Ps, tebal 15 mm

37,050

21,318

58,368

PPT6

1 M2

Plesteran 1 Pc : 2 Ps, tebal 15 mm

37,050

14,058

51,108

PPT7

1 M2

Plesteran 1 Pc : 3 Ps, tebal 15 mm

31,050

13,452

44,502

PPT8

1 M2

Plesteran 1 Pc : 4 Ps, tebal 15 mm

31,050

11,460

42,510

PPT9

1 M2

Plesteran 1 Pc : 5 Ps, tebal 15 mm

31,050

10,248

41,298

PPT10

1 M2

Plesteran 1 Pc : 6 Ps, tebal 15 mm

31,050

9,312

40,362

PPT11

1 M2

Plesteran granit 1 Pc : 2 Batu granit, tebal 10 mm

46,575

13,750

60,325

PPT12

1 M2

Plesteran traso 1 Pc : 2 Batu traso, tebal 10 mm

46,575

13,750

60,325

PPT13

1 M2

1 m2 Finishing siar pas. Bata merah (=20m')

15,525

4,274

19,799

PPT14

1 M2

Finishing siar pas. Batu kali 1 pc : 2 ps

31,050

10,158

41,208

PPT15

1 M2

Plesteran Ciprat, 1 Pc : 2 Ps

26,600

6,660

33,260

PPT16

1 M2

Acian

20,700

4,469

25,169

PPT17

1 M2

Plesteran batu kali 1pc:1/2kp:5ps tebal 10 mm

41,400

8,645

50,045

PPT18

1 M2

Plesteran batu kali 1pc:3ps

41,400

13,548

54,948

PPT19

1 M2

Plesteran batu kali 1pc:4ps

41,400

11,461

52,861

PPL

PEKERJAAN PASANG LANTAI


PASANG UBIN GRANIT

PPL1

1 M2

Pasang lantai ubin granit 40/40

25,875

496,235

522,110

PPL2

1 M2

Pasang lantai ubin granit 30/30

26,910

802,570

829,480

PPL3
PPL4
PPL5
PPL6
PPL7
PPL8
PPL9
PPL10

1 M1
1 M1
1 M1
1 M1
1 M1
1 M1
1 M1
1 M1

PASANG PLINT TEGEL DAN TERASO


Pasang plint ubin PC abu-abu ukuran 15 x 20 cm
Pasang plint ubin PC abu-abu ukuran 10 x 30 cm
Pasang plint ubin PC abu-abu ukuran 10 x 40 cm
Pasang plint ubin PC warna ukuran 10 x 20 cm
Pasang plint ubin PC warna ukuran 10 x 30 cm
Pasang plint ubin PC warna ukuran 10 x 40 cm
Pasang plint ubin traso ukuran 10 x 30 cm
Pasang plint ubin traso ukuran 10 x 40 cm

13,320
13,320
13,320
13,320
13,320
13,320
13,320
13,320

2,749
2,065
2,065
1,928
1,928
1,928
1,928
1,928

16,069
15,385
15,385
15,248
15,248
15,248
15,248
15,248

PPL11
PPL12
PPL13
PPL14
PPL15
PPL16

1 M1
1 M1
1 M1
1 M1
1 M1
1 M1

PASANG PLINT UBIN DAN MARMER


Pasang plint ubin granit ukuran 10 x 30 cm
Pasang plint ubin granit ukuran 10 x 40 cm
Pasang plint ubin teralux marmer ukuran 10 x 60 cm
Pasang plint ubin teralux marmer ukuran 10 x 40 cm
Pasang plint ubin teralux marmer ukuran 10 x 30 cm
Pasang lantai teraso cor ditempat tebal 3 cm

13,320
13,320
13,320
13,320
13,320
37,260

1,928
1,928
1,928
1,928
1,928
-

15,248
15,248
15,248
15,248
15,248
37,260

PPL17
PPL18
PPL19
PPL20
PPL21
PPL22
PPL23
PPL24
PPL25
PPL26
PPL27
PPL28
PPL29
PPL30
PPL31
PPL32
PPL33
PPL34

1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M1
1 M1
1 M1
1 M1
1 M2
1 M2
1 M2
1 M2

PEKERJAAN KERAMIK
Pasang lantai keramik artistik uk. 10 x 20 cm
Pasang lantai keramik artistik uk. 10 x 10 cm atau 5 x 20 cm
Pasang ubin porselin uk. 11 x 11 cm
Pasang ubin porselin uk. 10 x 20 cm
Pasang ubin porselin uk. 20 x 20 cm
Pasang tegel keramik uk. 33/33
Pasang tegel keramik uk. 30/30
Pasang tegel keramik uk. 20/20
Pasang tegel keramik uk. 10 x 33 cm (variasi/border)
Pasang lantai mozaik uk. 30 x 30 cm, camp. 1pc : 3ps
Pasang plint keramik ukuran 10 x 30 cm
Pasang plint keramik ukuran 10 x 40 cm
Pasang plint keramik 5 x 20 cm
Pasang plint internal cove artistik 5 x 5 x 20 cm
Pasang lantai marmer uk. 100 x 100 cm
Pasang lantai karpet
Pasang keramik dinding artistik 10 x 20 cm
Pasang keramik dinding artistik 5 x 20 cm

72,450
72,450
54,000
93,150
93,150
72,450
72,450
72,450
108,675
72,450
13,320
13,320
13,320
111,000
72,450
25,160
93,150
93,150

16,661
16,661
14,948
14,948
247,748
16,661
19,150
19,700
18,875
24,136
1,928
1,928
964
1,928
16,661
14,948
14,948

89,111
89,111
68,948
108,098
340,898
89,111
91,600
92,150
127,550
96,586
15,248
15,248
14,284
112,928
89,111
25,160
108,098
108,098

Analisa Harga Satuan Pekerjaan Tahun 2012

Hal :25

PT Pelabuhan Indonesia I (Persero)

KODE

SATUAN

PPL35
PPL36
PPL37
PPL38
PPL39
PPL40
PPL41
PPL42
PPL43
PPL44

1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M1
1 M1

Pasang keramik dinding 10 x 20 cm


Pasang keramik dinding 20 x 20 cm
Pasang keramik dinding 20/25
Pasang keramik stepnosing granito 5/30
Pasang dinding marmer uk. 100 x 100 cm
Pasang lantai vinyl uk. 30 x 30 cm kls 1
Pasang wallpaper lebar 50 cm
Pasang floor hardener
Pasang plint vinyl karet uk. 15 x 30 cm dengan perekat
Pasang plint kayu klas II tebal 2cm, lebar 10cm

HARGA SATUAN
UPAH
BAHAN
TOTAL
93,150
14,948
108,098
93,150
14,948
108,098
76,730
17,760
94,490
11,850
669
12,519
134,550
69,054
203,604
22,200
22,200
34,920
34,920
17,760
17,760
11,840
11,840
17,760
17,760

PCB
PCB1
PCB2
PCB3
PCB4
PCB5
PCB6
PCB7
PCB8
PCB9
PCB10
PCB11

1 M2
1 M2
1 M2
1 M2
1 M2
1 M2
1 M3
1 bh
1 M3
1 M3
1 M3

PEKERJAAN CONE BLOCK / PAVING BLOCK


Pasang conblock tipe segi-empat, uni, segi-enam abu-abu 8 cm, K-400
Pasang conblock tipe segi-empat abu-abu 8 cm, K-200
Pasang conblock tipe segi-empat, uni, segi-enam warna 8 cm, K-400
Pasang conblock tipe segi-empat warna 8 cm, K-200
Pasang grassblock bulat tebal 10 cm
Pasang grassblock tebal 10 cm
Bronjong kawat galvanis
Pasang buis beton dia. 80 cm
Langsiran batu kali
Langsiran kerikil
Langsiran pasir

51,750
51,750
51,750
51,750
51,750
51,750
369,900
24,875
12,600
7,560
3,150

4,725
4,725
4,725
4,725
4,725
4,725
-

56,475
56,475
56,475
56,475
56,475
56,475
369,900
24,875
12,600
7,560
3,150

1,304,000

########

11,714,780

782,400

########

11,150,800
202,295

PKY

MACAM PEKERJAAN

PEKERJAAN KAYU

PKY1

1 M3

Pasang konstruksi kuda-kuda konvensional

PKY2

1 M3

Pasang gording Kayu meranti

PKY3

1 M2

Pasang usuk 5/7 Kayu meranti, reng 2/3 Kayu damar (laut)

14,800

187,495

PKY4

1 M2

Pasang usuk 5/7 Kayu meranti, reng 3/4 Kayu damar (laut)

14,800

241,300

256,100

PKY5

1 M2

Pasang rangka atap sirap

17,760

1,518,000

1,535,760

PKY6
PKY7
PKY8
PKY9
PKY10
PKY11
PKY12
PKY13

1 M2
1 M'
1 M'
1 M'
1 M'
1 M'
1 M'
1 M'

Pasang rangka langit-langit (50 x 100) c


Pasang lisplank ukuran (3 x 20) cm
Pasang lisplank ukuran (3 x 30) cm,
Pasang lisplank ukuran (2 x 20) cm
Pasang lisplank ukuran (2 x 25) cm
Pasang lisplank ukuran 2 x (3 x 20) cm
Pasang lisplank ukuran 2 x (2 x 20) cm
Mengerjakan papan ruiter 2/20

40,950
23,700
23,700
14,800
14,800
31,100
14,800
8,772

141,680
100,990
102,015
45,138
56,178
134,378
80,098
37,126

182,630
124,690
125,715
59,938
70,978
165,478
94,898
45,898

PKY14

1 M2

Pasang rangka dinding pemisah ukuran (60 x 120) cm

48,900

260,045

308,945

PKY15

1 M2

Pasang dinding pemisah teakwood rangkap

48,900

260,045

308,945

PKY16

1 M2

Pasang dinding pemisah plywood rangkap

65,200

2,445

67,645

PKY17

1 M2

Pasang dinding lambiziring, dari Kayu jati papan

195,600

66,030

261,630

PKY18

1 M2

Pasang dinding bilik bambu, rangka kayu klas III, IV

10,350

218,799

229,149

PKY19

1 M2

Membuat dan memasang kusen pintu / jendela Kayu Meranti

2,282,000

########

12,402,000

PKY20

1 M2

Membuat dan memasang kusen pintu / jendela kayu Damar Laut

1,956,000

########

19,143,500

PKY21

1 M2

Membuat dan memasang pintu klamp standar

114,100

625,815

739,915

PKY22

1 M2

Membuat dan memasang daun pintu panil

326,000

368,000

694,000

PKY23

1 M2

Membuat dan memasang daun pintu dan jendela jalusi

326,000

588,800

914,800

PKY24

1 M2

Membuat daun pintu kayu lapis plywood rangkap, rangka tertutup kayu

228,200

230,489

458,689

PKY25

1 M2

Membuat pintu plywood rangkap, rangka expose

260,800

236,009

496,809

PKY26

1 M2

Memasang jalusi kusen

241,650

554,445

796,095

PKY27

1 M2

Memasang teakwood rangkap, rangka expose

260,800

230,489

491,289

PKY28

1 M2

Memasang teakwood rangkap lapis formika, rangka expose

305,150

230,489

535,639

PBS
PBS1
PBS2
PBS3
PBS4
PBS5
PBS6
PBS7
PBS8
PBS9
PBS10

1 Kg
1 Kg
1 Kg
1 Kg
1 Kg
1 Kg
1 Kg
1 Unit
1 Unit
1 Kg

PEKERJAAN BESI DAN ALUMUNIUM


Pasang besi profil
Pasang kuda-kuda baja IWF
Kuda-kuda baja siku
Plat besi lembaran
Gording baja
Ikatan angin diameter 16 mm dan water mur
Trekstang diameter 12 mm
Manhole uk. 70 x 70 cm
Grill dari besi beton 16mm rangka baja 50.50.5 uk 1 x 1 m
Pekerjaan perakitan

8,880
8,880
8,436
8,436
8,436
8,436
8,436
55,000
63,000
140

13,915
14,530
13,656
13,219
12,673
12,673
196,033
754,003
-

22,795
8,880
22,966
22,092
21,655
21,109
21,109
251,033
817,003
140

PBS11
PBS12

1 M2
1 Cm

Membuat pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
Pengelasan dengan las listrik

155,360
414

199,500
-

354,860
414

PBS13

1 M2

Rangka jendela besi square tube (25 x 5) cm

PBS14

1 M2

Pasang Rolling door besi

PBS15

1 M2

Pasang pintu lipat (folding door) bahan plastik/PVC

Analisa Harga Satuan Pekerjaan Tahun 2012

96,160

96,160

173,280

173,280

65,120

65,120

Hal :26

PT Pelabuhan Indonesia I (Persero)

KODE

SATUAN

PBS16

1 M2

Pasang pintu Sunscreen alumunium

PBS17

1 M2

Pasang Rolling door alumunium

PBS18

1 M2

Pasang kusen pintu alumunium

PBS19

1 M2

Pasang pintu alumunium strip lebar 8 cm

PBS20

1 M2

Pasang pintu kaca rangka alumunium

PBS21

1 M2

Pasang vienetions dan vertikal blinds

PBS22

1 M2

Pasang terali besi strip (2 x 3) mm

PBS23

1 M2

PBS24
PBS25
PBS26

1 M2
1 M'
1 M'

PAT

MACAM PEKERJAAN

UPAH

HARGA SATUAN
BAHAN
TOTAL

75,920

75,920

148,000

148,000

6,360

450

6,810

12,576

12,576

12,685

2,025

14,710

51,800

51,800

247,120

82,154

329,274

Pasang kawat nyamuk

14,800

22,823

37,623

Pasang jendela nako & tralis


Pasang talang datar/jurai, seng plat BJLS 28 lebar 90 cm
Pasang talang lingkaran D - 15 cm, seng plat BJLS 30 lebar 45 cm

28,880
46,050
35,550

93,100
175,045
6,813

121,980
221,095
42,363

8,200

PEKERJAAN ATAP

PAT1

1 M2

Langit-langit asbes semen tebal 4, 5 dan 6 mm

8,200

PAT2

1 M2

Langit-langit asbes (1,00 x 1,00) m memakai plepet

8,000

8,000

PAT3

1 M2

Langit-langit akustik ukuran (30 x 30) cm

17,760

17,760

PAT4

1 M2

Langit-langit akustik ukuran (30 x 60) cm

14,800

14,800

PAT5

1 M2

Langit-langit akustik ukuran (60 x 120) cm

14,800

14,800

PAT6

1 M2

Langit-langit triplek ukuran (120 x 240) cm tebal 3mm, 4mm, dan 6 mm

14,800

23,400

38,200

PAT7

1 M2

Langit-langit lambriziring Kayu jati tebal 9 mm

118,400

138,000

256,400

PAT8
PAT9

1 M2
1 M'

Langit-langit gypsum board ukuran (1200 x 2400 x 9) mm


Pasang list plafond gypsum profil

10,350
8,880

24,752
-

35,102
8,880

PAT10
PAT11

1 M2
1 M'

Langit-langit akustik ukuran 60 x 120 cm + rangka alumunium


List langit-langit kayu profil

74,000
7,440

3,000
163

77,000
7,603

PAT12

1 M2

Pasang rangka langit-langit (1,00 x 1,00) m, Kayu jati

31,100

112,030

143,130

PAT13

1 M2

Pasang rangka langit-langit (60 x 120) cm, Kayu jati

34,060

121,556

155,616

PAT14

1 M2

Langit-langit rangka hollow

36,740

36,740

PAT15

1 M2

Pasang genteng beton besar Natural ( isi 9 / m2 )

20,700

20,700

PAT16

1 M2

Pasang genteng beton besar Natural ( isi 9 / m2 ) untuk rumah tingkat

26,600

26,600

PAT17

1 M2

Pasang genteng beton besar Warna ( isi 9 / m2 )

20,700

20,700

PAT18

1 M2

Pasang genteng beton besar Warna ( isi 9 / m2 ) untuk rumah tingkat

26,600

26,600

PAT19

1 M2

Pasang genteng keramik berglasir KIA, Kanmuri Natural

20,700

20,700

PAT20

1 M2

Pasang genteng keramik berglasir KIA, Kanmuri Natural untuk rumah tingkat

26,600

26,600

PAT21

1 M1

Pasang bubungan genteng paris

41,400

3,920

45,320

PAT22

1 M1

Pasang bubungan genteng beton Warna

41,400

3,920

45,320

PAT23

1 M2

Pasang atap asbes gelombang (2,25 x 0,92 m) x 5 mm

15,060

1,956

17,016

PAT24

1 M2

Pasang atap asbes gelombang (2,00 x 0,92 m) x 5 mm

14,490

1,956

16,446

PAT25

1 M2

Pasang atap asbes gelombang (1,80 x 0,92 m) x 5 mm

14,490

1,956

16,446

PAT26

1 M2

Pasang atap asbes gelombang (2,40 x 1,05 m) x 4 mm

14,250

1,956

16,206

PAT27

1 M2

Pasang atap asbes gelombang (2,10 x 1,05 m) x 4 mm

14,250

1,956

16,206

PAT28

1 M2

Pasang atap asbes gelombang (1,50 x 1,05 m) x 4 mm

14,250

1,956

16,206

PAT29

1 M2

Pasang atap sbes gelombang (2,40 x 1,08 m) x 6 mm

14,250

1,956

16,206

PAT30

1 M2

Pasang atap asbes gelombang (2,10 x 1,08 m) x 6 mm

14,250

1,956

16,206

PAT31

1 M2

Pasang atap asbes gelombang (1,80 x 1,08 m) x 6 mm

14,250

1,956

16,206

PAT32

1 M1

Pasang bubung stel gelombang 0,92 m

16,110

16,110

PAT33

1 M1

Pasang nok stel rata 0,92 m

18,990

18,990

PAT34

1 M1

Pasang nok stel rata 1,09 m

16,110

16,110

PAT35

1 M1

Pasang nok atap seng

15,050

652

15,702

PAT36

1 M1

Pasang atap genteng metal zinc alume type prima roof

19,980

19,980

PAT37

1 M1

Pasang atap metal gelombang

19,980

19,980

PAT38

1 M1

Pasang nok genteng metal U type prima roof

28,140

28,140

PAT39

1 M1

Pasang atap alumunium

69,450

69,450

PAT40

1 M1

Pasang nok alumunium

87,200

87,200

PAT41

1 M2

Pasang alumunium foil / sisalation

13,340

13,340

PAT42

1 M2

Pasang atap polikarbonat

72,200

84,700

156,900

PAT43

1 M2

Rangka atap baja ringan atap genteng metal

25,738

1,630

27,368

PAT44
PAT45

1 M2
1 M'

Atap spandek tebal 0,50 mm uk. 0.75X1.33 m2


Rabung atap spandek

49,120
3,600

49,120
3,600

38,500
25,667
12,833

15,687
10,458
5,229

54,187
36,124
18,062

PPC
PPC1

PEKERJAAN PENGECATAN

1 M2

Mengecat kerb 3 kali TIAP 1 M2 ( 3 kali )


Mengecat kerb 3 kali TIAP 1 M2 ( 2 kali )
Mengecat kerb 3 kali TIAP 1 M2 ( 1 kali )

Analisa Harga Satuan Pekerjaan Tahun 2012

Hal :27

PT Pelabuhan Indonesia I (Persero)

HARGA SATUAN
BAHAN
TOTAL

KODE

SATUAN

PPC2

1 M2

Mengikis / mengerok permukaan cat tembok lama

8,450

8,450

PPC3

1 M2

Mengerok karat cat lama permukaan baja dengan cara manual

8,450

8,450

PPC4

1 M2

Mendempul dan menggosok kayu

5,960

2,056

8,016

PPC5

1 M2

Pengecatan bidang kayu lama

10,725

14,807

25,532

PPC6

1 M2

Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup

4,590

33,729

38,319

PPC7

1 M2

Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 3 lapis cat penutup

12,810

35,254

48,064

PPC8

1 M2

Pelaburan bidang kayu dengan teak oil

13,110

13,110

PPC9

1 M2

Pelaburan bidang kayu dengan politur

6,440

6,440

PPC10

1 M2

Pelaburan bidang kayu dengan cat residu atau ter

5,980

5,980

PPC11

1 M2

Pelaburan bidang kayu dengan vernis

23,240

7,750

30,990

PPC12

1 M2

Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)

6,907

16,998

23,905

PPC13

1 M2

Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup)

5,478

13,560

19,038

PPC14

1 M2

Pengecatan tembok tidak terlindung dari panas dan hujan

6,907

6,907

PPC15

1 M2

Melabur tembok dengan kalkarium

5,478

5,478

PPC16

1 M2

Pengecatan bidang besi ( 3 x )

12,810

7,695

20,505

PPC17

1 M2

Melamin

19,490

4,800

24,290

PPC18

1 M2

Pemasangan wall paper

17,480

17,480

PPC19

1 M2

Pengecacatan permukaan baja dengan meni besi

19,700

3,530

23,230

PPC20

1 M2

Pengecacatan permukaan baja dengan meni besi memakai perancah

33,000

3,530

36,530

PPC21

1 M2

Pengetiran kayu ( 2 x )

5,900

5,900

PPC22

1 M2

Mengecat genteng

6,907

6,907

PPC23

2 M2

Mengerjakan Cat Sungging

464,293

30,596

494,889

PBK

MACAM PEKERJAAN

UPAH

PEKERJAAN BONGKARAN

PBK1

1 M3

Membongkar pasangan batu kali

342,000

342,000

PBK2

1 M3

Membongkar pasangan batu merah dan membersihkan

165,500

165,500

PBK3

1 M3

Membongkar beton bertulang dan membersihkan

464,000

464,000

PBK4

1 M2

Pekerjaan bongkar lantai tegel untuk dipergunakan lagi

11,800

11,800

PBK5

1 M2

Mengupas plesteran lama

7,875

7,875

PBK6

1 M2

Membongkar genteng / sirap untuk dipergunakan lagi

11,800

11,800

PBK7

1 M2

Membongkar atap seng

PBK8

1 M2

Membongkar usuk / reng dipakai lagi

PBK9

1 M2

Membongkar usuk / reng tidak dipakai lagi

PBK10

1 M3

Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan untuk digunakan lagi

PBK11

1 M3

Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan tidak digunakan lagi

PBK12

1 M3

Mengerjakan kembali bangunan kayu yang telah dibongkar

PSN
PSN1
PSN2
PSN3
PSN4
PSN5
PSN6
PSN7
PSN8

1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh

PEKERJAAN SANITASI
Memasang kloset duduk/monoblock
Memasang kloset jongkok porselen
Memasang kloset jongkok teraso
Memasang urinoir
Memasang wastafel
Memasang bak mandi fiberglass volume 0,30 m3
Memasang badkip porselen
Memasang bak fiberglass volume 1 m3 air

9,500

9,500

17,140

17,140

11,800

11,800

770,000

770,000

71,000

71,000

1,304,000

1,304,000

282,390
322,800
210,800
152,000
203,500
372,400
93,500
678,000

1,896,804
9,450
122,850
9,450
552,661
372,593
466,015

2,179,194
332,250
333,650
161,450
756,161
744,993
93,500
1,144,015

PSN9

1 M1

Memasang pipa penyalur air limbah jenis pipa tanah, diameter 15 cm

6,170

3,535

9,705

PSN10

1 M1

Memasang pipa penyalur air limbah jenis pipa tanah, diameter 20 cm

8,520

16,106

24,626

PSN11

1 M1

Memasang pipa beton, diameter 15 cm - 20 cm

14,490

14,378

28,868

PSN12
PSN13
PSN14
PSN15

1 M1
1 bh
1 bh
1 bh

Memasang pipa beton, diameter 30 cm - 100 cm


Memasang bak kontrol pasangan batu bata ukuran (30 x 30) cm, tinggi 35 cm
Memasang bak kontrol pasangan batu bata ukuran (45 x 45) cm, tinggi 50 cm
Memasang bak kontrol pasangan batu bata ukuran (60 x 60) cm, tingg 65 cm

39,330
258,615
125,850
190,880

28,003
106,567
165,837
255,103

67,333
365,182
291,687
445,983

PSN16

1 M1

Memasang pipa galvanis diameter 1/2"

13,140

13,140

PSN17

1 M1

Memasang pipa galvanis diameter 3/4"

13,140

13,140

PSN18

1 M1

Memasang pipa galvanis diameter 1"

13,140

13,140

PSN19

1 M1

Memasang pipa galvanis diameter 1 1/2"

22,392

22,392

PSN20

1 M1

Memasang pipa galvanis diameter 3"

22,392

22,392

PSN21

1 M1

Memasang pipa galvanis diameter 4"

27,994

27,994

PSN22

1 M1

Memasang pipa PVC tipe AW diameter 1/2"

7,464

18,118

25,582

PSN23

1 M1

Memasang pipa PVC tipe AW diameter 3/4"

7,464

24,995

32,459

PSN24

1 M1

Memasang pipa PVC tipe AW diameter 1"

7,464

34,253

41,717

PSN25

1 M1

Memasang pipa PVC tipe AW diameter 1 1/2"

7,464

58,851

66,315

Analisa Harga Satuan Pekerjaan Tahun 2012

Hal :28

PT Pelabuhan Indonesia I (Persero)

KODE

SATUAN

PSN26

1 M1

Memasang pipa PVC tipe AW diameter 2"

PSN27

1 M1

Memasang pipa PVC tipe AW diameter 2 1/2"

PSN28

1 M1

PSN29
PSN30
PSN31
PSN32
PSN33
PSN34
PSN35
PSN36

1 M1
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh

PPG
PPG1
PPG2
PPG3
PPG4
PPG5
PPG6
PPG7
PPG8
PPG9
PPG10
PPG11
PPG12
PPG13
PPG14
PPG15

1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh
1 bh

PPG16
PPG17

1 M2
1 M'

PTM

MACAM PEKERJAAN

UPAH

HARGA SATUAN
BAHAN
TOTAL

11,218

75,250

86,468

7,464

109,900

117,364

Memasang pipa PVC tipe AW diameter 3"

19,750

148,252

168,002

Memasang pipa PVC tipe AW diameter 4"


Memasang bak cuci piring stainless steel
Memasang bak cuci piring teraso
Memasang kran diameter 3/4" atau 1/2"
Memasang floor drain
Memasang shower dinding
Memasang kran air angsa
Memasang tempat sabun

19,750
28,470
47,450
9,850
9,850
550
207,250
550

245,721
33,500
19,700
78,100
52,500

265,471
28,470
80,950
29,550
87,950
550
207,250
53,050

PEKERJAAN KUNCI DAN KACA


Pasang kunci tanam antik
Pasang kunci tanam biasa
Pasang kunci tanam kamar mandi
Pasang kunci tanam silinder
Pasang engsel pintu
Pasang engsel jendela kupu-kupu
Pasang engsel angin
Pasang spring knip
Pasang kait angin
Pasang door closer
Pasang kunci selot
Pasang pegangan pintu / door holder
Pasang door stop
Pasang rel pintu dorong
Pasang kunci lemari

56,940
41,850
40,925
40,745
14,235
9,850
19,700
14,235
14,235
47,450
18,980
47,450
9,490
56,940
23,725

157,500
69,300
69,300
31,500
22,100
-

214,440
111,150
110,225
40,745
45,735
31,950
19,700
14,235
14,235
47,450
18,980
47,450
9,490
56,940
23,725

Pasang kaca
Pasang kusen alumunium

14,235
14,235

66,990
-

81,225
14,235

PEKERJAAN TAMAN /JALAN

PTM1

1 M2/Hari

Penyapuan Jalan Dan Trotoar

47

47

PTM2

1 M2/Hari

Pembersihan / Penyapuan halaman

66

66

PTM3

1 M2/Hari

Pemangkasan teh-tehan

11

11

PTM4

1 M2/Hari

Pangkas bentuk tanaman perdu

35

35

PTM5

1 M2/Hari

Pangkas rumput

PTM6

1 M2/Hari

Penyiangan tanaman semak dan penggemburan tanah

20

20

SPL
SPL1
SPL2
SPL3
SPL4
SPL5
SPL6
SPL7
SPL8
SPL9
SPL10
SPL11
SPL12
SPL13
SPL14
SPL15
SPL16
SPL17
SPL18
SPL19
SPL20
SPL21
SPL22
SPL23
SPL24
SPL25
SPL26
SPL27
SPL28
SPL29
SPL30
SPL31

1 M2
1 M2
1 M3
1 M3
1 M3
1 M3
1 KG
1 KG
1 M2
1 KG
1 M2
1 M'
1 M2
1 M2
1 M2
1 M'
1 M'
1 M'
1 M'
1 M'
1 M'
1 M'
1 M'
1 M'
1 Bh
1 Bh
1 Bh
1 M'
1M
1 M'
1 bh

504,000
7,100
47,500
37,500
37,500
37,500
384
845
56,300
4,620
34,573
24,840
37,500
37,500
103,500
10,750,000
462,000
51,333
138,813
69,169
3,417
227,663
227,663
156,400
2,042
332,000

126,612
318,846
333,246
2,187
1,223
1,000
6,000
9,486
408
614,370
1,137,668
920,966
-

504,000
7,100
174,112
356,346
370,746
39,687
384
845
57,523
5,620
40,573
34,326
37,500
37,908
717,870
10,750,000
462,000
51,333
138,813
69,169
3,417
227,663
227,663
156,400
1,137,668
920,966
2,042
332,000

ANALISA TAMBAHAN (SUPLEMEN)


PASANG STOOT WERK (SCAFOLDING)
Pemasangan Geotextile
Timbunan tanah merah dipadatkan
Lapisan Base coarse Agregat kelas A dipadatkan
Lapisan Sub Base coarse Agregat kelas B dipadatkan
Lapisan Sub Base coarse Agregat Kelas C dipadatkan
Memasang gelagar-gelagar besi
Menurunkan gelagar-gelagar besi jembatan
Mengerjakan lantai jembatan (papan yang dipakukan diatas gelagar kayu)
Memasang 1 Kg jaring kawat baja/wire mesh
Memasang lantai cone block t.10 cm dipadatkan denganVibratory Roller kapasitas 10-15 ton
Memasang riol 20 cm
Memasang kawat harmonica
Memasang kawat duri
Pasang Aluminium Composite Panel (Alucopan)
Mobilisasi dan Demobilisasi Peralatan
Pengadaan Tiang Pancang Beton dia . Cm (Bottom)
Pengadaan Tiang Pancang Beton dia . Cm (Upper/Middle)
Handling dan Transport tiang pancang dan penimbunan ke titik pancang
Pemancangan tiang pancang (Darat)
Pemancangan tiang (Laut)
Pengangkatan 1 m Tiang Pancang ke titik pancang (Darat)
Pengangkatan 1 m Sheet Pile ke titik pancang (laut)
Pemancangan Sheet Pile
Sambungan tiang pancang beton/spun pile dia 50 cm
Sambungan tiang pancang baja dia 50 cm
Memotong tiang pancang beton/ spun pile dia 50 cm
Pembuatan tiang pancang (40 x 40) cm, beton bertulang
Pembuatan tiang pancang (35 x 35) cm, beton bertulang
Pemancangan Cerucuk kayu laut dia. 3" - 4" panjang 5 m
Membongkar dan melepas fender

Analisa Harga Satuan Pekerjaan Tahun 2012

Hal :29

PT Pelabuhan Indonesia I (Persero)

KODE

SATUAN

SPL32
SPL33
SPL34
SPL35
SPL36
SPL37
SPL38
SPL39
SPL40
SPL41
SPL42
SPL43
SPL44
SPL45
SPL46
SPL47
SPL48
SPL49
SPL50
SPL51

1 M'
1 BH
1 M'
1 M'
1 M2
1 M2
1 M'
1 M'
1 M'
1 M'
1 M2
1 M'
1 M2
1 M2
1 M3
1 M3
1 M3
1 M3
1 M3
1 M3

PLS

MACAM PEKERJAAN
Mengebor beton dermaga untuk lobang baut fender '(dihitung 120 menit).
Memasang fender karet
Pasang pipa beton oval dia. 25/37,5 dalam 0 - 1 m
Pasang pipa beton oval dia. 25/37,5 dalam 1 - 2 m
Membongkar perkerasan lama (serifying) tebal 10 cm
Pelapisan epoxy/tar tiang pancang
Pekerjaan Grouting / Injeksi retakan dinding bata dengan Semen Slurry (Cebex 100)
Pelapisan epoxy/tar tiang pancang
Cor beton kerb ( 15 x 30 ) cm, dengan 1pc:2ps:3kr
Cor beton Devider ( 30 x 30 ) cm, dengan 1pc:2ps:3kr
Membongkar Paving Block

Memasang Riol RCP 60 t 10 cm :


Pasang conblock tipe segi-empat, abu-abu 10 cm, K-450
Pasang kembali conblock bekas
Beton bertulang K225 pondasi pagar
Beton bertulang K225 kolom pagar
Beton bertulang K225 balok pagar
Beton tanpa tulangan K225 pondasi menerus
Beton bertulang K225 manhole
Beton bertulang 1 :2:3, dinding drainase

HARGA SATUAN
UPAH
BAHAN
194,250
1,171,000
54,450
95,700
1,362
49,500
2,520
84,054
41,100
49,500
2,520
12,495
46,705
20,507
76,935
6,300
24,840
843,750
51,750
198,325
51,750
4,725
384,520 2,819,667
610,371 4,719,540
667,167 4,801,070
121,825
736,078
281,341 1,985,752
508,680 2,866,161

TOTAL
194,250
1,171,000
54,450
95,700
1,362
52,020
125,154
52,020
59,200
97,441
6,300
868,590
250,075
56,475
3,204,186
5,329,911
5,468,237
857,903
2,267,094
3,374,841

ANALISA HARGA SATUAN PEKERJAAN LISTRIK

PLS1

1 M1

Pasang Kabel NYY 3 x 6 sqmm

675

675

PLS2

1 M1

Pasang Kabel NYY 3 x 4 sqmm

675

675

PLS3

1 M1

Pasang Kabel NYM 2 x 2,5 sqmm

675

675

PLS4

1 M1

Pasang Kabel NYM 2 x 1,5 sqmm

675

675

PLS5

1 M1

Pasang Kabel NYA 1 x 2,5 sqmm

338

338

PLS6

1 M1

Pasang Kabel DX 2x10 sqmm + Accessories (antar tiang / gawang)

47,500

47,500

PLS7

1 M1

Pasang Kabel DX 2x16 sqmm + Accessories (antar tiang / gawang)

47,500

47,500

PLS8
PLS9
PLS10
PLS11
PLS12
PLS13
PLS14
PLS15
PLS16
PLS17
PLS18

1 M1
1 Unit
1 Unit
1 Unit
1 Unit
1 Set
1 Unit
1 Set
1 Unit
1 Set
1 Set

Pasang Kabel NYY 3x10 sqmm


Pasang Box Panel dan Panel Kontrol
Pasang Box KWH dan Meter
Pasang tiang lampu antik (b3)
Pasang tiang lampu antik (b3)
Pemasangan armatur komplit
Pemasangan komponen + Box
Bongkar komponen
Bongkar Armatur
Bongkar Tiang Lampu Antik
Bongkar Tiang Lampu Antik

675
61,250
61,250
399,230
300,000
61,250
81,640
49,000
40,828
300,000
399,395

675
61,250
61,250
399,230
300,000
61,250
81,640
49,000
40,828
300,000
399,395

PLS19

1 M1

Pasang Kabel NYM 2x2,5 sqmm

950

950

PLS20

1 M1

Pasang Kabel NYA 2,5 sqmm

950

950

PLS21
PLS22
PLS23
PLS24
PLS25
PLS26
PLS27
PLS28
PLS29
PLS30
PLS31
PLS32
PLS33
PLS34
PLS35
PLS36

1 M1
1 bh
1 bh
1 bh
1 Set
1 Set
1 Set
1 Set
1 Set
1 Set
1 Set
1 Set
1 Set
1 Set
1 Set
1 Set

Pasang Pralon 3" Kabel NYY 3x6 sqmm


Pasang tutup panel ukuran 30x30
Pasang MCB Ampere + box tutup panel ukuran 30 x 30
Pasang Kapasitor 12,5 uF
1 Set Pasang Stang Ornamen 2,2 meter + Lampu SRP 822/250 Watt Son + pengetesan dan penyalaan

950
7,500
7,500
7,500
67,500
107,431
67,500
236,750
267,300
280,964
310,750
337,262
116,844
102,509
116,844
109,326

206,304
206,304
206,304
206,304
206,304
-

950
7,500
7,500
7,500
67,500
107,431
67,500
443,054
473,604
487,268
517,054
543,566
116,844
102,509
116,844
109,326

772,658

1 Set Pasang Stang Ornamen 6 meter + Lampu SRP 822/250 Watt Son
1 Set Pasang Stang Ornamen 2,2 meter + Lampu SRP 822/250 Watt Son
Pasang Tiang Octogonal Cabang 1, h= 7 meter+ lampu SRP 822/250 Watt Son
Pasang Tiang Octogonal Cabang 1, h= 9 meter + lampu SRP 822/250 Watt Son
Pasang Tiang Octogonal Cabang 2, h= 9 meter+ lampu SRP 822/250 Watt Son
Pasang Tiang Octogonal Cabang 3, h= 9 m+ lampu SRP 822/250 Watt Son
Pasang Tiang Octogonal Cabang 3, h= 11 m+ lampu SRP 822/250 Watt Son
Bongkar armatur pada stang ornamen existing + pasang lampu SRP 822/150 Watt Son + return
Bongkar armatur pada stang ornamen existing + pasang Lampu SRP 822/250 Watt Son + retur
Bongkar armatur pada tang existing + pasang Lampu SRP 822/250 Watt Son + retur
Bongkar komponen lama existing + pasang komponen Lampu SRP 822/250 Watt Son + retur
ANALISA BASE

ABS
ABS1

1 M2

Menghampar dan mengisi bahan perkerasan

772,658

ABS2

1 M3

Menyawur pasir

491,200

491,200

ABS3

1 M2

Menggilas dengan motor walls

1,964,800

9,210,000

11,174,800

ABS4

1 M2

Perkerasan lapis pondasi bawah (sub base) tebal 20 cm padat

169,464

230,250

399,714

ABS5

1 M2

Pembuatan lapis pondasi bawah (sub base) tebal 15 cm padat

135,080

203,234

338,314

ABS6

1 M2

Pembuatan lapis pondasi atas (base) tebal 10 cm padat

92,919

141,220

234,139

Analisa Harga Satuan Pekerjaan Tahun 2012

Hal :30

PT Pelabuhan Indonesia I (Persero)

HARGA SATUAN
BAHAN
TOTAL

KODE

SATUAN

ABS7

1 M2

Pembuatan lapis pondasi atas (base) tebal 8 cm padat

13,099

125,256

ABS8

1 M2

Pembuatan lapis pondasi atas (base) tebal 7 cm padat

9,824

109,906

119,730

ABS9

1 M2

Lapisan Penetrasi 4 cm padat

98,928

2,410,171

2,509,099

ABS10

1 M2

Pengaspalan sand sheet (latasir), tebal 1 cm jereng

1,250,595

104,380

1,354,975

ABS11

1 M2

Pengaspalan sand sheet (latasir) tanpa aspal, tebal 1 cm jereng

89,890

37,086

126,975

ABS12

1 M2

Mengecat marka jalan dengan Rettar

220,058

236,758

456,816

ABS13

1 M2

Mengecat marka jalan dengan Thermoplastic

446,992

1,624,644

2,071,636

ABS14

1 M2

Pemotongan aspal dengan mesin potong (cutter), 2 sisi

ABS15

1 M1

Pembongkaran aspal dengan Jack Hammer

ABS16

1 M2

Expantion joint

ASP

MACAM PEKERJAAN

UPAH

138,355

2,807

13,333

16,139

173,394

972,576

1,145,970

2,750,720

########

19,016,808

ANALISA ASPAL

ASP1

1 M2

LATASTON ( HRS )

ASP2

1 M2

LASTON ( AC )

19,220

ASP3
ASP4

1 M3
1 liter

ASPHALT TREATED BASE ( ATB )


LAPIS RESAP PENGIKAT (PRIME COAT)

629,690
2,254

ASP5

1 M3

LAPIS PONDASI AGREGAT KLAS A

105,095

ASP6
ASP7

1 M3
1 liter

LAPIS PONDASI AGREGAT KLAS B


LAPIS PEREKAT (TACK COAT)

106,415
2,815

ASP8

1 M2

PENYIAPAN BADAN JALAN (PEMADATAN DAN PERATAAN)

ALT
ALT1
ALT2
ALT3
ALT4
ALT5
ALT6
ALT7
ALT8
ALT9
ALT10
ALT11
ALT12
ALT13
ALT14
ALT15
ALT16
ALT17
ALT18
ALT19
ALT20
ALT21
ALT22
ALT23
ALT24
ALT25
ALT26
ALT27
ALT28
ALT29
ALT30
ALT31
ALT32
ALT33
ALT34
ALT35
ALT36
ALT37
ALT38
ALT39
ALT40
ALT41

1 Jam
1 Jam
1 Jam
1 Jam
1 Jam
1 Jam
1 Jam
1 Jam
1 Jam
1 Jam
1 Jam
1 Jam
1 Jam
1 Jam
1 Jam
1 Jam
1 Jam
1 Jam
1 Jam
1 Jam
1 Jam
1 Jam
1 Jam
1 Jam
1 Jam
1 Jam
1 Jam
1 Jam
1 Jam
1 Jam
1 Jam
1 Jam
1 Jam
1 Jam
1 Jam
1 Jam
1 Jam
1 Jam
1 Jam
1 Jam
1 Jam

SEWA ALAT :
ASPHALT MIXING PLANT
ASPHALT FINISHER
ASPHALT SPRAYER
BULLDOZER 100 -150 HP
COMPRESSOR 4000 - 6500 L/M
WHEEL LOADER 1,0 - 1,6 M3
TANDEM ROLLER 6 - 8 T
PNEUMATIC TYRE ROLLER 8 - 10 T
DUMP TRUCK
GENERATOR SET
MOTOR GRADER > 100 HP
VIBRATORY ROLLER 5 - 8 T
WATER TANK TRUCK 3000 - 4000 L
JACK HAMMER
TAMPER
STONE CRUSHER
THREE WHEEL ROLLER 6 - 8 T
CONCRETE VIBRATOR
CONCRETE MIXER 0.3 - 0.6 M3
CRANE 10 - 15 TON
DUMP TRUCK 3 - 4 M3
EXCAVATOR 80 - 140 HP
FLAT BED TRUCK 3 - 4 M3
WATER PUMP 70 - 100 mm
FULVI MIXER
TRACK LOADER 75 - 100 HP
MESIN PENYARING 8 HP
CHIP SPREADER
MESIN PENGHAMPAR 1820 MM 30 HP
THRILLER GANDENG 1 TON
DUMP TRUCK 3,5 TON 44 HP
POMPA AIR ( D 5 CM ) 30 M3/JAM
TRAKTOR
THRILLER 1 TON
ALAT BOR
ALAT UKUR
BETON MOLEN
MESIN CUTTER
MOTOR WALLS
PERALATAN LAS
SPRAYER

29,149

5,081

6,816,302
216,086
54,621
370,000
163,285
344,901
177,077
215,630
227,651
369,422
384,919
236,640
167,999
6,380
9,289
451,227
113,261
21,426
34,275
300,141
178,697
179,333
210,793
11,228
139,372
205,761
50,000
50,000
181,000
184,000
118,000
11,000
15,000
15,000
150,000
75,000
25,000
60,000
20,000
75,000
48,000

BATAS RANGE

Analisa Harga Satuan Pekerjaan Tahun 2012

Hal :31

KUBIKASI/CALCULATION SHEET
PERKERASAN LAPANGAN EKS KANTIN DAN PARKIR
BELAWAN INTERNATIONAL CONTAINER TERMINA

NO.

URAIAN PEKERJAAN

2
PEKERJAAN PERSIAPAN
1 Survey lokasi
2 Mobilisasi dan Demobilisasi Alat
Jumlah I

II

PEKERJAAN GRILL DRAINASE DAERAH I


panjang grill baru
panjang bongkar psng btn
pekerjaan bongkar bata

1 Pekerjaan perbaikan beton dudukan grill

2 Pekerjaan bongkar beton


3 Pekerjaan bongkar bata
4 Pekerjaan beton bertulang
5 Pekerjaan besi siku pinggir 40.40.4
6 Pekerjaan besi pelat strip 5.50
7 Pekerjaan besi kotak 40x40 t 1,2

Jumlah II

IV

PEKERJAAN LAIN-LAIN
1 Pembersihan akhir
2 Dokumentasi dan laporan
Jumlah IV

KASI/CALCULATION SHEET
PANGAN EKS KANTIN DAN PARKIR TRUK
TERNATIONAL CONTAINER TERMINAL
Luas (m) Panjang/t
ebal (m)
3
4

Jumlah

koefisien
(kg/m)

Volume

7= 4 x 5 x 6

Gambar/ Keterangan
Satuan
6

1
1

ls
ls

64
58
83.73

m
m
m

ls

0.054

58

3.132

m3

0.075

83.73

6.27975

0.095

141.73

13.46435

m3

64

2.416667 309.3333

kg

64
0.6

2
768

128

kg

1.468 676.4544

kg

1
1

ls
ls

PERHITUNGAN VOLUME BESI


PEKERJAAN PERLUASAN WORKSHOP
BELAWAN INTERNATIONAL CONTAINER TERMINAL
No

Besi(mm)

Lebar
(m)

Tinggi
(m)

sloof/ring balok beton bertulang untuk 1m


1
10
2
8
0.15
0.45

Panjang
/keliling(
m)

Jumlah

Jumlah

Panjang
Jumlah
(m)

c=axb

10.52632
1.2

pjng 1 m

10
70.17544

volume

10
71

0.095

Pjng untuk menghasilkan 1m beton

105.2632
85.2

m
10.52632

MINAL
Koefisien
Berat Besi Keteranga
Berat
(Kg)
n
(Kg/m)
d
0.617
0.395

jumlah

e=cxd
64.947 t.utama
33.654 sengkang

98.601 kg

PT Pelabuhan Indonesia I (Persero)

KAMUS KODE ANALISA dan UPAH/BAHAN


KODE

URAIAN ANALISA

KODE
UPH
U

URAIAN UPAH DAN BAHAN

PPS

PEKERJAAN PERSIAPAN

PTN

PEKERJAAN TANAH

ALT

SEWA ALAT

PPO

PEKERJAAN PASANGAN PONDASI

ASB

ASBES

PPD

PASANGAN DINDING

ASP
P

ASPAL

PBT

PEKERJAAN BETON

ATP

ATAP

PPT

PEKERJAAN PLESTERAN

BBM

BAHAN PELARUT, PELUMAS

PPL

PEKERJAAN PASANG LANTAI

BKM

BAHAN KIMIA PEMBANTU UNTUK BETON

PCB

PEKERJAAN CONE BLOCK / PAVING BLOCK

BSI

PKY

PEKERJAAN KAYU

BTN

PAT

PEKERJAAN ATAP

BTU

BATU, AGREGAT, TANAH

PPC

PEKERJAAN PENGECATAN

CAT

BAHAN CAT

PBK

PEKERJAAN BONGKARAN

CBK

CONEBLOCK / PAVING BLOCK

SPL

ANALISA SUPLEMEN

DLL

LAIN-LAIN

PSI

PEKERJAAN SANITASI

KCA

BAHAN KACA

PBS

PEKERJAAN BESI DAN ALUMUNIUM

KCI

PENGGANTUNG / PENGUNCI

PPG

PEKERJAAN KUNCI DAN KACA

KPG

PLS

ANALISA HARGA SATUAN PEKERJAAN LISTRIK

KYU
PG

ABS

ANALISA BASE

LNT

LANTAI KERAMIK / TERASO

ASP

ANALISA ASPAL

LST

INSTALASI LISTRIK

ALT

SEWA ALAT

PKB

PTM

PEKERJAAN PEMBERSIHAN TAMAN, JALAN

Analisa Harga Satuan Pekerjaan Tahun 2012

UPAH

BAHAN BESI/BAJA TULANGAN/BESI BETON


BAHAN DARI BETON / BUIS / TIANG PANCANG

KAPUR DAN GIPS


BAHAN KAYU

PERLATAN KEBERSIHAN

PKU

PAKU / BAUT

PPA

PIPA

PRK

BAHAN PEREKAT HIDROLIS & ORGANIK

SNT

PEATAN SANITASI

TNM

PERALATAN TAMAN / JALAN

Hal :36

PT Pelabuhan Indonesia I (Persero)

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA


MASING MASING HARGA SATUAN
JENIS PEKERJAAN
SATUAN

NO

:
:

LATASTON ( HRS )
M2

KOMPONEN

A
1
2

TENAGA
Pekerja
Mandor

( L 01 )
( L 03 )

ASP 1

SATUAN

Jam
Jam

KUANTITAS

0.0113
0.0016

HARGA
SATUAN
(Rp.)

6,875.00
80,000.00

JUMLAH HARGA TENAGA


B
1
2
3
4

( M 03 )
( M 04 )
( M 05 )
( M 10 )

M3
M3
Kg
Kg

0.0121
0.0232
4.8004
5.2962

20,000.00
-

JUMLAH HARGA BAHAN

464.05
464.05

PERALATAN
Wheel Loader
AMP
Genset
Dump Truck
Aspal Finisher
Tandem Roller
Pneumatic Tyre Roller
Alat Bantu

( E 15 )
( E 01 )
( E 12 )
( E 09 )
( E 02 )
( E 17 )
( E 18 )

JUMLAH HARGA PERALATAN


JUMLAH
JASA 10 %
JUMLAH ( BELUM TERMASUK PPN )
DIBULATKAN

1
2
3
4

77.93
129.54
207.47

BAHAN
Agregat Kasar
Agregat Halus
Filler
Aspal

C
1
2
3
4
5
6
7
8

JUMLAH
HARGA
(Rp.)

Jam
Jam
Jam
Jam
Jam
Jam
Jam
Ls

0.0011
0.0016
0.0016
0.0143
0.0020
0.0017
0.0013
1.0000

344,900.53
6,816,302.41
369,422.18
227,650.78
216,085.57
177,076.60
215,630.16
500.00

383.05
11,037.48
598.20
3,263.91
437.38
304.78
277.12
500.00
16,801.91
17,473.44
1,747.34
19,220.78
19,220.00

Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak ) dan biaya biaya
lainnya

Harga Satuan Pekerjaan Tahun 2012

Hal :37

PT Pelabuhan Indonesia I (Persero)

URAIAN ANALISA HARGA SATUAN LATASTON ( HRS )


SATUAN

M2

No

URAIAN

I
1
2
3
4
5
6
7

II

ASP 2

ASUMSI
Menggunakan alat berat ( cara mekanik )
Lokasi pekerjaan sepanjang jalan
Kondisi existing jalan sedang
Jarak rata rata Base Camp ke Lokasi pekerjaan
Tebal lapisan padat
Jam kerja efektif 1 hari
Faktor kehilangan material
- Agregat
- Aspal

KODE

KOEF.

SATUAN

L
t
Tk

20.0
0.03
7.00

Km
m
Jam

Fh 1
Fh 2

1.10
1.05

8 Komposisi campuran HRS ( Spesifikasi )


- Coarse Agregat 20 - 40 %
- Fine Agregat 47 - 67 %
- Fraksi Filler 5 - 9 %
- Aspal minimum 7,3 %

CA
FA
FF
As

29.50
56.50
6.49
7.51

%
%
%
%

9 Berat jenis bahan


- HRS
- Coarse Agregat dan fine agregat
- Fraksi Filler
- Aspal

D1
D2
D3
D4

2.24
1.80
2.00
1.03

t / m3
t / m3
t / m3
t / m3

M03
M04
M05
M10

0.0121
0.0232
4.8004
5.2962

m3
m3
Kg
Kg

1.50
0.90
0.83

m3
-

1.50
0.50
2.00

menit
menit
menit

KET.

METODA KERJA
1 WHEEL LOADER memuat agregat dan aspal kedalam Coldbin AMP
2 Agregat dan aspal dicampur dan dipanaskan dengan AMP untuk dimuat langsung ke
dalam Dump Truck dan diangkut ke lokasi pekerjaan.
3 Campuran panas HRS dihampar dengan Finisher dan dipadatakan dengan Tandem dan
Peneumatic Tire Roller
4 Selama pemadatan sekelompok pekerja merapikan tepi hamparan dengan
menggunakan alat bantu

III
1
a
b
c
d

PEMAKAIAN BAHAN ALAT DAN TENAGA


BAHAN
Agregat kasar
= {( CA x D1 x t m3 ) x ( Fh 1 )}/ D2
Agregat halus
= {( FA x D1 x t m3 ) x ( Fh 1 )}/ D2
Filler
= {( FF x D1 x t m3 ) x ( Fh 1 )}
Aspal
= {( AS x D1 x t m3 ) x ( Fh 2 )}x1000

2 ALAT
a Wheel Loader
Kapasitas bucket
Faktor bucket
Faktor efisiensi alat
Waktu siklus
- Muat
- Lain lain

( E 15 )
V
Fb
Fa
Ts 1
T1
T2
Ts 1

Kap Produksi / Jam

Koefisien Alat / m2

Harga Satuan Pekerjaan Tahun 2012

D2 x V x Fb x Fa x 60
D1 x t x Ts1
1 / Q1

Q1

900.40

m2

( E 15 )

0.0011

Jam

Hal :38

PT Pelabuhan Indonesia I (Persero)

No

URAIAN
b Aspalt Mixing Plant ( AMP )
Kapasitas produksi
faktor Efisiensi alat

KODE

KOEF.

SATUAN

( E 01 )
V
Fa

50.00
0.83

ton / jam
-

Kapasitas produksi / jam

V x Fa
D1 x t

Q2

617.56

m2

Koefisien Alat / m2

1 / Q2

( E 01 )

0.0016

Jam

( E 12 )
Q3

617.56

m2

( E 12 )

0.0016

Jam

8.00
0.83
40.00
50.00
0.50
1.00

ton
km / jam
km / jam
ton
menit

16.00
30.00
15.00
24.00
85.00

menit
menit
menit
menit
menit

c Generator Set ( Genset )


Kapasitas produksi / jam = sama dengan AMP
Koefisien Alat / m2

d Dump Truk ( DT )
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata rata bermuatan
Kecepatan rata rata kosong
Kapasitas AMP batch
Waktu menyiapkan 1 batch HRS
Waktu Siklus
- Mengisi bak
=
- Angkut
=
- Tunggu + Dumping + Putar
- Kembali
=

1 / Q3

( V : Q2b ) x Tb
( L : v1 ) x 60 menit
( L : v2 ) x 60 menit

( E 09 )
V
Fa
v1
v2
Q2 b
Tb
Ts2
T1
T2
T3
T4
Ts2

Kapasitas Produksi / jam

V x Fa x 60
D1 x t x Ts2

Q4

69.75

m2

Koefisien Alat / m2

1 / Q4

( E 09 )

0.0143

Jam

( E 02 )
V
Fa

40.00
0.83

km / jam
-

e Finisher
Kapasitas produksi
Faktor efisiensi alat
Kapasitas produksi / jam

V x Fa
D1 x t

Q5

494.05

m2

Koefisien Alat / m2

1 / Q5

( E 02 )

0.0020

Jam

( E 17 )
v
b
n
Fa

3.50
1.20
6.00
0.83

f Tandem Roller
Kecepatan rata rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor efisiensi alat

km/jam
m
lintasan
-

Kapasitas produksi / jam

( v x 1000 ) x b x Fa
n

Q6

581.00

m2

Koefisien Alat / m2

1 / Q6

( E 17 )

0.0017

Jam

Harga Satuan Pekerjaan Tahun 2012

KET.

Hal :39

PT Pelabuhan Indonesia I (Persero)

No

URAIAN

KODE

g Pneumatic Tire Roller


Kecepatan rata rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor efisiensi alat

( E 18 )
v
b
n
Fa

KOEF.

5.00
1.50
8.00
0.83

SATUAN

km / jam
m
lintasan
-

Kapasitas produksi / jam

( v x 1000 ) x b x Fa
n

Q7

778.13

m2

Koefisien Alat / m2

1 / Q7

( E 18 )

0.0013

Jam

h Alat Bantu
Diperlukan :
- Kereta dorong
=
2
- Skop
=
3
- Garpu
=
2
- Tongkat kontrol ketebalan hamparan

bh
bh
bh

3 TENAGA
Produksi menentukan : ASPALT MIXING PLANT ( AMP )
Produksi HRS / hari
=
Tk x Q2
Kebutuhan tenaga
- Pekerja
- Mandor
Koefisien tenaga /m2 :
- Pekerja
- Mandor

=
=

( Tk x P ) / Qt
( Tk x M ) / Qt

KET.

Lump sum

Q2
Qt

617.56
4,322.92

P
M

7.00
1.00

( L 01 )
( L 03 )

0.0113
0.0016

m2 / jam
m2

orang
orang

jam
jam

4 HARGA DASAR SATUAN UPAH, BAHAN, DAN ALAT


( Lihat Lampiran )
5 ANALISA HARGA SATUAN PEKERJAAN
Lihat perhitungan dalam " Formulir Standart Untuk Perekaman Analisa Masing - nasing
Harga Satuan "
DIDAPAT HARGA SATUAN PEKERJAAN
Rp

19,220.00

/ M2

6 WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan
= . . . . . . . Bulan
7 VOLUME PEKERJAAN YANG DIPERLUKAN
Volume Pekerjaan
= . . . . . . . M2

Harga Satuan Pekerjaan Tahun 2012

Hal :40

PT Pelabuhan Indonesia I (Persero)

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA


MASING MASING HARGA SATUAN
JENIS PEKERJAAN
SATUAN

NO

:
:

LASTON ( AC )
M2

KOMPONEN

A
1
2

TENAGA
Pekerja
Mandor

( L 01 )
( L 03 )

ASP 3

SATUAN

Jam
Jam

KUANTITAS

0.0217
0.0022

HARGA
SATUAN
(Rp.)

6,875.00
80,000.00

JUMLAH HARGA TENAGA


B
1
2
3
4

( M 03 )
( M 04 )
( M 05 )
( M 10 )

M3
M3
Kg
Kg

0.0336
0.0149
4.8015
6.6150

20,000.00
-

JUMLAH HARGA BAHAN

297.00
297.00

PERALATAN
Wheel Loader
AMP
Genset
Dump Truck
Aspal Finisher
Tandem Roller
Pneumatic Tyre Roller
Alat Bantu

( E 15 )
( E 01 )
( E 12 )
( E 09 )
( E 02 )
( E 17 )
( E 18 )

JUMLAH HARGA PERALATAN


JUMLAH
JASA 10 %
JUMLAH ( BELUM TERMASUK PPN )
DIBULATKAN

1
2
3
4

149.10
173.49
322.59

BAHAN
Agregat Kasar
Agregat Halus
Filler
Aspal

C
1
2
3
4
5
6
7
8

JUMLAH
HARGA
(Rp.)

Jam
Jam
Jam
Jam
Jam
Jam
Jam
Ls

0.0015
0.0022
0.0022
0.0348
0.0027
0.0016
0.0023
1.0000

344,900.53
6,816,302.41
369,422.18
227,650.78
216,085.57
177,076.60
215,630.16
500.00

513.02
14,782.34
801.16
7,918.11
585.77
284.46
494.85
500.00
25,879.71
26,499.30
2,649.93
29,149.23
29,149.00

Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak ) dan biaya biaya
lainnya

Harga Satuan Pekerjaan Tahun 2012

Hal :41

PT Pelabuhan Indonesia I (Persero)

URAIAN ANALISA HARGA SATUAN LASTON ( AC )


SATUAN

M2

No

URAIAN

I
1
2
3
4
5
6
7

II

ASP 4

ASUMSI
Menggunakan alat berat
Lokasi pekerjaan sepanjang jalan
Kondisi existing jalan sedang
Jarak rata rata Base Camp ke Lokasi pekerjaan
Tebal lapisan ( AC ) padat
Jam kerja efektif 1 hari
Faktor kehilangan material
- Agregat
- Aspal

KODE

KOEF.

SATUAN

L
t
Tk

20.0
0.04
7.00

Km
m
Jam

Fh 1
Fh 2

1.10
1.05

8 Komposisi campuran AC ( Spesifikasi )


- Coarse Agregat 30 - 50 %
- Fine Agregat 39 - 59 %
- Filler 4,5 - 7,5 %
- Aspal minimum 6,7 %

CA
FA
FF
As

61.15
27.00
4.85
7.00

%
%
%
%

9 Berat jenis bahan


- AC
- Coarse Agregat dan fine agregat
- Filler
- Aspal

D1
D2
D3
D4

2.25
1.80
2.00
1.03

t / m3
t / m3
t / m3
t / m3

M03
M04
M05
M10

0.034
0.015
4.802
6.615

m3
m3
Kg
Kg

1.50
0.90
0.83

m3
-

1.50
0.50
2.00

menit
menit
menit

KET.

METODA KERJA
1 WHEEL LOADER memuat agregat dan aspal kedalam Coldbin AMP
2 Agregat dan aspal dicampur dan dipanaskan dengan AMP untuk dimuat langsung ke
dalam Dump Truck dan diangkut ke lapangan
3 Campuran panas AC dihampar dengan Finisher dan dipadatakan dengan Tandem dan
Tire Roller
4 Selama pemadatan sekelompok pekerja merapikan tepi hamparan dengan
menggunakan alat bantu

III
1
a
b
c
d

PEMAKAIAN BAHAN ALAT DAN TENAGA


BAHAN
Agregat kasar
= {( CA x D1 x t m3 ) x ( Fh 1 )}/ D2
Agregat halus
= {( FA x D1 x t m3 ) x ( Fh 1 )}/ D2
Filler
= {( FF x D1 x t m3 ) x ( Fh 1 )}
Aspal
= {( AS x D1 x t m3 ) x ( Fh 2 )}x1000

2 ALAT
a Wheel Loader
Kapasitas bucket
Faktor bucket
Faktor efisiensi alat
Waktu siklus
- Muat
- Lain lain

( E 15 )
V
Fb
Fa
Ts 1
T1
T2
Ts 1

Kap Produksi / Jam

Koefisien Alat / m2

Harga Satuan Pekerjaan Tahun 2012

D2 x V x Fb x Fa x 60
D1 x t x Ts1
1 / Q1

Q1

672.30

m3

( E 15 )

0.0015

Jam

Hal :42

PT Pelabuhan Indonesia I (Persero)

No

URAIAN
b Aspalt Mixing Plant ( AMP )
Kapasitas produksi
faktor Efisiensi alat

KODE

KOEF.

SATUAN

( E 01 )
V
Fa

50.00
0.83

ton / jam
-

Kapasitas produksi / jam

V x Fa
D1 x t

Q2

461.11

m2

Koefisien Alat / m2

1 / Q2

( E 01 )

0.0022

Jam

( E 12 )
Q3

461.11

m2

( E 12 )

0.0022

Jam

4.00
0.83
40.00
50.00
0.50
1.00

m3
km / jam
km / jam
ton
menit

8.00
29.99
15.00
23.99
76.98

menit
menit
menit
menit
menit

c Generator Set ( Genset )


Kapasitas produksi / jam = sama dengan AMP
Koefisien Alat / m2

d Dump Truk ( DT )
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata rata bermuatan
Kecepatan rata rata kosong
Kapasitas AMP batch
Waktu menyiapkan 1 batch AC
Waktu Siklus
- Mengisi bak
=
- Angkut
=
- Tunggu + Dumping + Putar
- Kembali
=

1 / Q3

( V : Q2b ) x Tb
( L : v1 ) x 60 menit
( L : v2 ) x 60 menit

( E 09 )
V
Fa
v1
v2
Q2 b
Tb
Ts2
T1
T2
T3
T4
Ts2

Kapasitas Produksi / jam

V x Fa x 60
D1 x t x Ts2

Q4

28.75

m2

Koefisien Alat / m2

1 / Q4

( E 09 )

0.0348

Jam

( E 02 )
V
Fa

40.00
0.83

ton / jam
-

e Finisher
Kapasitas produksi
Faktor efisiensi alat
Kapasitas produksi / jam

V x Fa
D1 x t

Q5

368.89

m2

Koefisien Alat / m2

1 / Q5

( E 02 )

0.0027

Jam

( E 17 )
v
b
n
Fa

2.50
1.20
4.00
0.83

f Tandem Roller
Kecepatan rata rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor efisiensi alat

km / jam
m
lintasan
-

Kapasitas produksi / jam

( v x 1000 ) x b x Fa
n

Q6

622.50

m2

Koefisien Alat / m2

1 / Q6

( E 17 )

0.0016

Jam

Harga Satuan Pekerjaan Tahun 2012

KET.

Hal :43

PT Pelabuhan Indonesia I (Persero)

No

URAIAN

KODE

g Pneumatic Tire Roller


Kecepatan rata rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor efisiensi alat

( E 18 )
v
b
n
Fa

KOEF.

3.50
1.20
8.00
0.83

SATUAN

km / jam
m
lintasan
-

Kapasitas produksi / jam

( v x 1000 ) x b x Fa
n

Q7

435.75

m2

Koefisien Alat / m2

1 / Q7

( E 18 )

0.0023

Jam

h Alat Bantu
Diperlukan :
- Rambu
=
- Kereta dorong
=
- Skop
=
- Garpu
=
- Tongkat kontrol ketebalan hamparan

2
2
3
2

bh
bh
bh
bh

3 TENAGA
Produksi menentukan : ASPALT MIXING PLANT ( AMP )
Produksi AC / hari
=
Tk x Q2
Kebutuhan tenaga
- Pekerja
- Mandor
Koefisien tenaga /m2 :
- Pekerja
- Mandor

=
=

( Tk x P ) / Qt
( Tk x M ) / Qt

KET.

Lump sum

Q2
Qt

461.11
3,227.78

m2 / jam
m2

P
M

10.00
1.00

orang
orang

( L 01 )
( L 03 )

0.0217
0.0022

jam
jam

4 HARGA DASAR SATUAN UPAH, BAHAN, DAN ALAT


( Lihat Lampiran )
5 ANALISA HARGA SATUAN PEKERJAAN
Lihat perhitungan dalam " Formulir Standart Untuk Perekaman Analisa Masing - nasing
Harga Satuan "
DIDAPAT HARGA SATUAN PEKERJAAN
Rp

29,149.00

/ M2

6 WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan
= . . . . . . . Bulan
7 VOLUME PEKERJAAN YANG DIPERLUKAN
Volume Pekerjaan
= . . . . . . . M2

Harga Satuan Pekerjaan Tahun 2012

Hal :44

PT Pelabuhan Indonesia I (Persero)

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA


MASING MASING HARGA SATUAN
JENIS PEKERJAAN
SATUAN

NO

:
:

ASPHALT TREATED BASE ( ATB )


M3

KOMPONEN

A
1
2

TENAGA
Pekerja
Mandor

( L 01 )
( L 03 )

ASP 5

SATUAN

Jam
Jam

KUANTITAS

0.3880
0.0554

HARGA
SATUAN
(Rp.)

6,875.00
80,000.00

JUMLAH HARGA TENAGA


B
1
2
3
4

( M 03 )
( M 04 )
( M 05 )
( M 10 )

M3
M3
Kg
Kg

0.7028
0.5341
139.2
157.0

20,000.00
-

JUMLAH HARGA BAHAN

10,682.22
10,682.22

PERALATAN
Wheel Loader
AMP
Genset
Dump Truck
Aspal Finisher
Tandem Roller
Pneumatic Tyre Roller
Alat Bantu

( E 15 )
( E 01 )
( E 12 )
( E 09 )
( E 02 )
( E 17 )
( E 18 )

JUMLAH HARGA PERALATAN


JUMLAH
JASA 10 %
JUMLAH ( BELUM TERMASUK PPN )
DIBULATKAN

1
2
3
4

2,667.17
4,433.73
7,100.90

BAHAN
Agregat Kasar
Agregat Halus
Filler
Aspal

C
1
2
3
4
5
6
7
8

JUMLAH
HARGA
(Rp.)

Jam
Jam
Jam
Jam
Jam
Jam
Jam
Ls

0.0380
0.0554
0.0554
0.4906
0.0767
0.0430
0.0321
1.0000

344,900.53
6,816,302.41
369,422.18
227,650.78
216,085.57
177,076.60
215,630.16
500.00

13,110.40
377,770.98
20,474.00
111,693.42
16,566.56
7,619.47
6,927.88
500.00
554,662.71
572,445.84
57,244.58
629,690.42
629,690.00

Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak ) dan biaya biaya
lainnya

Harga Satuan Pekerjaan Tahun 2012

Hal :45

PT Pelabuhan Indonesia I (Persero)

URAIAN ANALISA HARGA SATUAN ASPHALT TREATED BASE ( ATB )


SATUAN

M3

No

URAIAN

I
1
2
3
4
5
6
7

II

ASP 6

ASUMSI
Menggunakan alat berat ( Cara mekanik )
Lokasi pekerjaan sepanjang jalan
Kondisi existing jalan sedang
Jarak rata rata Base Camp ke Lokasi pekerjaan
Tebal lapisan ( ATB ) padat
Jam kerja efektif 1 hari
Faktor kehilangan material
- Agregat
- Aspal

KODE

KOEF.

SATUAN

L
t
Tk

20.0
0.04
7.00

Km
m
Jam

Fh 1
Fh 2

1.10
1.05

8 Komposisi campuran ATB ( Spesifikasi )


- Coarse Agregat 40 - 60 %
- Fine Agregat 26 - 49,5 %
- Fraksi Filler 4,5 - 7,5 %
- Aspal minimum 6 %

CA
FA
FF
As

50.00
38.00
5.50
6.50

%
%
%
%

9 Berat jenis bahan


- ATB
- Coarse Agregat dan fine agregat
- Fraksi Filler
- Aspal

D1
D2
D3
D4

2.30
1.80
2.00
1.03

t / m3
t/m3
t/m3
t/m3

M03
M04
M05
M10

0.7028
0.5341
139.2
157.0

m3
m3
Kg
Kg

1.50
0.90
0.83

m3
-

1.50
0.50
2.00

menit
menit
menit

Q1

26.31

m3

( E 15 )

0.0380

Jam

KET.

METODA KERJA
1 WHEEL LOADER memuat agregat dan aspal kedalam Coldbin AMP
2 Agregat dan aspal dicampur dan dipanaskan dengan AMP untuk dimuat langsung ke
dalam Dump truck dan diangkut ke lokasi pekerjaan
3 Campuran panas ATB dihampar dengan Finisher dan dipadatakan dengan Tandem dan
Pneumatic Roller
4 Selama pemadatan sekelompok pekerja merapikan tepi hamparan dengan
menggunakan alat bantu

III
1
a
b
c
d

PEMAKAIAN BAHAN ALAT DAN TENAGA


BAHAN
Agregat kasar
= {( CA x D1 x 1 m3 ) x ( Fh 1 )}/ D2
Agregat halus
= {( FA x D1 x 1 m3 ) x ( Fh 1 )}/ D2
Filler
= {( FF x D1 x 1 m3 ) x ( Fh 1 )}
Aspal
= {( AS x D1 x 1 m3 ) x ( Fh 2 )}

2 ALAT
a Wheel Loader
Kapasitas bucket
Faktor bucket
Faktor efisiensi alat
Waktu siklus
- Muat
- Lain lain

( E 15 )
V
Fb
Fa
Ts 1
T1
T2
Ts 1

Kap Produksi / Jam

Koefisien Alat / m2

Harga Satuan Pekerjaan Tahun 2012

D2 x V x Fb x Fa x 60
D1 x Ts1
1 / Q1

Hal :46

PT Pelabuhan Indonesia I (Persero)

No

URAIAN

KODE

b Aspalt Mixing Plant ( AMP )


Kapasitas produksi
Faktor Efisiensi alat

KOEF.

SATUAN

( E 01 )
V
Fa

50.00
0.83

ton / jam
-

Kapasitas produksi / jam

V x Fa
D1

Q2

18.04

m3

Koefisien Alat / m3

1 / Q2

( E 01 )

0.0554

Jam

( E 12 )
Q3

18.04

m3

( E 12 )

0.0554

Jam

8.00
0.83
40.00
50.00
0.50
1.00

ton
km / jam
km / jam
ton
menit

16.00
29.99
15.00
23.99
84.99

menit
menit
menit
menit
menit

2.04

m3

c Generator Set ( Genset )


Kapasitas produksi / jam = sama dengan AMP
Koefisien Alat / m3

d Dump Truk ( DT )
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata rata bermuatan
Kecepatan rata rata kosong
Kapasitas AMP batch
Waktu menyiapkan 1 batch ATB
Waktu Siklus
- Mengisi bak
=
- Angkut
=
- Tunggu + Dumping + Putar
- Kembali
=

1 / Q3

( V : Q2b ) x Tb
( L : v1 ) x 60 menit
( L : v2 ) x 60 menit

( E 09 )
V
Fa
v1
v2
Q2 b
Tb
Ts2
T1
T2
T3
T4
Ts2

Kapasitas Produksi / jam

V x Fa x 60
D1 x Ts2

Q4

Koefisien Alat / m3

1 / Q4

( E 09 )

0.4906

Jam

V
Fa

40.00
0.75

ton/jam
-

Q5

13.04

m3

( E 02 )

0.0767

Jam

( E 17 )
v
b
n
Fa

3.50
1.20
6.00
0.83

km / jam
m
lintasan
-

e Finisher
Kapasitas produksi
Faktor efisiensi alat
Kapasitas produksi / jam

Koefisien Alat / m3

V x Fa
D1
1 / Q5

f Tandem Roller
Kecepatan rata rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor efisiensi alat
Kapasitas produksi / jam

( v x 1000 ) x b x t x Fa
n

Q6

23.24

m3

Koefisien Alat / m3

1 / Q6

( E 17 )

0.0430

Jam

Harga Satuan Pekerjaan Tahun 2012

KET.

Hal :47

PT Pelabuhan Indonesia I (Persero)

No

URAIAN

KODE

g Pneumatic Tire Roller


Kecepatan rata rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor efisiensi alat

KOEF.

SATUAN

( E 18 )
v
b
n
Fa

5.00
1.50
8.00
0.83

km / jam
m
lintasan
-

Kapasitas produksi / jam

( v x 1000 ) x b x t x Fa
n

Q7

31.13

m3

Koefisien Alat / m3

1 / Q7

( E 18 )

0.0321

Jam

h Alat Bantu
Diperlukan :
- Kereta dorong
=
2
- Skop
=
3
- Garpu
=
2
- Tongkat kontrol ketebalan hamparan

bh
bh
bh

3 TENAGA
Produksi menentukan : ASPALT MIXING PLANT ( AMP )
Produksi ATB / hari
=
Tk x Q2
Kebutuhan tenaga
- Pekerja
- Mandor
Koefisien tenaga /m2 :
- Pekerja
- Mandor

=
=

( Tk x P ) / Qt
( Tk x M ) / Qt

KET.

Lump sum

Q2
Qt

18.04
126.30

P
M

7.00
1.00

( L 01 )
( L 03 )

0.3880
0.0554

m3 / jam
m3

orang
orang

jam
jam

4 HARGA DASAR SATUAN UPAH, BAHAN, DAN ALAT


( Lihat Lampiran )
5 ANALISA HARGA SATUAN PEKERJAAN
Lihat perhitungan dalam " Formulir Standart Untuk Perekaman Analisa Masing - nasing
Harga Satuan "
DIDAPAT HARGA SATUAN PEKERJAAN
Rp

629,690.00

/ M3

6 WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan
= . . . . . . . . . Bulan
..
7 VOLUME PEKERJAAN YANG DIPERLUKAN
Volume Pekerjaan
= . . . . . . . . . M2
..

Harga Satuan Pekerjaan Tahun 2012

Hal :48

PT Pelabuhan Indonesia I (Persero)

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA


MASING MASING HARGA SATUAN
JENIS PEKERJAAN
SATUAN

NO

:
:

LAPIS RESAP PENGIKAT (PRIME COAT)


LITER

KOMPONEN

A
1
2

TENAGA
Pekerja
Mandor

( L 01 )
( L 03 )

SATUAN

Jam
Jam

ASP 7

KUANTITAS

0.0301
0.0060

HARGA
SATUAN
(Rp.)

JUMLAH
HARGA
(Rp.)

6,875.00
80,000.00

JUMLAH HARGA TENAGA


B
1
2

207.08
481.93
689.01

BAHAN
Aspal
( M 10 )
Karosene ( M 11 )

( M 10 )
( M 11 )

Kg
Liter

0.6417
0.4889

JUMLAH HARGA BAHAN


C
1
2
3

PERALATAN
Asphalt Sprayer
Compresor
Dump Truck

( E 03 )
( E 05 )
( E 08 )

JUMLAH HARGA PERALATAN


JUMLAH
JASA 10 %
JUMLAH ( BELUM TERMASUK PPN )
DIBULATKAN

1
2
3
4

Jam
Jam
Jam

0.0030
0.0031
0.0030

54,620.78
163,284.90
227,650.78

164.52
510.27
685.70
1,360.48
2,049.49
204.95
2,254.44
2,254.00

Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak ) dan biaya biaya
lainnya

Harga Satuan Pekerjaan Tahun 2012

Hal :49

PT Pelabuhan Indonesia I (Persero)

URAIAN ANALISA HARGA SATUAN LAPIS RESAP PENGIKAT


SATUAN

ASP 8

No

URAIAN

I
1
2
3
4
5
6

KODE

ASUMSI
Menggunakan alat berat
Lokasi pekerjaan sepanjang jalan
Jarak rata rata Base Camp ke Lokasi pekerjaan
Jam kerja efektif 1 hari
Faktor kehilangan material
Komposisi campuran AC ( Spesifikasi )
- Aspal AC - 10 atau AC - 20
- Minyak Flux / pencair

KOEF.

SATUAN

L
Tk
Fh

20.00
7.00
1.10

AS
K

56
44

D1
D2

1.05
0.80

PC
M10
M11

1.1000
0.6417
0.4889

liter
kg
liter

( E 03 )
V
Fa
Ts

800.00
0.83
2.00

liter
jam

7 Berat jenis bahan


- Aspal AC - 10 atau AC - 20
- Minyak Flux / pencair

KET.

Km
Jam
%
%

100 Bagian
80 Bagian

Kg / Lt
Kg / Lt

8 Bahan dasar ( aspal dan minyak pencair ) semuanya diterima di Lokasi Pekerjaan
II
1
2
3
4

III

METODA KERJA
Aspal dan minyak Flux dicampur dan dipanaskan sehingga menjadi campuran aspal cair
Permukaan yang akan dilapis dibersihkan dari debu dan kotoran dg air kompresor
Campuran aspal cair disemprotkan dg aspahalt sprayer ke atas permukaan yg akan dilapis
Angkutan aspal dan minyak Flux menggunakan Dump truck

PEMAKAIAN BAHAN ALAT DAN TENAGA


1 BAHAN
Untuk mendapatkan 1 liter lapis resap pengikat diperlukan
( 1 Liter x Fh )
a Aspal
= AS x PC x D1
b Kerosene
= K x PC
2 ALAT
a Asphalt Sprayer
Kapasitas alat
Faktor efisiensi alat
Waktu siklus ( termasuk proses pemanasan )
Kap Produksi / Jam

V x Fa
Ts
1 / Q1

Q1

332.00

liter

Koefisien Alat / Liter

( E 03 )

0.0030

jam

b Air Compresor
Kapasitas alat -----------> Diambil
Aplikasi Lapis Resap Pengikat Rata rata ( Spesifikasi )

( E 05 )
V
Ap

400.00
0.80

m2 / jam
liter / m2

Kapasitas produksi / jam

V x Ap

Q2

320.00

liter

Koefisien Alat / liter

1 / Q2

( E 05 )

0.0031

jam

Harga Satuan Pekerjaan Tahun 2012

Campuran

Hal :50

PT Pelabuhan Indonesia I (Persero)

No

URAIAN

KODE

c Dump Truk ( DT )
Sebagai alat pengangkut bahan di lokasi pekerjaan Dump Truck melayani alat
Asphalt Sprayer

KOEF.

SATUAN

( E 08 )

Kapasitas Produksi / jam

V x Fa
Ts

Q3

332.00

liter

Koefisien Alat / m2

1 / Q3

( E 08 )

0.0030

jam

Q4
Qt

332.00
2,324.00

Liter
Liter

P
M

10.00
2.00

orang
orang

( L 01 )
( L 03 )

0.0301
0.0060

jam
jam

3 TENAGA
Produksi menentukan : ASPALT FINISHER
Produksi Lapis Resap Pengikat / hari

Tk x Q4

Kebutuhan tenaga
- Pekerja
- Mandor
Koefisien tenaga /liter :
- Pekerja
- Mandor

=
=

( Tk x P ) / Qt
( Tk x M ) / Qt

KET.

4 HARGA DASAR SATUAN UPAH, BAHAN, DAN ALAT


( Lihat Lampiran )
5 ANALISA HARGA SATUAN PEKERJAAN
Lihat perhitungan dalam " Formulir Standart Untuk Perekaman Analisa Masing - nasing
Harga Satuan "
DIDAPAT HARGA SATUAN PEKERJAAN
Rp

2,254.00

/ LITER

6 WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan
= . . . . . . . . . Bulan
..
7 VOLUME PEKERJAAN YANG DIPERLUKAN
Volume Pekerjaan
= . . . . . . . . . Liter
..

Harga Satuan Pekerjaan Tahun 2012

Hal :51

PT Pelabuhan Indonesia I (Persero)

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA


MASING MASING HARGA SATUAN
JENIS PEKERJAAN
SATUAN

NO

:
:

LAPIS PONDASI AGREGAT KLAS A


M3

KOMPONEN

A
1
2

TENAGA
Pekerja
Mandor

( L 01 )
( L 03 )

SATUAN

Jam
Jam

ASP 9

KUANTITAS

0.4373
0.0625

HARGA
SATUAN
(Rp.)

6,875.00
80,000.00

JUMLAH HARGA TENAGA


B
1
2

( M 03 )
( M 04 )

M3
M3

0.7680
0.4320

20,000.00

JUMLAH HARGA BAHAN

8,640.00
8,640.00

PERALATAN
Wheel Loader
Dump Truck
Motor Grader
Vibratory Roller
Pneumatic Tyre Roller
Water Tank Truck
Alat Bantu

( E 15 )
( E 09 )
( E 13 )
( E 19 )
( E 18 )
( E 23 )

JUMLAH HARGA PERALATAN


JUMLAH
JASA 10 %
JUMLAH ( BELUM TERMASUK PPN )
DIBULATKAN
UNTUK 1 M2 TEBAL 20 CM
UNTUK 1 M2 TEBAL 15 CM
UNTUK 1 M2 TEBAL 10 CM

1
2
3
4

3,006.47
4,997.77
8,004.24

BAHAN
Agregat Kasar
Agregat Halus

C
1
2
3
4
5
6
7

JUMLAH
HARGA
(Rp.)

Jam
Jam
Jam
Jam
Jam
Jam
Ls

0.0625
0.1994
0.0117
0.0178
0.0043
0.0211
1.0000

344,900.53
227,650.78
236,640.05
236,640.05
215,630.16
167,998.54
500.00

21,546.66
45,389.05
2,771.89
4,223.83
923.72
3,542.14
500.00
78,897.29
95,541.53
9,554.15
105,095.68
105,095.00
21,019.00
15,764.00
10,509.00

Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak ) dan biaya biaya
lainnya

Harga Satuan Pekerjaan Tahun 2012

Hal :52

PT Pelabuhan Indonesia I (Persero)

URAIAN ANALISA HARGA SATUAN LAPIS PONDASI AGREGAT KLAS A


SATUAN

M3

No

ASP 10
URAIAN

I
1
2
3
4
5
6
7
8

ASUMSI
Menggunakan alat berat Cara mekanik
Lokasi pekerjaan sepanjang jalan
Kondisi existing jalan sedang
Jarak rata rata Base Camp ke Lokasi pekerjaan
Tebal Agregat padat
Faktor kembang material ( padat - lepas )
Jam kerja efektif per hari
Proporsi campuran
- Agregat Kasar
- Agregat halus

II

METODA KERJA
1 WHEEL LOADER mencampur dan memuat agregat ke dalam Dump Truck di Base
camp
2
Dump Truck mengangkut Agregat ke lokasi pekerjaan dan dihampar dg motor Grader
3 Hamparan Agregat di basahi dengan Water Tank Truck sebelum dipadatkan dengan
Tandem Roller & PTR
4 Selama pemadatan sekelompok pekerja akan merapikan tepi hamparan dan level
permukaan dengan menggunakan alat bantu

III

PEMAKAIAN BAHAN ALAT DAN TENAGA


1 BAHAN
a Agregat kasar
= Ak x 1 m3 x Fk
b Agregat halus
= Ah x 1 m3 x Fk
2 ALAT
a Wheel Loader
Kapasitas bucket
Faktor bucket
Faktor efisiensi alat
Waktu siklus
- Mencampur
- Memuat dan Lain lain

KODE

Koefisien Alat / m3

V x Fb x Fa x 60
Fk x Ts1
1 / Q1

b Dump Truk ( DT )
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata rata bermuatan
Kecepatan rata rata kosong
Waktu Siklus
- Waktu tempuh isi
=
( L : v1 ) x 60 menit
- Waktu tempuh kosong
=
( L : v2 ) x 60 menit
- lain lain termasuk menurunkan Agregat

20.0
0.15
1.20
7.00

Jam

Ak
Ah

64.00
36.00

%
%

M03
M04

0.7680
0.4320

m3
m3

1.50
0.90
0.83

m3
-

2.50
1.00
3.50

menit
menit
menit

Q1

16.01

m3

( E 15 )

0.0625

Jam

6.00
0.83
45.00
60.00

m3
km / jam
km / jam

26.65
19.99
3.00

menit
menit
menit

49.65

menit

( E 09 )
V
Fa
v1
v2
Ts2
T1
T2
T3
Ts2

Harga Satuan Pekerjaan Tahun 2012

SATUAN

L
t
Fk
Tk

( E 15 )
V
Fb
Fa
Ts 1
T1
T2
Ts 1

Kap Produksi / Jam

KOEF.

KET.

Km
m

Tabel; 5.1.2 (a)

Hal :53

PT Pelabuhan Indonesia I (Persero)

No

URAIAN

KODE

Kapasitas Produksi / jam

V x Fa x 60
Fk x Ts2

Q2

Koefisien Alat / m3

1 / Q2

( E 09 )

c Motor Grader
Panjang hamparan
Lebar efektif kerja blade
Faktor Efisiensi alat
Kecepatan rata rata alat
Jumlah lintasan
Waktu siklus
- Perataan 1 Lintasan
- Lain lain

( E 13 )
Lh
b
Fa
v
n
Ts 3
T1
T2
Ts 3

KOEF.

SATUAN

5.02

m3

0.1994

Jam

50.00
2.40
0.83
4.00
6.00

m
m
km / jam
Lintas

0.75
1.00
1.75

menit
menit
menit

Lh : ( v x 1000 x 60 menit )

Kapasitas produksi / jam

Lh x b x t x Fa x 60
n x Ts 3

Q3

85.37

m3

Koefisien Alat / m3

1 / Q3

( E 02 )

0.0117

Jam

( E 19 )
v
b
n
Fa

3.00
1.20
8.00
0.83

km / jam
m
lintasan
-

d Vibratory Roller
Kecepatan rata rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor efisiensi alat
Kapasitas produksi / jam

( v x 1000 ) x b x t x Fa
n

Q4

56.03

m3

Koefisien Alat / m3

1 / Q4

( E 19 )

0.0178

Jam

( E 18 )
v
b
n
Fa

5.00
1.50
4.00
0.83

e Pneumatic Tire Roller


Kecepatan rata rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor efisiensi alat
Kapasitas produksi / jam

Koefisien Alat / m3

( v x 1000 ) x b x t x Fa
n
1 / Q5

f Water Tank Truck


Volume tangki air
Kebutuhan air / m3 agregat padat
Pengisian tangki / jam
Faktor efisiensi alat

3 x pp

km/jam
m
lintasan
-

Q5

233.44

m3

( E 18 )

0.0043

Jam

( E 23 )
v
Wc
n
Fa

4.00
0.07
1.00
0.83

m3
m3
kali
-

Kapasitas produksi / jam

v x n x Fa
Wc

Q6

47.43

m3

Koefisien Alat / m3

1 / Q6

( E 23 )

0.0211

Jam

Harga Satuan Pekerjaan Tahun 2012

KET.

Hal :54

PT Pelabuhan Indonesia I (Persero)

No

URAIAN

KODE

KOEF.

SATUAN

KET.

g Alat Bantu
Diperlukan :
- Kereta dorong
- Skop
- Garpu

=
=
=

2
3
2

bh
bh
bh

3 TENAGA
Produksi menentukan : WHEEL LOADER
Produksi Agregat / hari
= Tk x Q1
Kebutuhan tenaga
- Pekerja
- Mandor
Koefisien tenaga /m2 :
- Pekerja
- Mandor

=
=

( Tk x P ) / Qt
( Tk x M ) / Qt

Lump sum

Q1
Qt

16.01
112.05

P
M

7.00
1.00

( L 01 )
( L 03 )

0.4373
0.0625

m3 / jam
m3

orang
orang

jam
jam

4 HARGA DASAR SATUAN UPAH, BAHAN, DAN ALAT


( Lihat Lampiran )
5 ANALISA HARGA SATUAN PEKERJAAN
Lihat perhitungan dalam " Formulir Standart Untuk Perekaman Analisa Masing - nasing
Harga Satuan "
DIDAPAT HARGA SATUAN PEKERJAAN
Rp

105,095.00

/ M2

6 WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan
= .........B
. ulan
7 VOLUME PEKERJAAN YANG DIPERLUKAN
Volume Pekerjaan
= .........M
. 3

Harga Satuan Pekerjaan Tahun 2012

Hal :55

PT Pelabuhan Indonesia I (Persero)

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA


MASING MASING HARGA SATUAN
JENIS PEKERJAAN
SATUAN

NO

A
1
2

:
:

LAPIS PONDASI AGREGAT KLAS B


M3

KOMPONEN

TENAGA
Pekerja
Mandor

( L 01 )
( L 03 )

SATUAN

Jam
Jam

ASP 11

KUANTITAS

0.4373
0.0625

HARGA
SATUAN
(Rp.)

6,875.00
80,000.00

JUMLAH HARGA TENAGA


B
1
2

3,006.47
4,997.77
8,004.24

BAHAN
Agregat Kasar
Agregat Halus

( M 03 )
( M 04 )

M3
M3

0.7080
0.4920

20,000.00

JUMLAH HARGA BAHAN


C
1
2
3
4
5
6
7

JUMLAH
HARGA
(Rp.)

9,840.00
9,840.00

PERALATAN
Wheel Loader
Dump Truck
Motor Grader
Vibratory Roller
Pneumatic Tyre Roller
Water Tank Truck
Alat Bantu

( E 15 )
( E 09 )
( E 13 )
( E 19 )
( E 18 )
( E 23 )

Jam
Jam
Jam
Jam
Jam
Jam
Ls

0.0625
0.1994
0.0117
0.0178
0.0043
0.0211
1.0000

344,900.53
227,650.78
236,640.05
236,640.05
215,630.16
167,998.54
500.00

JUMLAH HARGA PERALATAN


JUMLAH
JASA 10 %
JUMLAH ( BELUM TERMASUK PPN )
DIBULATKAN
UNTUK 1 M2 TEBAL 20 CM
UNTUK 1 M2 TEBAL 15 CM
UNTUK 1 M2 TEBAL 10 CM

21,546.66
45,389.05
2,771.89
4,223.83
923.72
3,542.14
500.00
78,897.29
96,741.53
9,674.15
106,415.68
106,415.00
21,283.00
15,962.00
10,641.00

1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak ) dan biaya biaya
lainnya

Harga Satuan Pekerjaan Tahun 2012

Hal :56

PT Pelabuhan Indonesia I (Persero)

URAIAN ANALISA HARGA SATUAN LAPIS PONDASI AGREGAT KLAS B


SATUAN

M3

No

ASP 12
URAIAN

I
1
2
3
4
5
6
7
8

ASUMSI
Menggunakan alat berat
Lokasi pekerjaan sepanjang jalan
Kondisi existing jalan sedang
Jarak rata rata Base Camp ke Lokasi pekerjaan
Tebal Agregat padat
Faktor kembang material ( padat - lepas )
Jam kerja efektif per hari
Proporsi campuran
- Agregat Kasar
- Agregat halus

II

METODA KERJA
1 WHEEL LOADER mencampur dan memuat agregat ke dalam Dump Truck di Base
camp
2 Dump Truck mengangkut Agregat ke lokasi pekerjaan dan dihampar dengan motor
Grader
3 Hamparan Agregat di basahi dengan Water Tank Truck sebelum dipadatkan dengan
Tandem Roller & PTR
4 Selama pemadatan sekelompok pekerja akan merapikan tepi hamparan dan level
permukaan dengan menggunakan alat bantu

III

PEMAKAIAN BAHAN ALAT DAN TENAGA


1 BAHAN
a Agregat kasar
= Ak x 1 m3 x Fk
b Agregat halus
= Ah x 1 m3 x Fk
2 ALAT
a Wheel Loader
Kapasitas bucket
Faktor bucket
Faktor efisiensi alat
Waktu siklus
- Mencampur
- Memuat dan Lain lain

KODE

Koefisien Alat / m2

V x Fb x Fa x 60
Fk x Ts1
1 / Q1

b Dump Truk ( DT )
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata rata bermuatan
Kecepatan rata rata kosong
Waktu Siklus
- Waktu tempuh isi
=
( L : v1 ) x 60 menit
- Waktu tempuh kosong
=
( L : v2 ) x 60 menit
- lain lain termasuk menurunkan Agregat

20.0
0.15
1.20
7.00

Jam

Ak
Ah

59.00
41.00

%
%

M03
M04

0.7080
0.4920

m3
m3

1.50
0.90
0.83

m3
-

2.50
1.00
3.50

menit
menit
menit

Q1

16.01

m3

( E 15 )

0.0625

Jam

6.00
0.83
45.00
60.00

m3
km / jam
km / jam

26.65
19.99
3.00

menit
menit
menit

49.65

menit

( E 09 )
V
Fa
v1
v2
Ts2
T1
T2
T3
Ts2

Harga Satuan Pekerjaan Tahun 2012

SATUAN

L
t
Fk
Tk

( E 15 )
V
Fb
Fa
Ts 1
T1
T2
Ts 1

Kap Produksi / Jam

KOEF.

KET.

Km
m

Tabel; 5.1.2 (a)

Hal :57

PT Pelabuhan Indonesia I (Persero)

No

URAIAN

KODE

Kapasitas Produksi / jam

V x Fa x 60
Fk x Ts2

Q2

Koefisien Alat / m2

1 / Q2

( E 09 )

c Motor Grader
Panjang hamparan
Lebar efektif kerja blade
Faktor Efisiensi alat
Kecepatan rata rata alat
Jumlah lintasan
Waktu siklus
- Perataan 1 Lintasan
- Lain lain

( E 13 )
Lh
b
Fa
v
n
Ts 3
T1
T2
Ts 3

KOEF.

SATUAN

5.02

m3

0.1994

Jam

50.00
2.40
0.83
4.00
6.00

m
m
km / jam
Lintas

0.75
1.00
1.75

menit
menit
menit

( Lh x 60 ) : ( v x 1000 )

Kapasitas produksi / jam

Lh x b x t x Fa x 60
n x Ts 3

Q3

85.37

m3

Koefisien Alat / m2

1 / Q3

( E 02 )

0.0117

Jam

( E 17 )
v
b
n
Fa

3.00
1.20
8.00
0.83

km / jam
m
lintasan
-

d Vibratory Roller
Kecepatan rata rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor efisiensi alat
Kapasitas produksi / jam

( v x 1000 ) x b x t x Fa
n

Q4

56.03

m3

Koefisien Alat / m2

1 / Q4

( E 17 )

0.0178

Jam

( E 18 )
v
b
n
Fa

5.00
1.50
4.00
0.83

e Pneumatic Tire Roller


Kecepatan rata rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor efisiensi alat
=

( v x 1000 ) x b x t x Fa
n

Q5

233.44

m3

Koefisien Alat / m2

1 / Q5

( E 18 )

0.0043

Jam

( E 23 )
v
Wc
n
Fa

4.00
0.07
1.00
0.83

km / jam
m3
lintasan
-

Kapasitas produksi / jam

v x n x Fa
Wc

Q6

47.43

m3

Koefisien Alat / m2

1 / Q6

( E 23 )

0.0211

Jam

Harga Satuan Pekerjaan Tahun 2012

3 x pp

km / jam
m
lintasan
-

Kapasitas produksi / jam

f Water Tank Truck


Volume tangki air
Kebutuhan air / m3 agregat padat
Pengisian tangki / jam
Faktor efisiensi alat

KET.

Hal :58

PT Pelabuhan Indonesia I (Persero)

No

URAIAN

KODE

KOEF.

SATUAN

KET.

g Alat Bantu
Diperlukan :
- Kereta dorong
- Skop
- Garpu

=
=
=

2
3
2

bh
bh
bh

3 TENAGA
Produksi menentukan : WHEEL LOADER
Produksi Agregat / hari
=

Tk x Q1

Kebutuhan tenaga
- Pekerja
- Mandor
Koefisien tenaga /m2 :
- Pekerja
- Mandor

=
=

( Tk x P ) / Qt
( Tk x M ) / Qt

Lump sum

Q1
Qt

16.01
112.05

P
M

7.00
1.00

( L 01 )
( L 03 )

0.4373
0.0625

m3 / jam
m3 / jam

orang
orang

jam
jam

4 HARGA DASAR SATUAN UPAH, BAHAN, DAN ALAT


( Lihat Lampiran )
5 ANALISA HARGA SATUAN PEKERJAAN
Lihat perhitungan dalam " Formulir Standart Untuk Perekaman Analisa Masing - nasing
Harga Satuan "
DIDAPAT HARGA SATUAN PEKERJAAN
Rp

106,415.00

/ M2

6 WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan
= .........B
. ulan
7 VOLUME PEKERJAAN YANG DIPERLUKAN
Volume Pekerjaa
= .........M
. 2

Harga Satuan Pekerjaan Tahun 2012

Hal :59

PT Pelabuhan Indonesia I (Persero)

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA


MASING MASING HARGA SATUAN
JENIS PEKERJAAN
SATUAN

NO

:
:

LAPIS PEREKAT (TACK COAT)


LITER

KOMPONEN

A
1
2

TENAGA
Pekerja
Mandor

( L 01 )
( L 03 )

ASP 13

SATUAN

Jam
Jam

KUANTITAS

0.0301
0.0060

HARGA
SATUAN
(Rp.)

JUMLAH
HARGA
(Rp.)

6,875.00
80,000.00

JUMLAH HARGA TENAGA


B
1
2

207.08
481.93
689.01

BAHAN
Aspal
Kerosene

( M 10 )
( M 11 )

Kg
Liter

0.8880
0.2530

JUMLAH HARGA BAHAN


C
1
2
3

PERALATAN
Asphalt Sprayer
Compresor
Dump Truck

( E 03 )
( E 05 )
( E 08 )

JUMLAH HARGA PERALATAN


JUMLAH
JASA 10 %
JUMLAH ( BELUM TERMASUK PPN )
DIBULATKAN

1
2
3
4

Jam
Jam
Jam

0.0030
0.0063
0.0030

54,620.78
163,284.90
227,650.78

164.52
1,020.53
685.70
1,870.75
2,559.75
255.98
2,815.73
2,815.00

Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak ) dan biaya biaya
lainnya

Harga Satuan Pekerjaan Tahun 2012

Hal :60

PT Pelabuhan Indonesia I (Persero)

URAIAN ANALISA HARGA SATUAN LAPIS PEREKAT


SATUAN

M3

No

ASP 14
URAIAN

I
1
2
3
4
5
6

ASUMSI
Menggunakan alat berat
Lokasi pekerjaan sepanjang jalan
Jarak rata rata Base Camp ke Lokasi pekerjaan
Jam kerja efektif 1 hari
Faktor kehilangan material
Komposisi campuran ( Spesifikasi )
- Aspal AC - 10 atau AC - 20
- Minyak Flux / pencair

7 Berat jenis bahan


- Aspal AC - 10 atau AC - 20
- Minyak Flux / pencair

KODE

KOEF.

SATUAN

L
Tk
Fh

20.00
7.00
1.10

AS
K

77
23

D1
D2

1.05
0.80

PC
M10
M11

1.1000
0.8880
0.2530

Liter
Kg
Liter

( E 03 )
V
Fa
Ts

800.00
0.83
2.00

Liter
Jam

KET.

Km
Jam
%
%

100 Bagian
30 Bagian

Kg / Lt
Kg / Lt

8
Bahan dasar ( aspal dan minyak pencair ) semuanya diterima di Lokasi Pekerjaan
II

METODA KERJA
1 Aspal dan minyak Flux dicampur dan dipanaskan sehingga menjadi campuran aspal
cair
2
Permukaan yang akan dilapis dibersihkan dari debu dan kotoran dg air kompresor
3 Campuran aspal cair disemprotkan dg aspahalt sprayer ke atas permukaan yg akan
dilapis
4 Angkutan aspal dan minyak Flux menggunakan Dump truck

III

PEMAKAIAN BAHAN ALAT DAN TENAGA


1 BAHAN
Untuk mendapatkan 1 liter lapis resap pengikat diperlukan
( 1 Liter x Fh )
a Aspal
= AS x PC x D1
b Kerosene
= K x PC
2 ALAT
a Asphalt Sprayer
Kapasitas alat
Faktor efisiensi alat
Waktu siklus ( termasuk proses pemanasan )
Kap Produksi / Jam

V x Fa
Ts
1 / Q1

Q1

332.00

Liter

Koefisien Alat / Liter

( E 03 )

0.0030

Jam

b Air Compresor
Kapasitas alat . . . . . Diambil
Aplikasi Lapis Resap Pengikat Rata rata ( Spesifikasi )

( E 05 )
V
Ap

400.00
0.40

m2 / jam
Liter / m2

Kapasitas produksi / jam

V x Ap

Q2

160.00

Liter

Koefisien Alat / liter

1 / Q2

( E 05 )

0.0063

Jam

Harga Satuan Pekerjaan Tahun 2012

Campuran

Hal :61

PT Pelabuhan Indonesia I (Persero)

No

URAIAN

KODE

c Dump Truk ( DT )
Sebagai alat pengangkut bahan di lokasi pekerjaan Dump Truck melayani alat
Asphalt Sprayer

KOEF.

SATUAN

( E 08 )

Kapasitas Produksi / jam

V x Fa
Ts

Q3

332.00

Liter

Koefisien Alat / m2

1 / Q3

( E 08 )

0.0030

Jam

Q4
Qt

332.00
2,324.00

Liter
Liter

P
M

10.00
2.00

orang
orang

( L 01 )
( L 03 )

0.0301
0.0060

jam
jam

3 TENAGA
Produksi menentukan : ASPALT FINISHER
Produksi Lapis Perekat / hari =

Tk x Q4

Kebutuhan tenaga
- Pekerja
- Mandor
Koefisien tenaga /liter :
- Pekerja
- Mandor

=
=

( Tk x P ) / Qt
( Tk x M ) / Qt

KET.

4 HARGA DASAR SATUAN UPAH, BAHAN, DAN ALAT


( Lihat Lampiran )
5 ANALISA HARGA SATUAN PEKERJAAN
Lihat perhitungan dalam " Formulir Standart Untuk Perekaman Analisa Masing - nasing
Harga Satuan "
DIDAPAT HARGA SATUAN PEKERJAAN
Rp

2,815.00

/ Liter

6 WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan
= .........B
. ulan
7 VOLUME PEKERJAAN YANG DIPERLUKAN
Volume Pekerjaan
= . . . . . . . . . L. iter

Harga Satuan Pekerjaan Tahun 2012

Hal :62

PT Pelabuhan Indonesia I (Persero)

FORMULIR STANDAR UNTUK PEREKAMAN ANALISA


MASING MASING HARGA SATUAN
JENIS PEKERJAAN
SATUAN

NO

:
:

PENYIAPAN BADAN JALAN (PEMADATAN DAN PERATAAN)


M2

KOMPONEN

A
1
2

TENAGA
Pekerja
Mandor

( L 01 )
( L 02 )

SATUAN

Jam
Jam

KUANTITAS

0.0161
0.0040

ASP 15
HARGA
SATUAN
(Rp.)

6,875.00
80,000.00

JUMLAH HARGA TENAGA


B

JUMLAH
HARGA
(Rp.)

110.44
321.29
431.73

BAHAN
JUMLAH HARGA BAHAN

C
1
2
3
4

PERALATAN
Motor Grader
Vibratory Roller
Water Tank Truck
Alat Bantu

( E 13 )
( E 19 )
( E 23 )

JUMLAH HARGA PERALATAN


JUMLAH
JASA 10 %
JUMLAH ( BELUM TERMASUK PPN )
DIBULATKAN

1
2
3
4

Jam
Jam
Jam
Ls

0.0025
0.0040
0.0105
1.0000

384,919.36
236,640.05
167,998.54
500.00

966.16
950.36
1,771.07
500.00
4,187.59
4,619.32
461.93
5,081.25
5,081.00

Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak ) dan biaya biaya
lainnya

Harga Satuan Pekerjaan Tahun 2012

Hal :63

PT Pelabuhan Indonesia I (Persero)

URAIAN ANALISA HARGA SATUAN PENYIAPAN BADAN JALAN


( PEMADATAN DAN PERATAAN )
SATUAN

M2

No

ASP 16
URAIAN

I
1
2
3
4
5

ASUMSI
Pekerjaan dilakukan pada hanya pada tanah galian
Pekerjaan dilakukan secara mekanis
Lokasi pekerjaan : sepanjang jalan
Kondisi jalan : jelek / belum padat
Jam kerja efektif per hari

II

URUTAN KERJA
1 Motor Grader meratakan permukaan hasil galian
2 Vibro Roller memadatkan permukaan jalan yang telah diratakan oleh Motor grader
3 Sekelompok pekerja akan membanru meratakan badan jalan dengan alat bantu
permukaan dengan menggunakan alat bantu

III

PEMAKAIAN BAHAN ALAT DAN TENAGA


1 BAHAN
Tidak diperlukan bahan / material
2 ALAT
a Motor Grader
Panjang hamparan
Lebar efektif kerja blade
Faktor Efisiensi alat
Kecepatan rata rata alat
Jumlah lintasan
Waktu siklus
- Perataan 1 Lintasan
- Lain lain

KODE

Tk

( E 13 )
Lh
b
Fa
v
n
Ts 1
T1
T2
Ts 1

KOEF.

SATUAN

7.00

Jam

50.00
2.40
0.83
2.00
6.00

m
m
km / jam
Lintas

1.50
1.00
2.50

menit
menit
menit

Lh : ( v x 1000 x 60 menit )

Kapasitas produksi / jam

Lh x b x Fa x 60
n x Ts 1

Q1

398.40

m3

Koefisien Alat / m3

1 / Q1

( E 02 )

0.0025

Jam

( E 19 )
v
b
n
Fa

2.00
1.20
8.00
0.83

b Vibratory Roller
Kecepatan rata rata alat
Lebar efektif pemadatan
Jumlah lintasan
Faktor efisiensi alat
=

( v x 1000 ) x b x Fa
n

Q2

249.00

m3

Koefisien Alat / m3

1 / Q2

( E 19 )

0.0040

Jam

( E 23 )
v
Wc
n
Fa

4.00
0.07
2.00
0.83

m3
m3
kali
-

Harga Satuan Pekerjaan Tahun 2012

3 x pp

km / jam
m
lintasan
-

Kapasitas produksi / jam

c Water Tank Truck


Volume tangki air
Kebutuhan air / m3 agregat padat
Pengisian tangki / jam
Faktor efisiensi alat

KET.

Hal :64

PT Pelabuhan Indonesia I (Persero)

No

URAIAN

KODE

KOEF.

SATUAN

Kapasitas produksi / jam

v x n x Fa
Wc

Q3

94.86

m3

Koefisien Alat / m3

1 / Q3

( E 23 )

0.0105

Jam

KET.

g Alat Bantu
Diperlukan :
- Skop

bh

3 TENAGA
Produksi menentukan : VIBRATORY ROLLER
Produksi Pekerjaan / hari =
Tk x Q2
Kebutuhan tenaga
- Pekerja
- Mandor
Koefisien tenaga /m2 :
- Pekerja
- Mandor

=
=

( Tk x P ) / Qt
( Tk x M ) / Qt

Lump sum

Q2
Qt

249.00
1,743.00

P
M

4.00
1.00

( L 01 )
( L 03 )

0.0161
0.0040

m3 / jam
m3

orang
orang

jam
jam

4 HARGA DASAR SATUAN UPAH, BAHAN, DAN ALAT


( Lihat Lampiran )
5 ANALISA HARGA SATUAN PEKERJAAN
Lihat perhitungan dalam " Formulir Standart Untuk Perekaman Analisa Masing - nasing
Harga Satuan "
DIDAPAT HARGA SATUAN PEKERJAAN
Rp

5,081.00

/ M2

6 WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan
= .........B
. ulan
7 VOLUME PEKERJAAN YANG DIPERLUKAN
Volume Pekerjaan
= .........M
. 3

Harga Satuan Pekerjaan Tahun 2012

Hal :65

PT Pelabuhan Indonesia I (Persero)

NO.

MACAM ALAT

SATUAN

HARGA

A.1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

Mesin penyampur aspal (AMP)


Aspahlt Finisher
Mesin penyemprot aspal 800 liter (Asphlt Sprayer)
Buldozer 100 - 150 HP
Compressor 4000 - 6500 L/M
Concrette Mixer 0,3 - 0,6 m3
Crane 10 - 15 Ton
Dump Truck 3 - 4 M3
Dump Truck 8 ton 125 HP
Excavator 80 - 140 HP
Flat Bed Truck (Truk Bak Terbuka) 3 - 4 m3
Genset 125 KVA
Motor Grader > 100 HP
Track Loader 75 - 100 HP
Wheel Loader 105 HP
Mesin Gilas 3 Roda 8 - 10 ton (Three Wheel Roller)
Mesin Gilas Tandem 6 - 8 ton (Tandem Roller)
Mesin Roda Karet 8 - 10 ton (Pneumatic Tyre Roller)
Mesin Gilas getar otomatis 5 - 8 T
Alat penggetar beton 4 HP (Concrette Vibrator)
Pemecah batu 220 HP (Stone Crusher)
Water Pump / Pompa Air 70 - 100 mm
Truk tangki air 100 HP 4000 L (Water Tank Truck )
Stamper 5 HP
Jack Hammer
Fulvi Mixer
Mesin penyaring 8 HP
Chip Spreader
Mesin penghampar 1820 MM 30 HP
Thriller gandeng 1 ton
Dump Truck 3,5 ton 44 HP

Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
jam
jam
jam
jam
jam

7,500,000,000.00
715,000,000.00
145,000,000.00
700,000,000.00
175,000,000.00
45,000,000.00
300,000,000.00
100,000,000.00
145,000,000.00
250,000,000.00
250,000,000.00
440,000,000.00
880,000,000.00
300,000,000.00
840,000,000.00
125,000,000.00
460,000,000.00
510,000,000.00
500,000,000.00
12,000,000.00
491,500,000.00
5,000,000.00
50,000,000.00
3,000,000.00
3,500,000.00
100,000,000.00
50,000.00
50,000.00
181,000.00
184,000.00
118,000.00

32
33
34
35
36
37
38
39
40
41
42
43

Pompa air (D 5 cm) 30 m3 / jam


Thriller 1ton
Traktor
Alat Bor
Alat Ukur
Beton Molen
Mata Cutter
Mesin Cutter
Motor Walls
Peralatan Las
Sprayer
Alat bantu untuk pekerjaan analisa - E

jam
jam
jam
jam
jam
jam
bh
jam
jam
jam
jam
ls

11,000.00
15,000.00
15,000.00
150,000.00
75,000.00
25,000.00
1,000,000.00
60,000.00
20,000.00
75,000.00
48,000.00
500.00

Analisa Harga Satuan Pekerjaan Tahun 2012

KETERANGAN

Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Sewa
Sewa
Sewa
Sewa
Sewa
Sewa
Sewa
Sewa
Sewa
Sewa
Sewa
baru
Sewa
Sewa
Sewa
Sewa

Hal :66

ANALISA BASE

PT Pelabuhan Indonesia I (Persero)

No.
(1)

Macam Pekerjaan
(2)

BS1

1 m2 Menghampar dan mengisi bahan perkerasan


Pekerja
1.5000
org
Mandor
0.0730
org

X Rp.
X Rp.

491,200.00
491,200.00
JUMLAH

736,800.00
35,857.60
772,657.60

1 m3 Menyawur pasir
Pekerja

X Rp.

491,200.00
JUMLAH

491,200.00
491,200.00

491,200.00
491,200.00
491,200.00
491,200.00
491,200.00
491,200.00
491,200.00
491,200.00
JUMLAH

491,200.00
491,200.00
491,200.00
491,200.00

BS2

BS3

BS4

1.0000

1 hari Menggilas dengan motor walls


Masinis
1.0000
Kenek
1.0000
Penjaga
1.0000
Pekerja
1.0000
Olie
1.0000
Olie SAE
1.0000
Vet
0.7500
Solar
16.0000

Upah
(3)

org

org
org
org
org
ltr
ltr
ltr
ltr

X
X
X
X
X
X
X
X

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100 m2 Perkerasan lapis pondasi bawah (sub base) tebal 20 cm padat


3
m
Pasair pasang
5.0000
X Rp.
Batu belah 15/20
Batu pecah 5/7 cm
Pasir urug
Isi batu berkerasan
Menyawur pasir

1,964,800.00

Bahan
(4)

491,200.00
491,200.00
368,400.00
7,859,200.00
9,210,000.00

491,200.00

2,456,000.00

23.0000

m3

X Rp.

491,200.00

11,297,600.00

3.0000

X Rp.

491,200.00

1,473,600.00

6.5000

X Rp.

491,200.00

26.0000
6.5000

m3
Tng

X Rp.
X Rp.

491,200.00
491,200.00
JUMLAH

12,771,200.00
3,192,800.00
15,964,000.00

18,420,000.00

3,192,800.00

Tiap m2
1/100

15,964,000.00

18,420,000.00

159,640.00

184,200.00

1/200

1,964,800.00

9,210,000.00

9,824.00

46,050.00

1/200

JUMLAH

169,464.00

230,250.00

Biaya menggilas
Sewa motor walls

BS5

100 m2 Pembuatan lapis pondasi bawah (sub base) tebal 15 cm padat


m3
Pasair urug
5.0000
X Rp.

491,200.00

2,456,000.00

17.5000

m3

X Rp.

491,200.00

8,596,000.00

Batu pecah 5/7 cm

3.0000

X Rp.

491,200.00

1,473,600.00

Pasir urug (pengisi)

6.5000

m3

X Rp.

491,200.00

Isi batu berkerasan


20.5000
Menyawur pasir
5.0000
JUMLAH ( BELUM TERMASUK PPN )

m3
Tng

X Rp.
X Rp.

491,200.00
491,200.00

Batu belah 15/20

3,192,800.00
10,069,600.00
2,456,000.00
12,525,600.00

15,718,400.00

Tiap m2
1/100

12,525,600.00

15,718,400.00

125,256.00

157,184.00

1/200

1,964,800.00

9,210,000.00

9,824.00

46,050.00

1/200

JUMLAH

135,080.00

203,234.00

Biaya menggilas
Sewa motor walls

Analisa Harga Satuan Pekerjaan KPUT Tahun 2012

Hal :67

No.
(1)
BS6

PT Pelabuhan Indonesia I (Persero) Macam

Pekerjaan
(2)

Upah
(3)

100 m2 Pembuatan lapis pondasi atas (base) tebal 10 cm padat


m3
Batu koral 5/7 cm
10.0000
X Rp.
3
m
Batu koral 3/4 cm
2.0000
X Rp.
3

Bahan
(4)

491,200.00

4,912,000.00

491,200.00

982,400.00

Batu koral 2/3 cm

1.0000

X Rp.

491,200.00

491,200.00

Pasir urug (pengisi)

3.2500

m3

X Rp.

491,200.00

1,596,400.00

Isi batu berkerasan


Menyawur pasir

13.0000
3.2500

m
Tng

X Rp.
X Rp.

491,200.00
491,200.00
JUMLAH

6,385,600.00
1,596,400.00
7,982,000.00

7,982,000.00

Tiap m

1/100

7,982,000.00

7,982,000.00

79,820.00

79,820.00

1/150

1,964,800.00

9,210,000.00

13,098.67

61,400.00

1/150

JUMLAH

92,918.67

141,220.00

79,820.00

63,856.00

9,210,000.00

13,098.67

61,400.00

JUMLAH

13,098.67

125,256.00

79,820.00

63,856.00

9,210,000.00

9,824.00

46,050.00

JUMLAH

9,824.00

109,906.00

Biaya menggilas
Sewa motor walls

BS7

BS8

BS9

1 m2 Pembuatan lapis pondasi atas (base) tebal 8 cm padat


8/10
x
79,820.00
Biaya menggilas
1/150
x
1,964,800.00
Sewa motor walls
1/150
x
-

Pembuatan lapis pondasi atas (base) tebal 7 cm padat


1/100
x
79,820.00
Biaya menggilas
1/200
x
1,964,800.00
Sewa motor walls
1/200
x
-

100 m2 Lapisan Penetrasi 4 cm padat


Krokos D 20 - 40 mm

0.2400

X Rp.

491,200.00

117,888.00

Split D 10 mm

0.4800

X Rp.

491,200.00

235,776.00

Split D 30 - 40 mm

3.5000

m3

X Rp.

491,200.00

1,719,200.00

Split D 10 - 20 mm

1.2000

m3

X Rp.

491,200.00

589,440.00

1.2500
14.0000
1.0000
1.5000
1.0000
1.0000
1.0000
400.0000
80.0000
1.0000

X
X
X
X
X
X
X
X
X
X

491,200.00
491,200.00
491,200.00
491,200.00
491,200.00
491,200.00
491,200.00
491,200.00
491,200.00
491,200.00
JUMLAH

Kayu bakar
Pekerja
Mandor
Juru godog aspal
Masinis
Kenek
Penyemprot
Aspal
Aspal lem
Sprayer (sewa)

Analisa Harga Satuan Pekerjaan KPUT Tahun 2012

m
org
org
org
org
org
org
kg
kg
hr

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

614,000.00
6,876,800.00
491,200.00
736,800.00
491,200.00
491,200.00
491,200.00

9,578,400.00

196,480,000.00
39,296,000.00
491,200.00
239,543,504.00

Hal :68

No.
(1)

PT Pelabuhan Indonesia I (Persero) Macam

Pekerjaan
(2)

Upah
(3)

Bahan
(4)

Tiap m2
1/100

9,578,400.00

239,543,504.00

95,784.00

2,395,435.04

4/12,5/200

1,964,800.00

9,210,000.00

3,143.68

14,736.00

1/200

JUMLAH

98,927.68

2,410,171.04

491,200.00

61,400,000.00

491,200.00

491,200.00

491,200.00
491,200.00
491,200.00
491,200.00
JUMLAH

442,080.00

62,333,280.00

122,800.00
3,978,720.00
196,480.00
4,298,000.00

Biaya menggilas
Sewa motor walls

BS10

100 m2 Pengaspalan sand sheet (latasir), tebal 1 cm jereng


Aspal
125.0000
kg
X Rp.
m3
Pasair pasang
1.0000
X Rp.
m3
Kayu bakar
0.9000
X Rp.
Juru godog aspal
0.2500
org
X Rp.
Pekerja
8.1000
org
X Rp.
Mandor
0.4000
org
X Rp.

Tiap m2
Aspal sand sheet 2 cm jereng (1 cm padat)
2/100
x
Biaya menggilas
1/500
x
Sewa motor walls
1/500
x
Aspal untuk lem 0,5 kg
0.5000
x

Tiap m1
Aspal sand sheet 3 cm jereng (2 cm padat)
3/100
x
Biaya menggilas
1/500
x
Sewa motor walls
1/500
x
Aspal untuk lem 0,5 kg
0.5000
x

62,333,280.00

4,298,000.00

1,246,665.60

85,960.00

1,964,800.00

9,210,000.00

3,929.60

18,420.00

JUMLAH

1,250,595.20

104,380.00

62,333,280.00

4,298,000.00

1,869,998.40

128,940.00

1,964,800.00

9,210,000.00

3,929.60

18,420.00

JUMLAH

BS11

100 m2 Pengaspalan sand sheet (latasir) tanpa aspal, tebal 1 cm jereng


Aspal
kg
X Rp.
3
m
Pasair pasang
1.0000
X Rp.
Kayu bakar
Juru godog aspal
Pekerja
Mandor
JUMLAH

0.9000
0.2500
8.1000
0.4000

Analisa Harga Satuan Pekerjaan KPUT Tahun 2012

m3
org
org
org

X
X
X
X

Rp.
Rp.
Rp.
Rp.

1,873,928.00

491,200.00

491,200.00
491,200.00
491,200.00
491,200.00
491,200.00

147,360.00

491,200.00
442,080.00
122,800.00
3,978,720.00
196,480.00
4,298,000.00

933,280.00

Hal :69

No.
(1)

PT Pelabuhan Indonesia I (Persero) Macam

Pekerjaan
(2)

Upah
(3)

Tiap m2
Aspal sand sheet 2 cm jereng (1 cm padat) tanpa aspal
2/100
x
4,298,000.00
Biaya menggilas
1/500
x
1,964,800.00
Sewa motor walls
1/500
x
Aspal untuk lem 0,5 kg
0.5000
x
-

Bahan
(4)

933,280.00

85,960.00

18,665.60

9,210,000.00

3,929.60

18,420.00

JUMLAH

89,889.60

37,085.60

933,280.00

85,960.00

18,665.60

9,210,000.00

3,929.60

18,420.00

Tiap m
Aspal sand sheet 2 cm jereng (1 cm padat) tanpa aspal
2/100
x
4,298,000.00
Biaya menggilas
1/500
x
1,964,800.00
Sewa motor walls
1/500
x
Aspal untuk lem 0,5 kg
0.5000
x
-

JUMLAH
BS12

Mengecat marka jalan dengan Rettar


Cat rettar
4.2500
Minyak cat
0.5700
Tukang cat
2.2500
Kepala tukang cat
0.2300
Pekerja
2.0000

kg
ltr
org
org
org

X
X
X
X
X

Rp.
Rp.
Rp.
Rp.
Rp.

89,889.60

37,085.60

491,200.00
491,200.00
491,200.00
491,200.00
491,200.00
JUMLAH

2,087,600.00
279,984.00
1,105,200.00
112,976.00
982,400.00
2,200,576.00

2,367,584.00

2,367,584.00
JUMLAH

220,057.60
220,057.60

236,758.40
236,758.40

Tiap m
Mengecat marka jalan dengan rettar
1/10
x

BS13

2,200,576.00

1 m2 Mengecat marka jalan dengan Thermoplastic


Cat marka
1.6575
kg
Glasbit
0.4500
kg
Thinner
1.0500
ltr
Sewa Compressor
0.0750
jam
Sewa Dumptruck
0.0750
jam
Alat bantu
0.0100
ls
Tukang cat
0.2250
org
Pekerja
0.6000
org
Mandor
0.0750
org

Analisa Harga Satuan Pekerjaan KPUT Tahun 2012

X
X
X
X
X
X
X
X
X

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

491,200.00
491,200.00
491,200.00
491,200.00
491,200.00
491,200.00
491,200.00
491,200.00
491,200.00
JUMLAH

814,164.00
221,040.00
515,760.00
36,840.00
36,840.00
4,912.00
110,520.00
294,720.00
36,840.00
446,992.00

1,624,644.00

Hal :70

No.
(1)
BS14

PT Pelabuhan Indonesia I (Persero) Macam

Pekerjaan
(2)

Upah
(3)

350 m' Pemotongan aspal dengan mesin potong (cutter), 2 sisi


Cutter
2.0000
bh
X
Sewa mesin cutter
2.0000
hr
X
Solar
15.0000
ltr
X
Tk. Cutter / masinis
2.0000
org
X
Pekerja
2.0000
org
X

Tiap m

Rp.
Rp.
Rp.
Rp.
Rp.

Bahan
(4)

491,200.00
491,200.00
491,200.00
491,200.00
491,200.00
JUMLAH

982,400.00
982,400.00
7,368,000.00
982,400.00
982,400.00
1,964,800.00

9,332,800.00

1/350

1,964,800.00

9,332,800.00

5,613.71

26,665.14

m (cutter), 1 sisi
Pemotongan aspal dengan mesinTiap
potong
1/700
x
1,964,800.00

9,332,800.00

2,806.86

13,332.57

BS15

BS16

1 m2 Pembongkaran aspal dengan Jack Hammer


Sewa mesin Jack Hammer
0.6600
Solar
1.3200
Tk. Jack Hammer / masinis
0.0400
Pekerja
0.2500
Mandor
0.0630

Expantion joint
Ashpaltic Joint
Plate baja 5 mm
Joint Filler
Split 1/2 cm
Gas Elpiji
Sewa Jack Hammer
Sewa Genset 2000 watt
Sewa Compressor
Sewa Stamper
Mata cutter
Sewa mesin cutter
Alat bantu
Mekanik terlatih
Operator terlatih
Mandor

1.0000
18.5000
5.5000
1.0000
0.0150
6.5000
0.1000
0.1000
0.1000
0.1000
0.1000
0.1000
1.0000
1.0000
4.5000
0.1000

Analisa Harga Satuan Pekerjaan KPUT Tahun 2012

hari
ltr
org
org
org

m1
kg
kg
m1
3

m
kg
hr
hr
hr
hr
bh
hr
ls
org
org
org

X
X
X
X
X

Rp.
Rp.
Rp.
Rp.
Rp.

491,200.00
491,200.00
491,200.00
491,200.00
491,200.00
JUMLAH

324,192.00
648,384.00
19,648.00
122,800.00
30,945.60
173,393.60

972,576.00

X Rp.
X Rp.

491,200.00
491,200.00

9,087,200.00
2,701,600.00

X Rp.

491,200.00

491,200.00

X
X
X
X
X
X
X
X
X
X
X
X

491,200.00
491,200.00
491,200.00
491,200.00
491,200.00
491,200.00
491,200.00
491,200.00
491,200.00
491,200.00
491,200.00
491,200.00
JUMLAH

7,368.00
3,192,800.00
49,120.00
49,120.00
49,120.00
49,120.00
49,120.00
49,120.00
491,200.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

491,200.00
2,210,400.00
49,120.00
2,750,720.00

16,266,088.00

Hal :71

PT Pelabuhan Indonesia I (Persero)

Jumlah
(5)

772,657.60

491,200.00

11,174,800.00

34,384,000.00

399,714.00

28,244,000.00

338,314.00

Analisa Harga Satuan Pekerjaan KPUT Tahun 2012

Hal :72

PT Pelabuhan Indonesia I (Persero)


Jumlah
(5)

15,964,000.00

234,138.67

138,354.67

119,730.00

249,121,904.00

Analisa Harga Satuan Pekerjaan KPUT Tahun 2012

Hal :73

PT Pelabuhan Indonesia I (Persero)


Jumlah
(5)

2,509,098.72

66,631,280.00

1,354,975.20

2,021,288.00

5,231,280.00

Analisa Harga Satuan Pekerjaan KPUT Tahun 2012

Hal :74

PT Pelabuhan Indonesia I (Persero)


Jumlah
(5)

126,975.20

126,975.20

4,568,160.00

456,816.00

2,071,636.00

Analisa Harga Satuan Pekerjaan KPUT Tahun 2012

Hal :75

PT Pelabuhan Indonesia I (Persero)


Jumlah
(5)

11,297,600.00

32,278.86

16,139.43

1,145,969.60

19,016,808.00

Analisa Harga Satuan Pekerjaan KPUT Tahun 2012

Hal :76

PT Pelabuhan Indonesia I (Persero)

URAIAN ANALISA ALAT


No
I

URAIAN

KODE

URAIAN PERALATAN
1 Jenis Peralatan
2 Tenaga
3 Kapasitas
4 Alat Baru

5 Alat Yang Dipakai

II

KOEF.

SATUAN

ASPHALT MIXING PLANT

: a.
b.
c.
: a.
b.
c.

Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat

Pw
Cp
A
W
B
A'
W'
B'

150.00
50.00
10.00
1,500.00
7,500,000,000.00
10.00
1,500.00
7,500,000,000.00

HP
Ton/jam
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

BIAYA PASTI PER JAM KERJA


1 Nila sisa alat
2 Faktor angsuran Modal

=
=

10 % x B
i x ( 1 + i ) ^ A'
( 1 + i )^A'-1

C
D

3 Biaya pasti per jam


a. Biaya Pengmbalian Modal

( B-C)xD
W'
0,002 x B '
W'
( E + F )

1,073,352.41

Rupiah

10,000.00

Rupiah

1,083,352.41

Rupiah

= ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms


=
12 x 0,7 Cp x Ms

H1
H2

217,500.00
4,872,000.00

Rupiah
Rupiah

= ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp


= ( 12,5 % - 17,5 % ) x B '
W'
=
( 1 org / Jam ) x U1
( 3 org / Jam ) x U2

I
K

18,450.00
625,000.00

Rupiah
Rupiah

L
M

= ( H1 + H2 + I + K + L + M )

5,732,950.00

Rp

6,816,302.41

Rp

III

b. Asuransi dll

Biaya Pasti Perjam

750,000,000.00
Rupiah
0.23852 -

BIAYA OPERASI PER JAM KERJA


1 Bahan Bakar
Bahan bakar pemanasan
material
2 Pelumas
3 Perawatan dan perbaikan
4 Operator
5 Pembantu Operator
Biaya Operasi Per jam

IV

TOTAL BIAYA SEWA ALAT / JAM

V
1
2
3
4
5
6
7

( G + P )

LAIN LAIN
Tingkat suku bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pembantu Sopir
Bahan bakar bensin
Bahan bakar solar
Minyak Pelumas
PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Harga Satuan Pekerjaan Tahun 2012

(i)
U1
U2
Mb
Ms
Mp

20.00
11,600.00
12,300.00

Rupiah
Rupiah

% / Tahun
Rp / Jam
Rp / Jam
Liter
Liter
Liter

Hal :77

PT Pelabuhan Indonesia I (Persero)

URAIAN ANALISA ALAT


No
I

URAIAN

KODE

URAIAN PERALATAN
1 Jenis Peralatan
2 Tenaga
3 Kapasitas
4 Alat Baru

5 Alat Yang Dipakai

II

KOEF.

SATUAN

ASPHALT FINISHER

: a.
b.
c.
: a.
b.
c.

Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat

Pw
Cp
A
W
B
A'
W'
B'

47.00
6.00
6.00
2,000
715,000,000.00
6.00
2,000.00
715,000,000.00

HP
Ton
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

BIAYA PASTI PER JAM KERJA


1 Nila sisa alat
2 Faktor angsuran Modal

=
=

10 % x B
i x ( 1 + i ) ^ A'
( 1 + i )^A'-1

C
D

71,500,000.00
0.30071

Rupiah
-

3 Biaya pasti per jam


a. Biaya Pengembalian Modal

( B-C)xD
W'
0,002 x B '
W'
( E + F )

96,752.07

Rupiah

715.00

Rupiah

97,467.07

Rupiah

III

b. Asuransi dll

Biaya Pasti Perjam

BIAYA OPERASI PER JAM KERJA


1 Bahan Bakar

= ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms

H1

68,150.00

Rupiah

2 Pelumas
3 Perawatan dan perbaikan

= ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp


=
( 12,5 % - 17,5 % ) x B '
W'
=
( 1 org / Jam ) x U1
( 1 org / Jam ) x U2

I
K

5,781.00
44,687.50

Rupiah
Rupiah

L
M

0.00
0.00

Rupiah
Rupiah

= ( H1 + H2 + I + K + L + M )

118,618.50

Rupiah

216,085.57

Rupiah

(i)
U1
U2
Mb
Ms
Mp

20.00
11,600.00
12,300.00

% / Tahun
Rp / Jam
Rp / Jam
Liter
Liter
Liter

4 Operator
5 Pembantu Operator
Biaya Operasi Per jam
IV

TOTAL BIAYA SEWA ALAT / JAM

V
1
2
3
4
5
6
7

( G + P )

LAIN LAIN
Tingkat suku bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pembantu Sopir
Bahan bakar bensin
Bahan bakar solar
Minyak Pelumas
PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Harga Satuan Pekerjaan Tahun 2012

Hal :78

PT Pelabuhan Indonesia I (Persero)

URAIAN ANALISA ALAT


No
I

URAIAN

KODE

URAIAN PERALATAN
1 Jenis Peralatan
2 Tenaga
3 Kapasitas
4 Alat Baru

5 Alat Yang Dipakai

II

KOEF.

SATUAN

ASPHALT SPRAYER

: a.
b.
c.
: a.
b.
c.

Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat

Pw
Cp
A
W
B
A'
W'
B'

15.00
800.00
5.00
2,000
145,000,000.00
5.00
2,000.00
145,000,000.00

HP
Liter
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

BIAYA PASTI PER JAM KERJA


1 Nila sisa alat
2 Faktor angsuran Modal

=
=

10 % x B
i x ( 1 + i ) ^ A'
( 1 + i )^A'-1

C
D

14,500,000.00
0.33438

Rupiah
-

3 Biaya pasti per jam


a. Biaya Pengembalian Modal

( B-C)xD
W'
0,002 x B '
W'
( E + F )

21,818.28

Rupiah

145.00

Rupiah

21,963.28

Rupiah

III

b. Asuransi dll

Biaya Pasti Perjam

BIAYA OPERASI PER JAM KERJA


1 Bahan Bakar

= ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms

H1

21,750.00

Rupiah

2 Pelumas
3 Perawatan dan perbaikan

= ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp


=
( 12,5 % - 17,5 % ) x B '
W'
=
( 1 org / Jam ) x U1
( 1 org / Jam ) x U2

I
K

1,845.00
9,062.50

Rupiah
Rupiah

L
M

0.00
0.00

Rupiah
Rupiah

= ( H1 + H2 + I + K + L + M )

32,657.50

Rupiah

54,620.78

Rupiah

(i)
U1
U2
Mb
Ms
Mp

20.00
11,600.00
12,300.00

% / Tahun
Rp / Jam
Rp / Jam
Liter
Liter
Liter

4 Operator
5 Pembantu Operator
Biaya Operasi Per jam
IV

TOTAL BIAYA SEWA ALAT / JAM

V
1
2
3
4
5
6
7

( G + P )

LAIN LAIN
Tingkat suku bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pembantu Sopir
Bahan bakar bensin
Bahan bakar solar
Minyak Pelumas
PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Harga Satuan Pekerjaan Tahun 2012

Hal :79

PT Pelabuhan Indonesia I (Persero)

URAIAN ANALISA ALAT


No
I

URAIAN

KODE

URAIAN PERALATAN
1 Jenis Peralatan
2 Tenaga
3 Kapasitas
4 Alat Baru

5 Alat Yang Dipakai

II

KOEF.

SATUAN

BULLDOZER 100 -150 HP

: a.
b.
c.
: a.
b.
c.

Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat

Pw
Cp
A
W
B
A'
W'
B'

140.00
5.00
2,000
700,000,000.00
5.00
2,000.00
700,000,000.00

HP
Ton
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

BIAYA PASTI PER JAM KERJA


1 Nila sisa alat
2 Faktor angsuran Modal

=
=

10 % x B
i x ( 1 + i ) ^ A'
( 1 + i )^A'-1

C
D

70,000,000.00
0.33438

Rupiah
-

3 Biaya pasti per jam


a. Biaya Pengembalian Modal

( B-C)xD
W'
0,002 x B '
W'
( E + F )

105,329.61

Rupiah

700.00

Rupiah

106,029.61

Rupiah

III

b. Asuransi dll

Biaya Pasti Perjam

BIAYA OPERASI PER JAM KERJA


1 Bahan Bakar

= ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms

H1

203,000.00

Rupiah

2 Pelumas
3 Perawatan dan perbaikan

= ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp


=
( 12,5 % - 17,5 % ) x B '
W'
=
( 1 org / Jam ) x U1
( 1 org / Jam ) x U2

I
K

17,220.00
43,750.00

Rupiah
Rupiah

L
M

0.00
0.00

Rupiah
Rupiah

= ( H1 + H2 + I + K + L + M )

263,970.00

Rupiah

369,999.61

Rupiah

(i)
U1
U2
Mb
Ms
Mp

20.00
11,600.00
12,300.00

% / Tahun
Rp / Jam
Rp / Jam
Liter
Liter
Liter

4 Operator
5 Pembantu Operator
Biaya Operasi Per jam
IV

TOTAL BIAYA SEWA ALAT / JAM

V
1
2
3
4
5
6
7

( G + P )

LAIN LAIN
Tingkat suku bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pembantu Sopir
Bahan bakar bensin
Bahan bakar solar
Minyak Pelumas
PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Harga Satuan Pekerjaan Tahun 2012

Hal :80

PT Pelabuhan Indonesia I (Persero)

URAIAN ANALISA ALAT


No
I

URAIAN

KODE

URAIAN PERALATAN
1 Jenis Peralatan
2 Tenaga
3 Kapasitas
4 Alat Baru

5 Alat Yang Dipakai

II

KOEF.

SATUAN

COMPRESSOR 4000 - 6500 L/M

: a.
b.
c.
: a.
b.
c.

Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat

Pw
Cp
A
W
B
A'
W'
B'

80.00
5.00
2,000
175,000,000.00
5.00
2,000.00
175,000,000.00

HP
Ton
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

BIAYA PASTI PER JAM KERJA


1 Nila sisa alat
2 Faktor angsuran Modal

=
=

10 % x B
i x ( 1 + i ) ^ A'
( 1 + i )^A'-1

C
D

17,500,000.00
0.33438

Rupiah
-

3 Biaya pasti per jam


a. Biaya Pengembalian Modal

( B-C)xD
W'
0,002 x B '
W'
( E + F )

26,332.40

Rupiah

175.00

Rupiah

26,507.40

Rupiah

III

b. Asuransi dll

Biaya Pasti Perjam

BIAYA OPERASI PER JAM KERJA


1 Bahan Bakar

= ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms

H1

116,000.00

Rupiah

2 Pelumas
3 Perawatan dan perbaikan

= ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp


=
( 12,5 % - 17,5 % ) x B '
W'
=
( 1 org / Jam ) x U1
( 1 org / Jam ) x U2

I
K

9,840.00
10,937.50

Rupiah
Rupiah

L
M

0.00
0.00

Rupiah
Rupiah

= ( H1 + H2 + I + K + L + M )

136,777.50

Rupiah

163,284.90

Rupiah

(i)
U1
U2
Mb
Ms
Mp

20.00
11,600.00
12,300.00

% / Tahun
Rp / Jam
Rp / Jam
Liter
Liter
Liter

4 Operator
5 Pembantu Operator
Biaya Operasi Per jam
IV

TOTAL BIAYA SEWA ALAT / JAM

V
1
2
3
4
5
6
7

( G + P )

LAIN LAIN
Tingkat suku bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pembantu Sopir
Bahan bakar bensin
Bahan bakar solar
Minyak Pelumas
PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Harga Satuan Pekerjaan Tahun 2012

Hal :81

PT Pelabuhan Indonesia I (Persero)

URAIAN ANALISA ALAT


No

URAIAN

KODE

KOEF.

SATUAN

URAIAN PERALATAN
WHEEL LOADER 1,0 - 1,6 M3

1 Jenis Peralatan
2 Tenaga
3 Kapasitas
4 Alat Baru

5 Alat Yang Dipakai

II

: a.
b.
c.
: a.
b.
c.

Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat

Pw
Cp
A
W
B
A'
W'
B'

105.00
1.50
5.00
2,000.00
840,000,000.00
5.00
2,000.00
840,000,000.00

HP
Ton
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

BIAYA PASTI PER JAM KERJA


1 Nila sisa alat
2 Faktor angsuran Modal

=
=

10 % x B
i x ( 1 + i ) ^ A'
( 1 + i )^A'-1

C
D

84,000,000.00
0.33438

Rupiah
-

3 Biaya pasti per jam


a. Biaya Pengembalian Modal

( B-C)xD
W'
0,002 x B '
W'
( E + F )

126,395.53

Rupiah

840.00

Rupiah

127,235.53

Rupiah

III

b. Asuransi dll

Biaya Pasti Perjam

BIAYA OPERASI PER JAM KERJA


1 Bahan Bakar

= ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms

H1

152,250.00

Rupiah

2 Pelumas
3 Perawatan dan perbaikan

= ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp


=
( 12,5 % - 17,5 % ) x B '
W'
=
( 1 org / Jam ) x U1
( 1 org / Jam ) x U2

I
K

12,915.00
52,500.00

Rupiah
Rupiah

L
M

0.00
0.00

Rupiah
Rupiah

= ( H1 + H2 + I + K + L + M )

217,665.00

Rupiah

344,900.53

Rupiah

(i)
U1
U2
Mb
Ms
Mp

20.00
11,600.00
12,300.00

% / Tahun
Rp / Jam
Rp / Jam
Liter
Liter
Liter

4 Operator
5 Pembantu Operator
Biaya Operasi Per jam
IV

TOTAL BIAYA SEWA ALAT / JAM

V
1
2
3
4
5
6
7

( G + P )

LAIN LAIN
Tingkat suku bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pembantu Sopir
Bahan bakar bensin
Bahan bakar solar
Minyak Pelumas
PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Harga Satuan Pekerjaan Tahun 2012

Hal :82

PT Pelabuhan Indonesia I (Persero)

URAIAN ANALISA ALAT


No
I

URAIAN

KODE

URAIAN PERALATAN
1 Jenis Peralatan
2 Tenaga
3 Kapasitas
4 Alat Baru

5 Alat yang dipakai

II

KOEF.

SATUAN

TANDEM ROLLER 6 - 8 T

a
b
c
a
b
c

Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat

Pw
Cp
A
W
B
A'
W'
B'

50.00
8.00
5.00
2,000.00
460,000,000.00
5.00
2,000.00
460,000,000.00

HP
Ton
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

BIAYA PASTI PER JAM KERJA


1 Nila sisa alat
2 Faktor angsuran Modal

=
=

10 % x B
i x ( 1 + i ) ^ A'
( 1 + i )^A'-1

C
D

46,000,000.00
0.33

Rupiah
-

3 Biaya pasti per jam


a. Biaya Pengembalian Modal

( B-C)xD
W'
0,002 x B '
W'
( E + F )

69,216.60

Rupiah

460.00

Rupiah

69,676.60

Rupiah

III

b. Asuransi dll

Biaya Pasti Perjam

BIAYA OPERASI PER JAM KERJA


1 Bahan Bakar

= ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms

H1

72,500.00

Rupiah

2 Pelumas
3 Perawatan dan perbaikan

= ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp


=
( 12,5 % - 17,5 % ) x B '
W'
=
( 1 org / Jam ) x U1
( 1 org / Jam ) x U2

I
K

6,150.00
28,750.00

Rupiah
Rupiah

L
M

0.00
0.00

Rupiah
Rupiah

= ( H1 + H2 + I + K + L + M )

107,400.00

Rupiah

177,076.60

Rupiah

(i)
U1
U2
Mb
Ms
Mp

20.00
11,600.00
12,300.00

% / Tahun
Rp / Jam
Rp / Jam
Liter
Liter
Liter

4 Operator
5 Pembantu Operator
Biaya Operasi Per jam
IV

TOTAL BIAYA SEWA ALAT / JAM

V
1
2
3
4
5
6
7

( G + P )

LAIN LAIN
Tingkat suku bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pembantu Sopir
Bahan bakar bensin
Bahan bakar solar
Minyak Pelumas
PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Harga Satuan Pekerjaan Tahun 2012

Hal :83

PT Pelabuhan Indonesia I (Persero)

URAIAN ANALISA ALAT


No
I

URAIAN
URAIAN PERALATAN
1 Jenis Peralatan
2 Tenaga
3 Kapasitas
4 Alat Baru

5 Alat yang dipakai

II

KODE

KOEF.

SATUAN

PNEUMATIC TYRE ROLLER 8 - 10 T

a
b
c
a
b
c

Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat

Pw
Cp
A
W
B
A'
W'
B'

60.00
10.00
5.00
1,800.00
510,000,000.00
5.00
1,800.00
510,000,000.00

HP
Ton
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

BIAYA PASTI PER JAM KERJA


1 Nila sisa alat
2 Faktor angsuran Modal

=
=

10 % x B
i x ( 1 + i ) ^ A'
( 1 + i )^A'-1

C
D

51,000,000.00
0.33438

Rupiah
-

3 Biaya pasti per jam


a. Biaya Pengembalian Modal

( B-C)xD
W'
0,002 x B '
W'
( E + F )

85,266.82

Rupiah

566.67

Rupiah

85,833.49

Rupiah

III

b. Asuransi dll

Biaya Pasti Perjam

BIAYA OPERASI PER JAM KERJA


1 Bahan Bakar

= ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms

H1

87,000.00

Rupiah

2 Pelumas
3 Perawatan dan perbaikan

= ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp


=
( 12,5 % - 17,5 % ) x B '
W'
=
( 1 org / Jam ) x U1
( 1 org / Jam ) x U2

I
K

7,380.00
35,416.67

Rupiah
Rupiah

L
M

0.00
0.00

Rupiah
Rupiah

= ( H1 + H2 + I + K + L + M )

129,796.67

Rupiah

215,630.16

Rupiah

(i)
U1
U2
Mb
Ms
Mp

20.00
11,600.00
12,300.00

% / Tahun
Rp / Jam
Rp / Jam
Liter
Liter
Liter

4 Operator
5 Pembantu Operator
Biaya Operasi Per jam
IV

TOTAL BIAYA SEWA ALAT / JAM

V
1
2
3
4
5
6
7

( G + P )

LAIN LAIN
Tingkat suku bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pembantu Sopir
Bahan bakar bensin
Bahan bakar solar
Minyak Pelumas
PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Harga Satuan Pekerjaan Tahun 2012

Hal :84

PT Pelabuhan Indonesia I (Persero)

URAIAN ANALISA ALAT


No
I

URAIAN

KODE

URAIAN PERALATAN
1 Jenis Peralatan
2 Tenaga
3 Kapasitas
4 Alat Baru

5 Alat Yang Dipakai

II

KOEF.

SATUAN

DUMP TRUCK

: a.
b.
c.
: a.
b.
c.

Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat

Pw
Cp
A
W
B
A'
W'
B'

125.00
8.00
5.00
2,000.00
145,000,000.00
5.00
2,000.00
145,000,000.00

HP
Ton
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

BIAYA PASTI PER JAM KERJA


1 Nila sisa alat
2 Faktor angsuran Modal

=
=

10 % x B
i x ( 1 + i ) ^ A'
( 1 + i )^A'-1

C
D

14,500,000.00
0.33438

Rupiah
-

3 Biaya pasti per jam


a. Biaya Pengembalian Modal

( B-C)xD
W'
0,002 x B '
W'
( E + F )

21,818.28

Rupiah

145.00

Rupiah

21,963.28

Rupiah

III

b. Asuransi dll

Biaya Pasti Perjam

BIAYA OPERASI PER JAM KERJA


1 Bahan Bakar

= ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms

H1

181,250.00

Rupiah

2 Pelumas
3 Perawatan dan perbaikan

= ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp


=
( 12,5 % - 17,5 % ) x B '
W'
=
( 1 org / Jam ) x U1
( 1 org / Jam ) x U2

I
K

15,375.00
9,062.50

Rupiah
Rupiah

L
M

= ( H1 + H2 + I + K + L + M )

205,687.50

Rupiah

227,650.78

Rupiah

(i)
U1
U2
Mb
Ms
Mp

20.00
11,600.00
12,300.00

% / Tahun
Rp / Jam
Rp / Jam
Liter
Liter
Liter

4 Operator
5 Pembantu Operator
Biaya Operasi Per jam
IV

TOTAL BIAYA SEWA ALAT / JAM

V
1
2
3
4
5
6
7

( G + P )

LAIN LAIN
Tingkat suku bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pembantu Sopir
Bahan bakar bensin
Bahan bakar solar
Minyak Pelumas
PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Harga Satuan Pekerjaan Tahun 2012

Rupiah
Rupiah

Hal :85

PT Pelabuhan Indonesia I (Persero)

URAIAN ANALISA ALAT


No
I

URAIAN

KODE

URAIAN PERALATAN
1 Jenis Peralatan
2 Tenaga
3 Kapasitas
4 Alat Baru

5 Alat Yang Dipakai

II

KOEF.

SATUAN

GENERATOR SET

: a.
b.
c.
: a.
b.
c.

Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat

Pw
Cp
A
W
B
A'
W'
B'

175.00
125.00
5.00
2,000.00
440,000,000.00
5.00
2,000.00
440,000,000.00

HP
KVA
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

BIAYA PASTI PER JAM KERJA


1 Nila sisa alat
2 Faktor angsuran Modal

=
=

10 % x B
i x ( 1 + i ) ^ A'
( 1 + i )^A'-1

C
D

44,000,000.00
0.33438

Rupiah
-

3 Biaya pasti per jam


a. Biaya Pengembalian Modal

( B-C)xD
W'
0,002 x B '
W'
( E + F )

66,207.18

Rupiah

440.00

Rupiah

66,647.18

Rupiah

III

b. Asuransi dll

Biaya Pasti Perjam

BIAYA OPERASI PER JAM KERJA


1 Bahan Bakar

= ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms

H1

253,750.00

Rupiah

2 Pelumas
3 Perawatan dan perbaikan

= ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp


=
( 12,5 % - 17,5 % ) x B '
W'
=
( 1 org / Jam ) x U1
( 1 org / Jam ) x U2

I
K

21,525.00
27,500.00

Rupiah
Rupiah

L
M

= ( H1 + H2 + I + K + L + M )

302,775.00

Rupiah

369,422.18

Rupiah

(i)
U1
U2
Mb
Ms
Mp

20.00
11,600.00
12,300.00

% / Tahun
Rp / Jam
Rp / Jam
Liter
Liter
Liter

4 Operator
5 Pembantu Operator
Biaya Operasi Per jam
IV

TOTAL BIAYA SEWA ALAT / JAM

V
1
2
3
4
5
6
7

( G + P )

LAIN LAIN
Tingkat suku bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pembantu Sopir
Bahan bakar bensin
Bahan bakar solar
Minyak Pelumas
PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Harga Satuan Pekerjaan Tahun 2012

Rupiah
Rupiah

Hal :86

PT Pelabuhan Indonesia I (Persero)

URAIAN ANALISA ALAT


No
I

URAIAN

KODE

URAIAN PERALATAN
1 Jenis Peralatan
2 Tenaga
3 Kapasitas
4 Alat Baru

5 Alat yang dipakai

II

KOEF.

SATUAN

MOTOR GRADER > 100 HP

a
b
c
a
b
c

Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat

Pw
Cp
A
W
B
A'
W'
B'

125.00
5.00
2,000.00
880,000,000.00
5.00
2,000.00
880,000,000.00

HP
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

BIAYA PASTI PER JAM KERJA


1 Nila sisa alat
2 Faktor angsuran Modal

=
=

10 % x B
i x ( 1 + i ) ^ A'
( 1 + i )^A'-1

C
D

88,000,000.00
0.33438

Rupiah
-

3 Biaya pasti per jam


a. Biaya Pengembalian Modal

( B-C)xD
W'
0,002 x B '
W'
( E + F )

132,414.36

Rupiah

880.00

Rupiah

133,294.36

Rupiah

III

b. Asuransi dll

Biaya Pasti Perjam

BIAYA OPERASI PER JAM KERJA


1 Bahan Bakar

= ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms

H1

181,250.00

Rupiah

2 Pelumas
3 Perawatan dan perbaikan

= ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp


=
( 12,5 % - 17,5 % ) x B '
W'
=
( 1 org / Jam ) x U1
( 1 org / Jam ) x U2

I
K

15,375.00
55,000.00

Rupiah
Rupiah

L
M

= ( H1 + H2 + I + K + L + M )

251,625.00

Rupiah

384,919.36

Rupiah

(i)
U1
U2
Mb
Ms
Mp

20.00
11,600.00
12,300.00

% / Tahun
Rp / Jam
Rp / Jam
Liter
Liter
Liter

4 Operator
5 Pembantu Operator
Biaya Operasi Per jam
IV

TOTAL BIAYA SEWA ALAT / JAM

V
1
2
3
4
5
6
7

( G + P )

LAIN LAIN
Tingkat suku bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pembantu Sopir
Bahan bakar bensin
Bahan bakar solar
Minyak Pelumas
PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Harga Satuan Pekerjaan Tahun 2012

Rupiah
Rupiah

Hal :87

PT Pelabuhan Indonesia I (Persero)

URAIAN ANALISA ALAT


No
I

URAIAN

KODE

URAIAN PERALATAN
1 Jenis Peralatan
2 Tenaga
3 Kapasitas
4 Alat Baru

5 Alat yang dipakai

II

KOEF.

SATUAN

VIBRATORY ROLLER 5 - 8 T

Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat
a Umur Ekonomis
b Jam Kerja dalam 1 Tahun
c Harga Alat

Pw
Cp
A
W
B
A'
W'
B'

75.00
7.00
4.00
2,000.00
500,000,000.00
4.00
2,000.00
500,000,000.00

HP
Ton
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

BIAYA PASTI PER JAM KERJA


1 Nila sisa alat
2 Faktor angsuran Modal

=
=

10 % x B
i x ( 1 + i ) ^ A'
( 1 + i )^A'-1

C
D

50,000,000.00
0.38629

Rupiah
-

3 Biaya pasti per jam


a. Biaya Pengembalian Modal

( B-C)xD
W'
0,002 x B '
W'
( E + F )

86,915.05

Rupiah

500.00

Rupiah

87,415.05

Rp

III

b. Asuransi dll

Biaya Pasti Perjam

BIAYA OPERASI PER JAM KERJA


1 Bahan Bakar

= ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms

H1

108,750.00

Rupiah

2 Pelumas
3 Perawatan dan perbaikan

= ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp


=
( 12,5 % - 17,5 % ) x B '
W'
=
( 1 org / Jam ) x U1
( 1 org / Jam ) x U2

I
K

9,225.00
31,250.00

Rupiah
Rupiah

L
M

= ( H1 + H2 + I + K + L + M )

149,225.00

Rp

236,640.05

Rp

(i)
U1
U2
Mb
Ms
Mp

20.00
11,600.00
12,300.00

% / Tahun
Rp / Jam
Rp / Jam
Liter
Liter
Liter

4 Operator
5 Pembantu Operator
Biaya Operasi Per jam
IV

TOTAL BIAYA SEWA ALAT / JAM

V
1
2
3
4
5
6
7

( G + P )

LAIN LAIN
Tingkat suku bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pembantu Sopir
Bahan bakar bensin
Bahan bakar solar
Minyak Pelumas
PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Harga Satuan Pekerjaan Tahun 2012

Rupiah
Rupiah

Hal :88

PT Pelabuhan Indonesia I (Persero)

URAIAN ANALISA ALAT


No
I

URAIAN
URAIAN PERALATAN
1 Jenis Peralatan
2 Tenaga
3 Kapasitas
4 Alat Baru

5 Alat Yang Dipakai

II

KODE

KOEF.

SATUAN

WATER TANK TRUCK 3000 - 4000 L

: a.
b.
c.
: a.
b.
c.

Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat

Pw
Cp
A
W
B
A'
W'
B'

100.00
4,000.00
5.00
2,000.00
50,000,000.00
5.00
2,000.00
50,000,000.00

HP
Liter
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

BIAYA PASTI PER JAM KERJA


1 Nila sisa alat
2 Faktor angsuran Modal

=
=

10 % x B
i x ( 1 + i ) ^ A'
( 1 + i )^A'-1

C
D

5,000,000.00
0.33438

Rupiah
-

3 Biaya pasti per jam


a Biaya Pengembalian Modal

7,523.54

Rupiah

b Asuransi dll

( B-C)xD
W'
0,002 x B '
W'
( E + F )

50.00

Rupiah

7,573.54

Biaya Pasti Perjam


III

Rp

BIAYA OPERASI PER JAM KERJA


1 Bahan Bakar

= ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms

H1

145,000.00

Rupiah

2 Pelumas
3 Perawatan dan perbaikan

= ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp


=
( 12,5 % - 17,5 % ) x B '
W'
=
( 1 org / Jam ) x U1
( 1 org / Jam ) x U2

I
K

12,300.00
3,125.00

Rupiah
Rupiah

L
M

= ( H1 + H2 + I + K + L + M )

160,425.00

Rp

167,998.54

Rp

(i)
U1
U2
Mb
Ms
Mp

20.00
11,600.00
12,300.00

% / Tahun
Rp / Jam
Rp / Jam
Liter
Liter
Liter

4 Operator
5 Pembantu Operator
Biaya Operasi Per jam
IV

TOTAL BIAYA SEWA ALAT / JAM

V
1
2
3
4
5
6
7

( G + P )

LAIN LAIN
Tingkat suku bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pembantu Sopir
Bahan bakar bensin
Bahan bakar solar
Minyak Pelumas
PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Harga Satuan Pekerjaan Tahun 2012

Rupiah
Rupiah

Hal :89

PT Pelabuhan Indonesia I (Persero)

URAIAN ANALISA ALAT


No
I

URAIAN

KODE

URAIAN PERALATAN
1 Jenis Peralatan
2 Tenaga
3 Kapasitas
4 Alat Baru

5 Alat Yang Dipakai

II

KOEF.

SATUAN

JACK HAMMER

: a.
b.
c.
: a.
b.
c.

Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat

Pw
Cp
A
W
B
A'
W'
B'

3.00
4.00
1,000.00
3,500,000.00
4.00
1,000.00
3,500,000.00

HP
Liter
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

BIAYA PASTI PER JAM KERJA


1 Nila sisa alat
2 Faktor angsuran Modal

=
=

10 % x B
i x ( 1 + i ) ^ A'
( 1 + i )^A'-1

C
D

350,000.00
0.38629

Rupiah
-

3 Biaya pasti per jam


a Biaya Pengembalian Modal

1,216.81

Rupiah

b Asuransi dll

( B-C)xD
W'
0,002 x B '
W'
( E + F )

7.00

Rupiah

1,223.81

Rp

Biaya Pasti Perjam


III

BIAYA OPERASI PER JAM KERJA


1 Bahan Bakar

= ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms

H1

4,350.00

Rupiah

2 Pelumas
3 Perawatan dan perbaikan

= ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp


=
( 12,5 % - 17,5 % ) x B '
W'
=
( 1 org / Jam ) x U1
( 1 org / Jam ) x U2

I
K

369.00
437.50

Rupiah
Rupiah

L
M

Rupiah
Rupiah

= ( H1 + H2 + I + K + L + M )

5,156.50

Rp

6,380.31

Rp

(i)
U1
U2
Mb
Ms
Mp

20.00
11,600.00
12,300.00

% / Tahun
Rp / Jam
Rp / Jam
Liter
Liter
Liter

4 Operator
5 Pembantu Operator
Biaya Operasi Per jam
IV

TOTAL BIAYA SEWA ALAT / JAM

V
1
2
3
4
5
6
7

( G + P )

LAIN LAIN
Tingkat suku bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pembantu Sopir
Bahan bakar bensin
Bahan bakar solar
Minyak Pelumas
PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Harga Satuan Pekerjaan Tahun 2012

Hal :90

PT Pelabuhan Indonesia I (Persero)

URAIAN ANALISA ALAT


No
I

URAIAN

KODE

URAIAN PERALATAN
1 Jenis Peralatan
2 Tenaga
3 Kapasitas
4 Alat Baru

5 Alat Yang Dipakai

II

KOEF.

SATUAN

TAMPER

: a.
b.
c.
: a.
b.
c.

Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat

Pw
Cp
A
W
B
A'
W'
B'

5.00
0.170
4.00
1,000.00
3,000,000.00
4.00
1,000.00
3,000,000.00

HP
Ton
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

BIAYA PASTI PER JAM KERJA


1 Nila sisa alat
2 Faktor angsuran Modal

=
=

10 % x B
i x ( 1 + i ) ^ A'
( 1 + i )^A'-1

C
D

300,000.00
0.38629

Rupiah
-

3 Biaya pasti per jam


a Biaya Pengembalian Modal

1,042.98

Rupiah

b Asuransi dll

( B-C)xD
W'
0,002 x B '
W'
( E + F )

6.00

Rupiah

1,048.98

Rp

Biaya Pasti Perjam


III

BIAYA OPERASI PER JAM KERJA


1 Bahan Bakar

= ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms

H1

7,250.00

Rupiah

2 Pelumas
3 Perawatan dan perbaikan

= ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp


=
( 12,5 % - 17,5 % ) x B '
W'
=
( 1 org / Jam ) x U1
( 1 org / Jam ) x U2

I
K

615.00
375.00

Rupiah
Rupiah

L
M

Rupiah
Rupiah

= ( H1 + H2 + I + K + L + M )

8,240.00

Rp

9,288.98

Rp

(i)
U1
U2
Mb
Ms
Mp

20.00
11,600.00
12,300.00

% / Tahun
Rp / Jam
Rp / Jam
Liter
Liter
Liter

4 Operator
5 Pembantu Operator
Biaya Operasi Per jam
IV

TOTAL BIAYA SEWA ALAT / JAM

V
1
2
3
4
5
6
7

( G + P )

LAIN LAIN
Tingkat suku bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pembantu Sopir
Bahan bakar bensin
Bahan bakar solar
Minyak Pelumas
PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Harga Satuan Pekerjaan Tahun 2012

Hal :91

PT Pelabuhan Indonesia I (Persero)

URAIAN ANALISA ALAT


No
I

URAIAN

KODE

URAIAN PERALATAN
1 Jenis Peralatan
2 Tenaga
3 Kapasitas
4 Alat Baru

5 Alat Yang Dipakai

II

KOEF.

SATUAN

STONE CRUSHER

: a.
b.
c.
: a.
b.
c.

Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat

Pw
Cp
A
W
B
A'
W'
B'

220.00
50.00
5.00
2,000.00
491,500,000.00
5.00
2,000.00
491,500,000.00

HP
Ton/Jam
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

BIAYA PASTI PER JAM KERJA


1 Nila sisa alat
2 Faktor angsuran Modal

=
=

10 % x B
i x ( 1 + i ) ^ A'
( 1 + i )^A'-1

C
D

49,150,000.00
0.33438

Rupiah
-

3 Biaya pasti per jam


a Biaya Pengembalian Modal

73,956.43

Rupiah

b Asuransi dll

( B-C)xD
W'
0,002 x B '
W'
( E + F )

491.50

Rupiah

74,447.93

Rp

Biaya Pasti Perjam


III

BIAYA OPERASI PER JAM KERJA


1 Bahan Bakar

= ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms

H1

319,000.00

Rupiah

2 Pelumas
3 Perawatan dan perbaikan

= ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp


=
( 12,5 % - 17,5 % ) x B '
W'
=
( 1 org / Jam ) x U1
( 2 org / Jam ) x U2

I
K

27,060.00
30,718.75

Rupiah
Rupiah

L
M

= ( H1 + H2 + I + K + L + M )

376,778.75

Rp

451,226.68

Rp

(i)
U1
U2
Mb
Ms
Mp

20.00
11,600.00
12,300.00

% / Tahun
Rp / Jam
Rp / Jam
Liter
Liter
Liter

4 Operator
5 Pembantu Operator
Biaya Operasi Per jam
IV

TOTAL BIAYA SEWA ALAT / JAM

V
1
2
3
4
5
6
7

( G + P )

LAIN LAIN
Tingkat suku bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pembantu Sopir
Bahan bakar bensin
Bahan bakar solar
Minyak Pelumas
PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Harga Satuan Pekerjaan Tahun 2012

Rupiah
Rupiah

Hal :92

PT Pelabuhan Indonesia I (Persero)

URAIAN ANALISA ALAT


No
I

URAIAN

KODE

URAIAN PERALATAN
1 Jenis Peralatan
2 Tenaga
3 Kapasitas
4 Alat Baru

5 Alat Yang Dipakai

II

KOEF.

SATUAN

THREE WHEEL ROLLER 6 - 8 T

: a.
b.
c.
: a.
b.
c.

Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat

Pw
Cp
A
W
B
A'
W'
B'

55.00
8.00
5.00
2,000.00
125,000,000.00
5.00
2,000.00
125,000,000.00

HP
Ton
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

BIAYA PASTI PER JAM KERJA


1 Nila sisa alat
2 Faktor angsuran Modal

=
=

10 % x B
i x ( 1 + i ) ^ A'
( 1 + i )^A'-1

C
D

12,500,000.00
0.33438

Rupiah
-

3 Biaya pasti per jam


a Biaya Pengembalian Modal

18,808.86

Rupiah

b Asuransi dll

( B-C)xD
W'
0,002 x B '
W'
( E + F )

125.00

Rupiah

18,933.86

Rp

Biaya Pasti Perjam


III

BIAYA OPERASI PER JAM KERJA


1 Bahan Bakar

= ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms

H1

79,750.00

Rupiah

2 Pelumas
3 Perawatan dan perbaikan

= ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp


=
( 12,5 % - 17,5 % ) x B '
W'
=
( 1 org / Jam ) x U1
( 1 org / Jam ) x U2

I
K

6,765.00
7,812.50

Rupiah
Rupiah

L
M

= ( H1 + H2 + I + K + L + M )

94,327.50

Rp

113,261.36

Rp

(i)
U1
U2
Mb
Ms
Mp

20.00
11,600.00
12,300.00

% / Tahun
Rp / Jam
Rp / Jam
Liter
Liter
Liter

4 Operator
5 Pembantu Operator
Biaya Operasi Per jam
IV

TOTAL BIAYA SEWA ALAT / JAM

V
1
2
3
4
5
6
7

( G + P )

LAIN LAIN
Tingkat suku bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pembantu Sopir
Bahan bakar bensin
Bahan bakar solar
Minyak Pelumas
PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Harga Satuan Pekerjaan Tahun 2012

Rupiah
Rupiah

Hal :93

PT Pelabuhan Indonesia I (Persero)

URAIAN ANALISA ALAT


No
I

URAIAN

KODE

URAIAN PERALATAN
1 Jenis Peralatan
2 Tenaga
3 Kapasitas
4 Alat Baru

5 Alat Yang Dipakai

II

KOEF.

SATUAN

CONCRETE VIBRATOR

: a.
b.
c.
: a.
b.
c.

Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat

Pw
Cp
A
W
B
A'
W'
B'

10.00
4.00
1,000.00
12,000,000.00
4.00
1,000.00
12,000,000.00

HP
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

BIAYA PASTI PER JAM KERJA


1 Nila sisa alat
2 Faktor angsuran Modal

=
=

10 % x B
i x ( 1 + i ) ^ A'
( 1 + i )^A'-1

C
D

1,200,000.00
0.38629

Rupiah
-

3 Biaya pasti per jam


a Biaya Pengembalian Modal

4,171.92

Rupiah

b Asuransi dll

( B-C)xD
W'
0,002 x B '
W'
( E + F )

24.00

Rupiah

4,195.92

Rp

Biaya Pasti Perjam


III

BIAYA OPERASI PER JAM KERJA


1 Bahan Bakar

= ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms

H1

14,500.00

Rupiah

2 Pelumas
3 Perawatan dan perbaikan

= ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp


=
( 12,5 % - 17,5 % ) x B '
W'
=
( 1 org / Jam ) x U1
( 1 org / Jam ) x U2

I
K

1,230.00
1,500.00

Rupiah
Rupiah

L
M

= ( H1 + H2 + I + K + L + M )

17,230.00

Rp

21,425.92

Rp

(i)
U1
U2
Mb
Ms
Mp

20.00
11,600.00
12,300.00

% / Tahun
Rp / Jam
Rp / Jam
Liter
Liter
Liter

4 Operator
5 Pembantu Operator
Biaya Operasi Per jam
IV

TOTAL BIAYA SEWA ALAT / JAM

V
1
2
3
4
5
6
7

( G + P )

LAIN LAIN
Tingkat suku bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pembantu Sopir
Bahan bakar bensin
Bahan bakar solar
Minyak Pelumas
PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Harga Satuan Pekerjaan Tahun 2012

Rupiah
Rupiah

Hal :94

PT Pelabuhan Indonesia I (Persero)

URAIAN ANALISA ALAT


No
I

URAIAN

KODE

URAIAN PERALATAN
1 Jenis Peralatan
2 Tenaga
3 Kapasitas
4 Alat Baru

5 Alat Yang Dipakai

II

KOEF.

SATUAN

CONCRETE MIXER 0.3 - 0.6 M3

: a.
b.
c.
: a.
b.
c.

Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat

Pw
Cp
A
W
B
A'
W'
B'

15.00
500.00
4.00
2,000.00
45,000,000.00
4.00
2,000.00
45,000,000.00

HP
Liter
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

BIAYA PASTI PER JAM KERJA


1 Nila sisa alat
2 Faktor angsuran Modal

=
=

10 % x B
i x ( 1 + i ) ^ A'
( 1 + i )^A'-1

C
D

4,500,000.00
0.38629

Rupiah
-

3 Biaya pasti per jam


a Biaya Pengembalian Modal

7,822.35

Rupiah

b Asuransi dll

( B-C)xD
W'
0,002 x B '
W'
( E + F )

45.00

Rupiah

7,867.35

Rp

Biaya Pasti Perjam


III

BIAYA OPERASI PER JAM KERJA


1 Bahan Bakar

= ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms

H1

21,750.00

Rupiah

2 Pelumas
3 Perawatan dan perbaikan

= ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp


=
( 12,5 % - 17,5 % ) x B '
W'
=
( 1 org / Jam ) x U1
( 1 org / Jam ) x U2

I
K

1,845.00
2,812.50

Rupiah
Rupiah

L
M

= ( H1 + H2 + I + K + L + M )

26,407.50

Rp

34,274.85

Rp

(i)
U1
U2
Mb
Ms
Mp

20.00
11,600.00
12,300.00

% / Tahun
Rp / Jam
Rp / Jam
Liter
Liter
Liter

4 Operator
5 Pembantu Operator
Biaya Operasi Per jam
IV

TOTAL BIAYA SEWA ALAT / JAM

V
1
2
3
4
5
6
7

( G + P )

LAIN LAIN
Tingkat suku bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pembantu Sopir
Bahan bakar bensin
Bahan bakar solar
Minyak Pelumas
PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Harga Satuan Pekerjaan Tahun 2012

Rupiah
Rupiah

Hal :95

PT Pelabuhan Indonesia I (Persero)

URAIAN ANALISA ALAT


No
I

URAIAN

KODE

URAIAN PERALATAN
1 Jenis Peralatan
2 Tenaga
3 Kapasitas
4 Alat Baru

5 Alat Yang Dipakai

II

KOEF.

SATUAN

CRANE 10 - 15 TON

: a.
b.
c.
: a.
b.
c.

Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat

Pw
Cp
A
W
B
A'
W'
B'

150.00
15.00
5.00
2,000.00
300,000,000.00
5.00
2,000.00
300,000,000.00

HP
Ton
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

BIAYA PASTI PER JAM KERJA


1 Nila sisa alat
2 Faktor angsuran Modal

=
=

10 % x B
i x ( 1 + i ) ^ A'
( 1 + i )^A'-1

C
D

30,000,000.00
0.33438

Rupiah
-

3 Biaya pasti per jam


a Biaya Pengembalian Modal

45,141.26

Rupiah

b Asuransi dll

( B-C)xD
W'
0,002 x B '
W'
( E + F )

300.00

Rupiah

45,441.26

Rp

Biaya Pasti Perjam


III

BIAYA OPERASI PER JAM KERJA


1 Bahan Bakar

= ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms

H1

217,500.00

Rupiah

2 Pelumas
3 Perawatan dan perbaikan

= ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp


=
( 12,5 % - 17,5 % ) x B '
W'
=
( 1 org / Jam ) x U1
( 1 org / Jam ) x U2

I
K

18,450.00
18,750.00

Rupiah
Rupiah

L
M

= ( H1 + H2 + I + K + L + M )

254,700.00

Rp

300,141.26

Rp

(i)
U1
U2
Mb
Ms
Mp

20.00
11,600.00
12,300.00

% / Tahun
Rp / Jam
Rp / Jam
Liter
Liter
Liter

4 Operator
5 Pembantu Operator
Biaya Operasi Per jam
IV

TOTAL BIAYA SEWA ALAT / JAM

V
1
2
3
4
5
6
7

( G + P )

LAIN LAIN
Tingkat suku bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pembantu Sopir
Bahan bakar bensin
Bahan bakar solar
Minyak Pelumas
PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Harga Satuan Pekerjaan Tahun 2012

Rupiah
Rupiah

Hal :96

PT Pelabuhan Indonesia I (Persero)

URAIAN ANALISA ALAT


No
I

URAIAN

KODE

URAIAN PERALATAN
1 Jenis Peralatan
2 Tenaga
3 Kapasitas
4 Alat Baru

5 Alat Yang Dipakai

II

KOEF.

SATUAN

DUMP TRUCK 3 - 4 M3

: a.
b.
c.
: a.
b.
c.

Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat

Pw
Cp
A
W
B
A'
W'
B'

100.00
6.00
5.00
2,000.00
100,000,000.00
5.00
2,000.00
100,000,000.00

HP
Ton
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

BIAYA PASTI PER JAM KERJA


1 Nila sisa alat
2 Faktor angsuran Modal

=
=

10 % x B
i x ( 1 + i ) ^ A'
( 1 + i )^A'-1

C
D

10,000,000.00
0.33438

Rupiah
-

3 Biaya pasti per jam


a. Biaya Pengembalian Modal

( B-C)xD
W'
0,002 x B '
W'
( E + F )

15,047.09

Rupiah

100.00

Rupiah

15,147.09

Rupiah

III

b. Asuransi dll

Biaya Pasti Perjam

BIAYA OPERASI PER JAM KERJA


1 Bahan Bakar

= ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms

H1

145,000.00

Rupiah

2 Pelumas
3 Perawatan dan perbaikan

= ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp


=
( 12,5 % - 17,5 % ) x B '
W'
=
( 1 org / Jam ) x U1
( 1 org / Jam ) x U2

I
K

12,300.00
6,250.00

Rupiah
Rupiah

L
M

= ( H1 + H2 + I + K + L + M )

163,550.00

Rupiah

178,697.09

Rupiah

(i)
U1
U2
Mb
Ms
Mp

20.00
11,600.00
12,300.00

% / Tahun
Rp / Jam
Rp / Jam
Liter
Liter
Liter

4 Operator
5 Pembantu Operator
Biaya Operasi Per jam
IV

TOTAL BIAYA SEWA ALAT / JAM

V
1
2
3
4
5
6
7

( G + P )

LAIN LAIN
Tingkat suku bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pembantu Sopir
Bahan bakar bensin
Bahan bakar solar
Minyak Pelumas
PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Harga Satuan Pekerjaan Tahun 2012

Rupiah
Rupiah

Hal :97

PT Pelabuhan Indonesia I (Persero)

URAIAN ANALISA ALAT


No
I

URAIAN

KODE

URAIAN PERALATAN
1 Jenis Peralatan
2 Tenaga
3 Kapasitas
4 Alat Baru

5 Alat Yang Dipakai

II

KOEF.

SATUAN

EXCAVATOR 80 - 140 HP

: a.
b.
c.
: a.
b.
c.

Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat

Pw
Cp
A
W
B
A'
W'
B'

80.00
0.50
5.00
2,000.00
250,000,000.00
5.00
2,000.00
250,000,000.00

HP
M3
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

BIAYA PASTI PER JAM KERJA


1 Nila sisa alat
2 Faktor angsuran Modal

=
=

10 % x B
i x ( 1 + i ) ^ A'
( 1 + i )^A'-1

C
D

25,000,000.00
0.33438

Rupiah
-

3 Biaya pasti per jam


a. Biaya Pengembalian Modal

( B-C)xD
W'
0,002 x B '
W'
( E + F )

37,617.72

Rupiah

250.00

Rupiah

37,867.72

Rupiah

III

b. Asuransi dll

Biaya Pasti Perjam

BIAYA OPERASI PER JAM KERJA


1 Bahan Bakar

= ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms

H1

116,000.00

Rupiah

2 Pelumas
3 Perawatan dan perbaikan

= ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp


=
( 12,5 % - 17,5 % ) x B '
W'
=
( 1 org / Jam ) x U1
( 1 org / Jam ) x U2

I
K

9,840.00
15,625.00

Rupiah
Rupiah

L
M

= ( H1 + H2 + I + K + L + M )

141,465.00

Rupiah

179,332.72

Rupiah

(i)
U1
U2
Mb
Ms
Mp

20.00
11,600.00
12,300.00

% / Tahun
Rp / Jam
Rp / Jam
Liter
Liter
Liter

4 Operator
5 Pembantu Operator
Biaya Operasi Per jam
IV

TOTAL BIAYA SEWA ALAT / JAM

V
1
2
3
4
5
6
7

( G + P )

LAIN LAIN
Tingkat suku bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pembantu Sopir
Bahan bakar bensin
Bahan bakar solar
Minyak Pelumas
PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Harga Satuan Pekerjaan Tahun 2012

Rupiah
Rupiah

Hal :98

PT Pelabuhan Indonesia I (Persero)

URAIAN ANALISA ALAT


No
I

URAIAN

KODE

URAIAN PERALATAN
1 Jenis Peralatan
2 Tenaga
3 Kapasitas
4 Alat Baru

5 Alat Yang Dipakai

II

KOEF.

SATUAN

FLAT BED TRUCK 3 - 4 M3

: a.
b.
c.
: a.
b.
c.

Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat

Pw
Cp
A
W
B
A'
W'
B'

100.00
4.00
5.00
2,000.00
250,000,000.00
5.00
2,000.00
250,000,000.00

HP
M3
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

BIAYA PASTI PER JAM KERJA


1 Nila sisa alat
2 Faktor angsuran Modal

=
=

10 % x B
i x ( 1 + i ) ^ A'
( 1 + i )^A'-1

C
D

25,000,000.00
0.33438

Rupiah
-

3 Biaya pasti per jam


a. Biaya Pengembalian Modal

( B-C)xD
W'
0,002 x B '
W'
( E + F )

37,617.72

Rupiah

250.00

Rupiah

37,867.72

Rupiah

III

b. Asuransi dll

Biaya Pasti Perjam

BIAYA OPERASI PER JAM KERJA


1 Bahan Bakar

= ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms

H1

145,000.00

Rupiah

2 Pelumas
3 Perawatan dan perbaikan

= ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp


=
( 12,5 % - 17,5 % ) x B '
W'
=
( 1 org / Jam ) x U1
( 1 org / Jam ) x U2

I
K

12,300.00
15,625.00

Rupiah
Rupiah

L
M

= ( H1 + H2 + I + K + L + M )

172,925.00

Rupiah

210,792.72

Rupiah

(i)
U1
U2
Mb
Ms
Mp

20.00
11,600.00
12,300.00

% / Tahun
Rp / Jam
Rp / Jam
Liter
Liter
Liter

4 Operator
5 Pembantu Operator
Biaya Operasi Per jam
IV

TOTAL BIAYA SEWA ALAT / JAM

V
1
2
3
4
5
6
7

( G + P )

LAIN LAIN
Tingkat suku bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pembantu Sopir
Bahan bakar bensin
Bahan bakar solar
Minyak Pelumas
PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Harga Satuan Pekerjaan Tahun 2012

Rupiah
Rupiah

Hal :99

PT Pelabuhan Indonesia I (Persero)

URAIAN ANALISA ALAT


No
I

URAIAN

KODE

URAIAN PERALATAN
1 Jenis Peralatan
2 Tenaga
3 Kapasitas
4 Alat Baru

5 Alat Yang Dipakai

II

KOEF.

SATUAN

WATER PUMP 70 - 100 mm

: a.
b.
c.
: a.
b.
c.

Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat

Pw
Cp
A
W
B
A'
W'
B'

6.00
2.00
2,000.00
5,000,000.00
2.00
2,000.00
5,000,000.00

HP
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

BIAYA PASTI PER JAM KERJA


1 Nila sisa alat
2 Faktor angsuran Modal

=
=

10 % x B
i x ( 1 + i ) ^ A'
( 1 + i )^A'-1

C
D

500,000.00
0.65455

Rupiah
-

3 Biaya pasti per jam


a. Biaya Pengembalian Modal

( B-C)xD
W'
0,002 x B '
W'
( E + F )

1,472.73

Rupiah

5.00

Rupiah

1,477.73

Rupiah

III

b. Asuransi dll

Biaya Pasti Perjam

BIAYA OPERASI PER JAM KERJA


1 Bahan Bakar

= ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms

H1

8,700.00

Rupiah

2 Pelumas
3 Perawatan dan perbaikan

= ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp


=
( 12,5 % - 17,5 % ) x B '
W'
=
( 1 org / Jam ) x U1
( 1 org / Jam ) x U2

I
K

738.00
312.50

Rupiah
Rupiah

L
M

Rupiah
Rupiah

= ( H1 + H2 + I + K + L + M )

9,750.50

Rupiah

11,228.23

Rupiah

(i)
U1
U2
Mb
Ms
Mp

20.00
11,600.00
12,300.00

% / Tahun
Rp / Jam
Rp / Jam
Liter
Liter
Liter

4 Operator
5 Pembantu Operator
Biaya Operasi Per jam
IV

TOTAL BIAYA SEWA ALAT / JAM

V
1
2
3
4
5
6
7

( G + P )

LAIN LAIN
Tingkat suku bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pembantu Sopir
Bahan bakar bensin
Bahan bakar solar
Minyak Pelumas
PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Harga Satuan Pekerjaan Tahun 2012

Hal :100

PT Pelabuhan Indonesia I (Persero)

URAIAN ANALISA ALAT


No
I

URAIAN

KODE

URAIAN PERALATAN
1 Jenis Peralatan
2 Tenaga
3 Kapasitas
4 Alat Baru

5 Alat Yang Dipakai

II

KOEF.

SATUAN

FULVI MIXER

: a.
b.
c.
: a.
b.
c.

Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat

Pw
Cp
A
W
B
A'
W'
B'

75.00
5.00
2,000.00
100,000,000.00
5.00
2,000.00
100,000,000.00

HP
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

BIAYA PASTI PER JAM KERJA


1 Nila sisa alat
2 Faktor angsuran Modal

=
=

10 % x B
i x ( 1 + i ) ^ A'
( 1 + i )^A'-1

C
D

10,000,000.00
0.33438

Rupiah
-

3 Biaya pasti per jam


a. Biaya Pengembalian Modal

( B-C)xD
W'
0,002 x B '
W'
( E + F )

15,047.09

Rupiah

100.00

Rupiah

15,147.09

Rupiah

III

b. Asuransi dll

Biaya Pasti Perjam

BIAYA OPERASI PER JAM KERJA


1 Bahan Bakar

= ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms

H1

108,750.00

Rupiah

2 Pelumas
3 Perawatan dan perbaikan

= ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp


=
( 12,5 % - 17,5 % ) x B '
W'
=
( 1 org / Jam ) x U1
( 1 org / Jam ) x U2

I
K

9,225.00
6,250.00

Rupiah
Rupiah

L
M

= ( H1 + H2 + I + K + L + M )

124,225.00

Rupiah

139,372.09

Rupiah

(i)
U1
U2
Mb
Ms
Mp

20.00
11,600.00
12,300.00

% / Tahun
Rp / Jam
Rp / Jam
Liter
Liter
Liter

4 Operator
5 Pembantu Operator
Biaya Operasi Per jam
IV

TOTAL BIAYA SEWA ALAT / JAM

V
1
2
3
4
5
6
7

( G + P )

LAIN LAIN
Tingkat suku bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pembantu Sopir
Bahan bakar bensin
Bahan bakar solar
Minyak Pelumas
PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Harga Satuan Pekerjaan Tahun 2012

Rupiah
Rupiah

Hal :101

PT Pelabuhan Indonesia I (Persero)

URAIAN ANALISA ALAT


No
I

URAIAN

KODE

URAIAN PERALATAN
1 Jenis Peralatan
2 Tenaga
3 Kapasitas
4 Alat Baru

5 Alat Yang Dipakai

II

KOEF.

SATUAN

TRACK LOADER 75 - 100 HP

: a.
b.
c.
: a.
b.
c.

Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat
Umur Ekonomis
Jam Kerja dalam 1 Tahun
Harga Alat

Pw
Cp
A
W
B
A'
W'
B'

90.00
1.60
5.00
2,000.00
300,000,000.00
5.00
2,000.00
300,000,000.00

HP
M3
Tahun
Jam
Rupiah
Tahun
Jam
Rupiah

BIAYA PASTI PER JAM KERJA


1 Nila sisa alat
2 Faktor angsuran Modal

=
=

10 % x B
i x ( 1 + i ) ^ A'
( 1 + i )^A'-1

C
D

30,000,000.00
0.33438

Rupiah
-

3 Biaya pasti per jam


a. Biaya Pengembalian Modal

( B-C)xD
W'
0,002 x B '
W'
( E + F )

45,141.26

Rupiah

300.00

Rupiah

45,441.26

Rupiah

III

b. Asuransi dll

Biaya Pasti Perjam

BIAYA OPERASI PER JAM KERJA


1 Bahan Bakar

= ( 0,125 - 0,175 ltr / HP / Jam ) x Pw x Ms

H1

130,500.00

Rupiah

2 Pelumas
3 Perawatan dan perbaikan

= ( 0,01 - 0,02 ltr / HP / Jam ) x Pw x Mp


=
( 12,5 % - 17,5 % ) x B '
W'
=
( 1 org / Jam ) x U1
( 1 org / Jam ) x U2

I
K

11,070.00
18,750.00

Rupiah
Rupiah

L
M

= ( H1 + H2 + I + K + L + M )

160,320.00

Rupiah

205,761.26

Rupiah

(i)
U1
U2
Mb
Ms
Mp

20.00
11,600.00
12,300.00

% / Tahun
Rp / Jam
Rp / Jam
Liter
Liter
Liter

4 Operator
5 Pembantu Operator
Biaya Operasi Per jam
IV

TOTAL BIAYA SEWA ALAT / JAM

V
1
2
3
4
5
6
7

( G + P )

LAIN LAIN
Tingkat suku bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pembantu Sopir
Bahan bakar bensin
Bahan bakar solar
Minyak Pelumas
PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

Harga Satuan Pekerjaan Tahun 2012

Rupiah
Rupiah

Hal :102

PT Pelabuhan Indonesia I (Persero)

KET.

E01

Alat Baru
Alat Baru
Alat Baru

Khusus AMP

Harga Satuan Pekerjaan Tahun 2012

Hal :103

PT Pelabuhan Indonesia I (Persero)

KET.

E02

Alat Baru
Alat Baru
Alat Baru

Harga Satuan Pekerjaan Tahun 2012

Hal :104

PT Pelabuhan Indonesia I (Persero)

KET.

E03

Alat Baru
Alat Baru
Alat Baru

Harga Satuan Pekerjaan Tahun 2012

Hal :105

PT Pelabuhan Indonesia I (Persero)

KET.

E04

Alat Baru
Alat Baru
Alat Baru

Harga Satuan Pekerjaan Tahun 2012

Hal :106

PT Pelabuhan Indonesia I (Persero)

KET.

E05

Alat Baru
Alat Baru
Alat Baru

Harga Satuan Pekerjaan Tahun 2012

Hal :107

PT Pelabuhan Indonesia I (Persero)

KET.

E15

Alat Baru
Alat Baru
Alat Baru

Harga Satuan Pekerjaan Tahun 2012

Hal :108

PT Pelabuhan Indonesia I (Persero)

KET.

E17

Alat Baru
Alat Baru
Alat Baru

Harga Satuan Pekerjaan Tahun 2012

Hal :109

PT Pelabuhan Indonesia I (Persero)

KET.

E18

Alat Baru
Alat Baru
Alat Baru

Harga Satuan Pekerjaan Tahun 2012

Hal :110

PT Pelabuhan Indonesia I (Persero)

KET.

E09

Alat Baru
Alat Baru
Alat Baru

Harga Satuan Pekerjaan Tahun 2012

Hal :111

PT Pelabuhan Indonesia I (Persero)

KET.

E12

Alat Baru
Alat Baru
Alat Baru

Harga Satuan Pekerjaan Tahun 2012

Hal :112

PT Pelabuhan Indonesia I (Persero)

KET.

E12

Alat Baru
Alat Baru
Alat Baru

Harga Satuan Pekerjaan Tahun 2012

Hal :113

PT Pelabuhan Indonesia I (Persero)

KET.

E19

Alat Baru
Alat Baru
Alat Baru

Harga Satuan Pekerjaan Tahun 2012

Hal :114

PT Pelabuhan Indonesia I (Persero)

KET.

E23

Alat Baru
Alat Baru
Alat Baru

Harga Satuan Pekerjaan Tahun 2012

Hal :115

PT Pelabuhan Indonesia I (Persero)

KET.

E26

Alat Baru
Alat Baru
Alat Baru

Harga Satuan Pekerjaan Tahun 2012

Hal :116

PT Pelabuhan Indonesia I (Persero)

KET.

E25

Alat Baru
Alat Baru
Alat Baru

Harga Satuan Pekerjaan Tahun 2012

Hal :117

PT Pelabuhan Indonesia I (Persero)

KET.

E21

Alat Baru
Alat Baru
Alat Baru

Harga Satuan Pekerjaan Tahun 2012

Hal :118

PT Pelabuhan Indonesia I (Persero)

KET.

E16

Alat Baru
Alat Baru
Alat Baru

Harga Satuan Pekerjaan Tahun 2012

Hal :119

PT Pelabuhan Indonesia I (Persero)

KET.

E20

Alat Baru
Alat Baru
Alat Baru

Harga Satuan Pekerjaan Tahun 2012

Hal :120

PT Pelabuhan Indonesia I (Persero)

KET.

E06

Alat Baru
Alat Baru
Alat Baru

Harga Satuan Pekerjaan Tahun 2012

Hal :121

PT Pelabuhan Indonesia I (Persero)

KET.

E07

Alat Baru
Alat Baru
Alat Baru

Harga Satuan Pekerjaan Tahun 2012

Hal :122

PT Pelabuhan Indonesia I (Persero)

KET.

E08

Alat Baru
Alat Baru
Alat Baru

Harga Satuan Pekerjaan Tahun 2012

Hal :123

PT Pelabuhan Indonesia I (Persero)

KET.

E10

Alat Baru
Alat Baru
Alat Baru

Harga Satuan Pekerjaan Tahun 2012

Hal :124

PT Pelabuhan Indonesia I (Persero)

KET.

E11

Alat Baru
Alat Baru
Alat Baru

Harga Satuan Pekerjaan Tahun 2012

Hal :125

PT Pelabuhan Indonesia I (Persero)

KET.

E22

Alat Baru
Alat Baru
Alat Baru

Harga Satuan Pekerjaan Tahun 2012

Hal :126

PT Pelabuhan Indonesia I (Persero)

KET.

E27

Alat Baru
Alat Baru
Alat Baru

Harga Satuan Pekerjaan Tahun 2012

Hal :127

PT Pelabuhan Indonesia I (Persero)

KET.

E14

Alat Baru
Alat Baru
Alat Baru

Harga Satuan Pekerjaan Tahun 2012

Hal :128

PT Pelabuhan Indonesia I (Persero)

ANALISA HARGA SATUAN PEKERJAAN LISTRIK


KODE
(1)

MACAM PEKERJAAN
(2)

PLS1 1 M' Pasang Kabel NYY 3 x 6 sqmm


Tukang Listrik
Pekerja
Mandor
JUMLAH

0.0050
0.0050
0.0050

PLS2 1 M' Pasang Kabel NYY 3 x 4 sqmm


Tukang Listrik
Pekerja
Mandor
JUMLAH

0.0050
0.0050
0.0050

PLS3 1 M' Pasang Kabel NYM 2 x 2,5 sqmm


Tukang Listrik
Pekerja
Mandor
JUMLAH

0.0050
0.0050
0.0050

PLS4 1 M' Pasang Kabel NYM 2 x 1,5 sqmm


Tukang Listrik
Pekerja
Mandor
JUMLAH

0.0050
0.0050
0.0050

PLS5 1 M' Pasang Kabel NYA 1 x 2,5 sqmm


Tukang Listrik
Pekerja
Mandor
JUMLAH

0.0025
0.0025
0.0025

Upah
(3)

org X Rp.
org X Rp.
org X Rp.

org X Rp.
org X Rp.
org X Rp.

org X Rp.
org X Rp.
org X Rp.

org X Rp.
org X Rp.
org X Rp.

org X Rp.
org X Rp.
org X Rp.

PLS6 50 M' Pasang Kabel DX 2x10 sqmm + Accessories (antar tiang / gawang)
1
Kabel DX 2 x 10 sqmm "Supreme"
50.0000 m X Rp.
Tukang Listrik
0.5000 org X Rp.
Pekerja
0.5000 org X Rp.
Mandor
0.2500 org X Rp.
Penyambungan beban
1.0000 ls
X Rp.
JUMLAH

Analisa Harga Satuan Pekerjaan Listrik Tahun 2012

0
55000
80000

0
55000
80000

0
55000
80000

0
55000
80000

0
55000
80000

0
0
55000
80000
0

Bahan
(4)

275.00
400.00
675.00

275.00
400.00
675.00

275.00
400.00
675.00

275.00
400.00
675.00

137.50
200.00
337.50

27,500.00
20,000.00
47,500.00

Hal :129

PT Pelabuhan Indonesia I (Persero)

(2)

(1)

(3)

PLS7 50 M' Pasang Kabel DX 2x16 sqmm + Accessories (antar tiang / gawang)
1
Kabel DX 2 x 16 sqmm "Supreme"
50.0000 m X Rp.
Tukang Listrik
0.5000 org X Rp.
Pekerja
0.5000 org X Rp.
Mandor
0.2500 org X Rp.
Penyambungan beban
1.0000 ls
X Rp.
JUMLAH

0
0
55000
80000
0

(4)

27,500.00
20,000.00
47,500.00

PLS8 1 M' Pasang Kabel NYY 3x10 sqmm


Kabel NYY 3 x 10 sqmm "Supreme"
Tukang Listrik
Pekerja
Mandor
JUMLAH
PLS9 1 Unit Pasang Box Panel dan Panel Kontrol
Tukang Listrik
Pekerja
Mandor
Pasang panel kontrol
JUMLAH

1.0000
0.0050
0.0050
0.0050

m
org
org
org

0.5000 org
0.7500 org
0.2500 org
1.0000 unit

PLS10 1 Unit Pasang Box KWH dan Meter (1 Unit)


Tukang Listrik
Pekerja
Mandor
Pasang panel kontrol
JUMLAH

0.5000 org
0.7500 org
0.2500 org
1.0000 unit

PLS11 1 Unit Pasang tiang lampu antik (b3)


Tukang batu
Tukang listrik
Pekerja
Mandor
Alat bantu
Angkutan
JUMLAH

0.6600 org
0.6600 org
5.3300 org
0.6660 org
0.6660 set
4.6000 jam

PLS12 1 Unit Pasang tiang lampu antik (b3)


Tukang batu
Tukang listrik
Pekerja
Mandor
Alat bantu
Angkutan
JUMLAH

0.5000 org
0.5000 org
4.0000 org
0.5000 org
0.5000 set
3.5000 jam

Analisa Harga Satuan Pekerjaan Listrik Tahun 2012

X
X
X
X

X
X
X
X

X
X
X
X

X
X
X
X
X
X

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

0
0
55000
80000

0
55000
80000
0

0
55000
80000
0

80000
0
55000
80000
0
0

275.00
400.00
675.00

41,250.00
20,000.00
61,250.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

80000
0
55000
80000
0
0

41,250.00
20,000.00
61,250.00

52,800.00
293,150.00
53,280.00

399,230.00

X
X
X
X
X
X

40,000.00
220,000.00
40,000.00

300,000.00

Hal :130

PT Pelabuhan Indonesia I (Persero)

(2)

(1)

(3)

PLS13 1 Set Pemasangan armatur komplit


Tukang listrik
Pekerja
Mandor
Alat bantu
JUMLAH

0.5000 org
0.7500 org
0.2500 org
1.0000 set

PLS14 1 Unit Pemasangan komponen + Box


Tukang listrik
Pekerja
Mandor
Alat bantu
JUMLAH

0.6660 org
1.0000 org
0.3330 org
1.0000 set

PLS15 1 Set Bongkar komponen


Tukang listrik
Pekerja
Mandor
Alat bantu

X
X
X
X

Rp.
Rp.
Rp.
Rp.

0
55000
80000
0

Rp.
Rp.
Rp.
Rp.

0
55000
80000
0

X
X
X
X

Rp.
Rp.
Rp.
Rp.

0
55000
80000
0

JUMLAH

X
X
X
X

Rp.
Rp.
Rp.
Rp.

0
55000
80000
0

JUMLAH

0.5000 org
0.5000 org
4.0000 org
0.5000 org
0.5000 set
3.5000 jam

PLS18 1 Set Bongkar Tiang Lampu Antik (b.1)


Tukang batu
Tukang Listrik
Pekerja
Mandor
Alat bantu
Angkutan
JUMLAH

0.6600 org
0.6600 org
5.3330 org
0.6660 org
0.6660 set
4.6000 jam

Analisa Harga Satuan Pekerjaan Listrik Tahun 2012

X
X
X
X
X
X

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

80000
0
55000
80000
0
0

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

80000
0
55000
80000
0
0

40,000.00
220,000.00
40,000.00

300,000.00

X
X
X
X
X
X

27,500.00
13,328.00
40,828.00

PLS17 1 Set Bongkar Tiang Lampu Antik (b.1)


Tukang batu
Tukang Listrik
Pekerja
Mandor
Alat bantu
Angkutan
JUMLAH

33,000.00
16,000.00
49,000.00

0.3300 org
0.5000 org
0.1666 org
1.0000 jam

55,000.00
26,640.00
81,640.00

0.4000 org
0.6000 org
0.2000 org
1.0000 set

PLS16 1 Unit Bongkar Armatur


Tukang Listrik
Pekerja
Mandor
Angkutan

41,250.00
20,000.00
61,250.00

X
X
X
X

(4)

52,800.00
293,315.00
53,280.00

399,395.00

Hal :131

PT Pelabuhan Indonesia I (Persero)

(2)

(1)

(3)

(4)

PLS19 1 m' Pasang Kabel NYM 2x2,5 sqmm


Kabel NYM 2 x 2,5 sqmm "Supreme"
Tukang Listrik
Pekerja
Mandor
JUMLAH

1.0000
0.2500
0.0100
0.0050

m1
org
org
org

X
X
X
X

Rp.
Rp.
Rp.
Rp.

0
0
55000
80000

550.00
400.00
950.00

PLS20 1 m' Pasang Kabel NYA 2,5 sqmm


Kabel NYM 2 x 2,5 sqmm "Supreme"
Tukang Listrik
Pekerja
Mandor
JUMLAH

1.0000
0.2500
0.0100
0.0050

m1
org
org
org

X
X
X
X

Rp.
Rp.
Rp.
Rp.

0
0
55000
80000

550.00
400.00
950.00

PLS21 1 m' Pasang Pralon 3" Kabel NYY 3x6 sqmm


Pipa pralon 3"
Pekerja
Mandor

1.0000
0.0100
0.0050

m X Rp.
org X Rp.
org X Rp.

0
55000
80000

JUMLAH
PLS22 Pasang tutup panel ukuran 30x30
Tutup panel 30x30
Tukang listrik
Pekerja
Mandor
JUMLAH

1.0000 bh
0.0500 org
0.1000 org
0.0250 org

PLS23 Pasang MCB Ampere + box tutup panel ukuran 30 x 30


MCB 10 Ampere + box "MG"
1.0000
Tukang listrik
0.0500
Pekerja
0.1000
Mandor
0.0250
JUMLAH
PLS24 Pasang Kapasitor 12,5 uF
Kapasitor 12,5 uF
Tukang listrik
Pekerja
Mandor

bh
org
org
org

1.0000 bh
1.0000 bh
0.0500 org
0.1000 org
0.0250 org
JUMLAH

X
X
X
X

X
X
X
X

X
X
X
X

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

0
0
55000
80000

0
0
55000
80000

0
0
55000
80000

550.00
400.00
950.00

5,500.00
2,000.00
7,500.00

5,500.00
2,000.00
7,500.00

5,500.00
2,000.00
7,500.00

PLS25 1 Set Pasang Stang Ornamen 2,2 meter + Lampu SRP 822/250 Watt Son + pengetesan dan penyalaan

Analisa Harga Satuan Pekerjaan Listrik Tahun 2012

Hal :132

PT Pelabuhan Indonesia I (Persero)

(2)

(1)
Pekerja
Tukang Listrik
Pengawas
Mandor

Pengetesan dan Penyalaan


Pasang instalasi / titik

0.5000
0.5000
1.2500
0.5000

org
org
org
org

1.0000 ttk

X Rp.
X Rp.
X Rp.
X Rp.
JUMLAH (A)

55000
0
0
80000

X Rp.
JUMLAH (B)

PLS26 1 Set Pasang Stang Ornamen 6 meter + Lampu SRP 822/250 Watt Son
Pekerja
0.8750 org X Rp.
Tukang Listrik
0.8750 org X Rp.
Pengawas
1.8033 org X Rp.
Mandor
0.7413 org X Rp.
JUMLAH (C)

55000
0
0
80000

PLS27 1 Set Pasang Stang Ornamen 2,2 meter + Lampu SRP 822/250 Watt Son
Pekerja
0.5000 org X Rp.
Tukang Listrik
0.5000 org X Rp.
Pengawas
1.2500 org X Rp.
Mandor
0.5000 org X Rp.
JUMLAH (D)

55000
0
0
80000

(3)
27,500.00
40,000.00
67,500.00

48,125.00
59,306.40
107,431.40

27,500.00
40,000.00
67,500.00

PLS28 1 Set Pasang Tiang Octogonal Cabang 1, h= 7 meter+ lampu SRP 822/250 Watt Son
3
Pondasi Tiang Beton bertulang 1:2:3
0.4200 m X Rp.
491,200.00
Pekerja
2.8500 org X Rp.
55000
Tukang Listrik
2.8500 org X Rp.
0
Pengawas
2.0075 org X Rp.
0
Mandor
1.0000 org X Rp.
80000
JUMLAH (E)

156,750.00
80,000.00
236,750.00

PLS29 1 Set Pasang Tiang Octogonal Cabang 1, h= 9 meter + lampu SRP 822/250 Watt Son
3
Pondasi Tiang Beton bertulang 1:2:3
0.4200 m X Rp.
491,200.00
Pekerja
3.1000 org X Rp.
55000
Tukang Listrik
3.1000 org X Rp.
0
Pengawas
2.5000 org X Rp.
0
Mandor
1.2100 org X Rp.
80000
JUMLAH (F)

170,500.00
96,800.00
267,300.00

Analisa Harga Satuan Pekerjaan Listrik Tahun 2012

(4)

206,304.00

206,304.00

206,304.00

206,304.00

Hal :133

PT Pelabuhan Indonesia I (Persero)

(1)

(2)

(3)

(4)

PLS30 1 Set Pasang Tiang Octogonal Cabang 2, h= 9 meter+ lampu SRP 822/250 Watt Son
3
Pondasi Tiang Beton bertulang 1:2:3
0.4200 m X Rp.
491,200.00
Pekerja
3.3000 org X Rp.
55000
Tukang Listrik
3.3000 org X Rp.
0
Pengawas
2.5782 org X Rp.
0
Mandor
1.2433 org X Rp.
80000
JUMLAH (G)

181,500.00
99,464.00
280,964.00

PLS31 1 Set Pasang Tiang Octogonal Cabang 3, h= 9 m+ lampu SRP 822/250 Watt Son
3
Pondasi Tiang Beton bertulang 1:2:3
0.4200 m X Rp.
491,200.00
Pekerja
3.8100 org X Rp.
55000
Tukang Listrik
3.8100 org X Rp.
0
Pengawas
2.6626 org X Rp.
0
Mandor
1.2650 org X Rp.
80000
JUMLAH (H)

209,550.00
101,200.00
310,750.00

PLS32 1 Set Pasang Tiang Octogonal Cabang 3, h= 11 m+ lampu SRP 822/250 Watt Son
3
Pondasi Tiang Beton bertulang 1:2:3
0.4200 m X Rp.
491,200.00
Pekerja
4.2500 org X Rp.
55000
Tukang Listrik
4.2500 org X Rp.
0
Pengawas
2.9287 org X Rp.
0
Mandor
1.2939 org X Rp.
80000
JUMLAH (I)

233,750.00
103,512.00
337,262.00

206,304.00

PLS33 1 Set Bongkar armatur pada stang ornamen existing + pasang lampu SRP 822/150 Watt Son + return
Pekerja
0.9000 org X Rp.
55000
49,500.00
Tukang Listrik
0.9000 org X Rp.
0
Pengawas
2.1044 org X Rp.
0
Mandor
0.8418 org X Rp.
80000
67,344.00
Retur material existing
0.0500 unit X Rp.
0
JUMLAH (J)
116,844.00

PLS34 1 Set Bongkar armatur pada stang ornamen existing + pasang Lampu SRP 822/250 Watt Son + retur
Pekerja
0.8750 org X Rp.
55000
48,125.00
Tukang Listrik
0.8750 org X Rp.
0
Pengawas
1.6995 org X Rp.
0
Mandor
0.6798 org X Rp.
80000
54,384.00
Retur material existing
0.0500 unit X Rp.
0
JUMLAH (K)
102,509.00

Analisa Harga Satuan Pekerjaan Listrik Tahun 2012

206,304.00

206,304.00

206,304.00

206,304.00

206,304.00

Hal :134

PT Pelabuhan Indonesia I (Persero)

(1)

(2)

PLS35 1 Set Bongkar armatur pada tang existing + pasang Lampu SRP 822/250 Watt Son + retur
Pekerja
0.9000 org X Rp.
55000
Tukang Listrik
0.9000 org X Rp.
0
Pengawas
2.1044 org X Rp.
0
Mandor
0.8418 org X Rp.
80000
Retur material existing
0.0500 unit X Rp.
0
JUMLAH (L)

(3)

(4)

49,500.00
67,344.00
116,844.00

PLS36 1 Set Bongkar komponen lama existing + pasang komponen Lampu SRP 822/250 Watt Son + retur
Pekerja
0.8500 org X Rp.
55000
46,750.00
Tukang Listrik
0.8500 org X Rp.
0
Pengawas
1.9554 org X Rp.
0
Mandor
0.7822 org X Rp.
80000
62,576.00
Retur material existing
0.0500 unit X Rp.
0
JUMLAH (M)
109,326.00

Analisa Harga Satuan Pekerjaan Listrik Tahun 2012

Hal :135

PT Pelabuhan Indonesia I (Persero)

Jumlah
(5)

675.00

675.00

675.00

675.00

337.50

47,500.00

Analisa Harga Satuan Pekerjaan Listrik Tahun 2012

Hal :136

PT Pelabuhan Indonesia I (Persero)

(5)

47,500.00

675.00

61,250.00

61,250.00

399,230.00

300,000.00

Analisa Harga Satuan Pekerjaan Listrik Tahun 2012

Hal :137

PT Pelabuhan Indonesia I (Persero)

(5)

61,250.00

81,640.00

49,000.00

40,828.00

300,000.00

399,395.00

Analisa Harga Satuan Pekerjaan Listrik Tahun 2012

Hal :138

PT Pelabuhan Indonesia I (Persero)

(5)

950.00

950.00

950.00

7,500.00

7,500.00

7,500.00

Analisa Harga Satuan Pekerjaan Listrik Tahun 2012

Hal :139

PT Pelabuhan Indonesia I (Persero)

(5)

67,500.00

107,431.40

67,500.00

443,054.00

473,604.00

Analisa Harga Satuan Pekerjaan Listrik Tahun 2012

Hal :140

PT Pelabuhan Indonesia I (Persero)

(5)

487,268.00

517,054.00

543,566.00

116,844.00

102,509.00

Analisa Harga Satuan Pekerjaan Listrik Tahun 2012

Hal :141

PT Pelabuhan Indonesia I (Persero)

(5)

116,844.00

109,326.00

Analisa Harga Satuan Pekerjaan Listrik Tahun 2012

Hal :142