Parameter
BOD
COD
Total Solid (TDS+TSS)
TDS
TSS
N-NH3
P-PO4
Parameter
BOD
COD
Total Solid
(TDS+TSS)
TDS
TSS
N-NH3
P-PO4
850
600
250
50
11
Baku Mutu
(mg/L)
30
50
1500
50
0.5
2
Baku Mutu
(mg/L)
Removal yang
Dibutuhkan (%)
210
450
30
86%
50
89%
1500
50
0.5
2
-150%
80%
99%
82%
850
600
250
50
11
COD
0-5a
TSS
0-10a
N
-
30-40a
30-40a
50-65a
10-20a
80-95a
80-90a
70-90a
75-85a
80-95a
80-85a
80-90a
15-50a
60-80a
60-80a
60-85a
15-50a
50-70a
50-60a
90-96a
ammonia stripping
60-95a
ANAMMOX
50a
90a
80-90a
89-98b
80-90a
97c
70-90a
>75b
0
99c
Grit chamber
COD
0
38
90
85
80
85
50
80
90
75
85
80
85
45
0
88
73
50
95
60
60
96
ammonia stripping
95
ANAMMOX
50
90
90
90
85
90
Proses Pengolahan
Grit chamber
Oxydation Ditch (OD)
N
0
10
70
dasar peraturan
Parameter
Konsentrasi
Awal (mg/L)
BOD
COD
TSS
N-NH3
P-PO4
210
450
250
50
11
ALTERNATIF 2 (ANAMMOX- OD
P
10-20a
a
b
90
c
a
10-25
Parameter
Konsentrasi
Awal (mg/L)
BOD
COD
210
450
TSS
250
N-NH3
50
P-PO4
11
Kargi, Hydraulic residence time effects in biological nutrient removal using five-step sequencing
8-12a
Parameter
Konsentrasi
Awal (mg/L)
BOD
210
80a
a
75-85
99c
COD
TSS
N-NH3
P-PO4
P
0
20
25
25
12
0
75
0
80
25
450
250
50
11
1 (AS- OD)
Baku Mutu
(mg/L)
30
50
50
0.5
2
Removal yang
Dibutuhkan (%)
86%
89%
80%
99%
82%
UNIT PENGOLAHAN
Grit Chamber
BP I
ammonia stripping
Oxidation Ditch
Efisiensi
Hsl Akhir
Efisiensi
Hsl Akhir
Efisiensi
Hsl Akhir
Efisiensi
0%
0%
7%
0%
0%
210.0
450.0
232.5
50.0
11.0
40%
38%
65%
10%
20%
126.0
279.0
81.4
45.0
8.8
0%
0%
0%
95%
0%
226.0
379.0
81.4
2.3
8.8
85%
90%
85%
90%
25%
2 (ANAMMOX- OD)
UNIT PENGOLAHAN
Baku Mutu
(mg/L)
Removal yang
Dibutuhkan (%)
Grit Chamber
BP I
ANAMMOX
Oxidation Ditch
30
50
86%
89%
Efisiensi
0%
0%
Hsl Akhir
210.0
450.0
Efisiensi
40%
38%
Hsl Akhir
126.0
279.0
Efisiensi
0%
50%
Hsl Akhir
126.0
139.5
Efisiensi
85%
90%
50
80%
7%
232.5
65%
81.4
0%
81.4
85%
0.5
99%
0%
50.0
10%
45.0
90%
4.5
90%
82%
0%
11.0
20%
8.8
80%
1.8
25%
30
Removal yang
Dibutuhkan (%)
89%
Grit Chamber
BP I
Oxidation Ditch
Efisiensi
Hsl Akhir
Efisiensi
Hsl Akhir
Efisiensi
Hsl Akhir
0%
210.0
40%
126.0
85%
18.9
50
50
0.5
2
80%
99%
82%
0%
0%
7%
0%
0%
450.0
232.5
50.0
11.0
38%
65%
10%
20%
279.0
81.4
45.0
8.8
90%
85%
90%
25%
27.9
12.2
4.5
6.6
Oxidation Ditch
Hsl Akhir
33.9
37.9
12.2
0.2
6.6
OKE
Oxidation Ditch
Hsl Akhir
18.9
14.0
12.2
0.5
1.3
Konsentrasi
Awal (mg/L)
Baku Mutu
(mg/L)
Removal yang
Dibutuhkan (%)
BOD
COD
TSS
N-NH3
P-PO4
210
450
250
50
11
30
50
50
0.5
2
86%
89%
80%
99%
82%
Grit Chamber
Efisiensi
Hsl Akhir
210.0
450.0
250.0
50.0
11.0
BP I
Efisiensi
40%
38%
65%
10%
20%
Hsl Akhir
126.0
279.0
87.5
45.0
8.8
Konsentrasi
Awal (mg/L)
Baku Mutu
(mg/L)
Removal yang
Dibutuhkan (%)
210
450
250
50
11
30
50
50
0.5
2
86%
89%
80%
99%
82%
UNIT PENGOLAHAN
Grit Chamber
Efisiensi
Hsl Akhir
0%
210.0
0%
450.0
0%
250.0
0%
50.0
0%
11.0
Efisiensi
40%
38%
65%
10%
20%
BP I
Hsl Akhir
126.0
279.0
87.5
45.0
8.8
Konsentrasi
Awal (mg/L)
Baku Mutu
(mg/L)
Removal yang
Dibutuhkan (%)
210
30
86%
UNIT PENGOLAHAN
Grit Chamber
Efisiensi
Hsl Akhir
0%
210.0
Efisiensi
40%
BP I
Hsl Akhir
126.0
COD
TSS
N-NH3
P-PO4
450
250
50
11
50
50
0.5
2
89%
80%
99%
82%
0%
0%
0%
0%
450.0
250.0
50.0
11.0
38%
65%
10%
20%
279.0
87.5
45.0
8.8
UNIT PENGOLAHAN
Hsl Akhir
18.9
14.0
13.1
0.5
1.3
Secondary Treatment
(BP II)
Efisiensi
Hsl Akhir
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
UNIT PENGOLAHAN
ANAMMOX
Efisiensi
Hsl Akhir
0%
126.0
50%
139.5
0%
87.5
90%
4.5
80%
1.8
Aeration tank
Efisiensi
Hsl Akhir
0%
126.0
0%
139.5
0%
87.5
0%
4.5
0%
1.8
Secondary Treatment
Efisiensi
Hsl Akhir
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
UNIT PENGOLAHAN
ANAMMOX
Efisiensi
Hsl Akhir
0%
126.0
trickling filter
Efisiensi
Hsl Akhir
0%
126.0
Secondary Treatment
(BP II)
Efisiensi
Hsl Akhir
#REF!
#REF!
ANAMMOX
Efisiensi
0%
50%
0%
90%
80%
Hsl Akhir
126.0
139.5
87.5
4.5
1.8
Oxidation Ditch
Efisiensi
85%
90%
85%
90%
25%
50%
0%
90%
80%
139.5
87.5
4.5
1.8
0%
0%
0%
0%
139.5
87.5
4.5
1.8
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
MASS BALANCE
5 PLAN
210
450
250
50
11
mg/L
mg/L
mg/L
mg/L
mg/L
250
140
280
500
L/s
L/s
L/s
L/s
=
=
=
=
0.25
0.14
0.28
0.5
m/s
m/s
m/s
m/s
Baku Mutu Air Limbah Kelas 1 (SK gub no 45 th 2002) dan PP No 82 tahun 2001
=
BOD
30 mg/L
=
COD
50 mg/L
=
TSS
50 mg/L
N-NH3
0.5 mg/L
=
P-PO4
2 mg/L
=
GRIT CHAMBER
Influen
Diketahui :
Q ave
BOD
COD
TSS
N
P
Perhitungan :
M BOD
M COD
M TSS
MN
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
0.25
210
450
250
50
11
m/s
mg/L
mg/L
mg/L
mg/L
mg/L
Q ave x [BOD]
21600 m/hari x 0,15 kg/m
4536.00 kg/hari
Q ave x [COD]
21600 m/hari x 0,25 kg/m
9720.00 kg/hari
Q ave x [TSS]
21600 m/hari x 0,15 kg/m
5400 kg/hari
Q ave x [N]
=
=
=
=
=
=
21600
0.21
0.45
0.25
0.05
0.011
m/hari
kg/m
kg/m
kg/m
kg/m
kg/m
beban
MP
Removal
M BOD
M COD
M TSS
MN
MP
Effluen
M BOD
M COD
M TSS
MN
MP
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
0% x M BOD
0 % x 3240 kg/hari
0.0 kg/hari
0% x M COD
0 % x 5400 kg/hari
0.0 kg/hari
7% x M TSS
7 % x 3240 kg/hari
378 kg/hari
0% x M N
0 % x 1080 kg/hari
0.0 kg/hari
0% x M P
0 % x 324 kg/hari
0.0 kg/hari
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
378.000 kg/hari
= 226,8 kg/hari / 6%
210.06
450.129
232.567
50.0143
11.0031
Sg
air
Debit lumpur
Q effluen
=
6300 kg/hari
=
1.02 gr/cm
=
1 gr/cm
= M solid/ (Sg x air x 1000)
= 3780 kg/hari / (1,02 gr/cm x 1 gr/cm x 1000)
=
6.2 m/hari
= Q ave - Debit lumpur
=
21600 - 3,7 m/hari
=
21593.8 m/hari
Msolid
Sgx airx 10
210
450
250
50
11
mg/L
mg/L
mg/L
mg/L
mg/L
Q maks
1400
1600
1800
Qave
1.2
2
BAK PENGENDAP I
Influen
Diketahui :
Q influen
M BOD
M COD
M TSS
MN
MP
210.06
1
2
3
Removal
M BOD
M COD
M TSS
MN
1250
1500
1750
=
=
=
=
=
=
21593.8
4536.0
9720.0
5022.0
1080.0
237.6
=
=
=
=
=
=
=
=
=
=
40% x M BOD
40 % x 3240 kg/hari
1814.4
34% x M COD
34 % x 5400 kg/hari
3694
65% x M TSS
65 % x 3013,2 kg/hari
3264.3
10% x M N
MP
Effluen
M BOD
M COD
M TSS
MN
MP
=
=
=
=
=
10 % x 1080 kg/hari
108
20% x M P
20 % x 324 kg/hari
47.5
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
107981,5
3264.3
1958,6 kg/hari / 6%
54405
1.02
1
M solid/ (Sg x air x 1000)
32643 kg/hari / (1,02 gr/cm x 1 gr/cm x 1000)
53.3
Q influen - Debit lumpur
21596,3 - 32
21540.5
Primary
Sedimentation
107821,5
Msolid
x airx 1000
160
5 plan
Q maks
Q min
700
800
900
Q peak
280
320
360
Qave
2500
3000
3500
m/hari
kg/hari
kg/hari
kg/hari
kg/hari
kg/hari
Q min
140
160
180
Q peak
250
300
350
210.06
450.13
232.57
50.01
11.00
500
600
700
AMMONIA STRIPPING
Influen
Diketahui :
Q influen
=
21540.5
M BOD
=
2721.6
M COD
=
6026.4
M TSS
=
1757.7
MN
=
972.0
MP
=
190.1
Removal
M BOD
OD
kg/hari
OD
M COD
kg/hari
S
3,2 kg/hari
M TSS
kg/hari
MN
=
=
=
=
=
=
=
=
=
=
0% x M BOD
0 % x 1944 kg/hari
0.0
0% x M COD
0 % x 3564 kg/hari
0
0% x M TSS
0 % x 1054,6 kg/hari
0.0
95% x M N
kg/hari
MP
kg/hari
Effluen
M BOD
126.35
M COD
279.77
M TSS
81.60
MN
45.12
MP
8.82
= 95 % x 972 kg/hari
=
923.4
= 0% x M P
= 0 % x 259,2 kg/hari
=
0.0
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
kg/hari
hari / 6%
Q effluen
kg/hari
gr/cm
gr/cm
g x air x 1000)
ari / (1,02 gr/cm x 1 gr/cm x 1000)
m/hari
Debit lumpur
m/hari
m/hari
107821,5
Msolid
Sgx airx 1000
= Q influen
=
21540.5
m/hari
m/hari
m/hari
m/hari
m/hari
m/hari
x M BOD
% x 1944 kg/hari
kg/hari
x M COD
% x 3564 kg/hari
kg/hari
x M TSS
% x 1054,6 kg/hari
kg/hari
%xMN
=
=
=
=
=
126.04
279.08
81.40
45.01
8.80
mg/L
mg/L
mg/L
mg/L
mg/L
M COD
=
=
=
=
=
% x 972 kg/hari
kg/hari
xMP
% x 259,2 kg/hari
kg/hari
M TSS
MN
MP
126.35
279.77
Effluen
M BOD
81.60
M COD
2.26
M TSS
8.82
MN
nfluen
MP
m/hari
Msolid
Sgxairx%solidx1000
Q effluen
Q effluen
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
QR
M BODR
M CODR
M TSSR
M NR
M PR
M BODq
M CODq
M TSSq
M Nq
M Pq
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
21540.5 m/hari
(190,15 mg/L / 1000) x 21564,3 m/hari
4095.9 kg/hari
(265,27 mg/L / 1000) x 21564,3 m/hari
190.15
5714.1 kg/hari
(48,91 mg/L / 1000) x 21564,3 m/hari
1757.7 kg/hari
(2,25 mg/L / 1000) x 21564,3 m/hari
265.27
48.6 kg/hari
(12,02 mg/L / 1000) x 21564,3 m/hari
190.1 kg/hari
2.26
85% x M BOD
85 % x 4100,4 kg/hari
3686.3 kg/hari
85% x M COD
85 % x 5720,4 kg/hari
81.60
8.82
5142.7 kg/hari
80% x M TSS
80 % x 1054,6 kg/hari
1494.0 kg/hari
90% x M N
90 % x 48,9 kg/hari
43.7 kg/hari
25% x M P
25 % x 259,2 kg/hari
47.5 kg/hari
19.18
26.76
12.35
0.23
6.68
6459.7 m/hari
Q influen
M BOD
M COD
M TSS
MN
90.15
190.15
4095.9
165.27
265.27
5714.1
=
=
=
=
=
21540.5
190.15
265.27
81.60
2.26
MP
Msolid
Sgxair%sold10
8.82
CHECK BALANCE
Q = Q in = q out
Q in BP I
21593.8
21593.8
m/hari
mg/L
mg/L
mg/L
mg/L
=
=
=
Q effluen OD + QR + q + Q lumpur BP I
90029 +15021,5+ 6437,8 + 32
21593.8
M BOD in BP I
4536.0
4536.0
=
=
=
M COD ini BP I
9720.0
9720.0
=
=
=
M TSS in BP I
5022.0
5022
=
=
=
M N in BP I
mg/L
1080.0
1080
=
=
M P in BP I
237.6
237.6
=
=
=
MP eff OD + MP R + MP q + MP removal BP I
972 + 226,8 + 97,2 + 324
237.6
R + q + Q lumpur BP I
+ 6437,8 + 32
OK
R+
DR+
MN q + MN eff BP I + MN removal AS
MP q + MP removal BP I
2 + 324
OK
PRELIMINARY SIZING
Diketahui :
1 Jumlah penduduk terlayani Kota Malang tahun 2020
842471
250
3 Qpeak
500
4 Qmaks
280
5 Qmin
140.0
9 Konsentrasi SS rata-rata
250
10 Beban SS rata-rata
Qave x SS rata-rata
11 Beban SS maksimum
Qmax x SS rata-rata
250
Perhitungan Dimensi
I. SUMUR PENGUMPUL DAN POMPA
1 Jumlah
500
7 Asurface
Volume sumur/h
8 Lebar sumur
SQRT(Asurface)/2
9 Panjang sumur
10 Check td
Qpeak x td
2 xLebar
1 Kecepatan aliran
0.5
500
3 A cross saluran
4 Tinggi : Lebar
5 Lebar saluran
SQRT(Across/h)
6 Tinggi saluran
1 x lebar
7 Check V
Q peak / kecepatan
1
panjang saluran
Kebutuhan lahan
500
60
45
6 Kecepatan pengendapan, Vs
1.2
7 Kedalaman pengendapan, h
8 Kecepatan horizontal, Vh
0.3
9 A-cross bak
Qtiap bak/Vh
10 Lebar bak
Across/h
11 Check Vh
12 A-surface
Qtiap bak/Vs
13 Panjang bak
Asurface/lebar
14 Check Vs
Qpeak/jumlah GC
Vs x td
500
4 Waktu detensi
1.5
2000
Qtiap bak x td
7 Asurface
Qtiap bak/OFR
Qpeak/jumlah BP I
8 Dimensi bak :
9 Jika BP I persegi panjang
10 a. Tinggi BP I
11 b. Panjang : lebar
12 c. Lebar BP I
SQRT(Asurface/2)
13 d. Panjang BP I
2 x lebar BP I
14 e. Check td
Volume/Qtiap bak
15 Check OFR
Qbak/(panjangxlebar)x86400
Volume/Asurface
2
250
3 Hidraulic Loading
0.2
4 Volume (Vol)
5 kedalaman
50
7 Asurface
1500.0
8 diameter
43.7
Q / HRL
4 Waktu detensi
24
0.3
7 Volume reaktor
8 Check volumetric loading
Qtiap bak x td
9 Volume reaktor
10 Check waktu detensi
M BOD/OL
11 Dimensi OD :
12 a. Kedalaman OD
7
280.0
Qmaks/jumlah OD
15 d. A-cross OD
16 e. Panjang OD (strech-out)
la x panjang OD x jumlah OD
2 Debit rencana
3 Debit masing-masing bak
4 Waktu detensi
5 Overflow Rates (OFR)
1.5
1100
6 Solid Loading
7 MLSS (X)
6 Asurface
500
Qmaks/jumlah SC
7 Dimensi bak :
8 Diameter SC
SQRT(4*Asurface/3.14)
9 Qeffluen
Q - ((SSmax/jml bak)*0.45*0.9/0.008/1005/86400)
53.3
185.8
4 Q lumpur SDB
5 Kadar air pada sludge cake (awal)
=
=
96
75
Qlumpur*(1-96%)/(1-75%)
8 Dimensi bed :
9 a. Rencana jumlah bed
44
10
13 e. Lebar bed
14 f. Panjang bed
=
=
10.0
Luas permukaan/lebar bed
(pjg*lbr*jml)bed
0.3
Qlumpur*tk/jml bed/tbl
4.00
Sumur Pengumpul
18.00
Grit Chamber
25.00
Bak Pengendap I
530.32
Ammonia Striiping
3000.00
Oxidation Ditch
14515.20
1350.0
7972.2
27414.7
Kantor
300
Musholla
80
Kantin
50
Area Parkir
500
Gudang
100
Pos Satpam
20
1050.0
24007,2 m + 1050 m
28464.7
2.85
jiwa
21600 m/hari
43200 m/hari
L/s
L/s
L/s
L/s
mg/L
0.25 kg/m
5400 kg/hari
f peak = 2 - 3
f max = 1.1 - 1.5
24192 m/hari
12096.0 m/hari
mg/L
6048 kg/hari
0.25 kg/m
Qave x SS rata-rata
5400 kg/hari
Qmax x SS rata-rata
6048 kg/hari
L/s
0.5 m/s
menit
180 detik
90 m
bak
Qpeak x td
(<10 menit)
m
:1
Volume sumur/h
QRT(Asurface)/2
18.00 m
3.0 m
3.0
6.0 m
6.0
3 menit
18 m
2 xLebar
OK
3.00
18
Q peak / kecepatan
0.5 m/s
1.00 m
:1
QRT(Across/h)
bak
1.0 m
1.00
1.0 m
1.00
0.5 m/s
OK
0.50
L/s
Qpeak/jumlah GC
mesh
0.5 m/s
0.5 m/s
0.18 mm
detik
22.5
(45-90 detik)
m/menit
Vs x td
volum
0.02 m/s
=
0.9 m
m/s
Qtiap bak/Vh
1.67 m
Across/h
1.85 m
Qtiap bak/Vs
0.3 m/s
25.0 m
Asurface/lebar
13.5 m
0.02 m/s
25 m
OK
0.90
1.85
13.50
OK
0.02
1.2
25.00
bak
L/s
Qpeak/jumlah BP I
jam
gal/sqft.d
Qtiap bak x td
Qtiap bak/OFR
0.5000 m/s
0.125 m/s
43200.0
5400 detik
81.5 m/m.hari
675 m
132.6 m
1 ft2
0.093
1 m3
264
(2000-3000)
Volume/Asurface
5.09 m
QRT(Asurface/2)
8.14 m
x lebar BP I
16.28 m
:1
Volume/Qtiap bak
Qbak/(panjangxlebar)x86400
=
=
5400 detik
81.45975888 m/m.hari
2000 gal/sqft.d
530.3232 m
bak
L/s
L/min. m
Q / HRL
0.25 m/s
0.0033 L/s. m
75000 m
3000 m
m
m
m
5.09
8.14
OK
16.28
OK
1.50
530.32
bak
L/s
0.28 m/s
0.04 m/s
86400 detik
Qmaks/jumlah OD
jam
kgBOD/m.hari
.6 x b BOD max/jumlah OD
(18-48 jam)
(0.1-0.6 kgBOD/m3.hari)
=
Qtiap bak x td
M BOD/OL
518.4 kg BOD/hari
3456 m
0.2 kgBOD/m.hari
OK
3456
86400 detik
OK
m
m
m
=
15 m
a x panjang OD x jumlah OD
230.4 m
14515.2 m
.5 x (Ld+La) x kedalaman
bak
L/s
Qmaks/jumlah SC
0.5 m/s
0.125 m/s
jam
5400 detik
(1.5-2 jam)
gal/sqft.d
44.8 m/m.hari
(24-32)
solid flux
kg/m .jam
kg/m3
QRT(4*Asurface/3.14)
Q - ((SSmax/jml bak)*0.45*0.9/0.008/1005/86400)
337.50 m
20.73 m
0.12 m/s
=
=
1350.0 m
m/hari
m/hari
=
239.2 m/hari
38.3 m/hari
%
Qlumpur*(1-96%)/(1-75%)
bed
hari
kapasitas
383
m
Qlumpur*tk/jml bed/tbl
181.2 m
m
uas permukaan/lebar bed
18.1 m
pjg*lbr*jml)bed
7972.2 m
A total
1275.545
A tiap bed
28.98966
lebar bed
20.49879
panjang bed
40.99758
Qlumpur BP I
Qlumpur BP II
Qtotal
m2
Asurface
m2
m2
m2
m2
Aerobic Sludge Digester
jumlah
m
m
solid loading
Q lumpur BP I
Q lumpur BP II
Q lumpur total
temperatur
m
m
HRT
volume digester
kedalaman rencana
Asurface
4007,2 m + 1050 m
Diameter
Luas Lahan
ha
Sludge Drying Bed
Q lumpur BP I
Q lumpur BP II
Q total
kadar solid
kadar air
kadar air cake sludge
jumlah
waktu pengeringan
tebal cake
P:L
Vol.cake kering
kapasitas
Asurface total
Atiap bed
L
P
kedalaman
lebar
panjang
td
menit
m
luas
tinggi saluran m
lebar
kecepatan
m/s
0.21
COD
0.45
TSS
450 mg/L =
250 mg/L =
50 mg/L =
11 mg/L =
0.011
0.25
0.05
kedalaman
lebar
panjang
Vs
m/s
m
luas
kedalaman
lebar
panjang
td
jam
luas
m
m
m
m
Qlumpur BP I
Qlumpur BP II
=
Q lumpur BP I + BP II
6 m3/m2.hari
2
Aerobic Sludge Digester
53.34 m3/hari
0.00 m3/hari
solid loading
Q lumpur BP I
53.34 m3/hari
8.890 m2
Q lumpur BP II
4.445 m2
Q lumpur BP I + BP II
500/temperatur
temperatur
kedalaman rencana
=
Volume /= kedalaman
2.380 m
2 unit
Sludge Drying Bed
Q lumpur BP I
3 kg/m2.hari
53.34 m3/hari
Q lumpur BP II
=
0.00 m3/hari
Q lumpur= BP I + BP II
53.34 m3/hari
25 :C
=
kadar air cake sludge
20
1066.765 m3
8m
waktu pengeringan
133.35 m2
13.03 m
26.07 m2
53.34 m3/hari
SQRT (A tiap
= bed / 2)
2*L
0.00 m3/hari
53.34 m3/hari
4%
96 %
75 %
20 bed
10 hari
0.5 m
2
8.53 m3/hari
85.34 m3
170.68 m2
8.53 m2
2.07 m
4.13
Ha
kg/m
kg/m
kg/m
kg/m
kg/m
SK GUB 45/2002
No
Parameter
1 Ph
satuan
-
2 BOD
3 COD
4 TSS
mg/L
mg/L
mg/L
5 P sebagai PO4
mg/L
6 N sebagai NH4
mg/L
II
III
IV
6 -- 9
6 -- 9
6 -- 9
6 -- 9
30
50
150
300
80
100
100
200
300
200
600
500
0.5
20
PP 82/2001
Kelas Mutu Air
No
Parameter
satuan
1 Ph
2 BOD
3
4
5
6
COD
TSS
P sebagai PO4
N sebagai NH4
mg/L
mg/L
mg/L
mg/L
mg/L
II
III
IV
6 -- 9
6 -- 9
6 -- 9
5 -- 9
12
10
25
50
100
50
0.2
0.5
50
0.2
-
400
1
-
400
5
-
PP No. 82
tahun 2001
Keterangan
6 -- 9
2
10
50
0.2
0.5
Terlampaui
Terlampaui
Terlampaui
Terlampaui
Terlampaui
Perbandingan
No
Parameter
1
2
3
4
5
6
Ph
BOD
COD
TSS
P sebagai PO4
N sebagai NH4
satuan
mg/L
mg/L
mg/L
mg/L
mg/L
SK Gub. JaTim
No. 45 tahun
2002
6 -- 9
30
80
100
0.5
KRITERIA
PEMBERSIHAN
MANUAL
5 15
kedalaman (D),mm
Jarak antar batang (b),mm
25 - 38
25 - 50
30 45
0.3 - 0.6
150
TIPE BAR
Sharp-edged rectangular
2.45
1.83
1.67
Circular
Tear shape
1.79
0.76
PEMBERSIHAN
MEKANIS
5 15
25 38
15 75
0 30
0.6 - 1.0
150-600
Parameter
Kemampuan meremoval (%)
BOD
COD
SS
P
Org-N
N
Waktu detensi (detik)
Kecepatan horizontal (m/detik)
Kecepatan mengendap untuk meremoval:
Material 65-mesh ( 0,21 mm) (m/menit)
Material 100-mesh ( 0,15 mm) (m/menit)
Headloss pada unit kontrol, dalam %
Range
Tipikal
Range
Tipikal
Parameter
Kemampuan meremoval (%)
BOD
05
30 40
05
COD
30 40
0 10
-
SS
P
50 65
10 20
Org-N
10 20
45 90
60
0,25 0,40
0.3
1,0 1,3
1.15
0,6 0,9
0.75
Average flow
30 45
30 40
36
80 120
100
125 500
250
1,5 2,5
25 30
50 70
125 500
60
250
No.
Type of
Reactor
Process Name
1.
2.
Contact Stabilization
plug flow
3.
High-purity oxygen
plug flow
4.
Conventional plugplug
flowflow
5.
Step feed
6.
Complete Mix
7.
8.
9.
Batch decant
10.
11.
Countercurren
t aeration
system (CCAS)
plug flow
CMAS
Batch
plug flow
Overflow rate
2
Type of treatment
gal/ft .d
ave
peak
400-700
1000-1600
400-700
400-700
200-400
1000-1600
1000-1600
600-800
Volumetric Loading
F/M kg
BOD
Removal
SRT (d)
BOD/kg
lb BOD/
kg BOD/
MLVSS.d
1000 ft3.d
m3.d
75-90
0,5 -- 2
1,5-2
75 -- 150
1,2-2,4
80-90
5 -- 10
0,2-0,6
60 --75
1-1,3
85-95
1 -- 4
0,5-10
80 -- 200
85-95
3 -- 15
0,2-0,4
85-95
3 -- 15
85-95
MLSS
mg/L
RAS,
Total , h
% of influen
200-1000
1,5-3
1000-3000
0,5-1
6000-10000
2 -- 4
1,3-3,2
2000-5000
1 -- 3
25-50
20 -- 40
0,3-0,7
1000-3000
4 -- 8
25-75
0,2-0,4
40 -- 60
0,7-1
1500-4000
3 -- 5
25-75
3 -- 15
0,2-0,6
20 --100
0,3-1,6
1500-4000
3 -- 5
25-100
75-95
20-40
0,04-0,1
5 -- 15
0,1-0,3
2000-5000
20 --30
50-150
75-95
15-30
0,04-0,2
5 -- 15
0,1-0,4
3000-5000
15 -- 30
75-150
12 -- 25
0,04-0,3
5 -- 15
0,1-0,5
2000-5000
20 -- 40
NA
85-95
10 -- 30
0,04-0,4
5 -- 15
0,1-0,6
2000-5000
15 -- 40
NA
10 -- 30
0,04-0,5
5 -- 10
0,1-0,7
2000-4000
15 -- 40
25-75
Overflow rate
Solids loading
3
m /m .d
ave
peak
kg/m2.h
lb/ft .h
ave
peak
ave
Depth, m
peak
16-28
40-64
0.8-1.2
1.6
4 -- 6
3.5-6
16-28
16-28
8 -- 16
40-64
40-64
24-32
1.0-1.5
1.0-1.4
0.2-1.0
1.8
1.8
1.4
5 -- 8
5 -- 7
1,0 -- 5
9
9
7
3.5-6
3.5-6
3.5-6
100-150
50-150
Kelebihan
membutuhkan volume aerasi yang lebih kecil dibandingkan Conventional plug flow;membutuhkan energi
aerasi yang lebih sedikit
membutuhkan volume aerasi yang lebih kecil ; dapat menangani aliran dalam cuaca hujan tanpas
menghilangkan MLSS
membutuhkan volume aerasi yang lebih kecil; mengeluarkan sedikit VOC dan gas;menghasilkan lumpur yang
mudah untuk terendapkan;operasi dan kontrol DO tidak rumit;baik teradaptasi dari beberapa jenis limbah
meremoval ammonia lebih baik daripada process complete mix; baik beradaptasi dalam beberapa operasi
,proses aerobic/anoxic,design
mendistribusikan penyebaran oksigen; meminiminalisasi sludge pada clarifier; operasi yang flexible;baik
beradaptasi dalam beberapa operasi ,proses aerobic/anoxic,design
baik teradaptasi dari beberapa jenis limbah;kapasitas pelarutan besar dalam toxic dan shock loads;design
tidak selalu kompleks;suitable dalam alat aerasi
high quality effluen;design yang tidak rumit;kemampuan dalam shock loading;produksi biosolids terbatas
operasi mudah;kemampuan dalam shock loading;proses ekonomis dalm small plants;energy yang lebih
rendah dibandingkan extended aerasi;dapat diterapkan dalam removal nutrien;high quality effluen;produksi
biosolids terbatas
-
high quality effluen;transfer oksigen lebih baik conventional aerasi;dapat dimodifikasi dalam meremoval
nutrient
Kekurangan
operasi yang tidak stabil;effluen dengan kualitas yang rendah;tidak cocok untuk
nitrifikasi;banyak menghasilkan lumpur;aliran jam puncak akan mengganggu
pengurasan lumpur MLSS
tidak mempunyai kemampuan nitrifikasi; operasi rumit
kemampuan nitrifikasi kurang;susah dioperasi;aliran jam puncak akan mengganggu
pengurasan lumpur MLSS
design dan opeasi rumit; kesulitan dalam oksigen supply pada tahap awal
operasi yang lebih kompleks;flow split tidak dapat diukur;design yang kompleks
dalam aerasi dan proses
mudah terkena filamentous bulking
energi aerasi sangat tinggi;kolam aerasi besar;
structur lebih besar; low F/M bulking;energi lebih besar dibandingkan CMS dan plugflow; ekspansi kapasitas perencanaan lebih susah
proses control rumit;jam puncak mengganggu operasi;membutuhkan filtrasi dan
desinfeksi;sangat dubutuhkan kemampuan operasi;beberapa design tidak berguna
dalam aerasi
dibutuhkan fine scrrening;dibutuhkan ahli untuk mengoperasikannya
Item
OFR
Parameter
Value/Typical
3
8,0-16,0 m /m .hari
Hydraulic Loading
Solid loading
Kedalaman
Kedalaman zona settling
3,5-5 m
1,5 m
pH of waste water
air pressure drop
packing spacing
packing material
1 - 2 gal/min/ft
Faktor
Efisiensi BOD
Operasional
32 - 54 L/min/m
300 - 500 ft/min/gal
6,1 - 7,6 m
Effluen
Beban Hidrolik
Beban Organik
20 - 25 ft
PengolahanLumpur
10,8 - 11,5
Kebutuhan Area
5 cm / 2 inch horizontal/vertical
Nutrient treatment
plastik/kayu
Manintenance
Value
0,1 - 0,2 L/min/m
Tidak berbau
Tidak fleksibel
Tidak fleksibel
Tidak berbau
Tidak Fleksibel
Tidak fleksibel
Tidak berbau
Tidak Fleksibel
Tidak fleksibel
Clarifier - SDB
Clarifier - SDB
Clarifier - SDB
luas
sedang
sedang
sedang
sedang
banyak
tinggi
tinggi
tinggi
Mahal
Mahal
Sangat mahal
Proses Pengolahan
Parameter
BOD
0-5
0-5
0-10
Primary Sedimentation
30-40
30-40
50-65
Oct-20
80-95
80-90
65-80
80-85
80-90
60-80
80-90
80-90
60-85
15-50
70
15-50
88
73
50
95
Secondary Treatment
Parameter
Diameter screw (m)
3
Range
0,3 3
0,01 3,2
30 38
al (%)
P
Oct-20
Oct-25
8-Dec
75
Sumur Pengumpul
Q ave air limbah
Q peak
Qmin
jumlah sumur
Q tiap sumur
Q peak
Qmin
waktu detensi
panjang : lebar
volume sumur pengumpul (peak)
volume sumur pengumpul (min)
kedalaman
Luas surface (As)
lebar
panjang
kedalaman pipa sewer
diameter pipa sewer
kedalaman basah (peak)
kedalaman basah (min)
kedalaman total SP
BROSUR
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
1
250
500
140
1
500 L/s
140 L/s
=
=
=
0.25
0.5
0.14
=
=
0.5
0.14
3 menit
180
2 :1
Q x td
90000 L
90
25200 L
5m
25.2
Q x td
Vol/h
18
3.0
6.0
3
400
m
m
m
m
mm
vol/Asurface
5m
vol/Asurface
1.4 m
ketinggian air min
diameter pipa sewer + h(Qpeak) + free board
5.7 m
dilengkapi dengan casing, jika peak dipakai keduanya, jika min dipakan 1
2 buah
dipakai bergantian
45
=
500 L/s
=
0.5
140 L/s
=
0.14
1 m/s
Q peak/V
0.5 m
0.80 m
= 798.0869
=
800
Q/A
0.3 m/s
OK
=
= 5,2 + 1
=
=
=
=
=
=
=
L/s
L/s
L/s
buah
5.7 m
0.2785
6.7 m
10 m
110
0.0009 m
0.0014 m
0.0023 m
=
Minor Losses
Head velocity
Hf sisa tekan
Hf total
Power Pompa
densitas
Power Pompa
efisiensi pompa
Bar screen
Q pompa Saluran Pembawa
Kecepatan aliran
n
slope saluran
panjang saluran
Q peak
Q min
Tinggi Muka air (Q Peak)
Luas (A)
panjang saluran
lebar saluran
Kecepatan (V)
Luas (A)
kedalaman
slope
Hf
Head kecepatan
Headloss total
v cek
Tinggi Muka air (Q min)
Luas (A)
panjang saluran
lebar saluran
Kecepatan (V)
Luas (A)
kedalaman
slope
=
=
=
=
=
=
=
=
1000 kg/m3
3002 watt
80%
3752 watt
pembersihan manual
= 0,3 - 2
m/s
=
0.015
=
0.00045
=
4m
=
500 L/s
=
140 L/s
=
=
=
=
=
=
1.0 =
=
=
=
=
=
=
=
=
=
=
=
bxy
=
=
=
=
=
=
0.3 =
=
=
=
bxy
=
=
0.5
0.14
4m
1.0
0.5 m/s
Q/V
1.0 m
bxh
1.0 m
Hf/L
0.00006
OK
slope*L
0.00023 m
V/2g
0.01274 m
Hf + hv
0.01297 m
Q/A
0.50 m/s
OK
4m
1.0
0.5 m/s
Q/V
0.3 m
bxh
0.3 m
Hf/L
0.00031
OK
Hf
Head kecepatan
Headloss total
v cek
Dimensi saluran
panjang saluran (L)
lebar (b)
kedalaman (y)
Screen
Lebar screen
sudut kemiringan screen
Bentuk bar
jarak antar batang (b)
kecepatan melalui celah
lebar bar (w)
kedalaman bar
faktor bentuk ()
Jumlah bar (n)
B (lebar saluran)
=
=
=
=
=
=
=
=
=
=
=
slope*L
0.00123 m
V/2g
0.01274 m
Hf + hv
0.01397 m
Q/A
0.5 m/s
4.0 m
1.0 m
1.0 m
= lebar saluran
=
1.0 m
=
45
= persegi panjang dengan keempat ujungnya melingkar / tumpul
=
25 mm
=
0.025 m
= 0,3 - 0,6
m/s
=
15 mm
=
0.015 m
=
1.0 m
=
1.67
= (n x w) + ((n+1)b)
1.0 = (n x 0,015)+((n+1)0,025)
1.0 = 0,015 n + (0,025 n + 0,025)
=
24.38 buah
=
24 buah
= n+1
=
25 buah
= b x (n+1)
=
0.625 m
= h peak/sin
=
1.4 m
= h min/sin
=
0.4 m
= Lt/B x 100 %
=
63%
Saat Q min
OK
0.5
=
0.011 m
=
=
0.009 m
=
=
=
= 50 % x 0,625
=
0.3125 m
modifikasi dimensi
Q
td
V
h
Luas
Luas (A)1
Luas (A)2 trapesium
lebar1
panjang1
a
b
t
= 50% x 1,9
=
=
=
= Q x td
=
=
=
=
=
=
=
=
=
=
0.25 m/s
500 L/s
5s
2.5
0.5
5
3.75
1.25
3.0
1.3
1.0
3.0
0.8
2.1
m
m
m
m
m
m
m
m
m
m
m/s
m/s
m/s
m/s
m/s
detik
Q maks
Q min
1400
700
1600
800
1800
900
200
100
Qave
Q peak
1250
2500
1500
3000
1750
3500
250
500
m
m
mm
mm
diameter 900
Q
2500
A
0.63585
V
3.931745
Q
500
A
0.12717
diameter
0.402492
L/s
m
m/s
2.5
0.5
m
m
m/s
m/s
= yxb
2y + b
110
375
265
132.5
750
80
670
335
m/s
6.5
3.25000
m/s
Grit Chamber
Saluran Pembawa
panjang (L)
Lebar (b)
kedalaman (h) + fb
Q peak
Q min
Slope
Kecepatan aliran
Headloss saluran
V cek
Grit Chamber
Jumlah bak
Q tiap bak
Q peak
Q min
waktu detensi (td)
kec pengendapan (Vs)
Kec Horizontal (Vh)
diameter partikel minimum terendapkan
temperatur air
=
=
=
=
=
=
=
=
=
=
=
=
1
saluran bar screen
4
1.0
1.0
500
140
0.00045
0,3 - 2
slope x L
0.0018
Q/A
0.7
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
500
140
60
1.2
0.3
0.2
28
0,8372 x 10^-6
8.372E-07
2.65
0.05
Qtiap bak/Vh
1.67
Qtiap bak/Vs
25.00
Vs x td
1.2
Across/h
1.4
h/Vs = L/Vh
18
0.000136
0.210
=
=
=
=
=
=
500
43200
0.4
17.28
Sg
k
Luas Penampang (Across)
A surface
tinggi air di grit chamber (h)
Lebar grit chamber (w)
panjang (L) grit chamber
Grit Storage
Q tiap bak
kandungan pasir
Volume pasir
cek td
V/Q
60
V cek
Proposional Weir
tinggi air (h)
Q melalui weir
=
=
=
=
=
=
=
=
=
17.3 =
=
18.0
1.4
16
1.2
25.0
19.2
1 hari x Vol grit per hari
17.28
h/3 (10,4 + 3+10,4+3)
1.0
=
=
=
10
V/Q
2
=
=
=
=
=
=
=
1
Qlumpur/V
0.167
0.461
400
0.4
1.33
=
=
=
=
=
=
=
=
=
=
=
=
=
0.2
0.656
2.30
0.7
0.4
1.312
2
0.392
0.903
=
=
=
=
=
=
=
=
=
0.015
1
0.0003
500
0.95
0.5
2
slope x L
0.0006
Saluran Pembawa
Q peak
Q tiap saluran
V cek
Luas (A)
kedalaman (y)
Luas (A)
lebar (b)
v cek
Headloss saluran
Hf
Dimensi saluran
panjang saluran (L)
lebar (b)
kedalaman (y)
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
500
500
0,3 - 2
bxy
1
0.56
0.6
Q/A
0.9
slope x L
0.4489
0.5
0,3 - 2
1.0
Q maks
=
=
0.5 m/s
0.14 m/s
1400
1600
1800
200
Qave
1250
1500
1750
250
m/s
m
m/s
Q min
700
800
900
100
Q peak
2500
3000
3500
500
OK
buah
L
L
detik
m/menit
m/s
mm
C
m/s
m/s
=
=
=
0.5 m/s
0.14 m/s
(45-90 s)
0.02 m/s
0.0002 m
(1,0 -1,3)
saluran
panjang
lebar
m
m
m
m
m
m/s
>
L/s
m/hari
liter/m
m/hari
detik
Vs
OK
0.5 m/s
OK
6
3
1.4
m
m
m
m
m
m
1 hari x Vol grit per hari
m
3.0
1.4
2.7
0.2
m
m
m
m
0.1667
0.6
0.166667
menit
m/s
m
m
mm
m
m/s
OK
y
a
m
ft
ft
m
m
ft
1
2
3
4
5
6
7
8
9
m
m
:2
L/s
m
m
m
m
0.5 m/s
x
b
0.5
0.392
0.333
0.295
0.268
0.247
0.23
0.216
0.205
L/s
L/s
m/s
=
=
0.5 m/s
0.5 m/s
m
m
m/s
m
m
m
m
0
0
OK
y/a
x/b
1
2
3
4
5
6
7
8
9
0.5
0.392
0.333
0.295
0.268
0.247
0.23
0.216
0.205
Prasedimentasi
Q air
Jumlah bak
Q tiap bak
Grafik performance good performance (70%)
n
t/td
Tes kolom dengan h = 3 m selama 2 jam
Vo
Vo
t/td = Q/A
Zona Inlet
Saluran Pembawa
Q saluran pembawa
V
lebar : kedalaman
Luas (A)
h
h (kedalaman)
lebar
Headloss
Mayor Losses (hf)
V = 1/n R^2/3 S^1/2
n (kekasaran)
R (jarijari hidrolis)
slope
Hf
Head kecepatan
Headloss total
saluran pembagi
Q saluran pembagi
V
lebar : kedalaman
Luas (A)
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
500
0.5
4
125
0.125
buah
L/s
m/s
0.333
Vo(Q/A)
1.5
h/t
0.000416667 m/s
Vo/1,5
0.0003 m/s
125
0.125
0.6
2
L/s
m/s
m/s
:1
Q/V
0.208 m
hxh
0.208 m
0.3 m
h
0.6 m
0.015
lebar x kedalaman
0.161 m
Hf/L
0.00004
slope/L
0.00003 m
V/2g
0.01835 m
Hf + hv
0.01837 m
=
=
=
=
=
L/s
m/s
125
0.125
0.6
1
L/s
m/s
m/s
:1
Q/V
0.208 m
h
h (kedalaman)
lebar
panjang
saluran pengumpul
Q saluran pembagi
V
lebar : kedalaman
Luas (A)
h
h (kedalaman)
panjang
lebar
kedalaman + free board
Headloss
Mayor Losses (hf)
V = 1/n R^2/3 S^1/2
n (kekasaran)
R (jarijari hidrolis)
slope
Hf
Head kecepatan
Headloss total
Dimensi bak
Q air
jumlah bak
Q tiap bak
Q/A
Luas (A)
t/td
H
Vo
td
Volume
=
=
=
=
=
=
2h x h
0.104 m
0.32 m
2h
0.6 m
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
125
0.125
0.5
2
L/s
m/s
m/s
:1
Q/V
0.3 m
2h x h
0.125 m
0.35 m
13.25 m
2h
0.7 m
0.7 m
0.015
lebar x kedalaman
0.3 m
Hf/L
0.00036
slope/L
0.00473 m
V/2g
0.01274 m
Hf + hv
0.01747 m
500
0.5
4
125
0.125
0.0003
L/s
m/s
buah
L/s
m/s
m/s
Q/V
450 m
1.5
3m
0.00042 m/s
H/Vo
7200.0 detik
2.0 jam
Volume
Luas (A)
panjang : lebar
Luas (A)
L
Lebar (b)
panjang (l)
kedalaman (h)
Vh
k
f
Ss
d
d
=
=
=
=
=
=
300 =
=
=
=
=
=
=
=
=
=
=
=
=
Vsc
=
=
<
=
=
Vh
Jari-jari hidrolis (R)
Nre
Nfr
Perforated Baffle
d lubang
panjang baffle
tinggi baffle (h)
kecepatan melalui lubang (v)
Luas (A) tiap lubang
Luas (A) baffle yang terendam air
Luas total lubang (A total)
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Q x td
900 m
V/H
300 m
2 :1
2L x L
2L
150 m
12 m
2L
24 m
3m
L/td
0.0034 m/s
0.04
0.02
2.65
0.00264
0.000020
0.071 m/s
0.827 m/s
tidak terjadi penggerusan
Vsc
2.01 m
2
0.0008348 N s/m
8.394E-07 m/s
15 cm
0.15 m
lebar bak
12 m
tinggi bak
3m
0.5 m/s
1/4 x x D
0.018 m
Bxh
36.7 m
0.42 m
susunan lubang
horizontal
vertikal
Jarak horizontal antar lubang
Jarak vertikal antar lubang
Vh
R
Nre cek
Headloss
Ruang Lumpur dan Periode Pengurasan
ruang lumpur berbentuk limas terpancung
slope zona pengendapan
Removal TSS
TSS Air baku
Efisiensi pengendapan
diskrit dan grit
Kadar Air dalam lumpur
Kadar SS kering dalam lumpur
Periode pengurasan lumpur
diskrit dan grit
sludge teremoval/diendapkan
Sludge lolos
Berat lumpur terendapkan
berat jenis SS
berat jenis air
berat jenis lumpur
berat air
Volume sludge zone (ruang lumpur)
panjang permukaan zona lumpur (P1)
Lebar permukaan zona lumpur (L1)
panjang dasar zona lumpur (P2)
Lebar dasar zona lumpur (L2)
Luas Permukaan (A1)
Luas Permukaan (A2)
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
23.6 buah
24 buah
6 buah
4 buah
1.6 m
0.5 m
0.01 m/s
A/P
1/4 d lubang
0.0375 m
447 < 2000
V/2g
0.000005 m
0.5
40 - 85
250
70
90
95
5
2
%
% (Qosim, 1985)
mg/l
%
% x Konsentrasi SS
%
%
hari sekali
90 % x Konsentrasi SS
225 mg/L
70 % x diskrit dan grit
157.5 mg/L
67.5 mg/L
lumpur terendapkan x Q
1701 kg/hr
2650 kg/m
995 kg/m
[berat jenis SS x 5%] + [berat jenis air x 95%]
1078 kg/m
95%/5% x berat lumpur
32319 kg/hr
31.6
8.0
12
4
10
98.0
40
m
m
m
m
m
m
m
=
=
Volume ruang lumpur
=
63.1 =
kedalaman ruang lumpur (h)
=
pengurasan menggunakan Non-clogging Centrifugal pump
Debit pemompaan
=
Waktu pengurasan
=
=
pipa penguras lumpur
V pipa
=
A
=
=
diameter pipa penguras
=
=
=
V cek
=
=
Zona Outlet
Weir dan Gutter
WRL
=
=
Q tiap bak
=
=
jumlah gutter
=
panjang total weir (L)
=
=
lebar bak (w)
=
tebal weir (t)
=
lebar gutter (s)
=
w = 8s + (3 s)7 + 14 t
=
12 =
29 s
=
s
=
panjang bak (b)
=
panjang tiap gutter (L)
=
b = 14 L + 8s + (7 x 3s)
=
24 =
L
=
tinggi air diatas weir (h)
Cd
=
Q = (2/3 x Cd x L x 2g)x h^2/3
=
h
=
dimensi saluran weir
Q = 1,84 x L x h^3/2
=
0.125 =
h
=
Saluran Pengumpul Outlet
=
Q
=
=
150
0.00174
125
0.125
8
m
m
mm
m
m/s
m/m hari
m/m s
L/s
m/s
buah
Q/WRL
72 m
12 m
0.1 m
8s + (3 x s) 7 + 14 x 0,1
10.8 m
0.4 m
24 m
14 L + 8 (0,4) + (7 x 3(0,4))
1.0 m
0.6 m
0.01 m
lebar : kedalaman
panjang saluran
Q = 1,375 x L x h^3/2
L
2h x h^3/2
h^5/2
kedalaman (h)
lebar (I)
Kecepatan (V)
Headloss
Mayor Losses (hf)
V = 1/n R^2/3 S^1/2
n (kekasaran)
R (jarijari hidrolis)
slope
Hf
Head kecepatan
Headloss total
Saluran Outlet
Q
panjang saluran
kedalaman saluran
kedalaman saluran + free board
Kecepatan (V)
dimensi saluran outlet
Luas (A)
=
=
=
=
=
=
=
=
=
=
=
2 :1
lebar bak prased
12 m
=
=
=
=
=
=
=
=
=
=
=
0.015
lebar x kedalaman
0.2 m
Hf/L
0.00133
slope*L
0.01623 m
V/2g
0.02799 m
Hf + hv
0.04422 m
=
=
=
=
=
=
=
125 L/s
0.125 m/s
2m
kedalaman saluran pengumpul
0.3
0.6 m
0.7 m/s
=
=
0.2 =
=
=
=
=
=
=
=
=
=
2h
0.09
0.05
0.3
0.6
m
m
m
m
Q/A
0.74 m/s
Q/V
0.2 m
bxh
0.3 m
Hf/L
0.0013254
slope*L
0.00265 m
V/2g
0.02799 m
Hf + hv
0.03064 m
0.015
R (jarijari hidrolis)
slope
Hf
Head kecepatan
Headloss total
=
=
=
=
=
=
=
=
=
=
lebar x kedalaman
0.145 m
Hf/L
0.00162
slope xL
0.00094 m
V/2g
0.02799 m
Hf + hv
0.02893 m
suhu
28
=
=
=
=
0,8348 x 10^-3
0,8372 x 10^-6
995
9.81
OK
A cross
td
kedalaman x lebar
37
(Across x panjang)/Q
7200 s
2 jam
TIDAK OK
turbulen
TIDAK OK
>
Vs
0.3
OK
OK
OK
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
safety factor
jumlah tower
Q ave
suhu air
konsentrasi ammonia influent Ni
konsentrasi ammonia effluent Ne
wet bulb air temperature
efisiensi removal
efisiensi removal (e)
rasio gas/liquid loading rate
G/Lq
dimensi bangunan
Plan Area
lebar tiap reaktor (2 section)
panjang media ( 2 section)
konstanta Hendry (Hc)
gas loading rate (Gm)
liquid loading rate (Lm)
A
HTU
W/HTU
0.2
40
6,1 - 7,6
11
0,015 - 0,019
5
500
0.5
132
11.4
2.0
250
0.25
66
5.7
86
29.5
45
2.25
75.2
24
500
1000
18
59.04
1.2
L/min. m
L/min. m
m
/ft
cm
L/s
m/s
gal/s
Mgal/day
unit
L/s
m/s
gal/s
Mgal/day
F
C
mg/L
mg/L
F
C
lb H2O/h-ft
lb air/h-ft
m
ft
2
Q/2Lq x (8,34 x 10^6/24)
1981.6 ft
29.5 ft
67.1 ft
20.5 m
0,1117e^(0,0261 x T)
1.054
G/29
34.483 lb moles/ft - h
Lq/18
27.78 lb moles/ft - h
Hc Gm/Lm
1.308504047
9.7 ft
3.0 m
6.09
gambar 8
(X/X1)^(Lm/Hc Gm)
X/X1
Z/HTU
Z
tinggi tower
diameter
lebar tiap reaktor (2 section)
panjang media ( 2 section)
Pipa Inlet
Q pipa induk
jangkauan setiap pipa distribusi
V air
A pipa induk
diameter pipa induk
Q pipa dist
A p dist
diameter pipa induk
jumlah pipa distribusi
Vcek
Hydraulic loading
HRL
saluran outlet
Q in
Asurface
td
=
0.71
= 0,71 ^ (1/(Lm/Hc Gm))
=
0.639
=
1
=
84.25 ft
=
25.7 m
=
=
=
=
25.7
18
9
20.5
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
250
0.25
1
1
0.25
0.564332648
600
0.0014
0.0014
0.04
40
184
1.0
0.2
720
0.72
=
=
=
=
=
gambar 10
gambar 9
m
m
m
m
L/s
m/s
m
m/s
m
m
mm
m/s
m
m
mm
buah
m/s
L/min. m
L/day. m
m/day.m
250 L/s
0.25 m/s
254.34 m
OK
0,1 - 0,2
32 - 54
6,1 - 7,6
10,8 - 11,5
0,015 - 0,019/ft
1 m
1m
1 m
500- 1000
2 -- 4
Gambar 8
gambar 10
=
=
=
264 gallons
3.28 feet
10.7584 feet
gambar 9
Oxidation Ditch
Kriteria Desain
F/M
volumetric loading
MLSS
td aerasi
aerator loading
Qr/Q ratio
Q ave
Q maks
Q peak
BOD influent (So)
TSS influent
NH3 - N influent (Ni)
BOD effluent (S)
TSS effluent
NH3 - N effluent (Ne)
BOD solid
1 gr biodegradable
MLVSS/MLSS
BOD5
Volume reaktor
c
Q maks
jumlah bak
Q maks tiap bak
MLVSS (X)
MLSS
Xr (X resirkulasi)
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Kd
td aerasi
BODUL
OLR
Volume total reaktor (Vr)
ditentukan :
lebar tengah OD
lebar bawah ditch (b2)
lebar atas ditch (b1)
kemiringan dinding
kedalaman ditch
Luas penampang (Ac)
panjang 2 belokan
Pengolahan Biologis
Y
Yn
Kd
fd
c
KN
m
BODUL
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Px (MLVSS)
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Px (SS)
=
=
=
maka massa lumpur yang harus dibuang sebesar 166,6 kg/hari
Qw
=
=
=
maka debit lumpur yang harus dibuang sebesar 41,7 m/hari
Kontrol F/M dan OLR
F/M
OLR
Kebutuhan O2
=
=
=
=
=
=
=
=
Massa BODu dari air buangan yang masuk dan diubah dalam proses sebesar 347.783 kg/hari
BOD
=
=
=
=
maka untuk proses oksidasi BOD dengan massa diatas diperlukan waktu 16,8 jam
Kebutuhan Nutrient
Dari rumus kimia mikroorganisme C5H12O2N maka membutuhkan nutrien sebagai berikut :
Nitrogen
Ar N
=
Mr C5H12O2N
=
Kadar N (%)
Nitrogen
TKN
[TKN Q]
Kebutuhan Nitrogen
=
=
=
=
=
=
=
=
=
=
=
=
=
=
maka kebutuhan nitrogen untuk pengolahan perlu ditambahkan nitrogen sebesar 7,95 kg/hari
Phospor
Kadar P (%)
P
=
=
=
=
TP
[TKN Q]
=
=
=
=
Kebutuhan Phospor
=
=
=
maka kebutuhan phospor untuk pengolahan tidak perlu ditambahkan karena sudah kelebihan phospor 38,1 kg/hari
Kebutuhan O2 Nitrifikasi
Kebutuhan O2
=
=
=
safety factor
Udara mengandung
=
=
Berat udara
Kebutuhan udara teoritis
=
=
=
=
=
=
=
=
=
=
=
Mass Balance
OD dengan resirkulasi:
Konsentrasi VSS tangki OD (X)
Konsentrasi return VSS (Xr)
Qr/Q
Qr
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Rotor
Diameter rotor
Kedalaman imersi
Kecepatan rotor
=
=
=
=
=
=
=
=
(0,04 - 0,1)
(0,1 - 0,3)
4000
24
0.4
1.5
250
0.25
280
0.28
500
0.5
226.00
81.38
2.25
33.90
12.21
0.23
=
=
=
=
=
=
65 % biodegradable
1.42 gr BODu
0.8
0.68 BODu
30
280
0.28
24192
7
40
0.04
3456
0.5
0.4
226.00
33.90
(MLVSS/MLSS) x MLSS
0,8 x 4000
3200
3.2
MLVSS x Q maks tiap bak
3,2 kg/m x 3456
11059.2
4000
4
10000
10
=
=
=
=
hari
L/s
m/s
m/hari
unit
L/s
m/s
m/hari
/hari
kg VSS/kg BOD
mg/L
mg/L
mg/L
mg/L
3
kg/m
m/hari
kg/hari
mg/L
kg /m
mg/L
kg /m
0.15
24
0,68 x 190
154
0.154
531.1
0.3
(Q x So)/OLR
(24192 m/hari x 0,129 kg/m)/0,3
12392.8
Volume total reaktor/jumlah unit
10418,7 m / 7 unit
1770.4
6
6
9
60
2
1/2 (lebar atas + lebar bawah) x kedalaman
1/2 x (9 m + 6 m) x 2 m
15
volume/As
1488,4 m / (15 m x 3)
354.1
1/2 (2xlebar atas + lebar tengah)
1/2 x (2 x 9 m + 6 m)
12
kell lingkaran luar bak
2r
2 x x 12 m
75
1/2(panjang total - panjang 2 belokan)
1/2 x (297,7 m - 75 m)
139
0.4
0.12
0.15
0.15
30
0.74
0.75
0,68 x 190
154
/hari
jam
mg/L
mg/L
kg/m3
kg/hari
kg BOD/m hari
kg BOD/m hari
m
m
m
m
m
kg VSS/Kg BOD
kg VSS/kg NH4 - N
/hari
hari
kg NH4 - N/m3
/hari
mg/L
mg/L
3
0.154 kg/m
531.1 kg/hari
24 jam
m/Y
0,75/hari / 0,4 kg VSS/Kg BOD
1.88 /hari
(k x Ni)/(KN + Ni)
(1,88/hari x 0,0023 kg/m) / (0,74 kg NH4 - N/m + 0,0023 kg/m)
0.006 /hari
y/1+(kd x c)
0,4 kg VSS/Kg BOD / (1 + (0,15/hari x 30 hari))
0.1 kg VSS/Kg BOD
(Y obs x Q maks tiap bak x (So - S)) / 1000
0,1 kg VSS/Kg BOD x 3456 m/hari x (129 - 28,5) mg/L /1000
30.11 kg/hari
25,31 kg/hari
Px (MLSS) / 0,8
25,31 kg/hari / 0,8
37.6 kg/hari
1,6 kg/hari
(SSi - SSe) x Q maks tiap bak
(0,0488 - 0,0098) kg/m x 3456 m/hari
239.0 kg/hari
Px (MLSS) + SS removed
31,6 + 135 kg/hari
276.7 kg/hari
kg BOD5 / m3.hari
kg/hari
Hari
16.8 jam
5H12O2N
kg/hari
mg/L
kg/hari
kg/hari
0.11 Hari
2.7 jam
2%
2 % x Px bio (SS)
2 % x 166,6 kg/hari
5.53 kg/hari
12 mg/L
TKN x Q maks tiap bak/1000
12 mg/L x 3456 m/hari /1000
41.47 kg/hari
Phospor *TKP Q+
3,33 - 41,47 kg/hari
-35.9 kg/hari
ngolahan tidak perlu ditambahkan karena sudah kelebihan phospor 38,1 kg/hari
9,14 x N
9,14 x 19,77 kg/hari
300.0 O2 kg/hari
8%
2
20.20% O2
3
1.201 kg/m
14798 m /menit
safety factor x keb udara aktual
2 x 124444 m/menit
3
29596 m /menit
aktual
Keb udara teoritis/Vol tiap bak
1433552 m/hari / 1448,4 m
3
3
963 m /m
Keb udara teoritis/((Vol tiap bak x (So-S))
1433552 m/hari / (1448,4 m x (0,129 - 0,0285) kg/m)
3
1148 m /kg BOD5 removed
3200 mg/L
10000 mg/L
(Xr - X)/Xr
(10000 - 3200) mg/L / 10000 mg/L
0.7
Qr/Q x Q tiap bak
0,7 x 3456 m/hari
3
2350 m /hari
248 kg O2/hari
0.60
OR / SOR
307 kg kg O2/hari / 0,6
414.6 kg O2/hari
17.3 kg O2/jam
1000 mm
30 cm
70 rpm
7
3
10 kg O2/m.jam
Kebutuhan oksigen sebenarnya/Kapasitas transfer O2 mammoth rotor
21,4 kg O2/jam / 10 kg O2/m jam
1.7
2.2
3.0
118
m
buah
buah
m
(3000 - 5000)
(15 - 30 jam)
(0,1 - 0,4 kg / m hari)
(0,5 - 2)
0.2260
0.0814
0.0023
0.0339
0.0122
0.0002
kg /m
kg /m
kg /m
kg /m
kg /m
kg /m
Saluran inlet
Data perencanaan :
Debit (Q)
0.273
Kecepatan (v)
0.6
Saluran berbentuk persegi panjang
Panjang
2
lebar saluran (b)
4h
Jumlah bak
5
Perhitungan :
Q tiap bak
0.055
L.basah (A)
0.09
A
bxh
0.09 2h.h
2h^2
0.09
h
0.2
lebar saluran (b)
0.85
Cek kecepatan
v
0.3
bh
R
0.14
b 2h
A
D
vn
2
3
R
0.0003
0.0006
2
0.0017
0.5
0.3
0.0002
0.01
2
0.137
10
0.3
0.46
0.76
760
y obs Qbak So S
1000
m3
Q tiap bak So
VR x X
Q x So
Vr
So S
U MLVSS
0.3
7
(mass balance)
No N
U X
(mass balance)
6800
10
0.7
m
buah
m3/det
m/det
### m3/hari
### m3/hari
m
m
bak
m3/det
m2
m
m
m/det
m
m
m
m
m
buah
3
m /detik
m
m/dtk
m2
m
mm
OK!!
Q x So
Vr
obs
Qbak So S
1000
458.9909333
12392.8
1770.4
Pintu Air
Pintu air dipasang di bagian inlet bak aeration tank.
- Lebar pintu=rencana
0.4 m (B)
3
- Q pintu air = Q bak = 0,251 m /detik
- Tinggi muka air sebelum pintu (h) = 0.3 m
Perhitungan :
- Bukaan pintu air (a)
Q = k . . a . b ( 2 g h )0,5
0,251 = 1 . 1 . a . 1 (2 . 9.81 . 0.3) 0,5
a = 0,103 m
Headloss di pintu air
HL
saluran
berpintu
Dengan rumus :
= 1/3 x (hf total saluran sebelum pintu)
= 1/3 x 0.008 m
-3
= 2.667 . 10 m
HL
pintu air
Dengan rumus :
= Headloss sal. Berpintu / (1 2)
-3
= 2.667 . 10 m / (1 0,99 )
= 0.134 m
OR
{ a . ( C walt . . Fa C t / C st ) . ( 1,024 ( T
20 )
)}
1000 f
1,42
. PX 4,57 . Q' .
OR
{ a . ( C walt . . Fa C t / C st ) . ( 1,024 (
1000 f
1,42
( No N )
. PX 4,57 . Q' .
1000
OR
{ a . ( C walt . . Fa C t / C st ) . ( 1,024 (T 20 ) ) }
Secondary Clarifier
bak berbentuk circular dan dilengkapi scrapper, distribution box
Q maks
=
=
=
jumlah bak
Q maks tiap bak
QR
Qw
konsentrasi lumpur di SC
XMVLSS
Diketahui solid flux dari hasil tes laboratorium
SF
Dimensi Bak
Q total tiap bak
jumlah bak
Q tiap bak
Q. X
SF
4 xAs
As
Diameter bak
Kontrol OFR
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Kedalaman bak
kedalaman settling dan clearwater zone
MLSS pada SC
=
=
=
=
Tmsc
XR .A
=
=
Tmsc
XR .A
Kedalaman Lumpur
Y
SRT
Y
1 Kd . SRT
Kd
Yobs
So
S
Px
Px total
Td
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Zona Outlet
menggunakan v-notch pada plate weir 45 yang dipasang disekeliling clarifier
jarak antar pusat V notch
=
Q bak
Qr
Qw
D bak
=
=
Qeff
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
V air
Luas (A)
lebar
kedalaman
pipa inlet
Q maks
jumlah bak
Q tiap bak
V asumsi
A pipa
diameter pipa
cek V
v rencana
A pipa
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
cek V
=
=
panjang pipa inlet
=
Hf
=
Headloss yang dihitung merupan beda muka air di saluran pelimpah yaitu 0,035 m
diameter pipa
m/s
m/hari
m/hari
m/hari
mg/L
kg/m
mg/L
kg/m
atorium
4 kg/m.jam
96 kg/m.hari
QR + Q
6048 + 2350
8398.1
349.9
0.10
4
8398
350
0.10
Q X / SF
(350 m/jam x 3,2 kg/m) / 4 kg/m.jam
279.9
((4 x As)/ )^0,5
((4 x 279,9 m)/ )^0,5
18.9
Q/A
8398 m/hari / 279,9 m
30
m/hari
m/hari
m/jam
m/s
buah
m/hari
m/jam
m/s
m/m hari
OK
OK
(Q x X) / A
2m
3
12 kg/m
3
4 kg/m
3
8.0 kg/m
MLSS (x) . Volume OD
5665.3 kg
(1 P) x Tmsod
(1 - 0,75) x 4762,8 kg
1416.3 kg
Tmsc / (Xr . A)
1190,7 kg / (8 kg/m x 279,9 m)
0.6 m
0.4
24
1
0.15
Y / (1 + (Kd. SRT))
0,4 gr VSS/gr BOD / (1 + 0,15 gr VSS/gr VSS.hari x 1 hari)
0.35
154
33.90
gr VSS/gr BOD
jam
hari
gr VSS/gr VSS.hari
gr VSS/gr BOD
mg/L
mg/L
-3
Yobs . Q . (So - S) . 10
0,35 gr VSS/gr BOD x 8398 m/hari x (129 - 28,5) mg/L /1000
349.9
0.3
Px x SRT
0,3 kg/hari x 1 hari
0.3
1190,7 + 0,3
1416.7
total lumpur BP II / (X. A)
1191 kg/hari / (8 kg/m x 279,9 m)
0.6
2 + 0,5 + 0,5
3
As x h
279,9 m x 3 m
914
Vol/Q
858 m / 0,1 m/s
9403
2.6
0.1
mg/hari
kg/hari
kg
kg/hari
kg/hari
m
m
m
detik
jam
hari
69.2 m /hari
18.9 m
3
8398 - 2350 m /hari
3
5979 m /hari
0.069
x d bak
x 18,9
59.3
panjang weir total / jarak antar pusat v-notch
59,3 m / 0,35 m
169
Q tiap bak / jumlah v notch
0,1 m/s / 169 buah
m3/s
m
m
buah
3
0.0006 m /s
0.06 m
6 cm
Q eff / panjang weir total
6006 m/hari / 59,3 m
3
101 m /m.hari
8398
350
0.10
0.5
Q/V
0.2
0.40
0.5
280
0.280
4
70
0.070
1
Q peak/V
0.07
0.30
0.3
300
Q/A
1.0
m/hari
m/jam
m/s
m/s
m
m
m
L/s
m/s
unit
L/s
m/s
m/s
m
m
m
mm
m/s
6m
0.027 m
Qr + Qw
2419.2 m/hari
0.028 m/s
1 m/s
Q /V
0.028
0.19
0.2
200
Q/A
0.9
6
0.036
m
m
m
mm
m/s
m
m
Parameter
3
Range
15 40
50 150
< 124
26
2 4,2
4 xAs
( 0, 2785 xCxD
2 , 63
1, 85
xQ 1,85
0.421618656
298.6167687 mm
1200 mm
OK
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
280
0.280
24192
30
0.3
30
0.3
250
30
0.3
(5 - 12 m)
(6 - 30 m)
(10 - 15 )
<4
0,3 - 0,75
0.75
< 0,75
25 - 100% Qlumpur
=
=
=
=
1701
31.6
18,9 m/hari x 4 unit
126.3
=
=
=
=
=
=
=
=
=
=
=
1417
5%
1.015
1
M solid / (Sg x air x % solid x 1000)
1191 kg/hari / (1,015x 1 x 5% x 1000)
28
23 m/hari x 4 unit
112
6%
94%
L/s
m/s
m/hari
cm
m
cm
m
kg dry solid/m.tahun
cm
m
m
m
hari
mm
m/s
m/s
kg/hari
m/hari
m/hari
kg/hari
g/cm
g/cm
m/hari
m/hari
m/hari
(23 - 30 cm)
(20 - 30 cm)
2
debit lumpur
td
volume
h asumsi
luas
YANG BENAR
Karakteristik Lumpur
dari BP I
Debit lumpur BP I
jumlah SDB
Kadar solid
Sg lumpur
Sg pada filtrate
Massa sludge basah
di pisah
=
=
=
=
=
=
=
=
=
=
=
=
=
126.3
12
6%
0.06
1.03
1030
1.01
1010
debit lumpur x Sg lumpur
75,8 m/hari x 1030
130051
massa sludge basah x kadar solid
78031 kg/hari x 6 %
m/hari
unit
kg/L
kg/m
kg/L
kg/m
kg/m
kg/hari
=
=
7803 =
7803 =
7803 kg/hari
Solid di sludge cake + solid filtrate
(S x Sg sludge x 25%) x (F x Sg filtrate x 0,64%)
257,5 S + 6,464 F
pers 1
Q lumpur
= S+F
126.3 = S + F
F = 75,8 - S
Dari subsitusi persamaan 1 dan 2 di atas, diperoleh :
S=
F=
td
V total
Tebal cake
Luas permukaan (A)
panjang (p)
Qfiltrate
v pipa orifice
Diameter lubang orifice
Debit orifice
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
pers 2
26.77 m/hari
99.50 m/hari
10
solid di sludge cake x td
16,06 m/hari x 10
268
30
0.3
V total / tebal cake
161 m / 0,3
892
Luas permukaan / jumlah bed
535 m / 12 unit
74.4
hari
hari
m
cm
m
m
m
2 :1
2 L
(Luas tiap bed / 2) ^ 0,5
(44,6 m / 2)^ 0,5
6.1 m
2 x lebar
2 x 4,7 m
12.2 m
panjang x lebar
9,4 m x 4,7 m
74.4 m
Tebal cake + lapisan pasir + lapisan kerikil + freeboard
0,3 m + 0,3 m + 0,3 m + 0,3 m
1.2 m
75% x Qlumpur
75 % x 75,8 m/hari
94.7 m/hari
1.1 L/s
0.4 m/s
50 mm
0.05 m
Cd x A x v.or
0,6 x (1/4 x x d) x 0,4 m/s
3
0.0005 m /hari
Cek kecepatan
Luas pipa manifold
Diameter pipa manifold
Cek kecepatan
Pipa Inlet
Qinlet
v pipa
Luas penampang pipa
Diameter pipa
Cek kecepatan
panjang pipa
Headloss
Hf mayor
Hf minor
Hf suction
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
0.471
Q filtrate / Q orifice
56,8 m/hari / 0,004
201056
15079 buah / 12 unit
16755
11.2
0.3
0.12
0.0037
0.068
68
0.05
0.56
0.01
0.11
107.87
0.08
0.22
m
m/s
m/s
m
m
mm
m
m/s
m
m
mm
m
m/s
126
1.46
0.3
0.0049
0.08
78.77
0.06
0.52
2
m/hari
L/s
m/s
m
m
mm
m
m/s
m
=
=
=
=
=
=
=
=
=
=
=
=
L/s
m/hari
buah
buah
0.003 m
0.026 m
Hf Mayor + Hf Minor
0.029 m
Karakteristik Lumpur
dari SC
Debit lumpur SC
jumlah SDB
Kadar solid campuran
Sg lumpur
Sg pada filtrate
Massa sludge basah
=
=
=
=
=
=
=
=
=
=
=
=
=
Q lumpur
=
=
3400 =
3400 =
=
112 =
F=
Tebal cake
Luas permukaan (A)
panjang (p)
Qfiltrate
v pipa orifice
Diameter lubang orifice
Debit orifice
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
OK
OK
Under drain
Panjang pipa lateral
v pipa lateral
v pipa manifold
Luas pipa lateral
Diameter pipa lateral
OK
v pipa
Luas penampang pipa
Diameter pipa
Cek kecepatan
panjang pipa
Headloss
Hf mayor
Hf minor
Hf suction
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
di pisah
112
6
3%
0.03
1.015
1015
1.01
1010
debit lumpur x Sg lumpur
94 m/hari x 1015
113333
massa sludge basah x kadar solid
95280 kg/hari x 3 %
m/hari
unit
kg/L
kg/m
kg/L
kg/m
kg/m
kg/hari
3400 kg/hari
Solid di sludge cake + solid filtrate
(S x Sg sludge x 25%) x (F x Sg filtrate x 0,64%)
253,75 S + 6,464 F
pers 1
S+F
S+F
94 - S
pers 2
peroleh :
10.83 m/hari
100.83 m/hari
10
solid di sludge cake x td
9,11 m/hari x 10
108.3
30
0.3
V total / tebal cake
91,1 m / 0,3
361
Luas permukaan / jumlah bed
304 m / 6 unit
60.2
hari
hari
m
cm
m
m
m
2 :1
2 L
(Luas tiap bed / 2) ^ 0,5
(50,6m / 2)^ 0,5
5.5 m
2 x lebar
2x5 m
11 m
panjang x lebar
10 m x 5 m
60.2 m
Tebal cake + lapisan pasir + lapisan kerikil + freeboard
0,3 m + 0,3 m + 0,3 m + 0,3 m
1.2 m
75% x Qlumpur
75 % x 94 m/hari
83.7 m/hari
1.0 L/s
0.4 m/s
50 mm
0.05 m
Cd x A x v.or
0,6 x (1/4 x x d) x 0,4 m/s
3
0.00047 m /hari
0.47
Q filtrate / Q orifice
70,4 m/hari / 0,00047
177800
149478 buah / 6 unit
29633
L/s
m/hari
buah
buah
4.4
0.3
0.12
0.0032
0.064
64
0.05
0.49
0.01
0.10
101.44
0.08
0.22
m
m/s
m/s
m
m
mm
m
m/s
m
m
mm
m
m/s
112
1.29
0.3
0.0043
0.07
74
0.08
0.29
2
m/hari
L/s
m/s
m
m
mm
m
m/s
m
0.003 m
0.026 m
Hf Mayor + Hf Minor
0.028 m
OK
OK
OK
kedalaman
slope
Hf
Head kecepatan
Headloss total
=
=
=
=
=
1.0 =
=
=
=
=
=
=
=
=
=
dimensi saluran SP ke GC
panjang saluran
lebar saluran
kedalaman saluran
free board
kedalaman saluran + free board
saluran
1
1
500
0.5
500
0.5
17.3
1.0
0.5
m/s
Q/V
9.81
bxh
1.0 m
Hf/L
0.00006
slope*L
0.00097 m
V/2g
0.01274 m
Hf + hv
0.01372 m
=
=
=
=
=
0,3 - 2
unit
unit
L/s
m/s
L/s
m/s
m
m
m/s
17.3
1.0
1.0
0.3
1.3
saluran
0,3 - 2
1 unit
4 unit
500
0.5
61.24
1.0
0.5
L/s
m/s
m
m
m/s
Q/V
1.0 m
bxh
1.0 m
Hf/L
0.00006
slope*L
0.00344 m
V/2g
0.01274 m
m/s
9.81
Headloss total
saluran pembagi
Q
panjang saluran
lebar saluran
Kecepatan (V)
Luas (A)
kedalaman
slope
Hf
Head kecepatan
Headloss total
=
=
=
=
=
=
=
=
=
=
0.25 =
=
=
=
=
=
=
=
=
=
HL saluran berpintu
HL
HL pintu air
dimensi saluran GC ke BP I
panjang saluran
lebar saluran
kedalaman saluran
free board
kedalaman saluran + free board
Hf + hv
0.01619 m
saluran pengumpul
125 L/s
0.125 m/s
7.42 m
0.5 m
0.5 m/s
Q/V
0.3 m
bxh
0.5 m
Hf/L
0.00036
slope*L
0.00265 m
V/2g
0.01274 m
Hf + hv
0.01539 m
0.0051 m
0.26 m
=
=
=
=
=
7.42
0.5
0.5
0.3 0,3 - 2
0.8
pipa
4 unit
2 unit
125
0.125
4.71
1.0
0.5
L/s
m/s
m
m
m/s
Q/V
0.3 m
bxh
0.3 m
Hf/L
0.00036
slope*L
0.00168 m
V/2g
0.01274 m
Hf + hv
m/s
9.81
=
saluran pengumpul dari BP I
Q
panjang saluran
lebar saluran
Kecepatan (V)
Luas (A)
kedalaman
slope
Hf
Head kecepatan
Headloss total
pipa pembawa
Q
v pipa
Luas penampang pipa
Diameter pipa
Cek kecepatan
panjang pipa
Headloss
Mayor losses
Hf
Minor Losses
Head velocity
Hfm belokan (1 buah)
Hfm valve (1 buah)
Hf minor losses
Hf total
pipa pembagi
Q
v pipa
Luas penampang pipa
Diameter pipa
Cek kecepatan
panjang pipa
Headloss
Mayor losses
=
=
=
=
=
=
=
1.0 =
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
0.01442 m
500
0.5
50.8
1.0
0.5
L/s
m/s
m
m
m/s
Q/V
1.0 m
bxh
1.0 m
Hf/L
0.00006
slope*L
0.00286 m
V/2g
0.01274 m
Hf + hv
0.01560 m
500
0.5
1
0.5000
0.80
798.09
0.80
1.00
43.1
L/s
m/s
m/s
m
m
mm
m
m/s
m
0.062 m
=
=
=
=
=
0.051
0.020
0.015
0.087
0.148
=
=
=
=
=
=
=
=
=
=
250
0.25
1
0.25
0.56
564.33
0.50
1.27
3.05
OK
m
m
m
m
m
L/s
m/s
m/s
m
m
mm
m
m/s
m
OK
Hf
Minor Losses
Head velocity
Hfm belokan (1 buah)
Hf minor losses
Hf total
saluran pembawa outlet dari AS
Q
panjang saluran
kedalaman saluran
Kecepatan (V)
Luas (A)
lebar saluran
slope
Hf
Head kecepatan
Headloss total
saluran pengumpul dari AS
Q
panjang saluran
kedalaman saluran
Kecepatan (V)
Luas (A)
lebar saluran
slope
Hf
Head kecepatan
Headloss total
AS ke OD
jumlah unit AS
jumlah unit OD
saluran pembawa
Q
panjang saluran
=
=
=
=
=
=
=
=
=
=
=
=
0.50 =
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
1.00 =
=
=
=
=
=
=
=
=
=
0.012 m
0.051
0.020
0.071
0.083
250
0.25
4
0.5
0.5
=
=
=
L/s
m/s
m
m
m/s
Q/V
0.5 m
bxh
1.0 m
Hf/L
0.00014
slope*L
0.00057 m
V/2g
0.01274 m
Hf + hv
0.01331 m
500
0.5
43.8
1.0
0.5
L/s
m/s
m
m
m/s
Q/V
1.0 m
bxh
1.0 m
Hf/L
0.00006
slope*L
0.00246 m
V/2g
0.01274 m
Hf + hv
m/s
0.01521 m
saluran
=
=
m
m
m
m
0,3 - 2
2 unit
7 unit
280 L/s
0.28 m/s
32.6 m
9.81
lebar saluran
Kecepatan (V)
Luas (A)
=
1.0
=
0.5
= Q/V
=
0.6
0.6 = b x h
kedalaman
=
0.6
slope
= Hf/L
=
0.00012
Hf
= slope*L
=
0.00397
Head kecepatan
= V/2g
=
0.01274
Headloss total
= Hf + hv
=
0.01671
saluran pembagi
=
Q
=
40
=
0.04
panjang saluran
=
5.98
lebar saluran
=
0.4
Kecepatan (V)
=
0.5
Luas (A)
= Q/V
=
0.1
0.08 = b x h
kedalaman
=
0.2
slope
= Hf/L
=
0.00163
Hf
= slope*L
=
0.00976
Head kecepatan
= V/2g
=
0.01274
Headloss total
= Hf + hv
=
0.02250
pipa pembagi return sludge dari distribution box
Q
=
40
=
0.04
v pipa
=
1
Luas penampang pipa
=
0.04
Diameter pipa
=
0.23
=
225.73
=
0.25
Cek kecepatan
=
0.82
panjang pipa
=
27.56
Headloss
=
Mayor losses
Hf
=
0.106
Minor Losses
Head velocity
=
0.051
Hfm belokan (1 buah)
=
0.020
Hf minor losses
=
0.071
Hf total
=
0.177
m
m/s
m
m
m
m
m
L/s
m/s
m
m
m/s
m
m
m
m
m
L/s
m/s
m/s
m
m
mm
m
m/s
m
m
m
m
m
m
OK
L/s
m/s
buah
L/s
m/s
m/s
m
m
mm
m
m/s
m
OK
m
m
m
m
m
L/s
m/s
m
m
m/s
m
m
m
m
m
m
L/s
m/s
m
m
m/s
m
m
m
9.81
Hf
Head kecepatan
Headloss total
=
=
=
=
=
=
=
0.00012
slope*L
0.02437 m
V/2g
0.01274 m
Hf + hv
DB ke Clarifier
pipa
jumlah unit DB
=
jumlah unit BP II
=
pipa pembawa sludge dari distribution box
Q
=
=
jumlah pipa
=
Q
=
=
v pipa
=
Luas penampang pipa
=
Diameter pipa
=
=
=
Cek kecepatan
=
panjang pipa
=
Headloss
=
Mayor losses
Hf
=
Minor Losses
Head velocity
=
Hfm belokan (1 buah)
=
Hf minor losses
=
Hf total
=
pipa pembagi sludge dari distribution box
Q
=
=
jumlah pipa
=
Q
=
=
v pipa
=
Luas penampang pipa
=
Diameter pipa
=
=
=
Cek kecepatan
=
Headloss
=
Mayor losses
Hf
=
Minor Losses
Head velocity
=
Hfm belokan (1 buah)
=
Hf minor losses
=
0.03711 m
0,3 - 2
1 unit
4 unit
280
0.28
2
140
0.14
1
0.14
0.42
422.31
0.40
1.11
83.55
L/s
m/s
buah
L/s
m/s
m/s
m
m
mm
m
m/s
m
0.330 m
0.051
0.020
0.071
0.402
280
0.28
4
70
0.07
1
0.07
0.30
298.62
0.30
0.99
m
m
m
m
L/s
m/s
buah
L/s
m/s
m/s
m
m
mm
m
m/s
0.004 m
0.050 m
0.020 m
0.070 m
m/s
Hf total
panjang pipa
saluran pembawa outlet
Q
panjang saluran
lebar saluran
Kecepatan (V)
Luas (A)
kedalaman
slope
Hf
Head kecepatan
Headloss total
saluran pengumpul outlet
Q
panjang saluran
lebar saluran
Kecepatan (V)
Luas (A)
kedalaman
slope
Hf
Head kecepatan
Headloss total
pipa inlet
Q maks
jumlah bak
Q tiap bak
V asumsi
A pipa
diameter pipa
=
=
=
=
=
=
=
=
=
0.14 =
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
0.56 =
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
0.074 m
14.71 m
70
0.07
5.5
0.3
0.5
L/s
m/s
m
m
m/s
Q/V
0.14 m
bxh
0.5 m
Hf/L
0.00077
slope*L
0.00426 m
V/2g
0.01274 m
Hf + hv
0.01700 m
280
0.28
75.06
1.0
0.5
L/s
m/s
m
m
m/s
Q/V
0.56 m
bxh
0.6 m
Hf/L
0.00012
slope*L
0.00915 m
V/2g
0.01274 m
Hf + hv
0.02189 m
280
0.280
4
70
0.070
1
L/s
m/s
unit
L/s
m/s
m/s
0.07
0.30
0.3
300
m
m
m
mm
Q peak/V
cek V
v rencana
A pipa
diameter pipa
cek V
panjang pipa
Hf
BPII ke SDB
Pipa Inlet
Qinlet
v pipa
Luas penampang pipa
Diameter pipa
Cek kecepatan
panjang pipa
Headloss
Hf mayor
Hf minor
Hf total
Under drain
Panjang pipa underdrain
v pipa manifold
Luas pipa manifold
Diameter pipa manifold
Cek kecepatan
Headloss
Hf mayor
Hf minor
Hf total
=
=
=
=
=
Q/A
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Qr + Qw
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
1.0 m/s
13 m
0.059 m
2419.2 m/hari
0.028 m/s
1 m/s
Q /V
0.028
0.19
0.2
200
m
m
m
mm
Q/A
0.9 m/s
10.11 m
0.061 m
126
1.46
0.3
0.0049
0.08
78.77
0.06
0.52
3
m/hari
L/s
m/s
m
m
mm
m
m/s
m
0.005 m
0.026 m
Hf Mayor + Hf Minor
0.031 m
pipa outlet
46.19 m
0.12 m/s
0.01 m
0.11 m
107.87 mm
0.08 m
0.22 m/s
0.073 m
0.012 m
Hf Mayor + Hf Minor
0.085 m
Debit (Q)
0.273
Kecepatan (v)
0.6
Saluran berbentuk persegi panjang
Panjang
2
lebar saluran (b)
4h
Jumlah bak
5
Perhitungan :
Q tiap bak
0.055
L.basah (A)
0.09
A
bxh
0.09 2h.h
2h^2
0.09
h
0.2
lebar saluran (b)
0.85
Cek kecepatan
v
0.3
bh
R
0.14
m3/det
m/det
m
m
bak
m3/det
m2
m
m
m/det
b 2h
vn
2
3
R
23587 m3/hari
4717 m3/hari
0.0003
0.0006 m
2m
0.0017
0.5 m
0.3 m
0.0002 m
0.01 m
OK!!
awal
1 unit
akhir
Sumur Pengumpul
EMA awal
head pompa
EMA akhir
= +
=
= +
7.000 m
6.003 m
13.003 m
= +
=
= +
1 unit
13.003 m
0.011 m
12.992 m
= +
=
1 unit
12.992 m
0.014 m
Grit Chamber
EMA awal
Hf saluran
Hf GC
EMA akhir
Bak Pengendap I
EMA awal
Hf saluran pembawa
Hf saluran pembagi
Hf Pintu Air
Hf BP I
EMA BP I
EMA akhir
Ammonia Stripping
EMA awal
Hf saluran pembawa inlet
Hf saluran pengumpul inlet
Hf pipa pembawa
Hf pipa pembagi
Ketinggian AS (hf AS)
EMA AS
Hf saluran pembawa outlet
Hf saluran pengumpul outlet
EMA akhir
Oxidation Ditch
EMA awal
Hf saluran pembawa inlet
Hf saluran pembagi inlet
EMA OD
Hf OD
Hf pipa sludge pembawa
Hf pipa sludge pembagi
Hf saluran pembawa outlet
= +
=
12.978 m
= +
=
=
=
4 unit
12.978
0.016
0.015
0.258
= +
12.689
2 unit
= +
12.689
=
0.014
=
0.016
=
0.148
=
0.083
=
m
m
m
m
52.067
0.3
51.767
51.767
0.014
1.000
50.753
50.753
0.016
0.015
0.258
1.000
49.464
49.464
pompa
m
m
m
m
m
=
=
= +
0.013 m
0.015 m
12.399 m
= +
=
=
7 unit
12.399 m
0.017 m
0.023 m
=
=
=
58.070
6.003 pompa
52.067
0.285 m
0.177 m
0.062 m
49.464
0.014
0.016
0.148
0.083
25.000
24.202
0.013
0.015
24.174
24.174
0.017
0.023
23.135
1.000
0.285
0.177
0.062
=
= +
= +
=
=
=
0.037 m
11.799 m
4 unit
11.799
0.402
0.074
0.059
m
m
m
m
0.037
22.574
=
=
= +
0.017 m
0.022 m
11.225 m
22.574
0.402
0.074
0.059
1.000
21.039
0.017
0.022
21.000
= +
2.000 m
2.000
muka air
Sumur Pengumpul
EMA awal
head pompa
EMA akhir
=
=
=
1
15.100
9.503
24.603
unit
m
m
m
=
=
=
1
24.603
0.3
24.303
unit
m
m
m
Grit Chamber
EMA awal
Hf saluran
Hf GC
EMA akhir
=
=
=
=
1
24.303
0.014
1.000
23.289
unit
m
m
m
m
Bak Pengendap I
EMA awal
Hf saluran pembawa
Hf saluran pembagi
Hf Pintu Air
Hf BP I
EMA BP I
=
=
=
=
=
=
4
23.289
0.016
0.015
0.258
1.000
22
unit
m
m
m
m
m
m
Ammonia Stripping
EMA awal
Hf saluran pembawa inlet
Hf saluran pengumpul inlet
Hf pipa pembawa
Hf pipa pembagi
Ketinggian AS (hf AS)
EMA AS
Hf saluran pembawa outlet
Hf saluran pengumpul outlet
EMA akhir
=
=
=
=
=
=
=
=
=
=
2
25.290
47.290
0.014
0.016
0.148
0.083
25.000
22.029
0.013
0.015
22.000
unit
m
m
m
m
m
m
m
m
m
m
m
Oxidation Ditch
EMA awal
Hf saluran pembawa inlet
Hf saluran pembagi inlet
EMA OD
Hf OD
Hf pipa sludge pembawa
Hf pipa sludge pembagi
Hf saluran pembawa outlet
=
=
=
=
=
=
=
=
7
22.000
0.017
0.023
22.000
1.000
0.285
0.177
0.062
unit
m
m
m
m
m
m
m
m
5.4
22
pump
-4.603
1
22
-4.303 2.219503
22
-3.289
4.3
22
22
(belum freeboard)
pump
-27.290
0
22
22
-2.000
-2.000
2
22
=
=
=
=
=
=
=
=
=
=
=
=
0.037
20.440
2.135
4
22.574
0.402
0.074
0.059
1.000
21.039
0.017
0.022
21.000
1.000
20
m
m
m
unit
m
m
m
m
m
m
m
m
m
m
m
-0.440
22
-2.574
3
22
-1.000
22
pump
outfall
6.900
1.5 dibawah permukaan tanah
2.603
1.6 diatas perm tanah
2.303
0.1 diatas perm tanah
1.289
3.0 diatas perm tanah
0.000
0.0 diatas perm tanah
25.290
25.3 diatas perm tanah
0.000
0.0 diatas perm tanah
0.000
2.0 dibawah perm tanah
bar screen
Grit Removal
Aerated grit channel
velocity-controlled grit channel
primary sedimentation
aerated basin
trickling filter
low rate dosing tank
secondary clarifier
chlorination facility
-1.560
-1.6 dibawah perm tanah
0.574
2.7 dibawah perm tanah
-1.000
1.0 dibawah perm tanah
Sumur pengumpul
Volume penggalian
panjang + tebal beton
lebar + tebal beton
kedalaman + fb + tebal beton
Volume beton
Bar Screen & Saluran Bar Screen
Volume penggalian
panjang + tebal beton
lebar + tebal beton
kedalaman + fb + tebal beton
Volume beton
Grit Chamber
Bak Grit Chamber
Volume penggalian
panjang + tebal beton
lebar + tebal beton
kedalaman + fb + tebal beton
Volume beton
Grit Storage
Volume penggalian
panjang permukaan
lebar + tebal beton
kedalaman + fb + tebal beton
Volume beton
Saluran pembawa
Volume penggalian
panjang + tebal beton
lebar + tebal beton
kedalaman + fb + tebal beton
Volume beton
Saluran pembagi
Volume penggalian
panjang + tebal beton
lebar + tebal beton
kedalaman + fb + tebal beton
Volume beton
BP I
Bak BP I
Volume penggalian
panjang + tebal beton
lebar + tebal beton
kedalaman + fb + tebal beton
Volume beton
Zona Lumpur
102.6
6
3
5.7
32.312
m
m
m
m
m
34.6
17.3
1
2
27.4
m
m
m
m
m
30
18
1.4
1.2
19.2
m
m
m
m
m
25.5
18.0
1.4
1.0
18.5
m
m
m
m
m
79.61
61.24
1
1.3
75.7
m
m
m
m
m
1.86
7.42
0.5
0.5
5.2
m
m
m
m
m
900
24
12
3
202.0
m
m
m
m
m
Volume penggalian
panjang permukaan
lebar + tebal beton
kedalaman + fb + tebal beton
Volume beton
Saluran pembawa
Volume penggalian
panjang + tebal beton
lebar + tebal beton
kedalaman + fb + tebal beton
Volume beton
Saluran pembagi
Volume penggalian
panjang + tebal beton
lebar + tebal beton
kedalaman + fb + tebal beton
Volume beton
Ammonia Stripping
Tower
Volume penggalian
diameter
kedalaman + fb + tebal beton
Volume beton
saluran pembawa dari BP I
Volume penggalian
panjang + tebal beton
lebar + tebal beton
kedalaman + fb + tebal beton
Volume beton
saluran pengumpul dari BP I
Volume penggalian
panjang + tebal beton
lebar + tebal beton
kedalaman + fb + tebal beton
Volume beton
pipa pembawa
pipa pembagi
saluran pembawa outlet dari AS
Volume penggalian
panjang + tebal beton
lebar + tebal beton
kedalaman + fb + tebal beton
Volume beton
saluran pengumpul dari AS
Volume penggalian
panjang + tebal beton
lebar + tebal beton
kedalaman + fb + tebal beton
123.9
8.0
12.2
1.3
56.2
m
m
m
m
m
61.24
61.24
1
1
68.2
m
m
m
m
m
1.86
7.42
0.5
0.5
5.2
m
m
m
m
m
6533
18
26
426.5
m
m
m
m
1.18
4.71
1
0.25
4.2
m
m
m
m
m
50.80
50.8
1
1
56.7
m
m
m
m
m
2.00
4
1
0.5
4.2
m
m
m
m
m
43.80
43.8
1
1
m
m
m
m
Volume beton
Oxidation Ditch
Bak OD
Volume penggalian
panjang + tebal beton
lebar + tebal beton
kedalaman + fb + tebal beton
Volume beton
Saluran pembawa inlet
Volume penggalian
panjang + tebal beton
lebar + tebal beton
kedalaman + fb + tebal beton
Volume beton
Saluran pembagi inlet
Volume penggalian
panjang + tebal beton
lebar + tebal beton
kedalaman + fb + tebal beton
Volume beton
saluran pembawa outlet
Volume penggalian
panjang + tebal beton
lebar + tebal beton
kedalaman + fb + tebal beton
Volume beton
saluran pengumpul outlet
Volume penggalian
panjang + tebal beton
lebar + tebal beton
kedalaman + fb + tebal beton
Volume beton
Distribution Box
Distribution Box
Volume penggalian
panjang + tebal beton
lebar + tebal beton
kedalaman + fb + tebal beton
Volume beton
Saluran pembawa outlet
Volume penggalian
panjang + tebal beton
lebar + tebal beton
kedalaman + fb + tebal beton
Volume beton
Saluran pengumpul
Volume penggalian
panjang + tebal beton
49.0 m
6373
354
9
2
1956.8
m
m
m
m
m
18.26
32.6
1
0.56
30.7
m
m
m
m
m
0.48
5.98
0.4
0.2
3.1
m
m
m
m
m
2.40
30
0.2
0.4
14.0
m
m
m
m
m
112.00
200
1
0.56
185.4
m
m
m
m
m
48
4
4
3
19.8
m
m
m
m
m
0.77
5.5
0.3
0.5
3.2
m
m
m
m
m
42.03 m
75.06 m
1m
0.56 m
69.9 m
BP II
Bak BP II
Volume penggalian
diameter
kedalaman + fb + tebal beton
Volume beton
914
19
3
185.1
m
m
m
m
SDB Tipe I
SDB Tipe I
Volume penggalian
panjang + tebal beton
lebar + tebal beton
kedalaman + fb + tebal beton
Volume beton
89
12.2
6.1
1
49.9
m
m
m
m
m
SDB Tipe II
SDB Tipe II
Volume penggalian
panjang + tebal beton
lebar + tebal beton
kedalaman + fb + tebal beton
Volume beton
72
11
5
1
41.5
m
m
m
m
m
134.912
6.4
3.4
6.2
m
m
m
m
61.95
17.7
1.4
2.5
m
m
m
m
49.2
18.2
1.6
1.7
m
m
m
m
43.9
18.2
1.6
1.52
m
m
m
m
155.33
61.64
1.4
1.80
m
m
m
m
7.04
7.82
0.9
1.00
m
m
m
m
1102.0
24.9
12.6
3.50
m
m
m
m
Uraian
Jumlah
Prasedimentasi 1
No.
Uraian
Bak Pengendap 1
1 Penggalian
2 Beton
Zona Lumpur
1 Penggalian
2 Beton
3 Pipa lumpur 400 mm
4 Pompa penguras lumpur
5 Aksesoris pipa
Saluran Pembawa
1 Penggalian
2 Beton
3 Pintu Air
Saluran Pembagi
1 Penggalian
2 Beton
180.1
8.2
12.4
1.76
m
m
m
m
129.44
61.64
1.4
1.50
m
m
m
m
7.04
7.82
0.9
1.00
m
m
m
m
6959 m
18.4 m
26.19 m
5.37
5.11
1.4
0.75
m
m
m
m
107.52
51.2
1.4
1.50
m
m
m
m
6.16
4.4
1.4
1.00
m
m
m
m
92.82
44.2
1.4
1.50
m
m
m
m
3 Pintu Air
Jumlah
Ammonia Stripping
No.
Uraian
Tower Ammonia Stripping
1 Penggalian
2 Beton
3 Packed Material
4 Pompa
5 Fan
6 Aksesoris pipa
3 Pipa lumpur 400 mm
4 Pompa penguras lumpur
5 Aksesoris pipa
Saluran Pembawa inlet
1 Penggalian
2 Beton
Saluran Pengumpul inlet
1 Penggalian
2 Beton
3 Pintu Air
Inlet & Outlet
1 pipa pembawa 800 mm
2 pipa pembagi 500 mm
Saluran Pembawa outlet
1 Penggalian
2 Beton
Saluran Pengumpul outlet
1 Penggalian
2 Beton
3 Pintu Air
Jumlah
Oxidation Ditch
No.
Uraian
Bak Oxidation Ditch
1 Penggalian
2 Beton
3 Mammoth Rotor
4 Jembatan Mammoth
5 Pipa lumpur 300 mm
6 Aksesoris pipa
Saluran Pembawa inlet
1 Penggalian
2 Beton
Saluran Pembagi inlet
1 Penggalian
2 Beton
3 Pintu Air
8330.2
354.5
9.4
2.50
m
m
m
m
48.97
33
1.4
1.06
m
m
m
m
3.57
6.38
0.8
0.70
m
m
m
m
16.42
30.4
0.6
0.90
m
m
m
m
297.39
200.4
1.4
1.06
m
m
m
m
67.8
4.4
4.4
3.50
m
m
m
m
3.99
5.9
0.7
0.97
m
m
m
m
Clarifier
No.
Uraian
Bak Clarifier
1 Penggalian
2 Beton
3 Scrapper
4 Jembatan
Inlet & Outlet
1 Pipa pembawa 400 mm
2 Pipa pembagi sludge 200 mm
3 pipa inlet 200 mm
4 pipa penguras lumpur 200 mm
5 Aksesoris pipa
Jumlah
111.98 m
75.46 m
1.4 m
1.06 m
5 Pipa inlet 60 mm
6 Pipa underdrain 80 mm
7 Aksesoris pipa
Jumlah
1099 m
19.3 m
3.77 m
139.1
12.6
6.5
1.70
113.7
11.4
5.9
1.70
m
m
m
m
m
m
m
m
Volume
Jumlah
Satuan
Harga (Rp)
134.912
32.312
-
1
1
2
m
m
buah
13,875
292,500
200,000,000
1,871,904
9,451,260
400,000,000
61.95
27.4
-
1
1
24
m
m
buah
13,875
292,500
20,000
859,556
7,999,875
480,000
420,662,595
ompa
r Screen
Jumlah
Volume
Jumlah
Satuan
49.2
19.2
1
1
m
m
13,875
292,500
682,098
5,604,365
43.9
18.5
1
1
m
m
13,875
292,500
609,676
5,397,524
155.33
75.7
-
1
1
1
m
m
buah
13,875
292,500
300,000
2,155,243
22,148,334
300,000
7.04
5.2
-
1
1
4
m
m
buah
13,875
292,500
300,000
97,652
1,516,028
1,200,000
39,710,920
Jumlah
Volume
Jumlah
Satuan
1102.0
202.0
4
4
m
m
180.1
56.2
6
-
4
4
4
4
4
129.44
68.2
7.04
5.2
Harga (Rp)
Harga (Rp)
13,875
292,500
61,160,960
236,339,163
m
m
m
buah
set
13,875
292,500
20,000
55,000,000
100,000
9,998,095
65,762,777
480,000
220,000,000
400,000
1
1
1
m
m
buah
13,875
292,500
300,000
1,796,036
19,949,670
300,000
1
1
m
m
13,875
292,500
97,652
1,516,028
buah
Jumlah
Satuan
0
426.5
6
-
2
2
2
4
4
2
4
4
4
m
m
set
buah
buah
set
m
buah
set
5.37
4.2
4
4
107.52
56.7
-
300,000
Jumlah
Volume
600,000
618,400,380
Harga (Rp)
ng
13,875
292,500
50,000,000
80,000,000
6,000,000
450,000
20,000
55,000,000
100,000
249,475,733
100,000,000
320,000,000
24,000,000
900,000
480,000
220,000,000
400,000
m
m
13,875
292,500
297,785
4,899,960
1
1
1
m
m
buah
13,875
292,500
300,000
1,491,840
16,590,600
300,000
43.1
6.1
2
2
m
m
13,875
292,500
1,196,025
3,568,500
6.16
4.2
2
2
m
m
13,875
292,500
170,940
2,433,600
92.82
49.0
-
1
1
1
m
m
buah
13,875
292,500
300,000
1,287,878
14,338,350
300,000
962,131,211
Jumlah
Satuan
8330.2
1956.8
300
-
7
7
21
21
7
7
m
m
buah
buah
m
set
48.97
30.7
4
4
3.57
3.1
-
7
7
7
et
Jumlah
Volume
Harga (Rp)
13,875
292,500
125,000,000
550,000
85,000
450,000
809,075,523
4,006,615,486
2,625,000,000
11,550,000
178,500,000
3,150,000
m
m
13,875
292,500
2,717,946
35,937,720
m
m
buah
13,875
292,500
300,000
347,008
6,335,784
2,100,000
Ammonia Stripping
No.
Tower Ammonia Stripping
1
2
3
4
5
6
3
4
5
Saluran Pembawa inlet
1
2
Saluran Pengumpul inlet
1
2
3
Inlet & Outlet
1
2
Saluran Pembawa outlet
1
2
Saluran Pengumpul outlet
1
2
3
Oxidation Ditch
No.
Bak Oxidation Ditch
1
2
3
4
5
6
Saluran Pembawa inlet
1
2
Saluran Pembagi inlet
1
2
3
Saluran Pembawa outlet
1
2
Saluran Pengumpul outlet
16.42
14.0
7
7
m
m
13,875
292,500
1,594,404
28,697,760
297.39
185.4
-
1
1
1
m
m
buah
13,875
292,500
300,000
4,126,336
54,227,628
300,000
25.81
27.56
7
7
m
m
13,875
292,500
2,506,796
56,429,100
7,829,211,492
Jumlah
Satuan
67.8
19.8
-
1
1
2
16
m
m
buah
m
3.99
3.2
7
7
111.98
69.9
Jumlah
et
Jumlah
Volume
Harga (Rp)
13,875
292,500
60,000,000
250,000
940,170
5,779,800
120,000,000
4,000,000
m
m
13,875
292,500
387,755
6,597,728
1
1
1
m
m
buah
13,875
292,500
300,000
1,553,759
20,460,094
300,000
160,019,306
Jumlah
Satuan
1099
185.1
-
4
4
4
4
m
m
buah
buah
13,875
292,500
20,000,000
550,000
60,999,231
216,556,230
80,000,000
2,200,000
83.55
14.71
13
10.11
-
1
4
4
4
4
m
m
m
m
set
90,000
90,000
90,000
90,000
1,000,000
7,519,500
5,295,600
4,680,000
3,639,600
4,000,000
384,890,161
Jumlah
Satuan
12
12
12
12
m
m
m
m
et
Volume
Jumlah
Volume
139.1
49.9
22.30500782
22.30500782
Harga (Rp)
Harga (Rp)
23,161,015
175,096,916
5,888,522
8,029,803
1
2
3
Inlet & Outlet
1
2
Distribution Box
No.
Distribution Box
1
2
3
4
Saluran Pembawa outlet
1
2
Saluran Pengumpul outlet
1
2
3
Clarifier
No.
Bak Clarifier
1
2
3
4
Inlet & Outlet
1
2
3
4
5
Sludge Drying Bed Tipe I
No.
Sludge Drying Bed
1
2
3
4
5
6
7
Sludge Drying Bed Tipe II
No.
Sludge Drying Bed
3
46.19
-
12
12
12
m
m
set
Jumlah
Satuan
12
12
12
12
12
12
12
m
m
m
m
m
m
set
10,000
9,800
1,000,000
Jumlah
Volume
113.7
41.5
18.05086785
18.05086785
2
4.40
Jumlah
Harga ( Rp )
420,662,595
39,710,920
618,400,380
962,131,211
7,829,211,492
160,019,306
384,890,161
229,968,701
188,787,285
10,833,782,052
360,000
5,432,445
12,000,000
229,968,701
Harga (Rp)
18,939,303
145,826,800
4,765,429
6,498,312
240,000
517,440
12,000,000
188,787,285
1
2
3
4
5
6
7
Jumlah
Satuan
1
1
2
m
m
buah
1
1
24
m
m
buah
Jumlah
Satuan
1
1
m
m
1
1
m
m
1
1
1
m
m
buah
1
1
4
m
m
buah
Grit Chamber
Uraian
Volume
Bak Grit Chamber
Penggalian
49.2
Beton
19.2
Grit Storage
Penggalian
43.9
Beton
18.5
Saluran Pembawa
Penggalian
155.33
Beton
75.72
Pintu Air
Saluran Pembagi
Penggalian
7.04
Beton
5.18
Pintu Air
-
Prasedimentasi 1
Uraian
Volume
Jumlah
Bak Pengendap 1
Penggalian
1102.0
4
Beton
202.0
4
Zona Lumpur
Penggalian
180.1
4
Beton
56.2
4
Pipa lumpur 400 mm
6.0
4
Pompa penguras lumpur
4
Aksesoris pipa
4
Saluran Pembawa
Penggalian
129.44
1
Beton
68.20
1
Pintu Air
1
Saluran Pembagi
Penggalian
7.04
1
Beton
5.18
1
Pintu Air
2
Satuan
m
m
m
m
m
buah
set
m
m
buah
m
m
buah
Ammonia Stripping
Uraian
Volume
Jumlah
Tower Ammonia Stripping
Penggalian
0
2
Beton
426
2
Packed Material
2
Pompa
4
Fan
4
Aksesoris pipa
2
Pipa lumpur 400 mm
6
4
Pompa penguras lumpur
4
Aksesoris pipa
4
Saluran Pembawa inlet
Penggalian
5.37
4
Beton
4.19
4
Saluran Pengumpul inlet
Penggalian
107.52
1
Beton
56.72
1
Pintu Air
1
Inlet & Outlet
pipa pembawa 800
43.1mm 2
pipa pembagi 5006.1
mm 2
Saluran Pembawa outlet
Penggalian
6.16
2
Beton
4.16
2
Saluran Pengumpul outlet
Penggalian
92.82
1
Beton
49.02
1
Pintu Air
1
Oxidation Ditch
Uraian
Volume
Bak Oxidation Ditch
Penggalian
8330.2
Beton
1956.8
Mammoth Rotor
Jembatan Mammoth Pipa lumpur 300
mm
300.0
Aksesoris pipa
Saluran Pembawa inlet
Penggalian
48.97
Beton
30.72
Saluran Pembagi inlet
Penggalian
3.57
Beton
3.09
Pintu Air
Saluran Pembawa outlet
Penggalian
16.42
Beton
14.02
Saluran Pengumpul outlet
Satuan
m
m
set
buah
buah
set
m
buah
set
m
m
m
m
buah
m
m
m
m
m
m
buah
Jumlah
Satuan
7
7
21
21
7
7
m
m
buah
buah
m
set
4
4
m
m
7
7
7
m
m
buah
7
7
m
m
Penggalian
297.39
Beton
185.39
Pintu Air
Inlet & Outlet
pipa pembawa 25.81
500 mm
pipa pembagi 250
27.56
mm
1
1
1
m
m
buah
7
7
m
m
Distribution Box
Uraian
Volume
Jumlah
Distribution Box
Penggalian
67.8
1
Beton
19.8
1
pompa submersible non
- clogging
2
kisi besi
16
Saluran Pembawa outlet
Penggalian
3.99
7
Beton
3.22
7
Saluran Pengumpul outlet
Penggalian
111.98
1
Beton
69.95
1
Pintu Air
1
Uraian
Volume
Jumlah
Bak Clarifier
Penggalian
1099
4
Beton
185
4
Scrapper
4
Jembatan
4
Inlet & Outlet
Pipa pembawa 83.55
400 mm 1
Pipa pembagi sludge
14.71 200 mm
4
pipa inlet 200 mm13
4
pipa penguras lumpur
10.11 2004mm
Aksesoris pipa
4
Sludge Drying Bed Tipe I
Uraian
Volume
Jumlah
Sludge Drying Bed
Penggalian
139.1
12
Beton
49.9
12
Media Pasir
22.3
12
Media Kerikil
22.3
12
Pipa inlet 60 mm3.0
12
Pipa underdrain 46.2
80 mm 12
Aksesoris pipa
12
Sludge Drying Bed Tipe II
Uraian
Volume
Sludge Drying Bed
Jumlah
Satuan
m
m
buah
m
m
m
m
m
buah
Satuan
m
m
buah
buah
m
m
m
m
set
Satuan
m
m
m
m
m
m
set
Satuan
Penggalian
0.0
Beton
0.0
Media Pasir
0
Media Kerikil
0
Pipa inlet 80 mm 0
Pipa underdrain 0.00
80 mm
Aksesoris pipa
-
12
12
12
12
12
12
12
m
m
m
m
m
m
set
Sumur Pengumpul
P
L
h
Fb
Tebal Dinding Samping
Tebal Dinding Dasar
Vol. Galian
Vol. Depan-Belakang
Vol. Kiri-Kanan
Vol.Dasar
Vol.Beton
6.00
3.00
5.40
0.30
0.20
0.30
179.20
6.84
3.42
5.40
25.92
5.7
18
1.4
1.2
0.3
0.2
0.3
99.86
5.40
0.42
0.00
11.63
Grit Storage
P
L
h
Fb
Tebal Dinding Samping
Tebal Dinding Dasar
18
1.3888889
1.0195029
0.3
0.2
0.3
1.5
Vol. Galian
Vol. Depan-Belakang
Vol. Kiri-Kanan
Vol.Dasar
Vol.Beton
91.66
3.67
0.28
7.50
15.41
Inlet
P
L
h
Fb
Tebal Dinding Samping
Tebal Dinding Dasar
Vol. Galian
Vol. Depan-Belakang
Vol. Kiri-Kanan
Vol.Dasar
Vol.Beton
3
1.4
0.7
0.3
0.2
0.3
16.32
0.6
0
1.26
2.46
Bak Pengendap I
P
L
h
Fb
Tebal Dinding Samping
Tebal Dinding Dasar
Vol. Galian
Vol. Depan-Belakang
Vol. Kiri-Kanan
Vol.Dasar
Vol.Beton
55.5
15
18.5
2.4
2.7
0.3
0.2
0.3
3745.95
29.97
9.99
224.78
304.70
Zona Lumpur
P
L
h
Fb
Tebal Dinding Samping
Tebal Dinding Dasar
Vol. Galian
18.5
15
1.05
0.3
0.2
0.3
639.6
P1
L1
P2
L2
h
Fb
18.5
15
15.5
12
1.83
0.3
Outlet
P
2
L
1.5
h
0.75
1.05
Fb
0.3
Tebal Dinding Samping
0.2
Tebal Dinding Dasar
0.3
Vol. Galian 13.13
Vol. Depan-Belakang
0.42
Vol. Kiri-Kanan0
Vol.Dasar
0.9
Vol.Beton
1.74
40.5
0.2
0.3
6.22
4.94
55.80
78.13
Perforated Baffle
Vol. Depan
Vol. Dasar
Vol. Beton
9.99
11.1
21.09
2
1.16
0.58
0.3
0.2
0.3
10.24
0.35
0.00
0.70
1.40
3
2
2.4
0.3
0.2
0.3
40.8
1.08
1.62
1.8
6.12
0.88
2.7
0.87
Vol. Kiri-Kanan
Vol.Dasar
Vol.Beton
0.20
6.33
9.94
Vol. Kiri-Kanan0
Vol.Dasar
0.9
Vol.Beton
1.5
Weir
P
L
h
Fb
Vol.Beton
55.5
0.1
0.17
0.02
1.03
P
L
h
Fb
Vol.Beton
0.186
Oxydation Ditch
Ditch Lurus
P
L atas
L bawah
h
Fb
Tebal Dinding Samping
Tebal Dinding Dasar
Vol. Galian
h miring
Jumlah Ditch Lurus
Vol. Depan-Belakang
Vol. Dasar
Vol. Beton
125.63
9
6
2
0.3
0.2
0.3
3798.9
2.5
2
140.71
452.27
1185.95
Clarifier
D
h
Fb
Tebal Dinding Samping
Tebal Dinding Dasar
Vol. Galian
Vol. Keliling
Vol.Dasar
Vol.Beton
38.7
3.31
3.61
0.3
0.2
0.3
1175.69
87.74
36.46
124.19
Pelimpah
D1
D2
h
Fb
Tebal Dinding Samping
Tebal Dinding Dasar
Vol. Galian
Vol. Keliling
39
39.8
0.37
0.3
0.2
0.3
0.50
0.34
6.4
0.1
0.17
0.02
0.12
0.186
Ditch Belokan
r
10.5
Jumlah Belokan 2
P 1 belokan 32.97
h
2
Fb
0.3
Tebal Dinding Samping
0.2
Tebal Dinding Dasar
0.3
Vol. Galian 173.09
2.8 h miring
2.5
Vol. Depan-Belakang
36.93
Vol. Dasar 118.69
Vol. Beton 311.24
0.67
P
L
h
Fb
Vol.Beton
2.8
Vol.Dasar
Vol.Beton
0.75
1.09
Sludge Thinkener
D
h
Fb
Tebal Dinding Samping
Tebal Dinding Dasar
Vol. Galian
Vol. Keliling
Vol.Dasar
Vol.Beton
18
3.28
0.3
0.2
0.3
254.34
40.47
16.96
57.42
Outlet
D1
D2
h
Fb
Tebal Dinding Samping
Tebal Dinding Dasar
Vol. Galian
Vol. Keliling
Vol.Dasar
Vol.Beton
18.3
18.8
0.1
0.3
0.2
0.3
0.20
0.13
0.47
0.60
19.44
3
1
0.2
0.3
296.66
48.83
18.31
67.15
4
2
3
1
0.2
0.3
60
3.58
0.4
Vol. Depan-Belakang
Vol. Kiri-Kanan
Vol.Dasar
Vol.Beton
Sludge Drying Bed
P
L
h
Fb
Tebal Dinding Samping
Tebal Dinding Dasar
Vol. Galian
Vol. Depan-Belakang
Vol. Kiri-Kanan
Vol.Dasar
Vol.Beton
3.20
1.60
2.40
12.00
12.2
6.1
0.95
1.25
0.3
0.2
0.3
182.754
3.05
1.53
22.33
31.48
12.1
0.3
0.17
0.02
0.68
3971.99
1497.18
Inlet dan Outlet
0.80
2.30
0.186
Vol. Beton 1.83
Total