‘Method Statement For Coring &> Preparatory Works
1 Cerone ties type Acolor, mortar mx, glue, grout
shop drawings ond methad of Application shat be
‘approved by the CONSULTANT,
+ Emu Inet delivered materiak fom approves
‘manulactures and in orginal labeled packing
+ Mock Up shall be amtanged for wall and floor files ot
Ipcation designated by the CONSULTANT forthe fina
spproval
1 TR shall be raised fer the CONSULTANT’ inspection
‘ond approval af he Mock up.
+ Approved mock Up and somple shall be available a se and the material delivered to ste shel!
be checked wih respect to the approved sample
+ Ensure the MEP clearance obiaines.
+ All under laying installations shalbe approved by the CONSULTANT prior e stat of Hing works
+ Working area to be resticted for unauthorzed entry
1 The surface to which tlos are to be fixed shal be thercughly dry before fing commences and
free from alldetects
+ The eas to be iled shal be brushed clean and oll haces of grease, oll oote particle ele. must
bbe removed.
+ Ensue tho! the laying of Hes shel be es per the dhection ond patteen ogreed wih the
(CONSULTANT.
+ Before laying ies obtain approval of setting ou! by CONSULTANT. Provide symmelty about center
fines of he space or areas and agus fo minimize ie cuting
+ Lay out He work s0 thot Hes less than 1/2 full se do rot eccur and with minimum of cutting
Coretuly grind edges of cu! ile, Eretze cu les oe in comers and cre equal en each wal face.
+ Ti layout on Toor / wal shall follow the layout on floors / wals as per approved shop arowings.
WORKMANSHIP
a
installation Method Stalement For
ding Aluminum Doors
fo
Installation Procedure For Closed
onirol Units
td
|ETHOD STATEMENT FOR TESTING &
“OMMISSIONING OF WATER BOOSTER
PUMPS SET
bi
ESTING & COMMISSIONING OF FIRE
\LARM SYSTEM.
L
| an ‘Statement For Formwork
Ll
Za Testing & Commissioning Of Foam
SystemFor concrate block wall and concrete walk to be finshed with fe, apply 2 leveling coat of
pplster minimum 12 mm thick suiclent fo cover the Unewenness of the substrate and to moke
walls rue vertical
Plaster shall be shed rough inorder to have @ strong key for tling works
Plasior curing perio shall bo completed belere stat of iling wast.
To ensure rows of ties ore ruly horzontal,¢ level ine shal be establshed to postion the staring
Tes of specified and approved sizes shal be fed to wallsurlaces by approved adhesive,
Ming of stictly
recommenciatons,
Mortar shallbe used within 2 hous of mixing at normal temperatures or wihin the pot fe ofthe mix
whichever acrieved earlier
codnesive shall be Followed in aceorsence wih manuiccture’s
Matera shall not be used ater intial set nos token place.
Thin Bed Adhesive-Walls: Apply floated coal of adhesive “0 dry background in areas of
‘opproximately 1 M2 and como the surtace with the recommended sold bed trowel, APoy tin
fever coal of adhesive te bacis of dt ks. Press ‘los ento bedding with twisling/stding action to
ive fried bad thickness of no more han 3 mm.
1d Adnesive-Walls: Apply floated coat of adhesive fo cky background and comb the
surface with the recommended soll bed trowel Fl any keys and apply thin even coal of
fe. Thiek
codhesive over the enire back of each ie, Pes ies onto bedding with twislng/ing ection to
Ce fried bed thickness within the range recommended by the manufacturer.
Tame the ile with rubber male to obtain woquired adhesion andtiove
Ties shall be laid with required spacing and spacers shall be used io afgn horizontal and verical
joins
Lay fle to pat in accordance with Shop Drawings. Vey pattem & unintonupted though
openings
leblih ines of Borders wher
pple.
Excesive mis/achesve snallbe removed with a damp cloth betore the material hos set
The vertical joints shall be maintained plumb for the entre rue level and plane by uniformly
copplied pressure.
Lol
Download Method statement For PVC
“£.GI Conduits & Accessories
installation
CATEGORIES
= ms
coment & Cheer Teng
+ ChulEngineering
+ ChaMatnod Statements
+ Concrete testing
+ Constvetion Methodstatements
+ Duanage Pipes retallaton
+ Duel Wore
+ ecrieal
+ acrical Matned Statements
1 re Superesion sytem
+ Heath a Soety
+ HVAC Checkles
+ HVAC Maintenance
+ HVAC ethos Statements
+ 160 9001
+ Metnod Statement Templste
+ Matnod statements
+ Piping Method statements+ Joins in glazed wal tles ang fitings. ater edges of les have bsen thoroughly wet (After 4B hours + Piping Works
later i shat be grouted with neat whiter cobted approves grout + Plumeing Method Statements
+ Grout shall be oped to the spaces betwsen the fis using a sponge or @ smalipiece of the soft + Pressure Tesing
lots 1 rojact HSE Plan
+ Ensure that janis are 6 mm dees (or the depin af the Hl lee), and are toe fom dus! and debris. + Pump isolation
+ Force gfout and filjoints completely fo entre depth tool to an approved prole, clean off surface + uolly Assuroxco
‘ond leave tee fiom blemishes. + Quotly Managenent
+ Rub walling with « dry cloth when joints cre her 1 fis
+ Keep expansion/contraction ond conitoljens fee of mortar or grou Rk Assessment
+ Control Joints: Provide Control Joints émm minimum wicthin large fle arsos at a maximum of 45m + fic Marogerent
in each dkection and af the perimeter wats, Do ot saw-cut ins alter instotng Hes. 1 Some Forms & Formals
+ Movement joints shall be located os required and be catied through backing to the shuctural_ + Templates
wall. partly ‘ilsith stip an ish flusn with sealent fo tne manutacturer'secommendations, _* Testag & Commissioning
+ Ting shall be protected ttom heal ang inclement weather unl jainting nat campletely st 1 Water Supp Ping
+ Walang Rie
+ Whats azard?
1 Wht ike
Working A Height
Tas
| Ascot Cone Stem AC Ductna Nehoa stremant
(duct metaren AC Maintenance blank
pperforma blank proforma bm system BMS
Tes'ing Procedure Building Management
System Building Management Sysiom BMS
Control measures Eleemeal Mernod
PREPARATORY WORKS Slalernent FA System for hazard hvac HVAC
Method statementsinstallation
Installation Metned Statement Installation of
Foor fishes
+ Ceramic tes tyee Rotor, mortar mx ale, groul shop crawings and methad of Aaplestion shell
bbe opproved by the CONSULTANT. Gl Conduits & Accessories MEtNOd
+ Ensure that delivered material ftom opproved manufactures and in exginallabeled packing. Method Of Statement‘Mock up shall be arranged for wall ane flor les at location designated by the CONSULTANT for
tne final approval
Approved mock up and same shall be availabe at ste and the materials dalivered to site shall
bbe enecked wih spect to the approved somple
Ties ol approved ses shale used fer laying
Ensure the MEP clearance obtoines
Rostict the watking area to prevent unauthorized ety.
The areas of substrate to be fled shall be brushed clean and the Frished floor level shall be
estabisned by moans of dots.
Allies of grease, cl and loose paces etc. must be removes.
In wet areas check that appreved Water proofing is completed os per Manufacturer's instuction
cond tested for eokage,
Ensure that the laying of tiles shal be os per tne alrection and pattem agreed with the
‘CONSULTANT.
Setting out shallbe done by the surveyor and approves by the CONSULTANT,
Before laying tles obtain approval of seting oul by CONSULTANT. Provide symmetry about conter
lines of he space or areas and acs to minimize ile cutting.
Tling should be started rem the start point as kad on the approved shop drawings.
Loy out fle work so that Hes lass than 1/2 full Sze do not occur and with minimum of cuting,
Caretut grind edges of cu ile, Eraize cut hes re in comers and ore equal on each wal face,
Workmanship
+ Preparation of Flors: Castin-place concrete subsrotesshallbe sufiiantly smooth and level such
not when thinset morte te accept tes & apolled. ne voids under the tes occUr, Grind off high
spols and likin ow soots as necessary fo ensure no voids occur
+ Floor Water Frosting Application:
Allole's & ponies te receive water oreating
+ Apply the quia waterproofing ata rate of minimum 1.5 kg/mzon horizontal suface ond extend at
leas! 100mm high on vericol sutaces or as per the aporoved shop drawings and methos
statement cera
Method Statement
method statement for Installation
Method Statement Template mst msT
For BMS Of pipe flushing pressure pumps risk
Risk Assessment sate work method
sample check Ist sample checksheet
Sample Format teetica Statement
swms temolate test Testing &
Commissioning Testing & Commisioning
Method Statement water
DOWNLOAD METHOD STATEMENTS.
+ Downlaaa EMS Ietalaton Method Statement
+ Download Chilled Wile Pipes hsallsion &
Testng Method Statement
+ Download Meth Statement Fot NSTAILATION.
HYDRO TESING & FLUSHING OF HRE FIGHING
PPPING SYSTEM NICLUDING SPRINKLERS
+ Downloas Method Statement For CENTRAL
BATERY SYSTEM INSTALLATION
+ Downlsas Method Statement Fr fre Alm
system
+ Downisad Method Statement For fusing 1
Chiles Water Pong
+ Download Meth Statement Fo station OF
Packaged Unis
+ Downloaa Method Statement For station OF
So Unis & Rk Aztesement
+ Downlaas Method Statement For instatation OtBefore installation of porcelain fies, place a 1000 gauge polvthene sheet protected by 1omm
‘mortar layer end coordinate tor water proofing wotks withthe porcelain ts instar.
Testing shall be before ond after the instalation of tes.
‘Apply tile adhesive to the walln he require thickness,
‘les sallbe places according to lvel snown in drawing ord shall be placed frmW withthe help
of uber moll
Remove ond reso fer sold becring tls that give holow sound when tapped with stool od, after
Installation,
Ties shal be Inid level or rough alsin wo! arocs as may be required.
Paricular core shallbe token in wet areas to prevent low spot and pookng of water.
The ls shallbe neatly cul ind rough on exposed edges around plows & other obstuctions
Make provision af floor drains as per approved shop drawings.
Sikcon ber sealant shal be inserted Between Hes and sanitary fing,
\Whon the installation has nardened suffcient (aller 48 hour) a thick grout ef cement mixed with
‘o minimum amount of waterlapproved grout shallbe prepared and brushed over the loor un‘ lal
‘he jonts are thorougriy file.
Suplis material shall be removed with a ty cloth
CConttol Joints: Provide Cont Joints 6mm minimum within large tle creas at a maximum of 4 Sm
In each direction and at tne perimeter wals. Do nt sow-cut joins aftr instlng Hes.
Movement joints shall be located a requied and be cated through backing fo the skuctural
Wall, partial‘ wih ship ane Fish flush with seater fo whe manufacturer's recommendations.
The completes tie leer should oe kop! rac avoidedin the area for at toast 24 hous,
Italics unavoidable, beard walkways shall be used for fai fe avcid damage fo floats and lo
keep floor clean,
The join width shallbe 2mm or as mentionsdin the approved shop ckowings
Joins tobe true to theline, continuous and witnout steps.
[Apply 2 coals of sealer firth fo flooring and siois. Fallow sealer finish manulacture’s printed
instructions for ine application
‘onstormen
* Download Project HSE lan Wil AllFormsfeamie see)
usta
GALAXY core
LUKE US ON FACEBOOK,