Anda di halaman 1dari 27

Bagan Balok

Jenis Pekerjaan

Hari
1

4.53 Liter/m
3.63 Kg/m
0.5 Liter/m
0.5 Liter/m

satuan
litter
ton
bh
bh

volume
15,000
12
80
80

harga
600
1,300,000
2,000,000
2,000,000

jumlah
9000000
15600000
160000000
160000000
344600000

Penyekrapan
Cuci Air Tawar
Blasting
Pengecetan AC
Pengecetan AF

Jadwal pembayan upah pekerja


hari
jumlah pekerja
1
30
2
40
3
25
4
25
5
10
TOTAL

upah
50,000
50,000
50,000
50,000
50,000

jumlah
komulatif
1,500,000
23.0%
2,000,000
35.7%
1,250,000
19.2%
1,250,000
19.2%
500,000
8.0%
6,500,000
100%

Kurva Biaya

Kurva biaya
120.0%
100.0%
jumlah %

Pengeluaran Harga Bahan


Barang
Air Tawar
Pasir Kuarsa
Cat AC (20 Liter/kaleng)
Cat AF (20 Liter/kaleng)
TOTAL

80.0%
60.0%
40.0%
20.0%
0.0%

0.0%
Series1

23.0%

53.6%

72.8%

92.0%

100.0%

kurva jumlah pekerja

jumlah pekerja

jumlah pekerja
jumlah %
23.0%
53.6%
72.8%
92.0%
100.0%

45
40
35
30
25
20
15
10
5
0
1

4
hari

5
100.0%

Series1

Rincian Kegiatan
Nama Kegiatan
Penyekrapan

Hari
1
2

Alat (unit)
1
15
15

2
3

1
2
2

2
3
4
5

1
3
3
3
3

3
4
5
6

1
2
2
2
2

3
4
5
6

1
2
2
2
2

Cuci Air Tawar

Blasting

Pengecatan AC

Pengecatan AF

Waktu (jam)
1
8
8
Total
1
3
3
Total
1
5
5
8
6
Total
1
3.5
3.5
5
4
Total
1
3.5
3.5
5
4
Total

Volume (m)
13.8
1.655
1.655
3310

Komulatif

1.655
1.655
3310
45.9
689.6
689.6
1100.3
830.5
3310
206
689.6
689.6
1100.3
830.5
3310

50%
50%
100%

689.6
689.6
1100.3
830.5
3310

50%
50%
100%

20.8%
20.8%
33.2%
25.20%
100%
20.8%
20.8%
33.2%
25.20%
100%
20.8%
20.8%
33.2%
25.20%
100%

Nama Kegiatan
Penyekrapan
Cuci Air Tawar
Blasting
Pengecatan AC
Pengecatan AF

Alat (unit)
1
15
1
2
1
3
1
2
1
2

Waktu (jam)
1
1
1
1
1
1
1
1
1
1

Volume (m)
13.8
207
103.4
206.8
45.9
137.7
137.5
275
137.5
275

Jumlah %

Jaringan Kerja hitungan maju


Kegiatan
i
j
Nama Pekerjaan
1
2
Penyekrapan
2
4
Cuci air Tawar
4
5
Blasting
5
6
Pengecatan AC
4
5
Pengecatan AF

50%
100%

50%
100%

20.80%
41.60%
74.80%
100%
412
20.80%
41.60%
74.80%
100%

20.80%
41.60%
74.80%
100%

Kurun Waktu
2
2
4
4
4

Paling Awal
Mulai (ES)
Selesai(EF)
0
2
2
3
2
5
3
6
3
6

Bagan Balok
Hari
No
1
2
3
4
5
6
7
8
9
10
11

Jenis Pekerjaan
Penyekrapan (A)
Penyekrapan (B)
Cuci Air tawar (A)
Blasting (A1.1)
Cuci Air tawar (B)
Pengecatan AC (A2.1)
Blasting (B2.1)
Pengecatan AF (A2.2)
Pengecatan AC (B1.1)
Blasting (A1.2)
Pengecatan AF (B1.2)
Jenis Pekerjaan

No
12
13
14
15
16
17

Pengecatan AC (A2.3)
Blasting (B2.2)
Pengecatan AF (A2.4)
Blasting (AB)
Pengecatan AC (AB1.1)
Pengecatan AF (AB1.2)

Jumlah
Tenaga kerja Alat (unit)
15
15
15
15
5
2
15
3
5
2
10
2
15
3
10
2
10
2
15
3
10
2

Volume
(m)
1.655
1.655
1.655
689.6
1.655
689.6
689.6
689.6
689.6
550.8
689.6

1 (17 nop 2014)


4
7

2 (18 nop 2014)


3
4
5
6

Hari
Jumlah
Tenaga kerja
10
15
10
15
10
10

Alat (unit)
2
3
2
3
2
2

Volume
(m)
550.8
550.8
550.8
829.2
1379
1379

5 (21 nop 2014)


3 4 5 6
7

6 (22 nop 2014)


3
4
5
6

Hari
Jenis Pekerjaan
1
Blasting 3 (Haluan)
Blasting 4 (Buritan)
Pengecatan 2 (Buritan)
Pengecatan 3 (Haluan)
Pengecatan 4 (Buritan)

4
5

5
6

Hari

nop 2014)
7

3 (19 nop 2014)


4
5
6

4 (20 nop 2014)


3
4
5
6

7 (23 nop 2014)


4
5
6

Hari

nop 2014)
7

8
4

5
7

6
5

i
1
1
2
3
4
4
5
6
8
8
9
10

j
2
3
4
8
5
6
7
7
9
10
11
11

kode
a
b
c
d
e
f
g
h
i
j
k
l

Nama Pekerjaan
(jam)
Skrap Haluan
8
Skrap Buritan
8
Cuci Air Tawar (Haluan)
3
Cuci Air Tawar (Buritan)
3
Blasting 1 (Haluan)
5
Blasting 3 (Haluan)
8
Pengecatan 1 (Haluan)
8
Pengecatan 3 (haluan)
8
Blasting 2 (Buritan)
5
Blasting 4 (Buritan)
8
Pengecatan 2 (Buritan)
8
Pengecatan 4 (Buritan)
8

No

Jenis Pekerjaan

1 Penyekrapan haluan
2
Cuci air tawar
3
Blasting (A.1)
4
Pengecatan AC
5
Pengecatan AF
6
Penyekrapan Buritan
7
Cuci air tawar
8
Blasting (B.1)
9
Pengecatan AC
10
Pengecatan AF
11
Blasting (A.2)
12
Pengecatan AC
13
Pengecatan AF
14
Blasting (B.2)
15
Pengecatan AC
16
Pengecatan AF

Jumlah
Tenaga kerja Alat (unit)
15
15
5
2
15
3
10
2
10
2
15
15
5
2
15
3
10
2
10
2
15
3
10
2
10
2
15
3
10
2
10
2

Volume

(m)
1655
1655
689.6
689.6
689.6
1655
1655
689.6
689.6
689.6
965.4
965.4
965.4
965.4
965.4
965.4

8
41

9
83

10
83

11
83

12
83

13
83

14
83

15
83

16
83

1 (17 nop 2014)


17 18 19 20
41

21

22

50

50

41 83 83 83 83 83 83 83 83 41
50 50
41 124 207 290 373 456 539 622 705 746 746 746 746 796 846
9000

8000
7000
6000
5000

4000
3000
2000
1000

0
1

10

11

12

13

14

No

Jenis Pekerjaan

1 Penyekrapan haluan
2
Cuci air tawar
3
Blasting (A.1)
4
Pengecatan AC
5
Pengecatan AF
6
Penyekrapan Buritan
7
Cuci air tawar
8
Blasting (B.1)
9
Pengecatan AC
10
Pengecatan AF
11
Blasting (A.2)
12
Pengecatan AC
13
Pengecatan AF
14
Blasting (B.2)
15
Pengecatan AC
16
Pengecatan AF

23

24

150

150

150

150

150

100

100

50

10

11

12

13

14

15

83

100
83

100
83

2 (18 nop 2014)


16
17
18

19

20

21

22

50

50

50

41

50
150 150 150 150 150
896 896 1046 1196 1346 1496 1646 1646

14

15

16

17

18

19

20

21

22

100
1746

23

83

83

83

83

141 133
83
83
83
83
1887 2020 2103 2186 2269 2352

24

25

26

27

28

29

30

50
83

41

183 183 133


41
50
50
2535 2718 2851 2892 2892 2892 2892 2942 2992

31

32

33

34

35

36

37

38

39

40

23

24

150

150

150

150

150

100

100

50

10

11

12

13

14

15

100

100

HARI
3 (19 nop 2014)
16
17
18
19

20

21

22

150

150

50

50

50
150 150 150 150 150
100 100
50
100 100
50
150 150
3042 3042 3192 3342 3492 3642 3792 3792 3892 3992 4042 4042 4042 4042 4042 4142 4242 4292 4292 4292 4292 4292 4442 4592

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63

64

65

66

23

24

150

150

150

150

150

10

100

100

100

50

11

12

13

14

4 (20 nop 2014)


16
17
18

15

100

100

100

19

20

21

50
150

150 150 150 150 150


100 100 100
50
4742 4892 5042 5192 5342 5342 5342 5342 5442 5542 5642 5692

67

68

69

70

71

72

73

74

75

76

77

78

79

5692

80

81

100 100 100


50
150
5692 5692 5692 5792 5892 5992 6042 6042 6042 6192

82

83

84

85

86

87

88

89

90

91

92

22

23

24

150

150

150

150

150

150

150 150 150 150 150 150


6342 6492 6642 6792 6942 7092 7092 7092 7092

10

100

100

100

50

100 100
7192 7292

11

12

100
50
7392 7442 7442 7442 7442

Series1

92

93

94

95

96

97

98

99

100

101

102

103

104

13

105

106

107

5 (21 nop 2014)


14
15
16

7442

100
100
7542

17

18 19 20

100 100
50
100 100
50
7642 7742 7792

KETERANGAN

21 22 23 24

Anda mungkin juga menyukai