Anda di halaman 1dari 7
ZTER Telkom Indonesia 1.1.2 Cement platform specification Cement platform installation and materials should follow this requirement Material specification used for making cement platform should according to final 80 and Design Drawing specification (Cement : Sand : Spit stone=1: 2:3) The bearing capacity of the platform must be more than 1000kg ‘The cement platform must be solid smooth and painted with black outdoor paint to avold weather carrasion ‘The top side of cement platform should have slide side approximately 5* to avoid water storage in the center of platform ‘Working floor should be installed arround the cabinet and have thickness not less than 40cm Protection pin should be installed strong in 5 position according to design and painted black and yellow with height from working floor 60cm and inside the soll depth 40cm. Cement Platform Dimension Slide side ‘utdoor Paint | Indonesia 1.1.3 Dyna Bolts Installation Dyna Bolts installation should fllow this requirement : + Dyna bolts installed in four position according to ZTE design drawing and using Dynabolts from 2TE '¢ The cabinet should be fixed using dynabolts and properly tighten in all 4 point ‘* _Dynabolts cover should installed after tighten the dynabolts TIE rien Dynablts installation Dynabolts Cover ‘Screw hole for locking the dynabolts cover Dynabolts cover installation ‘Anchor oF Dynabolts layout ZTE rton Indonesia 2 Cabinet Installation Cabinet Installation should follow this requirement: ‘© The cabinet should be protected during conveying, After installation, the surface of equipment should not be damaged or deformed, without scratch or paint peeling off (over 20mm or metal exposed) ‘© If cabinet are arranged side by side, the main walkway side should be in one line, and the sides of the whole row of cabinet are on the same plane. ‘© The adjacent cabinet vertical should be less than 2° Cabinet should be protected during conveying ‘Gabinet Vertical level ‘Cabinet Horizontal level Indonesia ITE ee MOF Side view Exhaust Side view ZTE Telkom OF Indonesia Cable inet Confoguration Outer cable inlet BB Fiver optic Fo) Main Earth gro BE acrowe Sample ding cable 2: Spare outer cable inlet Earthling Bar TIE riser Indonesia 1. Cabinet Base Installation 1.1 Cabinet foundation Installation 1.1.1 Design Drawing Cement platform postion and specification should according to final design drawing Site Plan oem ZTE shen Indonesia Section A oem, j-——S0c__y an Si sem 60cm 140 Section 8

Anda mungkin juga menyukai