1
2
3
4
5
Tanggal
6/29/2014
7/12/2014
7/27/2014
8/18/2014
Biaya Tukang
DP pertama
Pembayaran ke-2
Pembayaran ke-3
Pembayaran ke-4
Pembayaran ke-5
Tukang
35,275,000
Jumlah
3,000,000
6,000,000
9,750,000
5,350,000
11,175,000 baru dibayar 6 juta
No
Tanggal
Nama Barang
1 16 Juni 2014 Pasir
2 16 Juni 2014 10/10 Ulin
5/7 mrt
papan mrt
3
6/21/2014 Batu Bata
Koral
4 21/06/2014 Kusen jendela 130x60, kusen gandeng 130x60
Kusen Ventilasi 25x15 dalam
Daun jendela listimbul
5 27/06/2014 Pasir
6 05/07/2014 Pasir
Koral
7 08/07/2014 Pasir
8 08/07/2014 Pasir
9 11/07/2014 2/20 X 4 m
5/7 X 4 m
10 11/07/2014 Pasir
11 17/07/2014 Pasir
12 22/07/2014 Pasir
Batu Bata
13 16/06/2014 No Drop
Paku 3"
Alumunium
Rol 2"
Paku 1,5"
Paku ulin
Multiroof
BB 10F
BB 8F
Bendrat
14
6/17/2014 Ember
L 2,5
T 2,5
Benang
Lem PVC
PVC 2,5
Semen Tonasa
15
6/27/2014 Semen Tonasa
BB 10F
BB 8F
Paku 3,5"
16
7/2/2014 Baut 2/8 X 25
Paku Ulin 3"
Paku 3"
17
7/4/2014 Bendrat
18
7/7/2014 Semen Tonasa
19
7/8/2014 AM 53
Banyak
1
4
25
12
1500
1
18.75
5
3
2
1
1
1
1
12
10
1
1
1
500
2
2
20
1
1
0.5
0.5
18
10
3
5
1
1
3
1
2
15
10
25
20
2
13
1
1
2
15
2
Unit
Ret
Ea
Ea
Ea
Ea
Ret
Ret
Ret
Ret
Ret
Ret
Ea
Ea
Ret
Ret
Ret
Ea
Ea
Kg
M
Ea
Kg
Kg
Pak
Ea
Ea
Ea
Ea
Ea
Ea
Ea
M
Sak
Sak
Ea
Ea
Kg
Ea
Kg
Kg
Kg
Sak
Dos
Harga
225,000
60,000
30,000
35,000
900
550,000
72,000
70,000
320,000
225,000
225,000
550,000
225,000
225,000
35,000
27,000
225,000
225,000
225,000
1,000
50,000
13,000
40,000
6,000
20,000
40,000
20,000
58,000
40,000
18,000
10,000
7,000
8,000
3,000
8,000
16,000
64,000
64,000
58,000
40,000
13,000
5,000
13,000
13,000
18,000
64,000
11,000
20
21
22
23
24
25
26
27
28
29
30
31
32
33
11
1
10
3
3
1
1
2
3
1
2
1
1
1
10
3
3
3
3
12
1
1
1
6
6
10
3
1
1
4
1
12
1
3
12
2
1
15
12
10
500
1
1
1
20
4
1
3
27
2
Dos
Ret
Sak
Ea
Dos
M
Ea
Ea
Ret
Sak
Ea
Ea
Ea
Dos
Sak
Sak
Ea
Dos
Dos
Ea
Ret
set
set
set
dos
ret
dos
Ea
Ea
Ea
Ea
Ea
Ea
Ea
Ret
Ret
Ret
Ea
klg
klg
klg
Ea
klg
60,000
225,000
64,000
10,000
12,000
60,000
12,000
45,000
2,667
10,000
45,000
3,000
2,000
225,000
64,000
55,000
40,000
5,000
60,000
64,000
25,000
50,000
8,000
75,000
65,000
5,000
110,000
500,000
380,000
305,000
5,200,000
300,000
500,000
67,500
35,000
60,000
180,000
30,000
35,000
27,000
1,000
225,000
900,000
250,000
27,000
132,000
199,000
132,000
28,000
199,000
Saringan 4 inch
tiner
tiner
E 4001
Lampu philip 42 watt
kabel
kater
isi kater
1
2
1
5
1
4
3
1
ea
Ea
Ea
klg
Ea
m
Ea
Ea
100,000
106,000
70,000
132,000
75,000
2,500
14,000
10,000
41,929,500
Jumlah
225,000
240,000
750,000
420,000
1,350,000
550,000
1,350,000
350,000
960,000
450,000
225,000
550,000
225,000
225,000
420,000
270,000
225,000
225,000
225,000
500,000
100,000
26,000
800,000
6,000
20,000
20,000
10,000
1,044,000
400,000
54,000
50,000
7,000
8,000
9,000
8,000
32,000
960,000
640,000
1,450,000
800,000
26,000
65,000
13,000
13,000
36,000
960,000
22,000
660,000
225,000
640,000
30,000
36,000
60,000
12,000
90,000
8,000
10,000
90,000
3,000
2,000
225,000
640,000
165,000
120,000
15,000
180,000
768,000
25,000
50,000
8,000
450,000
390,000
50,000
330,000
500,000
380,000
1,220,000
5,200,000
3,600,000
500,000
202,500
420,000
120,000
180,000
450,000
420,000
270,000
500,000
225,000
900,000
250,000
540,000
528,000
199,000
396,000
756,000 bapak
398,000
100,000
212,000
70,000
660,000
75,000
10,000
42,000
10,000
-
no nota
no nota
no nota
bapak
No
1
2
3
4
5
6
7
8
9
10
11
Tanggal
4/30/2014
5/16/2014
5/30/2014
6/16/2014
6/30/2014
7/16/2014
7/30/2014
8/16/2014
8/30/2014
9/16/2014
9/30/2014
Jenis Pembayaran
Tarikan Bank Mandiri 1
Bayar bahan 1
Tarikan Bank Mandiri 2
Bayar bahan 2
Tarikan Bank Mandiri 3
Bayar bahan 3
Tarikan Bank Mandiri 4
Bayar bahan 4
Tarikan Bank Mandiri 5
Bayar bahan 5
Tarikan Bank Mandiri 6
20,960,000
Jumlah
2,410,000
1,500,000
2,410,000
1,500,000
2,410,000
1,500,000
2,410,000
1,000,000
2,410,000
1,000,000
2,410,000
No
1
2
3
Jenis
Biaya Tukang
Biaya Bahan
Tagihan perBulan
Total
Jumlah
35,275,000
41,929,500
20,960,000
98,164,500