Anda di halaman 1dari 5

STRUKTUR PRODUK KIPAS

KIPAS
(1)

RANGKA LUAR
(1)

DUA
PEGANGAN

SEBUAH TALI
KIPAS

SEBUAH UNIT
ELEKTRIK

(2)

(3)

(1)

SEBUAH
RANGKA

DUA
PENOPANG

SEBUAH
TANGKAI

SEBUAH
POROS

5 BALINGBALING

SEBUAH MESIN
PENGGERAK

SEBUAH
TOMBOL

SEBUAH
KENOP

(2)

(1)

(1)

(1)

(2)

(1)

(1)

(1)

STRUKTUR PRODUK BERFASE WAKTU

SEBUAH KENOP

SEBUAH TOMBOL

SEBUAH UNIT ELEKTRIK

SEBUAH MESIN PENGGERAK

DUA PENOPANG

KIPAS

RANGKA LUAR

SEBUAH RANGKA

DUA PEGANGAN

SEBUAH POROS
SEBUAH TALI KIPAS

5 BALING-BALING

LEAD TIME
1

1. MRP DENGAN METODE LOT FOR LOT


PERIODE
KEBUTUHAN (GR)
SR
OH
NR
POR
POP

1
30
40

10

10

3
40
0
30
30

30

0
0
0
30

5
30

6
20

7
20

8
10

0
30
30
20

0
20
20
20

0
20
20
10

0
10
10

5
30

6
20

7
20

8
10

95

75

55

45

0
0
0
50

10
50
0
50
50

2. MRP DENGAN METODE EOQ


PERIODE
KEBUTUHAN (GR)
SR
OH
NR
POR
POP

1
30
40

10

10

155

3
40

125
30
155

125

45

155

10
50
150
5
155

TOTAL BIAYA
BIAYA PEMESANAN
BIAYA SIMPAN

EOQ

900
25
925

2 200 150
2,5

TOTAL BIAYA
BIAYA PEMESANAN (200/155 X 150)
BIAYA SIMPAN (2,5 X 155/2)

154.9193 = 155

193.5484
200
393.5484

1. MRP DENGAN METODE LOT FOR LOT


PERIODE
KEBUTUHAN (GR)
SR
OH
NR
POR
POP

1
30
40

10

10

3
40

0
30
30

30

30

5
30

6
70

7
20

0
30
30
70

0
70
70
20

0
20
20

10

9
10

10
80

11

12
50

0
10
10
80

0
80
80

9
10

10
80

11

12
50

39

158
41
199

158

108

0
50
50

50

2. MRP DENGAN METODE EOQ


PERIODE
KEBUTUHAN (GR)
SR
OH
NR
POR
POP

1
30
40

10

10

199

3
40

5
30

6
70

7
20

169
30
199

169

139

69

49

49

199

TOTAL BIAYA
BIAYA PEMESANAN
BIAYA SIMPAN

EOQ

1050
25
1075

2 330 150
2,5

TOTAL BIAYA
BIAYA PEMESANAN (330/199 X 150)
BIAYA SIMPAN (2,5 X 199/2)

198.9975 =199

248.7437
248.75
497.4937

Anda mungkin juga menyukai