Anda di halaman 1dari 3

HIERRO

PARAMETROS ECONOMICOS Y GEOMETRICOS


Precio Fe
Rec Ox
Rec Mix
Rec primario
Humedad concentrado
costo mina
costo proceso ox-mix
costo proceso primario
costo relave
costo transporte pellet feed al puerto
angulo interrampa
berma
angulo cara de banco
banco dobles de

103
46
66
79
9
1.61
3.4
3.1
0.32
8
54
11
70
30

US$/dmtu
%
%
%
%
US$/t
US$/t ore
US$/t ore
US$/t ore
US$/t pellet feed

tpd

tpa

US$/tpd

Inversin Total
US$
15,000
45,000,000

Planta
%
25%

Alimentacin a Planta
OX (ao 1-n)
MX
Etapa 1 (ao 1-9)
Etapa 2 (ao 10-21)
Etapa 3(ao 22-n)
PR (ao1-n)

3,000

1,080,000

5,000
20,000
30,000
35,000

1,800,000
7,200,000
10,800,000
12,600,000

15,000
15,000
15,000
15,000

75,000,000
300,000,000
450,000,000
525,000,000

25%
25%
25%
25%

Total

68,000

24,480,000

15,000

1,020,000,000

25%

Ao 0
Ao 7
Ao 8
Ao 17
Ao 18

926,250,000
48,900,000
56,250,000
48,900,000
37,500,000

Inversin I
Equipos
Etapa 2 MX
Equipos
Etapa 3 MX
tpd
Produccin Mina

tpa

400,000 144,000,000

US$/tpd

Inversin Mina
US$
1,913
765,000,000

US$
11,250,000
18,750,000
75,000,000
112,500,000
131,250,000
255,000,000
3750

Ao
0

US$
11,250,000

0 18,750,000
8 56,250,000
18 37,500,000
0 131,250,000