Project name : GREEN VIEW

Project number : 2014-123

Design Note

LOAD OF PROJECT
(AREAR LOAD) Roof
Dead load:
Snow load:

DL =
Ss =
S=

0.72 kPa
2.4 kPa
2.22 kPa

DL =
LL =

1.5 kPa
1.92 kPa

Main Floor (Exterior)


Dead load:
DL =
Live load :
LL =

10.5 kPa
2.22 kPa

Main Floor (Planter)


Dead load:
DL =
Live load :
LL =

16.76 kPa
2.22 kPa

Main Floor (Suit)


Dead load:
Live load :

(LINE LOAD)
Main Floor (For exterior walls_Parallel to party walls)
Dead load:
DL =
10.5 kN/m
Live load :
LL =
18.3 kN/m
Main Floor (For exterior walls_Perpendicular to party walls)
Dead load:
DL =
10.5 kN/m
Live load :
LL =
4.74 kN/m
Main Floor (For Stairwell walls)
Dead load:
DL =
Live load :
LL =
Main Floor (For Party Walls)
Dead load:
DL =
Live load :
LL =

6.79 kN/m
9.34 kN/m

21.01 kPa
36.54 kPa

(POINT LOAD)
Main Floor (For Patio)
Dead load:
DL =
Live load :
LL =
SOIL CONDITION (ASSUMED)
Service bearing capacity:
Ultimate bearing capacity:
DEFLECTION LIMITS :
Conc. Slab

1.4 kN
4.9 kN

150 kPa
225 kPa

Sr =

0.3 kPa

Project name : GREEN VIEW


Project number : 2014-123
Live Load :
Total Load :
CONCRETE STRENGTH

Design Note
L/360
L/240

Spread & strip ftgs


Slab-on-grade
Suspended slabs
Foundation walls
Retaining walls
Other walls
Concrete exposed
All other concrete

25
32
35
25
25
25
32
25

Mpa
Mpa
Mpa
Mpa
Mpa
Mpa
Mpa
Mpa

1.MAIN FLOOR AND FOUNDATION PLAN


A- CHECK PUNCHING SHEAR OF CONC. MAIN SLAB AND SLAB BAND
Member
SLAB
SLAB BAND
SLAB BAND
SLAB BAND

Type
10"
20"
24"
25.5"

Location
MAIN
MAIN
MAIN
MAIN

Span (m)
9.35
5.2
5.2
5.2

Punching Shear Factor


0%
89%
51%
49%

Result
OK
OK
OK
OK

B- CHECK DEFLECTION OF CONC. MAIN SLAB


Member

Type

Location

SLAB
SLAB

10"
10"

MAIN
MAIN

Span
(m)
9.35
9.35

Delfection
Load Case
(mm)
4
Live Load
36.7
Total Load

C- CHECK BEAM

Gravity\Etabs Model\2014-123 GrandView.EDB

D- CHECK COLUMN

Gravity\Etabs Model\2014-123 GrandView.EDB

E- CHECK WALL

Gravity\Etabs Model\2014-123 GrandView.EDB

Factor

Result

15% OK
94% OK

F- CHECK FOOTING
Member
F1
F2
F3
F4
F5
F6
F7
F8

Type
Location
9'-0" x 9'-0" x 18" FOUN.
10'-6" x 10'-6" x 24" FOUN.
11'-6" x 11'-6" x 26" FOUN.
11'-0" x 11'-0" x 24" FOUN.
4'-6"x15'-0"x24" DP FOUN.
7'-0"x15'-0"x24" DP FOUN.
9'-6"x19'-6"x24" DP FOUN.
10'-3"x19'-6"x18" DP FOUN.

Presure
0.82
0.89
0.88
0.85
0.86
0.89
0.77
0.65

Punching
80%
77%
81%
85%
83%
26%
44%
44%

Rebar Moment
120%
119%
122%
122%
120%
133%
133%
124%

Project name : GREEN VIEW


Project number : 2014-123
F9
SF1
SF2

Design Note
11'-5"x20'-6"x24" DP FOUN.
2'-0"x10" DP
FOUN.
3'-6"x10" DP
FOUN.

0.45
0.92
0.88

36%
-

109%
120%
120%

Project name : GREEN VIEW


Project number : 2014-123

Design Note

Project name : GREEN VIEW


Project number : 2014-123

Gravity\Safe Model\2014-123 GrandView _Beam.FDB


Gravity\Safe Model\2014-123 GrandView _Beam.FDB
Gravity\Safe Model\2014-123 GrandView _Beam.FDB
Gravity\Safe Model\2014-123 GrandView _Beam.FDB

Gravity\Safe Model\2014-123 GrandView _Beam.FDB


Gravity\Safe Model\2014-123 GrandView _Beam.FDB

Foundations\Pad Footing\F1 (9'x9')_GL P11-PC .pdf


Foundations\Pad Footing\F2 (10'6x10'6)_GL P10_11-PF.pdf
Foundations\Pad Footing\F3(11'6x11'6)_GL P5_6-PE.pdf
Foundations\Pad Footing\F4(12'0x12'0)_GL P8_9-PE.pdf
Foundations\Pad Footing\F5 (13'x13')_GL P3-4-PC.pdf
Foundations\Pad Footing\F6 (4'6x15')_GL P9_10-PF.pdf
Foundations\Pad Footing\F7 (7'x15')_GL P2-PF.pdf
Foundations\Pad Footing\F8 (10'3x19'6)_GL P12-PC.pdf

Design Note

Project name : GREEN VIEW


Project number : 2014-123
Foundations\Pad Footing\F9 (11'6x20'6)_GL P7-PD_C.pdf