FEEDER PROTECTION

Penyaji :
Ir. Yanuar Hakim, MSc.

DIAGRAM SATU GARIS PEMBANGKIT


TRAFO UNIT

TRANSMISI
SISTEM

GENERATOR

BUS HV

GARDU
INDUK

TRAFO P.S
BUS TM

FEEDER
27-30 Mei 2002

1 2 3 DST

PERLU DIKOORDINASIKAN
RELAI PENGAMAN

OC + GF ANTARA FEEDER TM
DAN INCOMING TM PEMAKAIAN
SENDIRI
GF DI INCOMING TRAFO P.S DAN
PENGAMAN GANGGUAN TANAH DI
TRANSMISI

Kursus "Protection of Industrial Power Systems"

DIAGRAM SATU GARIS PEMBANGKIT


SISTEM
TRAFO P.S

BUS HV

KOORDINASI PROTEKSI TM
DILAKUKAN DENGAN :
PENYETELAN ARUS TIAP FEEDER
DAN INCOMING BERDASARKAN ARUS
BEBANNYA MASING-MASING

BUS TM

1
2
FEEDER

DST

PENYETELAN WAKTU KERJA RELAI,


DIMANA DENGAN RELAI INVERSE
HARUS DENGAN MENGHITUNG ARUS
GANGGUAN DI FEEDER

ARUS GANGGUAN DIHITUNG DENGAN MENGETAHUI


SHORT CIRCUIT LEVEL DI BUS HV
IMPEDANSI, RATIO TRAFO P.S
IMPEDANSI FEEDER

27-30 Mei 2002

Kursus "Protection of Industrial Power Systems"

DIAGRAM SATU GARIS PEMBANGKIT


SISTEM
TRAFO P.S

BUS HV
GANGGUAN TANAH DI TRANSMISI
RELAI TRANSMISI TRIP DENGAN ZONE 1

BUS TM

BETUL !! , TETAPI
RELAI GROUND DI P.S JUGA MENTRIPKAN
INI MENGGANGGU OPERASI KIT

1
2
FEEDER

27-30 Mei 2002

DST

OLEH SEBAB ITU :


.t RELAI GROUND HARUS DISET
SATU GRADE DI ATAS t ZONE 3

Kursus "Protection of Industrial Power Systems"

KOORDINASI RELAI ARUS LEBIH & GROUND


GANGGUAN HUBUNG SINGKAT,

BERBAHAYA BAGI : PERALATAN


MENGGANGGU

: PELAYANAN

PERLU DIKETAHUI BESARNYA


ARUS SEBELUM KEJADIAN
SESUNGGUHNYA.
DALAM PERENCANAAN SISTEM

SPESIFIKASI PMT,KONDUKTOR

DARI SEGI PENGUSAHAAN ,

BESAR ARUS GANGGUAN HUBUNG


TERUTAMA KONTRIBUSINYA :
UNTUK KOORDINASI RELAI

OLEH SEBAB ITU :


DICARIKAN CARA MENGHITUNG YANG MUDAH, CEPAT
SEHINGGA BISA SEGERA DIGUNAKAN
LANGSUNG DAPAT DIPERGUNAKAN SEBAGAI LAPORAN
27-30 Mei 2002

Kursus "Protection of Industrial Power Systems"

KOORDINASI RELAI ARUS LEBIH & GROUND


CARA MENGHITUNG ARUS GANGGUAN HUBUNG SINGKAT
BISA DENGAN MENGGUNAKAN PROGRAM HUBUNG SINGKAT
MASUKKAN DATANYA, RUN PROGRAMNYA DAPAT HASIL
CARA INI MUDAH PELAKSANAANNYA, TAPI
ADA KERUGIANNYA :

KITA TIDAK TAHU CARA HITUNGNYA

AGAR CARA HITUNG DAPAT KITA KUASAI


BISA DIHITUNG DENGAN CARA SEDERHANA MUDAH
MENGGUNAKAN PAKET PROGRAM EXCEL
KARENA

RELEASE ...

PAKET PROGRAM YANG BANYAK DIKENAL STAF PLN


BISA DIPAKAI UNTUK MENGHITUNG KOORDINASI
BISA DILACAK RUMUS YANG DIGUNAKAN
BELAJAR ULANG SETELAH TRAINING

UNTUK ITU PERLU BEKAL ILMU CARA MENGHITUNG


27-30 Mei 2002

Kursus "Protection of Industrial Power Systems"

KOORDINASI RELAI ARUS LEBIH & GROUND


PERHITUNGAN ARUS HUBUNG SINGKAT

UNTUK :

GANGGUAN HUBUNG SINGKAT 3 FASA


GANGGUAN HUBUNG SINGKAT 2 FASA
GANGGUAN HUBUNG SINGKAT SATU FASA KE TANAH
RUMUS DASAR YANG DIGUNAKAN ADALAH HUKUM OHM
I =

I = ARUS GANGGUAN H.S

V = TEGANGAN SUMBER
Z = IMPEDANSI DARI SUMBER
KE TITIK GANGGUAN,
IMPEDANSI EKIVALENT

BIASANYA

27-30 Mei 2002

NILAI IMPEDANSI EKIVALENT INI YANG


MEMBINGUNGKAN PARA PEMULA.

Kursus "Protection of Industrial Power Systems"

KOORDINASI RELAI ARUS LEBIH & GROUND


DARI KETIGA JENIS GANGGUAN, PERBEDAANNYA ADA PADA
UNTUK GANGGUAN 3 FASA : IMPEDANSI YANG DIGUNAKAN
ADALAH IMPEDANSI URUTAN
POSITIF NILAI EKIVALEN Z1
TEGANGANNYA ADALAH E FASA
UNTUK GANGGUAN 2 FASA : IMPEDANSI YANG DIGUNAKAN
ADALAH JUMLAH IMPEDANSI
URUTAN POS. + URUTAN NEG.
NILAI EKIVALEN Z1 + Z2
TEGANGANNYA ADALAH E

FASA-FASA

UNTUK GANGGUAN 1 FASA KE TANAH


IMPEDANSI YANG DIGUNAKAN
ADALAH JUMLAH IMPEDANSI
URUTAN POS. + URUTAN NEG. +
URUTAN NOL
NILAI EKIVALEN Z1 + Z2 + Z0
TEGANGANNYA ADALAH E
27-30 Mei 2002

Kursus "Protection of Industrial Power Systems"

FASA
8

KOORDINASI RELAI ARUS LEBIH & GROUND


BENTUK JARINGAN PERLU DIKETAHUI UNTUK MENGHITUNG
ARUS GANGGUAN HUBUNG SINGKAT
UNTUK DISTRIBUSI YANG DIPASOK DARI GARDU INDUK :
FEEDER 20 KV

SUMBER KIT

BUS
150 KV

DARI SISTEM
150 KV, P3B
AMBIL DATA
SCC LEVEL
HITUNG
Z SUMBER
27-30 Mei 2002

TRAFO
DAYA

DI GARDU
INDUK
AMBIL DATA
IMPEDANSI
MVA, KV dll

AMBIL
DATA Z
100%

BUS
20 KV
HITUNG
25% Z

Z POS.
Z NOL
HITUNG
50% Z

UNTUK
SIMULASI
LOKASI GANG.

Kursus "Protection of Industrial Power Systems"

HITUNG
75% Z
9

KOORDINASI RELAI ARUS LEBIH & GROUND


MEWAKILI SEKIAN BANYAK SUMBER PEMBANGKIT
YANG ADA DI DALAM SISTEM 150 KV
TERMASUK DI DALAMNYA :
SUMBER KIT

IMPEDANSI SUMBER PEMBANGKIT.


IMPEDANSI TRAFO UNIT
IMPEDANSI TRANSMISI

SEPERTI CONTOH BERIKUT :

Trafo
unit

transmisi
KIT 1 Trafo
unit

KIT 3

27-30 Mei 2002

transmisi
Trafo
unit

KIT 2
transmisi

G.I A

transmisi

Kursus "Protection of Industrial Power Systems"

10

KOORDINASI RELAI ARUS LEBIH & GROUND


BAGAIMANA MENGHITUNG IMPEDANSI SUMBER ?
SHORT CIRCUIT LEVEL DI BUS 150 KV (MVA) MINTA KE PLN P3B
UNTUK APA ?

KV 2
DAPAT DIHITUNG IMPEDANSI SUMBER
DENGAN RUMUS
MVA
MISALKAN SHORT CIRCUIT LEVEL DI BUS 150 KV G.I A = 500 MVA
MAKA, XS =

150 2
500

= 45 OHM INGAT NILAI INI DI SISI 150 KV

KARENA AKAN MENGHITUNG I GANGGUAN SISI 20 KV, MAKA


IMPEDANSI DI SISI 150 KV, TRANSFER KE SISI 20 KV CARANYA
150 KV

27-30 Mei 2002

45 OHM

20 KV
20 KV

Kursus "Protection of Industrial Power Systems"

11

KOORDINASI RELAI ARUS LEBIH & GROUND


DASAR HITUNGANNYA
DAYA DI SISI 150 KV = DAYA DI SISI 20 KV
MVA SISI 150 = MVA SISI 20 KV
KV1 2
Z1

KV2 2
Z2

KALAU KV1 = 150 KV DAN Z1 = 45 OHM, DAN KV2 = 20 KV


MAKA

Z2

=
=

20 KV

27-30 Mei 2002

0.8 OHM

20
150

2
2

x 45 OHM

0.8 OHM, SEHINGGA GAMBARNYA


IMPEDANSI INI BERLAKU
UNTUK URUTAN POSITIF
DAN NEGATIF

Kursus "Protection of Industrial Power Systems"

12

KOORDINASI RELAI ARUS LEBIH & GROUND


MENGHITUNG REAKTANSI TRAFO TENAGA DI G.I
CONTOH

TRAFO TENAGA DENGAN DATA :


DAYA = 10 MVA RATIO TEGANGAN 150/20 KV
REAKTANSI = 10 %

PERHITUNGAN :
IMPEDANSI DASAR PADA TRAFO (100 % ) SISI 20 KV
ZB =

20 KV

10 MVA

= 40 OHM

REAKTANSI TRAFO = 10 %
XT = 10 % x 40 OHM
=
27-30 Mei 2002

4 OHM

REAKTANSI YANG DIHASILKAN


ADALAH REAKTANSI URUTAN
POSITIF DAN NEGATIF.

Kursus "Protection of Industrial Power Systems"

13

KOORDINASI RELAI ARUS LEBIH & GROUND


REAKTANSI URUTAN NOL TRAFO
MEMPERHATIKAN ADA ATAU TIDAKNYA BELITAN DELTA
KAPASITAS DELTA SAMA DENGAN KAPASITAS BINTANG
NILAI XT 0 = XT 1 BERLAKU PADA TRAFO UNIT
PADA CONTOH XT 0 = 4 OHM

TRAFO TENAGA DI G.I DENGAN HUBUNGAN Yy BIASANYA


PUNYA BELITAN DELTA DENGAN KAPASITAS SEPERTIGA x
KAPASITAS PRIMER (SEKUNDER)
NILAI XT 0 = 3 x XT 1
PADA CONTOH XT 0 = 3 x 4 OHM = 12 OHM
TRAFO TENAGA DI G.I DENGAN HUBUNGAN Yy YANG TIDAK
PUNYA BELITAN DELTA DI DALAMNYA
NILAI XT 0 = BERKISAR ANTARA 9 S/D 14 KALI XT 1
PADA CONTOH HITUNGAN DIAMBIL NILAI XT 0 = 10 x XT 1
= 10 x 4 OHM
27-30 Mei 2002

Kursus "Protection of Industrial Power Systems"

= 40 OHM

14

KOORDINASI RELAI ARUS LEBIH & GROUND


IMPEDANSI FEEDER
DATA IMPEDANSI FEEDER DIDAPAT

DIHITUNG
DARI TABEL
PER KM

IMPEDANSI FEEDER

PANJANG FEEDER

x Z PER KM

SIMULASIKAN LOKASI GANGGUAN


PER

25 %

50 % 75 % 100 % x PANJANG FEEDER

ATAU

PER

10 % 20 % 30 % . . . . . 100 % x PANJANG FEEDER

CONTOH PERHITUNGAN, MENGAMBIL IMPEDANSI FEEDER


IMPEDANSI URUTAN POSITIF = IMPEDANSI URUTAN NEGATIF
= ( 0.12 + j 0.23 ) OHM/ KM
27-30 Mei 2002

Kursus "Protection of Industrial Power Systems"

15

KOORDINASI RELAI ARUS LEBIH & GROUND


IMPEDANSI FEEDER URUTAN NOL

= ( 0.18 + j 0.53 ) OHM/KM

PANJANG FEEDER DALAM CONTOH = 10 KM


SEHINGGA :
IMPEDANSI URUTAN POSITIF DAN URUTAN NEGATIF UNTUK
FEEDER, DIHITUNG
U/ %
IMPEDANSI Z1 , Z2
PANJANG
25 %

0.25 x10 KM x (0.12 + j 0.23) OHM/KM =(0.3 + j 0.575) OHM

50 %

0.50 x10 KM x (0.12 + j 0.23) OHM/KM = (0.6 + j 1.150) OHM

75 %

0.75 x10 KM x (0.12 + j 0.23) OHM/KM = (0.9 + j 1.725) OHM

100 %

1.00 x10 KM x (0.12 + j 0.23) OHM/KM = (1.2 + j 2.3) OHM

27-30 Mei 2002

Kursus "Protection of Industrial Power Systems"

16

KOORDINASI RELAI ARUS LEBIH & GROUND


IMPEDANSI URUTAN NOL FEEDER, DIHITUNG
U/ %
PANJANG

IMPEDANSI Z0

25 %

0.25 x10 KM x(0.18 + j 0.53) OHM/KM = (0.45 + j 1.325) OHM

50 %

0.50 x10 KM x(0.18 + j 0.53) OHM/KM = (0.90 + j 2.650) OHM

75 %

0.75 x10 KM x(0.18 + j 0.53) OHM/KM = (1.35 + j 3.975) OHM

100 %

1.00 x10 KM x(0.18 + j 0.53) OHM/KM = (1.8 + j 5.300) OHM

MENGHITUNG IMPEDANSI EKIVALEN


Z1 eki DAN Z2 eki DAPAT LANGSUNG DIHITUNG SESUAI LOKASI
GANGGUAN, DENGAN MENJUMLAHKAN ZS + ZT + % ZL
27-30 Mei 2002

Kursus "Protection of Industrial Power Systems"

17

KOORDINASI RELAI ARUS LEBIH & GROUND


HITUNGAN Z1 eki DAN Z2 eki
Z1 eki = Z2 eki

= Z1S + Z1T t + Z1 FEEDER

INGAT HITUNGAN
IMPEDANSI SUMBER
=

INGAT HITUNGAN
IMPEDANSI TRAFO

TERGANTUNG
LOKASI GANG.

j 0.8+ j 4.0 + Z1 FEEDER

= j 4.8 + Z1 FEEDER
U/ %
PANJANG

IMPEDANSI Z1 , Z2 eki

25 %

j 4.8 + (0.3 + j 0.575) OHM = (0.3 + j 5.375) OHM

50 %

j 4.8 + (0.6 + j 1.150) OHM = (0.6 + j 5.950) OHM

75 %

j 4.8 + (0.9 + j 1.725) OHM = (0.9 + j 6.525) OHM

100 %

j 4.8 + (1.20 + j 2.30) OHM = (1.2 + j 7.100) OHM

27-30 Mei 2002

Kursus "Protection of Industrial Power Systems"

18

KOORDINASI RELAI ARUS LEBIH & GROUND


HITUNGAN

Z0

HITUNGAN DIDASARKAN PADA SISTEM PENTANAHAN NETRAL


SISTEM PASOKAN DARI G.I
Z0 DIHITUNG

PENTANAHAN TAHANAN 40 OHM

MULAI DARI TRAFO YANG DITANAHKAN


TAHANAN NETRAL NILAI 3 RN
IMPEDANSI FEEDER

TRAFO DI G.I UMUMNYA PUNYA BELITAN DELTA KAP. 1/3


X0 TRAFO = 3 x X1 TRAFO
= 3 x j 4.0 = j 12 OHM
3 RN = 3 x 40 = 120 OHM
Z0 FEEDER =
27-30 Mei 2002

% panjang x Z0 total
Kursus "Protection of Industrial Power Systems"

19

KOORDINASI RELAI ARUS LEBIH & GROUND


PERHITUNGAN Z0 EKIVALEN
Z0 eki

Z0 T + 3 RN + Z0 FEEDER

INGAT HITUNGAN
Z0 TRAFO
=
U/ %
PANJANG

INGAT TAHANAN
PENTANAHAN

TERGANTUNG
LOKASI GANG.

j 12 + 120 + Z0 FEEDER
IMPEDANSI Z0 eki

25 %

j12 + 120 + (0.45 + j 1.325) OHM= (120.45 + j 13.325) OHM

50 %

j12 + 120 + (0.90 + j 2.650) OHM= (120.90 + j 14.650) OHM

75 %

j12 + 120 + (1.35 + j 3.975) OHM= (121.35 + j 15.975) OHM

100 %

j12 + 120 + (1.80 + j 5.300) OHM= (121.80 + j 17.300) OHM

27-30 Mei 2002

Kursus "Protection of Industrial Power Systems"

20

KOORDINASI RELAI ARUS LEBIH & GROUND


PERHITUNGAN ARUS GANGGUAN :
GANGGUAN TIGA FASA : RUMUSNYA : I =

V
Z

V = TEGANGAN FASA - NETRAL


Z = IMPEDANSI Z1 ekivalen
GANGGUAN DI 25% PANJANG FEEDER

I =

20.000/ 3
(0.3 + j 5.375)

IMPEDANSI MASIH
DALAM KOMPLEKS
KARENA DIAMBIL MAGNITUTE
I =

27-30 Mei 2002

20.000/ 3
(0.32 + 5.3752 )

2144.9 AMPER

Kursus "Protection of Industrial Power Systems"

21

KOORDINASI RELAI ARUS LEBIH & GROUND


SECARA LENGKAP DIBUAT HITUNGAN ARUS H.S 3 FASA:
U/ GANGG. DI
% PANJANG
25 %

ARUS GANGGUAN 3 FASA


I =

50 %

I =

75 %

I =

100 %

27-30 Mei 2002

I =

20.000/ 3
(0.32 + 5.3752 )
20.000/ 3
(0.62 + 5.9502 )
20.000/ 3
(0.92

6.5252

20.000/ 3
(1.22 + 7.1002 )

2144.9 AMPER

1930.9 AMPER

1753.06 AMPER

1603.60 AMPER

Kursus "Protection of Industrial Power Systems"

22

KOORDINASI RELAI ARUS LEBIH & GROUND


PERHITUNGAN ARUS GANGGUAN :
GANGGUAN DUA FASA :

RUMUSNYA : I =

V
Z

V = TEGANGAN FASA - FASA


Z = IMPEDANSI ( Z1 + Z2 ) ekivalen
GANGGUAN DI 25% PANJANG FEEDER

I =

20.000
2 x (0.3 + j 5.375)

IMPEDANSI MASIH
DALAM KOMPLEKS
KARENA DIAMBIL MAGNITUTE
I =

27-30 Mei 2002

20.000
(2x0.3)2 + (2x5.375)2

1857.6 AMPER

Kursus "Protection of Industrial Power Systems"

23

KOORDINASI RELAI ARUS LEBIH & GROUND


SECARA LENGKAP DIBUAT HITUNGAN ARUS H.S 2 FASA:
U/ GANGG. DI
% PANJANG
25 %

ARUS GANGGUAN 2 FASA


I =

50 %

I =

75 %

I =

100 %

27-30 Mei 2002

I =

20.000
(2x0.3)2 + (2x5.375)2
20.000
(2x0.6)2 + (2x5.950)2
20.000
(2x0.9)2

(2x6.525)2

20.000
(2x1.2)2 + (2x7.10)2

1857.6 AMPER

1672.2 AMPER

1518.2 AMPER

1388.8 AMPER

Kursus "Protection of Industrial Power Systems"

24

KOORDINASI RELAI ARUS LEBIH & GROUND


PERHITUNGAN ARUS GANGGUAN :
GANGGUAN SATU FASA KE TANAH: RUMUSNYA :

I =

V
Z

V = 3 x TEGANGAN FASA - NETRAL


Z = IMPEDANSI ( Z1 + Z2 + Z0 )ekivalen
GANGGUAN DI 25% PANJANG FEEDER
3 x 20.000/ 3
I =
2 x (0.3 + j 5.375) + 120.45 +j 13.325
KARENA DIAMBIL MAGNITUTE
I =

IMPEDANSI MASIH
DALAM KOMPLEKS

3 x 20.000/ 3
(2x0.3 + 120.45)2 + (2x5.375 + 13.325)2

27-30 Mei 2002

Kursus "Protection of Industrial Power Systems"

280.74 AMPER

25

KOORDINASI RELAI ARUS LEBIH & GROUND


SECARA LENGKAP DIBUAT HITUNGAN ARUS H.S 1 FASA KE TANAH:
U/ GANGG. DI
% PANJANG
25 %

I =

50 %

I =

75 %

I =

100 %

I =

27-30 Mei 2002

ARUS GANGGUAN 1 FASA KE TANAH


3 x 20.000/ 3
(2x0.3 + 120.45)2 + (2x5.375 + 13.325)2
3 x 20.000/ 3
(2x0.6 + 120.9)2 + (2x5.950 + 14.65)2
3 x 20.000/ 3
(2x0.9 +

121.35)2

+ (2x6.525 +

15.975)2

3 x 20.000/ 3
(2x1.2 + 121.8)2 + (2x7.10 + 17.3)2

Kursus "Protection of Industrial Power Systems"

= 280.67 A

= 277.23 A

= 273.79 A
= 270.35 A

26

KOORDINASI RELAI ARUS LEBIH & GROUND


INGAT BENTUK JARINGAN YANG DIHITUNG ARUS GANGGUAN
HUBUNG SINGKATNYA ?
JARINGAN DISTRIBUSI YANG DIPASOK DARI GARDU INDUK :
SETELAN RELAI YANG DITINJAU

LIHAT Ibeban

FEEDER 20 KV

SUMBER KIT
DARI SISTEM
150 KV, P3B

BUS
150 KV

TRAFO
DAYA

BUS
20 KV

25% Z

75% Z
50% Z

100% Z

SIMULASI
LOKASI GANG.
27-30 Mei 2002

Kursus "Protection of Industrial Power Systems"

27

KOORDINASI RELAI ARUS LEBIH & GROUND


BAGAIMANA MENGHITUNG SETELAN RELAI ?
RELAI JENIS APA YANG DIGUNAKAN ?
DEFINITE TIME ? MUDAH !! TAPI KOMULASI WAKTU BESAR
INVERSE TIME ? SULIT !! TAPI BISA TEKAN KOMULASI WAKTU
CARA HITUNG DENGAN INVERSE TIME AGAR DIKUASAI,
Ibeban UNTUK HITUNG SETELAN ARUS

DASAR HITUNG :

Igangguan UNTUK HITUNG SETELAN WAKTU,


SETELAN ARUS : 1,05 x Ibeban
SETELAN WAKTU :
.t =

27-30 Mei 2002

BERDASARKAN RUMUS INVERSE

0.14 x tms
Ifault
Iset

0.02

- 1

NORMAL INVERSE
.t = WAKTU KERJA (DET)
.tms = TIME MULTIPLE SETTING
Kursus "Protection of Industrial Power Systems"

28

KOORDINASI RELAI ARUS LEBIH & GROUND


PERHITUNGAN SETTING RELAI ARUS LEBIH
SETTING RELAI ARUS LEBIH MULAI DARI RELAI PALING HILIR
FEEDER 20 KV :
MISAL ARUS BEBAN FEEDER = 100 AMPER
RATIO C.T = 150 : 5 AMPER
SETELAN ARUS FEEDER 20 KV
SETELAN ARUS (PRIMER)

= 1,05 x 100 AMPER


= 105 AMPER

SETELAN ARUS (SEKUNDER) = 105 x


= 105 x

1
RATIO C.T
5
150

= 3.5 AMPER
27-30 Mei 2002

Kursus "Protection of Industrial Power Systems"

29

KOORDINASI RELAI ARUS LEBIH & GROUND


SETELAN WAKTU RELAI FEEDER 20 KV
RELAI INVERSE WAKTU KERJA TERGANTUNG DARI ARUS (Ifault)
WAKTU KERJA : PALING HILIR DITETAPKAN = 0.3 DETIK
DENGAN RUMUS INVERSE
0.14 x tms
.t =
Ifault 0.02
- 1
Iset
0.3 =

0.14 x tms
2144.9
105

0.02

- 1

Ifault DIAMBIL UNTUK GANGGUAN


3 FASA DI 25% Pj FEEDER
DARI ANGKA YANG DIMASUKKAN
KE DALAM RUMUS, NILAI tms
DAPAT DIHITUNG.

.tms = 0.13

27-30 Mei 2002

Kursus "Protection of Industrial Power Systems"

30

KOORDINASI RELAI ARUS LEBIH & GROUND


INCOMING 20 KV :
ARUS BEBAN TRAFO DIHITUNG DARI KAPASITAS TRAFO
KAPASITAS TRAFO = 10 MVA , In SISI 20 KV = 288.7 A
RATIO C.T YANG DIGUNAKAN = 400 : 5 AMPER
SETELAN ARUS RELAI INCOMING 20 KV
SETELAN ARUS (PRIMER)

= 1,05 x 288.7 AMPER


= 303.1 AMPER

SETELAN ARUS (SEKUNDER) = 303.1 x


= 303.1 x

1
RATIO C.T
5
400

= 3.795 AMPER

27-30 Mei 2002

Kursus "Protection of Industrial Power Systems"

31

KOORDINASI RELAI ARUS LEBIH & GROUND


SETELAN WAKTU RELAI INCOMING 20 KV
RELAI INVERSE WAKTU KERJA TERGANTUNG DARI ARUS (Ifault)
WAKTU KERJA INCOMING :SELEKTIFITAS DIDAPAT DENGAN :
WAKTU KERJA RELAI DISISI HILIR + 0.4 DETIK :
.t INCOMING = ( 0.3 + 0.4 ) DETIK :
DENGAN RUMUS INVERSE
0.14 x tms
.t =
Ifault 0.02
- 1
Iset
0.7 =

0.14 x tms
2144.9
303.1

0.02

- 1

UNTUK GANG. DI 25%

Ifault DIAMBIL UNTUK GANGGUAN


3 FASA DI 25% Pj FEEDER
DARI ANGKA YANG DIMASUKKAN
KE DALAM RUMUS, NILAI tms
DAPAT DIHITUNG.

.tms = 0.2
27-30 Mei 2002

Kursus "Protection of Industrial Power Systems"

32

KOORDINASI RELAI ARUS LEBIH & GROUND


PERHITUNGAN SETTING RELAI GANGGUAN TANAH
SETTING RELAI GANGGUAN TANAH MULAI DARI RELAI PALING HILIR
FEEDER 20 KV :
RATIO C.T = 150 : 5 AMPER

DARI HASIL HITUNGAN


TERDAHULU

SETTING ARUS RELAI GANG. TANAH FEEDER 20 KV


BERDASARKAN ARUS GANGGUAN TANAH TERKECIL (270.4 A)
YAITU SEBESAR 10% x ARUS GANGGUAN TANAH TERKECIL
UNTUK MENAMPUNG TAHANAN BUSUR
SETELAN ARUS (PRIMER)

= 10% x 270.4 AMPER


= 27.04 AMPER

SETELAN ARUS (SEKUNDER) = 27.04 x


= 27.04 x

RATIO C.T
5

150
= 0.9 AMPER

27-30 Mei 2002

Kursus "Protection of Industrial Power Systems"

33

KOORDINASI RELAI ARUS LEBIH & GROUND


SETELAN WAKTU RELAI GANGGUAN TANAH FEEDER 20 KV
RELAI INVERSE WAKTU KERJA TERGANTUNG DARI ARUS (Ifault)
WAKTU KERJA : PALING HILIR DITETAPKAN = 0.3 DETIK
DENGAN RUMUS INVERSE
0.14 x tms
.t =
Ifault 0.02
- 1
Iset
0.3 =

0.14 x tms
280.67
27.04

0.02

- 1

Ifault DIAMBIL UNTUK GANGGUAN 1


FASA-TANAH DI 25% Pj FEEDER
DARI ANGKA YANG DIMASUKKAN
KE DALAM RUMUS, NILAI tms
DAPAT DIHITUNG.

.tms = 0.1

27-30 Mei 2002

Kursus "Protection of Industrial Power Systems"

34

KOORDINASI RELAI ARUS LEBIH & GROUND


INCOMING 20 KV :
CATATAN : SETELAN ARUS RELAI GANGGUAN TANAH DI
INCOMING 20 KV HARUS LEBIH SENSITIVE
FUNGSINYA : CADANGAN BAGI RELAI DI FEEDER 20 KV
DIBUAT 8% x ARUS GANGGUAN TANAH TERKECIL
RATIO C.T YANG DIGUNAKAN = 400 : 5 AMPER
SETELAN ARUS RELAI GANG. TANAH INCOMING 20 KV
SETELAN ARUS (PRIMER)

= 8% x 270.4 AMPER
= 21.63 AMPER

SETELAN ARUS (SEKUNDER) = 21.63 x


= 21.63 x

1
RATIO C.T
5
400

= 0.27 AMPER
27-30 Mei 2002

Kursus "Protection of Industrial Power Systems"

35

KOORDINASI RELAI ARUS LEBIH & GROUND


SETELAN WAKTU RELAI GANGGUAN TANAH INCOMING 20 KV
RELAI INVERSE WAKTU KERJA TERGANTUNG DARI ARUS (Ifault)
WAKTU KERJA INCOMING :SELEKTIFITAS DIDAPAT DENGAN :
WAKTU KERJA RELAI DI SISI HILIR + 0.4 DETIK :
.t INCOMING = ( 0.3 + 0.4 ) DETIK :
DENGAN RUMUS INVERSE
0.14 x tms
.t =
Ifault 0.02
- 1
Iset
0.7 =

0.14 x tms
280.67
21.63

0.02

- 1

UNTUK GANG. DI 25%

Ifault DIAMBIL UNTUK GANG. 1 FASA-TANAH DI 25% Pj FEEDER


DARI ANGKA YANG DIMASUKKAN
KE DALAM RUMUS, NILAI tms
DAPAT DIHITUNG.

.tms = 0.26
27-30 Mei 2002

Kursus "Protection of Industrial Power Systems"

36

KOORDINASI RELAI ARUS LEBIH & GROUND


NILAI SETELAN INI HARUS DIUJI SELEKTIFITASNYA
PADA NILAI ARUS GANGGUAN LAIN, YAITU :
PADA 25%, 50%, 75% DAN 100% PANJANG FEEDER :
CARANYA ?
.t =

GUNAKAN RUMUS INVERSE


0.14 x tms
Ifault
Iset

0.02

- 1

MASUKKAN NILAI tms RELAI


FEEDER ATAU INCOMING
MASUKKAN NILAI Iset RELAI
FEEDER ATAU INCOMING

MASUKKAN NILAI Ifault SESUAI


LOKASI GANGG. YANG DITINJAU
MAKA WAKTU KERJA RELAI t DAPAT DIHITUNG
PERIKSA SELISIH WAKTU KERJA RELAI
FEEDER DAN WAKTU KERJA INCOMING
27-30 Mei 2002

> 0.4 DETIK, KERJA


RELAI SELEKTIF

Kursus "Protection of Industrial Power Systems"

37

KOORDINASI RELAI ARUS LEBIH & GROUND


CONTOH :
.t =

GUNAKAN RUMUS INVERSE UNTUK RELAI FEEDER


0.14 x tms
Ifault
Iset

0.02

- 1

MASUKKAN NILAI tms


RELAI FEEDER
MASUKKAN NILAI Iset
RELAI FEEDER

MASUKKAN NILAI Ifault UNTUK


GANGG. PADA 25% PJ FEEDER
MAKA WAKTU KERJA RELAI FEEDER t DAPAT DIHITUNG
.t =

.t =
27-30 Mei 2002

0.14 x 0.13
2144.9
105
0.3

0.02

- 1

HITUNG PULA WAKTU


KERJA RELAI UNTUK
ARUS GANGGUAN DI
LOKASI 50%, 75%, DAN
100% PJ FEEDER

Kursus "Protection of Industrial Power Systems"

38

KOORDINASI RELAI ARUS LEBIH & GROUND


SELANJUTNYA : GUNAKAN RUMUS INVERSE UNTUK RELAI INCOMING
.t =

0.14 x tms
Ifault
Iset

0.02

- 1

MASUKKAN NILAI tms


RELAI INCOMING
MASUKKAN NILAI Iset
RELAI INCOMING

MASUKKAN NILAI Ifault UNTUK


GANGG. PADA 25% PJ FEEDER
MAKA WAKTU KERJA RELAI FEEDER t DAPAT DIHITUNG
.t =

.t =
27-30 Mei 2002

0.14 x 0.2
2144.9
303.1
0.7

0.02

- 1

HITUNG PULA WAKTU


KERJA RELAI UNTUK
ARUS GANGGUAN DI
LOKASI 50%, 75%, DAN
100% PJ FEEDER

Kursus "Protection of Industrial Power Systems"

39

KOORDINASI RELAI ARUS LEBIH & GROUND


SECARA LENGKAP HASIL HITUNGAN WAKTU KERJA DIBUAT TABEL

GANGG. DI
% PANJANG

WAKTU KERJA RELAI ( DETIK )


3 FASA

2 FASA 1 FASA

3 FASA

2 FASA

1 FASA

25 %

0.70

0.76

0.70

0.30

0.32

0.30

50 %

0.74

0.80

0.70

0.31

0.33

0.30

75 %

0.78

0.85

0.71

0.32

0.34

0.30

100 %

0.82

0.90

0.71

0.33

0.35

0.30

27-30 Mei 2002

Kursus "Protection of Industrial Power Systems"

40

KOORDINASI RELAI ARUS LEBIH & GROUND


KHUSUS PEMERIKSAAN WAKTU PADA RELAI GANGGUAN TANAH:
TIDAK MEMASUKKAN ARUS KAPASITIF
BISA MENYEBABKAN SIMPATETIK TRIP ? ?
PEMERIKSAAN WAKTU KERJA

PERLU DILANJUTKAN

ARUS ICE SEWAKTU GANGGUAN TANAH


MASUK KE GF RELAY

BAGIAN DARI I0

BISA MENTRIPKAN PMT

PENJELASANNYA ?

DIJELASKAN PADA URAIAN BERIKUT ! !