S.No.

DESCRIPTION

D TIME (m)

1.

Collect tool set

2.

Collect MS rod

15

3.

Mark length needed

4.

Rod to rod cutting machine

5.

Cutting of rod

45

6.

Facing

10

7.

Drilling

40

8.

Turning

120

9.

Checking dimension

10.

To horizontal milling machine

11.

Setting the machine

12.

Gear cutting

120

13.

Boring

20

TOTAL TIME (min) : O 355

2
*

30

5
*

25

30

10

D 70

CENTRAL WORKSHOPS

Model No:

Title: Spur Gears


Figure No.

O -OPERATION

- INSPECTION

PROCESS CHART
Type: Man/Machine
Charted by:
Dated:21-4-2014
-TRANSPORT

D DELAY

- STORAGE

EVENT PERFORMED ON------IS UPTO SERIAL NO. ..

SHEET NO..OF .

S.No.

DESCRIPTION

D TIME (m)

1.

Collect tool set

2.

Collect MS rod

15

3.

Mark length needed

4.

Rod to rod cutting machine

5.

Cutting of rod

45

6.

Facing

10

7.

Drilling

40

8.

Turning

120

9.

Checking dimension

10.

To horizontal milling machine

11.

Setting the machine

12.

Gear cutting

TOTAL TIME (min) : O

*
*

2
*

25

30

335

30

10
120

D 70

CENTRAL WORKSHOPS

Model No:

PROCESS CHART

Title: Shafts
Figure No.

O -OPERATION

Type: Man/Machine
Charted by:
Dated: 21-4-2014

- INSPECTION

-TRANSPORT

D DELAY

- STORAGE

EVENT PERFORMED ON------IS UPTO SERIAL NO. ..

SHEET NO..OF .

S.No.

DESCRIPTION

D TIME (m)

Collect tool set

Collect ms rod

Mark required dimension

to fitting shop

Fixing in the benchwise

Collect hacksaw

Rod cutting

To lathe

Turning

10

Dimension checking

TOTAL TIME (min) : O 132

2
*

2
90

10
40

12

30

D 40

CENTRAL WORKSHOPS

Model No:

PROCESS CHART

Title: Framework
Figure No.

O -OPERATION

- INSPECTION

Type: Man/Machine
Charted by:
Dated:21-4-2014
-TRANSPORT

D DELAY

- STORAGE

EVENT PERFORMED ON------IS UPTO SERIAL NO. ..

SHEET NO..OF .

S.No.

DESCRIPTION

D TIME (m)

Collecting plywood and wooden columns

Collect tool set

Marking required dimension

To carpentry

Cutting using jigsaw

Checking dimension

To drilling machine

Drilling

20

Filing

15

10

Fitting bearing

40

TOTAL TIME (min) : O 105

60
*

15
*

30
*

5
*

20

65

30

D30

CENTRAL WORKSHOPS

Model No:

PROCESS CHART

Title: Wooden Columns


Figure No.

O -OPERATION

- INSPECTION

Type: Man/Machine
Charted by:
Dated:21-4-14
-TRANSPORT

D DELAY

- STORAGE

EVENT PERFORMED ON------IS UPTO SERIAL NO. ..

SHEET NO..OF .

S.No.

DESCRIPTION

D TIME (m)

Collect tool set

Collect wooden planks

Plaining of surface

Marking of dimension

Cutting into desired shapes

To drilling machine

Drilling

30

Making slot

10

TOTAL TIME (min) : O 125

*
*

10

10
*

75
*

15

30

D30

CENTRAL WORKSHOPS

Model No:

PROCESS CHART

Title: Slotted lever


Figure No.

O -OPERATION

Type: Man/Machine
Charted by:
Dated:21-4-14

- INSPECTION

-TRANSPORT

D - DELAY

- STORAGE

EVENT PERFORMED ON------IS UPTO SERIAL NO. ..

SHEET NO..OF .

S.No.

DESCRIPTION

D TIME (m)

Collect tool set

Collect ms rod

Mark dimension

To rod cutting maching

Cutting

To Drilling machine

Drilling

To fitting

To welding centre

10

Welding

TOTAL TIME (min) : O 40

20
*

15

30

D30

CENTRAL WORKSHOPS

Model No:

PROCESS CHART

Title:Assembly
Figure No.

O -OPERATION

- INSPECTION

Type: Man/Machine
Charted by:
Dated:21-4-14
-TRANSPORT

D - DELAY

- STORAGE

EVENT PERFORMED ON------IS UPTO SERIAL NO. ..

SHEET NO..OF .

S.No.

DESCRIPTION

D TIME (m)

Collect nails and L-clamp

Fixing shaft in plywood

10

Welding gear to shaft

12

Mark dimensions

Fixing clamps

20

Welding crank to shaft

15

Assembling quick return components

20

Hammering

10

Fixing handle

10

Painting

60

TOTAL TIME (min) : O 152

30

30

D0

CENTRAL WORKSHOPS

Model No:

Title: Transporter link


Figure No.

O -OPERATION

- INSPECTION

PROCESS CHART
Type: Man/Machine
Charted by:
Dated:21-4-14
-TRANSPORT

D DELAY

- STORAGE

EVENT PERFORMED ON------IS UPTO SERIAL NO. ..

SHEET NO..OF .

S.No.

DESCRIPTION

D TIME (m)

Collect tool set

Collect wooden planks

Plaining of surface

Marking of dimension

Cutting into desired shapes

To drilling machine

Drilling

30

Making slot

10

TOTAL TIME (min) : O 125

*
*

10

10
*

75
*

15

30

D 30