Anda di halaman 1dari 2

PENGALIRAN DI ATAS VEE NOTCH

No
)
1
2
3
1.204
4
1.279
5
1.342
6
1.398

Volume
Q
2
84.00
2
56.00
2
48.00

(L) Waktu
(mm3/det)
10
23.810
13
35.714
16
41.667

(detik)
H5/2
Cd
Q2/5
316.228 0.002 3554
609.338 0.002 4180
1024.000
0.001

H
Log Q
1.377
1.553
4445

(mm
Log H
1.000
1.114
1.620

29.00

19

68.966 1573.563

0.002

5438

1.839

20.00

22

100.000 2270.161

0.002

6310

2.000

12.00

25

166.667 3125.000

0.003

7740

2.222

Lebar weir = 64 mm
"Medan,"
Pengambilan Data Oleh :
Group : IX ( Sembilan)
1. M. Fadhlan Azhari
2. Syahid A. Hidayatulla
h
Asisten

3. Robi Martin
4. Rudi Dharma
5. Sabaruddin Angkat

( Oktana Luviatu Mul Never )

No.
H
1
10
2
13
17.5
3
16
A
558.915
4
19
4873.301
5
22
5682.248
6
25

Q2/5
3554
4180
B
4445

(x-x')
-7.5
-4.5
269.649
-1.5

5438

1.5

(y-y') (x-x')2 (x-x')(y-y')


-1723.9 56.3
12929.4
4179.6 20.3
-18808.3
y
3255.406
4445.4 2.3
-6668.2
4064.353
5438.2 2.3
8157.3

6310

4.5

6309.6 20.3

28393.1

7740

7.5

2462.2 56.3

18466.5

?
?

5277.774

6491.195
?
105
7300.142

31667

0.000

21111.1 157.5

269.6490889
-546.2406322

42469.7

Anda mungkin juga menyukai