3.

Tahap Perhitungan

3.1. Data perhitungan

3.1.1 Spesipikasi Bahan

a. Mutu Beton
* Tie bem,Pile Cap,Dinding Basemen

fc'

24.9 Mpa

(K-300)

* Kolom,Shear Wall

fc'

33.2 Mpa

(K-400)

* Pelat,Balok,Tangga

fc'

24.9 Mpa

(K-300)

* Tiang Pancang

fc'

41.5 Mpa

(K-500)

* Tiang Bor

fc'

24.9 Mpa

(K-300)

fy

240 Mpa

fy

400 Mpa

fy

240 Mpa

Ec

fc'

24.9 Mpa

fc'

33.2 Mpa

b. Mutu Baja Tulangan


* BJTP U-24

10

* BJTD U-40

10

13

16

19

22

25

c. Mutu Baja Profil


*SS41 atau BJ37

d. Modulus Elastis Beton (Ec)

:
Ec

21409.52

Mpa

Ec

27081.14

Mpa

:
:

4700.f'c

a. Beban Mati
*Beton Bertulang

2400 kg/m3

*Pasir

1800 kg/m3

*Tanah urug )*

1700 kg/m3

*Tembok Bata dengan ketebalan 15 cm

250 kg/m3

*Mekanikal/ Electrical

30 kg/m3

*Adukan Mortar Penutup Lantai

2000 kg/m3

*Air

1000 kg/m3

*Penutup Lantai Finishing

108 kg/m3

( dari ubin, semen, traso, kramik)

b. Beban Hidup
* Menurut Pedoman Perencanaan Pembebanan untukgedung 1987 yaitu(Hotel)
:

c. Beban Gempa
* Beban Geser Dasar (base shear)
V

C1xIxWt
R

Beban geser dasar nominal statik ekuivalen akibad pengaruh gempa

250 kg/m2

rencana
C1

Nilai factor respons gempa yang didapat dari Spectrum Respons gempa
rencana untuk waktu getar alami fundamental dari struktur gedung .

Faktor keutamaan=

1.0 (Hotel)

Wt

Berat total gedung, termasuk beban hidup yang sesuai.

Faktor reduksi gempa, yaitu rasio antara beban gempa maximum akibad
pengaruh gempa rencana terhadap struktur gedung daktail.
Untuk perhitungan perhitungan struktur diatas diambil R=

* Lokasi bangunan terletak pada zone 2 (Palembang) peta wilayah gempa RI.
Percepatan puncak batuan dasar =

0.01

g. Jenis tanah nya merupakan

tanah lunak dgn nilai Nspt rata-rata <15 pada kedalaman 0- 10 m,sehingga
Percepatan puncak muka tanah AO = 0.2xg.

3.2 Perhitungan balok


I. B 1A 300X600
Perhitungan tulangan lentur tumpuan

Tumpuan atas

Mu=

44

ton.m

440000000

N.mm

0.8
300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

440000000

d2

fy
0.85

=
0.8

300

=
*

0.85

(1-

1 -

2 *

18.899

24.9

Rn

fy
1

(1-

1 -

2 *

18.899

18.899

5.846

560 ^2

400

fc'

5.846

0.0175133435

0.0175133435

400

0.0529

(1-

1 -

220.9685802032
400

max

0.0529

(1-

0.0529

(1-

0.4475785495

0.0529

(1-

0.6690131161

0.85 fc' 1

1 -

0.003Es

0.5524214505

0.067

>

0.0175

dipakai

fy

min

As tul.Atas

1.4

0.003+fy

fy

0.0035

<

0.0175133435

dipakai

0.0175

0.0175

22

3042.2857142857

ton.m

300

560 =

2942.24171

Digunakan tulangan:
8 D

OK

Tumpuan bawah

Mu=

24

240000000

N.mm

0.8
300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

240000000

d2

fy

0.8

0.85

(1-

1 -

2 *

18.899

24.9

Rn

fy
1

(1-

1 -

2 *

18.899

18.899

3.189

560 ^2

400

fc'

300

0.85

3.189

0.0086846554

0.0086846554

400

0.0529

(1-

1 -

120.5301397668
400

max

0.0529

(1-

0.0529

(1-

0.6986746506

0.0529

(1-

0.8358676035

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.3013253494

0.067

>

0.0087

dipakai

0.003+fy

fy

0.0035

<

0.0086846554

dipakai

0.0087

Digunakan tulangan:

0.0087

300

560 =

1459.02211

4 D

22

1521.1428571429

OK

Perhitungan tulangan geser tumpuan

Vu=

21

ton.m

210000

N.

0.6
300

mm

660

mm

fy

400

Mpa

fc'

24.9

Mpa

Vn

Vu

210000

Vc

Vs

Vn

Vn

>

Vc

350000.000

164669.669

185330.331

223.847

0.6

1/6fc' b d

Vc

0.17 *

350000.000

24.9 *

300

660

164669.669

b. Jarak sengkang:
Tulngan geser

10

As

78.5714285714

2 As fy d

2 *

78.5714286 *

Vs

400

660

185330.331

Dipakai tulangan geser

10

150

OK

Perhitungan tulangan lentur lapangan

Lapangan bawah

Mu=

26

ton.m

260000000

N.mm

0.8

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

=
*

260000000

d2

fy
0.85

0.8

300

=
*

400

fc'

0.85

(1-

1 -

2 *

Rn

3.455

560 ^2

=
24.9

18.899

m
=

fy
1

(1-

1 -

2 *

18.899

18.899

3.455

0.0094867047

0.0094867047

400

0.0529

(1-

1 -

130.5743180806
400

max

0.0529

(1-

0.0529

(1-

0.6735642048

0.0529

(1-

0.820709574

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.3264357952

0.067

>

0.00949

dipakai

0.003+fy

fy

0.0035

<

0.0094867047

dipakai

0.0095

0.0095

300

560 =

1593.76638

Digunakan tulangan:
5 D

22

ton.m

1901.4285714286 mm2

OK

Lapangan atas

Mu=

10

100000000

N.mm

0.8

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

=
*

100000000

d2

fy
0.85

0.8

=
*

0.85

1 -

2 *

m
=

24.9

Rn

(1-

1 -

0.0529

2 *

18.899

1.329

400

(1-

1 -

50.2208915695
400

18.899

fy

18.899

1.329

560 ^2

400

fc'

(1-

300

0.0529

(1-

1 -

0.1255522289

0.003433

max

0.0529

(1-

0.8744477711

0.0529

(1-

0.9351191213

0.85 fc' 1

0.003Es

fy

min

As tul.Atas

0.067

>

0.0034330095

0.0034 ### dipakai

0.003+fy

1.4

fy

0.0035

<

0.0034330095

dipakai

0.0035

0.0035

1473.2142857143

300

560 =

588

Digunakan tulangan:
3 D

25

OK

Perhitungan tulangan geser dilapangan

Vu=

32

ton.m

320000

N.

0.6
300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Vn

Vu

320000

Vc

Vs

Vn

Vn

>

Vc

533333.333

0.6

1/6fc' b d

Vc

0.17 *

533333.333

24.9 *

300

560

139719.719

139719.719

393613.614

89.428

a. Jarak sengkang minimum diambil dari d/2

560

280

mm

Dipakai tulangan

10

200

b. Jarak sengkang:
Tulngan geser

As

78.5714285714

2 As fy d

10

2 *

78.5714286 *

400

560

Vs

393613.614

Dipakai tulangan geser


D

10

75

NOT OK

II. B 1B 300X700
Perhitungan tulangan lentur tumpuan

DICEK

Tumpuan atas

Mu=

24

ton.m

240000000

N.mm

0.8

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

240000000

d2

fy

0.8

0.85

(1-

1 -

2 *

18.899

24.9

Rn

fy
1

(1-

1 -

2 *

18.899

18.899

3.189

560 ^2

400

fc'

300

0.85

3.189

0.0086846554

0.0086846554

400

0.0529

(1-

1 -

120.5301397668
400

max

0.0529

(1-

0.0529

(1-

0.6986746506

0.0529

(1-

0.8358676035

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.3013253494

0.067

>

0.00868

dipakai

0.003+fy

fy

0.0035

<

0.0086846554

dipakai

0.0087

Digunakan tulangan:

0.0087

300

560 =

1459.02211

5 D

22

ton.m

1901.4285714286

OK

Tumpuan bawah

Mu=

39

390000000

N.mm

0.8
300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

390000000

d2

fy

0.8

0.85

(1-

1 -

2 *

18.899

24.9

Rn

fy
1

(1-

1 -

2 *

18.899

18.899

5.182

560 ^2

400

fc'

300

0.85

5.182

0.0151125897

0.0151125897

400

0.0529

(1-

1 -

195.861477121
400

max

0.0529

(1-

0.0529

(1-

0.5103463072

0.0529

(1-

0.7143852652

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.4896536928

0.067

>

0.0151

dipakai

0.003+fy

fy

0.0035

<

0.0151125897

dipakai

0.0151

0.0151

300

Digunakan tulangan:
6 D

22

Perhitungan tulangan geser tumpuan

2281.7142857143 NOT

OK

560 =

2538.91506

Vu=

34

ton

340000

N.

0.6

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Vn

Vu

340000

Vc

Vs

Vn

Vn

>

Vc

566666.667

139719.719

426946.947

82.446

0.6

1/6fc' b d

Vc

0.17

566666.667

24.9 *

300

560

139719.719

b. Jarak sengkang:
Tulngan geser

10

As

78.5714285714

2 As fy d

2 *

78.5714286 *

Vs

400

560

426946.947

Dipakai tulangan geser

10

75

OK

Perhitungan tulangan lentur lapangan

Lapangan bawah

Mu=

23

ton.m

230000000

N.mm

0.8

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

fc'

230000000

d2

fy
0.85

=
0.8

300

(1-

1 -

2 *

(1-

1 -

2 *

3.056

560 ^2

400
0.85

m
=

18.899

24.9

Rn

fy

18.899

18.899

*
400

3.056

0.0082890364

0.0529

(1-

1 -

115.5080506098
400

max

0.0529

(1-

0.0529

(1-

0.7112298735

0.0529

(1-

0.8433444572

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.2887701265

0.067

>

0.0083

0.0082890364

dipakai

0.003+fy

fy

0.0035

<

0.0082890364

dipakai

0.0083

0.0083

300

560 =

1392.55812

Digunakan tulangan:
4 D

22

ton.m

1521.1428571429 mm2

OK

Lapangan atas

Mu=

10

100000000

N.mm

0.8

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

fc'

100000000

d2

fy
0.85

=
0.8

300

(1-

1 -

2 *

(1-

1 -

2 *

18.899

24.9

Rn

fy

18.899

1.329

560 ^2

400
0.85

m
=

0.0529

18.899

1.329

400

(1-

1 -

50.2208915695
400

0.0529

(1-

0.0529

(1-

1 -

0.1255522289

0.8744477711

0.003433

max

0.0529

(1-

0.85 fc' 1

0.9351191213

0.003Es

fy

min

As tul.Atas

0.067

>

0.0034

0.0034330095

dipakai

0.003+fy

1.4

fy

0.0035

>

0.0034330095

dipakai

0.0035

0.0035

1140.8571428572

300

560 =

588

Digunakan tulangan:
3 D

22

OK

Perhitungan tulangan geser dilapangan

Vu=

55

ton.m

550000

N.

0.6

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Vn

Vu

550000

Vc

Vs

Vn

Vn

>

Vc

916666.667

139719.719

776946.947

45.306

0.6

1/6fc' b d

Vc

0.17

916666.667

25 *

300

560

139719.719

a. Jarak sengkang minimum diambil dari d/2

560

280

mm

Dipakai tulangan

10

200

b. Jarak sengkang:
Tulngan geser

As

78.5714285714

2 As fy d
Vs

Dipakai tulangan geser

10

2 *

78.5714286 *

400

776946.947

560

10

100

NOT OK

III. B 1C 300X700
Perhitungan tulangan lentur tumpuan

BLOM DICEK

Tumpuan atas

Mu=

39

ton.m

390000000

N.mm

0.8

300

mm

660

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

390000000

d2

fy

0.8

0.85

(1-

1 -

2 *

fy
1

(1-

1 -

2 *

18.899

18.899

18.899

24.9

Rn

m
=

3.730

560 ^2

400

fc'

300

0.85

3.730

0.010335678

0.010335678

400

0.0529

(1-

1 -

141.0058751725
400

max

0.0529

(1-

0.0529

(1-

0.6474853121

0.0529

(1-

0.8046647203

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.3525146879

0.067

>

0.01034

dipakai

0.003+fy

fy

0.0035

<

0.010335678

dipakai

0.0103

0.0103

2281.7142857143

300

Digunakan tulangan:
6 D

Tumpuan bawah

22

OK

660 =

2046.46424

Mu=

51.2

ton.m

512000000

N.mm

0.8

300

mm

660

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

512000000

d2

fy

0.8

0.85

(1-

1 -

2 *

fy
1

(1-

1 -

2 *

18.899

18.899

18.899

24.9

Rn

m
=

4.897

560 ^2

400

fc'

300

0.85

4.897

0.0141304353

0.0141304353

400

0.0529

(1-

1 -

185.1154053547
400

max

0.0529

(1-

0.0529

(1-

0.5372114866

0.0529

(1-

0.732947124

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.4627885134

0.067

>

0.0141

0.003+fy

fy

0.0035

<

0.0141304353

dipakai

0.0141

0.0141

3042.2857142857

300

660 =

Digunakan tulangan:
8 D

22

OK

Perhitungan tulangan geser tumpuan

Vu=

32.6
=

dipakai

0.6

ton

326000

N.

2797.82619

300

mm

660

mm

fy

400

Mpa

fc'

24.9

Mpa

Vn

Vu

326000

Vc

Vs

Vn

1/6fc' b d

Vn

>

Vc

543333.333

164669.669

378663.664

109.558

0.6

Vc

0.17

543333.333

24.9 *

300

660

164669.669

b. Jarak sengkang:
Tulngan geser

10

As

78.5714285714

2 As fy d

2 *

78.5714286 *

Vs

400

660

378663.664

Dipakai tulangan geser

10

100

OK

Perhitungan tulangan lentur lapangan

Lapangan bawah

Mu=

40

ton.m

400000000

N.mm

0.8

300

mm

660

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

fc'

400000000

d2

fy
0.85

=
0.8

300

(1-

1 -

2 *

(1-

1 -

2 *

3.826

560 ^2

400
0.85

m
=

18.899

24.9

Rn

fy

18.899

18.899

*
400

3.826

0.0106339068

0.0529

(1-

1 -

144.6214104333
400

max

0.0529

(1-

0.0529

(1-

0.6384464739

0.0529

(1-

0.7990284563

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.3615535261

0.067

>

0.0106

0.0106339068

dipakai

0.003+fy

fy

0.0035

<

0.0106339068

dipakai

0.0106

0.0106

300

660 =

2105.51355

Digunakan tulangan:
6 D

22

ton.m

2281.7142857143 mm2

OK

Lapangan atas

Mu=

10

100000000

N.mm

0.8

300

mm

660

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

fc'

100000000

d2

fy
0.85

=
0.8

300

(1-

1 -

2 *

(1-

1 -

2 *

18.899

24.9

Rn

fy

18.899

0.957

560 ^2

400
0.85

m
=

0.0529

18.899

0.957

400

(1-

1 -

36.1553526083
400

0.0529

(1-

0.0529

(1-

1 -

0.0903883815

0.9096116185

0.002448

max

0.0529

(1-

0.85 fc' 1

0.9537356125

0.003Es

fy

min

As tul.Atas

1.4

0.067

>

0.0024

0.0024479644

dipakai

0.003+fy

fy

0.0035

>

0.0024479644

min

0.0035

0.0035

1521.1428571429

300

660 =

693

Digunakan tulangan:
4 D

22

OK

Perhitungan tulangan geser dilapangan

Vu=

29

ton.m

290000

N.

0.6

300

mm

660

mm

fy

400

Mpa

fc'

24.9

Mpa

Vn

Vu

290000

Vc

Vs

Vn

Vn

>

Vc

483333.333

164669.669

318663.664

130.187

0.6

1/6fc' b d

Vc

0.17

483333.333

25 *

300

660

164669.669

b. Jarak sengkang:
Tulngan geser

As

78.5714285714

2 As fy d
Vs

Dipakai tulangan geser

10

2 *

78.5714286 *

400

318663.664

660

10

125

OK

IV. B 1 300X600
Perhitungan tulangan lentur tumpuan

DICEK

Tumpuan atas

Mu=

32

ton.m

321400000

N.mm

0.8

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

321400000

d2

fy

0.8

0.85

(1-

1 -

2 *

m
=

18.899

24.9

Rn

fy
1

(1-

1 -

2 *

18.899

18.899

4.270

560 ^2

400

fc'

300

0.85

4.270

0.0120472223

0.0120472223

400

0.0529

(1-

1 -

161.4099455043
400

max

0.0529

(1-

0.0529

(1-

0.5964751362

0.0529

(1-

0.7723180279

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.4035248638

0.067

>

0.01205

dipakai

0.003+fy

fy

0.0035

<

0.0120472223

dipakai

0.0120

0.0120

2281.7142857143

300

Digunakan tulangan:
6 D

Tumpuan bawah

22

mm2

OK

560 =

2023.93335

Mu=

10

ton.m

100000000

N.mm

0.8

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

100000000

d2

fy

0.8

0.85

(1-

1 -

2 *

m
=

18.899

24.9

Rn

fy
1

(1-

1 -

2 *

18.899

18.899

1.329

560 ^2

400

fc'

300

0.85

1.329

0.0034330095

0.0034330095

400

0.0529

(1-

1 -

50.2208915695
400

max

0.0529

(1-

0.0529

(1-

0.8744477711

0.0529

(1-

0.9351191213

0.85 fc' 1

1 -

0.003Es

fy

min

min

As tul.Atas

1.4

0.1255522289

0.067

>

0.0034

0.003+fy

fy

0.0035

>

0.0034330095

dipakai

0.0035

min*

0.0035

1140.8571428572

300

560 =

Digunakan tulangan:
3 D

22

OK

Perhitungan tulangan geser tumpuan

Vu=

22
=

dipakai

0.6

ton

220000

N.

588

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Vn

Vu

220000

Vc

Vs

Vn

1/6fc' b d

Vn

>

Vc

366666.667

139719.719

226946.947

155.102

0.6

Vc

0.17

366666.667

24.9 *

300

560

139719.719

b. Jarak sengkang:
Tulngan geser

10

As

78.5714285714

2 As fy d

2 *

78.5714286 *

Vs

400

560

226946.947

Dipakai tulangan geser

10

125

OK

Perhitungan tulangan lentur lapangan

Lapangan bawah

Mu=

26

ton.m

260000000

N.mm

0.8

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

fc'

260000000

d2

fy
0.85

=
0.8

300

(1-

1 -

2 *

(1-

1 -

2 *

3.455

560 ^2

400
0.85

m
=

18.899

24.9

Rn

fy

18.899

18.899

*
400

3.455

0.0094867047

0.0529

(1-

1 -

130.5743180806
400

max

0.0529

(1-

0.0529

(1-

0.6735642048

0.0529

(1-

0.820709574

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.3264357952

0.067

>

0.0095

0.0094867047

dipakai

0.003+fy

fy

0.0035

<

0.0094867047

dipakai

0.0095

0.0095

300

560 =

1593.76638

Digunakan tulangan:
5 D

22

ton.m

1901.4285714286 mm2

OK

Lapangan atas

Mu=

10

100000000

N.mm

0.8

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

fc'

100000000

d2

fy
0.85

=
0.8

300

(1-

1 -

2 *

(1-

1 -

2 *

18.899

24.9

Rn

fy

18.899

1.329

560 ^2

400
0.85

m
=

0.0529

18.899

1.329

400

(1-

1 -

50.2208915695
400

0.0529

(1-

0.0529

(1-

1 -

0.1255522289

0.8744477711

0.003433

max

0.0529

(1-

0.85 fc' 1

0.9351191213

0.003Es

fy

min

min

As tul.Atas

1.4

0.067

>

0.0034

0.0034330095

dipakai

0.003+fy

fy

0.0035

>

0.0034330095

min

0.0035

min*

0.0035

1140.8571428572

300

560 =

588

Digunakan tulangan:
3 D

22

OK

Perhitungan tulangan geser dilapangan

Vu=

20

ton.m

200000

N.

0.6

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Vn

Vu

200000

Vc

Vs

Vn

Vn

>

Vc

333333.333

139719.719

193613.614

181.805

0.6

1/6fc' b d

Vc

0.17

333333.333

25 *

300

560

139719.719

b. Jarak sengkang:
Tulngan geser

As

78.5714285714

2 As fy d
Vs

Dipakai tulangan geser

10

2 *

78.5714286 *

400

193613.614

560

10

150

OK

V B 1B 350X800
Perhitungan tulangan lentur tumpuan

blom DICEK

Tumpuan atas

Mu=

47

ton.m

470000000

N.mm

0.8

350

mm

660

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

470000000

d2

fy

0.8

0.85

(1-

1 -

2 *

fy
1

(1-

1 -

2 *

18.899

18.899

18.899

24.9

Rn

m
=

3.853

560 ^2

400

fc'

350

0.85

=
*

3.853

0.0107195022

0.0107195022

400

0.0529

(1-

1 -

145.6544205078
400

max

0.0529

(1-

0.0529

(1-

0.6358639487

0.0529

(1-

0.7974107779

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.3641360513

0.067

>

0.01072

dipakai

0.003+fy

fy

0.0035

<

0.0107195022

dipakai

0.0107

0.0107

2662

350

Digunakan tulangan:
7 D

22

OK

660 =

2476.20501

Tumpuan bawah

Mu=

32

ton.m

320000000

N.mm

0.8

350

mm

660

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

320000000

d2

fy

0.8

0.85

(1-

1 -

2 *

m
=

18.899

24.9

Rn

fy
1

(1-

1 -

2 *

18.899

18.899

2.624

560 ^2

400

fc'

350

0.85

=
*

2.624

0.0070255066

0.0070255066

400

0.0529

(1-

1 -

99.1689671543
400

max

0.0529

(1-

0.0529

(1-

0.7520775821

0.0529

(1-

0.8672240668

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.2479224179

0.067

>

0.0070

fy

0.0035

<

0.0070255066

dipakai

0.0070

0.0070

1901.4285714286

350

660 =

Digunakan tulangan:
5 D

22

OK

Perhitungan tulangan geser tumpuan

Vu=

dipakai

0.003+fy

53

ton

530000

N.

1622.89202

0.6

350

mm

660

mm

fy

400

Mpa

fc'

24.9

Mpa

Vn

Vu

530000

Vc

Vs

Vn

Vn

>

Vc

883333.333

192114.614

691218.719

60.018

0.6

1/6fc' b d

Vc

0.17

883333.333

24.9 *

350

660

192114.614

b. Jarak sengkang:
Tulngan geser

10

As

78.5714285714

2 As fy d

2 *

78.5714286 *

Vs

400

660

691218.719
CATATAN

Dipakai tulangan geser

10

75

OK

Perhitungan tulangan lentur lapangan

Lapangan bawah

Mu=

63

ton.m

633600000

N.mm

0.8

350

mm

660

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

633600000

d2

fy
0.85

=
0.8

350

=
*

0.85

1 -

2 *

m
=

18.899

24.9

Rn

fy
1

(1-

1 -

18.899

5.195

660^2

400

fc'

(1-

0.0529

2 *

18.899

5.195

400

(1-

1 -

196.3545549655

0.0151582684

400

max

0.0529

(1-

0.0529

(1-

0.5091136126

0.0529

(1-

0.7135219776

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.4908863874

0.067

>

0.0152

0.0151582684

dipakai

0.003+fy

fy

0.0035

<

0.0151582684

dipakai

0.0152

0.0152

350

NOT

OK

660 =

3501.55999

Digunakan tulangan:
9 D

22

3422.57

mm2

2 D

10

157.14

mm2

tambah besi ekstra

besi eksa

3579.71

solusi

Lapangan atas

Mu=

15

ton.m

150000000

N.mm

0.8

350

mm

660

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

=
*

150000000

d2

fy
0.85

0.8

=
*

0.85

1 -

2 *

m
=

1.230

660 ^2

400

fc'

(1-

350

18.899

24.9

Rn

fy
1

18.899

(1-

1 -

2 *

18.899

*
400

1.230

0.003170

0.0529

(1-

1 -

46.4854533536
400

max

0.0529

(1-

0.0529

(1-

0.8837863666

0.0529

(1-

0.940099126

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.1162136334

0.067

>

0.0032

0.003169505

dipakai

0.003+fy

fy

0.0035

>

0.003169505

dipakai

0.0035

0.0035

1521.1428571429

350

660 =

808.5

Digunakan tulangan:
4 D

22

OK

Perhitungan tulangan geser dilapangan

Vu=

49

ton.m

490000

N.

0.6
350

mm

660

mm

fy

400

Mpa

fc'

24.9

Mpa

Vn

Vu

490000

Vc

Vs

Vn

Vn

>

Vc

Dipakai tulangan

b. Jarak sengkang:

816666.667

192114.614

624552.052

0.6

1/6fc' b d

Vc

10

200

0.17

816666.667

25 *

350

192114.614

660

Tulngan geser

10

As

78.5714285714

2 As fy d

2 *

78.5714286 *

Vs

400

660

624552.052

66.425
CATTATAN

Dipakai tulangan geser


D

10

100

NOT OK

VI. BA 1 300X600
Perhitungan tulangan lentur tumpuan

DICEK

Tumpuan atas

Mu=

30

ton.m

300000000

N.mm

0.8

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

300000000

d2

fy
0.85

=
0.8

300

=
*

0.85

(1-

1 -

2 *

18.899

24.9

Rn

fy
1

(1-

1 -

2 *

18.899

18.899

3.986

560 ^2

400

fc'

3.986

0.0111369733

0.0111369733

400

0.0529

(1-

1 -

150.6626747084
400

max

0.0529

(1-

0.0529

(1-

0.6233433132

0.0529

(1-

0.7895209391

0.85 fc' 1

fy

min

1.4

/
0.0111

1 -

0.3766566868

0.003Es

0.067

>

0.01114

dipakai

0.003+fy

fy

0.0035

<

0.0111369733

dipakai

As tul.Atas

0.0111

22

1901.4285714286

ton.m

300

560 =

1871.01152

Digunakan tulangan:
5 D

OK

Tumpuan bawah

Mu=

10

100000000

N.mm

0.8
300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

100000000

d2

fy

0.8

0.85

(1-

1 -

2 *

18.899

24.9

Rn

fy
1

(1-

1 -

2 *

18.899

18.899

1.329

560 ^2

400

fc'

300

0.85

1.329

0.0034330095

0.0034330095

400

0.0529

(1-

1 -

50.2208915695
400

max

0.0529

(1-

0.0529

(1-

0.8744477711

0.0529

(1-

0.9351191213

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.1255522289

0.067

>

0.0034

dipakai

0.003+fy

fy

0.0035

>

0.0034330095

dipakai

0.0035

0.0035

1901.4285714286

300

Digunakan tulangan:
5 D

22

OK

560 =

588

Perhitungan tulangan geser tumpuan

Vu=

10

ton

100000

N.

0.6

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Vn

Vu

100000

Vc

Vs

Vn

Vn

>

Vc

166666.667

139719.719

26946.947

1306.270

0.6

1/6fc' b d

Vc

0.17

166666.667

24.9 *

300

560

139719.719

b. Jarak sengkang:
Tulngan geser

10

As

78.5714285714

2 As fy d

2 *

78.5714286 *

Vs

400

560

26946.947

Dipakai tulangan geser

10

75

OK

Perhitungan tulangan lentur lapangan

Lapangan bawah

Mu=

23

ton.m

230000000

N.mm

0.8

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

fc'

fy
0.85

d2

230000000
0.8

300

=
560 ^2

400
0.85

3.056

=
24.9

18.899

(1-

1 -

2 *

(1-

1 -

2 *

m
=

fy
18.899

18.899

Rn

3.056

0.0082890364

0.0082890364

400

0.0529

(1-

1 -

115.5080506098
400

max

0.0529

(1-

0.0529

(1-

0.7112298735

0.0529

(1-

0.8433444572

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.2887701265

0.067

>

0.0083

dipakai

0.003+fy

fy

0.0035

<

0.0082890364

dipakai

0.0083

0.0083

300

560 =

1392.55812

Digunakan tulangan:
4 D

22

ton.m

1521.1428571429 mm2

OK

Lapangan atas

Mu=

10

100000000

N.mm

0.8

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

fc'

100000000

d2

fy
0.85

=
0.8

300

(1-

1 -

2 *

(1-

1 -

2 *

18.899

24.9

Rn

fy

18.899

1.329

560 ^2

400
0.85

m
=

0.0529

18.899

1.329

400

(1-

1 -

50.2208915695
400

0.003433

max

0.0529

(1-

0.0529

(1-

0.8744477711

0.0529

(1-

0.9351191213

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

0.067

>

0.0034

0.0034330095

dipakai

0.003+fy

1.4

0.1255522289

fy

0.0035

>

0.0034330095

dipakai

0.0035

0.0035

1140.8571428572

300

560 =

588

Digunakan tulangan:
3 D

22

OK

Perhitungan tulangan geser dilapangan

Vu=

15

ton.m

150000

N.

0.6

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Vn

Vu

150000

Vc

Vs

Vn

Vn

>

Vc

Vc

0.17

250000.000

a. Jarak sengkang minimum diambil dari d/2

560

280

mm

Dipakai tulangan

10

200

b. Jarak sengkang:
Tulngan geser
As

250000.000

139719.719

110280.281

0.6

1/6fc' b d

D
78.5714285714

10

25 *

300

139719.719

560

2 As fy d

2 *

78.5714286 *

Vs

400

560

319.187

110280.281

Dipakai tulangan geser


D

10

200

OK

VII. BP 200X600
Perhitungan tulangan lentur tumpuan

DICEK

Tumpuan atas

Mu=

11.2

ton.m

112000000

N.mm

0.8

200

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

112000000

d2

fy

0.8

0.85

(1-

1 -

2 *

18.899

24.9

Rn

fy
1

(1-

1 -

2 *

18.899

18.899

2.232

560 ^2

400

fc'

200

0.85

2.232

0.0059104643

0.0059104643

400

0.0529

(1-

1 -

84.3710978367
400

max

0.0529

(1-

0.0529

(1-

0.7890722554

0.0529

(1-

0.8882973913

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.2109277446

0.067

>

0.00591

dipakai

0.003+fy

fy

0.0035

<

0.0059104643

dipakai

0.0059

Digunakan tulangan:

0.0059

200

560 =

661.972

2 D

I=>>.

22

ton.m

760.5714285714

OK

Tumpuan bawah

Mu=

70000000

N.mm

0.8
200

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

70000000

d2

fy

0.8

0.85

(1-

1 -

2 *

18.899

24.9

Rn

fy
1

(1-

1 -

2 *

18.899

18.899

1.395

560 ^2

400

fc'

200

0.85

1.395

0.0036109346

0.0036109346

400

0.0529

(1-

1 -

52.731936148
400

max

0.0529

(1-

0.0529

(1-

0.8681701596

0.0529

(1-

0.9317564916

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.1318298404

0.067

>

0.0036

dipakai

0.003+fy

fy

0.0035

<

0.0036109346

dipakai

0.0036

0.0036

760.5714285714

200

Digunakan tulangan:
2 D

22

Perhitungan tulangan geser tumpuan

OK

560 =

404.42468

Vu=

13.15

ton

131500

N.

0.6

200

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Vn

Vu

131500

Vc

Vs

Vn

Vn

>

Vc

219166.667

93146.480

126020.187

279.320

0.6

1/6fc' b d

Vc

0.17

219166.667

24.9 *

200

560

93146.480

b. Jarak sengkang:
Tulngan geser

10

As

78.5714285714

2 As fy d

2 *

78.5714286 *

Vs

400

560

126020.187

Dipakai tulangan geser

10

200

OK

Perhitungan tulangan lentur lapangan

Lapangan bawah

Mu=

10

ton.m

100000000

N.mm

0.8

200

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

fc'

100000000

d2

fy
0.85

=
0.8

200

(1-

1 -

2 *

(1-

1 -

2 *

1.993

560 ^2

400
0.85

m
=

18.899

24.9

Rn

fy

18.899

18.899

*
400

1.993

0.0052421356

0.0529

(1-

1 -

75.3313373542
400

max

0.0529

(1-

0.0529

(1-

0.8116716566

0.0529

(1-

0.9009282195

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.1883283434

0.067

>

0.0052

0.0052421356

dipakai

0.003+fy

fy

0.0035

<

0.0052421356

dipakai

0.0052

0.0052

200

560 =

587.119186

Digunakan tulangan:
2 D

22

ton.m

760.5714285714 mm2

OK

Lapangan atas

Mu=

10

100000000

N.mm

0.8

200

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

fc'

100000000

d2

fy
0.85

=
0.8

200

(1-

1 -

2 *

(1-

1 -

2 *

18.899

24.9

Rn

fy

18.899

1.993

560 ^2

400
0.85

m
=

0.0529

18.899

1.993

400

(1-

1 -

75.3313373542
400

0.0529

(1-

0.0529

(1-

1 -

0.1883283434

0.8116716566

0.005242

max

0.0529

(1-

0.85 fc' 1

0.9009282195

0.003Es

fy

min

As tul.Atas

0.067

>

0.0052

0.0052421356

dipakai

0.003+fy

1.4

fy

0.0035

<

0.0052421356

dipakai

0.0052

0.0052

760.5714285714

200

560 =

587.119186

Digunakan tulangan:
2 D

22

OK

Perhitungan tulangan geser dilapangan

Vu=

15

ton.m

150000

N.

0.6

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Vn

Vu

150000

Vc

Vs

Vn

Vn

>

Vc

250000.000

139719.719

110280.281

319.187

0.6

1/6fc' b d

Vc

0.17

250000.000

25 *

300

560

139719.719

a. Jarak sengkang minimum diambil dari d/2

560

280

mm

Dipakai tulangan

10

200

b. Jarak sengkang:
Tulngan geser

As

78.5714285714

2 As fy d
Vs

Dipakai tulangan geser

10

2 *

78.5714286 *

400

110280.281

560

10

200

OK

VIII. BK1 300X800


Perhitungan tulangan lentur tumpuan

BLOM

DICEK

Tumpuan atas

Mu=

45

ton.m

450000000

N.mm

0.8

300

mm

760

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

450000000

d2

fy

0.8

0.85

(1-

1 -

2 *

18.899

24.9

Rn

fy
1

(1-

1 -

2 *

18.899

18.899

3.246

760 ^2

400

fc'

300

0.85

3.246

0.0088567148

0.0088567148

400

0.0529

(1-

1 -

122.7003500396
400

max

0.0529

(1-

0.0529

(1-

0.6932491249

0.0529

(1-

0.8326158327

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.3067508751

0.067

>

0.00886

dipakai

0.003+fy

fy

0.0035

<

0.0088567148

dipakai

0.0089

0.0089

2281.7142857143

300

Digunakan tulangan:
6 D

Tumpuan bawah

22

OK

760 =

2019.33096

Mu=

10

ton.m

100000000

N.mm

0.8
300

mm

760

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

100000000

d2

fy

0.8

0.85

(1-

1 -

2 *

18.899

24.9

Rn

fy
1

(1-

1 -

2 *

18.899

18.899

0.721

560 ^2

400

fc'

300

0.85

0.721

0.0018352676

0.0018352676

400

0.0529

(1-

1 -

27.2667444532
400

max

0.0529

(1-

0.0529

(1-

0.9318331389

0.0529

(1-

0.9653150464

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.0681668611

0.067

>

0.0018

0.003+fy

fy

0.0035

>

0.0018352676

dipakai

0.0035

0.0035

1140.8571428572

300

760 =

Digunakan tulangan:
3 D

22

OK

Perhitungan tulangan geser tumpuan

Vu=

18.6

dipakai

ton

186000

N.

0.6
300

mm

798

760

mm

fy
fc'

400

Mpa

24.9

Mpa

Vn

Vu

186000

Vc

Vs

Vn

Vn

>

Vc

310000.000

189619.619

120380.381

396.837

0.6

1/6fc' b d

Vc

0.17

310000.000

24.9 *

300

760

189619.619

b. Jarak sengkang:
Tulngan geser

10

As

78.5714285714

2 As fy d

2 *

78.5714286 *

Vs

400

760

120380.381

Dipakai tulangan geser

10

150

OK

Perhitungan tulangan lentur lapangan

Lapangan bawah

Mu=

10

ton.m

100000000

N.mm

0.8

300

mm

760

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

fc'

100000000

d2

fy
0.85

=
0.8

300

(1-

1 -

2 *

(1-

1 -

2 *

18.899

24.9

Rn

fy

18.899

0.721

560 ^2

400
0.85

m
=

0.0529

18.899

0.721

400

(1-

1 -

27.2667444532
400

0.0018352676

max

0.0529

(1-

0.0529

(1-

0.9318331389

0.0529

(1-

0.9653150464

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.0681668611

0.067

>

0.0018

0.0018352676

dipakai

0.003+fy

fy

0.0035

>

0.0018352676

dipakai

0.0035

0.0035

300

760 =

798

Digunakan tulangan:
3 D

22

ton.m

1140.8571428572 mm2

OK

Lapangan atas

Mu=

30

300000000

N.mm

0.8

300

mm

760

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

fc'

300000000

d2

fy
0.85

=
0.8

300

(1-

1 -

2 *

(1-

1 -

2 *

18.899

24.9

Rn

fy
18.899

18.899

2.164

760 ^2

400
0.85

m
=

2.164

0.005719

0.0057194317

400

0.0529

(1-

1 -

81.8002333597
400

max

0.0529

(1-

0.0529

(1-

0.7954994166

0.0529

(1-

0.89190774

0.85 fc' 1
fy

1 -

0.003Es
0.003+fy

0.2045005834

0.067

>

0.0057

dipakai

min

As tul.Atas

1.4

fy

0.0035

>

0.0057194317

dipakai

0.0057

0.0057

1521.1428571429

300

760 =

1304.03043

Digunakan tulangan:
4 D

22

OK

Perhitungan tulangan geser dilapangan

Vu=

10

ton.m

100000

N.

0.6

300

mm

760

mm

fy

400

Mpa

fc'

29.05

Mpa

Vn

Vu

100000

Vc

Vs

Vn

Vn

<

Vc

166666.667

204812.597

-38145.931

-1252.334

0.6

1/6fc' b d

Vc

0.17

166666.667

29 *

300

760

204812.597

b. Jarak sengkang:
Tulngan geser

As

78.5714285714

2 As fy d

10

2 *

78.5714286 *

Vs

400

-38145.931

Dipakai tulangan geser


D

10

200

OK

760

IX. BK2 300X600


Perhitungan tulangan lentur tumpuan

DICEK

L??????

Tumpuan atas

Mu=

39

ton.m

390000000

N.mm

0.8

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

390000000

d2

fy

0.8

0.85

(1-

1 -

2 *

fy
1

(1-

1 -

2 *

18.899

18.899

18.899

24.9

Rn

m
=

5.182

560 ^2

400

fc'

300

0.85

5.182

0.0151125897

0.0151125897

400

0.0529

(1-

1 -

195.861477121
400

max

0.0529

(1-

0.0529

(1-

0.5103463072

0.0529

(1-

0.7143852652

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.4896536928

0.067

>

0.01511

0.003+fy

fy

0.0035

<

0.0151125897

dipakai

0.0151

0.0151

22

1901.4285714286

ton.m

300

560 =

Digunakan tulangan:
5 D

OK

Tumpuan bawah

Mu=

10

dipakai

100000000

N.mm

0.8
300

mm

2538.91506

560

mm

fy
fc'

400

Mpa

24.9

Mpa

Rn

Mu

100000000

d2

fy

0.8

0.85

(1-

1 -

2 *

m
=

18.899

24.9

Rn

fy
1

(1-

1 -

2 *

18.899

18.899

1.329

560 ^2

400

fc'

300

0.85

1.329

0.0034330095

0.0034330095

400

0.0529

(1-

1 -

50.2208915695
400

max

0.0529

(1-

0.0529

(1-

0.8744477711

0.0529

(1-

0.9351191213

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.1255522289

0.067

>

0.0034

0.003+fy

fy

0.0035

>

0.0034330095

dipakai

0.0035

0.0035

1140.8571428572

300

560 =

Digunakan tulangan:
3 D

22

OK

Perhitungan tulangan geser tumpuan

Vu=

dipakai

20

ton

200000

N.

0.6

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

588

Vn

Vu

200000

Vc

Vs

Vn

1/6fc' b d

Vn

>

Vc

333333.333

139719.719

193613.614

181.805

0.6

Vc

0.17

333333.333

24.9 *

300

560

139719.719

b. Jarak sengkang:
Tulngan geser

10

As

78.5714285714

2 As fy d

2 *

78.5714286 *

Vs

400

560

193613.614

Dipakai tulangan geser

10

150

OK

Perhitungan tulangan lentur lapangan

Lapangan bawah

Mu=

10

ton.m

100000000

N.mm

0.8
300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

100000000

d2

fy
0.85

=
0.8

300

=
*

0.85

1 -

2 *

18.899

24.9

Rn

fy
1

(1-

1 -

18.899

1.329

560 ^2

400

fc'

(1-

0.0529

2 *

18.899

1.329

400

(1-

1 -

50.2208915695
400

0.0529

(1-

0.0529

(1-

1 -

0.1255522289

0.8744477711

0.0034330095

max

0.0529

(1-

0.85 fc' 1

0.9351191213

0.003Es

fy

min

As tul.Atas

1.4

0.067

>

0.0034

0.0034330095

dipakai

0.003+fy

fy

0.0035

>

0.0034330095

dipakai

0.0035

0.0035

300

560 =

588

Digunakan tulangan:
3 D

22

ton.m

1140.8571428572 mm2

OK

Lapangan atas

Mu=

20

200000000

N.mm

0.8
300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

200000000

d2

fy

0.8

0.85

(1-

1 -

2 *

18.899

24.9

Rn

fy
1

(1-

1 -

2 *

18.899

18.899

2.657

560 ^2

400

fc'

300

0.85

2.657

0.007123

0.0071226834

400

0.0529

(1-

1 -

100.441783139
400

max

0.0529

(1-

0.0529

(1-

0.7488955422

0.0529

(1-

0.8653875098

0.85 fc' 1

fy

min

1.4

1 -

0.2511044578

0.003Es

0.067

>

0.0071

dipakai

0.003+fy

0.0071

fy

0.0035

<

0.0071226834

dipakai

As tul.Atas

0.0071

1521.1428571429

300

560 =

1196.61081

Digunakan tulangan:
4 D

22

OK

Perhitungan tulangan geser dilapangan

Vu=

10

ton.m

100000

N.

0.6

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Vn

Vu

100000

Vc

Vs

Vn

1/6fc' b d

Vn

>

Vc

Dipakai tulangan

Vc

166666.667

139719.719

26946.947

1306.270

0.6

10

0.17

166666.667

25 *

300

560

139719.719

200

b. Jarak sengkang:
Tulngan geser

As

78.5714285714

2 As fy d

10

2 *

78.5714286 *

Vs

400

26946.947

Dipakai tulangan geser


D

10

200

OK

X. BT1 300X600
Perhitungan tulangan lentur tumpuan

DICEK

560

Tumpuan atas

Mu=

48

ton.m

475400000

N.mm

0.8

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

475400000

d2

fy

0.8

0.85

(1-

1 -

2 *

fy
1

(1-

1 -

2 *

18.899

18.899

18.899

24.9

Rn

m
=

6.316

560 ^2

400

fc'

300

0.85

=
*

6.316

0.0193172414

0.0193172414

400

0.0529

(1-

1 -

238.7501185213
400

max

0.0529

(1-

0.0529

(1-

0.4031247037

0.0529

(1-

0.6349210216

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.5968752963

0.067

<

0.01932

fy

0.0035

<

0.0193172414

dipakai

0.0193

0.0193

22

3422.5714285714

ton.m

300

560 =

Digunakan tulangan:
9 D

OK

Tumpuan bawah

Mu=

dipakai

0.003+fy

30

300000000

N.mm

0.8

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

3245.29656

Rn

Mu

300000000

d2

fy
0.85

=
*

0.8

=
*

0.85

(1-

1 -

2 *

m
=

18.899

24.9

Rn

fy
1

(1-

1 -

2 *

18.899

18.899

3.986

560 ^2

400

fc'

300

3.986

0.0111369733

0.0111369733

400

0.0529

(1-

1 -

150.6626747084
400

max

0.0529

(1-

0.0529

(1-

0.6233433132

0.0529

(1-

0.7895209391

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.3766566868

0.067

>

0.0111

dipakai

0.003+fy

fy

0.0035

<

0.0111369733

dipakai

0.0111

0.0111

1901.4285714286

300

560 =

1871.01152

Digunakan tulangan:
5 D

22

OK

Perhitungan tulangan geser tumpuan

Vu=

20

ton

200000

N.

0.6

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Vn

Vu

200000
0.6

333333.333

Vc

1/6fc' b d

Vs

Vn

Vn

>

Vc

Vc

0.17

333333.333

24.9 *

300

560

139719.719

139719.719

193613.614

181.805

b. Jarak sengkang:
Tulngan geser

10

As

78.5714285714

2 As fy d

2 *

78.5714286 *

Vs

400

560

193613.614

Dipakai tulangan geser

10

150

OK

Perhitungan tulangan lentur lapangan

Lapangan bawah

Mu=

39

ton.m

390000000

N.mm

0.8

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

390000000

d2

fy
0.85

=
0.8

300

=
*

0.85

1 -

2 *

m
=

18.899

24.9

Rn

fy
1

(1-

1 -

18.899

5.182

560 ^2

400

fc'

(1-

0.0529

2 *

18.899

5.182

0.0151125897

0.0151125897

400

(1-

1 -

195.861477121
400

0.0529

(1-

1 -

0.4896536928

0.0529

(1-

0.5103463072

0.0529

(1-

0.7143852652

max

0.85 fc' 1

0.003Es

fy

min

As tul.Atas

1.4

0.067

>

0.0151

dipakai

0.003+fy

fy

0.0035

<

0.0151125897

dipakai

0.0151

0.0151

22

2662

ton.m

300

mm2

OK

560 =

2538.91506

Digunakan tulangan:
7 D

Lapangan atas

Mu=

10

100000000

N.mm

0.8

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

100000000

d2

fy

0.8

0.85

(1-

1 -

2 *

m
=

18.899

24.9

Rn

fy
1

(1-

1 -

2 *

18.899

18.899

1.329

560 ^2

400

fc'

300

0.85

1.329

0.003433

0.0034330095

400

0.0529

(1-

1 -

50.2208915695
400

max

0.0529

(1-

0.0529

(1-

0.8744477711

0.0529

(1-

0.9351191213

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.1255522289

0.067

>

0.0034

dipakai

0.003+fy

fy

0.0035

>

0.0034330095

dipakai

0.0035

0.0035

300

560 =

588

Digunakan tulangan:
3 D

22

1140.8571428572

OK

Perhitungan tulangan geser dilapangan

Vu=

15

ton.m

150000

N.

0.6

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Vn

Vu

150000

Vc

Vs

Vn

Vn

>

Vc

250000.000

139719.719

110280.281

319.187

0.6

1/6fc' b d

Vc

0.17

250000.000

25 *

300

560

139719.719

a. Jarak sengkang minimum diambil dari d/2

560

280

mm

Dipakai tulangan

10

200

OK

b. Jarak sengkang:
Tulngan geser

As

78.5714285714

2 As fy d

10

2 *

78.5714286 *

Vs

400

560

110280.281

Dipakai tulangan geser


D

10

200

OK

XI. BT2 400X700


Perhitungan tulangan lentur tumpuan

DICEK

Tumpuan atas

Mu=

75
=

0.8

ton.m

750000000

N.mm

400

mm

660

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

750000000

d2

fy

0.8

0.85

(1-

1 -

2 *

fy
1

(1-

1 -

2 *

18.899

18.899

18.899

24.9

Rn

m
=

5.381

660 ^2

400

fc'

400

0.85

=
*

5.381

0.0158146352

0.0158146352

400

0.0529

(1-

1 -

203.3738584219
400

max

0.0529

(1-

0.0529

(1-

0.4915653539

0.0529

(1-

0.7011172184

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.5084346461

0.067

>

0.01581

fy

0.0035

<

0.0158146352

dipakai

0.0158

0.0158

400

660 =

Digunakan tulangan:
11 D

22

2 D

10

4183.1428571429 NO OK

besi eksa

157.14

mm2

4332.21

solusi
Tumpuan bawah

Mu=

dipakai

0.003+fy

23

ton.m

230000000

N.mm

0.8
400

mm

660

mm

4175.06369

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

230000000

d2

fy

0.8

0.85

(1-

1 -

2 *

18.899

24.9

Rn

fy
1

(1-

1 -

2 *

18.899

18.899

1.650

560 ^2

400

fc'

400

0.85

1.650

0.0042997603

0.0042997603

400

0.0529

(1-

1 -

62.3679832494
400

max

0.0529

(1-

0.0529

(1-

0.8440800419

0.0529

(1-

0.918738288

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.1559199581

0.067

>

0.0043

0.003+fy

fy

0.0035

<

0.0042997603

dipakai

0.0043

0.0043

1140.8571428572

400

660 =

Digunakan tulangan:
3 D

22

OK

Perhitungan tulangan geser tumpuan

Vu=

dipakai

34.28

ton

342800

N.

0.6

400

mm

660

mm

fy

400

Mpa

fc'

24.9

Mpa

1135.13673

Vn

Vu

342800

Vc

Vs

Vn

Vn

>

Vc

571333.333

219559.559

351773.774

117.933

0.6

1/6fc' b d

Vc

0.17

571333.333

24.9 *

400

660

219559.559

b. Jarak sengkang:
Tulngan geser

10

As

78.5714285714

2 As fy d

2 *

78.5714286 *

Vs

400

660

351773.774

Dipakai tulangan geser

10

100

OK

Perhitungan tulangan lentur lapangan

Lapangan bawah

Mu=

36

ton.m

360000000

N.mm

0.8

400

mm

660

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

fc'

360000000

d2

fy
0.85

=
0.8

400

(1-

1 -

2 *

(1-

1 -

2 *

18.899

24.9

Rn

fy

18.899

2.583

660 ^2

400
0.85

m
=

0.0529

18.899

2.583

400

(1-

1 -

97.6194520425
400

0.0529

(1-

0.0529

(1-

1 -

0.2440486301

0.7559513699

0.0069074814

max

0.0529

(1-

0.85 fc' 1

0.8694546394

0.003Es

fy

min

As tul.Atas

1.4

0.067

>

0.0069

0.0069074814

dipakai

0.003+fy

fy

0.0035

<

0.0069074814

dipakai

0.0069

0.0069

400

660 =

1823.57509

Digunakan tulangan:
5 D

22

ton.m

1901.4285714286 mm2

OK

Lapangan atas

Mu=

20

200000000

N.mm

0.8

400

mm

660

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

fc'

200000000

d2

fy

0.8

(1-

1 -

2 *

(1-

1 -

2 *

18.899

24.9

Rn

fy
18.899

18.899

1.435

560 ^2

400
0.85

m
=

400

0.85

1.435

0.003718

0.0037176049

400

0.0529

(1-

1 -

54.2330289125
400

max

0.0529

(1-

0.0529

(1-

0.8644174277

0.0529

(1-

0.9297405163

0.85 fc' 1

fy

min

1.4

1 -

0.1355825723

0.003Es

0.067

>

0.0037

dipakai

0.003+fy

fy

0.0037

0.0035

>

0.0037176049

dipakai

As tul.Atas

0.0037

1140.8571428572

400

660 =

981.447701

Digunakan tulangan:
3 D

22

OK

Perhitungan tulangan geser dilapangan

Vu=

30

ton.m

300000

N.

0.6

400

mm

660

mm

fy

400

Mpa

fc'

24.9

Mpa

Vn

Vu

300000

Vc

Vs

Vn

Vn

>

Vc

500000.000

219559.559

280440.441

147.931

0.6

1/6fc' b d

Vc

0.17

500000.000

25 *

400

660

219559.559

a. Jarak sengkang minimum diambil dari d/2

660

330

mm

Dipakai tulangan

10

200

b. Jarak sengkang:
Tulngan geser

As

78.5714285714

2 As fy d

10

2 *

78.5714286 *

Vs

400

280440.441

Dipakai tulangan geser


D

10

125

OK

XII. BT2 300X600


Perhitungan tulangan lentur tumpuan

Tumpuan atas

DICEK

660

Mu=

36

ton.m

360000000

N.mm

0.8

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

360000000

d2

fy

0.8

0.85

(1-

1 -

2 *

18.899

24.9

Rn

fy
1

(1-

1 -

2 *

18.899

18.899

4.783

560 ^2

400

fc'

300

0.85

4.783

0.0137425239

0.0137425239

400

0.0529

(1-

1 -

180.7952096501
400

max

0.0529

(1-

0.0529

(1-

0.5480119759

0.0529

(1-

0.7402783097

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.4519880241

0.067

>

0.01374

dipakai

0.003+fy

fy

0.0035

<

0.0137425239

dipakai

0.0137

0.0137

22

2662

ton.m

300

560 =

2308.74402

Digunakan tulangan:
7 D

L=>

OK

Tumpuan bawah

Mu=

23

230000000

N.mm

0.8
300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

230000000

3.056

d2

fy

0.8

300

0.85

400

fc'

0.85

(1-

1 -

2 *

18.899

24.9

Rn

fy
1

(1-

1 -

2 *

18.899

18.899

m
=

560 ^2

3.056

0.0082890364

0.0082890364

400

0.0529

(1-

1 -

115.5080506098
400

max

0.0529

(1-

0.0529

(1-

0.7112298735

0.0529

(1-

0.8433444572

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.2887701265

0.067

>

0.0083

dipakai

0.003+fy

fy

0.0035

<

0.0082890364

dipakai

0.0083

0.0083

1521.1428571429

300

560 =

1392.55812

Digunakan tulangan:
4 D

22

OK

Perhitungan tulangan geser tumpuan

Vu=

26.1

ton

261000

N.

0.6

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Vn

Vu

261000

Vc

1/6fc' b d

435000.000

139719.719

0.6

0.17

24.9 *

300

560

Vs

Vn

Vn

>

Vc

Vc

435000.000

139719.719

295280.281

119.209

b. Jarak sengkang:
Tulngan geser

10

As

78.5714285714

2 As fy d

2 *

78.5714286 *

Vs

400

560

295280.281

Dipakai tulangan geser

10

100

OK

Perhitungan tulangan lentur lapangan

Lapangan bawah

Mu=

31.1

ton.m

311000000

N.mm

0.8

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

fc'

311000000

d2

fy
0.85

=
0.8

300

(1-

1 -

2 *

(1-

1 -

2 *

18.899

24.9

Rn

fy
18.899

18.899

4.132

560 ^2

400
0.85

m
=

4.132

0.0116023531

0.0116023531

400

0.0529

(1-

1 -

156.1869727811
400

max

0.0529

(1-

0.0529

(1-

0.609532568

0.0529

(1-

0.7807256676

0.85 fc' 1
fy

1 -

0.003Es
0.003+fy

0.390467432

0.067

>

0.0116

dipakai

min

As tul.Atas

1.4

fy

0.0035

<

0.0116023531

dipakai

0.0116

0.0116

22

2662

ton.m

300

mm2

OK

560 =

1949.19532

Digunakan tulangan:
7 D

Lapangan atas

Mu=

10

100000000

N.mm

0.8

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

fc'

100000000

d2

fy

0.8

(1-

1 -

2 *

(1-

1 -

2 *

18.899

24.9

Rn

fy
18.899

18.899

1.329

560 ^2

400
0.85

m
=

300

0.85

1.329

0.003433

0.0034330095

400

0.0529

(1-

1 -

50.2208915695
400

max

0.0529

(1-

0.0529

(1-

0.8744477711

0.0529

(1-

0.9351191213

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.1255522289

0.067

>

0.0034

dipakai

0.003+fy

fy

0.0035

>

0.0034330095

dipakai

0.0035

0.0035

1521.1428571429

300

Digunakan tulangan:
4 D

22

OK

560 =

588

Perhitungan tulangan geser dilapangan

Vu=

15

ton.m

150000

N.

0.6

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Vn

Vu

150000

Vc

Vs

Vn

Vn

>

Vc

250000.000

139719.719

110280.281

319.187

0.6

1/6fc' b d

Vc

0.17

250000.000

25 *

300

560

139719.719

b. Jarak sengkang:
Tulngan geser

As

78.5714285714

2 As fy d

10

2 *

78.5714286 *

Vs

400

560

110280.281

Dipakai tulangan geser


D

10

200

OK

XIII. BT3 300X800


Perhitungan tulangan lentur tumpuan

DICEK

Tumpuan atas

Mu=

48.73

ton.m

487300000

N.mm

0.8

300

mm

760

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

487300000

d2

fy

0.8

0.85

(1-

1 -

2 *

18.899

24.9

Rn

fy
1

(1-

1 -

2 *

18.899

18.899

3.515

760 ^2

400

fc'

300

0.85

3.515

0.0096721769

0.0096721769

400

0.0529

(1-

1 -

132.8708457206
400

max

0.0529

(1-

0.0529

(1-

0.6678228857

0.0529

(1-

0.8172043109

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.3321771143

0.067

>

0.00967

dipakai

0.003+fy

fy

0.0035

<

0.0096721769

dipakai

0.0097

0.0097

22

2662

ton.m

300

760 =

2205.25633

Digunakan tulangan:
7 D

OK

Tumpuan bawah

Mu=

42

420000000

N.mm

0.8
300

mm

760

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

=
*

fy
0.85

d2

420000000
0.8

=
*

fc'

300

=
760 ^2

400
0.85

3.030

=
24.9

18.899

(1-

1 -

2 *

Rn

m
=

(1-

1 -

2 *

18.899

18.899

fy
*

3.030

0.0082116397

0.0082116397

400

0.0529

(1-

1 -

114.5203267036
400

max

0.0529

(1-

0.0529

(1-

0.7136991832

0.0529

(1-

0.844807187

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.2863008168

0.067

>

0.0082

dipakai

0.003+fy

fy

0.0035

<

0.0082116397

dipakai

0.0082

0.0082

1901.4285714286

300

760 =

1872.25386

Digunakan tulangan:
5 D

22

OK

Perhitungan tulangan geser tumpuan

Vu=

39.2

ton

392000

N.

0.6

300

mm

760

mm

fy

400

Mpa

fc'

24.9

Mpa

Vn

Vu

392000

Vc

1/6fc' b d

Vs

Vn

Vn

>

Vc

Vc

653333.333

189619.619

463713.714

0.6

0.17

653333.333

24.9 *

300

189619.619

760

b. Jarak sengkang:
Tulngan geser

10

As

78.5714285714

2 As fy d

2 *

78.5714286 *

Vs

400

760

103.019

463713.714

Dipakai tulangan geser

10

100

OK

Perhitungan tulangan lentur lapangan

Lapangan bawah

Mu=

42.8

ton.m

428000000

N.mm

0.8

300

mm

760

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

fc'

428000000

d2

fy

0.8

(1-

1 -

2 *

(1-

1 -

2 *

18.899

24.9

Rn

fy
18.899

18.899

3.087

760 ^2

400
0.85

m
=

300

0.85

3.087

0.008382746

0.008382746

400

0.0529

(1-

1 -

116.7016662598
400

max

0.0529

(1-

0.0529

(1-

0.7082458344

0.0529

(1-

0.8415734278

0.85 fc' 1

fy

min

1.4

1 -

0.2917541656

0.003Es

0.067

>

0.0084

dipakai

0.003+fy

fy

0.0084

0.0035

<

0.008382746

dipakai

As tul.Atas

0.0084

300

760 =

1911.26609

Digunakan tulangan:
6 D

22

ton.m

2281.7142857143 mm2

OK

Lapangan atas

Mu=

10

100000000

N.mm

0.8

300

mm

760

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

fc'

100000000

d2

fy

0.8

(1-

1 -

2 *

(1-

1 -

2 *

18.899

24.9

Rn

fy
18.899

18.899

0.721

760 ^2

400
0.85

m
=

300

0.85

0.721

0.001835

0.0018352676

400

0.0529

(1-

1 -

27.2667444532
400

max

0.0529

(1-

0.0529

(1-

0.9318331389

0.0529

(1-

0.9653150464

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.0681668611

0.067

>

0.0018

dipakai

0.003+fy

fy

0.0035

>

0.0018352676

dipakai

0.0035

0.0035

1140.8571428572

300

Digunakan tulangan:
3 D

22

Perhitungan tulangan geser dilapangan

OK

760 =

798

Vu=

35

ton.m

350000

N.

0.6

300

mm

760

mm

fy

400

Mpa

fc'

24.9

Mpa

Vn

Vu

350000

Vc

Vs

Vn

Vn

>

Vc

583333.333

189619.619

393713.714

121.335

0.6

1/6fc' b d

Vc

0.17

583333.333

25 *

300

760

189619.619

b. Jarak sengkang:
Tulngan geser

As

78.5714285714

2 As fy d

10

2 *

78.5714286 *

Vs

400

760

393713.714

Dipakai tulangan geser


D

10

100

OK

XIV. BT4 300X600


Perhitungan tulangan lentur tumpuan

DICEK

Tumpuan atas

Mu=

43

ton.m

430000000

N.mm

0.8

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

430000000

d2

fy

0.8

0.85

(1-

1 -

2 *

fy
1

(1-

1 -

2 *

18.899

18.899

18.899

24.9

Rn

m
=

5.713

560 ^2

400

fc'

300

0.85

5.713

0.0170206046

0.0170206046

400

0.0529

(1-

1 -

215.9498337488
400

max

0.0529

(1-

0.0529

(1-

0.4601254156

0.0529

(1-

0.6783254496

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.5398745844

0.067

>

0.01702

dipakai

0.003+fy

fy

0.0035

<

0.0170206046

dipakai

0.0170

0.0170

22

3042.2857142857

ton.m

300

560 =

2859.46158

Digunakan tulangan:
8 D

OK

Tumpuan bawah

Mu=

30

300000000

N.mm

0.8

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

1
m

300000000

d2

fy
0.85

=
0.8

300

=
*

0.85

1 -

2 *

Rn
fy

3.986

560 ^2

400

fc'

(1-

=
24.9

18.899

(1-

1 -

2 *

18.899

18.899

3.986

0.0111369733

0.0111369733

400

0.0529

(1-

1 -

150.6626747084
400

max

0.0529

(1-

0.0529

(1-

0.6233433132

0.0529

(1-

0.7895209391

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.3766566868

0.067

>

0.0111

dipakai

0.003+fy

fy

0.0035

<

0.0111369733

dipakai

0.0111

0.0111

2281.7142857143

300

560 =

1871.01152

Digunakan tulangan:
6 D

22

OK

Perhitungan tulangan geser tumpuan

Vu=

20

ton

200000

N.

0.6

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Vn

Vu

200000

Vc

Vs

Vn

Vn

>

Vc

b. Jarak sengkang:

1/6fc' b d

Vc

333333.333

139719.719

193613.614

0.6

0.17

333333.333

24.9 *

300

139719.719

560

Tulngan geser

10

As

78.5714285714

2 As fy d

2 *

78.5714286 *

Vs

400

560

181.805

193613.614

Dipakai tulangan geser

10

150

OK

Perhitungan tulangan lentur lapangan

Lapangan bawah

Mu=

24.3

ton.m

243000000

N.mm

0.8
300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

243000000

d2

fy

0.8

0.85

(1-

1 -

2 *

18.899

24.9

Rn

fy
1

(1-

1 -

2 *

18.899

18.899

3.229

560 ^2

400

fc'

300

0.85

3.229

0.0088040331

0.0088040331

400

0.0529

(1-

1 -

122.0367665138
400

max

0.0529

(1-

0.0529

(1-

0.6949080837

0.0529

(1-

0.8336114705

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.3050919163

0.067

>

0.0088

dipakai

0.003+fy

fy

0.0035

<

0.0088040331

dipakai

0.0088

Digunakan tulangan:

0.0088

300

560 =

1479.07756

4 D

22

ton.m

1521.1428571429 mm2

OK

Lapangan atas

Mu=

15

150000000

N.mm

0.8
300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

150000000

d2

fy

0.8

0.85

(1-

1 -

2 *

18.899

24.9

Rn

fy
1

(1-

1 -

2 *

18.899

18.899

1.993

560 ^2

400

fc'

300

0.85

1.993

0.005242

0.0052421356

400

0.0529

(1-

1 -

75.3313373542
400

max

0.0529

(1-

0.0529

(1-

0.8116716566

0.0529

(1-

0.9009282195

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.1883283434

0.067

>

0.0052

0.003+fy

fy

0.0035

>

0.0052421356

dipakai

0.0052

0.0052

1521.1428571429

300

560 =

Digunakan tulangan:
4 D

22

OK

Perhitungan tulangan geser dilapangan

Vu=

19.15
=

dipakai

0.6

ton.m

191500

N.

880.678779

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Vn

Vu

191500

Vc

Vs

Vn

1/6fc' b d

Vn

>

Vc

319166.667

139719.719

179446.947

196.158

0.6

Vc

0.17

319166.667

25 *

300

560

139719.719

b. Jarak sengkang:
Tulngan geser

As

78.5714285714

2 As fy d

10

2 *

78.5714286 *

Vs

400

179446.947

Dipakai tulangan geser


D

XV

3. Tahap Perhitungan

3.1. Data perhitungan

3.1.1 Spesipikasi Bahan

10

175

NOT OK

560

a. Mutu Beton
* Tie bem,Pile Cap,Dinding Basemen

fc'

24.9 Mpa

(K-300)

* Kolom,Shear Wall

fc'

33.2 Mpa

(K-400)

* Pelat,Balok,Tangga

fc'

24.9 Mpa

(K-300)

* Tiang Pancang

fc'

41.5 Mpa

(K-500)

* Tiang Bor

fc'

24.9 Mpa

(K-300)

fy

240 Mpa

fy

400 Mpa

*SS41 atau BJ37

fy

240 Mpa

d. Modulus Elastis Beton (Ec)

Ec

fc'

24.9 Mpa

fc'

33.2 Mpa

b. Mutu Baja Tulangan


* BJTP U-24

10

* BJTD U-40

10

13

16

19

22

25

c. Mutu Baja Profil

Ec

21409.52

Mpa

Ec

27081.14

Mpa

:
:

4700.f'c

a. Beban Mati
*Beton Bertulang

2400 kg/m3

*Pasir

1800 kg/m3

*Tanah urug )*

1700 kg/m3

*Tembok Bata dengan ketebalan 15 cm

250 kg/m3

*Mekanikal/ Electrical

30 kg/m3

*Adukan Mortar Penutup Lantai

2000 kg/m3

*Air

1000 kg/m3

*Penutup Lantai Finishing

108 kg/m3

( dari ubin, semen, traso, kramik)

b. Beban Hidup
* Menurut Pedoman Perencanaan Pembebanan untukgedung 1987 yaitu(Hotel)
:

c. Beban Gempa
* Beban Geser Dasar (base shear)
V

C1xIxWt
R

Beban geser dasar nominal statik ekuivalen akibad pengaruh gempa


rencana

C1

Nilai factor respons gempa yang didapat dari Spectrum Respons gempa
rencana untuk waktu getar alami fundamental dari struktur gedung .

Faktor keutamaan=

Wt

Berat total gedung, termasuk beban hidup yang sesuai.

1.0 (Hotel)

Faktor reduksi gempa, yaitu rasio antara beban gempa maximum akibad

250 kg/m2

pengaruh gempa rencana terhadap struktur gedung daktail.


Untuk perhitungan perhitungan struktur diatas diambil R=

* Lokasi bangunan terletak pada zone 2 (Palembang) peta wilayah gempa RI.
Percepatan puncak batuan dasar =

0.01

g. Jenis tanah nya merupakan

tanah lunak dgn nilai Nspt rata-rata <15 pada kedalaman 0- 10 m,sehingga
Percepatan puncak muka tanah AO = 0.2xg.

3.2 Perhitungan balok


I. B 1A 300X600
Perhitungan tulangan lentur tumpuan

Tumpuan atas

Mu=

44

ton.m

440000000

N.mm

0.8

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

440000000

d2

fy

0.8

0.85

(1-

1 -

2 *

m
=

18.899

24.9

Rn

fy
1

(1-

1 -

2 *

18.899

18.899

5.846

560 ^2

400

fc'

300

0.85

=
*

5.846

0.0175133435

0.0175133435

400

0.0529

(1-

1 -

220.9685802032
400

max

0.0529

(1-

0.0529

(1-

0.4475785495

0.0529

(1-

0.6690131161

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.5524214505

0.067

>

0.0175

dipakai

0.003+fy

fy

0.0035

<

0.0175133435

dipakai

0.0175

0.0175

300

560 =

2942.24171

Digunakan tulangan:
8 D

22

ton.m

3042.2857142857

OK

Tumpuan bawah

Mu=

24

240000000

N.mm

0.8

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

240000000

d2

fy

0.8

0.85

(1-

1 -

2 *

fy
1

(1-

1 -

2 *

18.899

18.899

18.899

24.9

Rn

m
=

3.189

560 ^2

400

fc'

300

0.85

=
*

3.189

0.0086846554

0.0086846554

400

0.0529

(1-

1 -

120.5301397668
400

max

0.0529

(1-

0.0529

(1-

0.6986746506

0.0529

(1-

0.8358676035

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.3013253494

0.067

>

0.0087

fy

0.0035

<

0.0086846554

dipakai

0.0087

0.0087

1521.1428571429

300

560 =

Digunakan tulangan:
4 D

22

OK

Perhitungan tulangan geser tumpuan

Vu=

21
=

dipakai

0.003+fy

0.6

ton.m

210000

N.

1459.02211

300

mm

660

mm

fy

400

Mpa

fc'

24.9

Mpa

Vn

Vu

210000

Vc

Vs

Vn

1/6fc' b d

Vn

>

Vc

350000.000

164669.669

185330.331

223.847

0.6

Vc

0.17 *

350000.000

24.9 *

300

660

164669.669

b. Jarak sengkang:
Tulngan geser

10

As

78.5714285714

2 As fy d

2 *

78.5714286 *

Vs

400

660

185330.331

Dipakai tulangan geser

10

150

OK

Perhitungan tulangan lentur lapangan

Lapangan bawah

Mu=

26

ton.m

260000000

N.mm

0.8

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

260000000

d2

fy
0.85

=
0.8

300

=
*

0.85

1 -

2 *

18.899

24.9

Rn

fy
1

(1-

1 -

18.899

3.455

560 ^2

400

fc'

(1-

0.0529

2 *

18.899

3.455

400

(1-

1 -

130.5743180806
400

0.0094867047

max

0.0529

(1-

0.0529

(1-

0.6735642048

0.0529

(1-

0.820709574

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.3264357952

0.067

>

0.00949

0.0094867047

dipakai

0.003+fy

fy

0.0035

<

0.0094867047

dipakai

0.0095

0.0095

300

560 =

1593.76638

Digunakan tulangan:
5 D

22

ton.m

1901.4285714286 mm2

OK

Lapangan atas

Mu=

10

100000000

N.mm

0.8
300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

100000000

d2

fy
0.85

=
0.8

300

=
*

0.85

(1-

1 -

2 *

18.899

24.9

Rn

fy
1

(1-

1 -

2 *

18.899

18.899

1.329

560 ^2

400

fc'

1.329

0.003433

0.0034330095

400

0.0529

(1-

1 -

50.2208915695
400

max

0.0529

(1-

0.0529

(1-

0.8744477711

0.0529

(1-

0.9351191213

0.85 fc' 1

1 -

0.003Es

0.1255522289

0.067

>

0.0034 ### dipakai

fy

min

As tul.Atas

0.003+fy

1.4

fy

0.0035

<

0.0034330095

dipakai

0.0035

0.0035

1473.2142857143

300

560 =

588

Digunakan tulangan:
3 D

25

OK

Perhitungan tulangan geser dilapangan

Vu=

32

ton.m

320000

N.

0.6

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Vn

Vu

320000

Vc

Vs

Vn

1/6fc' b d

Vn

>

Vc

533333.333

0.6

Vc

0.17 *

533333.333

24.9 *

300

560

139719.719

139719.719

393613.614

89.428

a. Jarak sengkang minimum diambil dari d/2

560

280

mm

Dipakai tulangan

10

200

b. Jarak sengkang:
Tulngan geser

As

78.5714285714

2 As fy d

10

2 *

78.5714286 *

Vs

400

393613.614

Dipakai tulangan geser


D

10

75

NOT OK

560

II. B 1B 300X700
Perhitungan tulangan lentur tumpuan

DICEK

Tumpuan atas

Mu=

24

ton.m

240000000

N.mm

0.8

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

240000000

d2

fy

0.8

0.85

(1-

1 -

2 *

fy
1

(1-

1 -

2 *

18.899

18.899

18.899

24.9

Rn

m
=

3.189

560 ^2

400

fc'

300

0.85

=
*

3.189

0.0086846554

0.0086846554

400

0.0529

(1-

1 -

120.5301397668
400

max

0.0529

(1-

0.0529

(1-

0.6986746506

0.0529

(1-

0.8358676035

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.3013253494

0.067

>

0.00868

fy

0.0035

<

0.0086846554

dipakai

0.0087

0.0087

22

1901.4285714286

ton.m

300

560 =

Digunakan tulangan:
5 D

OK

Tumpuan bawah

Mu=

39
=

dipakai

0.003+fy

0.8

390000000

N.mm

1459.02211

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

390000000

d2

fy

0.8

0.85

(1-

1 -

2 *

m
=

18.899

24.9

Rn

fy
1

(1-

1 -

2 *

18.899

18.899

5.182

560 ^2

400

fc'

300

0.85

=
*

5.182

0.0151125897

0.0151125897

400

0.0529

(1-

1 -

195.861477121
400

max

0.0529

(1-

0.0529

(1-

0.5103463072

0.0529

(1-

0.7143852652

0.85 fc' 1

1 -

0.003Es

fy

min

As tul.Atas

1.4

0.4896536928

0.067

>

0.0151

fy

0.0035

<

0.0151125897

dipakai

0.0151

0.0151

300

560 =

Digunakan tulangan:
6 D

22

2281.7142857143 NOT

OK

Perhitungan tulangan geser tumpuan

Vu=

dipakai

0.003+fy

34

ton

340000

N.

0.6

300

mm

560

mm

fy

400

Mpa

2538.91506

fc'

Vn

24.9

Mpa

Vu

340000

Vc

Vs

Vn

Vn

>

Vc

566666.667

139719.719

426946.947

82.446

0.6

1/6fc' b d

Vc

0.17

566666.667

24.9 *

300

560

139719.719

b. Jarak sengkang:
Tulngan geser

10

As

78.5714285714

2 As fy d

2 *

78.5714286 *

Vs

400

560

426946.947

Dipakai tulangan geser

10

75

OK

Perhitungan tulangan lentur lapangan

Lapangan bawah

Mu=

23

ton.m

230000000

N.mm

0.8

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

230000000

d2

fy
0.85

=
0.8

300

=
*

0.85

1 -

2 *

m
=

24.9

Rn

(1-

1 -

0.0529

2 *

18.899

3.056

400

(1-

1 -

115.5080506098
400

18.899

fy

18.899

3.056

560 ^2

400

fc'

(1-

0.0529

(1-

1 -

0.2887701265

0.0082890364

max

0.0529

(1-

0.7112298735

0.0529

(1-

0.8433444572

0.85 fc' 1

0.003Es

fy

min

As tul.Atas

1.4

0.067

>

0.0083

0.0082890364

dipakai

0.003+fy

fy

0.0035

<

0.0082890364

dipakai

0.0083

0.0083

300

560 =

1392.55812

Digunakan tulangan:
4 D

22

ton.m

1521.1428571429 mm2

OK

Lapangan atas

Mu=

10

100000000

N.mm

0.8

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Rn

Mu

100000000

d2

fy
0.85

=
0.8

300

=
*

0.85

(1-

1 -

2 *

m
=

18.899

24.9

Rn

fy
1

(1-

1 -

2 *

18.899

18.899

1.329

560 ^2

400

fc'

1.329

0.003433

0.0034330095

400

0.0529

(1-

1 -

50.2208915695
400

max

0.0529

(1-

0.0529

(1-

0.8744477711

0.0529

(1-

0.9351191213

0.85 fc' 1

fy

min

1.4

1 -

0.1255522289

0.003Es

0.067

>

0.0034

dipakai

0.003+fy

fy

0.0035

>

0.0034330095

dipakai

As tul.Atas

0.0035

0.0035

1140.8571428572

300

560 =

588

Digunakan tulangan:
3 D

22

OK

Perhitungan tulangan geser dilapangan

Vu=

55

ton.m

550000

N.

0.6

300

mm

560

mm

fy

400

Mpa

fc'

24.9

Mpa

Vn

Vu

550000

Vc

Vs

Vn

Vn

>

Vc

916666.667

139719.719

776946.947

45.306

0.6

1/6fc' b d

Vc

0.17

916666.667

25 *

300

560

139719.719

a. Jarak sengkang minimum diambil dari d/2

560

280

mm

Dipakai tulangan

10

200

b. Jarak sengkang:
Tulngan geser

As

78.5714285714

2 As fy d

10

2 *

78.5714286 *

Vs

400

776946.947

Dipakai tulangan geser


D

10

100

NOT OK

560

(K-300)
(K-400)
(K-300)
(K-500)
(K-300)

5.5

nis tanah nya merupakan

18.899

0.0175133435

0.0175133435

2942.24171

18.899

0.0086846554

0.0086846554

1459.02211

350000.000

164669.669

185330.331

223.847

18.899

mm

0.0094867047

0.0094867047

1593.76638

18.899

0.003433

0.0034330095

588

533333.333

139719.719

393613.614

89.428

mm

18.899

0.0086846554

0.0086846554

1459.02211

18.899

0.0151125897

0.0151125897

2538.91506

566666.667

139719.719

426946.947

82.446

18.899

0.0082890364

mm

0.0082890364

1392.55812

18.899

0.003433

0.0034330095

588

916666.667

139719.719

776946.947

45.306

mm

18.899

0.010335678

0.010335678

2046.46424

18.899

0.0141304353

0.0141304353

2797.82619

543333.333

164669.669

378663.664

109.558

18.899

0.0106339068

mm

0.0106339068

2105.51355

18.899

0.002448

0.0024479644

693

483333.333

164669.669

318663.664

130.187

mm

18.899

0.0120472223

0.0120472223

2023.93335

18.899

0.0034330095

0.0034330095

min

588

366666.667

139719.719

226946.947

155.102

18.899

0.0094867047

mm

0.0094867047

1593.76638

18.899

0.003433

0.0034330095

588

333333.333

139719.719

193613.614

181.805

mm

18.899

0.0107195022

0.0107195022

2476.20501

18.899

0.0070255066

0.0070255066

1622.89202

883333.333

192114.614

691218.719

60.018

CATATAN

18.899

0.0151582684

mm

0.0151582684

3501.55999

18.899

0.003170

0.003169505

min

808.5

816666.667

192114.614

624552.052

66.425
CATTATAN

18.899

0.0111369733

0.0111369733

mm

1871.01152

18.899

0.0034330095

0.0034330095

min

588

166666.667

139719.719

26946.947

1306.270

18.899

mm

0.0082890364

0.0082890364

1392.55812

18.899

0.003433

0.0034330095

588

250000.000

139719.719

110280.281

319.187

18.899

0.0059104643

0.0059104643

661.972

mm

18.899

0.0036109346

0.0036109346

404.42468

219166.667

93146.480

126020.187

279.320

18.899

0.0052421356

mm

0.0052421356

587.119186

18.899

0.005242

0.0052421356

587.119186

250000.000

139719.719

110280.281

319.187

mm

18.899

0.0088567148

0.0088567148

2019.33096

18.899

0.0018352676

0.0018352676

798

310000.000

189619.619

120380.381

396.837

18.899

0.0018352676

mm

0.0018352676

798

18.899

0.005719

0.0057194317

1304.03043

166666.667

204812.597

-38145.931

-1252.334

mm

18.899

0.0151125897

0.0151125897

2538.91506

18.899

0.0034330095

0.0034330095

588

333333.333

139719.719

193613.614

181.805

18.899

0.0034330095

mm

0.0034330095

588

18.899

0.007123

0.0071226834

1196.61081

166666.667

139719.719

26946.947

1306.270

mm

18.899

0.0193172414

0.0193172414

3245.29656

18.899

0.0111369733

0.0111369733

1871.01152

333333.333

139719.719

193613.614

181.805

18.899

0.0151125897

0.0151125897

mm

2538.91506

18.899

0.003433

0.0034330095

588

250000.000

139719.719

110280.281

319.187

mm

18.899

0.0158146352

0.0158146352

4175.06369

18.899

0.0042997603

0.0042997603

1135.13673

571333.333

219559.559

351773.774

117.933

18.899

0.0069074814

mm

0.0069074814

1823.57509

18.899

0.003718

0.0037176049

981.447701

500000.000

219559.559

280440.441

147.931

mm

18.899

0.0137425239

0.0137425239

2308.74402

18.899

0.0082890364

0.0082890364

1392.55812

435000.000

139719.719

295280.281

119.209

18.899

0.0116023531

0.0116023531

mm

1949.19532

18.899

0.003433

0.0034330095

588

250000.000

139719.719

110280.281

319.187

mm

18.899

0.0096721769

0.0096721769

2205.25633

18.899

0.0082116397

0.0082116397

1872.25386

653333.333

189619.619

463713.714

103.019

18.899

0.008382746

0.008382746

mm

1911.26609

18.899

0.001835

0.0018352676

798

583333.333

189619.619

393713.714

121.335

mm

18.899

0.0170206046

0.0170206046

2859.46158

18.899

0.0111369733

0.0111369733

1871.01152

333333.333

139719.719

193613.614

181.805

18.899

0.0088040331

0.0088040331

1479.07756

mm

18.899

0.005242

0.0052421356

880.678779

319166.667

139719.719

179446.947

196.158

mm

(K-300)
(K-400)
(K-300)
(K-500)
(K-300)

5.5

nis tanah nya merupakan

18.899

0.0175133435

0.0175133435

2942.24171

18.899

0.0086846554

0.0086846554

1459.02211

350000.000

164669.669

185330.331

223.847

18.899

0.0094867047

mm

0.0094867047

1593.76638

18.899

0.003433

0.0034330095

588

533333.333

139719.719

393613.614

89.428

mm

18.899

0.0086846554

0.0086846554

1459.02211

18.899

0.0151125897

0.0151125897

2538.91506

566666.667

139719.719

426946.947

82.446

18.899

0.0082890364

mm

0.0082890364

1392.55812

18.899

0.003433

0.0034330095

588

916666.667

139719.719

776946.947

45.306

mm

Compatibility Report for BATIQA HOTEL XL.xls


Run on 11/30/2014 21:44
The following features in this workbook are not supported by earlier versions of
Excel. These features may be lost or degraded when you save this workbook in
an earlier file format.
Minor loss of fidelity
Some cells or styles in this workbook contain formatting that is not supported by
the selected file format. These formats will be converted to the closest format
available.

# of occurrences
1

Anda mungkin juga menyukai