Project
Development Project
Banyu Urip Well Clean Up
Early Oil Expansion (EOE)
To (Client)
Sign
Attention
Sendy Ardianto
Drajat Akhmadi
Ilyas Suwardi
From
Date
Attention
Surya Kusuma
Pieter Harry
Sign
Material
Category
Reference
As per
Specification ?
Material
Proposed
3M Sticker Maeterial
Manufacturer
Supplier
21 September 2014
3M material sample
No.21
Dimension : 600 x 550
Location : Flow Line
Contact / No
Consultant
Comments
Rejected
Resubmit
Date
Date
Approved
Note Where practical, when an alternative material to that specified is being proposed,
both the specified and proposed samples must be submitted.
ISO Ref