Anda di halaman 1dari 5

WorldView 3 Orthorectification

World View 3 was launched August 13, 2014. In June 2014, the US Department of Commerce gave
Digital Globe permission to collect and sell imagery at the best available resolution. WorldView-3
provides 31 cm panchromatic resolution, 1.24 m multispectral resolution, 3.7 m short wave infrared
resolution and 30 m CAVIS resolution, making it the highest resolution commercial satellite in the
world. The satellite operates at an altitude of 617km and collects 680,000 sq km of data a day.
The following tutorial demonstrates how to orthorectify a WorldView 3 OrthoReady2A image using
Geomatica OrthoEngine. OrthoReady 2A data has no topographic relief (DEM) applied with respect to
the reference ellipsoid, making it suitable for orthorectification.

Project Setup
1. Open the Geomatica 2014 OrthoEngine application

2. From the OrthoEngine Toolbar click File

New

3. The project Information window opens.


a. Enter a Filename for the project. Browse to your destination folder with the Browse
button. Name the project and enter a description.
b. Select Optical Satellite Modelling as the Math Modeling Method
c. Select Rational Functions (Extract from image) under Options
d. Click OK

Page | 1
The information in this document is subject to change without notice and should not be construed as a commitment by PCI Geomatics.
PCI Geomatics assumes no responsibility for any errors that may appear in this document.

WorldView 3 Orthorectification

4. The Set Projection window will open up. Click Cancel to close this window. The projection
information will automatically be set once you add your first image.
5. Another pop-up window will appear and click OK.

Open Image Files in OrthoEngine


1. On the OrthoEngine toolbar select Data Input from the Processing Step drop down menu.
2. Select Open a new or existing image.

Page | 2
The information in this document is subject to change without notice and should not be construed as a commitment by PCI Geomatics.
PCI Geomatics assumes no responsibility for any errors that may appear in this document.

WorldView 3 Orthorectification

3. Select the .IMD file associated with the dataset.

GCP and TP Collection


At this stage an Orthorectified image can be directly generated in the absence of any GCPs. The
model will be computed based on the supplied RPCs. If GCPs are available, they can be added into the
project using the GCP/TP Collection Processing step. The model will be automatically computed, and
GCPs can be reviewed through the Residual report. It is recommended to use a ZERO order RPC
adjustment if there is a minimum of 1 GCP collected for the imagery. A FIRST order RPC adjustment is
recommended if there is a minimum of 3 GCPs. The distribution of these GCPs must be throughout
the entire image.

Page | 3
The information in this document is subject to change without notice and should not be construed as a commitment by PCI Geomatics.
PCI Geomatics assumes no responsibility for any errors that may appear in this document.

WorldView 3 Orthorectification

Generate Ortho
1. On the OrthoEngine toolbar select Ortho Generation from the Processing Step drop down
menu.
a. Select Schedule Ortho Generation.

b. Move the image from the Available images window on the left to the Images to process window
on the right.
c. Select an appropriate DEM file. For this tutorial gmted2010.pix was selected. This file can be found
in the etc folder - C:\PCI Geomatics\Geomatica 2014\etc
d. Modify any of the other parameters based on your data requirements.
e. Select Generate Orthos.

Page | 4
The information in this document is subject to change without notice and should not be construed as a commitment by PCI Geomatics.
PCI Geomatics assumes no responsibility for any errors that may appear in this document.

WorldView 3 Orthorectification

f. The Ortho Production Progress window will show you when the processing is complete.

2. The final orthorectified image can be viewed in Focus.

Page | 5
The information in this document is subject to change without notice and should not be construed as a commitment by PCI Geomatics.
PCI Geomatics assumes no responsibility for any errors that may appear in this document.

Anda mungkin juga menyukai