Perhitungan Pondasi Sumuran
Perhitungan Pondasi Sumuran
PEMBEBANAN
0,750
b.s. poer
6786,00 kg
L=
5,200
68434,80 kg
A=
0,442
b.s. kolom
B=
1,300
l=
2,900
DIMENSI
t=
0,750
data lain :
gt =
gbeton cyclop =
SG=
Ai =
0,498
2200
kg/m3
0,796
kg
d=
0,80
As =
1,005
m
m2
panjang sumuran,
Ls =
5,000
Ap =
3,770
m
m2
An =
2,765
m2
68434,8
Df = 1
m, Nq = 7,43
m, Ng = 4,6
qu = 13836
qa = 4612
0,461
sf = 3
kg/m2
DATA SONDIR
kg/cm
12750,75
kg
81541,78
kg
11058,41
kg
kg
2
78624,48 kg/m
Gp =
79041,95
luas poer,
n=
m2
1500
c= 0
st =
0,995
buah
m2
B = 1,300
80734,30 kg
kg/m3
5513,50 kg
SV=
qc pd 1.5 D ke atas =
15
kg/cm2
qc pd ujung sumuran =
28
kg/cm2
qc pd 1.5 D ke bawah =
30
kg/cm2
2
st = 8,1111111 kg/cm
2
st = 81111,111 kg/m
W < Q ........ ok
sumuran aman ...ok
5026,55
mm2
19
mm
mm2
283,53
18
buah
2
A ada = 5103,5173 mm
1,67
mm
selimut beton
50
mm
665
mm
keliling
2089,16
mm
342
mm
jarak tulangan
97,06
mm
15
qall =
26972
kg/cm2