PLANILLA DE SUSTENTO DE METRADOS

Obra
Frmula

Distrito de Trujillo - Provincia Trujillo - Departamento La Libertad

Lugar

DIMENSIONES/ELEMENTO
Item

Descripcin

02.00.00

LONGIT,

ANCHO

ALTO

CANTID.

(m)

(m)

(m)

02.01.00

OBRAS PROVISIONALES

02.01.01

MOVILIZACIN Y DESMOVILIZACIN DE EQUIPOS Y HERRAMIENTAS

02.02.00

TRABAJOS PRELIMINARES

02.02.01

DEMOLICIN DE PISOS DE CONCRETO E=4"

02.02.02

FACTOR

1.00

PABELLN A1 al A6

6.00

5.00

3.40

PABELLN B1 y B2

2.00

5.00

4.45

PABELLN B3 (06 Und)

0.60

5.00

4.45

PABELLN A1 al A6

6.00

5.00

3.40

PABELLN B1 y B2

2.00

5.00

4.45

PABELLN B3 (06 Und)

0.60

5.00

4.45

CORTE 1 -1'

6.00

2.20

0.80

1.10

CORTE 2 -2'

12.00

5.00

0.60

1.10

CORTE 4 -4'

12.00

2.20

0.60

1.10

CORTE 1 -1'

2.00

3.00

0.80

1.10

CORTE 2 -2'

4.00

5.00

0.60

1.10

CORTE 4 -4'

4.00

3.00

0.60

1.10

PABELLN B3 (06 Und)

1.00

TRAZO Y REPLANTEO EN TERRENO NORMAL

02.03.00

MOVIMIENTO DE TIERRAS

02.03.01

EXCAVACIN PARA CIMIENTOS HASTA 1.00m TERRENO NORMAL


PABELLN "A1 al A6"
CIMIENTOS

PABELLN "B1 y B2"


CIMIENTOS

02.03.02

RELLENO Y COMPACTACIN C/MATERIAL PROPIO


PABELLN "A1 al A6"

PLANILLA DE SUSTENTO DE METRADOS


Obra
Frmula

Distrito de Trujillo - Provincia Trujillo - Departamento La Libertad

Lugar

DIMENSIONES/ELEMENTO
Item

Descripcin

FACTOR

LONGIT,

ANCHO

ALTO

CANTID.

(m)

(m)

(m)

CIMIENTOS
CORTE 1 -1'

6.00

2.20

0.60

0.30

CORTE 2 -2'

12.00

5.00

0.45

0.30

CORTE 4 -4'

12.00

2.20

0.45

0.30

CORTE 1 -1'

2.00

3.00

0.60

0.30

CORTE 2 -2'

4.00

5.00

0.45

0.30

CORTE 4 -4'

4.00

3.00

0.45

0.30

PABELLN B3 (06 Und)

1.00

PABELLN A1 al A6

6.00

5.00

3.40

PABELLN B1 al B4

4.00

5.00

4.45

CORTE 1 -1'

-6.00

2.20

0.20

CORTE 2 -2'

-12.00

5.00

0.15

CORTE 4 -4'

-12.00

2.20

0.15

CORTE 1 -1'

-2.00

3.00

0.20

CORTE 2 -2'

-4.00

5.00

0.15

CORTE 4 -4'

-4.00

3.00

0.15

PABELLN B3 (06 Und)

1.00

PABELLN A1 al A6

6.00

5.00

3.40

PABELLN B1 y B2

2.00

5.00

4.45

PABELLN "B1 y B2"


CIMIENTOS

02.03.03

CAMA DE APOYO CON AFIRMADO E=4" P/FALSO PISO Y VEREDAS

- CIMIENTOS
PABELLN "A1 al A6"
CIMIENTOS

PABELLN "B1 y B2"


CIMIENTOS

02.03.04

NIVELACIN Y COMPACTACIN DE SUBRASANTE C/EQUIPO LIVIANO

- CIMIENTOS
PABELLN "A1 al A6"

PLANILLA DE SUSTENTO DE METRADOS


Obra
Frmula

Distrito de Trujillo - Provincia Trujillo - Departamento La Libertad

Lugar

DIMENSIONES/ELEMENTO
Item

Descripcin

FACTOR

LONGIT,

ANCHO

ALTO

CANTID.

(m)

(m)

(m)

CIMIENTOS
CORTE 1 -1'

-6.00

2.20

0.20

CORTE 2 -2'

-12.00

5.00

0.15

CORTE 4 -4'

-12.00

2.20

0.15

CORTE 1 -1'

-2.00

3.00

0.20

CORTE 2 -2'

-4.00

5.00

0.15

CORTE 4 -4'

-4.00

3.00

0.15

DEMOLICIN DE PISOS DE CONCRETO E=4"

1.50

15.99

EXCAVACIN PARA CIMIENTOS HASTA 1.00m TERRENO NORMAL

1.25

102.96

- RELLENO Y COMPACTACIN

-1.56

21.06

ACARREO DE MATERIAL EXCEDENTE L=200m MX. CARGUO MANUAL

1.00

119.77

CORTE 1 -1'

6.00

2.20

0.80

0.70

CORTE 2 -2'

12.00

5.00

0.60

0.70

CORTE 4 -4'

12.00

2.20

0.60

0.70

CORTE 1 -1'

2.00

3.00

0.80

0.70

CORTE 2 -2'

4.00

5.00

0.60

0.70

CORTE 4 -4'

4.00

3.00

0.60

0.70

PABELLN B3 (06 Und)

1.00

PABELLN "B1 y B2"


CIMIENTOS

02.03.05

02.03.06

ACARREO DE MATERIAL EXCEDENTE L=200m MX. CARGUO MANUAL

VOL.

ELIMINACIN DE MATERIAL EXCEDENTE C/VOLQUETE DE 8m3.

02.04.00

OBRAS DE CONCRETO SIMPLE

02.04.01

CIMIENTO CORRIDO MEZCLA 1:10 C:H + 30% P.G.

VOL.

PABELLN "A1 al A6"


CIMIENTOS

PABELLN "B1 y B2"


CIMIENTOS

PLANILLA DE SUSTENTO DE METRADOS


Obra
Frmula

Distrito de Trujillo - Provincia Trujillo - Departamento La Libertad

Lugar

DIMENSIONES/ELEMENTO
Item

02.04.02

Descripcin

FACTOR

LONGIT,

ANCHO

ALTO

CANTID.

(m)

(m)

(m)

ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO


PABELLN "A1 al A6"
CIMIENTOS
CORTE 1 -1'

12.00

2.20

0.60

CORTE 2 -2'

24.00

5.00

0.60

CORTE 4 -4'

24.00

2.20

0.60

CORTE 1 -1'

4.00

3.00

0.60

CORTE 2 -2'

8.00

5.00

0.60

CORTE 4 -4'

8.00

3.00

0.60

PABELLN B3 (06 Und)

1.00

PABELLN "B1 y B2"


CIMIENTOS

02.04.03

CONCRETO 1:8 C:H + 25% P.M., PARA SOBRECIMIENTOS


PABELLN "A1 al A6"
CIMIENTOS
CORTE 1 -1'

12.00

2.20

0.20

0.60

CORTE 2 -2'

24.00

5.00

0.15

0.60

CORTE 4 -4'

24.00

2.20

0.15

0.60

CORTE 1 -1'

4.00

3.00

0.20

0.60

CORTE 2 -2'

8.00

5.00

0.15

0.60

CORTE 4 -4'

8.00

3.00

0.15

0.60

PABELLN B3 (06 Und)

1.00

PABELLN A1 al A6

6.00

5.00

3.40

PABELLN B1 y B2

2.00

5.00

4.45

PABELLN "B1 y B2"


CIMIENTOS

02.04.04

CONCRETO EN FALSO PISO E=8", C:H; 1:8

- CIMIENTOS
PABELLN "A1 al A6"
CIMIENTOS

PLANILLA DE SUSTENTO DE METRADOS


Obra
Frmula

Distrito de Trujillo - Provincia Trujillo - Departamento La Libertad

Lugar

DIMENSIONES/ELEMENTO
Item

Descripcin

FACTOR

LONGIT,

ANCHO

ALTO

CANTID.

(m)

(m)

(m)

CORTE 1 -1'

-6.00

2.20

0.20

CORTE 2 -2'

-12.00

5.00

0.15

CORTE 4 -4'

-12.00

2.20

0.15

CORTE 1 -1'

-2.00

3.00

0.20

CORTE 2 -2'

-4.00

5.00

0.15

CORTE 4 -4'

-4.00

3.00

0.15

PABELLN "B1 y B2"


CIMIENTOS

02.05.00

OBRAS DE CONCRETO ARMADO

02.05.01

MUROS, COLUMNAS Y LOSAS

02.05.01.01

ACERO CORRUGADO FY=4200 KG/CM2, EN COLUMNAS Y As TEMPERATURA

02.05.01.02

ENCOFRADO Y DESENCOFRADO DE MUROS Y TECHO PARA NICHOS

1.00

PABELLN "A1" al "A6"


48 NICHOS C/U (Hasta el 6to nivel)

12.00

3.40

4.40
permetro

Paredes y Techo

288.00

2.40

Caras exteriores

12.00

5.00

60 NICHOS C/U (Hasta el 6to nivel)

4.00

4.45

1.74

LADOS LATERALES
4.40

PABELLN "B1" y "B2"


4.40
permetro

Paredes y Techo

120.00

2.40

Caras exteriores

4.00

5.00

PABELLN B3 (06 Und)

1.00

1.74

LADOS LATERALES

02.05.01.03

4.40

CONCRETO SIMPLE EN MUROS Y TECHO, F'C=175 kg/cm2


PABELLN "A1" al "A6"
48 NICHOS C/U (Hasta el 6to nivel)
LADO FRONTAL, POSTERIOR Y LATERALES
Todo

6.00

3.40

5.00

4.40

PLANILLA DE SUSTENTO DE METRADOS


Obra
Frmula

Distrito de Trujillo - Provincia Trujillo - Departamento La Libertad

Lugar

DIMENSIONES/ELEMENTO
Item

Descripcin

FACTOR

LONGIT,

CANTID.

(m)

ANCHO

ALTO

(m)

(m)

rea

- 48 nichos C/U

-288.00

2.40

2.00

4.45

0.397

PABELLN "B1" y "B2"


60 NICHOS C/U (Hasta el 6to nivel)
LADO FRONTAL, POSTERIOR Y LATERALES
Todo

5.00

4.40

rea

02.05.02

VIGAS

02.05.02.01

ACERO CORRUGADO FY=4200 KG/CM2, EN VIGAS

02.05.02.02

ENCOFRADO Y DESENC. EN VIGAS

- 60 nichos C/U

-120.00

PABELLN B3 (06 Und)

1.00

2.40

0.397

18.00

3.50

0.40

12.00

5.20

0.40

6.00

4.40

0.40

4.00

5.00

0.40

18.00

3.50

0.25

0.15

12.00

5.20

0.25

0.15

6.00

4.40

0.25

0.15

4.00

5.00

0.25

0.15

1.00

VC

PABELLN A1 al A6
PABELLN B1 y B2
PABELLN B3 (06 Und)
02.05.02.03

1.00

CONCRETO F`C=175 KG/CM2, EN VIGAS


VC

PABELLN A1 al A6
PABELLN B1 y B2

02.06.00

REVOQUES Y ENLCIDOS

02.06.01

TARRAJEO DE MUROS, MEZCLA C:A 1:5 E=1.5cm

PABELLN B3 (06 Und)

1.00

48 NICHOS C/U (Hasta el 6to nivel)

12.00

PABELLN "A1" al "A6"


3.40

4.40

PLANILLA DE SUSTENTO DE METRADOS


Obra
Frmula

Distrito de Trujillo - Provincia Trujillo - Departamento La Libertad

Lugar

DIMENSIONES/ELEMENTO
Item

Descripcin

FACTOR

LONGIT,

CANTID.

(m)

ANCHO

ALTO

(m)

(m)

rea

- NICHOS

-288.00

0.397
permetro

TARRAJEO DE BVEDAS

288.00

0.35

Caras exteriores

6.00

5.00

60 NICHOS C/U (Hasta el 6to nivel)

4.00

4.45

2.44

LADOS LATERALES
4.40

PABELLN "B1" y "B2"


4.40
rea

- NICHOS

-120.00

0.397
permetro

TARRAJEO DE BVEDAS

120.00

0.35

Caras exteriores

0.00

5.00

PABELLN B3 (06 Und)

1.00

2.44

LADOS LATERALES

02.06.02

4.40

TARRAJEO DE FRISOS MEZCLA C:A 1:5, E=1.5cm


VC

PABELLN A1 al A6
PABELLN B1 y B2

02.07.00

PINTURA

02.07.01

PINTURA LTEX 02 MANOS EN MUROS, C/ IMPRIMACIN

02.07.02

18.00

3.50

12.00

5.20

6.00

4.40

4.00

5.00

PABELLN B3 (06 Und)

1.00

DE TARRAJEO DE MUROS DE CONCRETO

1.00

582.95

DE TARRAJEO DE FRISOS

1.00

174.12

TODO

1.00

414.00

REA

PINTADO DE NUMERACIN DE NICHOS CON ESMALTE

0.20

PLANILLA DE SUSTENTO DE METRADOS


Obra
Frmula

Distrito de Trujillo - Provincia Trujillo - Departamento La Libertad

Lugar

DIMENSIONES/ELEMENTO
Item

Descripcin

02.08.00

OBRAS VARIAS

02.08.01

JUNTAS FLEXIBLES CON POLIURETANO E=1"

02.08.02

W.A.R.C

FACTOR

LONGIT,

ANCHO

ALTO

CANTID.

(m)

(m)

(m)

LONG

PABELLN A1 al A6
PABELLN B1 y B2

12.00

4.50

4.00

4.50

LIMPIEZA DE TODA LA OBRA

1.00

LIMPIEZA GENERAL DE OBRA DE 408 NICHOS

RADOS

Apr-11

Fecha :

ES/ELEMENTO

METRADO

ESPESOR

AREA

VOLUMEN

(m)

(m2)

(m3)

PARCIAL

1.00

102.00

102.00

44.50

44.50

13.35

13.35

102.00

102.00

44.50

44.50

13.35

13.35

11.62

11.62

39.60

39.60

17.42

17.42

5.28

5.28

13.20

13.20

7.92

7.92

7.92

7.92

N REPETICION
ELEMENTOS

TOTAL

Unidad

1.00

1.00

GBL

1.00

159.85

M2

1.00

159.85

M2

1.00

102.96

M3

1.00

21.06

M3

RADOS

Apr-11

Fecha :

ES/ELEMENTO

METRADO

ESPESOR

AREA

VOLUMEN

(m)

(m2)

(m3)

PARCIAL

2.38

2.38

8.10

8.10

3.56

3.56

1.08

1.08

2.70

2.70

1.62

1.62

1.62

1.62

102.00

102.00

89.00

89.00

-2.64

-2.64

-9.00

-9.00

-3.96

-3.96

-1.20

-1.20

-3.00

-3.00

-1.80

-1.80

-1.80

-1.80

102.00

102.00

44.50

44.50

N REPETICION
ELEMENTOS

TOTAL

Unidad

1.00

167.60

M2

1.00

124.90

M2

RADOS

Apr-11

Fecha :

ES/ELEMENTO

METRADO

ESPESOR

AREA

VOLUMEN

(m)

(m2)

(m3)

PARCIAL

-2.64

-2.64

-9.00

-9.00

-3.96

-3.96

-1.20

-1.20

-3.00

-3.00

-1.80

-1.80

23.98

23.98

128.70

128.70

-32.91

-32.91

119.77

119.77

7.39

7.39

25.20

25.20

11.09

11.09

3.36

3.36

8.40

8.40

5.04

5.04

5.04

5.04

N REPETICION
ELEMENTOS

TOTAL

Unidad

1.00

119.77

M3

1.00

119.77

M3

1.00

65.52

M3

RADOS

Apr-11

Fecha :

ES/ELEMENTO

METRADO

ESPESOR

AREA

VOLUMEN

(m)

(m2)

(m3)

PARCIAL

15.84

15.84

72.00

72.00

31.68

31.68

7.20

7.20

24.00

24.00

14.40

14.40

13.68

13.68

3.17

3.17

10.80

10.80

4.75

4.75

1.44

1.44

3.60

3.60

2.16

2.16

2.16

2.16

102.00

102.00

44.50

44.50

N REPETICION
ELEMENTOS

TOTAL

Unidad

2.00

357.60

M2

1.00

28.08

M3

1.00

124.90

M2

RADOS

Apr-11

Fecha :

ES/ELEMENTO

METRADO

ESPESOR

AREA

VOLUMEN

(m)

(m2)

(m3)

PARCIAL

-2.64

-2.64

-9.00

-9.00

-3.96

-3.96

-1.20

-1.20

-3.00

-3.00

-1.80

-1.80

N REPETICION
ELEMENTOS

179.52

1,202.69

1,202.69

264.00

264.00

78.32

78.32

501.12

501.12

88.00

88.00

33.37

33.37

448.80

448.80

Unidad

2,669.80

KG

1.00

2,347.02

M2

1.00

259.93

M3

2,669.80

179.52

TOTAL

RADOS

Apr-11

Fecha :

ES/ELEMENTO

METRADO

ESPESOR

AREA

VOLUMEN

(m)

(m2)

(m3)

PARCIAL

-274.41

-274.41

195.80

195.80

-114.34

-114.34

4.07

4.07

N REPETICION
ELEMENTOS

1,372.82

TOTAL

Unidad

1,372.82

KG

69.65

M2

6.53

M3

582.95

M2

1.00
25.20

25.20

24.96

24.96

10.56

10.56

8.00

8.00

0.93

0.93

1.00
2.36

2.36

2.34

2.34

0.99

0.99

0.75

0.75

0.09

0.09

1.00
179.52

179.52

RADOS

Apr-11

Fecha :

ES/ELEMENTO

METRADO

ESPESOR

AREA

VOLUMEN

(m)

(m2)

(m3)

PARCIAL

-114.34

-114.34

245.95

245.95

132.00

132.00

78.32

78.32

-47.64

-47.64

102.48

102.48

N REPETICION
ELEMENTOS

TOTAL

Unidad

0.00
6.66

6.66
174.12

ML

1.00

617.78

M2

1.00

414.00

UND

1.00
63.00
62.40
26.40
20.00
2.32

582.95
34.82

414.00

34.82

414.00

RADOS

Apr-11

Fecha :

ES/ELEMENTO

METRADO

ESPESOR

AREA

VOLUMEN

(m)

(m2)

(m3)

PARCIAL

N REPETICION
ELEMENTOS

TOTAL

Unidad

1.00

72.00

ML

1.00

1.00

GLB

54.00
18.00

1.00

PLANILLA DE METRADOS DE ACERO


0

Obra
Frmula
Lugar

0
Distrito de Trujillo - Provincia Trujillo - Departamento La Libertad

DIMEN
N

PARTIDA/DESCRIPCION

N DE
Veces

1/4
N ELEMENT

LONGIT.
(m)

8mm
TOTAL

N ELEMENT

LONGIT.
(m)

TOTAL

02.05.01 MUROS, COLUMNAS Y LOSAS


COLUMNAS DE PABELLONES
TODOS LOS PABELLONES
Acero principal
TODO

50.00

Acero en estribos
TODO

50.00

Acero de temperatura
PABELLN A1 al A6
PABELLN B1 y B2
PABELLN B3 (06 Und)

6.00
2.00
1.00

33.00

0.75

REA
102.00
133.50

TOTAL KG
673.20
293.70
14.69

1,237.50

981.59
METRADO TOTAL
PESO
METRADO TOTAL

ML
KG/ML
KG

1,237.50
0.25
1,290.96

0.00
0.58
0.00

N ELEMENT

PLANILLA DE METRADOS DE ACERO


0

Obra
Frmula
Lugar

0
Distrito de Trujillo - Provincia Trujillo - Departamento La Libertad

DIMEN
N

PARTIDA/DESCRIPCION

N DE
Veces

1/4
N ELEMENT

LONGIT.
(m)

8mm
TOTAL

N ELEMENT

LONGIT.
(m)

TOTAL

02.05.02 VIGAS
VC (15X25)
Acero principal
PABELLN A1 al A6
PABELLN B1 y B2
PABELLN B3 (06 Und)
REFUERZO DE 02 ACEROS EN 3er NIVEL

Acero en estribos
TODO LOS PABELLONES

METRADO TOTAL
PESO
METRADO TOTAL

ML
KG/ML
KG

18.00
12.00
6.00
4.00
6.00
2.00

1.00

1,027.00

0.75

770.25

770.25
0.25
192.56

0.00
0.58
0.00

N ELEMENT

OS DE ACERO

FECHA :

40,634.0

DIMENSIONES/ELEMENTO
3/8
LONGIT.
(m)

1/2
TOTAL

0.00
0.58
0.00

N ELEMENT

LONGIT.
(m)

5/8
TOTAL

4.00

6.38

1,275.00

4.00

3.20

76.80

1,351.80
1.02
1,378.84

N ELEMENT

LONGIT.
(m)

3/4
TOTAL

0.00
1.60
0.00

N ELEMENT

LONGIT.
(m)

TOTAL

0.00
2.26
0.00

OS DE ACERO

FECHA :

40,634.0

DIMENSIONES/ELEMENTO
3/8
LONGIT.
(m)

1/2
TOTAL

0.00
0.58
0.00

N ELEMENT

LONGIT.
(m)

4.00
4.00
4.00
4.00

4.20
5.80
5.20
5.80

2.00
2.00

21.12
23.60

5/8
TOTAL

N ELEMENT

LONGIT.
(m)

3/4
TOTAL

N ELEMENT

LONGIT.
(m)

TOTAL

302.40
278.40
124.80
92.80
10.88
253.44
94.40

1,157.12
1.02
1,180.26

0.00
1.60
0.00

0.00
2.26
0.00

RESUMEN DE PLANILLA DE METRADOS


Obra

Frmula
Lugar

Fecha :

Distrito de Trujillo - Provincia Trujillo - Departamento La Libertad

Item

Descripcin

02.00.00

Und
0

02.01.00

OBRAS PROVISIONALES

02.01.01

MOVILIZACIN Y DESMOVILIZACIN DE EQUIPOS Y HERRAMIENTAS

02.02.00

TRABAJOS PRELIMINARES

02.02.01

DEMOLICIN DE PISOS DE CONCRETO E=4"

M2

02.02.02

TRAZO Y REPLANTEO EN TERRENO NORMAL

M2

02.03.00

MOVIMIENTO DE TIERRAS

02.03.01

EXCAVACION PARA ZAPATAS HASTA 1.00 M DE PROFUNDIDAD

M3

02.03.02

EXCAVACIN PARA CIMIENTOS HASTA 1.00m TERRENO NORMAL

M3

02.03.03

RELLENO Y COMPACTACIN C/MATERIAL PROPIO

M3

02.03.04

CAMA DE APOYO CON AFIRMADO E=4" P/FALSO PISO Y VEREDAS

M2

02.03.05

NIVELACIN Y COMPACTACIN DE SUBRASANTE C/EQUIPO LIVIANO

M2

02.03.06

ACARREO DE MATERIAL EXCEDENTE L=200m MX. CARGUO MANUAL

M3

02.03.07

ELIMINACIN DE MATERIAL EXCEDENTE C/VOLQUETE DE 8m3.

M3

02.04.00

OBRAS DE CONCRETO SIMPLE

02.04.01

CONCRETO EN SOLADOS e=4" P/ZAPATAS

M2

02.04.02

CIMIENTO CORRIDO MEZCLA 1:10 C:H + 30% P.G.

M3

02.04.03

ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO

M2

02.04.04

CONCRETO 1:8 C:H + 25% P.M., PARA SOBRECIMIENTOS

M3

02.04.05

CONCRETO EN FALSO PISO E=8", C:H; 1:8

M2

02.05.00

OBRAS DE CONCRETO ARMADO

02.05.01

ACERO PARA ZAPATAS

KG

02.05.02

CONCRETO EN ZAPATAS

M3

02.05.03

MUROS, COLUMNAS Y LOSAS

02.05.01.01

ACERO CORRUGADO FY=4200 KG/CM2, EN COLUMNAS Y As TEMPERATURA

KG

02.05.01.02

ENCOFRADO Y DESENCOFRADO DE MUROS Y TECHO PARA NICHOS

M2

02.05.01.03

CONCRETO SIMPLE EN MUROS Y TECHO, F'C=175 kg/cm2

M3

02.05.02

VIGAS

02.05.02.01

ACERO CORRUGADO FY=4200 KG/CM2, EN VIGAS

KG

02.05.02.02

ENCOFRADO Y DESENC. EN VIGAS

M2

02.05.02.03

CONCRETO F`C=175 KG/CM2, EN VIGAS

M3

02.06.00

REVOQUES Y ENLCIDOS

02.06.01

TARRAJEO DE MUROS, MEZCLA C:A 1:5 E=1.5cm

M2

02.06.02

TARRAJEO DE FRISOS MEZCLA C:A 1:5, E=1.5cm

ML

02.07.00

PINTURA

02.07.01

PINTURA LTEX 02 MANOS EN MUROS, C/ IMPRIMACIN

02.07.02

PINTADO DE NUMERACIN DE NICHOS CON ESMALTE

02.08.00

OBRAS VARIAS

02.08.01

JUNTAS FLEXIBLES CON POLIURETANO E=1"

ML

02.08.02

LIMPIEZA GENERAL DE OBRA DE 408 NICHOS

GLB

W.A.R.C

GBL

M2
UND

Apr-11

Metrado

1.00
159.85
159.85
38.00
102.96
21.06
167.60
124.90
119.77
119.77
40.00
65.52
357.60
28.08
124.90
1,080.00
28.00
2,669.80
2,347.02
259.93
1,372.82
69.65
6.53
582.95
174.12
617.78
414.00
72.00
1.00