Diagram Alir Minescape

Mulai
Membuat Project baru
(Create new project)
Membuat Surface topo dari data survey
(Surface triangles atau survey grids)
Membuat Schema
(Model; Default; Lithology; Element; Compound; Survey; Comformable; Limits; Faults)
Mengimport data lubang bor
(Data survey dan lithology lubang bor)
Membuat Model Geologi
(Membuat Table Model dan Grid Model )
Membuat Output Grafis dari Model Geologi
(Membat kontur struktur, section 2D, Cropline/Subcropline, dll )
Perhitungan Sumber Daya (Resources)
(Inferred; Indicated; Measured )
Perhitungan Cadangan (Reserves)
Perhitungan Mining Reserves
(Total OB & IB ; Total Coal; SR)
Pembuatan Mine Design
(Bench; Slope; Crest; Toe; Ramp)
Perhitungan Mining Reserves
(Total OB & IB; Total Coal; SR)
Pembuatan Dump Design
(Bench; Slope; Crest; Toe; Ramp)
Pembuatan Mining Schedulling
(Blocks; Total OB & IB; Total Coal; SR)
Selesai