Anda di halaman 1dari 95

SUPERVISOR:

CONTRATISTA:
OBRA:
TRAMO 2:

OBRAS DE ARTE

ITEM

600
601.C
605.A
605.B
610.D1
610.E
610.G
610.I
612.A
615. A
622.B
622.C
622.D
622.E
623
625.H
625.I
640.D
640.F
700
700.A
700.B
702.A
702.B
900
906.A
NOMBRE
12

TOROBAMBA 3

HUAYAO

JULSSINA

ACOPIO 1

TINKUY

SN

10

ACOPIO 2

SN

11

ACOPIO 3

AYNA

13 LOS ANGELES 1
14 LOS ANGELES 2
7

SN

APURIMAC

ALTO MUNDO

PLAYA 1

PLAYA 2

CONSORCIO SUPERVISOR LA QUINUA


CONSORCIO VIAL QUINUA
REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO
(Km. 78+500 - Km. 172+420

BRAS DE ARTE
ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02
DESCRIPCION

OBRAS DE ARTE Y DRENAJE


EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN
RELLENOS PARA ESTRUCTURAS
MATERIAL FILTRANTE
CONCRETO CLASE D1 (F'C=210 KG/CM2) EN SECO
CONCRETO CLASE H (F'C=175 KG/CM2)
CONCRETO CLASE G (F'C=140 KG/CM2 + 30% P.G.)
CONCRETO CLASE I (F'C=100 KG/CM2)
ENCOFRADO Y DESENCOFRADO
ACERO DE REFUERZO
TUBERIA CORRUGADA DE ACERO GALVANIZADO CIRCULAR DE 0.90 M DE DIAMETRO
TUBERIA CORRUGADA DE ACERO GALVANIZADO CIRCULAR DE 1.20 M DE DIAMETRO
TUBERIA CORRUGADA DE ACERO GALVANIZADO CIRCULAR DE 1.50 M DE DIAMETRO
TUBERIA CORRUGADA DE ACERO GALVANIZADO CIRCULAR DE 1.80 M DE DIAMETRO
PINTURA ASFALTICA PARA ALCANTARILLAS METALICAS
TUBERIA DE PVC D=6" PARA MUROS - PERFORADA
TUBERIA DE PVC D=4" PARA MUROS
PIEDRA ASENTADA Y EMOQUILLADA e=0.30 m.
PIEDRA ASENTADA Y EMOQUILLADA e=0.20 m.
TRANSPORTES
TRANSPORTE DE MATERIAL GRANULAR ENTRE 120 Y 1000 m
TRANSPORTE DE MATERIAL GRANULAR PARA D> 1KM
TRANSPORTE DE ESCOMBROS ENTRE 120 Y 1000 m
TRANSPORTE DE ESCOMBROS PARA D> 1KM
PROTECCIN AMBIENTAL
ACONDICIONAMIENTO DE DESECHOS Y EXCEDENTE
CANTERAS
64+700
74+780
79+500
89+930
92+800
99+995
109+370
116+030
128+800
134+950
164+700
164+700
172+500
173+270
173+270
173+270

173+270

TMC

N 03
02
UND

ALCANT.

MURO CABEZAL

26,692.17

5,912.30

DISIPADOR

METRADO EJECUTADO

26,692.17

8,343.84

5,912.30

1,897.58
20.42

110.13

110.13

142.24

142.24

1,770.27

645.08
77.00

197.64

197.64

14.64

14.64

9,017.94

kg

443.01
6,847.40

1,770.27

m
m

TRAMO 1

9,460.95
6,847.40

3,301.69
-

898.28

898.28

335.33

899.90

899.90

300.50

13.77

13.77

334.53

334.53

8,844.83

m
m

8,844.83

106.11
-

105.40

105.40

14.70

121.64

121.64

46.98

18.90

18.90

167.25

167.25

mk

5,117.62

96.91

5,214.53

mk

91,032.03

3,437.05

94,469.08

mk

22,990.73

22,990.73

mk

477,069.99

477,069.99

m3
UND
m

26,692.17
RELLENO

26,692.17
FILTRO

TOTAL

m3

m3

m3

m3

2,817.64

2,817.64

m3

m3

m3

m3

m3

m3

3,094.66

110.13

3,204.79

m3

m3

m3

m3

m3

m3

5,912.30

110.13

6,022.43

TRAMO 2

TRAMO 3

TOTAL

DIF.

4,250.10

14,098.22

26,692.17

0.00

1,157.30

2,857.42

5,912.30

-0.00

22.45

67.26

110.13

9.83

132.41

142.24

0.00

387.64

737.55

1,770.27

65.10

55.53

197.64

0.00
-

1.08

13.56

14.64

1,907.17

4,252.09

9,460.95

465.42

6,381.99

6,847.40

304.56

258.39

898.28

144.99

454.41

899.90

13.77

13.77

23.49

204.93

334.53

1,510.02

7,334.81

8,844.83

6.40

84.30

105.40

45.10

29.56

121.64

18.90

18.90

167.25

167.25

-0.00

-0.00
-0.00
-

SUPERVCONSORCIO SUPERVISOR LA QUINUA


CONTRACONSORCIO VIAL QUINUA
OBRA: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO
TRAMO (Km. 78+500 - Km. 172+420

OBRAS DE ARTE
METRADOS DE ALCANTARILLAS TMC

km

79+175

79+490

79+998

4
5

PROGRES
REPLANTEO
EJECUTADO

No

PROGRES

ADICIONAL DE OBRA N 03
VALORIZACION N 02

Tipo

km

ANULADA

Diamet.

LONG.

ESTRUCT. DE
ENTRADA

ESTRUCT. DE SALIDA

CONDICION AL 23-072013

601.C EXCAV. PARA


ESTRUCT. EN MAT.
COMUN

RELLENO CABEZAL

RELLENO CUERPO

CONCRETO CLASE E (F'C=175 KG/CM2)


605.A RELLENOS
PARA ESTRUCT.

Area de Relleno 1
m

Ancho de relleno 1 Area de Relleno2


m

640.F PIEDRA ASENTADA 640.D PIEDRA ASENTADA Y


Y EMBOQUILL. e=0.20 m.
EMOQUILL. e=0.30 m.

Ancho de relleno 2
m

Concreto Cabezales Concreto Cabezales


Concreto Cajatomas
Salida
entrada
m

36

0.90

9.72

CAJATOMA

CABEZAL

5.12

1.90

1.07

9.72

2.74

72

1.80

12.15

CABEZAL

CABEZAL

6.70

2.80

2.50

12.15

6.15

79+998

72

1.80

12.15

CABEZAL

CABEZAL

EJECUTADO

325.16

5.15

2.80

2.50

12.15

44.74

6.15

80+315

80+315

36

0.90

10.53

CAJATOMA

CABEZAL

EJECUTADO

94.34

7.19

1.90

1.07

10.53

24.97

2.74

80+460

80+460

72

1.80

11.34

CABEZAL

CABEZAL

EJECUTADO

212.55

4.30

2.80

2.50

11.34

40.34

6.15

80+790

ANULADA

48

1.20

9.72

CABEZAL

CABEZAL

4.86

2.20

1.51

9.72

83+120

83+120

48

1.20

11.34

CABEZAL

CABEZAL

EJECUTADO

132.42

5.26

2.20

1.51

11.34

28.68

83+420

83+402

48

1.20

10.53

CABEZAL

CABEZAL

EJECUTADO

158.62

6.02

2.20

1.51

10.53

29.13

83+870

ANULADA

36

0.90

8.91

CAJATOMA

CABEZAL

3.90

1.90

1.07

8.91

10

84+240

ANULADA

48

1.20

11.34

CABEZAL

CABEZAL

5.52

2.20

1.51

11.34

11

84+650

48

1.20

11.34

CABEZAL

CABEZAL

6.71

2.20

1.51

11.34

12

85+005

72

1.80

11.34

CABEZAL

MURO

4.24

2.80

2.50

11.34

13

85+360

ANULADA

48

1.20

11.34

CAJATOMA

CABEZAL

4.91

2.20

1.51

11.34

14

85+800

ANULADA

48

1.20

9.72

CAJATOMA

CABEZAL

5.42

2.20

1.51

15

86+180

36

0.90

9.72

CAJATOMA

CABEZAL

6.90

1.90

16

86+545

48

1.20

10.53

CABEZAL

CABEZAL

5.83

17

87+005

86+954

48

1.20

10.53

CAJATOMA

CABEZAL

EJECUTADO

142.91

18

87+420

87+418

48

1.20

10.53

CAJATOMA

CABEZAL

EJECUTADO

19

87+850

87+850

48

1.20

11.34

CAJATOMA

CABEZAL

EJECUTADO

20

88+180

88+180

36

0.90

8.91

CAJATOMA

CABEZAL

EJECUTADO

21

88+260

88+260

48

1.20

11.34

CABEZAL

CABEZAL

22

88+620

88+620

48

1.20

10.53

CAJATOMA

23

89+020

89+020

48

1.20

8.91

24

89+405

89+405

72

1.80

25

89+780

89+780

36

26

89+870

89+870

27

90+095

28

610.e CONCRETO
CLASE E (F'C=175
KG/CM2)

5.69
6.15
6.15

612.A ENCOF. Y
DESENCOF.
Encofrado cabezales

Encofrado cajatomas

18.56

77.00

24.60

154.00

20.80

154.00

8.43

18.56

12.30

77.00

3.55

6.15
3.55

46.86

3.55

3.55

7.10

46.86

3.55

3.55

7.10

46.86

2.74

18.36

3.55

3.55

46.86

3.55

3.55

7.10

46.86

38.50

3.55

6.95

23.43

26.07

9.72

3.55

6.95

23.43

26.07

1.07

9.72

2.74

5.69

18.56

20.80

2.20

1.51

10.53

3.55

46.86

7.52

2.20

1.51

10.53

32.43

3.55

6.95

10.50

23.43

26.07

49.50

94.60

4.08

2.20

1.51

10.53

24.87

3.55

6.95

10.50

23.43

26.07

49.50

101.20

9.57

2.20

1.51

11.34

38.17

3.55

6.95

10.50

23.43

26.07

49.50

77.41

4.58

1.90

1.07

8.91

18.27

2.74

5.69

8.43

18.56

20.80

39.36

EJECUTADO

223.01

5.39

2.20

1.51

11.34

28.97

3.55

7.10

46.86

CABEZAL

EJECUTADO

107.65

8.98

2.20

1.51

10.53

35.65

3.55

6.95

10.50

23.43

26.07

49.50

CAJATOMA

CABEZAL

EJECUTADO

103.71

5.36

2.20

1.51

8.91

25.24

3.55

6.95

10.50

23.43

26.07

49.50

12.15

CABEZAL

CABEZAL

EJECUTADO

189.90

4.65

2.80

2.50

12.15

43.34

6.15

12.30

77.00

0.90

11.34

CAJATOMA

CABEZAL

EJECUTADO

91.71

9.21

1.90

1.07

11.34

29.68

2.74

5.69

8.43

18.56

20.80

39.36

36

0.90

8.91

CAJATOMA

CABEZAL

EJECUTADO

73.61

3.76

1.90

1.07

8.91

16.71

2.74

5.69

8.43

18.56

20.80

39.36

90+180

36

0.90

8.91

CAJATOMA

CABEZAL

EJECUTADO

46.93

5.32

1.90

1.07

8.91

19.68

2.74

5.69

8.43

18.56

20.80

39.36

90+340

90+334

36

0.90

8.91

CAJATOMA

CABEZAL

EJECUTADO

75.77

5.33

1.90

1.07

8.91

19.69

2.74

5.69

8.43

18.56

20.80

39.36

29

90+605

90+606

72

1.80

11.34

CABEZAL

CABEZAL

EJECUTADO

186.20

4.27

2.80

2.50

11.34

40.25

6.15

12.30

77.00

30

90+860

90+862

48

1.20

10.53

CAJATOMA

CABEZAL

EJECUTADO

77.35

4.18

2.20

1.51

10.53

25.09

3.55

6.95

10.50

23.43

26.07

49.50

31

91+155

91+155

36

0.90

8.91

CAJATOMA

CABEZAL

EJECUTADO

77.10

5.32

1.90

1.07

8.91

19.68

2.74

5.69

8.43

18.56

20.80

39.36

32

91+530

48

1.20

8.91

CAJATOMA

CABEZAL

EJECUTADO

74.29

5.23

2.20

1.51

8.91

24.95

3.55

6.95

10.50

23.43

26.07

49.50

33

91+840

91+840

36

0.90

9.72

CAJATOMA

CABEZAL

EJECUTADO

76.29

4.28

1.90

1.07

9.72

18.57

2.74

5.69

8.43

18.56

20.80

39.36

34

91+955

91+955

48

1.20

9.72

CAJATOMA

MURO

EJECUTADO

74.60

3.68

2.20

1.51

9.72

22.76

6.95

6.95

26.07

26.07

35

92+235

92+235

36

0.90

8.91

CAJATOMA

MURO

EJECUTADO

81.59

4.82

1.90

1.07

8.91

18.73

5.69

5.69

20.80

20.80

36

92+600

92+562

48

1.20

9.72

CAJATOMA

CABEZAL

EJECUTADO

108.17

4.94

2.20

1.51

9.72

25.54

3.55

6.95

10.50

23.43

26.07

49.50

37

92+882

92+882

72

1.80

12.96

CABEZAL

CABEZAL

EJECUTADO

197.68

6.03

2.80

2.50

12.96

49.22

6.15

12.30

77.00

38

93+162

93+162

48

1.20

10.53

CAJATOMA

CABEZAL

EJECUTADO

62.08

5.62

2.20

1.51

10.53

28.25

3.55

6.95

10.50

23.43

26.07

49.50

39

93+610

93+610

72

1.80

10.53

CAJATOMA

CABEZAL

EJECUTADO

89.17

10.47

2.80

2.50

10.53

55.58

6.15

9.69

15.84

38.50

31.97

70.47

40

93+810

48

1.20

10.53

CAJATOMA

CABEZAL

4.02

2.20

1.51

10.53

3.55

6.95

23.43

26.07

41

94+180

48

1.20

9.72

CABEZAL

MURO

5.01

2.20

1.51

9.72

3.55

23.43

42

94+580

36

0.90

8.91

CAJATOMA

CABEZAL

5.32

1.90

1.07

8.91

2.74

5.69

18.56

20.80

43

94+700

94+696

36

0.90

9.72

CAJATOMA

CABEZAL

5.89

1.90

1.07

9.72

2.74

5.69

8.43

18.56

20.80

44

94+820

ANULADA

36

0.90

8.91

CAJATOMA

CABEZAL

18.56

20.80

45

95+050

95+049

72

1.80

12.15

CABEZAL

84+572.7

91+528.3

94+180

EJECUTADO

283.36

31.87

201.83

EJECUTADO

97.24

5.32

1.90

1.07

8.91

2.74

CABEZAL

EJECUTADO

122.47

4.58

2.80

2.50

12.15

43.14

6.15

21.63
-

46

95+110

95+112

72

1.80

11.34

CABEZAL

MURO

EJECUTADO

124.43

4.14

2.80

2.50

11.34

39.89

47

95+270

95+270

48

1.20

8.91

CAJATOMA

CABEZAL

EJECUTADO

53.50

3.45

2.20

1.51

8.91

21.04

48

95+440

95+440

48

1.20

9.72

CAJATOMA

MURO

EJECUTADO

102.32

9.67

2.20

1.51

9.72

35.94

49

95+800

95+800

48

1.20

9.72

CAJATOMA

MURO

EJECUTADO

100.06

4.90

2.20

1.51

9.72

25.45

50

96+140

ANULADA

36

0.90

8.10

CAJATOMA

MURO

2.60

1.90

1.07

8.10

51

96+500

ANULADA

36

0.90

8.91

CAJATOMA

CABEZAL

5.32

1.90

1.07

52

96+880

ANULADA

36

0.90

8.91

CAJATOMA

CABEZAL

5.24

1.90

53

97+020

ANULADA

36

0.90

9.72

CAJATOMA

CABEZAL

5.20

54

97+160

ANULADA

36

0.90

9.72

CAJATOMA

CABEZAL

55

97+380

ANULADA

36

0.90

9.72

CAJATOMA

CABEZAL

56

97+600

48

1.20

8.91

CAJATOMA

CABEZAL

57

97+870

97+870

36

0.90

10.53

CAJATOMA

CABEZAL

58

98+010

ANULADA

36

0.90

8.91

CAJATOMA

CABEZAL

59

98+120

ANULADA

36

0.90

9.72

CAJATOMA

CABEZAL

60

98+260

98+260

36

0.90

8.91

CAJATOMA

CABEZAL

EJECUTADO

61

98+450

98+450

48

1.20

10.53

CAJATOMA

CABEZAL

EJECUTADO

62

98+530

48

1.20

9.71

CAJATOMA

CABEZAL

63

98+620

36

0.90

8.91

CAJATOMA

CABEZAL

64

98+925

48

1.20

9.72

CAJATOMA

CABEZAL

EJECUTADO

5.69

6.15

EJECUTADO

25.69

5.69

ENCOFRADO Y DESENCOFRADO

3.55

3.55

6.15

6.15

6.15

3.55

5.69
6.15
6.15

12.30

77.00

6.15

38.50

6.95

10.50

23.43

6.95

8.91

1.07

8.91

1.90

1.07

9.72

5.01

1.90

1.07

9.72

5.50

1.90

1.07

3.80

2.20

6.84

39.36
77.00
46.86
46.86

20.80

46.86
-

46.86

77.00

77.00

77.00

23.43
39.36
77.00
38.50

26.07

49.50

6.95

26.07

26.07

6.95

6.95

26.07

26.07

5.69

20.80

2.74

5.69

18.56

20.80

2.74

5.69

18.56

20.80

2.74

5.69

18.56

20.80

2.74

5.69

18.56

20.80

9.72

2.74

5.69

18.56

20.80

1.51

8.91

3.55

6.95

23.43

26.07

1.90

1.07

10.53

2.74

5.69

8.43

18.56

20.80

3.60

1.90

1.07

8.91

2.74

5.69

18.56

20.80

3.63

1.90

1.07

9.72

2.74

5.69

18.56

20.80

140.35

5.54

1.90

1.07

8.91

20.09

2.74

5.69

8.43

18.56

20.80

39.36

69.21

4.64

2.20

1.51

10.53

26.10

3.55

6.95

10.50

23.43

26.07

49.50

5.04

2.20

1.51

9.71

3.55

6.95

23.43

26.07

3.46

1.90

1.07

8.91

2.74

5.69

18.56

20.80

4.79

2.20

1.51

9.72

3.55

6.95

23.43

26.07

112.71

24.30

3.55

20.80

39.36
-

SUPERVCONSORCIO SUPERVISOR LA QUINUA


CONTRACONSORCIO VIAL QUINUA
OBRA: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO
TRAMO (Km. 78+500 - Km. 172+420

OBRAS DE ARTE
METRADOS DE ALCANTARILLAS TMC

PROGRES
REPLANTEO
EJECUTADO

No

PROGRES

ADICIONAL DE OBRA N 03
VALORIZACION N 02

Tipo

Diamet.

LONG.

ESTRUCT. DE
ENTRADA

ESTRUCT. DE SALIDA

CONDICION AL 23-072013

601.C EXCAV. PARA


ESTRUCT. EN MAT.
COMUN

RELLENO CABEZAL

RELLENO CUERPO

CONCRETO CLASE E (F'C=175 KG/CM2)


605.A RELLENOS
PARA ESTRUCT.

Area de Relleno 1
m

Ancho de relleno 1 Area de Relleno2


m

640.F PIEDRA ASENTADA 640.D PIEDRA ASENTADA Y


Y EMBOQUILL. e=0.20 m.
EMOQUILL. e=0.30 m.

Ancho de relleno 2
m

Concreto Cabezales Concreto Cabezales


Concreto Cajatomas
Salida
entrada
m

610.e CONCRETO
CLASE E (F'C=175
KG/CM2)

ENCOFRADO Y DESENCOFRADO
612.A ENCOF. Y
DESENCOF.
Encofrado cabezales

Encofrado cajatomas

km

km

65

99+140

99+140

36

0.90

10.53

CAJATOMA

CABEZAL

EJECUTADO

93.54

7.61

1.90

1.07

10.53

25.77

2.74

5.69

8.43

18.56

20.80

39.36

66

99+491

99+490

48

1.20

11.33

CAJATOMA

CABEZAL

EJECUTADO

68.13

4.68

2.20

1.51

11.33

27.39

3.55

6.95

10.50

23.43

26.07

49.50

67

99+730

99+780

36

0.90

11.34

CAJATOMA

CABEZAL

EJECUTADO

123.56

8.55

1.90

1.07

11.34

28.42

2.74

5.69

8.43

18.56

20.80

39.36

68

100+230

100+235

36

0.90

9.72

CAJATOMA

CABEZAL

EJECUTADO

74.12

3.98

1.90

1.07

9.72

18.00

2.74

5.69

8.43

18.56

20.80

39.36

69

100+680

100+670

36

0.90

10.53

CAJATOMA

CABEZAL

EJECUTADO

118.85

5.68

1.90

1.07

10.53

22.10

2.74

5.69

8.43

18.56

20.80

39.36

70

100+880

100+878

36

0.90

9.72

CAJATOMA

CABEZAL

EJECUTADO

105.45

4.05

1.90

1.07

9.72

18.13

2.74

5.69

8.43

18.56

20.80

39.36

71

101+311

101+311.3

36

0.90

8.91

CAJATOMA

MURO

EJECUTADO

87.51

1.64

1.90

1.07

8.91

12.68

5.69

5.69

20.80

20.80

72

101+370

101+370

36

0.90

8.91

CAJATOMA

CABEZAL

EJECUTADO

84.06

5.41

1.90

1.07

8.91

19.85

2.74

5.69

8.43

20.80

39.36

73

101+420

101+440

36

0.90

8.91

CAJATOMA

CABEZAL

EJECUTADO

156.88

5.32

1.90

1.07

8.91

19.68

2.74

5.69

8.43

20.80

20.80

74

101+700

101+698

36

0.90

9.72

CAJATOMA

MURO

EJECUTADO

78.55

3.81

1.90

1.07

9.72

17.68

5.69

5.69

18.56

20.80

39.36

75

101+740

48

1.20

8.91

CAJATOMA

CABEZAL

3.56

2.20

1.51

8.91

3.55

6.95

23.43

26.07

76

102+100

60

1.50

10.53

CAJATOMA

CABEZAL

4.39

2.50

1.98

10.53

3.55

6.95

23.43

26.07

77

102+300

102+271

36

0.90

9.72

CAJATOMA

CABEZAL

EJECUTADO

103.00

5.66

1.90

1.07

9.72

21.19

2.74

5.69

8.43

18.56

20.80

39.36

78

102+670

102+683

36

0.90

9.72

CAJATOMA

MURO

EJECUTADO

139.61

4.89

1.90

1.07

9.72

19.73

5.69

5.69

20.80

20.80

79

102+860

102+860

36

0.90

8.91

CAJATOMA

CABEZAL

EJECUTADO

66.31

5.06

1.90

1.07

8.91

19.18

2.74

5.69

8.43

18.56

20.80

39.36

80

103+060

103+060

36

0.90

10.53

CABEZAL

CABEZAL

EJECUTADO

238.87

6.02

1.90

1.07

10.53

22.75

2.74

2.74

5.48

37.12

81

103+310

103+300

36

0.90

11.33

CABEZAL

CABEZAL

EJECUTADO

228.21

4.79

1.90

1.07

11.33

21.27

2.75

2.74

5.49

37.12

82

103+560

103+560

36

0.90

8.10

CAJATOMA

MURO

EJECUTADO

87.44

4.19

1.90

1.07

8.10

16.66

83

104+120

104+120

48

1.20

11.34

CAJATOMA

CABEZAL

EJECUTADO

166.83

9.43

2.20

1.51

11.34

37.86

84

104+460

104+460

48

1.20

11.34

CAJATOMA

CABEZAL

EJECUTADO

117.79

8.75

2.20

1.51

11.34

36.36

85

104+880

36

0.90

9.72

CAJATOMA

CABEZAL

5.82

1.90

1.07

9.72

86

105+140

105+140

36

0.90

8.91

CAJATOMA

MURO

EJECUTADO

116.53

3.68

1.90

1.07

8.91

87

105+420

105+420

36

0.90

10.53

CAJATOMA

CABEZAL

EJECUTADO

94.53

6.88

1.90

1.07

88

105+980

105+980

36

0.90

8.91

CAJATOMA

MURO

EJECUTADO

82.63

3.71

1.90

1.07

89

106+220

106+220

36

0.90

8.91

CAJATOMA

CABEZAL

EJECUTADO

81.15

5.33

1.90

90

106+380

106+380

36

0.90

9.72

CAJATOMA

MURO

EJECUTADO

94.45

5.24

91

106+512

106+513

48

1.20

10.53

CAJATOMA

CABEZAL

EJECUTADO

78.47

92

106+840

106+840

48

0.90

8.91

CAJATOMA

CABEZAL

EJECUTADO

93

107+010

107+010

48

1.20

10.53

CAJATOMA

CABEZAL

94

107+390

107+390

48

1.20

10.53

CAJATOMA

CABEZAL

95

107+550

36

0.90

9.72

CAJATOMA

CABEZAL

96

107+840

36

0.90

8.91

CAJATOMA

97

108+480

36

0.90

8.91

98

108+700

36

0.90

99

109+000

48

100

109+730

101

18.56

37.12
37.12

5.69

5.69

3.55

6.95

10.50

3.55

6.95

10.50

2.74

5.69

16.56

5.69

5.69

18.56

20.80

39.36

10.53

24.38

5.69

8.43

18.56

20.80

39.36

8.91

16.62

5.69

5.69

20.80

20.80

1.07

8.91

19.69

5.69

8.43

20.80

39.36

1.90

1.07

9.72

20.39

5.69

5.69

20.80

20.80

4.10

2.20

1.51

10.53

24.91

3.55

6.95

10.50

23.43

26.07

49.50

55.63

3.78

1.90

1.07

8.91

16.75

2.74

5.69

8.43

18.56

20.80

39.36

EJECUTADO

86.33

7.10

2.20

1.51

10.53

31.51

3.55

6.95

10.50

23.43

26.07

49.50

EJECUTADO

100.78

5.71

2.20

1.51

10.53

28.45

3.55

6.95

10.50

23.43

26.07

49.50

5.48

1.90

1.07

9.72

2.74

5.69

18.56

20.80

CABEZAL

5.33

1.90

1.07

8.91

2.74

5.69

18.56

20.80

CAJATOMA

CABEZAL

4.48

1.90

1.07

8.91

2.74

5.69

18.56

20.80

8.91

CAJATOMA

MURO

3.39

1.90

1.07

8.91

5.69

20.80

1.20

9.72

CAJATOMA

CABEZAL

3.54

2.20

1.51

9.72

6.95

26.07

48

1.20

9.72

CAJATOMA

MURO

5.19

2.20

1.51

9.72

6.95

26.07

109+980

36

0.90

8.91

CAJATOMA

CABEZAL

5.32

1.90

1.07

8.91

5.69

20.80

102

110+220

36

0.90

8.10

CAJATOMA

MURO

4.27

1.90

1.07

8.10

5.69

103

110+520

48

1.20

10.53

CAJATOMA

CABEZAL

6.89

2.20

1.51

10.53

104

110+820

36

0.90

8.91

CAJATOMA

MURO

4.16

1.90

1.07

8.91

5.69

20.80

105

111+100

36

0.90

8.91

CAJATOMA

CABEZAL

4.97

1.90

1.07

8.91

2.74

5.69

18.56

20.80

106

111+340

36

0.90

8.91

CAJATOMA

CABEZAL

5.31

1.90

1.07

8.91

2.74

5.69

18.56

20.80

107

111+640

36

0.90

8.10

CAJATOMA

MURO

4.27

1.90

1.07

8.10

5.69

20.80

108

111+856

48

1.20

8.91

CAJATOMA

CABEZAL

4.98

2.20

1.51

8.91

3.55

6.95

23.43

26.07

109

112+080

36

0.90

8.91

CAJATOMA

CABEZAL

3.87

1.90

1.07

8.91

2.74

5.69

18.56

20.80

110

112+320

48

1.20

8.91

CAJATOMA

CABEZAL

3.95

2.20

1.51

8.91

3.55

6.95

23.43

26.07

111

112+900

48

1.20

10.53

CAJATOMA

CABEZAL

5.39

2.20

1.51

10.53

3.55

6.95

23.43

26.07

112

113+240

36

0.90

8.91

CAJATOMA

CABEZAL

5.37

1.90

1.07

8.91

2.74

5.69

18.56

20.80

113

113+540

48

1.20

8.91

CAJATOMA

CABEZAL

4.92

2.20

1.51

8.91

3.55

6.95

23.43

26.07

114

113+740

36

0.90

8.91

CAJATOMA

CABEZAL

4.62

1.90

1.07

8.91

2.74

5.69

18.56

20.80

115

114+020

48

1.20

8.91

CAJATOMA

CABEZAL

4.65

2.20

1.51

8.91

3.55

6.95

23.43

26.07

116

114+280

36

0.90

9.72

CAJATOMA

CABEZAL

4.39

1.90

1.07

9.72

2.74

5.69

18.56

20.80

117

114+540

48

1.20

10.53

CAJATOMA

CABEZAL

7.43

2.20

1.51

10.53

3.55

6.95

23.43

26.07

118

114+858

48

1.20

8.91

CAJATOMA

CABEZAL

2.99

2.20

1.51

8.91

3.55

6.95

23.43

26.07

119

115+158

36

0.90

9.72

CAJATOMA

CABEZAL

5.30

1.90

1.07

9.72

2.74

5.69

18.56

20.80

120

115+535

36

0.90

9.72

CAJATOMA

CABEZAL

4.20

1.90

1.07

9.72

2.74

5.69

18.56

20.80

121

115+800

36

0.90

8.91

CAJATOMA

CABEZAL

5.37

1.90

1.07

8.91

2.74

5.69

18.56

20.80

122

116+090

48

1.20

8.91

CAJATOMA

CABEZAL

5.23

2.20

1.51

8.91

3.55

6.95

23.43

26.07

123

116+390

36

0.90

8.91

CAJATOMA

CABEZAL

5.38

1.90

1.07

8.91

2.74

5.69

18.56

20.80

124

116+640

36

0.90

9.72

CAJATOMA

CABEZAL

5.71

1.90

1.07

9.72

2.74

5.69

18.56

20.80

125

116+940

36

0.90

7.62

CAJATOMA

CABEZAL

4.27

1.90

1.07

7.62

2.74

5.69

18.56

20.80

126

117+540

36

0.90

7.62

CAJATOMA

MURO

4.27

1.90

1.07

7.62

5.69

20.80

127

117+780

36

0.90

9.73

CAJATOMA

CABEZAL

5.48

1.90

1.07

9.73

5.69

20.80

128

118+320

36

0.90

8.91

CAJATOMA

MURO

3.56

1.90

1.07

8.91

5.69

20.80

110+520

EJECUTADO

86.13

31.05

2.74
2.74

3.55
2.74
3.55

2.74

6.95

10.50

20.80

20.80

23.43

26.07

49.50

23.43

26.07

49.50

20.80

18.56

23.43
18.56

20.80
23.43

18.56

26.07

49.50

SUPERVCONSORCIO SUPERVISOR LA QUINUA


CONTRACONSORCIO VIAL QUINUA
OBRA: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO
TRAMO (Km. 78+500 - Km. 172+420

OBRAS DE ARTE
METRADOS DE ALCANTARILLAS TMC

km

129

118+560

130

119+000

131

PROGRES
REPLANTEO
EJECUTADO

No

PROGRES

ADICIONAL DE OBRA N 03
VALORIZACION N 02

Tipo

km

118+564.8

Diamet.

LONG.

ESTRUCT. DE
ENTRADA

ESTRUCT. DE SALIDA

CONDICION AL 23-072013

601.C EXCAV. PARA


ESTRUCT. EN MAT.
COMUN

RELLENO CABEZAL

RELLENO CUERPO

CONCRETO CLASE E (F'C=175 KG/CM2)


605.A RELLENOS
PARA ESTRUCT.

Area de Relleno 1
m

Ancho de relleno 1 Area de Relleno2


m

640.F PIEDRA ASENTADA 640.D PIEDRA ASENTADA Y


Y EMBOQUILL. e=0.20 m.
EMOQUILL. e=0.30 m.

Ancho de relleno 2
m

36

0.90

8.91

CAJATOMA

CABEZAL

EJECUTADO

116.79

5.43

1.90

1.07

8.91

19.88

118+978

48

1.20

8.91

CAJATOMA

MURO

EJECUTADO

92.84

5.06

2.20

1.51

8.91

24.58

119+260

119+260

36

0.90

9.72

CAJATOMA

CABEZAL

EJECUTADO

75.15

5.30

1.90

1.07

9.72

20.51

132

119+571

119+570

48

1.20

10.53

CAJATOMA

CABEZAL

EJECUTADO

72.01

4.20

2.20

1.51

10.53

25.13

133

119+760

119+773

48

1.20

10.53

CAJATOMA

CABEZAL

EJECUTADO

208.23

5.58

2.20

1.51

10.53

28.17

134

120+156

120+156

48

1.20

10.53

CAJATOMA

CABEZAL

EJECUTADO

100.58

4.17

2.20

1.51

10.53

135

120+280

120+280

36

0.90

10.53

CAJATOMA

CABEZAL

EJECUTADO

83.03

4.35

1.90

1.07

136

120+680

120+680

48

1.20

9.72

CAJATOMA

MURO

EJECUTADO

130.88

4.55

2.20

137

120+825

120+825

36

0.90

9.72

CAJATOMA

CABEZAL

EJECUTADO

58.94

3.88

138

121+000

121+000

48

1.20

15.39

CABEZAL

CABEZAL

EJECUTADO

119.92

139

121+450

48

1.20

8.91

CAJATOMA

CABEZAL

140

121+580

36

0.90

8.91

CAJATOMA

CABEZAL

141

121+740

121+740

36

0.90

9.72

CAJATOMA

CABEZAL

EJECUTADO

142

121+900

122+900

36

0.90

8.91

CAJATOMA

CABEZAL

EJECUTADO

143

122+087

36

0.90

8.91

CAJATOMA

CABEZAL

144

122+380

36

0.90

9.72

CAJATOMA

CABEZAL

145

122+660

72

1.80

12.15

CABEZAL

CABEZAL

146

122+900

36

0.90

8.91

CAJATOMA

MURO

147

123+220

123+220

36

0.90

8.91

CAJATOMA

148

123+460

123+460

36

0.90

8.91

149

123+720

123+720

36

0.90

10.53

150

124+025

124+025

36

0.90

151

124+580

124+570

48

152

124+830

124+830

153

125+123

154

122+660

Concreto Cabezales Concreto Cabezales


Concreto Cajatomas
Salida
entrada
m

5.69

8.43

6.95

6.95

2.74

5.69

8.43

3.55

6.95

3.55

25.06

10.53

19.57

1.51

9.72

24.68

1.90

1.07

9.72

17.81

2.74

25.72

2.20

1.51

15.39

79.81

3.55

5.23

2.20

1.51

8.91

3.55

3.99

1.90

1.07

8.91

130.57

4.79

1.90

1.07

9.72

19.54

52.48

5.25

1.90

1.07

8.91

19.54

4.45

1.90

1.07

8.91

5.97

1.90

1.07

9.72

4.31

2.80

2.50

12.15

ENCOFRADO Y DESENCOFRADO
612.A ENCOF. Y
DESENCOF.
Encofrado cabezales

Encofrado cajatomas

20.80

39.36

26.07

26.07

18.56

20.80

39.36

10.50

23.43

26.07

49.50

6.95

10.50

23.43

26.07

49.50

3.55

6.95

10.50

23.43

26.07

49.50

2.74

5.69

8.43

18.56

20.80

39.36

6.95

6.95

26.07

26.07

5.69

8.43

18.56

20.80

39.36

7.10

46.86

6.95

23.43

26.07

2.74

5.69

18.56

20.80

2.74

5.69

8.43

18.56

20.80

39.36

2.74

5.69

8.43

18.56

20.80

39.36

2.74

5.69

18.56

20.80

2.74

5.69

18.56

20.80

6.15

3.55

6.21

1.90

1.07

8.91

5.69

EJECUTADO

55.08

3.83

1.90

1.07

8.91

16.84

2.74

5.69

8.43

18.56

20.80

39.36

CAJATOMA

CABEZAL

EJECUTADO

67.74

5.38

1.90

1.07

8.91

19.79

2.74

5.69

8.43

18.56

20.80

39.36

CAJATOMA

CABEZAL

EJECUTADO

63.65

5.54

1.90

1.07

10.53

21.83

2.74

5.69

8.43

18.56

20.80

39.36

8.91

CAJATOMA

CABEZAL

EJECUTADO

54.49

4.23

1.90

1.07

8.91

17.60

2.74

5.69

8.43

18.56

20.80

39.36

1.20

10.53

CAJATOMA

CABEZAL

EJECUTADO

96.43

5.38

2.20

1.51

10.53

27.73

3.55

6.95

10.50

23.43

26.07

49.50

48

1.20

9.72

CAJATOMA

CABEZAL

EJECUTADO

135.70

5.37

2.20

1.51

9.72

26.48

3.55

6.95

10.50

23.43

26.07

49.50

125+123

48

1.20

10.53

CAJATOMA

CABEZAL

EJECUTADO

67.41

4.46

2.20

1.51

10.53

25.70

3.55

6.95

10.50

23.43

26.07

49.50

125+225

125+220

48

1.20

10.53

CAJATOMA

CABEZAL

EJECUTADO

99.11

4.30

2.20

1.51

10.53

25.35

3.55

6.95

10.50

23.43

26.07

49.50

155

125+400

125+402

36

0.90

8.91

CAJATOMA

CABEZAL

EJECUTADO

105.94

5.01

1.90

1.07

8.91

19.09

2.74

5.69

8.43

18.56

20.80

39.36

156

125+920

36

0.90

9.72

CAJATOMA

CABEZAL

5.30

1.90

1.07

9.72

2.74

5.69

18.56

20.80

157

126+010

48

1.20

10.53

CAJATOMA

CABEZAL

5.78

2.20

1.51

10.53

3.55

6.95

23.43

26.07

158

126+095

48

1.20

8.91

CAJATOMA

CABEZAL

5.22

2.20

1.51

8.91

3.55

6.95

23.43

26.07

159

126+157

72

1.80

9.72

CAJATOMA

MURO

6.10

2.80

2.50

9.72

9.69

37.91

160

126+460

48

1.20

10.53

CAJATOMA

CABEZAL

4.29

2.20

1.51

10.53

6.95

161

126+648

126+650

72

1.80

11.34

CAJATOMA

MURO

EJECUTADO

108.47

3.41

2.80

2.50

11.34

37.84

9.69

9.69

162

126+800

126+800

36

0.90

9.72

CAJATOMA

CABEZAL

EJECUTADO

51.22

3.83

1.90

1.07

9.72

17.71

2.74

5.69

8.43

163

127+260

127+260

36

0.90

8.91

CAJATOMA

CABEZAL

EJECUTADO

54.21

5.24

1.90

1.07

8.91

19.52

2.74

5.69

8.43

164

127+340

36

0.90

10.53

CAJATOMA

CABEZAL

EJECUTADO

52.55

7.98

1.90

1.07

10.53

26.47

2.74

5.69

165

128+250

128+250

48

1.20

10.53

CAJATOMA

CABEZAL

EJECUTADO

93.79

7.85

2.20

1.51

10.53

33.16

3.55

166

128+447

128+447

48

1.20

8.91

CAJATOMA

CABEZAL

EJECUTADO

73.50

5.15

2.20

1.51

8.91

24.78

167

128+587

128+587

48

1.20

8.91

CAJATOMA

CABEZAL

EJECUTADO

85.16

3.81

2.20

1.51

8.91

21.83

168

128+749

36

0.90

12.15

CABEZAL

CABEZAL

7.16

1.90

1.07

12.15

169

129+001

36

0.90

14.58

CABEZAL

CABEZAL

8.60

1.90

1.07

14.58

170

129+244

72

1.80

11.34

CABEZAL

MURO

7.00

2.80

2.50

11.34

171

129+335

36

0.90

10.53

CABEZAL

CABEZAL

6.24

1.90

1.07

10.53

172

129+660

36

0.90

9.72

CAJATOMA

CABEZAL

5.50

1.90

1.07

9.72

173

129+840

48

1.20

9.72

CAJATOMA

MURO

4.74

2.20

1.51

9.72

174

130+410

48

1.20

8.91

CAJATOMA

MURO

175

130+717

130+717

36

0.90

9.72

CAJATOMA

176

131+010

131+010

36

0.90

9.72

177

131+247

131+247

36

0.90

9.72

178

131+467

36

0.90

179

131+615

36

180

131+862

181

132+038

182

132+242

183

132+443

184

132+711

185

132+959

186

133+144

187

133+360

188

133+584

189

133+833

190

134+059

191
192

126+010

127+341.5

129+335

EJECUTADO

107.58

28.61

26.07

49.50

20.80

39.36

18.56

20.80

39.36

8.43

18.56

20.80

39.36

6.95

10.50

23.43

26.07

49.50

3.55

6.95

10.50

23.43

26.07

49.50

3.55

6.95

10.50

23.43

26.07

49.50

2.74

2.74

37.12

2.74

2.74

37.12

6.15

38.50

2.74

2.74

5.48

37.12

2.74

5.69

18.56

6.95

6.95

192.90

6.16

2.20

1.51

8.91

CABEZAL

EJECUTADO

138.95

5.68

1.90

1.07

9.72

21.23

CAJATOMA

MURO

EJECUTADO

102.37

4.27

1.90

1.07

9.72

18.55

CAJATOMA

MURO

EJECUTADO

81.09

1.42

1.90

1.07

9.72

13.14

9.72

CAJATOMA

MURO

4.77

1.90

1.07

9.72

0.90

9.72

CAJATOMA

MURO

3.48

1.90

1.07

9.72

36

0.90

10.53

CAJATOMA

CABEZAL

5.25

1.90

1.07

10.53

72

1.80

12.15

CABEZAL

MURO

36

0.90

16.20

CABEZAL

132+445

36

0.90

8.91

132+711

36

0.90

10.53

132+959

36

0.90

36
133+360
133+582

131+862

23.43

18.56

EJECUTADO

20.80

37.91

148.35
-

77.00

37.91

EJECUTADO

129+840

3.55

10.50

77.00

CABEZAL

12.30

46.86

117.99

6.15

18.56

EJECUTADO

42.39

2.74

610.e CONCRETO
CLASE E (F'C=175
KG/CM2)

23.16
25.10
-

5.69

8.43

5.69

5.69

20.80
26.07
26.07

20.80

39.36

5.69

20.80

20.80

5.69

20.80

20.80

5.69

20.80

5.69

20.80

5.69

8.43

18.56

6.15

38.50

2.74

5.48

37.12

16.20

2.80

2.50

12.15

CABEZAL

EJECUTADO

104.31

28.61

1.90

1.07

16.20

71.76

2.74

CAJATOMA

CABEZAL

EJECUTADO

76.04

5.24

1.90

1.07

8.91

19.52

2.74

5.69

8.43

18.56

20.80

39.36

CAJATOMA

CABEZAL

EJECUTADO

127.70

8.66

1.90

1.07

10.53

27.76

2.74

5.69

8.43

18.56

20.80

39.36

8.91

CAJATOMA

CABEZAL

EJECUTADO

96.44

5.40

1.90

1.07

8.91

19.83

2.74

5.69

8.43

18.56

20.80

39.36

0.90

8.91

CAJATOMA

CABEZAL

5.48

1.90

1.07

8.91

2.74

5.69

18.56

20.80

48

1.20

9.72

CAJATOMA

MURO

EJECUTADO

80.85

3.69

2.20

1.51

9.72

22.79

6.95

6.95

26.07

26.07

36

0.90

10.53

CAJATOMA

MURO

EJECUTADO

75.16

5.42

1.90

1.07

10.53

21.61

5.69

5.69

20.80

20.80

36

0.90

9.72

CAJATOMA

MURO

EJECUTADO

93.73

5.36

1.90

1.07

9.72

20.62

5.69

5.69

20.80

20.80

134+060

48

1.20

9.72

CAJATOMA

MURO

EJECUTADO

66.99

3.67

2.20

1.51

9.72

22.74

6.95

6.95

26.07

26.07

134+282

134+280

36

0.90

9.72

CAJATOMA

MURO

EJECUTADO

62.70

3.65

1.90

1.07

9.72

17.37

5.69

5.69

20.80

20.80

134+517

134+517

36

0.90

8.91

CAJATOMA

CABEZAL

EJECUTADO

82.84

5.36

1.90

1.07

8.91

19.75

5.69

8.43

20.80

39.36

133+832.2

2.74

18.56

20.80

56.30
-

2.74

18.56

26.07

EJECUTADO

132+240.6

21.28

6.95
2.74

37.12

39.36
37.12

SUPERVCONSORCIO SUPERVISOR LA QUINUA


CONTRACONSORCIO VIAL QUINUA
OBRA: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO
TRAMO (Km. 78+500 - Km. 172+420

OBRAS DE ARTE
METRADOS DE ALCANTARILLAS TMC

PROGRES
REPLANTEO
EJECUTADO

No

PROGRES

ADICIONAL DE OBRA N 03
VALORIZACION N 02

Tipo

Diamet.

LONG.

ESTRUCT. DE
ENTRADA

ESTRUCT. DE SALIDA

CONDICION AL 23-072013

601.C EXCAV. PARA


ESTRUCT. EN MAT.
COMUN

RELLENO CABEZAL

RELLENO CUERPO

CONCRETO CLASE E (F'C=175 KG/CM2)


605.A RELLENOS
PARA ESTRUCT.

Area de Relleno 1
m

Ancho de relleno 1 Area de Relleno2


m

640.F PIEDRA ASENTADA 640.D PIEDRA ASENTADA Y


Y EMBOQUILL. e=0.20 m.
EMOQUILL. e=0.30 m.

Ancho de relleno 2

km

km

193

134+665

134+665

36

0.90

9.72

CAJATOMA

MURO

EJECUTADO

62.53

3.88

1.90

1.07

9.72

17.81

194

134+815

134+817

36

0.90

9.72

CAJATOMA

CABEZAL

EJECUTADO

83.09

5.83

1.90

1.07

9.72

21.51

195

135+080

135+080

36

0.90

9.72

CAJATOMA

CABEZAL

EJECUTADO

112.82

4.18

1.90

1.07

9.72

18.38

196

135+512

36

0.90

11.34

CAJATOMA

CABEZAL

5.58

1.90

1.07

11.34

197

135+551

48

1.20

12.96

CAJATOMA

CABEZAL

7.28

2.20

1.51

12.96

198

135+734

36

0.90

10.53

CAJATOMA

CABEZAL

6.44

1.90

1.07

10.53

199

135+871

135+870

36

0.90

9.72

CAJATOMA

MURO

EJECUTADO

68.82

4.68

1.90

1.07

9.72

200

136+171

136+171

36

0.90

8.91

CAJATOMA

CABEZAL

EJECUTADO

92.25

4.58

1.90

1.07

201

136+485

136+485

36

0.90

8.91

CAJATOMA

CABEZAL

EJECUTADO

77.46

3.94

1.90

1.07

202

136+730

36

0.90

9.72

CAJATOMA

CABEZAL

4.78

1.90

1.07

9.72

203

136+913

36

0.90

11.34

CABEZAL

CABEZAL

4.69

1.90

1.07

204

137+230

36

0.90

9.72

CAJATOMA

MURO

1.95

1.90

205

137+440

36

0.90

9.72

CAJATOMA

MURO

3.28

206

137+638

36

0.90

9.72

CAJATOMA

MURO

207

138+029

36

0.90

8.91

CAJATOMA

MURO

208

138+357

36

0.90

9.72

CAJATOMA

209

138+710

36

0.90

9.72

210

139+077

36

0.90

211

139+290

36

212

139+506

213

Concreto Cabezales Concreto Cabezales


Concreto Cajatomas
Salida
entrada
m

610.e CONCRETO
CLASE E (F'C=175
KG/CM2)

5.69

5.69

2.74

5.69

8.43

2.74

5.69

2.74

19.33

8.91

18.27

8.91

17.05

11.34

1.07

9.72

1.90

1.07

4.53

1.90

3.27

MURO

CAJATOMA

CABEZAL

9.72

CAJATOMA

0.90

9.72

36

0.90

139+722

48

214

140+345

215

ENCOFRADO Y DESENCOFRADO
612.A ENCOF. Y
DESENCOF.
Encofrado cabezales

Encofrado cajatomas

20.80

20.80

18.56

20.80

39.36

8.43

18.56

20.80

39.36

5.69

18.56

20.80

3.55

6.95

23.43

26.07

2.74

5.69

18.56

20.80

5.69

5.69

2.74

5.69

8.43

2.74

5.69

8.43

2.74

5.69

2.74

5.69

20.80

9.72

5.69

20.80

1.07

9.72

5.69

20.80

1.90

1.07

8.91

5.69

20.80

2.78

1.90

1.07

9.72

5.69

20.80

4.09

1.90

1.07

9.72

2.74

5.69

18.56

20.80

CABEZAL

4.52

1.90

1.07

9.72

2.74

5.69

18.56

20.80

CAJATOMA

MURO

5.23

1.90

1.07

9.72

5.69

20.80

9.72

CAJATOMA

MURO

2.87

1.90

1.07

9.72

5.69

20.80

1.20

10.53

CAJATOMA

CABEZAL

8.01

2.20

1.51

10.53

6.95

26.07

36

0.90

10.53

CAJATOMA

MURO

5.00

1.90

1.07

10.53

5.69

20.80

140+674

48

1.20

12.96

CAJATOMA

MURO

7.86

2.20

1.51

12.96

6.95

26.07

216

140+810

36

0.90

10.53

CAJATOMA

CABEZAL

6.20

1.90

1.07

10.53

2.74

5.69

18.56

20.80

217

141+094

48

1.20

10.53

CAJATOMA

CABEZAL

4.13

2.20

1.51

10.53

3.55

6.95

23.43

26.07

218

141+232

48

1.20

10.53

CAJATOMA

CABEZAL

4.13

2.20

1.51

10.53

3.55

6.95

23.43

26.07

219

141+396

36

0.90

9.72

CAJATOMA

MURO

4.94

1.90

1.07

9.72

5.69

20.80

220

141+536

48

1.20

9.72

CAJATOMA

MURO

5.33

2.20

1.51

9.72

6.95

26.07

221

141+763

36

0.90

8.10

CAJATOMA

MURO

4.26

1.90

1.07

8.10

5.69

20.80

222

141+968

48

1.20

11.34

CAJATOMA

MURO

5.44

2.20

1.51

11.34

6.95

26.07

223

142+194

48

1.20

10.53

CAJATOMA

MURO

4.89

2.20

1.51

10.53

6.95

26.07

224

142+400

48

1.20

9.72

CAJATOMA

MURO

3.70

2.20

1.51

9.72

6.95

6.95

26.07

225

142+623

48

1.20

12.15

CAJATOMA

CABEZAL

226

142+880

36

0.90

10.53

CAJATOMA

227

143+231

143+230

36

0.90

8.91

228

143+616

143+615

72

1.80

9.72

229

143+862

143+860

36

0.90

230

144+256

48

231

144+514

232

142+396

3.55

20.80

18.56

20.80

39.36

18.56

20.80

39.36

18.56

20.80

37.12

23.43

REINICIO

283.40

10.97

2.20

1.51

12.15

3.55

6.95

23.43

26.07

CABEZAL

REINICIO

108.59

5.62

1.90

1.07

10.53

21.99

19.53

0.89

2.74

5.69

8.43

18.56

20.80

39.36

CAJATOMA

CABEZAL

REINICIO

78.70

4.73

1.90

1.07

8.91

18.55

18.17

0.89

2.74

5.69

8.43

18.56

20.80

39.36

CABEZAL

MURO

REINICIO

156.10

3.51

2.80

2.50

9.72

34.08

6.15

38.50

8.91

CAJATOMA

CABEZAL

REINICIO

95.13

5.24

1.90

1.07

8.91

19.52

7.88

3.08

2.74

8.43

18.56

1.20

9.72

CABEZAL

CABEZAL

3.70

2.20

1.51

9.72

3.55

46.86

48

1.20

9.72

CAJATOMA

MURO

2.72

2.20

1.51

9.72

144+797

48

1.20

10.53

CABEZAL

CABEZAL

4.05

2.20

1.51

10.53

233

145+075

36

0.90

9.72

CABEZAL

MURO

4.85

1.90

1.07

9.72

234

145+198

48

1.20

11.34

CAJATOMA

CABEZAL

9.73

2.20

1.51

11.34

3.55

235

145+265

48

1.20

9.72

CAJATOMA

CABEZAL

3.91

2.20

1.51

9.72

236

145+359

36

0.90

9.72

CAJATOMA

CABEZAL

4.68

1.90

1.07

9.72

237

145+539

48

1.20

13.77

CAJATOMA

CABEZAL

9.94

2.20

1.51

13.77

238

145+887

48

1.20

8.91

CAJATOMA

MURO

6.44

2.20

1.51

8.91

239

146+470

146+470

48

1.20

8.91

CAJATOMA

CABEZAL

REINICIO

184.29

5.29

2.20

1.51

8.91

25.08

240

146+774

146+772

36

0.90

8.10

CAJATOMA

MURO

EJECUTADO

99.92

4.28

1.90

1.07

8.10

16.83

241

147+174

36

0.90

9.72

CAJATOMA

CABEZAL

EJECUTADO

128.71

5.30

1.90

1.07

9.72

20.51

2.74

242

147+602

48

1.20

10.53

CAJATOMA

CABEZAL

EJECUTADO

128.28

4.22

2.20

1.51

10.53

25.17

3.55

243

148+015

36

0.90

9.72

CAJATOMA

MURO

5.11

1.90

1.07

9.72

5.69

20.80

244

148+300

36

0.90

10.53

CAJATOMA

MURO

6.37

1.90

1.07

10.53

5.69

20.80

245

148+409

36

0.90

9.72

CAJATOMA

CABEZAL

EJECUTADO

66.48

5.17

1.90

1.07

9.72

20.26

2.74

5.69

8.43

18.56

20.80

39.36

246

148+520

48

1.20

9.72

CAJATOMA

CABEZAL

EJECUTADO

122.12

4.58

2.20

1.51

9.72

24.74

3.55

6.95

10.50

23.43

26.07

49.50

247

148+680

60

1.50

13.77

CAJATOMA

CABEZAL

7.76

2.50

1.98

13.77

5.05

8.29

31.28

31.77

248

148+762

60

1.50

11.34

CAJATOMA

CABEZAL

6.22

2.50

1.98

11.34

5.05

8.29

31.28

31.77

249

149+230

48

1.20

10.53

CAJATOMA

CABEZAL

7.83

2.20

1.51

10.53

3.55

6.95

23.43

26.07

250

149+460

36

0.90

9.72

CAJATOMA

MURO

7.19

1.90

1.07

9.72

5.69

20.80

251

149+615

72

1.80

9.72

CAJATOMA

MURO

4.56

2.80

2.50

9.72

9.69

37.91

252

149+664

36

0.90

8.91

CAJATOMA

CABEZAL

5.33

1.90

1.07

8.91

5.69

8.43

253

149+852

36

0.90

11.34

CAJATOMA

MURO

5.01

1.90

1.07

11.34

5.69

254

149+930

36

0.90

12.15

CAJATOMA

CABEZAL

5.86

1.90

1.07

12.15

2.74

5.69

18.56

20.80

255

150+150

36

0.90

8.91

CAJATOMA

CABEZAL

EJECUTADO

98.34

5.33

1.90

1.07

8.91

19.69

2.74

5.69

8.43

18.56

20.80

39.36

256

150+456

36

0.90

8.91

CAJATOMA

CABEZAL

EJECUTADO

73.99

3.13

1.90

1.07

8.91

15.51

2.74

5.69

8.43

18.56

20.80

39.36

142+894.5

147+173.5
147+597

148+408.5
148+520

149+198

149+660

150+149
150+455.5

EJECUTADO

EJECUTADO

145.27

117.19

22.81

2.74

20.80

33.12

19.69

6.15
5.69
3.55
6.95

38.50
20.80

39.36
-

26.07

3.55

46.86

2.74

18.56

6.95

23.43

26.07

3.55

6.95

23.43

26.07

2.74

5.69

18.56

20.80

3.55

6.95

23.43

26.07

6.95

27.60

3.55

26.07

3.55

2.74

26.07

6.95

10.50

5.69

5.69

5.69

8.43

18.56

6.95

10.50

23.43

10.50

23.43

18.56

26.07

49.50

20.80

20.80

20.80

39.36

26.07

49.50

20.80
20.80

49.50
39.36
-

SUPERVCONSORCIO SUPERVISOR LA QUINUA


CONTRACONSORCIO VIAL QUINUA
OBRA: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO
TRAMO (Km. 78+500 - Km. 172+420

OBRAS DE ARTE
METRADOS DE ALCANTARILLAS TMC

PROGRES
REPLANTEO
EJECUTADO

No

PROGRES

ADICIONAL DE OBRA N 03
VALORIZACION N 02

Tipo

Diamet.

ESTRUCT. DE
ENTRADA

ESTRUCT. DE SALIDA

CONDICION AL 23-072013

RELLENO CABEZAL

RELLENO CUERPO

CONCRETO CLASE E (F'C=175 KG/CM2)


605.A RELLENOS
PARA ESTRUCT.

Area de Relleno 1
m

Ancho de relleno 1 Area de Relleno2


m

640.F PIEDRA ASENTADA 640.D PIEDRA ASENTADA Y


Y EMBOQUILL. e=0.20 m.
EMOQUILL. e=0.30 m.

Ancho de relleno 2
m

Concreto Cabezales Concreto Cabezales


Concreto Cajatomas
Salida
entrada
m

610.e CONCRETO
CLASE E (F'C=175
KG/CM2)

612.A ENCOF. Y
DESENCOF.
Encofrado cabezales

Encofrado cajatomas

km

km

150+728

36

0.90

9.72

CAJATOMA

CABEZAL

EJECUTADO

51.93

5.46

1.90

1.07

9.72

20.81

258

150+983

150+987

48

1.20

9.72

CAJATOMA

MURO

EJECUTADO

176.46

3.76

2.20

1.51

9.72

22.94

259

151+222

151+222

72

1.80

11.34

CABEZAL

CABEZAL

EJECUTADO

428.76

4.31

2.80

2.50

11.34

40.36

6.15

6.15

12.30

77.00

77.00

260

151+453

48

1.20

9.72

CABEZAL

CABEZAL

EJECUTADO

184.60

5.52

2.20

1.51

9.72

26.81

3.55

3.55

7.10

46.86

46.86

261

151+782

151+779

48

1.20

12.15

CABEZAL

CABEZAL

EJECUTADO

408.58

6.74

2.20

1.51

12.15

33.16

3.55

3.55

7.10

46.86

46.86

262

151+952

151+951

36

0.90

11.34

CABEZAL

CABEZAL

EJECUTADO

275.10

8.00

1.90

1.07

11.34

27.38

2.74

2.74

5.48

37.12

37.12

263

152+143

36

0.90

11.34

CABEZAL

CABEZAL

EJECUTADO

422.01

6.40

1.90

1.07

11.34

24.34

2.74

2.74

5.48

37.12

37.12

264

152+462

152+461

36

0.90

12.15

CABEZAL

CABEZAL

EJECUTADO

69.24

5.56

1.90

1.07

12.15

23.61

2.74

2.74

5.48

37.12

37.12

265

152+640

152+638

72

1.80

10.53

CABEZAL

MURO

EJECUTADO

320.63

5.45

2.80

2.50

10.53

41.54

6.15

6.15

38.50

38.50

266

152+720

152+723

72

1.80

11.34

CABEZAL

CABEZAL

EJECUTADO

736.90

6.45

2.80

2.50

11.34

46.36

6.15

12.30

77.00

77.00

267

152+831

152+830

48

1.20

8.91

CABEZAL

MURO

EJECUTADO

54.01

1.36

2.20

1.51

8.91

16.44

3.55

3.55

23.43

23.43

268

153+360

153+360

48

1.20

8.91

CABEZAL

MURO

EJECUTADO

189.55

4.57

2.20

1.51

8.91

23.50

3.55

3.55

23.43

269

153+691

153+690

48

1.20

9.72

CAJATOMA

MURO

EJECUTADO

143.53

3.91

2.20

1.51

9.72

23.27

270

153+935

153+935

36

0.90

9.72

CABEZAL

CABEZAL

EJECUTADO

338.33

4.49

1.90

1.07

9.72

18.97

2.74

271

154+270

48

1.20

9.72

CAJATOMA

CABEZAL

4.34

2.20

1.51

9.72

3.55

272

154+722

48

1.20

10.53

CABEZAL

MURO

EJECUTADO

144.21

3.26

2.20

1.51

10.53

23.06

273

154+883

154+881

36

0.90

10.53

CAJATOMA

CABEZAL

EJECUTADO

101.35

5.70

1.90

1.07

10.53

22.14

274

155+314

155+312

60

1.50

13.77

CABEZAL

MURO

EJECUTADO

143.90

8.23

2.50

1.98

13.77

47.88

5.05

275

155+447

155+447

48

1.20

10.53

CABEZAL

MURO

EJECUTADO

125.93

2.22

2.20

1.51

10.53

20.77

276

155+584

155+582

48

1.20

12.15

CABEZAL

CABEZAL

EJECUTADO

112.90

7.06

2.20

1.51

12.15

33.87

277

155+954

155+952

36

0.90

12.15

CABEZAL

CABEZAL

EJECUTADO

261.54

7.11

1.90

1.07

12.15

26.56

278

156+236

156+234

36

0.90

9.72

CAJATOMA

CABEZAL

EJECUTADO

95.13

3.98

1.90

1.07

9.72

18.00

279

156+488

156+489

48

1.20

10.53

CAJATOMA

CABEZAL

EJECUTADO

115.96

4.13

2.20

1.51

10.53

280

156+702

156+700

48

1.20

9.72

CABEZAL

CABEZAL

EJECUTADO

205.59

5.52

2.20

1.51

281

157+080

157+080

48

1.20

12.96

CABEZAL

CABEZAL

EJECUTADO

169.71

7.33

2.20

282

157+370

157+320

48

1.20

11.34

CAJATOMA

CABEZAL

EJECUTADO

199.21

8.35

283

157+640

157+638

48

1.20

10.53

CABEZAL

MURO

EJECUTADO

89.69

284

157+916

157+914.5

36

0.90

9.72

CAJATOMA

CABEZAL

EJECUTADO

285

158+192

158+189.5

36

0.90

12.15

CABEZAL

CABEZAL

286

158+363

158+362

36

0.90

10.53

CAJATOMA

287

158+598

158+596

48

1.20

9.72

288

158+889

48

1.20

289

159+009

48

290

159+082

291

2.74

6.15

ENCOFRADO Y DESENCOFRADO

150+725

152+141.5

601.C EXCAV. PARA


ESTRUCT. EN MAT.
COMUN

257

151+452.5

LONG.

5.69

8.43

6.95

6.95

6.95

6.95

20.80

39.36

26.07

26.07

23.43
26.07

26.07

5.48

37.12

6.95

23.43

3.55

3.55

23.43

5.69

8.43

18.56

5.05

31.28

31.28

3.55

3.55

23.43

23.43

3.55

3.55

7.10

46.86

46.86

2.74

2.74

5.48

37.12

2.74

5.69

8.43

18.56

20.80

39.36

24.98

3.55

6.95

10.50

23.43

26.07

49.50

9.72

26.81

3.95

3.55

3.55

7.10

46.86

1.51

12.96

35.68

3.55

3.55

7.10

46.86

2.20

1.51

11.34

35.48

3.55

10.50

23.43

1.78

2.20

1.51

10.53

19.81

3.55

23.43

71.31

6.55

1.90

1.07

9.72

22.88

2.74

8.43

18.56

EJECUTADO

159.16

8.43

1.90

1.07

12.15

29.06

2.74

5.48

37.12

CABEZAL

EJECUTADO

79.42

5.71

1.90

1.07

10.53

22.16

2.74

8.43

18.56

CABEZAL

CABEZAL

EJECUTADO

193.18

5.52

2.20

1.51

9.72

26.81

3.55

7.10

46.86

14.58

CAJATOMA

CABEZAL

13.62

2.20

1.51

14.58

3.55

6.95

23.43

26.07

1.20

13.77

CAJATOMA

CABEZAL

10.50

2.20

1.51

13.77

3.55

6.95

23.43

26.07

60

1.50

12.15

CABEZAL

MURO

4.93

2.50

1.98

12.15

5.05

31.28

159+360

36

0.90

11.34

CABEZAL

MURO

4.69

1.90

1.07

11.34

2.74

18.56

292

159+537

60

1.50

11.34

CABEZAL

MURO

2.34

2.50

1.98

11.34

5.05

31.28

293

159+708

48

1.20

12.15

CAJATOMA

MURO

4.83

2.20

1.51

12.15

294

159+854

159+854

48

1.20

11.34

CABEZAL

MURO

EJECUTADO

111.52

2.79

2.20

1.51

11.34

23.25

295

160+105

160+102

48

1.20

21.87

CABEZAL

CABEZAL

EJECUTADO

232.56

64.97

2.20

1.51

21.87

175.94

3.55

296

160+330

160+300

36

0.90

8.91

CAJATOMA

CABEZAL

EJECUTADO

68.02

5.46

1.90

1.07

8.91

19.94

2.74

5.69

297

160+470

160+470

36

0.90

8.91

CAJATOMA

CABEZAL

EJECUTADO

96.58

5.24

1.90

1.07

8.91

19.52

2.74

298

160+619

160+618

48

1.20

10.53

CAJATOMA

CABEZAL

EJECUTADO

122.54

4.12

2.20

1.51

10.53

24.95

3.55

299

160+760

160+760

48

1.20

9.72

CABEZAL

CABEZAL

EJECUTADO

97.09

5.00

2.20

1.51

9.72

25.67

3.55

300

160+854

160+854

48

1.20

10.53

CABEZAL

CABEZAL

EJECUTADO

208.21

4.52

2.20

1.51

10.53

25.83

301

160+974

36

0.90

9.72

CABEZAL

CABEZAL

5.71

1.90

1.07

9.72

302

161+128

48

1.20

9.72

CABEZAL

MURO

5.55

2.20

1.51

9.72

303

161+249

36

0.90

9.72

CABEZAL

CABEZAL

5.70

1.90

1.07

9.72

304

161+323

161+350

48

1.20

11.34

CABEZAL

CABEZAL

EJECUTADO

171.78

6.20

2.20

1.51

11.34

30.75

305

161+493

161+491

48

1.20

9.72

CABEZAL

CABEZAL

EJECUTADO

182.36

4.82

2.20

1.51

9.72

25.27

306

161+635

161+627

48

1.20

10.53

CABEZAL

CABEZAL

EJECUTADO

117.46

4.71

2.20

1.51

10.53

26.25

307

161+715

161+710

72

1.80

11.34

CABEZAL

MURO

EJECUTADO

139.33

3.11

2.80

2.50

11.34

308

161+856

161+856

48

1.20

8.91

CAJATOMA

CABEZAL

EJECUTADO

104.48

5.03

2.20

1.51

309

162+029

36

0.90

8.10

CAJATOMA

MURO

EJECUTADO

17.94

1.33

1.90

310

162+160

162+160

36

0.90

8.91

CAJATOMA

CABEZAL

EJECUTADO

78.22

5.24

311

162+543

162+543

48

1.20

8.91

CAJATOMA

CABEZAL

EJECUTADO

78.87

312

162+745

36

0.90

12.15

CAJATOMA

CABEZAL

313

162+880

36

0.90

11.34

CAJATOMA

314

162+969

36

0.90

13.77

315

163+503

72

1.80

316

163+678

48

317

163+920

318

163+965

319
320

154+719.5

2.74

18.56

2.74

6.95
3.55
5.69
2.74
5.69
3.55

6.95

23.43

20.80

39.36

37.12

46.86
46.86
26.07

49.50
23.43

20.80

39.36
37.12

20.80

39.36
46.86

26.07

3.55

23.43

7.10

46.86

8.43

18.56

20.80

39.36

5.69

8.43

18.56

20.80

39.36

6.95

10.50

23.43

26.07

49.50

3.55

7.10

46.86

46.86

3.55

3.55

7.10

46.86

46.86

2.74

2.74

37.12

3.55

23.43

2.74

2.74

37.12

3.55

3.55

7.10

46.86

46.86

3.55

3.55

7.10

46.86

46.86

3.55

3.55

7.10

46.86

46.86

37.00

6.15

6.15

38.50

8.91

24.51

6.95

10.50

23.43

1.07

8.10

11.23

5.69

5.69

1.90

1.07

8.91

19.52

2.74

5.69

8.43

5.20

2.20

1.51

8.91

24.89

3.55

6.95

10.50

5.10

1.90

1.07

12.15

2.74

5.69

CABEZAL

5.07

1.90

1.07

11.34

2.74

CAJATOMA

CABEZAL

9.73

1.90

1.07

13.77

2.74

14.58

CABEZAL

CABEZAL

10.70

2.80

2.50

14.58

6.15

1.20

10.53

CAJATOMA

CABEZAL

4.14

2.20

1.51

10.53

3.55

6.95

48

1.20

9.72

CAJATOMA

CABEZAL

5.33

2.20

1.51

9.72

3.55

6.95

36

0.90

8.91

CAJATOMA

MURO

3.52

1.90

1.07

8.91

5.69

164+194

72

1.80

10.53

CABEZAL

CABEZAL

6.04

2.80

2.50

10.53

6.15

164+331

48

1.20

10.53

CAJATOMA

CABEZAL

4.13

2.20

1.51

10.53

3.55

162+028.5

163+678

EJECUTADO

77.64

25.00

3.55

37.12
26.07

3.55

3.55

23.43
46.86

38.50
26.07

49.50

20.80

20.80

18.56

20.80

39.36

23.43

26.07

49.50

18.56

20.80

5.69

18.56

20.80

5.69

18.56

20.80

77.00

6.15

6.15
6.95

10.50

23.43

26.07

23.43

26.07

20.80

77.00

23.43

49.50

26.07

SUPERVCONSORCIO SUPERVISOR LA QUINUA


CONTRACONSORCIO VIAL QUINUA
OBRA: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO
TRAMO (Km. 78+500 - Km. 172+420

OBRAS DE ARTE
METRADOS DE ALCANTARILLAS TMC

PROGRES
REPLANTEO
EJECUTADO

No

PROGRES

ADICIONAL DE OBRA N 03
VALORIZACION N 02

km

km

Tipo

Diamet.

LONG.

ESTRUCT. DE
ENTRADA

ESTRUCT. DE SALIDA

CONDICION AL 23-072013

601.C EXCAV. PARA


ESTRUCT. EN MAT.
COMUN

RELLENO CABEZAL

RELLENO CUERPO

CONCRETO CLASE E (F'C=175 KG/CM2)


605.A RELLENOS
PARA ESTRUCT.

Area de Relleno 1
m

Ancho de relleno 1 Area de Relleno2


m

640.F PIEDRA ASENTADA 640.D PIEDRA ASENTADA Y


Y EMBOQUILL. e=0.20 m.
EMOQUILL. e=0.30 m.

Ancho de relleno 2
m

Concreto Cabezales Concreto Cabezales


Concreto Cajatomas
Salida
entrada
m

321

164+350

36

0.90

9.72

CAJATOMA

CABEZAL

5.36

1.90

1.07

9.72

322

164+463

48

1.20

11.34

CAJATOMA

MURO

2.32

2.20

1.51

11.34

323

164+600

36

0.90

11.34

CAJATOMA

CABEZAL

5.15

1.90

1.07

11.34

2.74

324

164+830

36

0.90

13.77

CABEZAL

CABEZAL

10.25

1.90

1.07

13.77

2.74

325

164+977

48

1.20

10.53

CAJATOMA

MURO

3.74

2.20

1.51

10.53

326

165+183

72

1.80

9.72

CABEZAL

MURO

1.95

2.80

2.50

9.72

327

165+385

165+385

36

0.90

9.72

CABEZAL

CABEZAL

EJECUTADO

99.16

5.96

1.90

1.07

9.72

21.76

328

165+606

165+604

72

1.80

9.72

CABEZAL

CABEZAL

EJECUTADO

156.88

5.40

2.80

2.50

9.72

39.37

329

165+684

165+683.5

72

1.80

11.34

CABEZAL

CABEZAL

EJECUTADO

267.32

4.30

2.80

2.50

11.34

40.34

330

165+940

165+952.4

72

1.80

9.72

CABEZAL

CABEZAL

EJECUTADO

262.72

5.59

2.80

2.50

9.72

39.91

331

166+055

166+051.5

72

1.80

10.53

CABEZAL

CABEZAL

EJECUTADO

197.71

5.16

2.80

2.50

10.53

332

166+175

72

1.80

9.72

CABEZAL

MURO

EJECUTADO

135.04

0.61

2.80

2.50

9.72

333

166+307

72

1.80

9.72

CABEZAL

CABEZAL

5.38

2.80

2.50

9.72

334

166+675

72

1.80

19.44

CABEZAL

CABEZAL

EJECUTADO

360.33

51.58

2.80

2.50

19.44

335

166+820

72

1.80

9.72

CABEZAL

CABEZAL

EJECUTADO

188.61

5.38

2.80

2.50

9.72

336

166+915

60

1.50

12.15

CABEZAL

MURO

4.93

2.50

1.98

12.15

337

167+030

60

1.50

12.15

CABEZAL

MURO

6.13

2.50

1.98

12.15

338

167+167

167+167

72

1.80

8.91

CABEZAL

MURO

EJECUTADO

126.36

1.19

2.80

2.50

8.91

339

167+491

167+491

48

1.20

10.53

CABEZAL

CABEZAL

EJECUTADO

107.16

6.18

2.20

1.51

340

167+795

167+775

48

1.20

8.91

CAJATOMA

CABEZAL

EJECUTADO

76.96

5.19

2.20

1.51

341

168+000

168+015

48

1.20

8.91

CAJATOMA

CABEZAL

EJECUTADO

73.66

5.26

2.20

342

168+500

168+488

48

1.20

11.34

CAJATOMA

CABEZAL

EJECUTADO

111.34

6.97

343

168+795

168+795

72

1.80

11.34

CABEZAL

CABEZAL

EJECUTADO

269.81

344

168+983

168+981

72

1.80

10.53

CABEZAL

CABEZAL

EJECUTADO

345

169+153

169+151

72

1.80

10.53

CABEZAL

MURO

346

169+410

169+410

48

1.20

8.91

CAJATOMA

347

169+620

169+620

48

1.20

11.34

348

169+920

170+010

48

1.20

349

170+800

170+800

48

350

170+986

170+985

351

171+240

352

2.74

610.e CONCRETO
CLASE E (F'C=175
KG/CM2)

ENCOFRADO Y DESENCOFRADO
612.A ENCOF. Y
DESENCOF.
Encofrado cabezales

Encofrado cajatomas

5.69

6.95

5.69

18.56

37.12

2.74

20.80

26.07

20.80

26.07

6.15

37.91

2.74

2.74

5.48

37.12

37.12

6.15

6.15

12.30

77.00

77.00

6.15

6.15

12.30

77.00

77.00

6.15

6.15

12.30

77.00

77.00

40.72

6.15

6.15

12.30

77.00

77.00

25.96

6.15

6.15

38.50

38.50

6.15

6.15

77.00

192.93

6.15

6.15

12.30

77.00

77.00

39.32

6.15

6.15

12.30

77.00

77.00

5.05

31.28

5.05

31.28

25.57

6.15

6.15

38.50

10.53

29.49

3.55

7.10

46.86

8.91

24.86

3.55

6.95

10.50

23.43

26.07

49.50

1.51

8.91

25.02

3.55

6.95

10.50

23.43

26.07

49.50

2.20

1.51

11.34

32.45

3.55

6.95

10.50

23.43

26.07

49.50

4.30

2.80

2.50

11.34

40.34

6.15

6.15

12.30

77.00

77.00

256.56

41.00

2.80

2.50

10.53

141.08

6.15

6.15

12.30

77.00

77.00

EJECUTADO

150.11

3.91

2.80

2.50

10.53

37.22

6.15

6.15

38.50

CABEZAL

EJECUTADO

65.91

5.08

2.20

1.51

8.91

24.62

3.55

6.95

10.50

23.43

26.07

49.50

CAJATOMA

CABEZAL

EJECUTADO

144.63

8.40

2.20

1.51

11.34

35.59

3.55

6.95

10.50

23.43

26.07

49.50

8.91

CAJATOMA

CABEZAL

EJECUTADO

109.12

5.08

2.20

1.51

8.91

24.62

1.02

3.55

6.95

10.50

23.43

26.07

49.50

1.20

8.91

CAJATOMA

CABEZAL

EJECUTADO

80.12

5.09

2.20

1.51

8.91

24.64

3.55

6.95

10.50

23.43

26.07

49.50

48

1.20

8.91

CAJATOMA

MURO

EJECUTADO

50.12

3.51

2.20

1.51

8.91

21.17

20.76

0.60

6.95

6.95

26.07

26.07

171+234

48

1.20

9.72

CAJATOMA

CABEZAL

EJECUTADO

62.61

5.11

2.20

1.51

9.72

25.91

11.16

1.02

3.55

6.95

10.50

23.43

26.07

49.50

171+422

171+422

48

1.20

9.72

CAJATOMA

CABEZAL

EJECUTADO

68.05

4.63

2.20

1.51

9.72

24.85

13.56

1.02

3.55

6.95

10.50

23.43

26.07

49.50

353

171+751

171+749

48

1.20

8.91

CAJATOMA

CABEZAL

EJECUTADO

87.05

5.30

2.20

1.51

8.91

25.11

13.68

1.18

3.55

6.95

10.50

23.43

26.07

49.50

354

171+803

171+803

72

1.80

10.53

CABEZAL

MURO

EJECUTADO

146.75

3.90

2.80

2.50

10.53

37.20

22.95

4.37

6.15

38.50

355

171+881

60

1.50

10.53

CAJATOMA

CABEZAL

6.02

2.50

1.98

10.53

5.05

8.29

31.28

31.77

356

171+948

72

1.80

8.91

CAJATOMA

CABEZAL

4.94

2.80

2.50

8.91

6.15

9.69

38.50

37.91

357

171+987

72

1.80

10.53

CAJATOMA

CABEZAL

4.34

2.80

2.50

10.53

6.15

9.69

38.50

37.91

358

172+039

72

1.80

9.72

CABEZAL

CABEZAL

5.33

2.80

2.50

9.72

6.15

6.15

77.00

359

172+124

72

1.80

9.72

CABEZAL

CABEZAL

EJECUTADO

164.81

5.39

2.80

2.50

9.72

39.35

6.15

6.15

12.30

77.00

77.00

360

172+193

172+193

72

1.80

8.91

CABEZAL

MURO

EJECUTADO

175.06

1.69

2.80

2.50

8.91

26.97

6.15

6.15

38.50

38.50

361

172+589

172+589

48

1.20

8.91

CABEZAL

MURO

EJECUTADO

143.92

5.00

2.20

1.51

8.91

24.45

3.55

3.55

23.43

362

172+680

36

0.90

8.91

CAJATOMA

CABEZAL

4.58

1.90

1.07

8.91

2.74

5.69

18.56

20.80

363

173+140

36

0.90

12.15

CAJATOMA

CABEZAL

5.81

1.90

1.07

12.15

2.74

5.69

8.43

18.56

20.80

166+175
166+671.9
166+818

172+124.5

172+942
209

TOTAL

EJECUTADO

101.42
26,692.17

24.09

11.97

0.89

5,912.30

167.25

18.90

6.95

18.56

3.55

6.15

1,770.27

38.50
46.86

38.50

38.50

23.43
39.36
9,017.94

SUPERVCONSORCIO SUPERVISOR LA QUINUA


CONTRACONSORCIO VIAL QUINUA
OBRA: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO
TRAMO (Km. 78+500 - Km. 172+420

OBRAS DE ARTE
METRADOS DE ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02

No

PROGRESIVAS

PROGRESIVAS REPLANTEO

km

km

79+175

ANULADA

79+490

79+998

79+998

80+315

80+315

80+460

6
7

TMC (Pulg)

Diamet.

622.B TUBERIA CORRUGADA DE 622.C TUBERIA CORRUGADA DE 622.D TUBERIA CORRUGADA DE 622.E TUBERIA CORRUGADA DE
623 PINTURA ASFALTICA PARA
ACERO GALVANIZADO CIRCULAR ACERO GALVANIZADO CIRCULAR ACERO GALVANIZADO CIRCULAR ACERO GALVANIZADO CIRCULAR Permetro de Tubera
ALCANTARILLAS METALICAS
DE 0.90 M DE DIAMETRO
DE 1.20 M DE DIAMETRO
DE 1.50 M DE DIAMETRO
DE 1.80 M DE DIAMETRO

LONG.

36

0.90

9.72

72

1.80

12.15

72

1.80

12.15

36

0.90

10.53

80+460

72

1.80

11.34

80+790

ANULADA

48

1.20

9.72

83+120

83+120

48

1.20

11.34

11.34

83+420

83+402

48

1.20

10.53

10.53

m2

3.77

3.77

3.77

10.53

2.83

5.65

24.30
11.34

5.65
2.83
5.65

83+870

ANULADA

36

0.90

8.91

2.83

10

84+240

ANULADA

48

1.20

11.34

3.77

11

84+650

84+573

48

1.20

11.34

3.77

12

85+005

72

1.80

11.34

5.65

13

85+360

ANULADA

48

1.20

11.34

3.77

14

85+800

ANULADA

48

1.20

9.72

3.77

15

86+180

36

0.90

9.72

2.83

16

86+545

48

1.20

10.53

3.77

17

87+005

86+954

48

1.20

10.53

10.53

3.77

18

87+420

87+418

48

1.20

10.53

10.53

3.77

19

87+850

87+850

48

1.20

11.34

11.34

3.77

20

88+180

88+180

36

0.90

8.91

8.91

2.83

21

88+260

88+260

48

1.20

11.34

11.34

3.77

22

88+620

88+620

48

1.20

10.53

10.53

3.77

23

89+020

89+020

48

1.20

8.91

8.91

3.77

24

89+405

89+405

72

1.80

12.15

25

89+780

89+780

36

0.90

11.34

11.34

2.83

26

89+870

89+870

36

0.90

8.91

8.91

2.83

27

90+095

90+180

36

0.90

8.91

8.91

2.83

28

90+340

90+334

36

0.90

8.91

8.91

2.83

29

90+605

90+606

72

1.80

11.34

30

90+860

90+862

48

1.20

10.53

31

91+155

91+155

36

0.90

8.91

8.91

32

91+530

91+528

48

1.20

8.91

33

91+840

91+840

36

0.90

9.72

9.72

34

91+955

91+955

48

1.20

9.72

35

92+235

92+235

36

0.90

8.91

36

92+600

92+562

48

1.20

9.72

37

92+882

92+882

72

1.80

12.96

38

93+162

93+162

48

1.20

10.53

39

93+610

93+610

72

1.80

10.53

40

93+810

48

1.20

10.53

41

94+180

48

1.20

9.72

42

94+580

36

0.90

43

94+700

94+696

36

44

94+820

ANULADA

36

45

95+050

95+049

94+180

11.34

10.53

12.15

11.34

5.65

5.65

3.77

2.83

8.91

3.77

2.83

9.72

3.77

8.91

2.83

9.72

3.77

10.53

12.96
10.53

5.65
3.77

3.77

9.72

5.65
3.77

8.91

2.83

0.90

9.72

9.72

2.83

0.90

8.91

2.83

72

1.80

12.15

12.15

5.65

11.34

5.65

46

95+110

95+112

72

1.80

11.34

47

95+270

95+270

48

1.20

8.91

8.91

3.77

48

95+440

95+440

48

1.20

9.72

9.72

3.77

49

95+800

95+800

48

1.20

9.72

9.72

3.77

50

96+140

ANULADA

36

0.90

8.10

2.83

51

96+500

ANULADA

36

0.90

8.91

2.83

52

96+880

ANULADA

36

0.90

8.91

2.83

53

97+020

ANULADA

36

0.90

9.72

2.83

54

97+160

ANULADA

36

0.90

9.72

2.83

55

97+380

ANULADA

36

0.90

9.72

2.83

56

97+600

48

1.20

8.91

3.77

57

97+870

97+870

36

0.90

10.53

2.83

58

98+010

ANULADA

36

0.90

8.91

2.83

59

98+120

ANULADA

36

0.90

9.72

2.83

60

98+260

98+260

36

0.90

8.91

8.91

2.83

61

98+450

98+450

48

1.20

10.53

3.77

62

98+530

48

1.20

9.71

3.77

63

98+620

36

0.90

8.91

2.83

64

98+925

48

1.20

9.72

3.77

65

99+140

99+140

36

0.90

10.53

2.83

66

99+491

99+490

48

1.20

11.33

3.77

67

99+730

99+780

36

0.90

11.34

68

100+230

100+235

36

0.90

69

100+680

100+670

36

0.90

70

100+880

100+878

36

0.90

10.53

10.53
-

10.53

11.33

11.34

2.83

9.72

9.72

2.83

10.53

10.53

2.83

9.72

9.72

2.83

71

101+311

101+311

36

0.90

8.91

8.91

2.83

72

101+370

101+370

36

0.90

8.91

8.91

2.83

73

101+420

101+440

36

0.90

8.91

8.91

2.83

74

101+700

101+698

36

0.90

9.72

9.72

2.83

75

101+740

48

1.20

8.91

3.77

76

102+100

60

1.50

10.53

4.71

77

102+300

102+271

36

0.90

9.72

9.72

2.83

78

102+670

102+683

36

0.90

9.72

9.72

2.83

79

102+860

102+860

36

0.90

8.91

8.91

2.83

80

103+060

103+060

36

0.90

10.53

10.53

2.83

81

103+310

103+300

36

0.90

11.33

11.33

2.83

82

103+560

103+560

36

0.90

8.10

8.10

2.83

83

104+120

104+120

48

1.20

11.34

11.34

3.77

84

104+460

104+460

48

1.20

11.34

11.34

3.77

85

104+880

36

0.90

9.72

2.83

86

105+140

105+140

36

0.90

8.91

8.91

2.83

87

105+420

105+420

36

0.90

10.53

10.53

2.83

88

105+980

105+980

36

0.90

8.91

8.91

2.83

89

106+220

106+220

36

0.90

8.91

8.91

2.83

90

106+380

106+380

36

0.90

9.72

9.72

2.83

SUPERVCONSORCIO SUPERVISOR LA QUINUA


CONTRACONSORCIO VIAL QUINUA
OBRA: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO
TRAMO (Km. 78+500 - Km. 172+420

OBRAS DE ARTE
METRADOS DE ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02

No

PROGRESIVAS

PROGRESIVAS REPLANTEO

TMC (Pulg)

Diamet.

622.B TUBERIA CORRUGADA DE 622.C TUBERIA CORRUGADA DE 622.D TUBERIA CORRUGADA DE 622.E TUBERIA CORRUGADA DE
623 PINTURA ASFALTICA PARA
ACERO GALVANIZADO CIRCULAR ACERO GALVANIZADO CIRCULAR ACERO GALVANIZADO CIRCULAR ACERO GALVANIZADO CIRCULAR Permetro de Tubera
ALCANTARILLAS METALICAS
DE 0.90 M DE DIAMETRO
DE 1.20 M DE DIAMETRO
DE 1.50 M DE DIAMETRO
DE 1.80 M DE DIAMETRO

LONG.

km

km

91

106+512

106+513

48

1.20

92

106+840

106+840

48

93

107+010

107+010

48

94

107+390

107+390

48

95

107+550

96
97

10.53

10.53

0.90

8.91

8.91

1.20

10.53

10.53

1.20

10.53

10.53

36

0.90

9.72

107+840

36

0.90

8.91

108+480

36

0.90

8.91

98

108+700

36

0.90

m2

3.77

2.83

3.77

3.77

2.83

2.83

2.83

8.91

2.83

99

109+000

48

1.20

9.72

3.77

100

109+730

48

1.20

9.72

3.77

101

109+980

36

0.90

8.91

2.83

102

110+220

36

0.90

8.10

2.83

103

110+520

48

1.20

10.53

3.77

104

110+820

36

0.90

8.91

2.83

105

111+100

36

0.90

8.91

2.83

106

111+340

36

0.90

8.91

2.83

107

111+640

36

0.90

8.10

2.83

108

111+856

48

1.20

8.91

3.77

109

112+080

36

0.90

8.91

2.83

110

112+320

48

1.20

8.91

3.77

110+520

10.53

111

112+900

48

1.20

10.53

3.77

112

113+240

36

0.90

8.91

2.83

113

113+540

48

1.20

8.91

3.77

114

113+740

36

0.90

8.91

2.83

115

114+020

48

1.20

8.91

3.77

116

114+280

36

0.90

9.72

2.83

117

114+540

48

1.20

10.53

3.77

118

114+858

48

1.20

8.91

3.77

119

115+158

36

0.90

9.72

2.83

120

115+535

36

0.90

9.72

2.83

121

115+800

36

0.90

8.91

2.83

122

116+090

48

1.20

8.91

3.77

123

116+390

36

0.90

8.91

2.83

124

116+640

36

0.90

9.72

2.83

125

116+940

36

0.90

7.62

2.83

126

117+540

36

0.90

7.62

2.83

127

117+780

36

0.90

9.73

2.83

128

118+320

36

0.90

8.91

2.83

129

118+560

118+565

36

0.90

8.91

8.91

2.83

130

119+000

118+978

48

1.20

8.91

8.91

3.77

131

119+260

119+260

36

0.90

9.72

9.72

2.83

132

119+571

119+570

48

1.20

10.53

10.53

3.77

133

119+760

119+773

48

1.20

10.53

10.53

3.77

134

120+156

120+156

48

1.20

10.53

10.53

3.77

135

120+280

120+280

36

0.90

10.53

2.83

136

120+680

120+680

48

1.20

9.72

9.72

3.77

137

120+825

120+825

36

0.90

9.72

9.72

2.83

138

121+000

121+000

48

1.20

15.39

3.77

139

121+450

48

1.20

8.91

3.77

140

121+580

36

0.90

8.91

2.83

141

121+740

121+740

36

0.90

9.72

9.72

2.83

142

121+900

122+900

36

0.90

8.91

8.91

2.83

143

122+087

36

0.90

8.91

2.83

144

122+380

36

0.90

9.72

2.83

145

122+660

72

1.80

12.15

146

122+900

36

0.90

8.91

2.83

147

123+220

123+220

36

0.90

8.91

8.91

2.83

148

123+460

123+460

36

0.90

8.91

8.91

2.83

149

123+720

123+720

36

0.90

10.53

10.53

2.83

150

124+025

124+025

36

0.90

8.91

8.91

2.83

151

124+580

124+570

48

1.20

10.53

10.53

3.77

152

124+830

124+830

48

1.20

9.72

9.72

3.77

153

125+123

125+123

48

1.20

10.53

10.53

3.77

154

125+225

125+220

48

1.20

10.53

10.53

3.77

155

125+400

125+402

36

0.90

8.91

8.91

2.83

156

125+920

36

0.90

9.72

2.83

157

126+010

48

1.20

10.53

3.77

158

126+095

48

1.20

8.91

3.77

159

126+157

72

1.80

9.72

5.65

160

126+460

48

1.20

10.53

3.77

161

126+648

126+650

72

1.80

11.34

162

126+800

126+800

36

0.90

9.72

9.72

2.83

163

127+260

127+260

36

0.90

8.91

8.91

2.83

164

127+340

127+342

36

0.90

10.53

10.53

2.83

165

128+250

128+250

48

1.20

10.53

10.53

3.77

79.39

166

128+447

128+447

48

1.20

8.91

8.91

3.77

67.18

167

128+587

128+587

48

1.20

8.91

8.91

3.77

67.18

168

128+749

36

0.90

12.15

2.83

169

129+001

36

0.90

14.58

2.83

170

129+244

72

1.80

11.34

5.65

171

129+335

36

0.90

10.53

2.83

172

129+660

36

0.90

9.72

2.83

173

129+840

48

1.20

9.72

9.72

3.77

174

130+410

48

1.20

8.91

3.77

175

130+717

130+717

36

0.90

9.72

9.72

2.83

54.97

176

131+010

131+010

36

0.90

9.72

9.72

2.83

54.97

177

131+247

131+247

36

0.90

9.72

9.72

2.83

54.97

178

131+467

36

0.90

9.72

2.83

179

131+615

36

0.90

9.72

2.83

180

131+862

36

0.90

10.53

2.83

122+660

126+010

129+335
129+840

131+862

10.53

10.53

10.53

15.39

10.53

12.15

11.34

5.65

5.65

59.55
73.29
-

59.55

SUPERVCONSORCIO SUPERVISOR LA QUINUA


CONTRACONSORCIO VIAL QUINUA
OBRA: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO
TRAMO (Km. 78+500 - Km. 172+420

OBRAS DE ARTE
METRADOS DE ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02

No

PROGRESIVAS

km

181

132+038

182

132+242

183

132+443

PROGRESIVAS REPLANTEO

TMC (Pulg)

km

Diamet.

622.B TUBERIA CORRUGADA DE 622.C TUBERIA CORRUGADA DE 622.D TUBERIA CORRUGADA DE 622.E TUBERIA CORRUGADA DE
623 PINTURA ASFALTICA PARA
ACERO GALVANIZADO CIRCULAR ACERO GALVANIZADO CIRCULAR ACERO GALVANIZADO CIRCULAR ACERO GALVANIZADO CIRCULAR Permetro de Tubera
ALCANTARILLAS METALICAS
DE 0.90 M DE DIAMETRO
DE 1.20 M DE DIAMETRO
DE 1.50 M DE DIAMETRO
DE 1.80 M DE DIAMETRO

LONG.

72

1.80

12.15

132+241

36

0.90

16.20

m2

5.65

16.20

2.83

91.61

132+445

36

0.90

8.91

8.91

2.83

50.38

184

132+711

132+711

36

0.90

10.53

10.53

2.83

59.55

185

132+959

132+959

36

0.90

8.91

8.91

2.83

50.38

186

133+144

36

0.90

8.91

2.83

187

133+360

133+360

48

1.20

9.72

9.72

3.77

73.29

188

133+584

133+582

36

0.90

10.53

10.53

2.83

59.55

189

133+833

133+832

36

0.90

9.72

9.72

2.83

54.97

190

134+059

134+060

48

1.20

9.72

9.72

3.77

73.29

191

134+282

134+280

36

0.90

9.72

9.72

2.83

54.97

192

134+517

134+517

36

0.90

8.91

8.91

2.83

50.38

193

134+665

134+665

36

0.90

9.72

9.72

2.83

54.97

194

134+815

134+817

36

0.90

9.72

9.72

2.83

54.97

195

135+080

135+080

36

0.90

9.72

9.72

2.83

54.97

196

135+512

36

0.90

11.34

2.83

197

135+551

48

1.20

12.96

3.77

198

135+734

36

0.90

10.53

2.83

199

135+871

135+870

36

0.90

9.72

9.72

2.83

54.97

200

136+171

136+171

36

0.90

8.91

8.91

2.83

50.38

201

136+485

136+485

36

0.90

8.91

8.91

2.83

50.38

202

136+730

36

0.90

9.72

2.83

203

136+913

36

0.90

11.34

2.83

204

137+230

36

0.90

9.72

2.83

205

137+440

36

0.90

9.72

2.83

206

137+638

36

0.90

9.72

2.83

207

138+029

36

0.90

8.91

2.83

208

138+357

36

0.90

9.72

2.83

209

138+710

36

0.90

9.72

2.83

210

139+077

36

0.90

9.72

2.83

211

139+290

36

0.90

9.72

2.83

212

139+506

36

0.90

9.72

2.83

213

139+722

48

1.20

10.53

3.77

214

140+345

36

0.90

10.53

2.83

215

140+674

48

1.20

12.96

3.77

216

140+810

36

0.90

10.53

2.83

217

141+094

48

1.20

10.53

3.77

218

141+232

48

1.20

10.53

3.77

219

141+396

36

0.90

9.72

2.83

220

141+536

48

1.20

9.72

3.77

221

141+763

36

0.90

8.10

2.83

222

141+968

48

1.20

11.34

3.77

223

142+194

48

1.20

10.53

3.77

224

142+400

48

1.20

9.72

9.72

3.77

225

142+623

48

1.20

12.15

3.77

226

142+880

142+895

36

0.90

10.53

10.53

2.83

59.55

227

143+231

143+230

36

0.90

8.91

8.91

2.83

50.38

228

143+616

143+615

72

1.80

9.72

9.72

5.65

109.93

229

143+862

143+860

36

0.90

8.91

8.91

2.83

50.38

230

144+256

48

1.20

9.72

3.77

231

144+514

48

1.20

9.72

3.77

232

144+797

48

1.20

10.53

3.77

233

145+075

36

0.90

9.72

2.83

234

145+198

48

1.20

11.34

3.77

235

145+265

48

1.20

9.72

3.77

236

145+359

36

0.90

9.72

2.83

237

145+539

48

1.20

13.77

3.77

238

145+887

48

1.20

8.91

3.77

239

146+470

146+470

48

1.20

8.91

8.91

3.77

67.18

240

146+774

146+772

36

0.90

8.10

8.10

2.83

45.80

241

147+174

147+174

36

0.90

9.72

9.72

2.83

54.97

242

147+602

147+597

48

1.20

10.53

3.77

79.39

243

148+015

36

0.90

9.72

2.83

244

148+300

36

0.90

10.53

2.83

245

148+409

148+409

36

0.90

9.72

9.72

2.83

54.97

246

148+520

148+520

48

1.20

9.72

9.72

3.77

73.29

247

148+680

60

1.50

13.77

4.71

248

148+762

60

1.50

11.34

4.71

249

149+230

48

1.20

10.53

3.77

250

149+460

36

0.90

9.72

2.83

251

149+615

72

1.80

9.72

5.65

252

149+664

36

0.90

8.91

8.91

2.83

253

149+852

36

0.90

11.34

2.83

254

149+930

36

0.90

12.15

2.83

255

150+150

150+149

36

0.90

8.91

8.91

2.83

50.38

256

150+456

150+456

36

0.90

8.91

8.91

2.83

50.38

257

150+725

150+728

36

0.90

9.72

9.72

2.83

258

150+983

150+987

48

1.20

9.72

9.72

3.77

73.29

259

151+222

151+222

72

1.80

11.34

5.65

128.25

260

151+453

151+453

48

1.20

9.72

9.72

261

151+782

151+779

48

1.20

12.15

12.15

262

151+952

151+951

36

0.90

11.34

263

152+143

152+142

36

0.90

264

152+462

152+461

36

0.90

265

152+640

152+638

72

1.80

10.53

266

152+720

152+723

72

1.80

11.34

267

152+831

152+830

48

1.20

8.91

268

153+360

153+360

48

1.20

8.91

269

153+691

153+690

48

1.20

270

153+935

153+935

36

0.90

142+396

149+198

149+660

10.53

10.53

11.34

73.29
-

79.39
50.38
-

54.97

3.77

73.29

3.77

91.61

11.34

2.83

64.13

11.34

11.34

2.83

12.15

12.15

2.83

68.71

10.53

5.65

119.09

11.34

5.65

128.25

8.91

3.77

67.18

8.91

3.77

67.18

9.72

9.72

3.77

73.29

9.72

9.72

2.83

54.97

64.13

SUPERVCONSORCIO SUPERVISOR LA QUINUA


CONTRACONSORCIO VIAL QUINUA
OBRA: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO
TRAMO (Km. 78+500 - Km. 172+420

OBRAS DE ARTE
METRADOS DE ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02

No

PROGRESIVAS

km

271

154+270

272

154+722

273
274
275

PROGRESIVAS REPLANTEO

TMC (Pulg)

km

Diamet.

622.B TUBERIA CORRUGADA DE 622.C TUBERIA CORRUGADA DE 622.D TUBERIA CORRUGADA DE 622.E TUBERIA CORRUGADA DE
623 PINTURA ASFALTICA PARA
ACERO GALVANIZADO CIRCULAR ACERO GALVANIZADO CIRCULAR ACERO GALVANIZADO CIRCULAR ACERO GALVANIZADO CIRCULAR Permetro de Tubera
ALCANTARILLAS METALICAS
DE 0.90 M DE DIAMETRO
DE 1.20 M DE DIAMETRO
DE 1.50 M DE DIAMETRO
DE 1.80 M DE DIAMETRO

LONG.

1.20

9.72

154+720

48

1.20

10.53

154+883

154+881

36

0.90

10.53

155+314

155+312

60

1.50

13.77

155+447

155+447

48

1.20

10.53

10.53

276

155+584

155+582

48

1.20

12.15

12.15

277

155+954

155+952

36

0.90

12.15

12.15

278

156+236

156+234

36

0.90

9.72

9.72

279

156+488

156+489

48

1.20

10.53

280

156+702

156+700

48

1.20

9.72

281

157+080

157+080

48

1.20

12.96

282

157+370

157+320

48

1.20

11.34

283

157+640

157+638

48

1.20

10.53

284

157+916

157+915

36

0.90

9.72

9.72

285

158+192

158+190

36

0.90

12.15

286

158+363

158+362

36

0.90

10.53

287

158+598

158+596

48

1.20

9.72

288

158+889

48

1.20

289

159+009

48

1.20

290

159+082

60

291

159+360

292

159+537

293

159+708

294

159+854

295

160+105

296
297
298

m2

3.77

3.77

2.83

59.55

4.71

129.78

3.77

79.39

3.77

91.61

2.83

68.71

2.83

54.97

10.53

3.77

79.39

9.72

3.77

73.29

12.96

3.77

97.72

11.34

3.77

85.50

10.53

3.77

79.39

2.83

54.97

12.15

2.83

68.71

10.53

2.83

59.55

9.72

3.77

73.29

14.58

3.77

13.77

3.77

1.50

12.15

4.71

36

0.90

11.34

2.83

60

1.50

11.34

4.71

48

1.20

12.15

3.77

159+854

48

1.20

11.34

11.34

3.77

85.50

160+102

48

1.20

21.87

21.87

3.77

164.90

160+330

160+300

36

0.90

8.91

8.91

2.83

50.38

160+470

160+470

36

0.90

8.91

8.91

2.83

50.38

160+619

160+618

48

1.20

10.53

10.53

3.77

79.39

299

160+760

160+760

48

1.20

9.72

9.72

3.77

73.29

300

160+854

160+854

48

1.20

10.53

10.53

3.77

79.39

301

160+974

36

0.90

9.72

2.83

302

161+128

48

1.20

9.72

3.77

303

161+249

36

0.90

9.72

2.83

304

161+323

161+350

48

1.20

11.34

11.34

3.77

85.50

305

161+493

161+491

48

1.20

9.72

9.72

3.77

73.29

306

161+635

161+627

48

1.20

10.53

10.53

3.77

79.39

307

161+715

161+710

72

1.80

11.34

5.65

128.25

308

161+856

161+856

48

1.20

8.91

8.91

3.77

67.18

309

162+029

162+029

36

0.90

8.10

8.10

2.83

45.80

310

162+160

162+160

36

0.90

8.91

8.91

2.83

50.38

311

162+543

162+543

48

1.20

8.91

8.91

3.77

67.18

312

162+745

36

0.90

12.15

2.83

313

162+880

36

0.90

11.34

2.83

314

162+969

36

0.90

13.77

2.83

315

163+503

72

1.80

14.58

5.65

316

163+678

48

1.20

10.53

3.77

317

163+920

48

1.20

9.72

3.77

318

163+965

36

0.90

8.91

2.83

319

164+194

72

1.80

10.53

5.65

320

164+331

48

1.20

10.53

3.77

321

164+350

36

0.90

9.72

2.83

322

164+463

48

1.20

11.34

3.77

323

164+600

36

0.90

11.34

2.83

324

164+830

36

0.90

13.77

2.83

325

164+977

48

1.20

10.53

3.77

326

165+183

72

1.80

9.72

5.65

327

165+385

165+385

36

0.90

9.72

9.72

2.83

54.97

328

165+606

165+604

72

1.80

9.72

9.72

5.65

109.93

329

165+684

165+684

72

1.80

11.34

11.34

5.65

128.25

330

165+940

165+952

72

1.80

9.72

9.72

5.65

109.93

331

166+055

166+052

72

1.80

10.53

10.53

5.65

119.09

332

166+175

166+175

72

1.80

9.72

9.72

5.65

109.93

333

166+307

72

1.80

9.72

5.65

334

166+675

166+672

72

1.80

19.44

19.44

5.65

219.86

335

166+820

166+818

72

1.80

9.72

9.72

5.65

109.93

336

166+915

60

1.50

12.15

4.71

337

167+030

60

1.50

12.15

4.71

338

167+167

167+167

72

1.80

8.91

339

167+491

167+491

48

1.20

10.53

340

167+795

167+775

48

1.20

8.91

341

168+000

168+015

48

1.20

8.91

342

168+500

168+488

48

1.20

11.34

343

168+795

168+795

72

1.80

11.34

344

168+983

168+981

72

1.80

10.53

345

169+153

169+151

72

1.80

10.53

346

169+410

169+410

48

1.20

8.91

347

169+620

169+620

48

1.20

11.34

348

169+920

170+010

48

1.20

8.91

349

170+800

170+800

48

1.20

8.91

350

170+986

170+985

48

1.20

351

171+240

171+234

48

1.20

352

171+422

171+422

48

1.20

353

171+751

171+749

48

354

171+803

171+803

72

355

171+881

356
357

163+678

10.53

48

10.53
-

10.53

13.77

11.34

79.39

79.39

8.91

5.65

100.77

10.53

3.77

79.39

8.91

3.77

67.18

8.91

3.77

11.34

3.77

85.50

67.18

11.34

5.65

128.25

10.53

5.65

119.09

10.53

5.65

119.09

8.91

3.77

67.18

11.34

3.77

85.50

8.91

3.77

67.18

8.91

3.77

67.18

8.91

8.91

3.77

67.18

9.72

9.72

3.77

73.29

9.72

9.72

3.77

1.20

8.91

8.91

3.77

67.18

1.80

10.53

5.65

119.09

60

1.50

10.53

4.71

171+948

72

1.80

8.91

5.65

171+987

72

1.80

10.53

5.65

358

172+039

72

1.80

9.72

5.65

359

172+124

172+125

72

1.80

9.72

9.72

5.65

109.93

360

172+193

172+193

72

1.80

8.91

8.91

5.65

100.77

10.53

73.29

SUPERVCONSORCIO SUPERVISOR LA QUINUA


CONTRACONSORCIO VIAL QUINUA
OBRA: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO
TRAMO (Km. 78+500 - Km. 172+420

OBRAS DE ARTE
METRADOS DE ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02

No

PROGRESIVAS

PROGRESIVAS REPLANTEO

km

km

361

172+589

172+589

362

172+680

363

173+140

172+942
209

TMC (Pulg)

Diamet.

622.B TUBERIA CORRUGADA DE 622.C TUBERIA CORRUGADA DE 622.D TUBERIA CORRUGADA DE 622.E TUBERIA CORRUGADA DE
623 PINTURA ASFALTICA PARA
ACERO GALVANIZADO CIRCULAR ACERO GALVANIZADO CIRCULAR ACERO GALVANIZADO CIRCULAR ACERO GALVANIZADO CIRCULAR Permetro de Tubera
ALCANTARILLAS METALICAS
DE 0.90 M DE DIAMETRO
DE 1.20 M DE DIAMETRO
DE 1.50 M DE DIAMETRO
DE 1.80 M DE DIAMETRO

LONG.

m2

48

1.20

8.91

8.91

3.77

36

0.90

8.91

2.83

36

0.90

12.15

2.83

TOTAL

12.15
898.28

899.90

13.77

334.53

67.18
68.71
8,844.83

SUPERVCONSORCIO SUPERVISOR LA QUINUA


CONTRACONSORCIO VIAL QUINUA
OBRA: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO
TRAMO (Km. 78+500 - Km. 172+420

OBRAS DE ARTE
METRADOS DE MUROS CABEZAL DE ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02

No

PROG

PROGRESIVAS
REPLANTEO

TMC (Pulg)

Diamet.

LONG. DE
MURO

ESTRUCT. DE
SALIDA

605.B MATERIAL
FILTRANTE

610.D2 CONCRETO CLASE D1


(F'C=210 KG/CM2) EN SECO
MUROS CABEZAL

610.G CONCRETO
CLASE G (F'C=140
KG/CM2 + 30% P.G.)

610.I CONCRETO CLASE


I (F'C=100 KG/CM2)

612.A1 ENCOF. Y
DESENCOF.

615.A ACERO DE
REFUERZO

625.I TUBERIA DE PVC 4''


PARA MUROS

625.H TUBERIA DE PVC 6''


PARA MUROS PERFORADA

Kg

km

km

85+005

0+000

72

1.80

MURO

91+955

91+955

48

1.20

3.60

MURO

1.98

7.04

9.02

4.10

92+235

92+235

36

0.90

2.70

MURO

1.84

7.53

11.75

4.96

3.70

94+180

94+180

48

1.20

3.60

MURO

2.45

10.04

11.75

4.96

4.60

95+110

95+112

72

1.80

5.40

MURO

3.67

15.07

11.75

4.96

6.40

95+440

95+440

48

1.20

MURO

95+800

95+800

48

1.20

3.60

MURO

1.98

7.04

9.02

4.10

96+140

0+000

36

0.90

2.70

MURO

101+311

101+311

36

0.90

MURO

10

101+700

101+698

36

0.90

2.70

MURO

1.49

5.28

9.02

4.10

11

102+670

102+683

36

0.90

2.70

MURO

1.05

3.89

6.98

3.40

12

103+560

103+560

36

0.90

2.70

MURO

1.49

5.28

9.02

4.10

13

105+140

105+140

36

0.90

2.70

MURO

1.49

5.28

9.02

4.10

14

105+980

105+980

36

0.90

2.70

MURO

1.49

5.28

9.02

4.10

15

106+380

106+380

36

0.90

2.70

MURO

1.49

5.28

9.02

4.10

16

108+700

0+000

36

0.90

2.70

MURO

17

109+730

0+000

48

1.20

3.60

MURO

18

110+220

0+000

36

0.90

2.70

MURO

19

110+820

0+000

36

0.90

2.70

MURO

20

111+640

0+000

36

0.90

2.70

MURO

21

117+540

0+000

36

0.90

2.70

MURO

22

118+320

0+000

36

0.90

2.70

MURO

23

119+000

118+978

48

1.20

MURO

24

120+680

120+680

48

1.20

3.60

MURO

1.98

7.04

9.02

4.10

25

122+900

0+000

36

0.90

2.70

MURO

26

126+157

0+000

72

1.80

5.40

MURO

27

126+648

126+650

72

1.80

5.40

MURO

4.10

9.83

1.08

6.40

28

129+244

0+000

72

1.80

5.40

MURO

29

129+840

129+840

48

1.20

3.60

MURO

1.98

7.04

9.02

4.10

30

130+410

0+000

48

1.20

3.60

MURO

31

131+010

131+010

36

0.90

2.70

MURO

1.49

5.28

9.02

4.10

32

131+247

131+247

36

0.90

2.70

MURO

1.49

5.28

9.02

4.10

33

131+467

0+000

36

0.90

2.70

MURO

34

131+615

0+000

36

0.90

2.70

MURO

35

132+038

0+000

72

1.80

MURO

36

133+360

133+360

48

1.20

3.60

MURO

1.98

7.04

9.02

4.10

37

133+584

133+582

36

0.90

2.70

MURO

1.49

5.28

9.02

4.10

38

133+833

133+832

36

0.90

2.70

MURO

1.49

5.28

9.02

4.10

39

134+059

134+060

48

1.20

3.60

MURO

1.98

7.04

9.02

4.10

40

134+282

134+280

36

0.90

2.70

MURO

1.49

5.28

9.02

4.10

41

134+665

134+665

36

0.90

2.70

MURO

1.49

5.28

9.02

4.10

42

135+871

135+870

36

0.90

2.70

MURO

1.49

5.28

9.02

4.10

10.64

465.42

METRADOS DE MUROS CABEZAL DE ALCANTARILLAS TMC


ADICIONAL DE OBRA N 03
VALORIZACION N 02

No

PROG

PROGRESIVAS
REPLANTEO

TMC (Pulg)

Diamet.

LONG. DE
MURO

ESTRUCT. DE
SALIDA

605.B MATERIAL
FILTRANTE

610.D2 CONCRETO CLASE D1


(F'C=210 KG/CM2) EN SECO
MUROS CABEZAL

610.G CONCRETO
CLASE G (F'C=140
KG/CM2 + 30% P.G.)

610.I CONCRETO CLASE


I (F'C=100 KG/CM2)

612.A1 ENCOF. Y
DESENCOF.

615.A ACERO DE
REFUERZO

625.I TUBERIA DE PVC 4''


PARA MUROS

625.H TUBERIA DE PVC 6''


PARA MUROS PERFORADA

Kg

km

km

43

137+230

0+000

36

0.90

2.70

MURO

44

137+440

0+000

36

0.90

2.70

MURO

45

137+638

0+000

36

0.90

2.70

MURO

46

138+029

0+000

36

0.90

2.70

MURO

47

138+357

0+000

36

0.90

2.70

MURO

48

139+290

0+000

36

0.90

2.70

MURO

49

139+506

0+000

36

0.90

2.70

MURO

50

140+345

0+000

36

0.90

2.70

MURO

51

140+674

0+000

48

1.20

3.60

MURO

52

141+396

0+000

36

0.90

2.70

MURO

53

141+536

0+000

48

1.20

3.60

MURO

54

141+763

0+000

36

0.90

2.70

MURO

55

141+968

0+000

48

1.20

3.60

MURO

56

142+194

0+000

48

1.20

3.60

MURO

57

142+400

142+396

48

1.20

3.60

MURO

2.74

6.55

0.72

10.64

310.28

4.60

58

143+616

143+615

72

1.80

5.40

MURO

4.10

9.83

1.08

10.64

465.42

6.40

59

144+514

0+000

48

1.20

MURO

60

145+075

0+000

36

0.90

MURO

61

145+887

0+000

48

1.20

3.60

MURO

62

146+774

146+772

36

0.90

2.70

MURO

1.49

5.28

9.02

4.10

63

148+015

0+000

36

0.90

2.70

MURO

64

149+460

0+000

36

0.90

2.70

MURO

65

149+615

0+000

72

1.80

5.40

MURO

66

149+852

0+000

36

0.90

2.70

MURO

67

150+983

150+987

48

1.20

3.60

MURO

1.98

7.04

9.02

4.10

68

152+640

152+638

72

1.80

5.40

MURO

4.81

12.80

1.22

12.74

600.36

6.40

69

152+831

152+830

48

1.20

3.60

MURO

2.74

6.55

0.72

10.64

310.28

4.60

70

153+360

153+360

48

1.20

3.60

MURO

3.20

8.53

0.81

12.74

400.24

4.60

71

153+691

153+690

48

1.20

3.60

MURO

2.74

6.55

0.72

10.64

310.28

4.60

72

154+722

154+720

48

1.20

3.60

MURO

2.74

6.55

0.72

10.64

310.28

4.60

73

155+314

155+312

60

1.50

4.50

MURO

5.18

16.38

1.31

17.29

902.57

5.50

74

155+447

155+447

48

1.20

3.60

MURO

1.98

7.04

9.02

4.10

75

157+640

157+638

48

1.20

3.60

MURO

1.98

7.04

9.02

4.10

76

159+082

0+000

60

1.50

4.50

MURO

77

159+360

0+000

36

0.90

2.70

MURO

78

159+537

0+000

60

1.50

4.50

MURO

79

159+708

0+000

48

1.20

MURO

80

159+854

159+854

48

1.20

3.60

MURO

1.98

7.04

9.02

4.10

81

161+128

0+000

48

1.20

3.60

MURO

82

161+715

161+710

72

1.80

5.40

MURO

3.67

4.96

6.40

83

162+029

162+028.5

36

0.90

MURO

84

163+965

0+000

36

0.90

2.70

MURO

85

164+463

0+000

48

1.20

3.60

MURO

86

164+977

0+000

48

1.20

MURO

87

165+183

0+000

72

1.80

5.40

MURO

88

166+175

166+175

72

1.80

5.40

MURO

4.81

1.22

6.40

89

166+915

0+000

60

1.50

4.50

MURO

90

167+030

0+000

60

1.50

4.50

MURO

91

167+167

167+167

72

1.80

5.40

MURO

4.10

9.83

1.08

6.40

12.80

15.07

11.75

12.74

10.64

600.36

465.42

METRADOS DE MUROS CABEZAL DE ALCANTARILLAS TMC


ADICIONAL DE OBRA N 03
VALORIZACION N 02

No

PROG

PROGRESIVAS
REPLANTEO

TMC (Pulg)

Diamet.

LONG. DE
MURO

ESTRUCT. DE
SALIDA

605.B MATERIAL
FILTRANTE

610.D2 CONCRETO CLASE D1


(F'C=210 KG/CM2) EN SECO
MUROS CABEZAL

610.G CONCRETO
CLASE G (F'C=140
KG/CM2 + 30% P.G.)

610.I CONCRETO CLASE


I (F'C=100 KG/CM2)

612.A1 ENCOF. Y
DESENCOF.

615.A ACERO DE
REFUERZO

625.I TUBERIA DE PVC 4''


PARA MUROS

625.H TUBERIA DE PVC 6''


PARA MUROS PERFORADA

Kg

km

km

92

169+153

169+151

72

1.80

5.40

MURO

4.10

93

170+986

170+985

48

1.20

3.60

MURO

94

171+803

171+803

72

1.80

5.40

MURO

95

172+193

172+193

72

1.80

5.40

96

172+589

172+589

48

1.20

3.60

9.83

1.98

7.04

9.02

4.10

4.10

9.83

1.08

10.64

465.42

6.40

MURO

4.10

9.83

1.08

10.64

465.42

6.40

MURO

2.74

6.55

0.72

10.64

310.28

110.13

142.24

14.64

443.01

6,847.40

TOTAL
TRAMO 1
EXCAVACION PARA ESTRUCTURAS EN MATERIAL COMUN

TRAMO 2

TRAMO 3

197.64
TOTAL
-

1.08

10.64

465.42
-

121.64

6.40

4.60
105.40

SUPERCONSORCIO SUPERVISOR LA QUINUA


CONTRCONSORCIO VIAL QUINUA
OBRA: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO
TRAMO(Km. 78+500 - Km. 172+420

OBRAS DE ARTE

METRADOS DE DISIPADOR DE ENERGIA EN SALIDA D


ADICIONAL DE OBRA N 03

No

UBICACION

TMC (Pulg)

km

Diametro

LONGITUD DE
SALIDA DEL
DISIPADOR

Espesor

Ancho de
Relleno

85+005

72

1.80

1.20

0.10

3.00

85+360

48

1.20

1.20

0.10

2.40

91+955

48

1.20

1.20

0.10

2.40

92+235

36

0.90

1.20

0.10

2.10

94+180

48

1.20

1.20

0.10

2.40

95+110

72

1.80

1.20

0.10

3.00

95+440

48

1.20

1.20

0.10

2.40

95+800

48

1.20

1.20

0.10

2.40

96+140

36

0.90

1.20

0.10

2.10

10

101+311

36

0.90

1.20

0.10

2.10

11

102+670

36

0.90

1.20

0.10

2.10

12

103+560

36

0.90

1.20

0.10

2.10

13

105+140

36

0.90

1.20

0.10

2.10

14

105+980

36

0.90

1.20

0.10

2.10

15

106+380

36

0.90

1.20

0.10

2.10

16

110+220

36

0.90

1.20

0.10

2.10

17

110+820

36

0.90

1.20

0.10

2.10

18

111+640

36

0.90

1.20

0.10

2.10

19

119+000

48

1.20

1.20

0.10

2.40

20

120+680

48

1.20

1.20

0.10

2.40

21

122+900

36

0.90

1.20

0.10

2.10

22

126+648

72

1.80

1.20

0.10

3.00

23

129+244

72

1.80

1.20

0.10

3.00

24

129+840

48

1.20

1.20

0.10

2.40

25

130+410

48

1.20

1.20

0.10

2.40

26

131+010

36

0.90

1.20

0.10

2.10

27

131+247

36

0.90

1.20

0.10

2.10

28

131+467

36

0.90

1.20

0.10

2.10

29

131+615

36

0.90

1.20

0.10

2.10

30

132+038

72

1.80

1.20

0.10

3.00

31

133+360

48

1.20

1.20

0.10

2.40

32

133+584

36

0.90

1.20

0.10

2.10

33

133+833

36

0.90

1.20

0.10

2.10

34

134+059

48

1.20

1.20

0.10

2.40

35

134+282

36

0.90

1.20

0.10

2.10

36

134+665

36

0.90

1.20

0.10

2.10

37

135+871

36

0.90

1.20

0.10

2.10

38

137+230

36

0.90

1.20

0.10

2.10

39

137+440

36

0.90

1.20

0.10

2.10

40

137+638

36

0.90

1.20

0.10

2.10

41

138+029

36

0.90

1.20

0.10

2.10

42

138+357

36

0.90

1.20

0.10

2.10

43

139+290

36

0.90

1.20

0.10

2.10

44

139+506

36

0.90

1.20

0.10

2.10

SUPERCONSORCIO SUPERVISOR LA QUINUA


CONTRCONSORCIO VIAL QUINUA
OBRA: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO
TRAMO(Km. 78+500 - Km. 172+420

OBRAS DE ARTE

METRADOS DE DISIPADOR DE ENERGIA EN SALIDA D


ADICIONAL DE OBRA N 03

No

UBICACION

TMC (Pulg)

km

Diametro

LONGITUD DE
SALIDA DEL
DISIPADOR

Espesor

Ancho de
Relleno

45

140+345

36

0.90

1.20

0.10

2.10

46

140+674

48

1.20

1.20

0.10

2.40

47

141+396

36

0.90

1.20

0.10

2.10

48

141+536

48

1.20

1.20

0.10

2.40

49

141+763

36

0.90

1.20

0.10

2.10

50

141+968

48

1.20

1.20

0.10

2.40

51

142+194

48

1.20

1.20

0.10

2.40

52

142+400

48

1.20

1.20

0.10

2.40

53

143+616

72

1.80

1.20

0.10

3.00

54

144+514

48

1.20

1.20

0.10

2.40

55

145+075

36

0.90

1.20

0.10

2.10

56

145+887

48

1.20

1.20

0.10

2.40

57

146+774

36

0.90

1.20

0.10

2.10

58

148+015

36

0.90

1.20

0.10

2.10

59

149+460

36

0.90

1.20

0.10

2.10

60

149+615

72

1.80

1.20

0.10

3.00

61

149+852

36

0.90

1.20

0.10

2.10

62

150+983

48

1.20

1.20

0.10

2.40

63

152+640

72

1.80

1.20

0.10

3.00

64

152+831

48

1.20

1.20

0.10

2.40

65

153+360

48

1.20

1.20

0.10

2.40

66

153+691

48

1.20

1.20

0.10

2.40

67

154+722

48

1.20

1.20

0.10

2.40

68

155+314

60

1.50

1.20

0.10

2.70

69

155+447

48

1.20

1.20

0.10

2.40

70

157+640

48

1.20

1.20

0.10

2.40

71

159+082

60

1.50

1.20

0.10

2.70

72

159+360

36

0.90

1.20

0.10

2.10

73

159+537

60

1.50

1.20

0.10

2.70

74

159+708

48

1.20

1.20

0.10

2.40

75

159+854

48

1.20

1.20

0.10

2.40

76

161+128

48

1.20

1.20

0.10

2.40

77

161+715

72

1.80

1.20

0.10

3.00

78

162+029

36

0.90

1.20

0.10

2.10

79

163+965

36

0.90

1.20

0.10

2.10

80

164+463

48

1.20

1.20

0.10

2.40

81

164+977

48

1.20

1.20

0.10

2.40

82

165+183

72

1.80

1.20

0.10

3.00

83

166+175

72

1.80

1.20

0.10

3.00

84

166+915

72

1.80

1.20

0.10

3.00

85

167+030

60

1.50

1.20

0.10

2.70

86

167+167

72

1.80

1.20

0.10

3.00

87

169+153

72

1.80

1.20

0.10

3.00

88

170+986

48

1.20

1.20

0.10

2.40

SUPERCONSORCIO SUPERVISOR LA QUINUA


CONTRCONSORCIO VIAL QUINUA
OBRA: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO
TRAMO(Km. 78+500 - Km. 172+420

OBRAS DE ARTE

METRADOS DE DISIPADOR DE ENERGIA EN SALIDA D


ADICIONAL DE OBRA N 03

No

UBICACION

TMC (Pulg)

km

Diametro

LONGITUD DE
SALIDA DEL
DISIPADOR

Espesor

Ancho de
Relleno

89

171+803

72

1.80

1.20

0.10

3.00

90

172+193

72

1.80

1.20

0.10

3.00

91

172+589

48

1.20

1.20

0.10

2.40

TOTAL

DISIPADOR DE ENERGIA EN SALIDA DE MUROS


ADICIONAL DE OBRA N 03
605.A RELLENOS PARA CONCRETO POR
610.E CONCRETO CLASE
ESTRUCTURAS
UN METRO LINEAL
H (F'C=175 KG/CM2)

m/m

ENCOFRADO POR
UN METRO LINEAL

612.A ENCOFRADO Y
DESENCOFRADO

m/m

2.45

7.10

1.81

4.80

1.81

4.80

1.51

3.83

1.81

4.80

2.45

7.10

1.81

4.80

1.81

4.80

1.51

3.83

1.51

3.83

1.51

3.83

1.51

3.83

1.51

3.83

1.51

3.83

1.51

3.83

1.51

3.83

1.51

3.83

1.51

3.83

1.81

4.80

1.81

4.80

1.51

3.83

2.45

7.10

2.45

7.10

1.81

4.80

1.81

4.80

1.51

3.83

1.51

3.83

1.51

3.83

1.51

3.83

2.45

7.10

1.81

4.80

1.51

3.83

1.51

3.83

1.81

4.80

1.51

3.83

1.51

3.83

1.51

3.83

1.51

3.83

1.51

3.83

1.51

3.83

1.51

3.83

1.51

3.83

1.51

3.83

1.51

3.83

DISIPADOR DE ENERGIA EN SALIDA DE MUROS


ADICIONAL DE OBRA N 03
605.A RELLENOS PARA CONCRETO POR
610.E CONCRETO CLASE
ESTRUCTURAS
UN METRO LINEAL
H (F'C=175 KG/CM2)

m/m

ENCOFRADO POR
UN METRO LINEAL

612.A ENCOFRADO Y
DESENCOFRADO

m/m

1.51

3.83

1.81

4.80

1.51

3.83

1.81

4.80

1.51

3.83

1.81

4.80

1.81

4.80

1.81

4.80

2.45

7.10

1.81

4.80

1.51

3.83

1.81

4.80

1.51

3.83

1.51

3.83

1.51

3.83

2.45

7.10

1.51

3.83

1.81

4.80

2.45

7.10

1.81

4.80

1.81

4.80

1.81

4.80

1.81

4.80

2.12

5.89

1.81

4.80

1.81

4.80

2.12

5.89

1.51

3.83

2.12

5.89

1.81

4.80

1.81

4.80

1.81

4.80

2.45

7.10

1.51

3.83

1.51

3.83

1.81

4.80

1.81

4.80

2.45

7.10

2.45

7.10

2.45

7.10

2.12

5.89

2.45

7.10

2.45

7.10

1.81

4.80

DISIPADOR DE ENERGIA EN SALIDA DE MUROS


ADICIONAL DE OBRA N 03
605.A RELLENOS PARA CONCRETO POR
610.E CONCRETO CLASE
ESTRUCTURAS
UN METRO LINEAL
H (F'C=175 KG/CM2)

m/m

ENCOFRADO POR
UN METRO LINEAL

612.A ENCOFRADO Y
DESENCOFRADO

m/m

2.45

7.10

2.45

7.10

1.81

4.80

SUPERVICONSORCIO SUPERVISOR LA QUINUA


CONTRAT
CONSORCIO VIAL QUINUA
OBRA:

REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO

TRAMO 2(Km. 78+500 - Km. 172+420

TRANSPORTE
METRADOS DE TRANSPORTE DE MATERIAL GRANULAR
ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02
605.A RELLENOS PARA
ESTRUCTURAS

CANTERA

No

PROGRESIVAS
REPLANTEO

CENTRO GRAV.

km

km

ANULADA

0+000

0+000

0+000

79+998

80.00

44.74

92+800

0.10

12.90

80+315

80.32

24.97

92+800

0.10

12.59

80+460

80.46

40.34

92+800

0.10

12.44

ANULADA

0+000

83+120

83.12

28.68

92+800

0.10

9.78

83+402

83.40

29.13

92+800

0.10

9.50

ANULADA

0+000

10

ANULADA

0+000

11

84+573

92+800

0.10

8.33

84.57

31.87

Prog.

Acc.

km

km

DISTANCIA DE
TRANSPORTE
km

12

0+000

0+000

13

ANULADA

0+000

14

ANULADA

0+000

15

0+000

0+000

16

0+000

0+000

17

86+954

86.95

32.43

92+800

0.10

5.95

18

87+418

87.42

24.87

92+800

0.10

5.48

19

87+850

87.85

38.17

92+800

0.10

5.05

20

88+180

88.18

18.27

92+800

0.10

4.72

21

88+260

88.26

28.97

92+800

0.10

4.64

22

88+620

88.62

35.65

92+800

0.10

4.28

23

89+020

89.02

25.24

92+800

0.10

3.88

24

89+405

89.41

43.34

92+800

0.10

3.50

25

89+780

89.78

29.68

92+800

0.10

3.12

26

89+870

89.87

16.71

92+800

0.10

3.03

27

90+180

90.18

19.68

92+800

0.10

2.72

28

90+334

90.33

19.69

92+800

0.10

2.57

29

90+606

90.61

40.25

92+800

0.10

2.29

30

90+862

90.86

25.09

92+800

0.10

2.04

31

91+155

91.16

19.68

92+800

0.10

1.75

32

91+528

91.53

24.95

92+800

0.10

1.37

33

91+840

91.84

18.57

92+800

0.10

1.06

34

91+955

91.96

22.76

92+800

0.10

0.94

35

92+235

92.24

18.73

92+800

0.10

0.66

36

92+562

92.56

25.54

92+800

0.10

0.34

37

92+882

92.88

49.22

92+800

0.10

0.18

38

93+162

93.16

28.25

92+800

0.10

0.46

39

93+610

93.61

55.58

92+800

0.10

0.91

40

0+000

0+000

41

94+180

92+800

0.10

1.48

94.18

25.69

SUPERVICONSORCIO SUPERVISOR LA QUINUA


CONTRAT
CONSORCIO VIAL QUINUA
OBRA:

REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO

TRAMO 2(Km. 78+500 - Km. 172+420

TRANSPORTE
METRADOS DE TRANSPORTE DE MATERIAL GRANULAR
ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02

No

PROGRESIVAS
REPLANTEO

CENTRO GRAV.

km

km

42

0+000

43

94+696

44

ANULADA

45

95+049

605.A RELLENOS PARA


ESTRUCTURAS
m

94.70
-

21.63
-

CANTERA
Prog.

Acc.

km

km

DISTANCIA DE
TRANSPORTE
km

0+000

92+800

0.10

2.00

0+000

95.05

43.14

92+800

0.10

2.35

46

95+112

95.11

39.89

92+800

0.10

2.41

47

95+270

95.27

21.04

92+800

0.10

2.57

48

95+440

95.44

35.94

92+800

0.10

2.74

49

95+800

95.80

25.45

92+800

0.10

3.10

50

ANULADA

0+000

51

ANULADA

0+000

52

ANULADA

0+000

53

ANULADA

0+000

54

ANULADA

0+000

55

ANULADA

0+000

56

0+000

0+000

57

97+870

92+800

0.10

5.17

58

ANULADA

0+000

59

ANULADA

0+000

60

98+260

98.26

20.09

92+800

0.10

5.56

61

98+450

98.45

26.10

92+800

0.10

5.75

62

0+000

0+000

63

0+000

0+000

64

0+000

0+000

65

99+140

99.14

25.77

92+800

0.10

6.44

66

99+490

99.49

27.39

92+800

0.10

6.79

97.87

24.30

67

99+780

99.78

28.42

92+800

0.10

7.08

68

100+235

100.24

18.00

92+800

0.10

7.54

69

100+670

100.67

22.10

92+800

0.10

7.97

70

100+878

100.88

18.13

92+800

0.10

8.18

71

101+311

101.31

12.68

92+800

0.10

8.61

72

101+370

101.37

19.85

92+800

0.10

8.67

73

101+440

101.44

19.68

92+800

0.10

8.74

74

101+698

101.70

17.68

92+800

0.10

9.00

75

0+000

0+000

76

0+000

0+000

77

102+271

102.27

21.19

92+800

0.10

9.57

78

102+683

102.68

19.73

92+800

0.10

9.98

79

102+860

102.86

19.18

92+800

0.10

10.16

80

103+060

103.06

22.75

92+800

0.10

10.36

81

103+300

103.30

21.27

92+800

0.10

10.60

82

103+560

103.56

16.66

92+800

0.10

10.86

SUPERVICONSORCIO SUPERVISOR LA QUINUA


CONTRAT
CONSORCIO VIAL QUINUA
OBRA:

REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO

TRAMO 2(Km. 78+500 - Km. 172+420

TRANSPORTE
METRADOS DE TRANSPORTE DE MATERIAL GRANULAR
ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02
CANTERA

No

PROGRESIVAS
REPLANTEO

CENTRO GRAV.

605.A RELLENOS PARA


ESTRUCTURAS

km

km

83

104+120

104.12

37.86

92+800

0.10

11.42

84

104+460

104.46

36.36

92+800

0.10

11.76

85

0+000

0+000

86

105+140

105.14

16.56

92+800

0.10

12.44

87

105+420

105.42

24.38

92+800

0.10

12.72

88

105+980

105.98

16.62

92+800

0.10

13.28

89

106+220

106.22

19.69

92+800

0.10

13.52

90

106+380

106.38

20.39

92+800

0.10

13.68

91

106+513

106.51

24.91

92+800

0.10

13.81

92

106+840

106.84

16.75

92+800

0.10

14.14

93

107+010

107.01

31.51

92+800

0.10

14.31

94

107+390

107.39

28.45

92+800

0.10

14.69

95

0+000

0+000

96

0+000

0+000

97

0+000

0+000

98

0+000

0+000

99

0+000

0+000

100

0+000

0+000

101

0+000

0+000

102

0+000

0+000

103

110+520

92+800

0.10

104

0+000

0+000

105

0+000

0+000

106

0+000

0+000

107

0+000

0+000

108

0+000

0+000

109

0+000

0+000

110

0+000

0+000

111

0+000

0+000

112

0+000

0+000

113

0+000

0+000

114

0+000

0+000

115

0+000

0+000

116

0+000

0+000

117

0+000

0+000

118

0+000

0+000

119

0+000

0+000

120

0+000

0+000

121

0+000

0+000

122

0+000

0+000

123

0+000

0+000

110.52

31.05

Prog.

Acc.

DISTANCIA DE
TRANSPORTE

km

km

km

17.82

SUPERVICONSORCIO SUPERVISOR LA QUINUA


CONTRAT
CONSORCIO VIAL QUINUA
OBRA:

REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO

TRAMO 2(Km. 78+500 - Km. 172+420

TRANSPORTE
METRADOS DE TRANSPORTE DE MATERIAL GRANULAR
ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02
605.A RELLENOS PARA
ESTRUCTURAS

CANTERA

No

PROGRESIVAS
REPLANTEO

CENTRO GRAV.

km

km

124

0+000

0+000

125

0+000

0+000

126

0+000

0+000

127

0+000

0+000

Acc.

km

km

DISTANCIA DE
TRANSPORTE
km

128

0+000

0+000

129

118+565

118.56

19.88

92+800

0.10

25.86

130

118+978

118.98

24.58

92+800

0.10

26.28

131

119+260

119.26

20.51

92+800

0.10

26.56

132

119+570

119.57

25.13

92+800

0.10

26.87

133

119+773

119.77

28.17

92+800

0.10

27.07

134

120+156

120.16

25.06

92+800

0.10

27.46

135

120+280

120.28

19.57

92+800

0.10

27.58

136

120+680

120.68

24.68

92+800

0.10

27.98

137

120+825

120.83

17.81

92+800

0.10

28.13

138

121+000

121.00

79.81

92+800

0.10

28.30

139

0+000

0+000

140

0+000

0+000

141

121+740

121.74

19.54

92+800

0.10

29.04

142

122+900

122.90

19.54

92+800

0.10

30.20

143

0+000

0+000

144

0+000

0+000

145

122+660

92+800

0.10

122.66
-

Prog.

42.39

29.96

146

0+000

0+000

147

123+220

123.22

16.84

92+800

0.10

30.52

148

123+460

123.46

19.79

92+800

0.10

30.76

149

123+720

123.72

21.83

92+800

0.10

31.02

150

124+025

124.03

17.60

92+800

0.10

31.33

151

124+570

124.57

27.73

92+800

0.10

31.87

152

124+830

124.83

26.48

92+800

0.10

32.13

153

125+123

125.12

25.70

92+800

0.10

32.42

154

125+220

125.22

25.35

92+800

0.10

32.52

155

125+402

125.40

19.09

92+800

0.10

32.70

156

0+000

0+000

157

126+010

92+800

0.10

158

0+000

0+000

159

0+000

0+000

160

0+000

0+000

161

126+650

126.65

37.84

92+800

0.10

33.95

162

126+800

126.80

17.71

92+800

0.10

34.10

163

127+260

127.26

19.52

92+800

0.10

34.56

164

127+342

127.34

26.47

92+800

0.10

34.64

126.01

28.61

33.31

SUPERVICONSORCIO SUPERVISOR LA QUINUA


CONTRAT
CONSORCIO VIAL QUINUA
OBRA:

REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO

TRAMO 2(Km. 78+500 - Km. 172+420

TRANSPORTE
METRADOS DE TRANSPORTE DE MATERIAL GRANULAR
ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02
CANTERA

No

PROGRESIVAS
REPLANTEO

CENTRO GRAV.

605.A RELLENOS PARA


ESTRUCTURAS

km

km

165

128+250

128.25

33.16

92+800

0.10

35.55

166

128+447

128.45

24.78

92+800

0.10

35.75

167

128+587

128.59

21.83

92+800

0.10

35.89

168

0+000

0+000

169

0+000

0+000

170

0+000

0+000

171

129+335

92+800

0.10

172

0+000

173

129+840

129.34
129.84
-

23.16
25.10

Acc.

DISTANCIA DE
TRANSPORTE

km

km

km

0+000

92+800

0.10

36.64
37.14

174

0+000

0+000

175

130+717

130.72

21.23

92+800

0.10

38.02

176

131+010

131.01

18.55

92+800

0.10

38.31

177

131+247

131.25

13.14

92+800

0.10

38.55

178

0+000

0+000

179

0+000

0+000

180

131+862

92+800

0.10

131.86
-

Prog.

21.28

39.16

181

0+000

0+000

182

132+241

132.24

71.76

92+800

0.10

39.54

183

132+445

132.45

19.52

92+800

0.10

39.75

184

132+711

132.71

27.76

92+800

0.10

40.01

185

132+959

132.96

19.83

92+800

0.10

40.26

186

0+000

0+000

187

133+360

133.36

22.79

164+700

7.40

38.74

188

133+582

133.58

21.61

164+700

7.40

38.52

189

133+832

133.83

20.62

164+700

7.40

38.27

190

134+060

134.06

22.74

164+700

7.40

38.04

191

134+280

134.28

17.37

164+700

7.40

37.82

192

134+517

134.52

19.75

164+700

7.40

37.58

193

134+665

134.67

17.81

164+700

7.40

37.44

194

134+817

134.82

21.51

164+700

7.40

37.28

195

135+080

135.08

18.38

164+700

7.40

37.02

196

0+000

0+000

197

0+000

0+000

198

0+000

0+000

199

135+870

135.87

19.33

164+700

7.40

36.23

200

136+171

136.17

18.27

164+700

7.40

35.93

201

136+485

136.49

17.05

164+700

7.40

35.62

202

0+000

0+000

203

0+000

0+000

204

0+000

0+000

205

0+000

0+000

SUPERVICONSORCIO SUPERVISOR LA QUINUA


CONTRAT
CONSORCIO VIAL QUINUA
OBRA:

REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO

TRAMO 2(Km. 78+500 - Km. 172+420

TRANSPORTE
METRADOS DE TRANSPORTE DE MATERIAL GRANULAR
ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02
605.A RELLENOS PARA
ESTRUCTURAS

CANTERA

No

PROGRESIVAS
REPLANTEO

CENTRO GRAV.

km

km

206

0+000

0+000

207

0+000

0+000

208

0+000

0+000

209

0+000

0+000

210

0+000

0+000

211

0+000

0+000

212

0+000

0+000

213

0+000

0+000

214

0+000

0+000

215

0+000

0+000

216

0+000

0+000

217

0+000

0+000

218

0+000

0+000

219

0+000

0+000

220

0+000

0+000

221

0+000

0+000

222

0+000

0+000

223

0+000

0+000

224

142+396

164+700

7.40

142.40
-

22.81
-

Prog.

Acc.

km

km

DISTANCIA DE
TRANSPORTE
km

29.70

225

0+000

0+000

226

142+895

142.89

21.99

164+700

7.40

29.21

227

143+230

143.23

18.55

164+700

7.40

28.87

228

143+615

143.62

34.08

164+700

7.40

28.49

229

143+860

143.86

19.52

164+700

7.40

28.24

230

0+000

0+000

231

0+000

0+000

232

0+000

0+000

233

0+000

0+000

234

0+000

0+000

235

0+000

0+000

236

0+000

0+000

237

0+000

0+000

238

0+000

0+000

239

146+470

146.47

25.08

164+700

7.40

25.63

240

146+772

146.77

16.83

164+700

7.40

25.33

241

147+174

147.17

20.51

164+700

7.40

24.93

242

147+597

147.60

25.17

164+700

7.40

24.50

243

0+000

0+000

244

0+000

0+000

245

148+409

148.41

20.26

164+700

7.40

23.69

246

148+520

148.52

24.74

164+700

7.40

23.58

SUPERVICONSORCIO SUPERVISOR LA QUINUA


CONTRAT
CONSORCIO VIAL QUINUA
OBRA:

REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO

TRAMO 2(Km. 78+500 - Km. 172+420

TRANSPORTE
METRADOS DE TRANSPORTE DE MATERIAL GRANULAR
ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02
605.A RELLENOS PARA
ESTRUCTURAS

CANTERA

No

PROGRESIVAS
REPLANTEO

CENTRO GRAV.

km

km

247

0+000

0+000

248

0+000

0+000

249

149+198

164+700

7.40

250

0+000

0+000

149.20
-

251

0+000

252

149+660

253

0+000

254

0+000

255

150+149

150.15

256

150+456

257

150+728

258

33.12
-

Acc.

km

km

DISTANCIA DE
TRANSPORTE
km

22.90
-

0+000

164+700

7.40

0+000

0+000

19.69

164+700

7.40

21.95

150.46

15.51

164+700

7.40

21.64

150.73

20.81

164+700

7.40

21.37

150+987

150.99

22.94

164+700

7.40

21.11

259

151+222

151.22

40.36

164+700

7.40

20.88

260

151+453

151.45

26.81

164+700

7.40

20.65

261

151+779

151.78

33.16

164+700

7.40

20.32

262

151+951

151.95

27.38

164+700

7.40

20.15

263

152+142

152.14

24.34

164+700

7.40

19.96

264

152+461

152.46

23.61

164+700

7.40

19.64

265

152+638

152.64

41.54

164+700

7.40

19.46

266

152+723

152.72

46.36

164+700

7.40

19.38

267

152+830

152.83

16.44

164+700

7.40

19.27

268

153+360

153.36

23.50

164+700

7.40

18.74

269

153+690

153.69

23.27

164+700

7.40

18.41

270

153+935

153.94

18.97

164+700

7.40

18.17

271

0+000

0+000

272

154+720

154.72

23.06

164+700

7.40

17.38

273

154+881

154.88

22.14

164+700

7.40

17.22

274

155+312

155.31

47.88

164+700

7.40

16.79

275

155+447

155.45

20.77

164+700

7.40

16.65

276

155+582

155.58

33.87

164+700

7.40

16.52

277

155+952

155.95

26.56

164+700

7.40

16.15

278

156+234

156.23

18.00

164+700

7.40

15.87

279

156+489

156.49

24.98

164+700

7.40

15.61

280

156+700

156.70

26.81

164+700

7.40

15.40

281

157+080

157.08

35.68

164+700

7.40

15.02

282

157+320

157.32

35.48

164+700

7.40

14.78

283

157+638

157.64

19.81

164+700

7.40

14.46

284

157+915

157.91

22.88

164+700

7.40

14.19

285

158+190

158.19

29.06

164+700

7.40

13.91

286

158+362

158.36

22.16

164+700

7.40

13.74

287

158+596

158.60

26.81

164+700

7.40

13.50

149.66

Prog.

19.69

22.44
-

SUPERVICONSORCIO SUPERVISOR LA QUINUA


CONTRAT
CONSORCIO VIAL QUINUA
OBRA:

REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO

TRAMO 2(Km. 78+500 - Km. 172+420

TRANSPORTE
METRADOS DE TRANSPORTE DE MATERIAL GRANULAR
ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02
605.A RELLENOS PARA
ESTRUCTURAS

CANTERA

No

PROGRESIVAS
REPLANTEO

CENTRO GRAV.

km

km

288

0+000

0+000

289

0+000

0+000

290

0+000

0+000

291

0+000

0+000

292

0+000

0+000

293

0+000

0+000

294

159+854

159.85

23.25

164+700

7.40

12.25

295

160+102

160.10

175.94

164+700

7.40

12.00

296

160+300

160.30

19.94

164+700

7.40

11.80

297

160+470

160.47

19.52

164+700

7.40

11.63

298

160+618

160.62

24.95

164+700

7.40

11.48

299

160+760

160.76

25.67

164+700

7.40

11.34

300

160+854

160.85

25.83

164+700

7.40

11.25

301

0+000

0+000

302

0+000

0+000

303

0+000

0+000

304

161+350

161.35

30.75

164+700

7.40

10.75

305

161+491

161.49

25.27

164+700

7.40

10.61

306

161+627

161.63

26.25

164+700

7.40

10.47

307

161+710

161.71

37.00

164+700

7.40

10.39

308

161+856

161.86

24.51

164+700

7.40

10.24

309

162+029

162.03

11.23

164+700

7.40

10.07

310

162+160

162.16

19.52

164+700

7.40

9.94

311

162+543

162.54

24.89

164+700

7.40

9.56

312

0+000

0+000

313

0+000

0+000

314

0+000

0+000

315

0+000

0+000

316

163+678

164+700

7.40

8.42

317

0+000

0+000

318

0+000

0+000

319

0+000

0+000

320

0+000

0+000

321

0+000

0+000

322

0+000

0+000

323

0+000

0+000

324

0+000

0+000

325

0+000

0+000

326

0+000

0+000

327

165+385

165.39

21.76

164+700

7.40

8.09

328

165+604

165.60

39.37

164+700

7.40

8.30

163.68

25.00

Prog.

Acc.

km

km

DISTANCIA DE
TRANSPORTE
km

SUPERVICONSORCIO SUPERVISOR LA QUINUA


CONTRAT
CONSORCIO VIAL QUINUA
OBRA:

REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO

TRAMO 2(Km. 78+500 - Km. 172+420

TRANSPORTE
METRADOS DE TRANSPORTE DE MATERIAL GRANULAR
ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02
CANTERA

No

PROGRESIVAS
REPLANTEO

CENTRO GRAV.

605.A RELLENOS PARA


ESTRUCTURAS

km

km

329

165+684

165.68

40.34

164+700

7.40

8.38

330

165+952

165.95

39.91

164+700

7.40

8.65

331

166+052

166.05

40.72

164+700

7.40

8.75

332

166+175

166.18

25.96

164+700

7.40

8.88

Acc.

DISTANCIA DE
TRANSPORTE

km

km

km

333

0+000

0+000

334

166+672

166.67

192.93

164+700

7.40

9.37

335

166+818

166.82

39.32

164+700

7.40

9.52

336

0+000

0+000

337

0+000

0+000

338

167+167

167.17

25.57

164+700

7.40

9.87

339

167+491

167.49

29.49

164+700

7.40

10.19

340

167+775

167.78

24.86

164+700

7.40

10.48

341

168+015

168.02

25.02

164+700

7.40

10.72

342

168+488

168.49

32.45

164+700

7.40

11.19

343

168+795

168.80

40.34

164+700

7.40

11.50

344

168+981

168.98

141.08

164+700

7.40

11.68

345

169+151

169.15

37.22

164+700

7.40

11.85

346

169+410

169.41

24.62

164+700

7.40

12.11

347

169+620

169.62

35.59

164+700

7.40

12.32

348

170+010

170.01

24.62

164+700

7.40

12.71

349

170+800

170.80

24.64

164+700

7.40

13.50

350

170+985

170.99

21.17

164+700

7.40

13.69

351

171+234

171.23

25.91

164+700

7.40

13.93

352

171+422

171.42

24.85

164+700

7.40

14.12

353

171+749

171.75

25.11

164+700

7.40

14.45

354

171+803

171.80

37.20

164+700

7.40

14.50

355

0+000

0+000

356

0+000

0+000

357

0+000

0+000

358

0+000

0+000

359

172+125

172.12

39.35

164+700

7.40

14.82

360

172+193

172.19

26.97

164+700

7.40

14.89

361

172+589

172.59

24.45

164+700

7.40

15.29

362

0+000

0+000

363

172+942

164+700

7.40

172.94

Prog.

24.09
5,912.30

15.64

DE TRANSPORTE DE MATERIAL GRANULAR


ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02
Distancia Libre 120 ml
TRANSPORTE DE MATERIAL GRANULAR
< 1km

> 1km

mkm

mkm

39.37

532.38

21.97

289.38

35.50

461.45

25.24

251.85

25.64

247.64

28.05

233.64

28.54

160.55

21.88

111.40

33.59

154.57

16.08

67.96

25.49

105.45

31.37

116.92

22.21

72.68

38.14

108.35

26.12

62.91

14.71

33.92

17.31

33.84

17.33

30.92

35.42

51.93

22.08

26.09

17.31

14.76

21.96

9.23

16.34

1.11

18.67

10.11

5.62

2.95

9.61

43.91

22.61

12.33

DE TRANSPORTE DE MATERIAL GRANULAR


ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02
Distancia Libre 120 ml
TRANSPORTE DE MATERIAL GRANULAR
< 1km

> 1km

mkm

mkm

19.03
-

21.63
-

37.96

58.24

35.10

56.24

18.51

33.03

31.63

62.54

22.39

53.44

21.39
-

101.35
-

17.68

91.63

22.97

123.97

22.67

140.17

24.11

158.61

25.01

172.81

15.84

117.72

19.45

154.03

15.96

130.19

11.16

96.52

17.47

152.22

17.31

152.29

15.56

141.41

18.65

181.61

17.36

177.16

16.88

175.71

20.02

212.90

18.72

204.17

14.66

164.26

DE TRANSPORTE DE MATERIAL GRANULAR


ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02
Distancia Libre 120 ml
TRANSPORTE DE MATERIAL GRANULAR
< 1km

> 1km

mkm

mkm

33.32

394.48

32.00

391.26

14.57

189.44

21.45

285.73

14.62

204.05

17.33

246.58

17.95

258.59

21.92

319.10

14.74

220.09

27.73

419.40

25.04

389.51

27.32

522.23

DE TRANSPORTE DE MATERIAL GRANULAR


ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02
Distancia Libre 120 ml
TRANSPORTE DE MATERIAL GRANULAR
< 1km

> 1km

mkm

mkm

17.50

494.34

21.63

621.32

18.05

524.17

22.11

650.11

24.79

734.29

22.06

663.19

17.22

520.23

21.72

665.81

15.67

483.17

70.23

2,178.76

17.19

547.86

17.20

570.65

37.30
-

1,227.50
-

14.82

497.26

17.42

588.94

19.21

655.44

15.49

533.95

24.40

855.90

23.30

824.38

22.62

807.56

22.31

799.03

16.80

605.05

25.17

924.26

33.30

1,246.99

15.59

586.35

17.18

655.22

23.29

890.43

DE TRANSPORTE DE MATERIAL GRANULAR


ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02
Distancia Libre 120 ml
TRANSPORTE DE MATERIAL GRANULAR
< 1km

> 1km

mkm

mkm

29.18

1,145.68

21.80

860.95

19.21

761.56

20.38
22.08
-

825.54
906.96
-

18.68

785.92

16.32

692.12

11.56

493.24

18.73
63.14

812.14
2,765.44

17.18

756.55

24.43

1,082.97

17.45

778.44

20.05

859.93

19.01

810.63

18.15

768.57

20.01

842.35

15.29

639.66

17.38

722.52

15.67

648.98

18.93

780.55

16.17

662.03

17.01

680.98

16.08

638.16

15.01

590.40

DE TRANSPORTE DE MATERIAL GRANULAR


ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02
Distancia Libre 120 ml
TRANSPORTE DE MATERIAL GRANULAR
< 1km

> 1km

mkm

mkm

20.07
-

654.58
-

19.35

620.21

16.33

517.12

29.99

936.93

17.18

531.83

22.07

617.80

14.81

409.47

18.05

490.75

22.15

591.59

17.83

459.71

21.77

558.71

DE TRANSPORTE DE MATERIAL GRANULAR


ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02
Distancia Libre 120 ml
TRANSPORTE DE MATERIAL GRANULAR
< 1km

> 1km

mkm

mkm

29.14
17.33
-

725.24
422.26
-

17.33

412.61

13.65

320.23

18.31

423.93

20.19

461.32

35.52

802.45

23.59

526.85

29.18

640.70

24.09

524.27

21.42

461.43

20.78

440.11

36.55

766.75

40.79

852.04

14.46

300.31

20.68

416.88

20.48

405.13

16.69

325.69

20.29

377.76

19.48

359.07

42.13

756.01

18.28

325.11

29.80

525.61

23.37

402.32

15.84

267.65

21.98

364.90

23.59

386.09

31.40

500.28

31.22

488.95

17.43

266.59

20.14

301.82

25.58

375.22

19.50

282.27

23.59

335.15

DE TRANSPORTE DE MATERIAL GRANULAR


ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02
Distancia Libre 120 ml
TRANSPORTE DE MATERIAL GRANULAR
< 1km

> 1km

mkm

mkm

20.46

261.57

154.82

1,935.30

17.55

215.37

17.18

207.54

21.96

261.52

22.59

265.40

22.73

264.80

27.06

299.84

22.24

242.86

23.10

248.61

32.56

347.48

21.57

226.49

9.88

101.81

17.18

174.54

21.90

213.02

22.00

185.49

19.15

154.29

34.65

287.43

DE TRANSPORTE DE MATERIAL GRANULAR


ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02
Distancia Libre 120 ml
TRANSPORTE DE MATERIAL GRANULAR
< 1km

> 1km

mkm

mkm

35.50

297.69

35.12

305.28

35.84

315.61

22.85

204.58

169.78

1,614.85

34.60

334.99

22.50

226.76

25.95

270.98

21.88

235.71

22.02

243.17

28.55

330.63

35.50

423.54

124.15

1,506.69

32.76

403.88

21.67

273.54

31.32

402.91

21.67

288.32

21.69

308.04

18.63

268.61

22.80

335.01

21.87

326.08

22.09

337.67

32.73

502.14

34.62

543.77

23.73

374.55

21.51

349.33

21.20

352.62

5,117.62

91,032.03

SUPERVICONSORCIO SUPERVISOR LA QUINUA


CONTRAT
CONSORCIO VIAL QUINUA
OBRA:

REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO

TRAMO 2(Km. 78+500 - Km. 172+420

TRANSPORTE
METRADOS DE TRANSPORTE DE MATERIAL FILTRANTE
MUROS CABEZAL DE ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02

No

PROGRESIVAS
REPLANTEO

CENTRO GRAV.

km

km

0+000

91+955

3
4

605.B MATERIAL FILTRANTE

CANTERA
Prog.

Acc.

km

km

DISTANCIA DE
TRANSPORTE

km

0+000

91.96

1.98

164+700

7.40

80.15

92+235

92.24

1.84

164+700

7.40

79.87

94+180

94.18

2.45

164+700

7.40

77.92

95+112

95.11

3.67

164+700

7.40

76.99

95+440

95.44

0+000

95.44

95+800

95.80

1.98

164+700

7.40

76.30

0+000

0+000

101+311

101.31

0+000

101.31

10

101+698

101.70

1.49

164+700

7.40

70.40

11

102+683

102.68

1.05

164+700

7.40

69.42

12

103+560

103.56

1.49

164+700

7.40

68.54

13

105+140

105.14

1.49

164+700

7.40

66.96

14

105+980

105.98

1.49

164+700

7.40

66.12

15

106+380

106.38

1.49

164+700

7.40

65.72

16

0+000

0+000

17

0+000

0+000

18

0+000

0+000

19

0+000

0+000

20

0+000

0+000

21

0+000

0+000

22

0+000

0+000

23

118+978

118.98

164+700

7.40

53.12

24

120+680

120.68

1.98

164+700

7.40

51.42

25

0+000

0+000

26

0+000

27

126+650

28

0+000

29

129+840

126.65
129.84
-

0+000

4.10

164+700

7.40

0+000

1.98

164+700

7.40

45.45
42.26

30

0+000

0+000

31

131+010

131.01

1.49

164+700

7.40

41.09

32

131+247

131.25

1.49

164+700

7.40

40.85

33

0+000

0+000

34

0+000

0+000

35

0+000

0+000

36

133+360

133.36

1.98

164+700

7.40

38.74

37

133+582

133.58

1.49

164+700

7.40

38.52

38

133+832

133.83

1.49

164+700

7.40

38.27

39

134+060

134.06

1.98

164+700

7.40

38.04

40

134+280

134.28

1.49

164+700

7.40

37.82

41

134+665

134.67

1.49

164+700

7.40

37.44

SUPERVICONSORCIO SUPERVISOR LA QUINUA


CONTRAT
CONSORCIO VIAL QUINUA
OBRA:

REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO

TRAMO 2(Km. 78+500 - Km. 172+420

TRANSPORTE
METRADOS DE TRANSPORTE DE MATERIAL FILTRANTE
MUROS CABEZAL DE ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02

No

PROGRESIVAS
REPLANTEO

CENTRO GRAV.

605.B MATERIAL FILTRANTE

km

km

42

135+870

43

0+000

44

Acc.

DISTANCIA DE
TRANSPORTE

km

km

km

1.49

164+700

7.40

0+000

0+000

0+000

45

0+000

0+000

46

0+000

0+000

47

0+000

0+000

48

0+000

0+000

49

0+000

0+000

50

0+000

0+000

51

0+000

0+000

52

0+000

0+000

53

0+000

0+000

54

0+000

0+000

55

0+000

0+000

56

0+000

0+000

57

142+396

142.40

2.74

164+700

7.40

29.70

58

143+615

143.62

4.10

164+700

7.40

28.49

59

0+000

0+000

60

0+000

0+000

61

0+000

0+000

62

146+772

1.49

164+700

7.40

63

0+000

0+000

64

0+000

0+000

65

0+000

0+000

66

0+000

0+000

67

150+987

150.99

1.98

164+700

7.40

21.11

68

152+638

152.64

4.81

164+700

7.40

19.46

69

152+830

152.83

2.74

164+700

7.40

19.27

70

153+360

153.36

3.20

164+700

7.40

18.74

71

153+690

153.69

2.74

164+700

7.40

18.41

72

154+720

154.72

2.74

164+700

7.40

17.38

73

155+312

155.31

5.18

164+700

7.40

16.79

74

155+447

155.45

1.98

164+700

7.40

16.65

75

157+638

157.64

1.98

164+700

7.40

14.46

76

0+000

0+000

77

0+000

0+000

78

0+000

0+000

79

0+000

0+000

80

159+854

1.98

164+700

7.40

81

0+000

82

161+710

135.87

CANTERA
Prog.

146.77

159.85
161.71

0+000

3.67

164+700

7.40

36.23

25.33

12.25
10.39

SUPERVICONSORCIO SUPERVISOR LA QUINUA


CONTRAT
CONSORCIO VIAL QUINUA
OBRA:

REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO

TRAMO 2(Km. 78+500 - Km. 172+420

TRANSPORTE
METRADOS DE TRANSPORTE DE MATERIAL FILTRANTE
MUROS CABEZAL DE ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02

No

PROGRESIVAS
REPLANTEO

CENTRO GRAV.

605.B MATERIAL FILTRANTE

km

km

83

162+029

84

0+000

85
86

Acc.

km

km

DISTANCIA DE
TRANSPORTE

km

0+000

0+000

0+000

0+000

0+000

0+000

87

0+000

88

166+175

89

0+000

90

0+000

91

167+167

92
93

162.03

CANTERA
Prog.

162.03

0+000

4.81

164+700

7.40

8.88

0+000

0+000

167.17

4.10

164+700

7.40

9.87

169+151

169.15

4.10

164+700

7.40

11.85

170+985

170.99

1.98

164+700

7.40

13.69

94

171+803

171.80

4.10

164+700

7.40

14.50

95

172+193

172.19

4.10

164+700

7.40

14.89

96

172+589

172.59

2.74

164+700

7.40

15.29

166.18

110.13

DE TRANSPORTE DE MATERIAL FILTRANTE

OS CABEZAL DE ALCANTARILLAS TMC


ADICIONAL DE OBRA N 03
VALORIZACION N 02
Distancia Libre 120 ml
TRANSPORTE DE MATERIAL GRANULAR
< 1km

> 1km

mkm

mkm

1.74

156.72

1.62

145.12

2.16

188.45

3.23

278.88

1.74
1.31

149.09
103.41

0.92

71.84

1.31

100.63

1.31

98.28

1.31

97.03

1.31

96.43

1.74
3.61
1.74
-

99.83
182.25
81.69
-

1.31

59.73

1.31

59.38

1.74

74.73

1.31

55.90

1.31

55.53

1.74

73.34

1.31

54.86

1.31

54.30

DE TRANSPORTE DE MATERIAL FILTRANTE

OS CABEZAL DE ALCANTARILLAS TMC


ADICIONAL DE OBRA N 03
VALORIZACION N 02
Distancia Libre 120 ml
TRANSPORTE DE MATERIAL GRANULAR
< 1km

> 1km

mkm

mkm

1.31

52.49

2.41

78.64

3.61

112.71

1.31

36.25

1.74

39.82

4.23

88.79

2.41

50.06

2.82

56.77

2.41

47.70

2.41

44.88

4.56

81.79

1.74

30.99

1.74

26.65

1.74
3.23

22.28
34.46

DE TRANSPORTE DE MATERIAL FILTRANTE

OS CABEZAL DE ALCANTARILLAS TMC


ADICIONAL DE OBRA N 03
VALORIZACION N 02
Distancia Libre 120 ml
TRANSPORTE DE MATERIAL GRANULAR
< 1km

> 1km

mkm

mkm

4.23
-

37.90
-

3.61

36.37

3.61

44.49

1.74

25.13

3.61

55.35

3.61

56.95

2.41
96.91

39.15
3,437.05

SUPERVICONSORCIO SUPERVISOR LA QUINUA


CONTRAT
CONSORCIO VIAL QUINUA
OBRA:

REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO

TRAMO 2(Km. 78+500 - Km. 172+420

TRANSPORTE
METRADOS DE TRANSPORTE DE ESCOMBROS A DME
ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02

No

PROGRESIVAS
REPLANTEO

CENTRO GRAV.

601.C EXCAVACION PARA


ESTRUCTURAS

km

km

ANULADA

BOTADERO

Prog.

Acc.

km

km

0+000
0+000

DISTANCIA DE
TRANSPORTE
km

79+998

80.00

325.16

89+930

0.304

10.24

80+315

80.32

94.34

89+930

0.304

9.92

80+460

80.46

212.55

89+930

0.304

9.77

ANULADA

83+120

83.12

132.42

89+930

0.304

7.11

83+402

83.40

158.62

89+930

0.304

6.83

0+000

ANULADA

0+000

10

ANULADA

0+000

11

84+573

84.57

12

283.36

89+930

0.304

0+000

13

ANULADA

0+000

14

ANULADA

0+000

15

0+000

16

0+000

5.66

17

86+954

86.95

142.91

89+930

0.304

3.28

18

87+418

87.42

94.60

89+930

0.304

2.82

19

87+850

87.85

101.20

89+930

0.304

2.38

20

88+180

88.18

77.41

89+930

0.304

2.05

21

88+260

88.26

223.01

89+930

0.304

1.97

22

88+620

88.62

107.65

89+930

0.304

1.61

23

89+020

89.02

103.71

89+930

0.304

1.21

24

89+405

89.41

189.90

89+930

0.304

0.83

25

89+780

89.78

91.71

89+930

0.304

0.45

26

89+870

89.87

73.61

89+930

0.304

0.36

27

90+180

90.18

46.93

89+930

0.304

0.55

28

90+334

90.33

75.77

89+930

0.304

0.71

29

90+606

90.61

186.20

89+930

0.304

0.98

30

90+862

90.86

77.35

89+930

0.304

1.24

31

91+155

91.16

77.10

89+930

0.304

1.53

32

91+528

91.53

74.29

89+930

0.304

1.90

33

91+840

91.84

76.29

89+930

0.304

2.21

34

91+955

91.96

74.60

89+930

0.304

2.33

35

92+235

92.24

81.59

89+930

0.304

2.61

36

92+562

92.56

108.17

89+930

0.304

2.94

37

92+882

92.88

197.68

89+930

0.304

3.26

38

93+162

93.16

62.08

89+930

0.304

3.54

39

93+610

93.61

89.17

89+930

0.304

3.98

40
41

94+180

94.18

201.83

0+000
89+930

0.304

4.55

SUPERVICONSORCIO SUPERVISOR LA QUINUA


CONTRAT
CONSORCIO VIAL QUINUA
OBRA:

REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO

TRAMO 2(Km. 78+500 - Km. 172+420

TRANSPORTE
METRADOS DE TRANSPORTE DE ESCOMBROS A DME
ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02

No

PROGRESIVAS
REPLANTEO

CENTRO GRAV.

601.C EXCAVACION PARA


ESTRUCTURAS

km

km

42

BOTADERO

94.70

97.24

Prog.

Acc.

km

km

0+000

km

43

94+696

44

ANULADA

45

95+049

95.05

122.47

89+930

0.304

5.42

46

95+112

95.11

124.43

89+930

0.304

5.49

47

95+270

95.27

53.50

89+930

0.304

5.64

48

95+440

95.44

102.32

89+930

0.304

5.81

49

95+800

95.80

100.06

89+930

0.304

6.17

50

ANULADA

0+000

51

ANULADA

0+000

52

ANULADA

0+000

53

ANULADA

0+000

54

ANULADA

0+000

55

ANULADA

0+000

0+000

56
97.87

112.71

89+930

DISTANCIA DE
TRANSPORTE

0+000

5.07

57

97+870

58

ANULADA

59

ANULADA

60

98+260

98.26

140.35

89+930

0.304

8.63

61

98+450

98.45

69.21

89+930

0.304

8.82

89+930

0.304

0+000
0+000

0.304

8.24

62

0+000

63

0+000

64

0+000

65

99+140

99.14

93.54

89+930

0.304

66

99+490

99.49

68.13

89+930

0.304

9.86

67

99+780

99.78

123.56

89+930

0.304

10.15

68

100+235

100.24

74.12

89+930

0.304

10.61

69

100+670

100.67

118.85

89+930

0.304

11.04

70

100+878

100.88

105.45

89+930

0.304

11.25

71

101+311

101.31

87.51

89+930

0.304

11.69

72

101+370

101.37

84.06

89+930

0.304

11.74

73

101+440

101.44

156.88

89+930

0.304

11.81

74

101+698

101.70

78.55

89+930

0.304

12.07

75

0+000

76

0+000

9.51

77

102+271

102.27

103.00

89+930

0.304

12.65

78

102+683

102.68

139.61

89+930

0.304

13.06

79

102+860

102.86

66.31

89+930

0.304

13.23

80

103+060

103.06

238.87

89+930

0.304

13.43

81

103+300

103.30

228.21

89+930

0.304

13.67

82

103+560

103.56

87.44

89+930

0.304

13.93

SUPERVICONSORCIO SUPERVISOR LA QUINUA


CONTRAT
CONSORCIO VIAL QUINUA
OBRA:

REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO

TRAMO 2(Km. 78+500 - Km. 172+420

TRANSPORTE
METRADOS DE TRANSPORTE DE ESCOMBROS A DME
ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02

No

PROGRESIVAS
REPLANTEO

CENTRO GRAV.

601.C EXCAVACION PARA


ESTRUCTURAS

km

km

BOTADERO
Prog.

Acc.

DISTANCIA DE
TRANSPORTE

km

km

km

83

104+120

104.12

166.83

89+930

0.304

14.49

84

104+460

104.46

117.79

89+930

0.304

14.83

85

0+000

86

105+140

105.14

116.53

89+930

0.304

15.51

87

105+420

105.42

94.53

89+930

0.304

15.79

88

105+980

105.98

82.63

89+930

0.304

16.35

89

106+220

106.22

81.15

89+930

0.304

16.59

90

106+380

106.38

94.45

89+930

0.304

16.75

91

106+513

106.51

78.47

89+930

0.304

16.89

92

106+840

106.84

55.63

89+930

0.304

17.21

93

107+010

107.01

86.33

89+930

0.304

17.38

94

107+390

107.39

100.78

89+930

0.304

17.76

95

0+000

96

0+000

97

0+000

98

0+000

99

0+000

100

0+000

101

0+000

102

0+000

103

110+520

110.52

86.13

89+930

0.304

104

0+000

105

0+000

106

0+000

107

0+000

108

0+000

109

0+000

110

0+000

111

0+000

112

0+000

113

0+000

114

0+000

115

0+000

116

0+000

117

0+000

118

0+000

119

0+000

120

0+000

121

0+000

122

0+000

123

0+000

20.89

SUPERVICONSORCIO SUPERVISOR LA QUINUA


CONTRAT
CONSORCIO VIAL QUINUA
OBRA:

REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO

TRAMO 2(Km. 78+500 - Km. 172+420

TRANSPORTE
METRADOS DE TRANSPORTE DE ESCOMBROS A DME
ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02

No

PROGRESIVAS
REPLANTEO

CENTRO GRAV.

601.C EXCAVACION PARA


ESTRUCTURAS

km

km

BOTADERO
Prog.

Acc.

km

km

DISTANCIA DE
TRANSPORTE
km

124

0+000

125

0+000

126

0+000

127

0+000

128

0+000

129

118+565

118.56

116.79

141+170

0.250

22.86

130

118+978

118.98

92.84

141+170

0.250

22.44

131

119+260

119.26

75.15

141+170

0.250

22.16

132

119+570

119.57

72.01

141+170

0.250

21.85

133

119+773

119.77

208.23

141+170

0.250

21.65

134

120+156

120.16

100.58

141+170

0.250

21.26

135

120+280

120.28

83.03

141+170

0.250

21.14

136

120+680

120.68

130.88

141+170

0.250

20.74

137

120+825

120.83

58.94

141+170

0.250

20.60

138

121+000

121.00

119.92

141+170

0.250

20.42

139

140

0+000
0+000

141

121+740

121.74

130.57

141+170

0.250

19.68

142

122+900

122.90

52.48

141+170

0.250

18.52

143

0+000

144

0+000

145

122+660

122.66

146

117.99
-

141+170
0+000

0.250

18.76

147

123+220

123.22

55.08

141+170

0.250

18.20

148

123+460

123.46

67.74

141+170

0.250

17.96

149

123+720

123.72

63.65

141+170

0.250

17.70

150

124+025

124.03

54.49

141+170

0.250

17.40

151

124+570

124.57

96.43

141+170

0.250

16.85

152

124+830

124.83

135.70

141+170

0.250

16.59

153

125+123

125.12

67.41

141+170

0.250

16.30

154

125+220

125.22

99.11

141+170

0.250

16.20

155

125+402

125.40

105.94

141+170

0.250

16.02

156
157

126+010

126.01

107.58

0+000
141+170

0.250

158

0+000

159

0+000

160

0+000

15.41

161

126+650

126.65

108.47

141+170

0.250

14.77

162

126+800

126.80

51.22

141+170

0.250

14.62

163

127+260

127.26

54.21

141+170

0.250

14.16

164

127+342

127.34

52.55

141+170

0.250

14.08

SUPERVICONSORCIO SUPERVISOR LA QUINUA


CONTRAT
CONSORCIO VIAL QUINUA
OBRA:

REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO

TRAMO 2(Km. 78+500 - Km. 172+420

TRANSPORTE
METRADOS DE TRANSPORTE DE ESCOMBROS A DME
ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02

No

PROGRESIVAS
REPLANTEO

CENTRO GRAV.

601.C EXCAVACION PARA


ESTRUCTURAS

km

km

BOTADERO
Prog.

Acc.

DISTANCIA DE
TRANSPORTE

km

km

km

165

128+250

128.25

93.79

141+170

0.250

13.17

166

128+447

128.45

73.50

141+170

0.250

12.97

167

128+587

128.59

85.16

141+170

0.250

12.83

168

0+000

169

0+000

170

0+000

171

129+335

129.34

172
173

148.35
-

129+840

129.84

174

192.90
-

141+170
0+000
141+170
0+000

0.250

12.09

0.250

11.58

175

130+717

130.72

138.95

141+170

0.250

10.70

176

131+010

131.01

102.37

141+170

0.250

10.41

177

131+247

131.25

81.09

141+170

0.250

10.17

178

179
180

131+862

131.86

181

56.30
-

0+000
0+000
141+170
0+000

0.250

9.56

182

132+241

132.24

104.31

141+170

0.250

9.18

183

132+445

132.45

76.04

141+170

0.250

8.98

184

132+711

132.71

127.70

141+170

0.250

8.71

185

132+959

132.96

96.44

141+170

0.250

8.46

187

133+360

133.36

80.85

141+170

0.250

8.06

188

133+582

133.58

75.16

141+170

0.250

7.84

189

133+832

133.83

93.73

141+170

0.250

7.59

190

134+060

134.06

66.99

141+170

0.250

7.36

191

134+280

134.28

62.70

141+170

0.250

7.14

192

134+517

134.52

82.84

141+170

0.250

6.90

193

134+665

134.67

62.53

141+170

0.250

6.76

194

134+817

134.82

83.09

141+170

0.250

6.60

195

135+080

135.08

112.82

141+170

0.250

6.34

186

0+000

196

0+000

197

0+000

198

0+000

199

135+870

135.87

68.82

141+170

0.250

5.55

200

136+171

136.17

92.25

141+170

0.250

5.25

201

136+485

136.49

77.46

141+170

0.250

4.93

202

0+000

203

0+000

204

0+000

205

0+000

SUPERVICONSORCIO SUPERVISOR LA QUINUA


CONTRAT
CONSORCIO VIAL QUINUA
OBRA:

REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO

TRAMO 2(Km. 78+500 - Km. 172+420

TRANSPORTE
METRADOS DE TRANSPORTE DE ESCOMBROS A DME
ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02

No

PROGRESIVAS
REPLANTEO

CENTRO GRAV.

601.C EXCAVACION PARA


ESTRUCTURAS

km

km

BOTADERO
Prog.

Acc.

km

km

DISTANCIA DE
TRANSPORTE
km

206

0+000

207

0+000

208

0+000

209

0+000

210

0+000

211

0+000

212

0+000

213

0+000

214

0+000

215

0+000

216

0+000

217

0+000

218

0+000

219

0+000

220

0+000

221

0+000

222

0+000

223

0+000

224

142+396

142.40

225

283.40
-

226

142+895

142.89

227

143+230

228

143+615

229

143+860

158+600
0+000

0.100

16.30

108.59

158+600

0.100

15.81

143.23

78.70

158+600

0.100

15.47

143.62

156.10

158+600

0.100

15.09

143.86

95.13

158+600

0.100

14.84

230

0+000

231

0+000

232

0+000

233

0+000

234

0+000

235

0+000

236

0+000

237

0+000

238

0+000

239

146+470

146.47

184.29

158+600

0.100

12.23

240

146+772

146.77

99.92

89+930

0.304

57.15

241

147+174

147.17

128.71

89+930

0.304

57.55

242

147+597

147.60

128.28

89+930

0.304

57.97

243

244

0+000
0+000

245

148+409

148.41

66.48

89+930

0.304

58.78

246

148+520

148.52

122.12

89+930

0.304

58.89

SUPERVICONSORCIO SUPERVISOR LA QUINUA


CONTRAT
CONSORCIO VIAL QUINUA
OBRA:

REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO

TRAMO 2(Km. 78+500 - Km. 172+420

TRANSPORTE
METRADOS DE TRANSPORTE DE ESCOMBROS A DME
ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02

No

PROGRESIVAS
REPLANTEO

CENTRO GRAV.

601.C EXCAVACION PARA


ESTRUCTURAS

km

km

247

248
249

149+198

149.20

250

145.27
-

251
252

BOTADERO

149+660

149.66

253

117.19
-

254

Prog.

Acc.

km

km

0+000
0+000
89+930
0+000
0+000
89+930
0+000
0+000

DISTANCIA DE
TRANSPORTE
km

0.304

59.57

0.304

60.03

255

150+149

150.15

98.34

141+170

0.250

9.23

256

150+456

150.46

73.99

89+930

0.304

60.83

257

150+728

150.73

51.93

89+930

0.304

61.10

258

150+987

150.99

176.46

89+930

0.304

61.36

259

151+222

151.22

428.76

89+930

0.304

61.60

260

151+453

151.45

184.60

89+930

0.304

61.83

261

151+779

151.78

408.58

89+930

0.304

62.15

262

151+951

151.95

275.10

89+930

0.304

62.33

263

152+142

152.14

422.01

89+930

0.304

62.52

264

152+461

152.46

69.24

89+930

0.304

62.84

265

152+638

152.64

320.63

141+170

0.250

11.72

266

152+723

152.72

736.90

141+170

0.250

11.80

267

152+830

152.83

54.01

89+930

0.304

63.20

268

153+360

153.36

189.55

89+930

0.304

63.73

269

153+690

153.69

143.53

89+930

0.304

64.06

270

153+935

153.94

338.33

89+930

0.304

64.31

271

0+000

272

154+720

154.72

144.21

141+170

0.250

13.80

273

154+881

154.88

101.35

141+170

0.250

13.96

274

155+312

155.31

143.90

141+170

0.250

14.39

275

155+447

155.45

125.93

141+170

0.250

14.53

276

155+582

155.58

112.90

141+170

0.250

14.66

277

155+952

155.95

261.54

141+170

0.250

15.03

278

156+234

156.23

95.13

141+170

0.250

15.31

279

156+489

156.49

115.96

141+170

0.250

15.57

280

156+700

156.70

205.59

141+170

0.250

15.78

281

157+080

157.08

169.71

141+170

0.250

16.16

282

157+320

157.32

199.21

141+170

0.250

16.40

283

157+638

157.64

89.69

141+170

0.250

16.72

284

157+915

157.91

71.31

141+170

0.250

16.99

285

158+190

158.19

159.16

141+170

0.250

17.27

286

158+362

158.36

79.42

141+170

0.250

17.44

287

158+596

158.60

193.18

141+170

0.250

17.68

SUPERVICONSORCIO SUPERVISOR LA QUINUA


CONTRAT
CONSORCIO VIAL QUINUA
OBRA:

REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO

TRAMO 2(Km. 78+500 - Km. 172+420

TRANSPORTE
METRADOS DE TRANSPORTE DE ESCOMBROS A DME
ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02

No

PROGRESIVAS
REPLANTEO

CENTRO GRAV.

601.C EXCAVACION PARA


ESTRUCTURAS

km

km

BOTADERO
Prog.

Acc.

km

km

DISTANCIA DE
TRANSPORTE
km

288

0+000

289

0+000

290

0+000

291

0+000

292

0+000

293

0+000

294

159+854

159.85

111.52

141+170

0.250

18.93

295

160+102

160.10

232.56

141+170

0.250

19.18

296

160+300

160.30

68.02

141+170

0.250

19.38

297

160+470

160.47

96.58

141+170

0.250

19.55

298

160+618

160.62

122.54

141+170

0.250

19.70

299

160+760

160.76

97.09

141+170

0.250

19.84

300

160+854

160.85

208.21

141+170

0.250

19.93

301

0+000

302

0+000

303

0+000

304

161+350

161.35

171.78

141+170

0.250

20.43

305

161+491

161.49

182.36

141+170

0.250

20.57

306

161+627

161.63

117.46

141+170

0.250

20.71

307

161+710

161.71

139.33

141+170

0.250

20.79

308

161+856

161.86

104.48

141+170

0.250

20.94

309

162+029

162.03

17.94

141+170

0.250

21.11

310

162+160

162.16

78.22

141+170

0.250

21.24

311

162+543

162.54

78.87

141+170

0.250

21.62

312

0+000

313

0+000

314

0+000

315

0+000

316

163+678

163.68

77.64

141+170

0.250

317

0+000

318

0+000

319

0+000

320

0+000

321

0+000

322

0+000

323

0+000

324

0+000

325

0+000

326

0+000

22.76

327

165+385

165.39

99.16

141+170

0.250

24.47

328

165+604

165.60

156.88

141+170

0.250

24.68

SUPERVICONSORCIO SUPERVISOR LA QUINUA


CONTRAT
CONSORCIO VIAL QUINUA
OBRA:

REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO

TRAMO 2(Km. 78+500 - Km. 172+420

TRANSPORTE
METRADOS DE TRANSPORTE DE ESCOMBROS A DME
ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02

No

PROGRESIVAS
REPLANTEO

CENTRO GRAV.

601.C EXCAVACION PARA


ESTRUCTURAS

km

km

BOTADERO
Prog.

Acc.

DISTANCIA DE
TRANSPORTE

km

km

km

329

165+684

165.68

267.32

141+170

0.250

24.76

330

165+952

165.95

262.72

141+170

0.250

25.03

331

166+052

166.05

197.71

141+170

0.250

25.13

332

166+175

166.18

135.04

141+170

0.250

25.26

333

0+000

334

166+672

166.67

360.33

141+170

0.250

25.75

335

166+818

166.82

188.61

141+170

0.250

25.90

336

337

0+000
0+000

338

167+167

167.17

126.36

168+200

0.065

1.10

339

167+491

167.49

107.16

168+200

0.065

0.77

340

167+775

167.78

76.96

168+200

0.065

0.49

341

168+015

168.02

73.66

168+200

0.065

0.25

342

168+488

168.49

111.34

168+200

0.065

0.35

343

168+795

168.80

269.81

168+200

0.065

0.66

344

168+981

168.98

256.56

168+200

0.065

0.85

345

169+151

169.15

150.11

168+200

0.065

1.02

346

169+410

169.41

65.91

168+200

0.065

1.28

347

169+620

169.62

144.63

168+200

0.065

1.49

348

170+010

170.01

109.12

168+200

0.065

1.88

349

170+800

170.80

80.12

168+200

0.065

2.67

350

170+985

170.99

50.12

168+200

0.065

2.85

351

171+234

171.23

62.61

168+200

0.065

3.10

352

171+422

171.42

68.05

168+200

0.065

3.29

353

171+749

171.75

87.05

168+200

0.065

3.61

354

171+803

171.80

146.75

168+200

0.065

3.67

355

0+000

356

0+000

357

0+000

358

0+000

359

172+125

172.12

164.81

168+200

0.065

3.99

360

172+193

172.19

175.06

168+200

0.065

4.06

361

172+589

172.59

143.92

168+200

0.065

4.45

362
363

172+942

172.94

101.42
26,692.17

0+000
168+200

0.065

4.81

DE TRANSPORTE DE ESCOMBROS A DME


ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02
Distancia Libre 120 ml
TRANSPORTE DE ESCOMBROS A DME
< 1km

> 1km

mkm

mkm

286.14

3,004.52

83.01

841.47

187.04

1,864.05

116.53

809.07

139.59

924.75

249.36

1,320.46

125.76

325.84

83.25

172.17

89.06

139.66

68.12

81.28

196.25

216.32

94.73

65.66

91.26

21.78

134.83

30.27

17.67

20.18

44.71

160.13

68.07

18.56

67.85

40.86

65.38

66.86

67.13

92.30

65.65

99.22

71.80

131.35

95.19

209.86

173.96

446.76

54.63

157.69

78.47

265.74

177.61

716.49

DE TRANSPORTE DE ESCOMBROS A DME


ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02
Distancia Libre 120 ml
TRANSPORTE DE ESCOMBROS A DME
< 1km

> 1km

mkm

mkm

85.57

395.77

107.78

541.33

109.50

558.70

47.08

248.26

90.04

492.17

88.05

517.29

99.18

816.01

123.51

1,070.89

60.91

541.24

82.31

796.00

59.96

603.67

108.73

1,130.55

65.22

712.28

104.58

1,193.20

92.80

1,080.86

77.01

935.52

73.97

902.76

138.06

1,695.91

69.12

869.50

90.64

1,199.94

122.86

1,683.72

58.35

810.97

210.20

2,969.13

200.82

2,891.41

76.95

1,130.57

DE TRANSPORTE DE ESCOMBROS A DME


ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02
Distancia Libre 120 ml
TRANSPORTE DE ESCOMBROS A DME
< 1km

> 1km

mkm

mkm

146.81

2,250.48

103.65

1,629.01

102.54

1,690.81

83.18

1,398.02

72.72

1,268.39

71.41

1,265.11

83.12

1,487.57

69.06

1,246.95

48.96

901.79

75.97

1,414.05

88.69

1,689.11

75.79
-

1,713.13

DE TRANSPORTE DE ESCOMBROS A DME


ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02
Distancia Libre 120 ml
TRANSPORTE DE ESCOMBROS A DME
< 1km

> 1km

mkm

mkm

102.78

2,553.09

81.70

1,990.49

66.13

1,590.07

63.37

1,501.33

183.24

4,299.95

88.51

2,037.83

73.07

1,672.22

115.17

2,583.53

51.87

1,155.18

105.53

2,328.89

114.90

2,439.01

46.18

919.41

103.83

2,095.54

48.47

947.39

59.61

1,148.79

56.01

1,062.96

47.95

893.67

84.85

1,528.35

119.41

2,115.50

59.32

1,031.34

87.22

1,506.47

93.23

1,591.28

94.67

1,550.23

95.46

1,493.66

45.08

697.67

47.70

713.36

46.25

687.41

DE TRANSPORTE DE ESCOMBROS A DME


ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02
Distancia Libre 120 ml
TRANSPORTE DE ESCOMBROS A DME
< 1km

> 1km

mkm

mkm

82.53

1,141.38

64.68

879.82

74.94

1,007.47

130.55

1,645.22

169.75

2,040.84

122.27

1,347.79

90.09

963.32

71.36

743.61

49.54

481.90

91.79

853.26

66.91

606.78

112.38

984.56

84.87

719.47

71.15

570.80

66.14

514.12

82.48

617.66

58.95

426.06

55.18

384.98

72.90

488.76

55.03

360.17

73.12

465.29

99.28

602.47

60.56

313.12

81.18

392.04

68.17

304.43

DE TRANSPORTE DE ESCOMBROS A DME


ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02
Distancia Libre 120 ml
TRANSPORTE DE ESCOMBROS A DME
< 1km

> 1km

mkm

mkm

249.40

4,336.08

95.55

1,608.14

69.25

1,138.76

137.37

2,199.45

83.72

1,316.64

162.18

2,069.60

87.93

5,610.56

113.26

7,278.32

112.89

7,308.23

58.50

3,841.27

107.47

7,069.64

DE TRANSPORTE DE ESCOMBROS A DME


ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02
Distancia Libre 120 ml
TRANSPORTE DE ESCOMBROS A DME
< 1km

> 1km

mkm

mkm

127.83

8,508.23

103.13

6,917.84

86.54

809.37

65.11

4,426.58

45.70

3,120.81

155.29

10,651.25

377.31

25,983.10

162.45

11,229.34

359.55

24,984.91

242.09

16,871.94

371.37

25,961.99

60.93

4,281.55

282.15

3,437.13

648.48

7,958.56

47.53

3,359.42

166.81

11,890.60

126.30

9,050.88

297.73

21,419.86

126.90

1,845.89

89.18

1,313.44

126.63

1,926.82

110.82

1,703.81

99.36

1,542.27

230.15

3,669.34

83.72

1,361.35

102.05

1,689.57

180.92

3,038.62

149.34

2,572.77

175.30

3,067.83

78.93

1,409.99

62.75

1,140.20

140.06

2,589.55

69.89

1,305.66

170.00

3,222.28

DE TRANSPORTE DE ESCOMBROS A DME


ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02
Distancia Libre 120 ml
TRANSPORTE DE ESCOMBROS A DME
< 1km

> 1km

mkm

mkm

98.14

1,999.52

204.65

4,227.98

59.86

1,250.21

84.99

1,791.50

107.84

2,291.50

85.44

1,829.10

183.22

3,941.38

151.16

3,337.61

160.48

3,568.75

103.36

2,315.10

122.61

2,757.30

91.94

2,083.29

15.78

360.69

68.84

1,583.23

69.41

1,626.30

68.32

1,689.40

87.26

2,327.31

138.06

3,715.01

DE TRANSPORTE DE ESCOMBROS A DME


ALCANTARILLAS TMC
ADICIONAL DE OBRA N 03
VALORIZACION N 02
Distancia Libre 120 ml
TRANSPORTE DE ESCOMBROS A DME
< 1km

> 1km

mkm

mkm

235.24

6,351.43

231.20

6,313.26

173.98

4,770.69

118.84

3,276.17

317.09

8,918.22

165.98

4,696.34

111.20

12.64

69.66

28.47

9.58

25.61

145.70

187.29

132.10

3.00

58.00

18.46

127.27

70.87

96.03

96.03

70.51

133.81

44.10

92.71

55.10

131.49

59.88

155.83

76.61

227.21

129.14

391.82

145.03

492.78

154.05

535.67

126.65

496.54

89.25
22,990.73

386.42
477,069.99

AREAS DE INGRESO Y SALIDA DE EMBOQUILLADOS


PROG
79+175.00
79+318.00
79+490.00
79+998.00
80+315.00
80+460.00
80+790.00
83+120.00
83+420.00
83+870.00
84+240.00
84+650.00
85+005.00
85+360.00
85+800.00
86+180.00
86+545.00
87+005.00
87+420.00
87+850.00
88+180.00
88+260.00
88+620.00
89+020.00
89+405.00
89+780.00
89+870.00
90+095.00
90+340.00
90+605.00
90+860.00
91+155.00
91+530.00
91+840.00
91+955.00
92+235.00
92+600.00
92+882.00
93+162.00
93+610.00
93+810.00
94+180.00
94+580.00
94+700.00
94+820.00
95+050.00
95+110.00
95+270.00
95+440.00
95+800.00
96+140.00
97+020.00
97+160.00
97+380.00
98+010.00
98+120.00
98+450.00

ENTRADA

SALIDA
0.85
4.87
3.79
4.16
3.14
1.03
6.44
1.63
1.63
0.85
1.63
4.87
3.29
0.85
0.85
0.85
3.56
0.85
0.85
0.85
0.85
3.79
0.85
0.85
1.8
0.85
0.85
0.46
0.85
1.79
0
0.85
0
0.85
0.85
0.85
0.85
1.63
0.46
0.38
0.4
0.85
9.7
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0
0.85
0.85
0.85
0.85
0.85

1
4.82
4.89
1.14
4.75
0.74
2.78
1
1
1.05
1.01
3.95
0.66
2.44
1.71
1.48
2.86
1.14
1.14
1.49
0.71
0.74
0.65
1.62
0.74
0.74
0.74
2.03
1.01
0.1
0.1
2.05
0.1
1.96
3.12
0.74
1.27
1.14
0.65
1.46
2.57
2.53
1.5
0.85
0.1
0.74
4.15
0.1
2.27
0.7
0.85
0.8
1.05
1.29
1.14
0.74
3.41

0.85
0.85
0.85
0
0.85
0.85
0.85
0.85
0.85
0.85
0.85
1.63
1.63
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0.85
0
0.85
0.85
5.77
0.85
0.85
0.85
0.85
0.85
0.85
0
0
0
0
0
0
0
0
0
0
0
0
0
0.85
0
0
0.85
0.85
0
0
0.85
0
0.91
0
0
0.85
0

1.07
3.07
1.36
0.1
0.74
1.02
0.64
1.65
1.06
0.87
1.2
0.74
0.74
1.01
1.14
1.56
1.35
1.25
1.37
1.03
1
0.77
0.44
0.1
1
1.07
1.45
1.13
0.74
1.06
0.74
0.74
1
0.1
0.2
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
1.61
0.46
0.1
1.51
1.37
0.1
0.1
1.07
0.1
1.65
0.1
0.1
1.6
0.1

TRAMO I

98+620.00
98+925.00
99+140.00
99+491.00
99+730.00
100+230.00
101+311.00
101+370.00
102+300.00
102+670.00
102+860.00
103+060.00
103+310.00
103+560.00
104+120.00
104+460.00
104+880.00
105+140.00
105+420.00
105+980.00
106+220.00
106+380.00
106+512.00
106+840.00
107+010.00
107+390.00
107+550.00
110+220.00
110+520.00
110+820.00
111+100.00
111+340.00
111+640.00
111+856.00
113+240.00
113+540.00
113+740.00
114+020.00
114+280.00
114+540.00
114+858.00
115+158.00
115+535.00
115+800.00
116+090.00
116+390.00
116+640.00
119+000.00
119+260.00
119+571.00
119+760.00
120+156.00
120+280.00
120+680.00
120+825.00
121+000.00
121+450.00
121+580.00
121+740.00
121+900.00

0
0
0
0.85
0
0
0
0
0.85
0
0.85
0
0
0
0.46
0
0.85
0.46
0.85
8.66
0.85
4.32
1.13
1.44
12.44
13.24
0
6.16
2.29
0.85
7.2
0.85
17.24
0.85
5.71
0
15.76
0
8.57
0.85
6.79
12.47
7.32
7.08
0
0
0
0
0.85
9.65
1.84

0.1
0.1
0.1
1.21
0.1
0.1
0.1
0.1
0.54
0.1
0.96
0.1
0.1
0.1
1.71
0.1
1.32
0.89
5.32
1.34
3.69
0.74
1.47
0.74
9.51
1
12.37
0.74
1.74
9.44
1.21
14.3
1.59
7.33
1.74
14.35
0.1
3.35
0.1
6.52
8.29
0.74
4.08
1.69
1.01
0.1
6.62
0.1
12.08
4.19
1.23

128+250.00

0.85
0.85
0.85
1.63
1.63
1.63
3.29
2.93
6.01

0.74
0.74
0.74
0.74
0.9
2.86
1.14
5.02
2.71

128+447.00
128+587.00
128+749.00
129+001.00
129+244.00
129+335.00
129+660.00
129+840.00

CONECTADAS

122+087.00
122+380.00
122+660.00
122+900.00
123+220.00
123+460.00
123+720.00
124+025.00
125+400.00
124+580.00
124+830.00
125+920.00
126+010.00
126+460.00
126+648.00
126+800.00
127+260.00
127+340.00
96+500.00
96+880.00
97+870.00
98+260.00
98+010.00
98+120.00
97+600.00
98+530.00
100+880.00
101+420.00
101+740.00
107+840.00
108+480.00
108+700.00
109+980.00
109+000.00
109+730.00
112+080.00
113+240.00
112+320.00
112+900.00
116+940.00
117+540.00
118+560.00
117+780.00
118+320.00
126+157.00
125+123.00
125+225.00
126+095.00
100+680.00
101+700.00
102+100.00

130+410.00
130+717.00
131+010.00
131+247.00
131+467.00
131+615.00
131+862.00
132+038.00
132+242.00
132+443.00
132+711.00
132+959.00
133+144.00
133+360.00
133+584.00
133+833.00
134+059.00
134+282.00
134+517.00
134+665.00
134+815.00
135+080.00
135+512.00
135+551.00
135+734.00
135+871.00
136+171.00
136+485.00
136+730.00
136+913.00
137+230.00
137+440.00
137+638.00
138+029.00
138+357.00
138+710.00
139+077.00
139+290.00
139+506.00
139+722.00
140+345.00
140+674.00
140+810.00
141+094.00
141+232.00
141+396.00
141+536.00
141+763.00
141+968.00
142+194.00
142+400.00
142+623.00
142+880.00
143+231.00
143+616.00
143+862.00
144+256.00
144+514.00
144+797.00
145+075.00

6.01
0.85
4.43
2.93
0.85
2.93
0.85
3.53
1.39
2.93
4.43
2.93
0.85
0.85
0.85
2.93
0.85
0.85
2.93
0.85
0.85
0.85
2.93
0.85
0.85
0.85
2.93
0.85
6.01
1.63
0.85
0.85
0.85
2.93
0.85
0.85
0.85
6.01
0.85
2.93
0.85
0.85
0.85
0.85
0.85
0.85
2.93
0.85
1.63
1.63
0.85
2.93
0.85
0.85
1.63
2.93
1.63
0.85
4.17
4.17

0.34
0.12
1.32
1.89
0.27
3.37
1.43
3.89
1.32
1.61
0.1
0.1
1.69
1.51
1.69
2.05
0.81
0.39
0.1
1.36
2.95
0.1
0.92
0.74
1.14
1.48
2.44
0.1
0.1
0.1
0.52
0.13
0.17
0.25
0.3
0.1
0.1
1.83
0.22
4.48
0.09
0.42
0.68
2.74
1.54
1.29
1.39
0.1
0.16
0.1
0
0.98
1.86
1.73
0.31
0.75
0.1
0
1.84
0.85

0.85
0.85
0.85
2.93
3.77
0.79
3.77
3.77
3.77
0.85
0.85
0.85
0.85
0.85
0.85
0.85
3.77
3.77
3.77
2.27
0.85
0.85
0.85
0.85
0.85
1.63
1.63
6.02
1.63
1.63
1.63
6.37
1.63
1.63
3.29
0.85
1.63
0.71
1.63
0.85
1.63
1.63
1.63
1.63
2.78
2.78
3.29
1.63
0.85
1.63
0.85
1.63
0.85
3.29
0.85
0.85
1.63
1.63
1.63
0.85

0.91
0.1
1.76
1.49
3.37
1.51
0.1
3.89
1.7
0.09
0.25
0.32
0.74
1.11
1.14
0.23
2.36
3.2
1.77
1.82
1.84
0.1
0.79
1.59
0.1
1.23
0.1
1.42
0.1
0.1
0.1
1.84
1.27
0
1.64
0
0.1
3.1
0
0.1
1.81
0.17
2.36
0.1
1.46
1.14
2.24
1.78
0.1
1.32
0.1
0.1
0.1
1.33
0.74
4.11
3.5
0.4
0.2
0

TRAMO II

145+198.00
145+265.00
145+359.00
145+539.00
145+887.00
146+470.00
146+774.00
147+174.00
147+602.00
148+015.00
148+300.00
148+409.00
148+520.00
148+680.00
148+762.00
149+230.00
149+460.00
149+615.00
149+664.00
149+852.00
149+930.00
150+150.00
150+456.00
150+725.00
150+983.00
151+222.00
151+453.00
151+782.00
151+952.00
152+143.00
152+462.00
152+640.00
152+720.00
152+831.00
153+360.00
153+691.00
153+935.00
154+270.00
154+722.00
154+883.00
155+314.00
155+447.00
155+584.00
155+954.00
156+236.00
156+488.00
156+702.00
157+080.00
157+370.00
157+640.00
157+916.00
158+192.00
158+363.00
158+598.00
158+889.00
159+009.00
159+082.00
159+360.00
159+537.00
159+708.00

159+854.00
160+105.00
160+330.00
160+470.00
160+619.00
160+760.00
160+854.00
160+974.00
161+128.00
161+249.00
161+323.00
161+493.00
161+635.00
161+715.00
161+856.00
162+160.00
162+029.00
162+543.00
162+745.00
162+880.00
162+969.00
163+133.00
163+503.00
163+493.00
163+678.00
163+920.00
163+965.00
164+194.00
164+331.00
164+350.00
164+463.00
164+600.00
164+830.00
164+977.00
165+183.00
165+385.00
165+606.00
165+684.00
165+940.00
166+055.00
166+175.00
166+307.00
166+675.00
166+820.00
166+915.00
167+030.00
167+167.00
167+491.00
167+795.00
168+000.00
168+500.00
168+795.00
168+983.00
169+153.00
169+410.00
169+620.00
169+920.00
170+800.00
170+986.00
171+240.00

1.63
1.17
0.85
0.85
0.85
1.63
3.29
1.63
1.63
1.63
1.63
1.63
1.63
1.63
0.85
0.85
0.85
0.85
1.63
0.85
0.85
0.85
1.63
1.63
0.85
2.78
0.85
1.63
2.78
2.78
0.85
0.85
1.63
0.85
3.29
1.63
1.63
3.29
3.29
1.63
1.63
1.63
1.63
1.63
1.63
1.63
1.63
1.63
0.94
1.4
0.85
3.29
1.79
1.63
0.55
0.85
0.85
0.85
1.73
0.85

1.24
1.14
1.14
0.39
0.74
0.1
0.74
1.14
0.85
0.74
0.74
0.74
1.02
0.1
0.74
2.18
0.81
2.14
0.95
0.74
0.74
0.74
0.74
1.19
1.12
0.74
0.92
0.74
0.74
0.74
0.8
0.74
0.74
0.69
1.79
1.39
0.74
0.74
0.74
1.54
0.81
0.74
1.13
1.14
2.19
0.76
2.72
0.74
0.74
0.74
0.74
0.74
0.74
2.63
0.74
0.74
0.74
0.74
0.5
0.93

171+422.00
171+751.00
171+803.00
171+881.00
171+948.00
171+987.00
172+039.00
172+124.00
172+193.00
172+589.00
172+680.00
173+140.00

0.85
0.98
1.53
0.85
1.69
0.85
1.63
1.63
1.63
1.63
0.85
0.85

1.13
1.14
2.91
1.14
1.88
1.14
0.74
0.74
0.1
0.1
1.14
1.14

SUPERVISOR:

CONSORCIO SUPERVISOR LA QUINUA

CONTRATISTA:

CONSORCIO VIAL QUINUA

OBRA:

REHABILITACION Y MEJORAMIENTO DE LA CARRETERA QUINUA - SAN FRANCISCO

TRAMO 2:

(Km. 78+500 - Km. 172+420

OBRAS DE ARTE

METRADOS DE ALCA
CONCRETO CABEZALES

ENCOFRADO CABEZALES

CABEZAL TIPO ALERO 36"

CABEZAL TIPO ALERO 36"

Descripcion

Area

Area Posterior 1

0.25

0.20

0.60

0.14

Area Posterior 2

0.45

0.32

1.20

0.46
0.30

1.50

Volumen

Descripcion

Area Posterior 1

1.35

0.75

1.50

Area Posterior 2

1.35

0.75

1.60

0.25

0.2

0.60

0.90

ALMA

ALMA
0.45

0.30

0.30

Cimientos Ala

Cimientos Alma

0.45

1.20

0.45

1.30

1.50

0.30

0.09

1.78

1.50

0.54

1.52

0.82

Alcantarilla

0.40

0.18

1.50

0.06

Parapeto

1.00

0.30
0.40

3.42

1.30

1.06

2.50

Cimientos

10.70

2.46

1.13

0.66

1.18

Viga de Borde

8.87

0.85

0.40

Alcantarilla

1.32

0.40

0.53

0.34

2.00

0.68

0.39

0.24

0.64

Total

2.74

CABEZAL TIPO ALERO 48"

CABEZAL TIPO ALERO 48"

Descripcion

Area

Area Posterior 1

0.25

0.20

0.70

0.16

Area Posterior 2

0.45

0.32

1.50

0.58
0.37

ALMA

0.40
Total

1.70

Volumen

1.25
ALMA

Descripcion

Area Posterior 1

1.65

0.85

1.70

Area Posterior 2

1.65

0.85

1.80

0.25

0.20

0.70

0.48

0.30

0.30

Cimientos Ala

Cimientos Alma
Alcantarilla

0.45

1.50

0.59

1.60

1.80

0.30

0.09

2.31

1.80

0.68

1.83

1.24

Alcantarilla

1.50

0.06

0.40

0.18

Parapeto

1.00

0.30

4.00

1.60

1.20

3.36

Cimientos

11.75

0.40

3.03

1.43

0.80

1.78

Viga de Borde

10.72

0.88

0.40

1.58

0.40

0.63

0.35

2.30

0.81

0.39

0.44

1.13

Total

3.55

0.40
Total

CABEZAL TIPO ALERO 60"

CABEZAL TIPO ALERO 60"

Descripcion

Area

Area Posterior 1

0.25

0.20

0.95

0.21

Area Posterior 2

0.60

0.35

1.90

0.90
0.56

2.20

Volumen

Descripcion

Area Posterior 1

2.05

1.10

1.95

Area Posterior 2

2.05

1.10

2.10

0.25

0.20

0.95

2.46

ALMA

ALMA
0.45

0.30

0.30

Cimientos Ala

Cimientos Alma

0.45

1.90

0.71

1.90

2.35

0.30

0.09

2.46

2.35

0.80

2.14

1.72

Alcantarilla

1.50

0.06

0.40

0.18

Parapeto

1.00

0.30

4.65

1.89

1.18

3.86

Cimientos

14.14

0.40

3.68

1.72

0.98

2.65

Viga de Borde

12.83

0.95

0.40

Alcantarilla

1.21

0.40

0.49

0.38

2.66

1.0108

0.39

0.68

1.77

Total

5.05

CABEZAL TIPO ALERO 72"


Descripcion

0.40
Total

CABEZAL TIPO ALERO 72"


Area

Volumen

ALA

Descripcion

ALA
Area Posterior 1

0.25

0.20

1.10

0.25

Area Posterior 1

2.35

1.25

2.35

Area Posterior 2

0.45

0.32

2.20

0.85

Area Posterior 2

2.35

1.25

2.47

0.25

0.20

1.10

0.55

2.35

2.57

ALMA

ALMA
0.45

0.30

0.30

Cimientos Ala

Cimientos Alma

0.45

2.20

0.83

2.20

2.50

0.30

0.09

2.77

2.50

0.92

2.45

2.24

Alcantarilla

1.50

0.06

0.40

0.18

Parapeto

1.00

0.30

5.50

2.20

1.68

6.47

Cimientos

16.19

0.40

4.08

2.03

1.25

3.82

Viga de Borde

15.61

1.00

0.40

2.65

0.40

1.06

0.4

2.97

1.19

0.40
Total

Alcantarilla

2.54

0.39
Total

0.98
6.15

METRADOS DE ALCANTARILLAS TMC


CONCRETO CAJAS

ENCOFRADO CAJAS

CAJA RECEPTORA 36"


Area

Descripcion

CAJA RECEPTORA 36"

Area

Volumen

Descripcion
Muro Ant.

3.15

Muro Ant.

0.50

0.30

1.80

0.72

2.00

1.44

2.00

3.36

Muro Post.

0.50

0.30

2.60

1.04

2.00

2.08

0.27

Base

1.25

0.30

1.40

0.53

Muro Post.

Lados

0.30

2.10

1.25

1.58

Parapetos

0.50

0.30

1.95

Cimiento

0.50

0.30

2.00

0.60

Parapetos

0.50

0.30

2.67

Cantarilla

0.50

0.32

Lados

1.25

1.27

Entradas

0.30

0.21

Cimiento

3.40

5.69

Cantarilla

1.40
2.00
1.40

0.64
0.78

0.38

0.40

0.23

Total
0.60

Entradas

0.78

0.38

4.28
3.55
18.56

CAJA RECEPTORA 48"


Area

Descripcion

CAJA RECEPTORA 48"

Area

Volumen

4.25

Muro Ant.

0.50

0.30

2.10

0.84

2.30

1.93

4.50

Muro Post.

0.50

0.30

2.90

1.16

2.30

2.67

0.32

Base

1.25

0.30

1.70

0.64

Lados

0.30

2.40

1.25

1.80

Descripcion
Muro Ant.

B
2.30
1.70

Muro Post.

2.30
1.70

2.88

Cimiento

4.158

Cantarilla

2.26

Entradas

0.50
0.78

0.30
0.38

0.40

2.30

0.69

Parapetos

0.50

0.30

1.13

0.50

0.57

Parapetos

0.50

0.30

0.23

0.30

0.21

Lados

1.25

6.95

Cimiento

4.00

Total
0.60

Cantarilla

4.7

Entradas

4.29
23.43

0.78

0.38

CAJA RECEPTORA 60"


Area

Descripcion

CAJA RECEPTORA 60"

Area

Volumen

Descripcion

Muro Ant.

0.50

0.30

2.40

0.96

2.60

2.50

6.62

Muro Post.

0.50

0.30

3.20

1.28

2.60

3.33

0.43

Base

1.25

0.30

2.00

0.75

Lados

0.30

2.70

1.25

2.03

4.47

Cimiento

0.50

0.30

2.60

0.78

Parapetos

0.50

0.30

5.78

Cantarilla

1.77

0.50

0.88

Parapetos

0.50

0.30

3.53

Entradas

0.23

0.30

0.21

Lados

1.25

8.29

Cimiento

4.60

0.78

0.38

0.40

Total

Muro Ant.

6.14

2.60
2.00

Muro Post.

2.60
2.00

0.60

Cantarilla

5.66

Entradas

0.78

0.38

5.13
31.28

CAJA RECEPTORA 72"


Area

Descripcion

CAJA RECEPTORA 72"

Area

Volumen

Muro Ant.

0.50

0.30

2.70

1.08

2.90

3.13

8.46

Muro Post.

0.50

0.30

3.50

1.40

2.90

4.06

8.89

Base

1.25

0.30

2.30

0.86

0.50

Lados

0.30

3.00

1.25

2.25

Cimiento

0.50

0.30

2.90

0.87

Parapetos

0.50

0.30

2.54

0.50

1.27

Parapetos

0.50

0.30

0.23

0.30

0.21

Lados

1.25

9.69

Cimiento

5.20

5.50

Cantarilla

6.93

Entradas

5.09

0.78

0.38

0.40

Total

Descripcion
Muro Ant.

2.90
2.30

Muro Post.

2.90
2.30

Cantarilla
0.60
6.48
6.24
38.50

Entradas

0.78

0.38

DO CAJAS

PTORA 36"
H

Area

1.80

3.60

1.80

2.52

2.60

5.20

2.60

3.64

1.80

1.44

2.60

2.08

1.80

2.25

0.30

2.04
1.27

0.40
Total

0.70
20.80

PTORA 48"
H

Area

2.10

4.83

2.10

3.57

2.90

6.67

2.90

4.93

2.10

1.68

2.90

2.32

2.10

2.63

0.30

2.40
2.26

0.40
Total

0.70
26.07

PTORA 60"
H

Area

2.40

6.24

2.40

4.80

3.20

8.32

3.20

6.40

2.40

1.92

3.20

2.56

2.40

3.00

0.30

2.76
3.53

0.40
Total

0.70
31.77

PTORA 72"
H

Area

2.70

7.83

2.70

6.21

3.50

10.15

3.50

8.05

2.70

2.16

3.50

2.80

2.70

3.38

0.30

3.12
5.09

0.40
Total

0.70
37.91

DISIPADOR DE ENERGA 72"

A
m.
0.55

B
m.
3.00

C
m.
0.50

Datos:
D
H
m.
m.
0.30
0.80

h
m.
0.60

DISIPADOR DE ENERGA 60"

L
m.
1.00

und.
m3.
0.90
0.64
0.48
0.43
2.45

Concreto:
Losa
Ua
Aleros
Parapeto

B*L*e
(A+D)*C/2*B
2*L*H*e
(B-2e)*h*e

und.
m2.
1.50
2.72
2.88
7.10

Encofrado:
Losa
Aleros
Parapeto

(B+2L)*e
2*L*H+2(L-e)*H
2*(B-2e)*h

RESUMEN

"

m.

Concreto
m3/m.

Encofrado
m3/m.

e
m.
0.30

B
m.

A
m.
0.55

B
m.
2.70

C
m.
0.50

Datos:
D
H
m.
m.
0.30 0.70

Concreto:
Losa
Ua
Aleros
Parapeto

B*L*e
(A+D)*C/2*B
2*L*H*e
(B-2e)*h*e

Encofrado:
Losa
Aleros
Parapeto

(B+2L)*e
2*L*H+2(L-e)*H
2*(B-2e)*h

h
m.
0.50

L
m.
1.00

72
60
48
36

1.8
1.5
1.2
0.9

2.45
2.12
1.81
1.51

7.10
5.89
4.80
3.83

3.00
2.70
2.40
2.10

60"

DISIPADOR DE ENERGA 48"

e
m.
0.30
und.
m3.
0.81
0.57
0.42
0.32
2.12
und.
m2.
1.41
2.38
2.10
5.89

A
m.
0.55

B
m.
2.40

C
m.
0.50

Datos:
D
H
m.
m.
0.30 0.60

Concreto:
Losa
Ua
Aleros
Parapeto

B*L*e
(A+D)*C/2*B
2*L*H*e
(B-2e)*h*e

Encofrado:
Losa
Aleros
Parapeto

(B+2L)*e
2*L*H+2(L-e)*H
2*(B-2e)*h

h
m.
0.40

L
m.
1.00

DISIPADOR DE ENERGA 36"

e
m.
0.30
und.
m3.
0.72
0.51
0.36
0.22
1.81
und.
m2.
1.32
2.04
1.44
4.80

A
m.
0.55

B
m.
2.10

C
m.
0.50

Datos:
D
H
m.
m.
0.30
0.50

Concreto:
Losa
Ua
Aleros
Parapeto

B*L*e
(A+D)*C/2*B
2*L*H*e
(B-2e)*h*e

Encofrado:
Losa
Aleros
Parapeto

(B+2L)*e
2*L*H+2(L-e)*H
2*(B-2e)*h

h
m.
0.30

A 36"

L
m.
1.00

e
m.
0.30
und.
m3.
0.63
0.45
0.30
0.14
1.51
und.
m2.
1.23
1.70
0.90
3.83

Anda mungkin juga menyukai