LARSEN & TOUBRO LIMITED:: ECC DIVISION

BUILDINGS AND FACTORIES OPERATING COMPANY


Ref: IM 08 D Rev 00
Date: 01.11.08

SAFE WORK METHOD FOR SHUTTERING ACTIVITY


Document No
Name of the Job Site
Risk Level

: SHUTTERING / F/05
: ICICI BANK PROJECT, Hyderabad
: Low

Safe Work Method:

SHUTTERING
Shuttering shall be done as per the drawing given and under supervision.
Before it is cleared for concrete pouring the carpentry foreman shall
inspect for the reliability of the shutters.
While pouring the concrete, persons shall be assigned to keep a watch on
the shutters & its supports esp. during major pours; for reliability.
Employees should be briefed the proper handling of the shuttering
materials.
Shuttering oil should be applied gently over the shuttering plates.
Overdose may make the floor form more slippery. Instruction should be
given for NO SMOKING and care for no fire/ hot work occurs nearby.
Vessel containing shuttering oil should be covered and kept in a safe place
to avoid any ignition source come and contact with the shuttering oil.
Dismantling of shutters is done as per the instruction and supervision of
the foreman.
Tools & nails are to be kept in a toolbox.
No materials shall be left scattered on the ground. The foreman shall
ensure good housekeeping.
Residual risk( if any):Low
Action By
:
___________________
PM/CM / Section Head

HSEO