PROYECTO:
LOCALIDAD
DISTRITO
PROVINCIA
REGION
FECHA
PARIAHUANCA
PARIAHUANCA
CARHUAZ
ANCASH
JUNIO 2014
Item
01
01.01
01.02
02
02.01
02.01.01
02.01.02
02.01.03
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.03
02.03.01
02.03.02
02.03.03
02.04
02.04.01
02.05
02.05.01
03
03.01
03.01.01
03.02
03.02.01
03.02.02
03.02.03
03.02.04
03.03
03.03.01
03.03.02
03.04
03.04.01
03.04.02
04
04.01
04.02
04.03
04.04
04.05
04.06
04.07
04.07.01
04.07.02
04.07.03
04.07.04
04.07.05
04.07.06
04.07.07
04.07.08
04.07.09
04.08
04.08.01
04.08.02
04.08.03
04.08.04
04.08.05
04.08.06
04.08.07
04.08.08
05
05.01
05.02
05.03
Descripcin
OBRAS PROVISIONALES
CARTEL DE IDENTIFICACION DE LA OBRA DE 5.40M X 3.60M.
ALAMCEN Y OFICINA
PAVIMENTO
OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y HERRAMIENTAS
TRAZO, NIVELACION Y REPLANTEO
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
MOVIMIENTO DE TIERRAS
CORTE HASTA EL NIVEL DE SUBRASANTE CON MAQUINARIA
COMPACTADO SUBRASANTE EN ZONA DE CORTE
SUB - BASE AFIRMADO DE 0.15 M. FACTOR DE COMPACTACION 1.2
BASE GRANULAR E=0.20 M REND.=2310 M2/DIA FACT. COMPACT.=1.20
ELIMINACION DE DESMONTE,PROV.DEL MOV.EN TERRENO D=4KM
OBRAS DE CONCRETO
ENCOFRADO DE PAVIMENTO RIGIDO
CONCRETO F'C=210 KG/CM2. EN PAVIMENTO RIGIDO
CURADO EN PAVIMENTO RIGIDO
JUNTAS DE DILATACION
JUNTAS DE CONTRACCION, e=2.0 cm
SEALIZACION
SEALIZACION CON CINTAS DE SEGURIDAD
VEREDAS DE CONCRETO
OBRAS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO
MOVIMIENTO DE TIERRAS
CORTE SUPERFICIAL MANUAL HASTA 0.20 MT
NIVELACION Y COMPACTACION DE SUBRASANTE CON EQUIPO LIVIANO
RELLENO CON MATERIAL GRANULAR COMPACTADO
ELIMINACION DE DESMONTE,PROV.DEL MOV.EN TERRENO D=4KM
OBRAS DE CONCRETO
ENCOFRADO Y DESENCOFRADO DE VEREDAS
CONCRETO F'C=140 KG/CM2
JUNTAS DE DILATACION
JUNTAS ASFALTICAS
PINTURA CON ESMALTE EN EXTERIOR
MURO DE CONTENCION
TRAZO, NIVELACION Y REPLANTEO
EXCAVACION PARA ESTRUCTURAS
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO DE REFUERZO fy=4,200 kg/cm2
JUNTAS ASFALTICAS
CONCRETO F'C=210 KG/CM2,
SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
TRAZO, NIVELACION Y REPLANTEO
EXCAVACION MANUAL DE ZANJAS 0.40 X 1.20
REFINE Y NIVELACION EN TERRENO NORMAL
CAMA DE APOYO DE ARENA e=0.15 M
DOBLE PRUEBA HIDRAULICA
RELLENO Y COMPACTADO CON MATERIAL SELECCIONADO
SUMINISTRO E INSTALACION DE TUBERIA P.V.C. C10 D= 2"
TUBERIA DE PVC A-10 SP D=1/2" INC.ELEM.UNION+2% DESPER
CONEXIONES DOMICILIARIAS DE AGUA
CANAL DE CONCRETO
EXCAVACION MANUAL DE ZANJAS
REFINE Y NIVELACION EN TERRENO NORMAL
ENCOFRADO Y DESENCOFRADO NORMAL
CONCRETO f'c=175 kg/cm2
CONCRETO F'C=210 KG/CM2,
JUNTAS DE CONTRACCION, e=2.0 cm
JUNTAS DE DILATACION, e=2.0 cm
ACERO DE REFUERZO fy=4,200 kg/cm2
CONTROL DE CALIDAD DEL CONCRETO
DISEO DE MEZCLAS
ENSAYOS DE DENSIDAD DE CAMPO
PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)
Und.
Metrado
Precio (S/.)
und
m2
1.00
25.00
2,128.15
102.87
GLB
KM
KM
1.00
0.10
1.00
3,000.00
3,096.34
178.47
m3
m2
m2
m2
m3
123.20
363.00
363.00
122.40
135.00
3.54
7.29
80.58
31.41
19.42
m2
m3
m3
61.20
56.70
56.70
52.07
441.67
20.33
396.25
8.18
m2
10.20
57.74
KM
0.20
3,096.34
m3
m2
m3
m3
15.27
50.90
15.27
17.56
5.28
7.29
25.89
19.42
m2
m3
30.54
15.27
23.71
289.33
m
m2
120.81
30.54
4.22
3.22
KM
m3
m2
kg
m
m3
0.06
471.41
512.40
15,526.69
132.17
204.96
3,096.34
9.02
23.71
4.35
4.22
453.04
KM
m3
m2
m3
m3
m3
m
m
pza
0.11
52.80
44.00
6.60
52.80
52.80
110.00
50.00
18.00
3,096.34
3.86
1.79
159.14
0.69
24.05
88.59
3.12
184.37
m3
m2
m2
m3
m3
m
m
kg
50.22
54.00
216.00
17.10
10.80
17.00
27.20
1,873.25
3.86
1.79
23.71
359.98
453.04
8.18
15.78
4.35
und
und
und
2.00
2.00
10.00
305.00
36.67
36.67
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
Parcial (S/.)
4,699.90
2,128.15
2,571.75
75,499.68
3,488.10
3,000.00
309.63
178.47
38,799.22
436.13
2,646.27
29,250.54
3,844.58
2,621.70
29,382.08
3,186.68
25,042.69
1,152.71
3,241.33
3,241.33
588.95
588.95
7,557.65
619.27
619.27
1,188.05
80.63
371.06
395.34
341.02
5,142.17
724.10
4,418.07
608.16
509.82
98.34
218,917.44
185.78
4,252.12
12,149.00
67,541.10
557.76
92,855.08
16,199.32
340.60
203.81
78.76
1,050.32
36.43
1,269.84
9,744.90
156.00
3,318.66
25,177.28
193.85
96.66
5,121.36
6,155.66
4,892.83
139.06
429.22
8,148.64
1,050.04
610.00
73.34
366.70
SEMANA1
S/.
S/.
2,128.15
2,571.75
S/.
S/.
S/.
3,000.00
309.63
178.47
S/.
436.13
SEMANA2
S/. 2,646.27
S/. 14,625.27
SEMANA3
SEMANA4
SEMANA6
S/.
3,241.33
S/.
619.27
S/.
S/.
S/.
S/.
80.63
371.06
395.34
341.02
4,049.67
S/. 4,049.67
S/. 33,770.55
340.60
203.81
78.76
S/.
S/.
S/.
S/. 23,213.77
724.10
4,418.07
S/. 4,049.67
S/. 33,770.55
S/. 23,213.77
S/.
S/.
557.76
S/. 23,213.77
588.95
185.78
4,252.12
S/.
S/.
S/.
S/.
SEMANA8
S/. 12,521.35
S/. 1,152.71
S/.
S/.
S/.
S/.
SEMANA7
S/. 14,625.27
S/. 3,844.58
S/. 2,621.70
S/. 3,186.68
S/. 12,521.35
S/.
SEMANA5
3,248.30
S/.
1,050.32
3,248.30
S/.
S/.
S/.
S/.
36.43
1,269.84
3,248.30
156.00
S/.
1,659.33
S/.
S/.
3,077.83
2,446.42
S/.
1,659.33
S/.
S/.
S/.
2,446.42
139.06
429.22
193.85
96.66
S/.
S/.
610.00
S/.
183.35
2,560.68
S/.
4,074.32
S/.
S/.
73.34
183.35
S/.
S/.
S/.
2,560.68
3,077.83
4,074.32
S/. 23,213.77
06
06.01
06.02
06.03
06.04
06.05
VARIOS
REPOSICION Y CAMBIO DE TUBERIAS AVERIADAS
m
MODIFICACION DE NIVELES DE TAPA DE BUZONES
und
FLETE TERRESTRE
GLB
REPOSICION DE MUROS DE ABOBE
GLB
DESBROSE Y DESQUINCHE POR ENSANCHE DE VIA (PROPIEDAD DE TERCER GLB
110.00
4.00
1.00
1.00
1.00
S/.
70.44 S/.
2,611.12 S/.
2,600.00 S/.
2,500.00 S/.
11,100.00 S/.
34,392.88
7,748.40
10,444.48
2,600.00
2,500.00
11,100.00
S/.
7,748.40
S/.
650.00
S/. 5,550.00
S/. 31,965.76
S/.
650.00
S/. 33,750.47
S/.
S/.
5,222.24
650.00
S/. 79,207.41
S/.
S/.
5,222.24
650.00
S/. 66,584.06
S/. 46,610.50
S/. 28,355.94
S/. 23,771.53
S/. 2,500.00
S/. 5,550.00
S/. 31,263.77
CRONOGRAMA GANTT
PROYECTO:
LOCALIDAD
DISTRITO
PROVINCIA
REGION
FECHA
Item
01
01.01
01.02
02
02.01
02.01.01
02.01.02
02.01.03
02.02
02.02.01
02.02.02
02.02.03
02.02.04
02.02.05
02.03
02.03.01
02.03.02
02.03.03
02.04
02.04.01
02.05
02.05.01
03
03.01
03.01.01
03.02
03.02.01
03.02.02
03.02.03
03.02.04
03.03
03.03.01
03.03.02
03.04
03.04.01
03.04.02
04
04.01
04.02
04.03
04.04
04.05
04.06
04.07
04.07.01
04.07.02
04.07.03
04.07.04
04.07.05
04.07.06
04.07.07
04.07.08
04.07.09
04.08
04.08.01
04.08.02
04.08.03
04.08.04
04.08.05
04.08.06
04.08.07
04.08.08
05
05.01
05.02
05.03
Descripcin
OBRAS PROVISIONALES
CARTEL DE IDENTIFICACION DE LA OBRA DE 5.40M X 3.60M.
ALAMCEN Y OFICINA
PAVIMENTO
OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y HERRAMIENTAS
TRAZO, NIVELACION Y REPLANTEO
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE OBRA
MOVIMIENTO DE TIERRAS
CORTE HASTA EL NIVEL DE SUBRASANTE CON MAQUINARIA
COMPACTADO SUBRASANTE EN ZONA DE CORTE
SUB - BASE AFIRMADO DE 0.15 M. FACTOR DE COMPACTACION 1.2
BASE GRANULAR E=0.20 M REND.=2310 M2/DIA FACT. COMPACT.=1.20
ELIMINACION DE DESMONTE,PROV.DEL MOV.EN TERRENO D=4KM
OBRAS DE CONCRETO
ENCOFRADO DE PAVIMENTO RIGIDO
CONCRETO F'C=210 KG/CM2. EN PAVIMENTO RIGIDO
CURADO EN PAVIMENTO RIGIDO
JUNTAS DE DILATACION
JUNTAS DE CONTRACCION, e=2.0 cm
SEALIZACION
SEALIZACION CON CINTAS DE SEGURIDAD
VEREDAS DE CONCRETO
OBRAS PRELIMINARES
TRAZO, NIVELACION Y REPLANTEO
MOVIMIENTO DE TIERRAS
CORTE SUPERFICIAL MANUAL HASTA 0.20 MT
NIVELACION Y COMPACTACION DE SUBRASANTE CON EQUIPO LIVIANO
RELLENO CON MATERIAL GRANULAR COMPACTADO
ELIMINACION DE DESMONTE,PROV.DEL MOV.EN TERRENO D=4KM
OBRAS DE CONCRETO
ENCOFRADO Y DESENCOFRADO DE VEREDAS
CONCRETO F'C=140 KG/CM2
JUNTAS DE DILATACION
JUNTAS ASFALTICAS
PINTURA CON ESMALTE EN EXTERIOR
MURO DE CONTENCION
TRAZO, NIVELACION Y REPLANTEO
EXCAVACION PARA ESTRUCTURAS
ENCOFRADO Y DESENCOFRADO NORMAL
ACERO DE REFUERZO fy=4,200 kg/cm2
JUNTAS ASFALTICAS
CONCRETO F'C=210 KG/CM2,
SUMINISTRO E INSTALACION DE TUBERIAS Y ACCESORIOS
TRAZO, NIVELACION Y REPLANTEO
EXCAVACION MANUAL DE ZANJAS 0.40 X 1.20
REFINE Y NIVELACION EN TERRENO NORMAL
CAMA DE APOYO DE ARENA e=0.15 M
DOBLE PRUEBA HIDRAULICA
RELLENO Y COMPACTADO CON MATERIAL SELECCIONADO
SUMINISTRO E INSTALACION DE TUBERIA P.V.C. C10 D= 2"
TUBERIA DE PVC A-10 SP D=1/2" INC.ELEM.UNION+2% DESPER
CONEXIONES DOMICILIARIAS DE AGUA
CANAL DE CONCRETO
EXCAVACION MANUAL DE ZANJAS
REFINE Y NIVELACION EN TERRENO NORMAL
ENCOFRADO Y DESENCOFRADO NORMAL
CONCRETO f'c=175 kg/cm2
CONCRETO F'C=210 KG/CM2,
JUNTAS DE CONTRACCION, e=2.0 cm
JUNTAS DE DILATACION, e=2.0 cm
ACERO DE REFUERZO fy=4,200 kg/cm2
CONTROL DE CALIDAD DEL CONCRETO
DISEO DE MEZCLAS
ENSAYOS DE DENSIDAD DE CAMPO
PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION)
Und.
Metrado
SEMANA1
SEMANA2
MES2
SEMANA3
SEMANA4
SEMANA5
und
m2
1.00
25.00
7 DIAS
7 DIAS
GLB
KM
KM
1.00
0.10
1.00
7 DIAS
7 DIAS
7 DIAS
m3
m2
m2
m2
m3
123.20
363.00
363.00
122.40
135.00
7 DIAS
m2
m3
m3
61.20
56.70
56.70
396.25
m2
10.20
KM
0.20
7 DIAS
m3
m2
m3
m3
15.27
50.90
15.27
17.56
7 DIAS
7 DIAS
7 DIAS
7 DIAS
m2
m3
30.54
15.27
m
m2
120.81
30.54
KM
m3
m2
kg
m
m3
0.06
471.41
512.40
15,526.69
132.17
204.96
7 DIAS
7 DIAS
KM
m3
m2
m3
m3
m3
m
m
pza
0.11
52.80
44.00
6.60
52.80
52.80
110.00
50.00
18.00
7 DIAS
7 DIAS
7 DIAS
m3
m2
m2
m3
m3
m
m
kg
50.22
54.00
216.00
17.10
10.80
17.00
27.20
1,873.25
7 DIAS
7 DIAS
und
und
und
2.00
2.00
10.00
7 DIAS
7 DIAS
7 DIAS
SEMANA6
SEMANA7
SEMANA8
7 DIAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS
PARTIDAS CRITICAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS
06
06.01
06.02
06.03
06.04
06.05
VARIOS
REPOSICION Y CAMBIO DE TUBERIAS AVERIADAS
m
MODIFICACION DE NIVELES DE TAPA DE BUZONES
und
FLETE TERRESTRE
GLB
REPOSICION DE MUROS DE ABOBE
GLB
DESBROSE Y DESQUINCHE POR ENSANCHE DE VIA (PROPIEDAD DE TERCER GLB
110.00
4.00
1.00
1.00
1.00
7 DIAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS
7 DIAS