Anda di halaman 1dari 91

DAFTAR STANDARD ANALISA

SATUAN HARGA BAHAN DAN UPAH KERJA


PT ( Persero ) PELABUHAN INDONESIA I
WILAYAH SUMUT I
( KP, UTPK, BLW, RSP, UGK, KTJ, PKL SUSU, TBA 5 % )

M E D A N
2 0 11

PT ( Persero ) PELABUHAN INDONESIA I

DAFTAR SATUAN UPAH KERJA HARIAN


TAHUN 2011

HARGA SATUAN
( Rp./Hari )
5

HARGA SATUAN
( Rp./Jam )
6

No

JENIS TENAGA KERJA

KODE

SATUAN

1.

PEKERJA

L01

Orang/Hari/jam

50,000.00

6,250.00

2.

TUKANG

L02

Orang/Hari/jam

72,000.00

9,000.00

3.

MANDOR

L03

Orang/Hari/jam

72,000.00

9,000.00

4.

OPERATOR

L04

Orang/Hari/jam

72,000.00

9,000.00

5.

PEMBANTU OPERATOR

L05

Orang/Hari/jam

50,000.00

6,250.00

6.

SUPIR/DRIVER

L06

Orang/Hari/jam

72,000.00

9,000.00

7.

PEMBANTU SUPIR/DRIVER

L07

Orang/Hari/jam

50,000.00

6,250.00

8.

MEKANIK

L08

Orang/Hari/jam

72,000.00

9,000.00

9.

PEMBANTU MEKANIK

L09

Orang/Hari/jam

50,000.00

6,250.00

10.

KEPALA TUKANG

L10

Orang/Hari/jam

80,000.00

10,000.00

Medan,

September 2011

MENEJER TEKNIK

SADARUDDIN, ST. MM

DAFTAR ISI
ANALYSA PEKERJAAN SIPIL
TAHUN 2009
NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

URAIAN

HALAMAN

Daftar Peralatan
Daftar Upah
Daftar Bahan
Daftar Rekap
Daftar Pekerjaan Tanah
Daftar Pekerjaan Jalan & Aspal
Daftar Pekerjaan Pancang & T. Berskrup
Daftar Pekerjaan Rangka Atap & Plafond
Daftar Pekerjaan Kuda - Kuda & List Plank
Daftar Pekerjaan Jembatan
Daftar Pekerjaan Kosen
Daftar Pekerjaan Pintu dan Jendela
Daftar Pekerjaan Langit - Langit, Lantai, dan Dinding Papan
Daftar Pekerjaan Cetakan
Daftar Pekerjaan Batu Kosong, Turap
Daftar Pekerjaan Plesteran
Daftar Pekerjaan Pasangan Bata
Daftar Pekerjaan Beton
Daftar Pekerjaan Beton Bertulang
Daftar Pekerjaan Lantai
Daftar Pekerjaan Rabung dan Talang
Daftar Pekerjaan Pembesian
Daftar Pekerjaan Mengecat
Daftar Pekerjaan Bongkar Pasang
Daftar Pekerjaan Suplemen
Daftar Pekerjaan Instalasi Listrik
Daftar Pekerjaan Pipa Galvanis
Daftar Pekerjaan Pipa PVC
Daftar Pekerjaan Alat Sambung
Daftar Pekerjaan Instalasi Air

Medan,

Mei 2004

PEMELIHARAAN BANGUNAN
ASISTEN MENEJER

1
2
3
9
16
18
21
23
25
26
27
29
31
34
35
36
38
41
43
45
47
49
50
53
55
59
65
66
67
70

SADARUDDIN, ST. MM

PT ( Persero ) PELABUHAN INDONESIA I

DAFTAR HARGA SEWA PERALATAN


TAHUN 2009
BIAYA SEWA
( Rp.)
4

No.

U R A I A N

SATUAN

1.

MESIN GILING

HARI

400,000.00

2.

PONTON PANCANG

HARI

1,750,000.00

3.

PERALATAN PANCANG

HARI

475,000.00

4.

CRANE

HARI

1,600,000.00

5.

JACK SNIPER

HARI

225,000.00

6.

M E S I N LAS

HARI

350,000.00

7.

BOR BETON

HARI

150,000.00

8.

BOR BETON MATA INTAN

HARI

275,000.00

9.

VIBRO COMPACTOR

HARI

1,100,000.00

10.

EXAVATOR

HARI

1,500,000.00

11.

BULDOZER

HARI

1,400,000.00

12.

STAMPER

HARI

150,000.00

13.

THEODOLITH

HARI

75,000.00

14.

WATERPASS

HARI

45,000.00

15.

COMPRESSOR

HARI

550,000.00

16.

PERANCAH KERJA

HARI

275,000.00

17.

GRADER

HARI

1,400,000.00

Medan,

Januari
2009

ASM PEMELIHARAAN

SADARUDDIN, ST. MM

T ( Persero ) PELABUHAN INDONESIA I

DAFTAR HARGA SATUAN BAHAN


TAHUN 2011
No.

URAIAN/JENIS BAHAN BANGUNAN

KODE

SATUAN

A.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44

BAHAN BANGUNAN GEDUNG


Agregat Kasar
Agregat Halus
Agregat Kelas C1
Agregat Kelas C2
Aspal 60/70
Aspal Emulsi
Asphalt Concrete (AC)
Atap Asbes Gelombang
Atap Aluminium Gelombang
Atap Super Dek
Atap Plastik Gelbang Fiber
Atap Nipah
Atap Rumbia
Atap Gemteng Metal
Amplas
Asbes
Batu Gunung
Batu Kali
Batu Koral
Batu Pecah 10-15cm
Batu Pecah 5-7cm
Batu Pecah 3-5cm
Batu Pecah 2-3cm
Batu Belah
Besi Beton Polos
Besi Beton Ulir
Besi Profil
Besi Baja IWF
Besi Plat Strip
Bak Air Fiberglass
Bak Cuci piring 2 lobang komplet
Bensin
Batu Alam (paras)
Batu Tempel
Batu Bata cetak mesin
Batu Kerawang
Cat Kilat setara Bee brand
Cat Perak setara Bee Brand
Cat Tembok setara Paragon
Cat Tembok setara Vinilex
Cat Vernis
Cat Manie Besi
Cat Manie Kayu
Cat Dasar

m3
m3
m3
m3
kg
kg
ton
kaki
kaki
kaki
lembar
lembar
lembar
lembar
lbr
keping
m3
m3
m3
m3
m3
m3
m3
m3
kg
kg
kg
kg
kg
bh
unit
liter
m2
m2
bh
bh
kg
kg
kg
kg
kg
kg
kg
kg

H. SATUAN
(Rp.)
5

25,000.00
10,000.00
18,000.00
54,000.00
4,000.00
4,000.00
77,000.00
3,000.00
13,000.00
133,000.00
133,000.00
145,000.00
197,000.00
197,000.00
197,000.00
197,000.00
145,000.00
13,000.00
13,000.00
21,000.00
21,000.00
21,000.00
375,000.00
692,000.00
4,500.00
180,000.00
135,000.00
800.00
4,000.00
43,000.00
43,000.00
13,000.00
19,000.00
34,000.00
20,000.00
20,000.00
34,000.00

KETERANGAN
6

No.

URAIAN/JENIS BAHAN BANGUNAN

KODE

SATUAN

45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96

Casing
Conblok 6 cm
Door Closer
Door Holder
Dempul
Engsel Pintu Nyilon 4"
Engsel Jendela Nyilon 4"
Filler
Filter Plastik
Floor Drain
Floor Hardener
Geotextienle Non Woven
Gebalan rumput
Genteng Keramik
Genteng PC warna
Genteng Rabung
Gedek/Topas bambu
Gedek/ Topas kelapa sawit
Gypsum
Grendel Besar 4"
Hak Angin Biasa
Handle (pegangan)
Hot Roll Sheet (HSR)
Ijuk
Jerjak Besi
Kayu Bulat O4"K
Kayu Profil
Kayu papan /Broti (Setara Kayyu kuat Klas 1)
Kayu papan /Broti (Setara Kayyu kuat Klas 2)
Kayu papan /Broti (Setara Kayyu kuat Klas 3)
Kayu papan /Broti (Setara Kayyu kuat Klas 4)
Kayu setara Damuli 8-10
Kerikil Beton
Keramik polos 20x20 cm
Keramik polos 20x25 cm
Keramik polos 30x30 cm
Keramik polos 40x40 cm
Keramik 60x60cm
Keramik Warna polos 20X20 cm
Keramik Siku (bon-bon)
Karpet
Kanstin 15X30X45 cm
Kanstin 15X30X60 cm
kawat licin /Bronjong
Kawat Beton
kawat Las
Kloset duduk (dengan bak air)
Kloset jongkok
Kran air lokal
Kran air bebek Lokal
Kran air setara San Ei
Kran Air bebek setara San Ei

m2
bh
bh
bh
kg
pasang
pasang
kg
m2
bh
kg
m2
m2
keping
keping
keping
lembar
lembar
m2
bh
pasang
bh
ton
m2
m2
btg
btg
m3
m3
m3
m3
btg
m3
bh
bh
bh
bh
bh
bh
m'
m2
bh
bh
kg
kg
dos
bh
bh
bh
bh
bh
bh

H. SATUAN
(Rp.)
5
27,000.00
1,800.00
180,000.00
90,000.00
15,000.00
10,000.00
10,000.00
19,000.00
13,000.00
15,000.00
3,500.00
45,000.00
18,000.00
9,000.00
6,000.00
7,000.00
27,000.00
27,000.00
20,000.00
4,000.00
10,000.00
4,000.00
800,000.00
27,000.00
270,000.00
18,000.00
18,000.00
7,902,000.00
5,822,000.00
3,115,000.00
3,115,000.00
18,000.00
166,000.00
1,960.00
2,250.00
4,909.09
8,833.33
45,000.00
1,960.00
9,300.00
36,000.00
22,000.00
27,000.00
13,000.00
19,000.00
8,000.00
1,350,000.00
143,000.00
13,000.00
31,000.00
100,000.00
126,000.00

KETERANGAN
6

No.

URAIAN/JENIS BAHAN BANGUNAN

KODE

SATUAN

97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147

kunci Tanam 4"


Kunci Lock KCL Biasa 6" (antik)
Kunci Lock Besar Uk.4"
Kunci silinder
Kuas
Kaca 3 mm
Kaca 5 mm
Kaca 8 mm (tempred)
Kaca 12 mm (tempred)
Kaca jendela nako+ rangka
Kaca Blok
Kipas angin Stainlesstell lengkap
Lantai kayu (Gym floor)
Lem Kayu
Lem
Lisplank motif bunga 14x40
minyak Silinder
Minyak gemuk
Minyak Solar
Minyak tanah/lampu
Kerosine
Minyak bekisting
Minyak Gerdang
Minyak Cat
Material pilihan
Oxygen las
Paving blok
Pintu Gulung besi
Pintu Besi
Pintu lipar Harmonika
Pintu KM/WC PVC
Pipa Porous
Plat baja
Paku
Paku skrup
Plamur
Porselin Polos 30x30cm
Parquet Kayu Solid
Pipa medium 6 m (GI) 1/2"
Pipa medium 6 m (GI) 3/4"
Pipa medium 6 m (GI) 1"
Pipa medium 6 m (GI) 1 1/2"
Pipa medium 6 m (GI) 2"
Pipa medium 6 m (GI) 2,5"
Pipa medium 6 m (GI) 3"
Pipa medium 6 m (GI) 4"
Pipa medium 6 m (GI) 6"
Pipa Galvanis 6 m 1/2"
Pipa Galvanis 6 m 3/4"
Pipa Galvanis 6 m 1"
Pipa Galvanis 6 m 1 1/2"

bh
bh
bh
bh
bh
kaki
kaki
kaki
kaki
m2
bh
bh
m2
kg
kg
bh
liter
liter
liter
liter
liter
kg
liter
liter
m3
kg
bh
m2
m2
m2
set
m'
kg
kg
kg
kg
bh
m2
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'

H. SATUAN
(Rp.)
5
52,000.00
135,000.00
52,000.00
27,000.00
13,000.00
13,000.00
14,000.00
90,000.00
135,000.00
108,000.00
23,000.00
900,000.00
180,000.00
13,000.00
45,000.00
8,600.00
27,000.00
35,000.00
4,500.00
7,500.00
7,500.00
22,000.00
24,000.00
15,000.00
197,000.00
9,000.00
1,800.00
450,000.00
720,000.00
1,186,000.00
336,000.00
15,000.00
21,000.00
16,000.00
23,000.00
18,000.00
8,000.00
270,000.00
2,900.00
3,700.00
5,700.00
6,700.00
7,500.00
9,000.00
11,600.00
16,400.00
23,900.00
10,950.00
14,400.00
18,000.00
27,000.00

KETERANGAN
6

No.

URAIAN/JENIS BAHAN BANGUNAN

KODE

SATUAN

148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198

Pipa Galvanis 6 m 2"


Pipa Galvanis 6 m 2 1/2"
Pipa Galvanis 6 m 3"
Pipa Galvanis 6 m 4"
Pipa Galvanis 6 m 5"
Pipa Galvanis 6 m 6"
Pasir pasang/ Beton
Pasir urug
Pagar Besi Strip
Profil Gipsum
Rabung Genteng Metal
Rabung Seng Lebar 30 cm
Rabung Seng Lebar 30 cm per 7 kaki
Rabung Genteng Keramik
Rangka Furing Plafond Gypsum
Rangka Atap Zincalum
Rangka Atap Baja Ringan Atap Seng
Rangka Atap Baja Ringan Atap Genteng Metal
Rangka Atap Baja Ringan Atap Keramik/ Beton
rabung Asbes Panjang 0.5 m'
Riol dia. 150 mm
Semen Putih 40 kg
Semen Portland (Andalas) 40 Kg
Semen Portland (Andalas)
Sirtu (Pasir Batu)
Seng GL BJLS 20
Seng GL BJLS 32
Seng Plat BJLS 30
Septiktank Kapasitas 3 m3
Tanah timbun
Tanah Timbun Pilihan
Talang Kantong Seng BJLS
Tripleks 4 mm
Tripleks 6 mm
Tripleks 9 mm
Tempat Sabun Keramik 10x20 cm
tepas Kelapa sawit
Tepas bambu
Urinoir
Urugan porus
Wallpapper
Wastafel Biasa
Instalasi titik nyala
Instalasi stop kontak
Instalasi Air Bersih
Lampu SL 23 watt komplet
Lampu SL 18 watt komplet
Box Zekering 1 Group
Box Zekering 2 Group
Saklar Seri Tanam
Saklar

m'
m'
m'
m'
m'
m'
m3
m3
m2
m'
m'
lembar
lembar
keping
m2
m2
m2
m2
m2
lembar
bh
zak
zak
kg
m3
lembar
lembar
kaki
bh
m3
m3
m'
lembar
lembar
lembar
bh
lembar
lembar
bh
m3
m2
bh
titik
titik
titik
bh
bh
set
set
bh
bh

H. SATUAN
(Rp.)
5

KETERANGAN
6

36,900.00
0.00
0.00
0.00
0.00
0.00
90,000.00
73,000.00
270,000.00
9,000.00
37,000.00
20,000.00
20,000.00
14,000.00
72,000.00
194,000.00
167,000.00
194,000.00
216,000.00
10,000.00
38,000.00
123,000.00
44,000.00
1,100.00
99,000.00
38,000.00
66,000.00
13,000.00
3,339,000.00
69,000.00
69,000.00
130,000.00
60,000.00
90,000.00
110,000.00
33,000.00
27,000.00
27,000.00
740,000.00
73,000.00
94,000.00
459,000.00
92,000.00
92,000.00
92,000.00
30,000.00
21,000.00
3,500.00
5,500.00
6,500.00
6,500.00

Medan,

September 2011

MENEJER TEKNIK

10

No.

URAIAN/JENIS BAHAN BANGUNAN

KODE

SATUAN

H. SATUAN
(Rp.)
5

KETERANGAN

SADARUDDIN, ST. MM

DAFTAR ANALISA PEKERJAAN


PT. T-38-2000-C
PEKERJAAN PENGECATAN
PT. T-38-2000-C.1
1 m2 pelaburan bidang kayu dengan vernis
Kebutuhan
Satuan
Vernis
kg
Dempul
kg
Bahan
Ampelas
lbr
Kuas
bh
Pekerja
Oh
Tukang cat
Oh
Tenaga
Kepala Tukang
Oh
Mandor
Oh

Indeks
0.150
0.050
0.100
0.010
0.160
0.160
0.016
0.003

Harga satuan
Rp.
34,000.00
Rp.
15,000.00
Rp.
3,000.00
Rp.
13,000.00
Rp.
Rp.
Rp.
Rp.

Harga satuan Jumlah harga bahan Jumlah harga upah


Rp.
Rp.
5,100.00 Rp.
Rp.
Rp.
750.00 Rp.
Rp.
Rp.
300.00 Rp.
Rp.
Rp.
130.00 Rp.
Rp. 50,000.00 Rp.
Rp.
8,000.00
Rp. 72,000.00 Rp.
Rp.
11,520.00
Rp. 80,000.00 Rp.
Rp.
1,280.00
Rp. 72,000.00 Rp.
Rp.
180.00
6,280.00
20,980.00
Jumlah harga =
Rp.
27,260.00
Pembulatan =
Rp.
27,260.00

PT. T-38-2000-C.2
1 m2 pengecatan bidang kayu lama
Kebutuhan
Plamur
Bahan Cat dasar
Cat kilat setara bee brand
Pekerja
Tukang cat
Tenaga
Kepala Tukang
Mandor

Satuan
kg
kg
kg
Oh
Oh
Oh
Oh

Indeks
0.150
0.170
0.170
0.070
0.075
0.008
0.003

Harga satuan
Rp.
18,000.00
Rp.
34,000.00
Rp.
43,000.00
Rp.
Rp.
Rp.
Rp.

Harga satuan Jumlah harga bahan Jumlah harga upah


Rp.
Rp.
2,700.00 Rp.
Rp.
Rp.
5,780.00 Rp.
Rp.
Rp.
7,310.00 Rp.
Rp. 50,000.00 Rp.
Rp.
3,500.00
Rp. 72,000.00 Rp.
Rp.
5,400.00
Rp. 80,000.00 Rp.
Rp.
600.00
Rp. 72,000.00 Rp.
Rp.
180.00
15,790.00
9,680.00
Jumlah harga =
Rp.
25,470.00
Pembulatan =
Rp.
25,470.00

PT. T-38-2000-C.3
1 m2 pengecatan bidang kayu baru
Kebutuhan
Cat meni
Plamur
Bahan
Cat dasar
Cat kilat setara bee brand
Pekerja
Tukang Batu
Tenaga
Kepala Tukang
Mandor

Satuan
kg
Kg
Kg
Kg
Oh
Oh
Oh
Oh

Indeks
0.200
0.150
0.170
0.260
0.070
0.009
0.006
0.003

Harga satuan
Rp.
20,000.00
Rp.
18,000.00
Rp.
34,000.00
Rp.
43,000.00
Rp.
Rp.
Rp.
Rp.

Harga satuan Jumlah harga bahan Jumlah harga upah


Rp.
Rp.
4,000.00 Rp.
Rp.
Rp.
2,700.00 Rp.
Rp.
Rp.
5,780.00 Rp.
Rp.
Rp.
11,180.00 Rp.
Rp. 50,000.00 Rp.
Rp.
3,500.00
Rp. 72,000.00 Rp.
Rp.
648.00
Rp. 80,000.00 Rp.
Rp.
480.00
Rp. 72,000.00 Rp.
Rp.
180.00
23,660.00
4,808.00
Jumlah harga =
Rp.
28,468.00
Pembulatan =
Rp.
28,470.00

PT. T-38-2000-C.4
1 m2 pengecatan tembok/plafond baru str vinilex (1 lps plamur, 1 lps cat dasar,2 lps cat penutup)
Kebutuhan
Satuan Indeks
Harga satuan
Harga satuan Jumlah harga bahan Jumlah harga upah
Plamur
kg
0.100 Rp.
18,000.00 Rp.
Rp.
1,800.00 Rp.
Cat
dasar
kg
0.110
Rp.
34,000.00
Rp.
Rp.
3,740.00 Rp.
Bahan
Cat tembok setara vinilex
kg
0.260 Rp.
19,000.00 Rp.
Rp.
4,940.00 Rp.
Pekerja
Oh
0.020 Rp.
Rp. 50,000.00 Rp.
Rp.
1,000.00
Tukang batu
Oh
0.063 Rp.
Rp. 72,000.00 Rp.
Rp.
4,536.00
Tenaga Kepala Tukang
Oh
0.006 Rp.
Rp. 80,000.00 Rp.
Rp.
504.00
Mandor
Oh
0.003 Rp.
Rp. 72,000.00 Rp.
Rp.
180.00
10,480.00
6,220.00
Jumlah harga =
Rp.
16,700.00
Pembulatan =
Rp.
16,700.00

PT. T-38-2000-C.4.1
1 m2 pengecatan tembok/plafond lama str vinilex ( 1 lps cat dasar,2 lps cat penutup)
Kebutuhan
Satuan Indeks
Harga satuan
Harga satuan Jumlah harga bahan Jumlah harga upah
Cat dasar
kg
0.100 Rp.
34,000.00 Rp.
Rp.
3,400.00 Rp.
Bahan
Cat tembok setara vinilex
kg
0.260 Rp.
19,000.00 Rp.
Rp.
4,940.00 Rp.
Pekerja
Oh
0.020 Rp.
Rp. 50,000.00 Rp.
Rp.
1,000.00
Tukang batu
Oh
0.063 Rp.
Rp. 72,000.00 Rp.
Rp.
4,536.00
Tenaga
Kepala Tukang
Oh
0.006 Rp.
Rp. 80,000.00 Rp.
Rp.
504.00
Mandor
Oh
0.003 Rp.
Rp. 72,000.00 Rp.
Rp.
180.00
8,340.00
6,220.00
Jumlah harga =
Rp.
14,560.00
Pembulatan =
Rp.
14,560.00
PT. T-38-2000-C.4.2
1 m2 pengecatan tembok/plafond lama str vinilex ( 2 lps cat penutup)
Kebutuhan
Satuan Indeks
Harga satuan
Cat
tembok
setara
vinilex
kg
0.260
Rp.
19,000.00
Bahan
Pekerja
Oh
0.020 Rp.
Tukang batu
Oh
0.063 Rp.
Tenaga
Kepala Tukang
Oh
0.006 Rp.
Mandor
Oh
0.003 Rp.

Harga satuan Jumlah harga bahan Jumlah harga upah


Rp.
Rp.
4,940.00 Rp.
Rp. 50,000.00 Rp.
Rp.
1,000.00
Rp. 72,000.00 Rp.
Rp.
4,536.00
Rp. 80,000.00 Rp.
Rp.
504.00
Rp. 72,000.00 Rp.
Rp.
180.00
4,940.00
6,220.00
Jumlah harga =
Rp.
11,160.00
Pembulatan =
Rp.
11,160.00

PT. T-38-2000-C.5
1 m2 pengecatan tembok/plafond baru str paragon (1 lps plamur, 1 lps cat dasar,2 lps cat penutup)
Kebutuhan
Satuan Indeks
Harga satuan
Harga satuan Jumlah harga bahan Jumlah harga upah
Plamur
kg
0.100 Rp.
18,000.00 Rp.
Rp.
1,800.00 Rp.
kg
0.100 Rp.
34,000.00 Rp.
Rp.
3,400.00 Rp.
Bahan Cat dasar
Cat tembok setara paragon
kg
0.260 Rp.
13,000.00 Rp.
Rp.
3,380.00 Rp.
Pekerja
Oh
0.020 Rp.
Rp. 50,000.00 Rp.
Rp.
1,000.00
Tukang batu
Oh
0.063 Rp.
Rp. 72,000.00 Rp.
Rp.
4,536.00
Tenaga
Kepala Tukang
Oh
0.006 Rp.
Rp. 80,000.00 Rp.
Rp.
504.00
Mandor
Oh
0.003 Rp.
Rp. 72,000.00 Rp.
Rp.
180.00
8,580.00
6,220.00
Jumlah harga =
Rp.
14,800.00
Pembulatan =
Rp.
14,800.00
PT. T-38-2000-C.5.1
1 m2 pengecatan tembok/plafond lama str paragon ( 1 lps cat dasar,2 lps cat penutup)
Kebutuhan
Satuan Indeks
Harga satuan
Harga satuan Jumlah harga bahan Jumlah harga upah
Cat dasar
kg
0.100 Rp.
34,000.00 Rp.
Rp.
3,400.00 Rp.
Bahan
Cat tembok setara paragon
kg
0.260 Rp.
13,000.00 Rp.
Rp.
3,380.00 Rp.
Pekerja
Oh
0.020 Rp.
Rp. 50,000.00 Rp.
Rp.
1,000.00
Tukang batu
Oh
0.063 Rp.
Rp. 72,000.00 Rp.
Rp.
4,536.00
Tenaga
Kepala Tukang
Oh
0.006 Rp.
Rp. 80,000.00 Rp.
Rp.
504.00
Mandor
Oh
0.003 Rp.
Rp. 72,000.00 Rp.
Rp.
180.00
6,780.00
6,220.00
Jumlah harga =
Rp.
13,000.00
Pembulatan =
Rp.
13,000.00
PT. T-38-2000-C.5.2
1 m2 pengecatan tembok/plafond lama str paragon (2 lps cat penutup)
Kebutuhan
Satuan Indeks
Harga satuan
kg
0.260 Rp.
13,000.00
Bahan Cat tembok setara paragon
Pekerja
Oh
0.020 Rp.
Tukang batu
Oh
0.063 Rp.
Tenaga
Kepala Tukang
Oh
0.006 Rp.
Mandor
Oh
0.003 Rp.

Harga satuan Jumlah harga bahan Jumlah harga upah


Rp.
Rp.
3,380.00 Rp.
Rp. 50,000.00 Rp.
Rp.
1,000.00
Rp. 72,000.00 Rp.
Rp.
4,536.00
Rp. 80,000.00 Rp.
Rp.
504.00
Rp. 72,000.00 Rp.
Rp.
180.00
3,380.00
6,220.00
Jumlah harga =
Rp.
9,600.00

Pembulatan
PT. T-38-2000-C.6
1 m2 pengecatan permukaan baja dengan meni besi dan perancah
Kebutuhan
Satuan Indeks
Harga satuan
Meni besi
kg
0.100 Rp.
20,000.00
bh
0.010 Rp.
13,000.00
Bahan Kuas
Perancah kayu
m3
0.002 Rp. 5,822,000.00
Pekerja
Oh
0.250 Rp.
Tukang batu
Oh
0.225 Rp.
Tenaga
Kepala Tukang
Oh
0.023 Rp.
Mandor
Oh
0.008 Rp.

Rp.

9,600.00

Harga satuan Jumlah harga bahan Jumlah harga upah


Rp.
Rp.
2,000.00 Rp.
Rp.
Rp.
130.00 Rp.
Rp.
Rp.
11,644.00 Rp.
Rp. 50,000.00 Rp.
Rp.
12,500.00
Rp. 72,000.00 Rp.
Rp.
16,200.00
Rp. 80,000.00 Rp.
Rp.
1,800.00
Rp. 72,000.00 Rp.
Rp.
540.00
13,774.00
31,040.00
Jumlah harga =
Rp.
44,814.00
Pembulatan =
Rp.
44,810.00

sero ) Pelabuhan Indonesia I

14
REKAPITULASI ANALYSA PEKERJAAN TEKNIK SIPIL

No.
1
A.

No.SNI

JENIS PEKERJAAN

H. SATUAN (Rp.)

2
RSNI.T-15-2002
PEKERJAAN PERSIAPAN
RSNI.T-15-2002.1
RSNI.T-15-2002.2
RSNI.T-15-2002.3
RSNI.T-15-2002.4
RSNI.T-15-2002.5
RSNI.T-15-2002.6
RSNI.T-15-2002.7

1 m' Pagar sementara dari seng gelombang tinggi 2 m


1 m' Pek. Pengukuran & pemasangan Bowplank
1 m2 Pek. Kantor direksi keet dengan lantai plesteran
1 m2 Pembuatan gudang sementara dan alat-alat
1 m2 Pembuatan rumah jaga konstruksi kayu
1 m2 Membersihkan lapangan dan perataan
1 m2 Pembuatan bedeng buruh

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

522,970.00
72,870.00
1,328,690.00
1,130,750.00
1,386,540.00
8,600.00
1,149,290.00

1
2
3
4
5
6
7

SNI.DT 91-0006-2007
PEKERJAAN TANAH
SNI.DT 91-0006-2007.6.1
SNI.DT 91-0006-2007.6.2
SNI.DT 91-0006-2007.6.3
SNI.DT 91-0006-2007.6.5
SNI.DT 91-0006-2007.6.6
SNI.DT 91-0006-2007.6.7
SNI.DT 91-0006-2007.6.8

Menggali 1 m3 tanah biasa sedalam 1 meter


Menggali 1 m3 tanah biasa sedalam 2 meter
Menggali 1 m3 tanah biasa sedalam 3 meter
Menggali 1 m3 tanah cadas sedalam 1 meter
Menggali 1 m3 tanah lumpur sedalam 1 meter
Mengerjakan 1 m2 stripping tebing setinggi 1 meter
Membuang 1 m3 tanah sejauh 30 meter

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

39,300.00
48,200.00
57,300.00
79,300.00
63,200.00
2,860.00
17,220.00

SNI.DT 91-0006-2007.6.8 A

Membuang 1 m3 tanah /bahan galian/adukan beton/mortar/dll


sejauh 60 meter

Rp.

SNI.DT 91-0006-2007.6.8 B

Membuang 1 m tanah /bahan galian/adukan beton/mortar/dll


sejauh 90 meter

Rp.

10

SNI.DT 91-0006-2007.6.8 C

Membuang 1 m3 tanah /bahan galian/adukan beton/mortar/dll


sejauh 120 meter

Rp.

11

SNI.DT 91-0006-2007.6.8 D

Membuang 1 m3 tanah /bahan galian/adukan beton/mortar/dll


sejauh 150 meter

Rp.

12

SNI.DT 91-0006-2007.6.8 E

Membuang 1 m tanah /bahan galian/adukan beton/mortar/dll


sejauh 180 meter

Rp.

13

SNI.DT 91-0006-2007.6.8 F

Membuang 1 m3 tanah /bahan galian/adukan beton/mortar/dll


sejauh 180 meter

Rp.

14

SNI.DT 91-0006-2007.6.8 G

Membuang 1 m tanah /bahan galian/adukan beton/mortar/dll


sejauh 240 meter

Rp.

15

SNI.DT 91-0006-2007.6.8 H

Membuang 1 m3 tanah /bahan galian/adukan beton/mortar/dll


sejauh 270 meter

Rp.

16

SNI.DT 91-0006-2007.6.8 I

17
18
19
20
22
23

SNI.DT 91-0006-2007.6.9
SNI.DT 91-0006-2007.6.10
SNI.DT 91-0006-2007.6.11
SNI.DT 91-0006-2007.6.12
SNI.DT 91-0006-2007.6.14
SNI.DT 91-0006-2007.6.15

Membuang 1 m3 tanah /bahan galian/adukan beton/mortar/dll


sejauh 300 meter
Mengurug kembali 1 m3 galian
Memadatkan 1 m3 tanah (per 20 cm)
Mengurug 1 m3 pasir urug
Mengurug 1 m3 tanah urug
Memasang 1 m2 lapisan ijuk tebal 10 cm
Mengurug 1 m3 sirtu padat untuk peninggian lantai bangunan

C.

SNI.DT 91-0007-2006
PEKERJAAN PONDASI
SNI.DT 91-0007-2006.6.1
SNI.DT 91-0007-2006.6.2
SNI.DT 91-0007-2006.6.9
SNI.DT 91-0007-2006.6.10
SNI.DT 91-0007-2006.6.11
SNI.DT 91-0008-2007
PEKERJAAN BETON
SNI.DT 91-0008-2007.6.1
SNI.DT 91-0008-2007.6.2
SNI.DT 91-0008-2007.6.4
SNI.DT 91-0008-2007.6.5
SNI.DT 91-0008-2007.6.6

1
2
3
4
5
6
7
B.

1
2
3
4
5
D.
1
2
3
4
5

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

19,100.00
28,600.00
103,300.00
98,500.00
170,580.00
133,100.00

Memasang 1 m3 pondasi batu belah, campuran 1 PC: 3 PP


Memasang 1 m3 pondasi batu belah, campuran 1 PC: 4 PP
Memasang 1 m3 batu kosong (anstamping)
Memasang 1 m3 pondasi siklop campuran 1 PC:2PB:3KR
Memasang 1 m3 pondasi sumuran, diameter 100 cm

Rp.
Rp.
Rp.
Rp.
Rp.

642,650.00
602,900.00
340,940.00
2,350,680.00
614,890.00

Membuat 1 m3 beton mutu K 100


Membuat 1 m3 beton mutu K 125
Membuat 1 m3 beton mutu K 150
Membuat 1 m3 beton mutu K 175
Membuat 1 m3 beton mutu f'c = 16.9 Mpa k200

Rp.
Rp.
Rp.
Rp.
Rp.

657,230.00
656,630.00
680,150.00
708,330.00
734,650.00

sero ) Pelabuhan Indonesia I

15
REKAPITULASI ANALYSA PEKERJAAN TEKNIK SIPIL

No.

No.SNI

JENIS PEKERJAAN

1
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

2
SNI.DT 91-0008-2007.6.7
SNI.DT 91-0008-2007.6.8
SNI.DT 91-0008-2007.6.9
SNI.DT 91-0008-2007.6.10
SNI.DT 91-0008-2007.6.11
SNI.DT 91-0008-2007.6.12
SNI.DT 91-0008-2007.6.17
SNI.DT 91-0008-2007.6.18
SNI.DT 91-0008-2007.6.19
SNI.DT 91-0008-2007.6.20
SNI.DT 91-0008-2007.6.21
SNI.DT 91-0008-2007.6.22
SNI.DT 91-0008-2007.6.23
SNI.DT 91-0008-2007.6.24
SNI.DT 91-0008-2007.6.25
SNI.DT 91-0008-2007.6.26
SNI.DT 91-0008-2007.6.27

3
Membuat 1 m3 beton mutu K 225
Membuat 1 m3 beton mutu K 250
Membuat 1 m3 beton mutu K 275
Membuat 1 m3 beton mutu K 300
Membuat 1 m3 beton mutu K 325
Membuat 1 m3 beton mutu K 350
Pembesian 10 kg dengan besi polos atau besi ulir
Memasang 10 kg kabel pres stressed polos /strands
Memasang 10 kg jaring kawat baja/wire mest
Memasang 1 m2 bekisting untuk pondasi
Memasang 1 m2 bekisting untuk sloof
Memasang 1 m2 bekisting untuk kolom
Memasang 1 m2 bekisting untuk balok
Memasang 1 m2 bekisting untuk lantai
Memasang 1 m2 bekisting untuk dinding
Memasang 1 m2 bekisting untuk tangga
Memasang 1 m2 jembatan untuk pengecoran beton

23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44

SNI.DT 91-0008-2007.6.28
SNI.DT 91-0008-2007.6.28A
SNI.DT 91-0008-2007.6.28B
SNI.DT 91-0008-2007.6.29
SNI.DT 91-0008-2007.6.29A
SNI.DT 91-0008-2007.6.29B
SNI.DT 91-0008-2007.6.29C
SNI.DT 91-0008-2007.6.30
SNI.DT 91-0008-2007.6.30A
SNI.DT 91-0008-2007.6.31
SNI.DT 91-0008-2007.6.31A
SNI.DT 91-0008-2007.6.31B
SNI.DT 91-0008-2007.6.31C
SNI.DT 91-0008-2007.6.32
SNI.DT 91-0008-2007.6.32A
SNI.DT 91-0008-2007.6.32B
SNI.DT 91-0008-2007.6.33
SNI.DT 91-0008-2007.6.33A
SNI.DT 91-0008-2007.6.33B
SNI.DT 91-0008-2007.6.34
SNI.DT 91-0008-2007.6.35
SNI.DT 91-0008-2007.6.36

Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting)


Membuat 1 m3 pondasi beton bertulang (125 kg besi + bekisting)
Membuat 1 m3 pondasi beton bertulang (100 kg besi + bekisting)
Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting)
Membuat 1 m3 sloof beton bertulang (150 kg besi + bekisting)
Membuat 1 m3 sloof beton bertulang (125 kg besi + bekisting)
Membuat 1 m3 sloof beton bertulang (100 kg besi + bekisting)
Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting)
Membuat 1 m3 kolom beton bertulang (200 kg besi + bekisting)
Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting)
Membuat 1 m3 balok beton bertulang (150 kg besi + bekisting)
Membuat 1 m3 balok beton bertulang (125 kg besi + bekisting)
Membuat 1 m3 balok beton bertulang (100 kg besi + bekisting)
Membuat 1 m3 kolom beton bertulang (150 kg besi + bekisting)
Membuat 1 m3 kolom beton bertulang (125 kg besi + bekisting)
Membuat 1 m3 kolom beton bertulang (100 kg besi + bekisting)
Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting)
Membuat 1 m3 dinding beton bertulang (125 kg besi + bekisting)
Membuat 1 m3 dinding beton bertulang (100 kg besi + bekisting)
Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting)
Membuat 1 m' kolom praktis beton bertulang (11x11) cm
Membuat 1 m' ring balok beton bertulang (10x15) cm

E.

SNI.DT 91-0009-2007
PEKERJAAN DINDING

H. SATUAN (Rp.)
4
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,792,750.00
3,451,500.00
3,110,250.00
5,172,550.00
4,490,050.00
4,148,800.00
3,807,550.00
8,405,420.00
7,040,420.00
6,440,380.00
5,757,880.00
5,416,630.00
5,075,380.00
5,803,000.00
5,461,800.00
5,120,500.00
5,642,700.00
5,301,500.00
4,959,970.00
5,892,760.00
101,220.00
117,020.00

SNI.DT 91-0009-2007.6.1

Memasang 1 m2 dinding bata merah tebal 1 bata, campuran spesi


Rp.
1 PC: 2PP

215,210.00

SNI.DT 91-0009-2007.6.2

Memasang 1 m dinding bata merah tebal 1 bata, campuran spesi


Rp.
1 PC: 3PP

204,600.00

SNI.DT 91-0009-2007.6.3

Memasang 1 m2 dinding bata merah tebal 1 bata, campuran spesi


Rp.
1 PC: 4PP

197,740.00

SNI.DT 91-0009-2007.6.7

Memasang 1 m2 dinding bata merah tebal 1/2 bata, campuran


spesi 1 PC: 2PP

Rp.

104,350.00

SNI.DT 91-0009-2007.6.8

Memasang 1 m2 dinding bata merah tebal 1/2 bata, campuran


spesi 1 PC: 3PP

Rp.

SNI.DT 91-0009-2007.6.9

Memasang 1 m dinding bata merah tebal 1/2 bata, campuran


spesi 1 PC: 4PP

Rp.

SNI.DT 91-0009-2007.6.23

Memasang 1 m dinding terawang campuran spesi 1 PC: 4PP

Rp.

96,600.00
159,330.00

F.

SNI.DT 91-0010-2007
PEKERJAAN PLESTERAN
SNI.DT 91-0010-2007.6.1
SNI.DT 91-0010-2007.6.2
SNI.DT 91-0010-2007.6.3

Memasang 1 m2 plesteran 1 PC: 1PP, tebal 15 mm


Memasang 1 m2 plesteran 1 PC: 2PP, tebal 15 mm
Memasang 1 m2 plesteran 1 PC: 3PP, tebal 15 mm

Rp.
Rp.
Rp.

46,570.00
41,130.00
38,700.00

1
2
3

755,240.00
767,670.00
788,990.00
795,590.00
850,760.00
859,390.00
148,700.00
145,100.00
138,700.00
180,270.00
195,850.00
318,400.00
327,750.00
390,400.00
320,830.00
286,150.00
111,670.00

99,490.00

sero ) Pelabuhan Indonesia I

16
REKAPITULASI ANALYSA PEKERJAAN TEKNIK SIPIL

No.
1
4
5
6

No.SNI
2
SNI.DT 91-0010-2007.6.4
SNI.DT 91-0010-2007.6.23
SNI.DT 91-0010-2007.6.27

JENIS PEKERJAAN
3
Memasang 1 m2 plesteran 1 PC: 4PP, tebal 15 mm
Memasang 1 m2 plesteran ciprat 1 PC: 2PP
Memasang 1 m2 acian

H. SATUAN (Rp.)
4
Rp.
Rp.
Rp.

37,100.00
29,370.00
22,300.00

sero ) Pelabuhan Indonesia I

17
REKAPITULASI ANALYSA PEKERJAAN TEKNIK SIPIL

No.

No.SNI

JENIS PEKERJAAN

H. SATUAN (Rp.)

G.

SNI.DT 91-0011-2007
PEKERJAAN KAYU

SNI.DT 91-0011-2007.6.1

Membuat dan memasang 1 m3 kusen pintu dan kusen jendela


kayu klas I

Rp.

SNI.DT 91-0011-2007.6.2

Membuat dan memasang 1 m kusen pintu dan kusen jendela


kayu klas II

Rp.

3
4

SNI.DT 91-0011-2007.6.3
SNI.DT 91-0011-2007.6.6

Membuat dan memasang 1 m daun pintu panel , kayu klas II


Membuat dan memasang 1 m2 pintu dan jendela kaca , kayu klas
II

SNI.DT 91-0011-2007.6.7

Membuat dan memasang 1 m pintu dan jendela jalusi , kayu klas


Rp.
II

SNI.DT 91-0011-2007.6.9

Membuat 1 m2 pintu plywood rangkap rangka expose , kayu klas II

7
8

SNI.DT 91-0011-2007.6.10

Memasang 1 m jalusi kusen, kayu klas II

SNI.DT 91-0011-2007.6.13

Memasang 1 m3 konstruksi kuda-kuda konvensional, kayu klas II

9
10
11
12
13
14
15
16

SNI.DT 91-0011-2007.6.15
SNI.DT 91-0011-2007.6.16
SNI.DT 91-0011-2007.6.17
SNI.DT 91-0011-2007.6.18
SNI.DT 91-0011-2007.6.19
SNI.DT 91-0011-2007.6.21
SNI.DT 91-0011-2007.6.23
SNI.DT 91-0011-2007.6.25

Memasang 1 m konstruksi gordeng, kayu klas II


Memasang 1 m2 rangka atap genteng keramik, kayu klas II
Memasang 1 m2 rangka atap genteng beton, kayu klas II
Memasang 1 m2 rangka atap seng BJLS, kayu klas II
Memasang 1 m2 rangka plafond, kayu klas III
Memasang 1 m' lisplank ukuran ( 1.5"x8") cm, kayu klas II
Memasang 1 m2 dinding pemisah (60x120)cm kayu klasIII
Memasang 1 m2 dinding partisi plywood rangkap, rangka kayu klas
III

Rp.
Rp.

10,780,400.00
8,781,000.00
532,980.00
378,510.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

672,710.00
500,900.00
569,340.00
7,983,200.00
7,471,840.00
308,460.00
430,720.00
979,860.00
88,070.00
85,840.00
133,700.00
233,020.00

H.

SNI.DT 91-0012-2007
PEKERJAAN PENUTUP LANTAI DAN DINDING

1
2
3
4
5
6
7
8
9
10
11
12
13

SNI.DT 91-0012-2007.6.13
SNI.DT 91-0012-2007.6.34
SNI.DT 91-0012-2007.6.35
SNI.DT 91-0012-2007.6.36
SNI.DT 91-0012-2007.6.36.1
SNI.DT 91-0012-2007.6.44
SNI.DT 91-0012-2007.6.46
SNI.DT 91-0012-2007.6.47
SNI.DT 91-0012-2007.6.57
SNI.DT 91-0012-2007.6.58
SNI.DT 91-0012-2007.6.60
SNI.DT 91-0012-2007.6.61
SNI.DT 91-0012-2007.6.7

Memasang 1 m2 lantai keramik ukuran (60x60) cm


Memasang 1 m2 lantai keramik ukuran (40x40) cm
Memasang 1 m2 lantai keramik ukuran (30x30) cm
Memasang 1 m2 lantai keramik ukuran (20x20) cm
Memasang 1 m2 dinding keramik ukuran (20x25) cm
Memasang 1 m2 lantai karpet
Memasang 1 m2 lantai parquet
Memasang 1 m2 lantai kayu (gym floor)
Memasang 1 m2 dinding batu paras
Memasang 1 m2 dinding batu tempel hitam
Memasang 1 m2 wall paper
Memasang 1 m2 floor hardener
Memasang 1 m2 conblok #6 cm

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

169,190.00
105,980.00
141,640.00
134,990.00
130,990.00
76,300.00
376,020.00
281,520.00
279,600.00
230,100.00
249,650.00
33,530.00
114,140.00

I.
1

SNI.DT 91-0013-2007
PEKERJAAN LANGIT-LANGIT
SNI.DT 91-0013-2007.6.1

Memasang 1 m2 langit-langit asbes semen

Rp.

21,850.00

2
3
4

SNI.DT 91-0013-2007.6.5
SNI.DT 91-0013-2007.6.6
SNI.DT 91-0013-2007.6.7

Rp.
Rp.

36,340.00
153,770.00

SNI.DT 91-0013-2007.6.9

Memasang 1 m2 langit-langit tripleks ukuran (120x240) cm


Memasang 1 m2 langit-langit lambriziring kayu, tebal 9 mm
Memasang 1 m2 langit-langit gypsum board ukuran (120x240x
90)mm
Memasang 1 m' list langit-langit kayu profil

Rp.

19,170.00
11,600.00

J.

SNI.DT 91-0014-2007
PEKERJAAN BESI DAN ALUMINIUM
SNI.DT 91-0014-2007.6.1
SNI.DT 91-0014-2007.6.2
SNI.DT 91-0014-2007.6.7
SNI.DT 91-0014-2007.6.8

Memasang 1 kg besi profil


Memasang 1 kg rangka kuda-kuda baj IWF
Memasang 1 m2 pintu rollling door besi
Memasang 1 m2 pintu lipat (folding door)

Rp.
Rp.
Rp.
Rp.

32,170.00
32,170.00
606,430.00
1,244,780.00

1
2
3
4

Rp.

sero ) Pelabuhan Indonesia I

18
REKAPITULASI ANALYSA PEKERJAAN TEKNIK SIPIL

No.

No.SNI

JENIS PEKERJAAN

H. SATUAN (Rp.)

1
5
6
7
8
9
10
11
12
13
14

2
SNI.DT 91-0014-2007.6.20
SNI.DT 91-0014-2007.6.20A
SNI.DT 91-0014-2007.6.20B
SNI.DT 91-0014-2007.6.20C
SNI.DT 91-0014-2007.6.20D
SNI.DT 91-0014-2007.6.20E
SNI.DT 91-0014-2007.6.20F
SNI.DT 91-0014-2007.6.20G
SNI.DT 91-0014-2007.6.20H
SNI.DT 91-0014-2007.6.20I

3
Memasang 1 m' pipa galvanis diameter 1/2"
Memasang 1 m' pipa galvanis diameter 3/4"
Memasang 1 m' pipa galvanis diameter 1"
Memasang 1 m' pipa galvanis diameter 1 1/2"
Memasang 1 m' pipa galvanis diameter 2"
Memasang 1 m' pipa galvanis diameter 2 1/2"
Memasang 1 m' pipa galvanis diameter 3"
Memasang 1 m' pipa galvanis diameter 4"
Memasang 1 m' pipa galvanis diameter 5"
Memasang 1 m' pipa galvanis diameter 6"

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

28,820.00
34,160.00
42,890.00
65,500.00
77,380.00
20,190.00
20,190.00
20,190.00
20,190.00
20,190.00

K.

SNI. 03-3436-1994
PEKERJAAN PENUTUP ATAP
SNI. 03-3436-1994.1
SNI. 03-3436-1994.2
SNI. 03-3436-1994.3
SNI. 03-3436-1994.4
SNI. 03-3436-1994.5
SNI. 03-3436-1994.6
SNI. 03-3436-1994.7
SNI. 03-3436-1994.8

1 m2 pasang atap genteng keramik


1 m' pasang nok genteng keramik
1 m2 pasang atap genteng beton
1 m' pasang nok genteng beton
1 m2 pasang atap genteng metal
1 m' pasang nok genteng metal
1 m2 pasang atap seng gelombang
1 m2 pasang atap nok seng

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

118,200.00
126,410.00
85,200.00
101,910.00
99,810.00
66,940.00
57,750.00
13,500.00

1
2
3
4

RSNI. T-15-2002
PEKERJAAN SANITASI
RSNI. T-15-2002.1
RSNI. T-15-2002.2
RSNI. T-15-2002.3
RSNI. T-15-2002.4

Memasang 1 buah kloset duduk/monobox


Memasang I buah kloset jongkok porselen
Memasang i1 buah urinoir
Memasang 1 buah wastafel

5
6
7
8
9
10
11
12
13
14
15
16
17

RSNI. T-15-2002.6
RSNI. T-15-2002.7
RSNI. T-15-2002.8
RSNI. T-15-2002.10
RSNI. T-15-2002.11
RSNI. T-15-2002.12
RSNI. T-15-2002.13
RSNI. T-15-2002.14
RSNI. T-15-2002.15
RSNI. T-15-2002.16
RSNI. T-15-2002.17
RSNI. T-15-2002.18
RSNI. T-15-2002.19

Memasang 1 buah bak mandi fiberglass volume 0.3 m 3


Memasang 1 buah bak mandi batu bata volume 0.3 m 3
Memasang 1 buah bak cuci piring stainless steel
Memasang 1 buah kran 3/4" atau 1/2"
Memasanh 1 buah floor drain
Memasang 1 m' pipa PVC tipe AW 1/2"
Memasang 1 m' pipa PVC tipe AW 3/4"
Memasang 1 m' pipa PVC tipe AW 1 "
Memasang 1 m' pipa PVC tipe AW 1 1/2"
Memasang 1 m' pipa PVC tipe AW 2"
Memasang 1 m' pipa PVC tipe AW 2 1/2"
Memasang 1 m' pipa PVC tipe AW 3"
Memasang 1 m' pipa PVC tipe AW 4"

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,010,800.00
440,020.00
1,106,700.00
789,650.00
710,520.00
753,480.00
717,640.00
21,860.00
23,860.00
10,210.00
11,170.00
13,600.00
14,800.00
19,100.00
17,530.00
29,070.00
34,830.00

M.

PT. T-30-2000-C
PEKERJAAN KUNCI DAN KACA
PT. T-30-2000-C.1
PT. T-30-2000-C.2
PT. T-30-2000-C.3
PT. T-30-2000-C.4
PT. T-30-2000-C.5
PT. T-30-2000-C.6
PT. T-30-2000-C.7
PT. T-30-2000-C.8
PT. T-30-2000-C.9
PT. T-30-2000-C.11
PT. T-30-2000-C.12
PT. T-30-2000-C.13
PT. T-30-2000-C.14
PT. T-30-2000-C.15

1 Buah pasang kunci tanam antik


1 Buah pasang kunci tanam biasa
1 Buah pasang kunci tanam kamar mandi
1 Buah pasang kunci silinder
1 Buah pasang engsel pintu
1 Buah pasang ensel jendela
1 Buah pasang hak angin
1 Buah pasang pegangan jendela
1 Buah pasang door closer
1 Buah pasang pegangan pintu/door holder
1 m2 pasang kaca tebal 3 mm
1 m2 pasang kaca tebal 5 mm
1 m2 pasang kaca tebal 8 mm
1 m2 pasang kaca buram tebal 12 mm

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

186,220.00
89,660.00
88,830.00
63,670.00
22,800.00
18,540.00
27,720.00
16,800.00
222,680.00
132,680.00
27,100.00
28,200.00
113,100.00
169,800.00

1
2
3
4
5
6
7
8
L.

1
2
3
4
5
6
7
8
9
10
11
12
13
14

sero ) Pelabuhan Indonesia I

19
REKAPITULASI ANALYSA PEKERJAAN TEKNIK SIPIL

No.

No.SNI

JENIS PEKERJAAN

H. SATUAN (Rp.)

N.
1
2
3

PT. T-38-2000-C
PEKERJAAN PENGECATAN
PT. T-38-2000-C.1
PT. T-38-2000-C.2
PT. T-38-2000-C.3

1 m2 pelaburan bidang kayu dengan vernis


1 m2 pengecatan bidang kayu lama
1 m2 pengecatan bidang kayu baru

Rp.
Rp.
Rp.

PT. T-38-2000-C.4

1 m2 pengecatan tembok/plafond baru str vinilex (1 lps plamur, 1


lps cat dasar,2 lps cat penutup)

Rp.

PT. T-38-2000-C.4.1

1 m2 pengecatan tembok/plafond lama str vinilex ( 1 lps cat


dasar,2 lps cat penutup)

Rp.

PT. T-38-2000-C.4.2

1 m2 pengecatan tembok/plafond lama str vinilex ( 2 lps cat


penutup)

Rp.

PT. T-38-2000-C.5

1 m pengecatan tembok/plafond baru str paragon (1 lps plamur, 1


Rp.
lps cat dasar,2 lps cat penutup)

14,800.00

PT. T-38-2000-C.5.1

1 m pengecatan tembok/plafond lama str paragon ( 1 lps cat


dasar,2 lps cat penutup)

Rp.

13,000.00

PT. T-38-2000-C.5.2

1 m2 pengecatan tembok/plafond lama str paragon (2 lps cat


penutup)

Rp.

10

PT. T-38-2000-C.6

1 m2 pengecatan permukaan baja dengan meni besi dan perancah

O.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

27,260.00
25,470.00
28,470.00
16,700.00

14,560.00
11,160.00

Rp.

PEKERJAAN PEMASANGAN KOZEN


PINTU/JENDELA METAL
1 Unit Kozen Metal Type PJ1
1 Unit Kozen Metal Type P1
1 Unit Kozen Metal Type P2
1 Unit Kozen Metal Type P3
1 Unit Kozen Metal Type P4
1 Unit Kozen Metal Type J1
1 Unit Kozen Metal Type J2
1 Unit Kozen Metal Type J3
1 Unit Kozen Metal Type J4
1 Unit Kozen Metal Type V1
1 Unit Kozen Metal Type V2
1 Unit Kozen Metal Type V3
1 Unit Kozen Metal Type V4
1 Unit Kozen Metal Type PJ 1K
1 Unit Kozen Metal Type P1 K
1 Unit Kozen Metal Type P2 K
1 Unit Kozen Metal Type P3 K
1 Unit Kozen Metal Type J 1 K
1 Unit Kozen Metal Type J 2 K
1 Unit Kozen Metal Type J 3 K
1 Unit Kozen Metal Type J 4 K
1 Unit Kozen Metal Type V 1 K
1 Unit Kozen Metal Type V 2 K
1 Unit Kozen Metal Type V 3 K
1 Unit Kozen Metal Type V 4 K

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

9,600.00
44,810.00

DAFTAR ANALISA PEKERJAAN


PT. T-30-2000-C
PEKERJAAN KUNCI DAN KACA
PT. T-30-2000-C.1
1 Buah pasang kunci tanam antik
Kebutuhan
Bahan Kunci Lock KCL biasa 6" (antik)
Pekerja
Tukang kayu
Tenaga
Kepala Tukang
Mandor

Satuan Indeks Harga satuan


bh
1.000 Rp. 135,000.00
Oh
0.060 Rp.
Oh
0.600 Rp.
Oh
0.060 Rp.
Oh
0.003 Rp.

Harga satuan
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
3,000.00
Rp.
43,200.00
Rp.
4,800.00
Rp.
216.00
51,216.00
Rp.
186,216.00
Rp.
186,220.00

PT. T-30-2000-C.2
1 Buah pasang kunci tanam biasa
Kebutuhan
Kunci
tanam 4"
Bahan
Pekerja
Tukang kayu
Tenaga
Kepala Tukang
Mandor

Satuan Indeks Harga satuan


bh
1.000 Rp.
52,000.00
Oh
0.010 Rp.
Oh
0.500 Rp.
Oh
0.010 Rp.
Oh
0.005 Rp.

Harga satuan
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
500.00
Rp.
36,000.00
Rp.
800.00
Rp.
360.00
37,660.00
Rp.
89,660.00
Rp.
89,660.00

PT. T-30-2000-C.3
1 Buah pasang kunci tanam kamar mandi
Kebutuhan
Bahan Kunci Lock besar 4"
Pekerja
Tukang kayu
Tenaga
Kepala Tukang
Mandor

Satuan Indeks Harga satuan


bh
1.000 Rp.
52,000.00
Oh
0.005 Rp.
Oh
0.500 Rp.
Oh
0.005 Rp.
Oh
0.003 Rp.

Harga satuan
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
250.00
Rp.
36,000.00
Rp.
400.00
Rp.
180.00
36,830.00
Rp.
88,830.00
Rp.
88,830.00

PT. T-30-2000-C.4
1 Buah pasang kunci silinder
Kebutuhan
Bahan Kunci silinder
Pekerja
Tukang kayu
Tenaga
Kepala Tukang
Mandor

Satuan Indeks Harga satuan


bh
1.000 Rp.
27,000.00
Oh
0.005 Rp.
Oh
0.500 Rp.
Oh
0.005 Rp.
Oh
0.000 Rp.

Harga satuan
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
250.00
Rp.
36,000.00
Rp.
400.00
Rp.
18.00
36,668.00
Rp.
63,668.00
Rp.
63,670.00

PT. T-30-2000-C.5
1 Buah pasang engsel pintu
Kebutuhan
Bahan Engsel pintu Nyilon 4"
Pekerja
Tukang kayu
Tenaga Kepala Tukang
Mandor

Satuan Indeks Harga satuan


bh
1.000 Rp.
10,000.00
Oh
0.015 Rp.
Oh
0.150 Rp.
Oh
0.015 Rp.
Oh
0.001 Rp.

Harga satuan
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
750.00
Rp.
10,800.00
Rp.
1,200.00
Rp.
54.00
12,804.00
Rp.
22,804.00
Rp.
22,800.00

PT. T-30-2000-C.6

Jumlah harga bahan


Rp.
135,000.00
Rp.
Rp.
Rp.
Rp.
135,000.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
52,000.00
Rp.
Rp.
Rp.
Rp.
52,000.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
52,000.00
Rp.
Rp.
Rp.
Rp.
52,000.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
27,000.00
Rp.
Rp.
Rp.
Rp.
27,000.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
10,000.00
Rp.
Rp.
Rp.
Rp.
10,000.00
Jumlah harga =
Pembulatan =

1 Buah pasang ensel jendela


Kebutuhan
Bahan Engsel jendela Nyilon 4"
Pekerja
Tukang kayu
Tenaga
Kepala Tukang
Mandor

Satuan Indeks Harga satuan


bh
1.000 Rp.
10,000.00
Oh
0.010 Rp.
Oh
0.100 Rp.
Oh
0.010 Rp.
Oh
0.001 Rp.

Harga satuan
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
500.00
Rp.
7,200.00
Rp.
800.00
Rp.
36.00
8,536.00
Rp.
18,536.00
Rp.
18,540.00

PT. T-30-2000-C.7
1 Buah pasang hak angin
Kebutuhan
Bahan Hak angin biasa
Pekerja
Tukang kayu
Tenaga
Kepala Tukang
Mandor

Satuan Indeks Harga satuan


pasang 1.000 Rp.
10,000.00
Oh
0.020 Rp.
Oh
0.200 Rp.
Oh
0.020 Rp.
Oh
0.010 Rp.

Harga satuan
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
1,000.00
Rp.
14,400.00
Rp.
1,600.00
Rp.
720.00
17,720.00
Rp.
27,720.00
Rp.
27,720.00

PT. T-30-2000-C.8
1 Buah pasang pegangan jendela
Kebutuhan
Bahan Handle (pegangan)
Pekerja
Tukang kayu
Tenaga
Kepala Tukang
Mandor

Satuan Indeks Harga satuan


bh
1.000 Rp.
4,000.00
Oh
0.015 Rp.
Oh
0.150 Rp.
Oh
0.015 Rp.
Oh
0.001 Rp.

Harga satuan
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
750.00
Rp.
10,800.00
Rp.
1,200.00
Rp.
54.00
12,804.00
Rp.
16,804.00
Rp.
16,800.00

PT. T-30-2000-C.9
1 Buah pasang door closer
Kebutuhan
Bahan Door closer
Pekerja
Tukang kayu
Tenaga
Kepala Tukang
Mandor

Satuan Indeks Harga satuan


bh
1.000 Rp. 180,000.00
Oh
0.050 Rp.
Oh
0.500 Rp.
Oh
0.050 Rp.
Oh
0.003 Rp.

Harga satuan
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
2,500.00
Rp.
36,000.00
Rp.
4,000.00
Rp.
180.00
42,680.00
Rp.
222,680.00
Rp.
222,680.00

PT. T-30-2000-C.11
1 Buah pasang pegangan pintu/door holder
Kebutuhan
Satuan Indeks Harga satuan
bh
1.000 Rp.
90,000.00
Bahan Door Holder
Pekerja
Oh
0.050 Rp.
Tukang kayu
Oh
0.500 Rp.
Tenaga
Kepala Tukang
Oh
0.050 Rp.
Mandor
Oh
0.003 Rp.

Harga satuan
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
2,500.00
Rp.
36,000.00
Rp.
4,000.00
Rp.
180.00
42,680.00
Rp.
132,680.00
Rp.
132,680.00

PT. T-30-2000-C.12
1 m2 pasang kaca tebal 3 mm
Kebutuhan
Bahan Kaca 3 mm
Pekerja
Tukang kayu
Tenaga

Jumlah harga bahan


Rp.
10,000.00
Rp.
Rp.
Rp.
Rp.
10,000.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
10,000.00
Rp.
Rp.
Rp.
Rp.
10,000.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
4,000.00
Rp.
Rp.
Rp.
Rp.
4,000.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
180,000.00
Rp.
Rp.
Rp.
Rp.
180,000.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
90,000.00
Rp.
Rp.
Rp.
Rp.
90,000.00
Jumlah harga =
Pembulatan =

Satuan Indeks Harga satuan


Harga satuan
m2
1.100 Rp.
13,000.00 Rp.
Oh
0.015 Rp.
Rp.
50,000.00
Oh
0.150 Rp.
Rp.
72,000.00

Jumlah harga bahan


Rp.
14,300.00
Rp.
Rp.

Jumlah harga upah


Rp.
Rp.
750.00
Rp.
10,800.00

Tenaga

Kepala Tukang
Mandor

Oh
Oh

0.015 Rp.
0.001 Rp.

Rp.
Rp.

80,000.00 Rp.
72,000.00 Rp.

Rp.
Rp.
14,300.00

Jumlah harga =
Pembulatan =

Rp.
Rp.

1,200.00
54.00
12,804.00
27,104.00
27,100.00

PT. T-30-2000-C.13
1 m2 pasang kaca tebal 5 mm
Kebutuhan
Bahan Kaca 5 mm
Pekerja
Tukang kayu
Tenaga
Kepala Tukang
Mandor

Satuan Indeks Harga satuan


m2
1.100 Rp.
14,000.00
Oh
0.015 Rp.
Oh
0.150 Rp.
Oh
0.015 Rp.
Oh
0.001 Rp.

Harga satuan
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
750.00
Rp.
10,800.00
Rp.
1,200.00
Rp.
54.00
12,804.00
Rp.
28,204.00
Rp.
28,200.00

PT. T-30-2000-C.14
1 m2 pasang kaca tebal 8 mm
Kebutuhan
Bahan Kaca 8 mm (tempred)
Pekerja
Tukang kayu
Tenaga
Kepala Tukang
Mandor

Satuan Indeks Harga satuan


m2
1.100 Rp.
90,000.00
Oh
0.017 Rp.
Oh
0.165 Rp.
Oh
0.017 Rp.
Oh
0.001 Rp.

Harga satuan
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
825.00
Rp.
11,880.00
Rp.
1,320.00
Rp.
57.60
14,082.60
Rp.
113,082.60
Rp.
113,100.00

PT. T-30-2000-C.15
1 m2 pasang kaca buram tebal 12 mm
Kebutuhan
Kaca
12 mm (tempred)
Bahan
Pekerja
Tukang kayu
Tenaga
Kepala Tukang
Mandor

Satuan Indeks Harga satuan


m2
1.100 Rp. 135,000.00
Oh
0.025 Rp.
Oh
0.250 Rp.
Oh
0.025 Rp.
Oh
0.001 Rp.

Harga satuan
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
1,250.00
Rp.
18,000.00
Rp.
2,000.00
Rp.
90.00
21,340.00
Rp.
169,840.00
Rp.
169,800.00

Jumlah harga bahan


Rp.
15,400.00
Rp.
Rp.
Rp.
Rp.
15,400.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
99,000.00
Rp.
Rp.
Rp.
Rp.
99,000.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
148,500.00
Rp.
Rp.
Rp.
Rp.
148,500.00
Jumlah harga =
Pembulatan =

DAFTAR ANALISA PEKERJAAN


RSNI. T-15-2002
PEKERJAAN SANITASI
RSNI. T-15-2002.1
Memasang 1 buah kloset duduk/monobox
Kebutuhan
Kloset duduk (dengan bak air)
Bahan
Perlengkapan
Pekerja
Tukang batu
Tenaga
Kepala Tukang
Mandor

Satuan
Indeks
Harga satuan
bh
1.000 Rp. 1,350,000.00
30% Dari bahan Rp.
405,000.00
Oh
3.300 Rp.
Oh
1.100 Rp.
Oh
0.001 Rp.
Oh
0.160 Rp.

Harga satuan
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
165,000.00
Rp.
79,200.00
Rp.
80.00
Rp.
11,520.00
255,800.00
Rp.
2,010,800.00
Rp.
2,010,800.00

RSNI. T-15-2002.2
Memasang I buah kloset jongkok porselen
Kebutuhan
Kloset jongkok porselen
Bahan Semen portland Pasir pasang
Pasir pasang
Pekerja
Tukang batu
Tenaga
Kepala Tukang
Mandor

Satuan
bh
kg
m3
Oh
Oh
Oh
Oh

Harga satuan
Rp.
143,000.00
Rp.
1,100.00
Rp.
90,000.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
108,000.00
Rp.
120,000.00
Rp.
11,520.00
289,520.00
Rp.
440,020.00
Rp.
440,020.00

RSNI. T-15-2002.3
Memasang i1 buah urinoir
Kebutuhan
Urinoir
Perlengkapan
Bahan Portland Semen
Pasir pasang
Pekerja
Tukang Batu
Tenaga Kepala Tukang
Mandor

Satuan
Indeks
Harga satuan
bh
1.000 Rp.
740,000.00
30% Dari bahan Rp.
222,000.00
kg
6.000 Rp.
1,100.00
m3
0.010 Rp.
90,000.00
Oh
1.000 Rp.
Oh
1.000 Rp.
Oh
0.100 Rp.
Oh
0.100 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
8,000.00
Rp.
7,200.00
137,200.00
Rp.
1,106,700.00
Rp.
1,106,700.00

RSNI. T-15-2002.4
Memasang 1 buah wastafel
Kebutuhan
Westafel biasa
Perlengkapan
Bahan
Semen Putih
Pasir pasang
Pekerja
Tukang batu
Tenaga
Kepala Tukang
Mandor

Satuan
Indeks
Harga satuan
bh
1.000 Rp.
459,000.00
30% dari bahan Rp. 137,700.00
kg
6.000 Rp.
3,075.00
m3
0.010 Rp.
90,000.00
Oh
1.000 Rp.
Oh
1.450 Rp.
Oh
0.150 Rp.
Oh
0.100 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
104,400.00
Rp.
12,000.00
Rp.
7,200.00
173,600.00
Rp.
789,650.00
Rp.
789,650.00

Indeks
1.000
6.000
0.010
1.000
1.500
1.500
0.160

RSNI. T-15-2002.6
Memasang 1 buah bak mandi fiberglass volume 0.3 m3
Kebutuhan
Satuan
Indeks
Bak fibreglass
bh
1.000
Bahan
Perlengkapan
Pekerja
Oh
1.800
Tukang batu
Oh
2.700
Tenaga
Kepala Tukang
Oh
0.540
Mandor
Oh
0.110

Jumlah harga bahan


Rp.
1,350,000.00
Rp.
405,000.00
Rp.
Rp.
Rp.
Rp.
1,755,000.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
143,000.00
Rp.
6,600.00
Rp.
900.00
Rp.
Rp.
Rp.
Rp.
150,500.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
740,000.00
Rp.
222,000.00
Rp.
6,600.00
Rp.
900.00
Rp.
Rp.
Rp.
Rp.
969,500.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
459,000.00
Rp.
137,700.00
Rp.
18,450.00
Rp.
900.00
Rp.
Rp.
Rp.
Rp.
616,050.00
Jumlah harga =
Pembulatan =

Harga satuan
Harga satuan
Rp.
375,000.00 Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

50,000.00
72,000.00
80,000.00
72,000.00

Jumlah harga bahan


Jumlah harga upah
Rp.
375,000.00 Rp.
Rp.
Rp.
Rp.
90,000.00
Rp.
Rp.
194,400.00
Rp.
Rp.
43,200.00
Rp.
Rp.
7,920.00

375,000.00
Jumlah harga =
Pembulatan =

Rp.
Rp.

335,520.00
710,520.00
710,520.00

RSNI. T-15-2002.7
Memasang 1 buah bak mandi batu bata volume 0.3 m3
Kebutuhan
Satuan
Indeks
Bata merah
bh
0.400
Semen portland
kg
120.000
m3
0.300
Bahan Pair pasang
m2
Keramik polos 20x20cm
7.200
Semen putih 40 kg
kg
6.000
Pekerja
Oh
6.000
Tukang batu
Oh
3.000
Tenaga
Kepala Tukang
Oh
0.300
Mandor
Oh
0.300

Harga satuan
Rp.
800.00
Rp.
1,100.00
Rp.
90,000.00
Rp.
1,960.00
Rp.
3,075.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
300,000.00
Rp.
216,000.00
Rp.
24,000.00
Rp.
21,600.00
561,600.00
Rp.
753,482.00
Rp.
753,480.00

RSNI. T-15-2002.8
Memasang 1 buah bak cuci piring stainless steel
Kebutuhan
Satuan
Bahan Bak cuci stainless steel 2 lobang unit
Pekerja
Oh
Tukang batu
Oh
Tenaga
Kepala Tukang
Oh
Mandor
Oh

Indeks
1.000
0.030
0.300
0.030
0.002

Harga satuan
Rp.
692,000.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
1,500.00
Rp.
21,600.00
Rp.
2,400.00
Rp.
144.00
25,644.00
Rp.
717,644.00
Rp.
717,640.00

RSNI. T-15-2002.10
Memasang 1 buah kran 3/4" atau 1/2"
Kebutuhan
Bahan Kran air lokal
Pekerja
Tukang batu
Tenaga
Kepala Tukang
Mandor

Satuan
bh
Oh
Oh
Oh
Oh

Indeks
1.000
0.010
0.100
0.010
0.005

Harga satuan
Rp.
13,000.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
500.00
Rp.
7,200.00
Rp.
800.00
Rp.
360.00
8,860.00
Rp.
21,860.00
Rp.
21,860.00

RSNI. T-15-2002.11
Memasanh 1 buah floor drain
Kebutuhan
Bahan Floor drain
Pekerja
Tukang batu
Tenaga Kepala Tukang
Mandor

Satuan
bh
Oh
Oh
Oh
Oh

Indeks
1.000
0.010
0.100
0.010
0.005

Harga satuan
Rp.
15,000.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
500.00
Rp.
7,200.00
Rp.
800.00
Rp.
360.00
8,860.00
Rp.
23,860.00
Rp.
23,860.00

RSNI. T-15-2002.12
Memasang 1 m' pipa PVC tipe AW 1/2"
Kebutuhan
Bahan Pipa PVC D 1/2"
Pekerja
Tukang batu
Tenaga Kepala Tukang
Mandor

Satuan
m'
Oh
Oh
Oh
Oh

Indeks
1.200
0.036
0.060
0.006
0.002

Harga satuan
Rp.
2,900.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
1,800.00
Rp.
4,320.00
Rp.
480.00
Rp.
129.60
6,729.60
Rp.
10,209.60
Rp.
10,210.00

RSNI. T-15-2002.13
Memasang 1 m' pipa PVC tipe AW 3/4"

Jumlah harga bahan


Rp.
320.00
Rp.
132,000.00
Rp.
27,000.00
Rp.
14,112.00
Rp.
18,450.00
Rp.
Rp.
Rp.
Rp.
191,882.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
692,000.00
Rp.
Rp.
Rp.
Rp.
692,000.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
13,000.00
Rp.
Rp.
Rp.
Rp.
13,000.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
15,000.00
Rp.
Rp.
Rp.
Rp.
15,000.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
3,480.00
Rp.
Rp.
Rp.
Rp.
3,480.00
Jumlah harga =
Pembulatan =

Satuan
m'
Oh
Oh
Oh
Oh

Indeks
1.200
0.036
0.060
0.006
0.002

Harga satuan
Rp.
3,700.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
1,800.00
Rp.
4,320.00
Rp.
480.00
Rp.
129.60
6,729.60
Rp.
11,169.60
Rp.
11,170.00

Satuan
m'
Oh
Oh
Oh
Oh

Indeks
1.200
0.036
0.060
0.006
0.002

Harga satuan
Rp.
5,700.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
1,800.00
Rp.
4,320.00
Rp.
480.00
Rp.
129.60
6,729.60
Rp.
13,569.60
Rp.
13,600.00

RSNI. T-15-2002.15
Memasang 1 m' pipa PVC tipe AW 1 1/2"
Kebutuhan
Satuan
m'
Bahan Pipa PVC tipe AW 1 1/2"
Pekerja
Oh
Tukang batu
Oh
Tenaga
Kepala Tukang
Oh
Mandor
Oh

Indeks
1.200
0.036
0.060
0.006
0.002

Harga satuan
Rp.
6,700.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
1,800.00
Rp.
4,320.00
Rp.
480.00
Rp.
129.60
6,729.60
Rp.
14,769.60
Rp.
14,800.00

RSNI. T-15-2002.16
Memasang 1 m' pipa PVC tipe AW 2"
Kebutuhan
Bahan Pipa PVC tipe AW 2"
Pekerja
Tukang batu
Tenaga
Kepala Tukang
Mandor

Satuan
m'
Oh
Oh
Oh
Oh

Indeks
1.200
0.054
0.090
0.009
0.003

Harga satuan
Rp.
7,500.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
2,700.00
Rp.
6,480.00
Rp.
720.00
Rp.
194.40
10,094.40
Rp.
19,094.40
Rp.
19,100.00

RSNI. T-15-2002.17
Memasang 1 m' pipa PVC tipe AW 2 1/2"
Kebutuhan
Satuan
m'
Bahan Pipa PVC tipe AW 2 1/2"
Pekerja
Oh
Tukang batu
Oh
Tenaga
Kepala Tukang
Oh
Mandor
Oh

Indeks
1.200
0.036
0.060
0.006
0.002

Harga satuan
Rp.
9,000.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
1,800.00
Rp.
4,320.00
Rp.
480.00
Rp.
129.60
6,729.60
Rp.
17,529.60
Rp.
17,530.00

RSNI. T-15-2002.18
Memasang 1 m' pipa PVC tipe AW 3"
Kebutuhan
Bahan Pipa PVC tipe AW 3"
Pekerja
Tukang kayu
Tenaga
Kepala Tukang
Mandor

Indeks
1.200
0.081
0.135
0.014
0.004

Harga satuan
Rp.
11,600.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
4,050.00
Rp.
9,720.00
Rp.
1,080.00
Rp.
295.20
15,145.20
Rp.
29,065.20
Rp.
29,070.00

Bahan
Tenaga

Kebutuhan
Pipa PVC tipe AW 3/4'
Pekerja
Tukang batu
Kepala Tukang
Mandor

RSNI. T-15-2002.14
Memasang 1 m' pipa PVC tipe AW 1 "
Kebutuhan
Bahan Pipa PVC tipe AW 1'
Pekerja
Tukang batu
Tenaga
Kepala Tukang
Mandor

Satuan
m'
Oh
Oh
Oh
Oh

Jumlah harga bahan


Rp.
4,440.00
Rp.
Rp.
Rp.
Rp.
4,440.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
6,840.00
Rp.
Rp.
Rp.
Rp.
6,840.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
8,040.00
Rp.
Rp.
Rp.
Rp.
8,040.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
9,000.00
Rp.
Rp.
Rp.
Rp.
9,000.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
10,800.00
Rp.
Rp.
Rp.
Rp.
10,800.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
13,920.00
Rp.
Rp.
Rp.
Rp.
13,920.00
Jumlah harga =
Pembulatan =

RSNI. T-15-2002.19
Memasang 1 m' pipa PVC tipe AW 4"
Kebutuhan
Bahan Pipa PVC tipe AW 4"
Pekerja
Tukang kayu
Tenaga
Kepala Tukang
Mandor

Satuan
m'
Oh
Oh
Oh
Oh

Indeks
1.200
0.081
0.135
0.014
0.004

Harga satuan
Rp.
16,400.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga bahan


Rp.
19,680.00
Rp.
Rp.
Rp.
Rp.
19,680.00
Jumlah harga =
Pembulatan =

Jumlah harga upah


Rp.
Rp.
4,050.00
Rp.
9,720.00
Rp.
1,080.00
Rp.
295.20
15,145.20
Rp.
34,825.20
Rp.
34,830.00

DAFTAR ANALISA PEKERJAAN


SNI. 03-3436-1994
PEKERJAAN PENUTUP ATAP
SNI. 03-3436-1994.1
1 m2 pasang atap genteng keramik
Kebutuhan
Genteng keramik
Bahan
Paku biasa 2"-5"
Pekerja
Tukang Kayu
Tenaga
Kepala Tukang
Mandor

Satuan
Lbr
kg
Oh
Oh
Oh
Oh

Indeks
11.000
0.030
0.200
0.100
0.010
0.010

Harga satuan
Rp.
9,000.00
Rp. 16,000.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
Rp. 50,000.00
Rp. 72,000.00
Rp. 80,000.00
Rp. 72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
10,000.00
Rp.
7,200.00
Rp.
800.00
Rp.
720.00
18,720.00
Rp.
118,200.00
Rp.
118,200.00

SNI. 03-3436-1994.2
1 m' pasang nok genteng keramik
Kebutuhan
Satuan
Rabung genteng keramik
lbr
Paku biasa 2"-5"
kg
Semen
abu-abu
kg
Bahan
m3
Pasir pasang
Semen warna
kg
Pekerja
Oh
Tukang Kayu
Oh
Tenaga
Kepala Tukang
Oh
Mandor
Oh

Indeks
3.500
0.050
10.800
0.032
1.000
0.400
0.200
0.020
0.020

Harga satuan
Rp. 14,000.00
Rp. 16,000.00
Rp.
3,075.00
Rp. 90,000.00
Rp.
3,075.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp. 50,000.00
Rp. 72,000.00
Rp. 80,000.00
Rp. 72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
20,000.00
Rp.
14,400.00
Rp.
1,600.00
Rp.
1,440.00
37,440.00
Rp.
126,405.00
Rp.
126,410.00

SNI. 03-3436-1994.3
1 m2 pasang atap genteng beton
Kebutuhan
Genteng beton
Bahan
Paku biasa 2"-5"
Pekerja
Tukang Kayu
Tenaga
Kepala Tukang
Mandor

Satuan
Lbr
kg
Oh
Oh
Oh
Oh

Indeks
11.000
0.030
0.200
0.100
0.010
0.010

Harga satuan
Rp.
6,000.00
Rp. 16,000.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
Rp. 50,000.00
Rp. 72,000.00
Rp. 80,000.00
Rp. 72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
10,000.00
Rp.
7,200.00
Rp.
800.00
Rp.
720.00
18,720.00
Rp.
85,200.00
Rp.
85,200.00

SNI. 03-3436-1994.4
1 m' pasang nok genteng beton
Kebutuhan
Rabung genteng beton
Paku biasa 2"-5"
Bahan Semen abu-abu
Pasir pasang
Semen warna
Pekerja
Tukang Kayu
Tenaga
Kepala Tukang
Mandor

Satuan
lbr
kg
kg
m3
kg
Oh
Oh
Oh
Oh

Indeks
3.500
0.050
10.800
0.032
1.000
0.400
0.200
0.020
0.020

Harga satuan
Rp.
7,000.00
Rp. 16,000.00
Rp.
3,075.00
Rp. 90,000.00
Rp.
3,075.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp. 50,000.00
Rp. 72,000.00
Rp. 80,000.00
Rp. 72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
20,000.00
Rp.
14,400.00
Rp.
1,600.00
Rp.
1,440.00
37,440.00
Rp.
101,905.00
Rp.
101,910.00

SNI. 03-3436-1994.5

Jumlah harga bahan


Rp.
99,000.00
Rp.
480.00
Rp.
Rp.
Rp.
Rp.
99,480.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
49,000.00
Rp.
800.00
Rp.
33,210.00
Rp.
2,880.00
Rp.
3,075.00
Rp.
Rp.
Rp.
Rp.
88,965.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
66,000.00
Rp.
480.00
Rp.
Rp.
Rp.
Rp.
66,480.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
24,500.00
Rp.
800.00
Rp.
33,210.00
Rp.
2,880.00
Rp.
3,075.00
Rp.
Rp.
Rp.
Rp.
64,465.00
Jumlah harga =
Pembulatan =

1 m2 pasang atap genteng metal


Kebutuhan
Genteng metal
Bahan
Paku biasa 2"-5"
Pekerja
Tukang Kayu
Tenaga
Kepala Tukang
Mandor

Satuan
Lbr
kg
Oh
Oh
Oh
Oh

Indeks
1.020
0.200
0.200
0.100
0.010
0.001

Harga satuan
Rp. 77,000.00
Rp. 16,000.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
Rp. 50,000.00
Rp. 72,000.00
Rp. 80,000.00
Rp. 72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
10,000.00
Rp.
7,200.00
Rp.
800.00
Rp.
72.00
18,072.00
Rp.
99,812.00
Rp.
99,810.00

SNI. 03-3436-1994.6
1 m' pasang nok genteng metal
Kebutuhan
Rabung genteng metal
Bahan
Paku biasa 1/2"-1"
Pekerja
Tukang Kayu
Tenaga
Kepala Tukang
Mandor

Satuan
Lbr
kg
Oh
Oh
Oh
Oh

Indeks
1.100
0.050
0.250
0.150
0.015
0.013

Harga satuan
Rp. 37,000.00
Rp. 16,000.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
Rp. 50,000.00
Rp. 72,000.00
Rp. 80,000.00
Rp. 72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
12,500.00
Rp.
10,800.00
Rp.
1,200.00
Rp.
936.00
25,436.00
Rp.
66,936.00
Rp.
66,940.00

SNI. 03-3436-1994.7
1 m2 pasang atap seng gelombang
Kebutuhan
Satuan
Seng gelombang 3"x6" BJ Lbr
Bahan
Paku biasa 1/2"-1"
kg
Pekerja
Oh
Tukang Kayu
Oh
Tenaga
Kepala Tukang
Oh
Mandor
Oh

Indeks
0.700
0.020
0.120
0.060
0.006
0.006

Harga satuan
Rp. 66,000.00
Rp. 16,000.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
Rp. 50,000.00
Rp. 72,000.00
Rp. 80,000.00
Rp. 72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
6,000.00
Rp.
4,320.00
Rp.
480.00
Rp.
432.00
11,232.00
Rp.
57,752.00
Rp.
57,750.00

SNI. 03-3436-1994.8
1 m2 pasang atap nok seng
Kebutuhan
Rabung seng
Bahan
Paku biasa 1/2"-1"
Pekerja
Tukang Kayu
Tenaga
Kepala Tukang
Mandor

Indeks
0.300
0.040
0.015
0.070
0.008
0.006

Harga satuan
Rp. 20,000.00
Rp. 16,000.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
Rp. 50,000.00
Rp. 72,000.00
Rp. 80,000.00
Rp. 72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
750.00
Rp.
5,040.00
Rp.
640.00
Rp.
432.00
6,862.00
Rp.
13,502.00
Rp.
13,500.00

Satuan
Lbr
kg
Oh
Oh
Oh
Oh

Jumlah harga bahan


Rp.
78,540.00
Rp.
3,200.00
Rp.
Rp.
Rp.
Rp.
81,740.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
40,700.00
Rp.
800.00
Rp.
Rp.
Rp.
Rp.
41,500.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
46,200.00
Rp.
320.00
Rp.
Rp.
Rp.
Rp.
46,520.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
6,000.00
Rp.
640.00
Rp.
Rp.
Rp.
Rp.
6,640.00
Jumlah harga =
Pembulatan =

DAFTAR ANALISA PEKERJAAN


SNI.DT 91-0014-2007
PEKERJAAN BESI DAN ALUMINIUM
SNI.DT 91-0014-2007.6.1
Memasang 1 kg besi profil
Kebutuhan
Bahan Besi Profil
Pekerja
Tukang las
Tenaga
Kepala Tukang
Mandor

Satuan
kg
Oh
Oh
Oh
Oh

Indeks
1.150
0.060
0.060
0.006
0.003

Harga satuan
Rp.
21,000.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp. 50,000.00
Rp. 72,000.00
Rp. 80,000.00
Rp. 72,000.00

Jumlah harga bahan


Rp.
24,150.00
Rp.
Rp.
Rp.
Rp.
24,150.00
Jumlah harga =
Pembulatan =

Jumlah harga upah


Rp.
Rp.
3,000.00
Rp.
4,320.00
Rp.
480.00
Rp.
216.00
8,016.00
Rp.
32,166.00
Rp.
32,170.00

SNI.DT 91-0014-2007.6.2
Memasang 1 kg rangka kuda-kuda baj IWF
Kebutuhan
Satuan
Indeks
kg
1.150
Bahan Besi baja IWF
Pekerja
Oh
0.060
Tukang
Oh
0.060
Tenaga Kepala Tukang
Oh
0.006
Mandor
Oh
0.003

Harga satuan
Rp.
21,000.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp. 50,000.00
Rp. 72,000.00
Rp. 80,000.00
Rp. 72,000.00

Jumlah harga upah


Rp.
Rp.
3,000.00
Rp.
4,320.00
Rp.
480.00
Rp.
216.00
8,016.00
Rp.
32,166.00
Rp.
32,170.00

SNI.DT 91-0014-2007.6.7
Memasang 1 m2 pintu rollling door besi
Kebutuhan
Satuan
Indeks
m2
1.000
Bahan Pintu gulung besi
Pekerja
Oh
1.200
Tukang
Oh
1.200
Tenaga Kepala Tukang
Oh
0.120
Mandor
Oh
0.006

Harga satuan
Rp.
450,000.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp. 50,000.00
Rp. 72,000.00
Rp. 80,000.00
Rp. 72,000.00

Jumlah harga upah


Rp.
Rp.
60,000.00
Rp.
86,400.00
Rp.
9,600.00
Rp.
432.00
156,432.00
Rp.
606,432.00
Rp.
606,430.00

SNI.DT 91-0014-2007.6.8
Memasang 1 m2 pintu lipat (folding door)
Kebutuhan
Satuan
Indeks
m2
1.000
Bahan Pintu lipat
Pekerja
Oh
0.440
Tukang
Oh
0.440
Tenaga
Kepala Tukang
Oh
0.044
Mandor
Oh
0.022

Harga satuan
Rp. 1,186,000.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp. 50,000.00
Rp. 72,000.00
Rp. 80,000.00
Rp. 72,000.00

Jumlah harga upah


Rp.
Rp.
22,000.00
Rp.
31,680.00
Rp.
3,520.00
Rp.
1,584.00
58,784.00
Rp.
1,244,784.00
Rp.
1,244,780.00

SNI.DT 91-0014-2007.6.20
Memasang 1 m' pipa galvanis diameter 1/2"
Kebutuhan
Satuan
Indeks
Pipa galvanis
m'
1.200
Bahan
Perlengkapan
35% Harga pipa
Pekerja
Oh
0.054
Tukang
Oh
0.090
Tenaga
Kepala Tukang
Oh
0.009
Mandor
Oh
0.027

Harga satuan
Rp.
10,950.00
Rp.
10,950.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
Rp. 50,000.00
Rp. 72,000.00
Rp. 80,000.00
Rp. 72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
2,700.00
Rp.
6,480.00
Rp.
720.00
Rp.
1,944.00
11,844.00
Rp.
28,816.50
Rp.
28,820.00

Jumlah harga bahan


Rp.
24,150.00
Rp.
Rp.
Rp.
Rp.
24,150.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
450,000.00
Rp.
Rp.
Rp.
Rp.
450,000.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
1,186,000.00
Rp.
Rp.
Rp.
Rp.
1,186,000.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
13,140.00
Rp.
3,832.50
Rp.
Rp.
Rp.
Rp.
16,972.50
Jumlah harga =
Pembulatan =

SNI.DT 91-0014-2007.6.20A
Memasang 1 m' pipa galvanis diameter 3/4"
Kebutuhan
Satuan
Indeks
Pipa galvanis
m'
1.200
Bahan
Perlengkapan
35% Harga pipa
Pekerja
Oh
0.054
Tukang
Oh
0.090
Tenaga
Kepala Tukang
Oh
0.009
Mandor
Oh
0.027

Harga satuan
Rp.
14,400.00
Rp.
14,400.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
Rp. 50,000.00
Rp. 72,000.00
Rp. 80,000.00
Rp. 72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
2,700.00
Rp.
6,480.00
Rp.
720.00
Rp.
1,944.00
11,844.00
Rp.
34,164.00
Rp.
34,160.00

SNI.DT 91-0014-2007.6.20B
Memasang 1 m' pipa galvanis diameter 1"
Kebutuhan
Satuan
Indeks
Pipa galvanis
m'
1.200
Bahan
Perlengkapan
35% Harga pipa
Pekerja
Oh
0.054
Tukang
Oh
0.090
Tenaga Kepala Tukang
Oh
0.009
Mandor
Oh
0.027

Harga satuan
Rp.
18,000.00
Rp.
27,000.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
Rp. 50,000.00
Rp. 72,000.00
Rp. 80,000.00
Rp. 72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
2,700.00
Rp.
6,480.00
Rp.
720.00
Rp.
1,944.00
11,844.00
Rp.
42,894.00
Rp.
42,890.00

SNI.DT 91-0014-2007.6.20C
Memasang 1 m' pipa galvanis diameter 1 1/2"
Kebutuhan
Satuan
Indeks
Pipa galvanis
m'
1.200
Bahan Perlengkapan
35% Harga pipa
Pekerja
Oh
0.108
Tukang
Oh
0.180
Tenaga Kepala Tukang
Oh
0.018
Mandor
Oh
0.005

Harga satuan
Rp.
27,000.00
Rp.
36,900.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
Rp. 50,000.00
Rp. 72,000.00
Rp. 80,000.00
Rp. 72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
5,400.00
Rp.
12,960.00
Rp.
1,440.00
Rp.
388.80
20,188.80
Rp.
65,503.80
Rp.
65,500.00

SNI.DT 91-0014-2007.6.20D
Memasang 1 m' pipa galvanis diameter 2"
Kebutuhan
Satuan
Indeks
Pipa galvanis
m'
1.200
Bahan
Perlengkapan
35% Harga pipa
Pekerja
Oh
0.108
Tukang
Oh
0.180
Tenaga
Kepala Tukang
Oh
0.018
Mandor
Oh
0.005

Harga satuan
Rp.
36,900.00
Rp.
36,900.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
Rp. 50,000.00
Rp. 72,000.00
Rp. 80,000.00
Rp. 72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
5,400.00
Rp.
12,960.00
Rp.
1,440.00
Rp.
388.80
20,188.80
Rp.
77,383.80
Rp.
77,380.00

SNI.DT 91-0014-2007.6.20E
Memasang 1 m' pipa galvanis diameter 2 1/2"
Kebutuhan
Satuan
Indeks
Pipa galvanis
m'
1.200
Bahan
Perlengkapan
35% Harga pipa
Pekerja
Oh
0.108
Tukang
Oh
0.180
Tenaga
Kepala Tukang
Oh
0.018
Mandor
Oh
0.005

Harga satuan
Rp.
0.00
Rp.
0.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
Rp. 50,000.00
Rp. 72,000.00
Rp. 80,000.00
Rp. 72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
5,400.00
Rp.
12,960.00
Rp.
1,440.00
Rp.
388.80
20,188.80
Rp.
20,188.80
Rp.
20,190.00

Jumlah harga bahan


Rp.
17,280.00
Rp.
5,040.00
Rp.
Rp.
Rp.
Rp.
22,320.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
21,600.00
Rp.
9,450.00
Rp.
Rp.
Rp.
Rp.
31,050.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
32,400.00
Rp.
12,915.00
Rp.
Rp.
Rp.
Rp.
45,315.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
44,280.00
Rp.
12,915.00
Rp.
Rp.
Rp.
Rp.
57,195.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
0.00
Rp.
0.00
Rp.
Rp.
Rp.
Rp.
0.00
Jumlah harga =
Pembulatan =

SNI.DT 91-0014-2007.6.20F
Memasang 1 m' pipa galvanis diameter 3"
Kebutuhan
Satuan
Indeks
Pipa galvanis
m'
1.200
Bahan
Perlengkapan
35% Harga pipa
Pekerja
Oh
0.108
Tukang
Oh
0.180
Tenaga
Kepala Tukang
Oh
0.018
Mandor
Oh
0.005

Harga satuan
Rp.
0.00
Rp.
0.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
Rp. 50,000.00
Rp. 72,000.00
Rp. 80,000.00
Rp. 72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
5,400.00
Rp.
12,960.00
Rp.
1,440.00
Rp.
388.80
20,188.80
Rp.
20,188.80
Rp.
20,190.00

SNI.DT 91-0014-2007.6.20G
Memasang 1 m' pipa galvanis diameter 4"
Kebutuhan
Satuan
Indeks
Pipa galvanis
m'
1.200
Bahan
Perlengkapan
35% Harga pipa
Pekerja
Oh
0.108
Tukang
Oh
0.180
Tenaga Kepala Tukang
Oh
0.018
Mandor
Oh
0.005

Harga satuan
Rp.
0.00
Rp.
0.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
Rp. 50,000.00
Rp. 72,000.00
Rp. 80,000.00
Rp. 72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
5,400.00
Rp.
12,960.00
Rp.
1,440.00
Rp.
388.80
20,188.80
Rp.
20,188.80
Rp.
20,190.00

SNI.DT 91-0014-2007.6.20H
Memasang 1 m' pipa galvanis diameter 5"
Kebutuhan
Satuan
Indeks
Pipa galvanis
m'
1.200
Bahan Perlengkapan
35% Harga pipa
Pekerja
Oh
0.108
Tukang
Oh
0.180
Tenaga Kepala Tukang
Oh
0.018
Mandor
Oh
0.005

Harga satuan
Rp.
0.00
Rp.
0.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
Rp. 50,000.00
Rp. 72,000.00
Rp. 80,000.00
Rp. 72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
5,400.00
Rp.
12,960.00
Rp.
1,440.00
Rp.
388.80
20,188.80
Rp.
20,188.80
Rp.
20,190.00

SNI.DT 91-0014-2007.6.20I
Memasang 1 m' pipa galvanis diameter 6"
Kebutuhan
Satuan
Indeks
Pipa galvanis
m'
1.200
Bahan
Perlengkapan
35% Harga pipa
Pekerja
Oh
0.108
Tukang
Oh
0.180
Tenaga
Kepala Tukang
Oh
0.018
Mandor
Oh
0.005

Harga satuan
Rp.
0.00
Rp.
0.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
Rp. 50,000.00
Rp. 72,000.00
Rp. 80,000.00
Rp. 72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
5,400.00
Rp.
12,960.00
Rp.
1,440.00
Rp.
388.80
20,188.80
Rp.
20,188.80
Rp.
20,190.00

Jumlah harga bahan


Rp.
0.00
Rp.
0.00
Rp.
Rp.
Rp.
Rp.
0.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
0.00
Rp.
0.00
Rp.
Rp.
Rp.
Rp.
0.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
0.00
Rp.
0.00
Rp.
Rp.
Rp.
Rp.
0.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
0.00
Rp.
0.00
Rp.
Rp.
Rp.
Rp.
0.00
Jumlah harga =
Pembulatan =

DAFTAR ANALISA PEKERJAAN


SNI.DT 91-0006-2007
PEKERJAAN TANAH
SNI.DT 91-0006-2007.6.1
Menggali 1 m3 tanah biasa sedalam 1 meter
Kebutuhan
Satuan Indeks
Harga satuan
Pekerja
Oh
0.750 Rp.
Tenaga
Mandor
Oh
0.025 Rp.

SNI.DT 91-0006-2007.6.2
Menggali 1 m3 tanah biasa sedalam 2 meter
Kebutuhan
Satuan Indeks
Harga satuan
Pekerja
Oh
0.900 Rp.
Tenaga
Mandor
Oh
0.045 Rp.

SNI.DT 91-0006-2007.6.3
Menggali 1 m3 tanah biasa sedalam 3 meter
Kebutuhan
Satuan Indeks
Harga satuan
Pekerja
Oh
1.050 Rp.
Tenaga
Mandor
Oh
0.067 Rp.

SNI.DT 91-0006-2007.6.5
Menggali 1 m3 tanah cadas sedalam 1 meter
Kebutuhan
Satuan Indeks
Harga satuan
Pekerja
Oh
1.500 Rp.
Tenaga
Mandor
Oh
0.060 Rp.

SNI.DT 91-0006-2007.6.6
Menggali 1 m3 tanah lumpur sedalam 1 meter
Kebutuhan
Satuan Indeks
Harga satuan
Pekerja
Oh
1.200 Rp.
Tenaga
Mandor
Oh
0.045 Rp.

SNI.DT 91-0006-2007.6.7
Mengerjakan 1 m2 stripping tebing setinggi 1 meter
Kebutuhan
Satuan Indeks
Harga satuan
Pekerja
Oh
0.050 Rp.
Tenaga
Mandor
Oh
0.005 Rp.

Harga satuan
Jumlah harga bahan
Rp.
50,000.00 Rp.
Rp.
72,000.00 Rp.
0.00
Jumlah harga =
Pembulatan =

Jumlah harga upah


Rp.
37,500.00
Rp.
1,800.00
39,300.00
Rp.
39,300.00
Rp.
39,300.00

Harga satuan
Jumlah harga bahan
Rp.
50,000.00 Rp.
Rp.
72,000.00 Rp.
0.00
Jumlah harga =
Pembulatan =

Jumlah harga upah


Rp.
45,000.00
Rp.
3,240.00
48,240.00
Rp.
48,240.00
Rp.
48,200.00

Harga satuan
Jumlah harga bahan
Rp.
50,000.00 Rp.
Rp.
72,000.00 Rp.
0.00
Jumlah harga =
Pembulatan =

Jumlah harga upah


Rp.
52,500.00
Rp.
4,824.00
57,324.00
Rp.
57,324.00
Rp.
57,300.00

Harga satuan
Jumlah harga bahan
Rp.
50,000.00 Rp.
Rp.
72,000.00 Rp.
0.00
Jumlah harga =
Pembulatan =

Jumlah harga upah


Rp.
75,000.00
Rp.
4,320.00
79,320.00
Rp.
79,320.00
Rp.
79,300.00

Harga satuan
Jumlah harga bahan
Rp.
50,000.00 Rp.
Rp.
72,000.00 Rp.
0.00
Jumlah harga =
Pembulatan =

Jumlah harga upah


Rp.
60,000.00
Rp.
3,240.00
63,240.00
Rp.
63,240.00
Rp.
63,200.00

Harga satuan
Jumlah harga bahan
Rp.
50,000.00 Rp.
Rp.
72,000.00 Rp.
0.00
Jumlah harga =
Pembulatan =

Jumlah harga upah


Rp.
2,500.00
Rp.
360.00
2,860.00
Rp.
2,860.00
Rp.
2,860.00

SNI.DT 91-0006-2007.6.8
Membuang 1 m3 tanah sejauh 30 meter
Kebutuhan
Satuan Indeks
Harga satuan
Pekerja
Oh
0.330 Rp.
Tenaga
Mandor
Oh
0.010 Rp.

Harga satuan
Jumlah harga bahan
Rp.
50,000.00 Rp.
Rp.
72,000.00 Rp.
0.00
Jumlah harga =
Pembulatan =

Jumlah harga upah


Rp.
16,500.00
Rp.
720.00
17,220.00
Rp.
17,220.00
Rp.
17,220.00

SNI.DT 91-0006-2007.6.9
Mengurug kembali 1 m3 galian
Kebutuhan
Satuan Indeks
Harga satuan
Harga satuan
Jumlah harga bahan
Jumlah harga upah
Mengurug kembali 1 m3 galian dihitung dari 1/3 kali upah pekerjaan
Menggali 1 m3 tanah biasa sedalam 3 meter
Jumlah harga =
Rp.
19,100.00
Pembulatan =
Rp.
19,100.00
SNI.DT 91-0006-2007.6.10
Memadatkan 1 m3 tanah (per 20 cm)
Kebutuhan
Satuan Indeks
Harga satuan
Pekerja
Oh
0.500 Rp.
Tenaga
Mandor
Oh
0.050 Rp.

SNI.DT 91-0006-2007.6.11
Mengurug 1 m3 pasir urug
Kebutuhan
Satuan
m3
Pasir Urug
Bahan
Tenaga

Pekerja
Mandor

Oh
Oh

Indeks
Harga satuan
1.200 Rp. 73,000.00
0.300 Rp.
0.010 Rp.

Harga satuan
Jumlah harga bahan
Rp.
50,000.00 Rp.
Rp.
72,000.00 Rp.
0.00
Jumlah harga =
Pembulatan =

Harga satuan
Rp.
Rp.
Rp.

Jumlah harga upah


Rp.
25,000.00
Rp.
3,600.00
28,600.00
Rp.
28,600.00
Rp.
28,600.00

Jumlah harga bahan


Jumlah harga upah
Rp.
87,600.00 Rp.

50,000.00 Rp.
72,000.00 Rp.

Rp.
Rp.
87,600.00

Jumlah harga =
Pembulatan =
SNI.DT 91-0006-2007.6.12
Mengurug 1 m3 tanah urug
Kebutuhan
Satuan
m3
Tanah Timbun
Bahan
Tenaga

Pekerja
Mandor

Oh
Oh

Indeks
Harga satuan
1.200 Rp. 69,000.00
0.300 Rp.
0.010 Rp.

Harga satuan
Rp.
Rp.
Rp.

Rp.
Rp.

Jumlah harga bahan


Jumlah harga upah
Rp.
82,800.00 Rp.

50,000.00 Rp.
72,000.00 Rp.

Rp.
Rp.
82,800.00

Jumlah harga =
Pembulatan =
SNI.DT 91-0006-2007.6.14
Memasang 1 m2 lapisan ijuk tebal 10 cm
Kebutuhan
Satuan Indeks
Harga satuan
Ijuk
kg
6.000 Rp. 27,000.00
Bahan
Tenaga

Pekerja
Mandor

Oh
Oh

0.150 Rp.
0.015 Rp.

Harga satuan
Rp.
Rp.
Rp.

15,000.00
720.00
15,720.00
103,320.00
103,300.00

Rp.
Rp.

15,000.00
720.00
15,720.00
98,520.00
98,500.00

Jumlah harga bahan


Jumlah harga upah
Rp.
162,000.00 Rp.

50,000.00 Rp.
72,000.00 Rp.

Rp.
Rp.
162,000.00

Jumlah harga =
Pembulatan =

Rp.
Rp.

7,500.00
1,080.00
8,580.00
170,580.00
170,580.00

SNI.DT 91-0006-2007.6.15
Mengurug 1 m3 sirtu padat untuk peninggian lantai bangunan
Kebutuhan
Satuan Indeks
Harga satuan
Harga satuan
m3
Sirtu
1.200 Rp. 99,000.00 Rp.
Bahan
Tenaga

Pekerja
Mandor

Oh
Oh

0.250 Rp.
0.025 Rp.

Rp.
Rp.

Jumlah harga bahan


Jumlah harga upah
Rp.
118,800.00 Rp.

50,000.00 Rp.
72,000.00 Rp.

Rp.
Rp.
118,800.00

Jumlah harga =
Pembulatan =

Rp.
Rp.

12,500.00
1,800.00
14,300.00
133,100.00
133,100.00

DAFTAR ANALISA PEKERJAAN


RSNI T-15-2002
PEKERJAAN PERSIAPAN
RSNI T-15-2002.1
1 m' Pagar sementara dari seng gelombang tinggi 2 m
Kebutuhan
Satuan Indeks
Broti kayu kls III
btg
0.030
Semen portland
kg
2.500
Seng Gelombang 3"-5"
lbr
1.200
Pasir pasang
m3
1.200
Bahan
m3
Kerikil beton
0.009
m3
Papan kayu klas III
0.072
Paku biasa 2"-5" Meni besi
kg
0.060
Meni besi
Lt
0.450
Pekerja
Oh
0.400
Tukang Kayu
Oh
0.200
Tenaga
Kepala Tukang
Oh
0.020
Mandor
Oh
0.020

Harga satuan
Rp. 3,115,000.00
Rp.
1,100.00
Rp.
38,000.00
Rp.
90,000.00
Rp.
166,000.00
Rp. 3,115,000.00
Rp.
16,000.00
Rp.
20,000.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp. 50,000.00
Rp. 72,000.00
Rp. 80,000.00
Rp. 72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
20,000.00
Rp.
14,400.00
Rp.
1,600.00
Rp.
1,440.00
37,440.00
Rp.
522,974.00
Rp.
522,970.00

RSNI.T-15-2002.2
1 m' Pek. Pengukuran & pemasangan Bowplank
Kebutuhan
Satuan Indeks
Broti kayu kls III
btg
0.012
kg
0.020
Bahan Paku biasa 2"-5" Meni besi
m3
Papan kayu klas III
0.007
Pekerja
Oh
0.100
Tukang Kayu
Oh
0.100
Tenaga
Kepala Tukang
Oh
0.010
Mandor
Oh
0.005

Harga satuan
Rp. 3,115,000.00
Rp.
16,000.00
Rp. 3,115,000.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp. 50,000.00
Rp. 72,000.00
Rp. 80,000.00
Rp. 72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
5,000.00
Rp.
7,200.00
Rp.
800.00
Rp.
360.00
13,360.00
Rp.
72,865.00
Rp.
72,870.00

RSNI.T-15-2002.3
1 m2 Pek. Kantor direksi keet dengan lantai plesteran
Kebutuhan
Satuan Indeks
Kayu setara Damuli 8-10
m'
5.625
m3
Broti kayu kls III
0.180
Paku
kg
0.850
Besi Strip
kg
1.100
Semen portland
kg
35.000
m3
Pasir pasang
0.250
m3
0.150
Bahan Koral
Bata Merah
bh
30.000
Seng Gelombang BJLS 32
lbr
1.500
Jendela Nako (Rangka+kaca m2
0.500
Kaca Polos
m2
0.080
Kunci Tanam
bh
0.150
Tripleks 6mm
lbr
0.060
Pekerja
Oh
2.000
Tukang Kayu
Oh
2.000
Oh
1.000
Tenaga Tukang Batu
Kepala Tukang
Oh
0.300
Mandor
Oh
0.050

Harga satuan
Rp.
18,000.00
Rp. 3,115,000.00
Rp.
16,000.00
Rp.
21,000.00
Rp.
1,100.00
Rp.
90,000.00
Rp.
145,000.00
Rp.
800.00
Rp.
66,000.00
Rp.
108,000.00
Rp.
13,000.00
Rp.
135,000.00
Rp.
90,000.00
Rp.
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp. 50,000.00
Rp. 72,000.00
Rp. 72,000.00
Rp. 80,000.00
Rp. 72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
100,000.00
Rp.
144,000.00
Rp.
72,000.00
Rp.
24,000.00
Rp.
3,600.00
343,600.00
Rp. 1,328,690.00
Rp. 1,328,690.00

Jumlah harga bahan


Rp.
93,450.00
Rp.
2,750.00
Rp.
45,600.00
Rp.
108,000.00
Rp.
1,494.00
Rp.
224,280.00
Rp.
960.00
Rp.
9,000.00
Rp.
Rp.
Rp.
Rp.
485,534.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
37,380.00
Rp.
320.00
Rp.
21,805.00
Rp.
Rp.
Rp.
Rp.
59,505.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
101,250.00
Rp.
560,700.00
Rp.
13,600.00
Rp.
23,100.00
Rp.
38,500.00
Rp.
22,500.00
Rp.
21,750.00
Rp.
24,000.00
Rp.
99,000.00
Rp.
54,000.00
Rp.
1,040.00
Rp.
20,250.00
Rp.
5,400.00
Rp.
Rp.
Rp.
Rp.
Rp.
985,090.00
Jumlah harga =
Pembulatan =

RSNI.T-15-2002.4
1 m2 Pembuatan gudang sementara dan alat-alat
Kebutuhan
Satuan Indeks
Kayu setara Damuli 8-10
m'
7.650
m3
Broti kayu kls III
0.210
Paku
kg
0.300
kg
10.500
Bahan Semen portland
Pasir pasang
m3
0.030
Koral
m3
0.050
Seng Gelombang BJLS 32
lbr
1.500
Pekerja
Oh
1.000
Tukang Kayu
Oh
2.000
Tenaga
Kepala Tukang
Oh
0.200
Mandor
Oh
0.050

Harga satuan
Rp.
18,000.00
Rp. 3,115,000.00
Rp.
16,000.00
Rp.
1,100.00
Rp.
90,000.00
Rp.
145,000.00
Rp.
66,000.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp. 50,000.00
Rp. 72,000.00
Rp. 80,000.00
Rp. 72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
144,000.00
Rp.
16,000.00
Rp.
3,600.00
213,600.00
Rp. 1,130,750.00
Rp. 1,130,750.00

RSNI.T-15-2002.5
1 m2 Pembuatan rumah jaga konstruksi kayu
Kebutuhan
Satuan
Kayu setara Damuli 8-10
m'
Broti kayu kls III
m3
Bahan
Paku
kg
Seng Gelombang BJLS 32
lbr
Pekerja
Oh
Tukang Kayu
Oh
Tenaga Kepala Tukang
Oh
Mandor
Oh

Indeks
13.500
0.276
0.700
1.500
1.000
1.500
0.150
0.050

Harga satuan
Rp.
18,000.00
Rp. 3,115,000.00
Rp.
16,000.00
Rp.
66,000.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp. 50,000.00
Rp. 72,000.00
Rp. 80,000.00
Rp. 72,000.00

Jumlah harga bahan


Rp.
243,000.00
Rp.
859,740.00
Rp.
11,200.00
Rp.
99,000.00
Rp.
Rp.
Rp.
Rp.
1,212,940.00
Jumlah harga =
Pembulatan =

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
108,000.00
Rp.
12,000.00
Rp.
3,600.00
173,600.00
Rp. 1,386,540.00
Rp. 1,386,540.00

RSNI.T-15-2002.6
1 m2 Membersihkan lapangan dan perataan
Kebutuhan
Satuan
Pekerja
Oh
Tenaga
Mandor
Oh

Indeks
Harga satuan
0.100 Rp.
0.050 Rp.

Harga satuan Jumlah harga bahan


Rp. 50,000.00 Rp.
Rp. 72,000.00 Rp.
0.00
Jumlah harga =
Pembulatan =

Jumlah harga upah


Rp.
5,000.00
Rp.
3,600.00
8,600.00
Rp.
8,600.00
Rp.
8,600.00

RSNI.T-15-2002.7
1 m2 Pembuatan bedeng buruh
Kebutuhan
Kayu setara Damuli 8-10
Broti kayu kls III
Paku
Bahan Semen portland
Pasir pasang
Koral
Seng Gelombang BJLS 32
Tripleks 6mm
Pekerja
Tukang Kayu
Tenaga
Kepala Tukang
Mandor

Indeks
5.625
0.186
0.300
18.000
0.030
0.050
1.500
1.350
1.000
2.000
0.200
0.050

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp. 50,000.00
Rp. 72,000.00
Rp. 80,000.00
Rp. 72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Satuan
m'
m3
kg
kg
m3
m3
lbr
lbr
Oh
Oh
Oh
Oh

Harga satuan
Rp.
18,000.00
Rp. 3,115,000.00
Rp.
16,000.00
Rp.
1,100.00
Rp.
90,000.00
Rp.
145,000.00
Rp.
66,000.00
Rp.
90,000.00
Rp.
Rp.
Rp.
Rp.

Jumlah harga bahan


Rp.
137,700.00
Rp.
654,150.00
Rp.
4,800.00
Rp.
11,550.00
Rp.
2,700.00
Rp.
7,250.00
Rp.
99,000.00
Rp.
Rp.
Rp.
Rp.
917,150.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
101,250.00
Rp.
579,390.00
Rp.
4,800.00
Rp.
19,800.00
Rp.
2,700.00
Rp.
7,250.00
Rp.
99,000.00
Rp.
121,500.00
Rp.
Rp.
Rp.
Rp.
935,690.00
Jumlah harga =
Pembulatan =

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

50,000.00
144,000.00
16,000.00
3,600.00
213,600.00
1,149,290.00
1,149,290.00

DAFTAR ANALISA PEKERJAAN


SNI.DT 91-0008-2007
PEKERJAAN BETON
SNI.DT 91-0008-2007.6.1
Membuat 1 m3 beton mutu K 100
Kebutuhan
Satuan Indeks
Harga satuan
Portland Semen
kg
247.000 Rp.
1,100.00
m3
0.869 Rp.
90,000.00
Bahan Pasir pasang
m3
Batu Pecah 5-7 cm
0.999 Rp.
197,000.00
Pekerja
Oh
1.650 Rp.
Tukang batu
Oh
0.275 Rp.
Tenaga
Kepala Tukang
Oh
0.028 Rp.
Mandor
Oh
0.083 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
82,500.00
Rp.
19,800.00
Rp.
2,240.00
Rp.
5,976.00
110,516.00
Rp.
657,229.00
Rp.
657,230.00

SNI.DT 91-0008-2007.6.2
Membuat 1 m3 beton mutu K 125
Kebutuhan
Satuan Indeks
Harga satuan
Portland Semen
kg
276.000 Rp.
1,100.00
m3
0.828 Rp.
90,000.00
Bahan Pasir pasang
m3
Kerikil Beton
1.012 Rp.
166,000.00
Pekerja
Oh
1.650 Rp.
Tukang batu
Oh
0.275 Rp.
Tenaga
Kepala Tukang
Oh
0.028 Rp.
Mandor
Oh
0.083 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
82,500.00
Rp.
19,800.00
Rp.
2,240.00
Rp.
5,976.00
110,516.00
Rp.
656,628.00
Rp.
656,630.00

Harga satuan
Rp.

Jumlah harga upah


Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

SNI.DT 91-0008-2007.6.4
Membuat 1 m3 beton mutu K 150
Kebutuhan
Satuan Indeks
Harga satuan
Portland Semen
kg
299.000 Rp.
1,100.00
m3
0.799 Rp.
90,000.00
Bahan Pasir pasang
m3
Kerikil Beton
1.017 Rp.
166,000.00
Pekerja
Oh
1.650 Rp.
Tukang Batu
Oh
0.275 Rp.
Tenaga
Kepala Tukang
Oh
0.028 Rp.
Mandor
Oh
0.083 Rp.

SNI.DT 91-0008-2007.6.5
Membuat 1 m3 beton mutu K 175
Kebutuhan
Satuan Indeks
Harga satuan
Portland Semen
kg
326.000 Rp.
1,100.00
m3
0.760 Rp.
90,000.00
Bahan Pasir pasang
m3
Kerikil Beton
1.029 Rp.
166,000.00
Pekerja
Oh
1.650 Rp.
Tukang batu
Oh
0.275 Rp.
Tenaga
Kepala Tukang
Oh
0.028 Rp.
Mandor
Oh
0.083 Rp.

Jumlah harga bahan


Rp.
271,700.00
Rp.
78,210.00
Rp.
196,803.00
Rp.
Rp.
Rp.
Rp.
546,713.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
303,600.00
Rp.
74,520.00
Rp.
167,992.00
Rp.
Rp.
Rp.
Rp.
546,112.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
328,900.00
Rp.
71,910.00
Rp.
168,822.00
50,000.00 Rp.
72,000.00 Rp.
80,000.00 Rp.
72,000.00 Rp.
569,632.00
Jumlah harga =
Pembulatan =

Harga satuan
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga bahan


Rp.
358,600.00
Rp.
68,400.00
Rp.
170,814.00
Rp.
Rp.
Rp.
Rp.
597,814.00
Jumlah harga =
Pembulatan =

Rp.
Rp.

82,500.00
19,800.00
2,240.00
5,976.00
110,516.00
680,148.00
680,150.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
82,500.00
Rp.
19,800.00
Rp.
2,240.00
Rp.
5,976.00
110,516.00
Rp.
708,330.00
Rp.
708,330.00

SNI.DT 91-0008-2007.6.6
Membuat 1 m3 beton mutu f'c = 16.9 Mpa k200
Kebutuhan
Satuan Indeks
Portland Semen
kg
352.000
m3
0.731
Bahan Pasir pasang
m3
Kerikil Beton
1.031
Pekerja
Oh
1.650
Tukang batu
Oh
0.275
Tenaga
Kepala Tukang
Oh
0.028
Mandor
Oh
0.083

Harga satuan
Rp.
1,100.00
Rp.
90,000.00
Rp.
166,000.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga bahan


Rp.
387,200.00
Rp.
65,790.00
Rp.
171,146.00
Rp.
Rp.
Rp.
Rp.
624,136.00
Jumlah harga =
Pembulatan =

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
82,500.00
Rp.
19,800.00
Rp.
2,240.00
Rp.
5,976.00
110,516.00
Rp.
734,652.00
Rp.
734,650.00

SNI.DT 91-0008-2007.6.7
Membuat 1 m3 beton mutu K 225
Kebutuhan
Satuan Indeks
Harga satuan
Portland Semen
kg
371.000 Rp.
1,100.00
m3
0.698 Rp.
90,000.00
Bahan Pasir pasang
m3
Kerikil Beton
1.047 Rp.
166,000.00
Pekerja
Oh
1.650 Rp.
Tukang batu
Oh
0.275 Rp.
Tenaga
Kepala Tukang
Oh
0.028 Rp.
Mandor
Oh
0.083 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
82,500.00
Rp.
19,800.00
Rp.
2,240.00
Rp.
5,976.00
110,516.00
Rp.
755,238.00
Rp.
755,240.00

SNI.DT 91-0008-2007.6.8
Membuat 1 m3 beton mutu K 250
Kebutuhan
Satuan Indeks
Harga satuan
Portland Semen
kg
384.000 Rp.
1,100.00
m3
0.692 Rp.
90,000.00
Bahan Pasir pasang
m3
Kerikil Beton
1.039 Rp.
166,000.00
Pekerja
Oh
1.650 Rp.
Tukang batu
Oh
0.275 Rp.
Tenaga
Kepala Tukang
Oh
0.028 Rp.
Mandor
Oh
0.083 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
82,500.00
Rp.
19,800.00
Rp.
2,240.00
Rp.
5,976.00
110,516.00
Rp.
767,670.00
Rp.
767,670.00

SNI.DT 91-0008-2007.6.9
Membuat 1 m3 beton mutu K 275
Kebutuhan
Satuan Indeks
Harga satuan
Portland Semen
kg
406.000 Rp.
1,100.00
m3
0.684 Rp.
90,000.00
Bahan Pasir pasang
m3
Kerikil Beton
1.026 Rp.
166,000.00
Pekerja
Oh
1.650 Rp.
Tukang batu
Oh
0.275 Rp.
Tenaga
Kepala Tukang
Oh
0.028 Rp.
Mandor
Oh
0.083 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
82,500.00
Rp.
19,800.00
Rp.
2,240.00
Rp.
5,976.00
110,516.00
Rp.
788,992.00
Rp.
788,990.00

Jumlah harga bahan


Rp.
408,100.00
Rp.
62,820.00
Rp.
173,802.00
Rp.
Rp.
Rp.
Rp.
644,722.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
422,400.00
Rp.
62,280.00
Rp.
172,474.00
Rp.
Rp.
Rp.
Rp.
657,154.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
446,600.00
Rp.
61,560.00
Rp.
170,316.00
Rp.
Rp.
Rp.
Rp.
678,476.00
Jumlah harga =
Pembulatan =

SNI.DT 91-0008-2007.6.10
Membuat 1 m3 beton mutu K 300
Kebutuhan
Satuan Indeks
Harga satuan
Portland Semen
kg
413.000 Rp.
1,100.00
m3
0.681 Rp.
90,000.00
Bahan Pasir pasang
m3
Kerikil Beton
1.021 Rp.
166,000.00
Pekerja
Oh
1.650 Rp.
Tukang batu
Oh
0.275 Rp.
Tenaga
Kepala Tukang
Oh
0.028 Rp.
Mandor
Oh
0.083 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
82,500.00
Rp.
19,800.00
Rp.
2,240.00
Rp.
5,976.00
110,516.00
Rp.
795,592.00
Rp.
795,590.00

SNI.DT 91-0008-2007.6.11
Membuat 1 m3 beton mutu K 325
Kebutuhan
Satuan Indeks
Harga satuan
Portland Semen
kg
439.000 Rp.
1,100.00
m3
0.670 Rp.
90,000.00
Bahan Pasir pasang
m3
Kerikil Beton
1.006 Rp.
166,000.00
Pekerja
Oh
2.100 Rp.
Tukang batu
Oh
0.350 Rp.
Tenaga
Kepala Tukang
Oh
0.035 Rp.
Mandor
Oh
0.105 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
105,000.00
Rp.
25,200.00
Rp.
2,800.00
Rp.
7,560.00
140,560.00
Rp.
850,756.00
Rp.
850,760.00

SNI.DT 91-0008-2007.6.12
Membuat 1 m3 beton mutu K 350
Kebutuhan
Satuan Indeks
Harga satuan
Portland Semen
kg
448.000 Rp.
1,100.00
m3
0.667 Rp.
90,000.00
Bahan Pasir pasang
m3
Kerikil Beton
1.000 Rp.
166,000.00
Pekerja
Oh
2.100 Rp.
Tukang batu
Oh
0.350 Rp.
Tenaga
Kepala Tukang
Oh
0.035 Rp.
Mandor
Oh
0.105 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
105,000.00
Rp.
25,200.00
Rp.
2,800.00
Rp.
7,560.00
140,560.00
Rp.
859,390.00
Rp.
859,390.00

SNI.DT 91-0008-2007.6.17
Pembesian 10 kg dengan besi polos atau besi ulir
Kebutuhan
Satuan Indeks
Harga satuan
Besi beton (polos/ulir) kg
10.500 Rp.
13,000.00
Bahan
Kawat beton
kg
0.150 Rp.
19,000.00
Pekerja
Oh
0.070 Rp.
Tukang batu
Oh
0.070 Rp.
Tenaga
Kepala Tukang
Oh
0.007 Rp.
Mandor
Oh
0.004 Rp.

Harga satuan
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
3,500.00
Rp.
5,040.00
Rp.
560.00
Rp.
288.00
9,388.00
Rp.
148,738.00
Rp.
148,700.00

SNI.DT 91-0008-2007.6.18
Memasang 10 kg kabel pres stressed polos /strands
Kebutuhan
Satuan Indeks
Harga satuan
Besi beton (polos/ulir) kg
10.500 Rp.
13,000.00
Bahan
Kawat beton
kg
0.100 Rp.
19,000.00
Pekerja
Oh
0.050 Rp.
Tukang batu
Oh
0.050 Rp.
Tenaga
Kepala Tukang
Oh
0.005 Rp.
Mandor
Oh
0.003 Rp.

Harga satuan
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga bahan


Rp.
454,300.00
Rp.
61,290.00
Rp.
169,486.00
Rp.
Rp.
Rp.
Rp.
685,076.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
482,900.00
Rp.
60,300.00
Rp.
166,996.00
Rp.
Rp.
Rp.
Rp.
710,196.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
492,800.00
Rp.
60,030.00
Rp.
166,000.00
Rp.
Rp.
Rp.
Rp.
718,830.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
136,500.00
Rp.
2,850.00
Rp.
Rp.
Rp.
Rp.
139,350.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
136,500.00
Rp.
1,900.00
Rp.
Rp.
Rp.
Rp.
138,400.00

Jumlah harga upah


Rp.
Rp.
Rp.
2,500.00
Rp.
3,600.00
Rp.
400.00
Rp.
216.00
6,716.00

Jumlah harga =
Pembulatan =

Rp.
Rp.

145,116.00
145,100.00

SNI.DT 91-0008-2007.6.19
Memasang 10 kg jaring kawat baja/wire mest
Kebutuhan
Satuan Indeks
Jaring kawat baja dila
kg
10.200
Bahan
Kawat beton
kg
0.050
Pekerja
Oh
0.025
Tukang batu
Oh
0.025
Tenaga
Kepala Tukang
Oh
0.025
Mandor
Oh
0.001

Harga satuan
Rp.
13,000.00
Rp.
19,000.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
1,250.00
Rp.
1,800.00
Rp.
2,024.00
Rp.
72.00
5,146.00
Rp.
138,696.00
Rp.
138,700.00

SNI.DT 91-0008-2007.6.20
Memasang 1 m2 bekisting untuk pondasi
Kebutuhan
Satuan Indeks
m3
Kayu klas III
0.040
kg
0.300
Bahan Paku 5cm-10cm
minyak bekisting
Ltr
0.100
Pekerja
Oh
0.520
Tukang kayu
Oh
0.260
Tenaga
Kepala Tukang
Oh
0.026
Mandor
Oh
0.026

Harga satuan
Rp. 3,115,000.00
Rp.
16,000.00
Rp.
22,000.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
26,000.00
Rp.
18,720.00
Rp.
2,080.00
Rp.
1,872.00
48,672.00
Rp.
180,272.00
Rp.
180,270.00

SNI.DT 91-0008-2007.6.21
Memasang 1 m2 bekisting untuk sloof
Kebutuhan
Satuan
m3
Kayu klas III
kg
Bahan Paku 5cm-10cm
minyak bekisting
Ltr
Pekerja
Oh
Tukang kayu
Oh
Tenaga
Kepala Tukang
Oh
Mandor
Oh

Indeks
0.045
0.300
0.100
0.520
0.260
0.026
0.026

Harga satuan
Rp. 3,115,000.00
Rp.
16,000.00
Rp.
22,000.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
26,000.00
Rp.
18,720.00
Rp.
2,080.00
Rp.
1,872.00
48,672.00
Rp.
195,847.00
Rp.
195,850.00

SNI.DT 91-0008-2007.6.22
Memasang 1 m2 bekisting untuk kolom
Kebutuhan
Satuan
m3
Kayu klas III
kg
Bahan Paku 5cm-12cm
minyak bekisting
Ltr
m3
Balok kayu klas III
Tripleks tebal 9 mm
Lbr
Kayu Bulat O4" K
Btg
Pekerja
Oh
Tukang kayu
Oh
Tenaga
Kepala Tukang
Oh
Mandor
Oh

Indeks
0.040
0.400
0.200
0.015
0.350
2.000
0.660
0.330
0.033
0.033

Harga satuan
Rp. 3,115,000.00
Rp.
16,000.00
Rp.
22,000.00
Rp. 3,115,000.00
Rp.
110,000.00
Rp.
18,000.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
33,000.00
Rp.
23,760.00
Rp.
2,640.00
Rp.
2,376.00
61,776.00
Rp.
318,401.00
Rp.
318,400.00

Jumlah harga bahan


Rp.
132,600.00
Rp.
950.00
Rp.
Rp.
Rp.
Rp.
133,550.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
124,600.00
Rp.
4,800.00
Rp.
2,200.00
Rp.
Rp.
Rp.
Rp.
131,600.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
140,175.00
Rp.
4,800.00
Rp.
2,200.00
Rp.
Rp.
Rp.
Rp.
147,175.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
124,600.00
Rp.
6,400.00
Rp.
4,400.00
Rp.
46,725.00
Rp.
38,500.00
Rp.
36,000.00
Rp.
Rp.
Rp.
Rp.
256,625.00
Jumlah harga =
Pembulatan =

SNI.DT 91-0008-2007.6.23
Memasang 1 m2 bekisting untuk balok
Kebutuhan
Satuan
m3
Kayu klas III
kg
Bahan Paku 5cm-12cm
minyak bekisting
Ltr
m3
Balok kayu klas III
Tripleks tebal 9 mm
Lbr
Kayu Bulat O4" K
Btg
Pekerja
Oh
Tukang kayu
Oh
Tenaga
Kepala Tukang
Oh
Mandor
Oh

Indeks
0.040
0.400
0.200
0.018
0.350
2.000
0.660
0.330
0.033
0.033

Harga satuan
Rp. 3,115,000.00
Rp.
16,000.00
Rp.
22,000.00
Rp. 3,115,000.00
Rp.
110,000.00
Rp.
18,000.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
33,000.00
Rp.
23,760.00
Rp.
2,640.00
Rp.
2,376.00
61,776.00
Rp.
327,746.00
Rp.
327,750.00

SNI.DT 91-0008-2007.6.24
Memasang 1 m2 bekisting untuk lantai
Kebutuhan
Satuan
m3
Kayu klas III
kg
Bahan Paku 5cm-12cm
minyak bekisting
Ltr
m3
Balok kayu klas III
Tripleks tebal 9 mm
Lbr
Kayu Bulat O4" K
Btg
Pekerja
Oh
Tukang kayu
Oh
Tenaga
Kepala Tukang
Oh
Mandor
Oh

Indeks
0.040
0.400
0.200
0.015
0.350
6.000
0.660
0.330
0.033
0.033

Harga satuan
Rp. 3,115,000.00
Rp.
16,000.00
Rp.
22,000.00
Rp. 3,115,000.00
Rp.
110,000.00
Rp.
18,000.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
33,000.00
Rp.
23,760.00
Rp.
2,640.00
Rp.
2,376.00
61,776.00
Rp.
390,401.00
Rp.
390,400.00

SNI.DT 91-0008-2007.6.25
Memasang 1 m2 bekisting untuk dinding
Kebutuhan
Satuan Indeks
Harga satuan
m3
Kayu klas III
0.030 Rp. 3,115,000.00
kg
0.400 Rp.
16,000.00
Bahan Paku 5cm-12cm
minyak bekisting
Ltr
0.200 Rp.
22,000.00
m3
Balok kayu klas III
0.020 Rp. 3,115,000.00
Tripleks tebal 9 mm
Lbr
0.350 Rp.
110,000.00
Kayu Bulat O4" K
Btg
3.000 Rp.
18,000.00
Pekerja
Oh
0.660 Rp.
Tukang kayu
Oh
0.330 Rp.
Tenaga
Kepala Tukang
Oh
0.033 Rp.
Mandor
Oh
0.033 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
33,000.00
Rp.
23,760.00
Rp.
2,640.00
Rp.
2,376.00
61,776.00
Rp.
320,826.00
Rp.
320,830.00

SNI.DT 91-0008-2007.6.26
Memasang 1 m2 bekisting untuk tangga
Kebutuhan
Satuan Indeks
Harga satuan
m3
Kayu klas III
0.030 Rp. 3,115,000.00
kg
0.400 Rp.
16,000.00
Bahan Paku 5cm-12cm
minyak bekisting
Ltr
0.150 Rp.
22,000.00
m3
Balok kayu klas III
0.015 Rp. 3,115,000.00
Tripleks tebal 9 mm
Lbr
0.350 Rp.
110,000.00
Kayu Bulat O4" K
Btg
2.000 Rp.
18,000.00
Pekerja
Oh
0.660 Rp.
Tukang kayu
Oh
0.330 Rp.
Tenaga
Kepala Tukang
Oh
0.033 Rp.
Mandor
Oh
0.033 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga bahan


Rp.
124,600.00
Rp.
6,400.00
Rp.
4,400.00
Rp.
56,070.00
Rp.
38,500.00
Rp.
36,000.00
Rp.
Rp.
Rp.
Rp.
265,970.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
124,600.00
Rp.
6,400.00
Rp.
4,400.00
Rp.
46,725.00
Rp.
38,500.00
Rp.
108,000.00
Rp.
Rp.
Rp.
Rp.
328,625.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
93,450.00
Rp.
6,400.00
Rp.
4,400.00
Rp.
62,300.00
Rp.
38,500.00
Rp.
54,000.00
Rp.
Rp.
Rp.
Rp.
259,050.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
93,450.00
Rp.
6,400.00
Rp.
3,300.00
Rp.
46,725.00
Rp.
38,500.00
Rp.
36,000.00
Rp.
Rp.
Rp.
Rp.
224,375.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
33,000.00
Rp.
23,760.00
Rp.
2,640.00
Rp.
2,376.00
61,776.00

Jumlah harga =
Pembulatan =

Rp.
Rp.

286,151.00
286,150.00

SNI.DT 91-0008-2007.6.27
Memasang 1 m2 jembatan untuk pengecoran beton
Kebutuhan
Satuan Indeks
Harga satuan
m3
Kayu klas III
0.026 Rp. 3,115,000.00
kg
0.600 Rp.
16,000.00
Bahan Paku 5cm-12cm
Kayu Bulat O4" K
Btg
0.500 Rp.
18,000.00
Pekerja
Oh
0.150 Rp.
Tukang kayu
Oh
0.050 Rp.
Tenaga
Kepala Tukang
Oh
0.005 Rp.
Mandor
Oh
0.008 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
7,500.00
Rp.
3,600.00
Rp.
400.00
Rp.
576.00
12,076.00
Rp.
111,666.00
Rp.
111,670.00

SNI.DT 91-0008-2007.6.28
Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting)
Kebutuhan
Satuan Indeks
Harga satuan
m3
Kayu klas III
0.200 Rp. 3,115,000.00
Paku 5cm-12cm
kg
1.500 Rp.
16,000.00
minyak bekisting
Ltr
0.400 Rp.
22,000.00
Besi beton polos
kg
157.500 Rp.
13,000.00
Bahan Kawat beton
kg
2.250 Rp.
19,000.00
Portland cement
kg
336.000 Rp.
1,100.00
m3
Pasir pasang/beton
0.540 Rp.
90,000.00
m3
Krikel beton
0.810 Rp.
166,000.00
Pekerja
Oh
5.300 Rp.
Tukang batu
Oh
0.275 Rp.
Tukang kayu
Oh
1.300 Rp.
Tenaga
Tukang Besi
Oh
1.050 Rp.
Kepala Tukang
Oh
0.262 Rp.
Mandor
Oh
0.265 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
72,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
265,000.00
Rp.
19,800.00
Rp.
93,600.00
Rp.
75,600.00
Rp.
20,960.00
Rp.
19,080.00
494,040.00
Rp.
3,792,750.00
Rp.
3,792,750.00

SNI.DT 91-0008-2007.6.28A
Membuat 1 m3 pondasi beton bertulang (125 kg besi + bekisting)
Kebutuhan
Satuan Indeks
Harga satuan
m3
Kayu klas III
0.200 Rp. 3,115,000.00
Paku 5cm-12cm
kg
1.500 Rp.
16,000.00
minyak bekisting
Ltr
0.400 Rp.
22,000.00
Besi beton polos
kg
131.250 Rp.
13,000.00
Bahan Kawat beton
kg
2.250 Rp.
19,000.00
Portland cement
kg
336.000 Rp.
1,100.00
m3
Pasir pasang/beton
0.540 Rp.
90,000.00
m3
Krikel beton
0.810 Rp.
166,000.00
Pekerja
Oh
5.300 Rp.
Tukang batu
Oh
0.275 Rp.
Tukang kayu
Oh
1.300 Rp.
Tenaga
Tukang Besi
Oh
1.050 Rp.
Kepala Tukang
Oh
0.262 Rp.
Mandor
Oh
0.265 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
72,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
265,000.00
Rp.
19,800.00
Rp.
93,600.00
Rp.
75,600.00
Rp.
20,960.00
Rp.
19,080.00
494,040.00
Rp.
3,451,500.00
Rp.
3,451,500.00

Jumlah harga bahan


Rp.
80,990.00
Rp.
9,600.00
Rp.
9,000.00
Rp.
Rp.
Rp.
Rp.
99,590.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
623,000.00
Rp.
24,000.00
Rp.
8,800.00
Rp.
2,047,500.00
Rp.
42,750.00
Rp.
369,600.00
Rp.
48,600.00
Rp.
134,460.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,298,710.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
623,000.00
Rp.
24,000.00
Rp.
8,800.00
Rp.
1,706,250.00
Rp.
42,750.00
Rp.
369,600.00
Rp.
48,600.00
Rp.
134,460.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,957,460.00
Jumlah harga =
Pembulatan =

SNI.DT 91-0008-2007.6.28B
Membuat 1 m3 pondasi beton bertulang (100 kg besi + bekisting)
Kebutuhan
Satuan Indeks
Harga satuan
m3
Kayu klas III
0.200 Rp. 3,115,000.00
Paku 5cm-12cm
kg
1.500 Rp.
16,000.00
minyak bekisting
Ltr
0.400 Rp.
22,000.00
Besi beton polos
kg
105.000 Rp.
13,000.00
Bahan Kawat beton
kg
2.250 Rp.
19,000.00
Portland cement
kg
336.000 Rp.
1,100.00
m3
Pasir pasang/beton
0.540 Rp.
90,000.00
m3
Krikel beton
0.810 Rp.
166,000.00
Pekerja
Oh
5.300 Rp.
Tukang batu
Oh
0.275 Rp.
Tukang kayu
Oh
1.300 Rp.
Tenaga
Tukang Besi
Oh
1.050 Rp.
Kepala Tukang
Oh
0.262 Rp.
Mandor
Oh
0.265 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
72,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
265,000.00
Rp.
19,800.00
Rp.
93,600.00
Rp.
75,600.00
Rp.
20,960.00
Rp.
19,080.00
494,040.00
Rp.
3,110,250.00
Rp.
3,110,250.00

SNI.DT 91-0008-2007.6.29
Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting)
Kebutuhan
Satuan Indeks
Harga satuan
Kayu klas III
m3
0.270 Rp. 3,115,000.00
Paku 5cm-12cm
kg
2.000 Rp.
16,000.00
minyak bekisting
Ltr
0.600 Rp.
22,000.00
Besi beton polos
kg
210.000 Rp.
13,000.00
kg
3.000 Rp.
19,000.00
Bahan Kawat beton
Portland cement
kg
336.000 Rp.
1,100.00
Tripleks 9 mm
Lbr
3.500 Rp.
110,000.00
m3
Pasir pasang/beton
0.540 Rp.
90,000.00
m3
Krikel beton
0.810 Rp.
166,000.00
Pekerja
Oh
5.650 Rp.
Tukang batu
Oh
0.275 Rp.
Tukang kayu
Oh
1.560 Rp.
Tenaga
Tukang Besi
Oh
1.400 Rp.
Kepala Tukang
Oh
0.323 Rp.
Mandor
Oh
0.283 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
72,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
282,500.00
Rp.
19,800.00
Rp.
112,320.00
Rp.
100,800.00
Rp.
25,840.00
Rp.
20,376.00
561,636.00
Rp.
5,172,546.00
Rp.
5,172,550.00

SNI.DT 91-0008-2007.6.29A
Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting)
Kebutuhan
Satuan Indeks
Harga satuan
m3
Kayu klas III
0.270 Rp. 3,115,000.00
Paku 5cm-12cm
kg
2.000 Rp.
16,000.00
minyak bekisting
Ltr
0.600 Rp.
22,000.00
Besi beton polos
kg
157.500 Rp.
13,000.00
kg
3.000 Rp.
19,000.00
Bahan Kawat beton
Portland cement
kg
336.000 Rp.
1,100.00
Tripleks 9 mm
Lbr
3.500 Rp.
110,000.00
m3
Pasir pasang/beton
0.540 Rp.
90,000.00
m3
Krikel beton
0.810 Rp.
166,000.00
Pekerja
Oh
5.650 Rp.
Tukang batu
Oh
0.275 Rp.
Tukang kayu
Oh
1.560 Rp.
Tenaga
Tukang Besi
Oh
1.400 Rp.
Kepala Tukang
Oh
0.323 Rp.
Mandor
Oh
0.283 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
72,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
282,500.00
Rp.
19,800.00
Rp.
112,320.00
Rp.
100,800.00
Rp.
25,840.00
Rp.
20,376.00
561,636.00
Rp.
4,490,046.00
Rp.
4,490,050.00

Jumlah harga bahan


Rp.
623,000.00
Rp.
24,000.00
Rp.
8,800.00
Rp.
1,365,000.00
Rp.
42,750.00
Rp.
369,600.00
Rp.
48,600.00
Rp.
134,460.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,616,210.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
841,050.00
Rp.
32,000.00
Rp.
13,200.00
Rp.
2,730,000.00
Rp.
57,000.00
Rp.
369,600.00
Rp.
385,000.00
Rp.
48,600.00
Rp.
134,460.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,610,910.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
841,050.00
Rp.
32,000.00
Rp.
13,200.00
Rp.
2,047,500.00
Rp.
57,000.00
Rp.
369,600.00
Rp.
385,000.00
Rp.
48,600.00
Rp.
134,460.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,928,410.00
Jumlah harga =
Pembulatan =

SNI.DT 91-0008-2007.6.29B
Membuat 1 m3 sloof beton bertulang (125 kg besi + bekisting)
Kebutuhan
Satuan Indeks
Harga satuan
m3
Kayu klas III
0.270 Rp. 3,115,000.00
Paku 5cm-12cm
kg
2.000 Rp.
16,000.00
minyak bekisting
Ltr
0.600 Rp.
22,000.00
Besi beton polos
kg
131.250 Rp.
13,000.00
kg
3.000 Rp.
19,000.00
Bahan Kawat beton
Portland cement
kg
336.000 Rp.
1,100.00
Tripleks 9 mm
Lbr
3.500 Rp.
110,000.00
m3
Pasir pasang/beton
0.540 Rp.
90,000.00
m3
Krikel beton
0.810 Rp.
166,000.00
Pekerja
Oh
5.650 Rp.
Tukang batu
Oh
0.275 Rp.
Tukang kayu
Oh
1.560 Rp.
Tenaga
Tukang Besi
Oh
1.400 Rp.
Kepala Tukang
Oh
0.323 Rp.
Mandor
Oh
0.283 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
72,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
282,500.00
Rp.
19,800.00
Rp.
112,320.00
Rp.
100,800.00
Rp.
25,840.00
Rp.
20,376.00
561,636.00
Rp.
4,148,796.00
Rp.
4,148,800.00

SNI.DT 91-0008-2007.6.29C
Membuat 1 m3 sloof beton bertulang (100 kg besi + bekisting)
Kebutuhan
Satuan Indeks
Harga satuan
m3
Kayu klas III
0.270 Rp. 3,115,000.00
Paku 5cm-12cm
kg
2.000 Rp.
16,000.00
minyak bekisting
Ltr
0.600 Rp.
22,000.00
Besi beton polos
kg
105.000 Rp.
13,000.00
kg
3.000 Rp.
19,000.00
Bahan Kawat beton
Portland cement
kg
336.000 Rp.
1,100.00
Tripleks 9 mm
Lbr
3.500 Rp.
110,000.00
m3
Pasir pasang/beton
0.540 Rp.
90,000.00
m3
Krikel beton
0.810 Rp.
166,000.00
Pekerja
Oh
5.650 Rp.
Tukang batu
Oh
0.275 Rp.
Tukang kayu
Oh
1.560 Rp.
Tenaga
Tukang Besi
Oh
1.400 Rp.
Kepala Tukang
Oh
0.323 Rp.
Mandor
Oh
0.283 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
72,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
282,500.00
Rp.
19,800.00
Rp.
112,320.00
Rp.
100,800.00
Rp.
25,840.00
Rp.
20,376.00
561,636.00
Rp.
3,807,546.00
Rp.
3,807,550.00

SNI.DT 91-0008-2007.6.30
Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting)
Kebutuhan
Satuan Indeks
Harga satuan
m3
Kayu klas III
0.400 Rp. 3,115,000.00
Paku 5cm-12cm
kg
4.000 Rp.
16,000.00
minyak bekisting
Ltr
2.000 Rp.
22,000.00
Besi beton polos
kg
315.000 Rp.
13,000.00
Kawat beton
kg
4.500 Rp.
19,000.00
kg
336.000 Rp.
1,100.00
Bahan Portland cement
Tripleks 9 mm
Lbr
3.500 Rp.
110,000.00
m3
Pasir pasang/beton
0.540 Rp.
90,000.00
m3
Krikel beton
0.810 Rp.
166,000.00
m3
Kayu klas II balok
0.150 Rp. 5,822,000.00
Kayu bulat O4"K
Btg
20.000 Rp.
18,000.00
Pekerja
Oh
7.050 Rp.
Tukang batu
Oh
0.275 Rp.
Tukang kayu
Oh
1.650 Rp.
Tenaga
Tukang Besi
Oh
2.100 Rp.
Kepala Tukang
Oh
0.403 Rp.
Mandor
Oh
0.353 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
72,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga bahan


Rp.
841,050.00
Rp.
32,000.00
Rp.
13,200.00
Rp.
1,706,250.00
Rp.
57,000.00
Rp.
369,600.00
Rp.
385,000.00
Rp.
48,600.00
Rp.
134,460.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,587,160.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
841,050.00
Rp.
32,000.00
Rp.
13,200.00
Rp.
1,365,000.00
Rp.
57,000.00
Rp.
369,600.00
Rp.
385,000.00
Rp.
48,600.00
Rp.
134,460.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,245,910.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
1,246,000.00
Rp.
64,000.00
Rp.
44,000.00
Rp.
4,095,000.00
Rp.
85,500.00
Rp.
369,600.00
Rp.
385,000.00
Rp.
48,600.00
Rp.
134,460.00
Rp.
873,300.00
Rp.
360,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
352,500.00
Rp.
19,800.00
Rp.
118,800.00
Rp.
151,200.00
Rp.
32,240.00
Rp.
25,416.00

7,705,460.00
Jumlah harga =
Pembulatan =

Rp.
Rp.

699,956.00
8,405,416.00
8,405,420.00

SNI.DT 91-0008-2007.6.30
Membuat 1 m3 kolom beton bertulang (200 kg besi + bekisting)
Kebutuhan
Satuan Indeks
Harga satuan
m3
Kayu klas III
0.400 Rp. 3,115,000.00
Paku 5cm-12cm
kg
4.000 Rp.
16,000.00
minyak bekisting
Ltr
2.000 Rp.
22,000.00
Besi beton polos
kg
210.000 Rp.
13,000.00
Kawat beton
kg
4.500 Rp.
19,000.00
kg
336.000 Rp.
1,100.00
Bahan Portland cement
Tripleks 9 mm
Lbr
3.500 Rp.
110,000.00
m3
Pasir pasang/beton
0.540 Rp.
90,000.00
m3
Krikel beton
0.810 Rp.
166,000.00
m3
Kayu klas II balok
0.150 Rp. 5,822,000.00
Kayu bulat O4"K
Btg
20.000 Rp.
18,000.00
Pekerja
Oh
7.050 Rp.
Tukang batu
Oh
0.275 Rp.
Tukang kayu
Oh
1.650 Rp.
Tenaga
Tukang Besi
Oh
2.100 Rp.
Kepala Tukang
Oh
0.403 Rp.
Mandor
Oh
0.353 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
72,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
352,500.00
Rp.
19,800.00
Rp.
118,800.00
Rp.
151,200.00
Rp.
32,240.00
Rp.
25,416.00
699,956.00
Rp.
7,040,416.00
Rp.
7,040,420.00

SNI.DT 91-0008-2007.6.31
Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting)
Kebutuhan
Satuan Indeks
Harga satuan
m3
Kayu klas III
0.320 Rp. 3,115,000.00
Paku 5cm-12cm
kg
3.200 Rp.
16,000.00
minyak bekisting
Ltr
1.600 Rp.
22,000.00
Besi beton polos
kg
210.000 Rp.
13,000.00
Kawat beton
kg
3.000 Rp.
19,000.00
kg
336.000 Rp.
1,100.00
Bahan Portland cement
Tripleks 9 mm
Lbr
2.800 Rp.
110,000.00
m3
Pasir pasang/beton
0.540 Rp.
90,000.00
m3
Krikel beton
0.810 Rp.
166,000.00
m3
Kayu klas II balok
0.140 Rp. 5,822,000.00
Kayu bulat O4"K
Btg
16.000 Rp.
18,000.00
Pekerja
Oh
6.350 Rp.
Tukang batu
Oh
0.275 Rp.
Tukang kayu
Oh
1.650 Rp.
Tenaga
Tukang Besi
Oh
1.400 Rp.
Kepala Tukang
Oh
0.333 Rp.
Mandor
Oh
0.318 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
72,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
317,500.00
Rp.
19,800.00
Rp.
118,800.00
Rp.
100,800.00
Rp.
26,640.00
Rp.
22,896.00
606,436.00
Rp.
6,440,376.00
Rp.
6,440,380.00

SNI.DT 91-0008-2007.6.31A
Membuat 1 m3 balok beton bertulang (150 kg besi + bekisting)
Kebutuhan
Satuan Indeks
Harga satuan
m3
Kayu klas III
0.320 Rp. 3,115,000.00
Paku 5cm-12cm
kg
3.200 Rp.
16,000.00
minyak bekisting
Ltr
1.600 Rp.
22,000.00
Besi beton polos
kg
157.500 Rp.
13,000.00
Kawat beton
kg
3.000 Rp.
19,000.00
kg
336.000 Rp.
1,100.00
Bahan Portland cement
Tripleks 9 mm
Lbr
2.800 Rp.
110,000.00
m3
Pasir pasang/beton
0.540 Rp.
90,000.00
m3
Krikel beton
0.810 Rp.
166,000.00
m3
Kayu klas II balok
0.140 Rp. 5,822,000.00

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Jumlah harga bahan


Rp.
1,246,000.00
Rp.
64,000.00
Rp.
44,000.00
Rp.
2,730,000.00
Rp.
85,500.00
Rp.
369,600.00
Rp.
385,000.00
Rp.
48,600.00
Rp.
134,460.00
Rp.
873,300.00
Rp.
360,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,340,460.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
996,800.00
Rp.
51,200.00
Rp.
35,200.00
Rp.
2,730,000.00
Rp.
57,000.00
Rp.
369,600.00
Rp.
308,000.00
Rp.
48,600.00
Rp.
134,460.00
Rp.
815,080.00
Rp.
288,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5,833,940.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
996,800.00
Rp.
51,200.00
Rp.
35,200.00
Rp.
2,047,500.00
Rp.
57,000.00
Rp.
369,600.00
Rp.
308,000.00
Rp.
48,600.00
Rp.
134,460.00
Rp.
815,080.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Bahan

Kayu bulat O4"K


Pekerja
Tukang batu
Tukang kayu
Tenaga
Tukang Besi
Kepala Tukang
Mandor

Btg
Oh
Oh
Oh
Oh
Oh
Oh

16.000
6.350
0.275
1.650
1.400
0.333
0.318

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

18,000.00 Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

50,000.00
72,000.00
72,000.00
72,000.00
80,000.00
72,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Jumlah harga =
Pembulatan =

288,000.00 Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5,151,440.00
Rp.
Rp.

317,500.00
19,800.00
118,800.00
100,800.00
26,640.00
22,896.00
606,436.00
5,757,876.00
5,757,880.00

SNI.DT 91-0008-2007.6.31B
Membuat 1 m3 kolom beton bertulang (100 kg besi + bekisting)
Kebutuhan
Satuan Indeks
Harga satuan
m3
Kayu klas III
0.320 Rp. 3,115,000.00
Paku 5cm-12cm
kg
3.200 Rp.
16,000.00
minyak bekisting
Ltr
1.600 Rp.
22,000.00
Besi beton polos
kg
131.250 Rp.
13,000.00
Kawat beton
kg
3.000 Rp.
19,000.00
kg
336.000 Rp.
1,100.00
Bahan Portland cement
Tripleks 9 mm
Lbr
2.800 Rp.
110,000.00
m3
Pasir pasang/beton
0.540 Rp.
90,000.00
m3
Krikel beton
0.810 Rp.
166,000.00
m3
Kayu klas II balok
0.140 Rp. 5,822,000.00
Kayu bulat O4"K
Btg
16.000 Rp.
18,000.00
Pekerja
Oh
6.350 Rp.
Tukang batu
Oh
0.275 Rp.
Tukang kayu
Oh
1.650 Rp.
Tenaga
Tukang Besi
Oh
1.400 Rp.
Kepala Tukang
Oh
0.333 Rp.
Mandor
Oh
0.318 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
72,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
317,500.00
Rp.
19,800.00
Rp.
118,800.00
Rp.
100,800.00
Rp.
26,640.00
Rp.
22,896.00
606,436.00
Rp.
5,416,626.00
Rp.
5,416,630.00

SNI.DT 91-0008-2007.6.31C
Membuat 1 m3 balok beton bertulang (100 kg besi + bekisting)
Kebutuhan
Satuan Indeks
Harga satuan
m3
Kayu klas III
0.320 Rp. 3,115,000.00
Paku 5cm-12cm
kg
3.200 Rp.
16,000.00
minyak bekisting
Ltr
1.600 Rp.
22,000.00
Besi beton polos
kg
105.000 Rp.
13,000.00
Kawat beton
kg
3.000 Rp.
19,000.00
kg
336.000 Rp.
1,100.00
Bahan Portland cement
Tripleks 9 mm
Lbr
2.800 Rp.
110,000.00
m3
Pasir pasang/beton
0.540 Rp.
90,000.00
m3
Krikel beton
0.810 Rp.
166,000.00
m3
Kayu klas II balok
0.140 Rp. 5,822,000.00
Kayu bulat O4"K
Btg
16.000 Rp.
18,000.00
Pekerja
Oh
6.350 Rp.
Tukang batu
Oh
0.275 Rp.
Tukang kayu
Oh
1.650 Rp.
Tenaga
Tukang Besi
Oh
1.400 Rp.
Kepala Tukang
Oh
0.333 Rp.
Mandor
Oh
0.318 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
72,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
317,500.00
Rp.
19,800.00
Rp.
118,800.00
Rp.
100,800.00
Rp.
26,640.00
Rp.
22,896.00
606,436.00
Rp.
5,075,376.00
Rp.
5,075,380.00

Jumlah harga bahan


Rp.
996,800.00
Rp.
51,200.00
Rp.
35,200.00
Rp.
1,706,250.00
Rp.
57,000.00
Rp.
369,600.00
Rp.
308,000.00
Rp.
48,600.00
Rp.
134,460.00
Rp.
815,080.00
Rp.
288,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,810,190.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
996,800.00
Rp.
51,200.00
Rp.
35,200.00
Rp.
1,365,000.00
Rp.
57,000.00
Rp.
369,600.00
Rp.
308,000.00
Rp.
48,600.00
Rp.
134,460.00
Rp.
815,080.00
Rp.
288,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,468,940.00
Jumlah harga =
Pembulatan =

SNI.DT 91-0008-2007.6.32
Membuat 1 m3 kolom beton bertulang (150 kg besi + bekisting)
Kebutuhan
Satuan Indeks
Harga satuan
Harga satuan
m3
Kayu klas III
0.320 Rp. 3,115,000.00 Rp.
Paku 5cm-12cm
kg
3.200 Rp.
16,000.00 Rp.
minyak bekisting
Ltr
1.600 Rp.
22,000.00 Rp.

Bahan

Jumlah harga bahan Jumlah harga upah


Rp.
996,800.00 Rp.
Rp.
51,200.00 Rp.
Rp.
35,200.00 Rp.

Besi beton polos


Kawat beton
Bahan Portland cement
Tripleks 9 mm
Pasir pasang/beton
Krikel beton
Kayu klas II balok
Kayu bulat O4"K
Pekerja
Tukang batu
Tukang kayu
Tenaga
Tukang Besi
Kepala Tukang
Mandor

kg
kg
kg
Lbr
m3
m3
m3
Btg
Oh
Oh
Oh
Oh
Oh
Oh

157.500
2.250
336.000
2.800
0.540
0.810
0.120
32.000
5.300
0.275
1.300
1.050
0.265
0.265

Rp.
13,000.00 Rp.
Rp.
19,000.00 Rp.
Rp.
1,100.00 Rp.
Rp.
110,000.00 Rp.
Rp.
90,000.00 Rp.
Rp.
166,000.00 Rp.
Rp. 5,822,000.00 Rp.
Rp.
18,000.00 Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

50,000.00
72,000.00
72,000.00
72,000.00
80,000.00
72,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,047,500.00
42,750.00
369,600.00
308,000.00
48,600.00
134,460.00
698,640.00
576,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,308,750.00
Jumlah harga =
Pembulatan =

Rp.
Rp.

265,000.00
19,800.00
93,600.00
75,600.00
21,200.00
19,080.00
494,280.00
5,803,030.00
5,803,000.00

SNI.DT 91-0008-2007.6.32A
Membuat 1 m3 kolom beton bertulang (125 kg besi + bekisting)
Kebutuhan
Satuan Indeks
Harga satuan
m3
Kayu klas III
0.320 Rp. 3,115,000.00
Paku 5cm-12cm
kg
3.200 Rp.
16,000.00
minyak bekisting
Ltr
1.600 Rp.
22,000.00
Besi beton polos
kg
131.250 Rp.
13,000.00
Kawat beton
kg
2.250 Rp.
19,000.00
kg
336.000 Rp.
1,100.00
Bahan Portland cement
Tripleks 9 mm
Lbr
2.800 Rp.
110,000.00
m3
Pasir pasang/beton
0.540 Rp.
90,000.00
m3
Krikel beton
0.810 Rp.
166,000.00
m3
Kayu klas II balok
0.120 Rp. 5,822,000.00
Kayu bulat O4"K
Btg
32.000 Rp.
18,000.00
Pekerja
Oh
5.300 Rp.
Tukang batu
Oh
0.275 Rp.
Tukang kayu
Oh
1.300 Rp.
Tenaga
Tukang Besi
Oh
1.050 Rp.
Kepala Tukang
Oh
0.265 Rp.
Mandor
Oh
0.265 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
72,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
265,000.00
Rp.
19,800.00
Rp.
93,600.00
Rp.
75,600.00
Rp.
21,200.00
Rp.
19,080.00
494,280.00
Rp.
5,461,780.00
Rp.
5,461,800.00

SNI.DT 91-0008-2007.6.32B
Membuat 1 m3 kolom beton bertulang (100 kg besi + bekisting)
Kebutuhan
Satuan Indeks
Harga satuan
m3
Kayu klas III
0.320 Rp. 3,115,000.00
Paku 5cm-12cm
kg
3.200 Rp.
16,000.00
minyak bekisting
Ltr
1.600 Rp.
22,000.00
Besi beton polos
kg
105.000 Rp.
13,000.00
Kawat beton
kg
2.250 Rp.
19,000.00
kg
336.000 Rp.
1,100.00
Bahan Portland cement
Tripleks 9 mm
Lbr
2.800 Rp.
110,000.00
m3
Pasir pasang/beton
0.540 Rp.
90,000.00
m3
Krikel beton
0.810 Rp.
166,000.00
m3
Kayu klas II balok
0.120 Rp. 5,822,000.00
Kayu bulat O4"K
Btg
32.000 Rp.
18,000.00
Pekerja
Oh
5.300 Rp.
Tukang batu
Oh
0.275 Rp.
Tukang kayu
Oh
1.300 Rp.
Tenaga
Tukang Besi
Oh
1.050 Rp.
Kepala Tukang
Oh
0.265 Rp.
Mandor
Oh
0.265 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
72,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
265,000.00
Rp.
19,800.00
Rp.
93,600.00
Rp.
75,600.00
Rp.
21,200.00
Rp.
19,080.00
494,280.00
Rp.
5,120,530.00
Rp.
5,120,500.00

SNI.DT 91-0008-2007.6.33
Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting)
Kebutuhan
Satuan Indeks
Harga satuan
m3
Kayu klas III
0.240 Rp. 3,115,000.00
Paku 5cm-12cm
kg
3.200 Rp.
16,000.00
minyak bekisting
Ltr
1.600 Rp.
22,000.00
Besi beton polos
kg
157.500 Rp.
13,000.00
Kawat beton
kg
2.250 Rp.
19,000.00
kg
336.000 Rp.
1,100.00
Bahan Portland cement
Tripleks 9 mm
Lbr
2.800 Rp.
110,000.00
Pasir pasang/beton
m3
0.540 Rp.
90,000.00
m3
Krikel beton
0.810 Rp.
166,000.00
m3
Kayu klas II balok
0.160 Rp. 5,822,000.00
Kayu bulat O4"K
Btg
24.000 Rp.
18,000.00
Pekerja
Oh
5.300 Rp.
Tukang batu
Oh
0.275 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00

Tenaga

Jumlah harga bahan


Rp.
996,800.00
Rp.
51,200.00
Rp.
35,200.00
Rp.
1,706,250.00
Rp.
42,750.00
Rp.
369,600.00
Rp.
308,000.00
Rp.
48,600.00
Rp.
134,460.00
Rp.
698,640.00
Rp.
576,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,967,500.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
996,800.00
Rp.
51,200.00
Rp.
35,200.00
Rp.
1,365,000.00
Rp.
42,750.00
Rp.
369,600.00
Rp.
308,000.00
Rp.
48,600.00
Rp.
134,460.00
Rp.
698,640.00
Rp.
576,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,626,250.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
747,600.00
Rp.
51,200.00
Rp.
35,200.00
Rp.
2,047,500.00
Rp.
42,750.00
Rp.
369,600.00
Rp.
308,000.00
Rp.
48,600.00
Rp.
134,460.00
Rp.
931,520.00
Rp.
432,000.00
Rp.
Rp.

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
265,000.00
Rp.
19,800.00

Tenaga

Tukang kayu
Tukang Besi
Kepala Tukang
Mandor

Oh
Oh
Oh
Oh

1.300
1.050
0.265
0.265

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

72,000.00
72,000.00
80,000.00
72,000.00

Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
5,148,430.00

Jumlah harga =
Pembulatan =

Rp.
Rp.

93,600.00
75,600.00
21,200.00
19,080.00
494,280.00
5,642,710.00
5,642,700.00

SNI.DT 91-0008-2007.6.33A
Membuat 1 m3 dinding beton bertulang (125 kg besi + bekisting)
Kebutuhan
Satuan Indeks
Harga satuan
m3
Kayu klas III
0.240 Rp. 3,115,000.00
Paku 5cm-12cm
kg
3.200 Rp.
16,000.00
minyak bekisting
Ltr
1.600 Rp.
22,000.00
Besi beton polos
kg
131.250 Rp.
13,000.00
Kawat beton
kg
2.250 Rp.
19,000.00
kg
336.000 Rp.
1,100.00
Bahan Portland cement
Tripleks 9 mm
Lbr
2.800 Rp.
110,000.00
m3
Pasir pasang/beton
0.540 Rp.
90,000.00
m3
Krikel beton
0.810 Rp.
166,000.00
m3
Kayu klas II balok
0.160 Rp. 5,822,000.00
Kayu bulat O4"K
Btg
24.000 Rp.
18,000.00
Pekerja
Oh
5.300 Rp.
Tukang batu
Oh
0.275 Rp.
Tukang kayu
Oh
1.300 Rp.
Tenaga
Tukang Besi
Oh
1.050 Rp.
Kepala Tukang
Oh
0.265 Rp.
Mandor
Oh
0.265 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
72,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
265,000.00
Rp.
19,800.00
Rp.
93,600.00
Rp.
75,600.00
Rp.
21,200.00
Rp.
19,080.00
494,280.00
Rp.
5,301,460.00
Rp.
5,301,500.00

SNI.DT 91-0008-2007.6.33B
Membuat 1 m3 dinding beton bertulang (100 kg besi + bekisting)
Kebutuhan
Satuan Indeks
Harga satuan
m3
Kayu klas III
0.240 Rp. 3,115,000.00
Paku 5cm-12cm
kg
3.200 Rp.
16,000.00
minyak bekisting
Ltr
1.600 Rp.
22,000.00
Besi beton polos
kg
105.000 Rp.
13,000.00
Kawat beton
kg
2.250 Rp.
19,000.00
kg
336.000 Rp.
1,100.00
Bahan Portland cement
Tripleks 9 mm
Lbr
2.800 Rp.
110,000.00
m3
Pasir pasang/beton
0.540 Rp.
90,000.00
m3
Krikel beton
0.810 Rp.
166,000.00
m3
Kayu klas II balok
0.160 Rp. 5,822,000.00
Kayu bulat O4"K
Btg
24.000 Rp.
18,000.00
Pekerja
Oh
5.300 Rp.
Tukang batu
Oh
0.275 Rp.
Tukang kayu
Oh
1.300 Rp.
Tenaga
Tukang Besi
Oh
1.050 Rp.
Kepala Tukang
Oh
0.262 Rp.
Mandor
Oh
0.265 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
72,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
265,000.00
Rp.
19,800.00
Rp.
93,600.00
Rp.
75,600.00
Rp.
20,960.00
Rp.
19,080.00
494,040.00
Rp.
4,959,970.00
Rp.
4,959,970.00

SNI.DT 91-0008-2007.6.34
Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting)
Kebutuhan
Satuan Indeks
Harga satuan
Kayu klas III
m3
0.250 Rp. 3,115,000.00
Paku 5cm-12cm
kg
3.000 Rp.
16,000.00
minyak bekisting
Ltr
1.200 Rp.
22,000.00
Besi beton polos
kg
210.000 Rp.
13,000.00
Kawat beton
kg
3.000 Rp.
19,000.00
kg
336.000 Rp.
1,100.00
Bahan Portland cement

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Jumlah harga bahan


Rp.
747,600.00
Rp.
51,200.00
Rp.
35,200.00
Rp.
1,706,250.00
Rp.
42,750.00
Rp.
369,600.00
Rp.
308,000.00
Rp.
48,600.00
Rp.
134,460.00
Rp.
931,520.00
Rp.
432,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,807,180.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
747,600.00
Rp.
51,200.00
Rp.
35,200.00
Rp.
1,365,000.00
Rp.
42,750.00
Rp.
369,600.00
Rp.
308,000.00
Rp.
48,600.00
Rp.
134,460.00
Rp.
931,520.00
Rp.
432,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,465,930.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
778,750.00
Rp.
48,000.00
Rp.
26,400.00
Rp.
2,730,000.00
Rp.
57,000.00
Rp.
369,600.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Bahan

Tripleks 9 mm
Pasir pasang/beton
Krikel beton
Kayu klas II balok
Kayu bulat O4"K
Pekerja
Tukang batu
Tukang kayu
Tenaga
Tukang Besi
Kepala Tukang
Mandor

Lbr
m3
m3
m3
Btg
Oh
Oh
Oh
Oh
Oh
Oh

2.500
0.540
0.810
0.105
14.000
5.650
0.275
1.560
1.400
0.323
0.283

Rp.
110,000.00 Rp.
Rp.
90,000.00 Rp.
Rp.
166,000.00 Rp.
Rp. 5,822,000.00 Rp.
Rp.
18,000.00 Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

50,000.00
72,000.00
72,000.00
72,000.00
80,000.00
72,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

275,000.00
48,600.00
134,460.00
611,310.00
252,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,331,120.00
Jumlah harga =
Pembulatan =

Rp.
Rp.

282,500.00
19,800.00
112,320.00
100,800.00
25,840.00
20,376.00
561,636.00
5,892,756.00
5,892,760.00

SNI.DT 91-0008-2007.6.35
Membuat 1 m' kolom praktis beton bertulang (11x11) cm
Kebutuhan
Satuan Indeks
Harga satuan
m3
Kayu klas III
0.002 Rp. 3,115,000.00
Paku 5cm-12cm
kg
0.010 Rp.
16,000.00
minyak bekisting
Ltr
1.200 Rp.
22,000.00
Besi beton polos
kg
3.000 Rp.
13,000.00
Bahan Kawat beton
kg
0.450 Rp.
19,000.00
Portland cement
kg
4.000 Rp.
1,100.00
m3
Pasir pasang/beton
0.006 Rp.
90,000.00
m3
Krikel beton
0.009 Rp.
166,000.00
Pekerja
Oh
0.180 Rp.
Tukang batu
Oh
0.020 Rp.
Tukang kayu
Oh
0.020 Rp.
Tenaga
Tukang Besi
Oh
0.020 Rp.
Kepala Tukang
Oh
0.006 Rp.
Mandor
Oh
0.009 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
72,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
9,000.00
Rp.
1,440.00
Rp.
1,440.00
Rp.
1,440.00
Rp.
480.00
Rp.
648.00
14,448.00
Rp.
101,222.00
Rp.
101,220.00

SNI.DT 91-0008-2007.6.36
Membuat 1 m' ring balok beton bertulang (10x15) cm
Kebutuhan
Satuan Indeks
Harga satuan
m3
Kayu klas III
0.003 Rp. 3,115,000.00
Paku 5cm-12cm
kg
0.020 Rp.
16,000.00
minyak bekisting
Ltr
1.200 Rp.
22,000.00
Besi beton polos
kg
3.600 Rp.
13,000.00
Bahan Kawat beton
kg
0.050 Rp.
19,000.00
Portland cement
kg
5.500 Rp.
1,100.00
m3
Pasir pasang/beton
0.009 Rp.
90,000.00
m3
Krikel beton
0.015 Rp.
166,000.00
Pekerja
Oh
0.297 Rp.
Tukang batu
Oh
0.033 Rp.
Tukang kayu
Oh
0.033 Rp.
Tenaga
Tukang Besi
Oh
0.033 Rp.
Kepala Tukang
Oh
0.010 Rp.
Mandor
Oh
0.015 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
72,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
14,850.00
Rp.
2,376.00
Rp.
2,376.00
Rp.
2,376.00
Rp.
800.00
Rp.
1,080.00
23,858.00
Rp.
117,023.00
Rp.
117,020.00

Jumlah harga bahan


Rp.
6,230.00
Rp.
160.00
Rp.
26,400.00
Rp.
39,000.00
Rp.
8,550.00
Rp.
4,400.00
Rp.
540.00
Rp.
1,494.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
86,774.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
9,345.00
Rp.
320.00
Rp.
26,400.00
Rp.
46,800.00
Rp.
950.00
Rp.
6,050.00
Rp.
810.00
Rp.
2,490.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
93,165.00
Jumlah harga =
Pembulatan =

SNI.DT 91-0008-2007.6.7

SNI.DT 91-0008-2007.6.28A

DAFTAR ANALISA PEKERJAAN


SNI.DT 91-0007-2006
PEKERJAAN PONDASI
SNI.DT 91-0007-2006.6.1
Memasang 1 m3 pondasi batu belah, campuran 1 PC: 3 PP
Kebutuhan
Satuan
Indeks
Harga satuan
m3
Batu belah 10-15cm
1.200 Rp. 197,000.00
kg
202.000 Rp.
1,100.00
Bahan Semen portland
m3
Pasir pasang
0.485 Rp. 90,000.00
Pekerja
Oh
1.500 Rp.
Tukang batu
Oh
0.750 Rp.
Tenaga
Kepala Tukang
Oh
0.075 Rp.
Mandor
Oh
0.075 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp. 50,000.00
Rp. 72,000.00
Rp. 80,000.00
Rp. 72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
75,000.00
Rp.
54,000.00
Rp.
6,000.00
Rp.
5,400.00
140,400.00
Rp.
642,650.00
Rp.
642,650.00

SNI.DT 91-0007-2006.6.2
Memasang 1 m3 pondasi batu belah, campuran 1 PC: 4 PP
Kebutuhan
Satuan
Indeks
Harga satuan
m3
Batu belah 10-15cm
1.200 Rp. 197,000.00
kg
163.000 Rp.
1,100.00
Bahan Semen portland
m3
Pasir pasang
0.520 Rp. 90,000.00
Pekerja
Oh
1.500 Rp.
Tukang batu
Oh
0.750 Rp.
Tenaga
Kepala Tukang
Oh
0.075 Rp.
Mandor
Oh
0.075 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp. 50,000.00
Rp. 72,000.00
Rp. 80,000.00
Rp. 72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
75,000.00
Rp.
54,000.00
Rp.
6,000.00
Rp.
5,400.00
140,400.00
Rp.
602,900.00
Rp.
602,900.00

SNI.DT 91-0007-2006.6.9
Memasang 1 m3 batu kosong (anstamping)
Kebutuhan
Satuan
Indeks
m3
Batu belah 10-15cm
1.200
Bahan
m3
Pasir Urug
0.432
Pekerja
Oh
0.780
Tukang Batu
Oh
0.390
Tenaga
Kepala Tukang
Oh
0.039
Mandor
Oh
0.039

Harga satuan
Rp. 197,000.00
Rp. 73,000.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
Rp. 50,000.00
Rp. 72,000.00
Rp. 80,000.00
Rp. 72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
39,000.00
Rp.
28,080.00
Rp.
3,120.00
Rp.
2,808.00
73,008.00
Rp.
340,944.00
Rp.
340,940.00

SNI.DT 91-0007-2006.6.10
Memasang 1 m3 pondasi siklop campuran 1 PC:2PB:3KR
Kebutuhan
Satuan
Indeks
Harga satuan
m3
Batu belah 10-15cm
0.480 Rp. 197,000.00
Semen portland
kg
194.000 Rp.
1,100.00
m3
Pasir pasang
0.312 Rp. 90,000.00
Bahan
m3
Batu pecah 5-7
0.468 Rp. 197,000.00
Besi beton
kg
126.000 Rp. 13,000.00
Kawat beton
kg
1.800 Rp. 19,000.00
Pekerja
Oh
3.400 Rp.
Tukang batu
Oh
0.850 Rp.
Tenaga
Kepala Tukang
Oh
0.085 Rp.
Mandor
Oh
0.170 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp. 50,000.00
Rp. 72,000.00
Rp. 80,000.00
Rp. 72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
170,000.00
Rp.
61,200.00
Rp.
6,800.00
Rp.
12,240.00
250,240.00
Rp.
2,350,676.00
Rp.
2,350,680.00

Jumlah harga bahan


Rp.
236,400.00
Rp.
222,200.00
Rp.
43,650.00
Rp.
Rp.
Rp.
Rp.
502,250.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
236,400.00
Rp.
179,300.00
Rp.
46,800.00
Rp.
Rp.
Rp.
Rp.
462,500.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
236,400.00
Rp.
31,536.00
Rp.
Rp.
Rp.
Rp.
267,936.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
94,560.00
Rp.
213,400.00
Rp.
28,080.00
Rp.
92,196.00
Rp.
1,638,000.00
Rp.
34,200.00
Rp.
Rp.
Rp.
Rp.
2,100,436.00
Jumlah harga =
Pembulatan =

SNI.DT 91-0007-2006.6.11
Memasang 1 m3 pondasi sumuran, diameter 100 cm
Kebutuhan
Satuan
Indeks
Harga satuan
m3
Batu belah 10-15cm
0.450 Rp. 197,000.00
Semen portland
kg
194.000 Rp.
1,100.00
Bahan
m3
Pasir pasang
0.312 Rp. 90,000.00
m3
Batu pecah 5-7
0.468 Rp. 197,000.00
Pekerja
Oh
2.400 Rp.
Tukang batu
Oh
0.800 Rp.
Tenaga
Kepala Tukang
Oh
0.080 Rp.
Mandor
Oh
0.119 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp. 50,000.00
Rp. 72,000.00
Rp. 80,000.00
Rp. 72,000.00

Jumlah harga bahan


Rp.
88,650.00
Rp.
213,400.00
Rp.
28,080.00
Rp.
92,196.00
Rp.
Rp.
Rp.
Rp.
422,326.00
Jumlah harga =
Pembulatan =

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
120,000.00
Rp.
57,600.00
Rp.
6,400.00
Rp.
8,568.00
192,568.00
Rp.
614,894.00
Rp.
614,890.00

DAFTAR ANALISA PEKERJAAN


SNI.DT 91-0010-2007
PEKERJAAN PLESTERAN
SNI.DT 91-0010-2007.6.1
Memasang 1 m2 plesteran 1 PC: 1PP, tebal 15 mm
Kebutuhan
Satuan Indeks
Harga satuan
Semen portland
kg
15.504 Rp.
1,100.00
Bahan
m3
Pasir pasang
0.016 Rp. 90,000.00
Pekerja
Oh
0.300 Rp.
Tukang batu
Oh
0.150 Rp.
Tenaga
Kepala Tukang
Oh
0.015 Rp.
Mandor
Oh
0.015 Rp.

Harga satuan
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
15,000.00
Rp.
10,800.00
Rp.
1,200.00
Rp.
1,080.00
28,080.00
Rp.
46,574.40
Rp.
46,570.00

SNI.DT 91-0010-2007.6.2
Memasang 1 m2 plesteran 1 PC: 2PP, tebal 15 mm
Kebutuhan
Satuan Indeks
Harga satuan
Semen portland
kg
10.224 Rp.
1,100.00
Bahan
m3
Pasir pasang
0.020 Rp. 90,000.00
Pekerja
Oh
0.300 Rp.
Tukang batu
Oh
0.150 Rp.
Tenaga
Kepala Tukang
Oh
0.015 Rp.
Mandor
Oh
0.015 Rp.

Harga satuan
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
15,000.00
Rp.
10,800.00
Rp.
1,200.00
Rp.
1,080.00
28,080.00
Rp.
41,126.40
Rp.
41,130.00

Harga satuan

Jumlah harga upah

SNI.DT 91-0010-2007.6.3
Memasang 1 m2 plesteran 1 PC: 3PP, tebal 15 mm
Kebutuhan
Satuan Indeks
Harga satuan
Semen portland
kg
7.776 Rp.
1,100.00
Bahan
m3
Pasir pasang
0.023 Rp. 90,000.00
Pekerja
Oh
0.300 Rp.
Tukang Batu
Oh
0.150 Rp.
Tenaga
Kepala Tukang
Oh
0.015 Rp.
Mandor
Oh
0.015 Rp.

Jumlah harga bahan


Rp.
17,054.40
Rp.
1,440.00
Rp.
Rp.
Rp.
Rp.
18,494.40
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
11,246.40
Rp.
1,800.00
Rp.
Rp.
Rp.
Rp.
13,046.40
Jumlah harga =
Pembulatan =

Rp.
Rp.
Rp.
Rp.
Rp.

Jumlah harga bahan


Rp.
8,553.60
Rp.
2,070.00
50,000.00 Rp.
72,000.00 Rp.
80,000.00 Rp.
72,000.00 Rp.
10,623.60
Jumlah harga =
Pembulatan =

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

15,000.00
10,800.00
1,200.00
1,080.00
28,080.00
38,703.60
38,700.00

SNI.DT 91-0010-2007.6.4
Memasang 1 m2 plesteran 1 PC: 4PP, tebal 15 mm
Kebutuhan
Satuan Indeks
Harga satuan
Semen portland
kg
6.240 Rp.
1,100.00
Bahan
m3
Pasir pasang
0.024 Rp. 90,000.00
Pekerja
Oh
0.300 Rp.
Tukang batu
Oh
0.150 Rp.
Tenaga
Kepala Tukang
Oh
0.015 Rp.
Mandor
Oh
0.015 Rp.

Harga satuan
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
15,000.00
Rp.
10,800.00
Rp.
1,200.00
Rp.
1,080.00
28,080.00
Rp.
37,104.00
Rp.
37,100.00

SNI.DT 91-0010-2007.6.23
Memasang 1 m2 plesteran ciprat 1 PC: 2PP
Kebutuhan
Satuan Indeks
Semen portland
kg
4.320
Bahan
m3
Pasir pasang
0.006
Pekerja
Oh
0.300
Tukang batu
Oh
0.100
Tenaga
Kepala Tukang
Oh
0.010
Mandor
Oh
0.015

Harga satuan
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
15,000.00
Rp.
7,200.00
Rp.
800.00
Rp.
1,080.00
24,080.00
Rp.
29,372.00

Harga satuan
Rp.
1,100.00
Rp. 90,000.00
Rp.
Rp.
Rp.
Rp.

Jumlah harga bahan


Rp.
6,864.00
Rp.
2,160.00
Rp.
Rp.
Rp.
Rp.
9,024.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
4,752.00
Rp.
540.00
Rp.
Rp.
Rp.
Rp.
5,292.00
Jumlah harga =

Pembulatan

Rp.

29,370.00

SNI.DT 91-0010-2007.6.27
Memasang 1 m2 acian
Kebutuhan
Bahan Semen portland
Pekerja
Tukang batu
Tenaga
Kepala Tukang
Mandor

Satuan
kg
Oh
Oh
Oh
Oh

Indeks
3.250
0.200
0.100
0.010
0.010

Harga satuan
Rp.
1,100.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga bahan


Rp.
3,575.00
Rp.
Rp.
Rp.
Rp.
3,575.00
Jumlah harga =
Pembulatan =

Jumlah harga upah


Rp.
Rp.
10,000.00
Rp.
7,200.00
Rp.
800.00
Rp.
720.00
18,720.00
Rp.
22,295.00
Rp.
22,300.00

DAFTAR ANALISA PEKERJAAN


SNI.DT 91-0011-2007
PEKERJAAN KAYU
SNI.DT 91-0011-2007.6.1
Membuat dan memasang 1 m3 kusen pintu dan kusen jendela kayu klas I
Kebutuhan
Satuan Indeks
Harga satuan
Harga satuan
Balok kayu klas I
m3
1.100 Rp. 7,902,000.00 Rp.
kg
1.250 Rp.
16,000.00 Rp.
Bahan Paku 10 cm
Lem kayu
kg
1.000 Rp.
13,000.00 Rp.
Pekerja
Oh
7.000 Rp.
Rp.
50,000.00
Tukang Kayu
Oh
21.000 Rp.
Rp.
72,000.00
Tenaga
Kepala Tukang
Oh
2.100 Rp.
Rp.
80,000.00
Mandor
Oh
0.350 Rp.
Rp.
72,000.00

Jumlah harga bahan


Rp.
8,692,200.00
Rp.
20,000.00
Rp.
13,000.00
Rp.
Rp.
Rp.
Rp.
8,725,200.00
Jumlah harga =
Pembulatan =

SNI.DT 91-0011-2007.6.2
Membuat dan memasang 1 m3 kusen pintu dan kusen jendela kayu klas II
Kebutuhan
Satuan Indeks
Harga satuan
Harga satuan
m3
Balok kayu kls II
1.200 Rp. 5,822,000.00 Rp.
kg
1.250 Rp.
16,000.00 Rp.
Bahan Paku 10 cm
Lem kayu
kg
1.000 Rp.
13,000.00 Rp.
Pekerja
Oh
6.000 Rp.
Rp.
50,000.00
Tukang Kayu
Oh
18.000 Rp.
Rp.
72,000.00
Tenaga Kepala Tukang
Oh
1.800 Rp.
Rp.
80,000.00
Mandor
Oh
0.300 Rp.
Rp.
72,000.00

Jumlah harga bahan


Rp.
6,986,400.00
Rp.
20,000.00
Rp.
13,000.00
Rp.
Rp.
Rp.
Rp.
7,019,400.00
Jumlah harga =
Pembulatan =

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
350,000.00
Rp.
1,512,000.00
Rp.
168,000.00
Rp.
25,200.00
2,055,200.00
Rp.
10,780,400.00
Rp.
10,780,400.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
300,000.00
Rp.
1,296,000.00
Rp.
144,000.00
Rp.
21,600.00
1,761,600.00
Rp.
8,781,000.00
Rp.
8,781,000.00

SNI.DT 91-0011-2007.6.3
Membuat dan memasang 1 m2 daun pintu panel , kayu klas II
Kebutuhan
Satuan Indeks
Harga satuan
m3
Papan kayu kls II
0.040 Rp. 5,822,000.00
Bahan
Lem kayu
kg
0.500 Rp.
13,000.00
Pekerja
Oh
1.000 Rp.
Tukang Kayu
Oh
3.000 Rp.
Tenaga
Kepala Tukang
Oh
0.300 Rp.
Mandor
Oh
0.050 Rp.

Harga satuan
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
50,000.00
Rp.
216,000.00
Rp.
24,000.00
Rp.
3,600.00
293,600.00
Rp.
532,980.00
Rp.
532,980.00

SNI.DT 91-0011-2007.6.6
Membuat dan memasang 1 m2 pintu dan jendela kaca , kayu klas II
Kebutuhan
Satuan Indeks
Harga satuan
m3
Papan kayu kls II
0.024 Rp. 5,822,000.00
Bahan
Lem kayu
kg
0.300 Rp.
13,000.00
Pekerja
Oh
0.800 Rp.
Tukang Kayu
Oh
2.400 Rp.
Tenaga
Kepala Tukang
Oh
0.240 Rp.
Mandor
Oh
0.040 Rp.

Harga satuan
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
40,000.00
Rp.
172,800.00
Rp.
19,200.00
Rp.
2,880.00
234,880.00
Rp.
378,508.00
Rp.
378,510.00

SNI.DT 91-0011-2007.6.7
Membuat dan memasang 1 m2 pintu dan jendela jalusi , kayu klas II
Kebutuhan
Satuan Indeks
Harga satuan
Papan kayu kls II
m3
0.064 Rp. 5,822,000.00
Bahan
Lem kayu
kg
0.500 Rp.
13,000.00
Pekerja
Oh
1.000 Rp.
Tukang Kayu
Oh
3.000 Rp.
Tenaga
Kepala Tukang
Oh
0.300 Rp.
Mandor
Oh
0.050 Rp.

Harga satuan
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga bahan


Rp.
232,880.00
Rp.
6,500.00
Rp.
Rp.
Rp.
Rp.
239,380.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
139,728.00
Rp.
3,900.00
Rp.
Rp.
Rp.
Rp.
143,628.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
372,608.00
Rp.
6,500.00
Rp.
Rp.
Rp.
Rp.
379,108.00

Jumlah harga upah


Rp.
Rp.
Rp.
50,000.00
Rp.
216,000.00
Rp.
24,000.00
Rp.
3,600.00
293,600.00

Jumlah harga =
Pembulatan =

Rp.
Rp.

672,708.00
672,710.00

SNI.DT 91-0011-2007.6.9
Membuat 1 m2 pintu plywood rangkap rangka expose , kayu klas II
Kebutuhan
Satuan Indeks
Harga satuan
Papan kayu klas II
m3
0.026 Rp. 5,822,000.00
kg
0.030 Rp.
16,000.00
Bahan Paku 1cm-2.5 cm
Lem kayu
kg
0.500 Rp.
13,000.00
Tripleks 9mm
lbr
1.000 Rp.
110,000.00
Pekerja
Oh
0.800 Rp.
Tukang Kayu
Oh
2.400 Rp.
Tenaga
Kepala Tukang
Oh
0.240 Rp.
Mandor
Oh
0.040 Rp.

SNI.DT 91-0011-2007.6.10
Memasang 1 m2 jalusi kusen, kayu klas II
Kebutuhan
Satuan Indeks
Papan kayu klas II
m3
0.060
Bahan
Paku 1cm-2.5 cm
kg
0.150
Pekerja
Oh
0.670
Tukang Kayu
Oh
2.000
Tenaga
Kepala Tukang
Oh
0.200
Mandor
Oh
0.335

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga bahan


Rp.
149,043.20
Rp.
480.00
Rp.
6,500.00
Rp.
110,000.00
Rp.
Rp.
Rp.
Rp.
266,023.20
Jumlah harga =
Pembulatan =

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

40,000.00
172,800.00
19,200.00
2,880.00
234,880.00
500,903.20
500,900.00

Harga satuan
Rp. 5,822,000.00
Rp.
16,000.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
33,500.00
Rp.
144,000.00
Rp.
16,000.00
Rp.
24,120.00
217,620.00
Rp.
569,340.00
Rp.
569,340.00

SNI.DT 91-0011-2007.6.13
Memasang 1 m3 konstruksi kuda-kuda konvensional, kayu klas II
Kebutuhan
Satuan Indeks
Harga satuan
Balok kayu klas II
m3
1.100 Rp. 5,822,000.00
15.000 Rp.
21,000.00
Bahan Besi strip tebal 5 mm kg
Paku 12 cm
kg
5.600 Rp.
16,000.00
Pekerja
Oh
4.000 Rp.
Tukang Kayu
Oh
12.000 Rp.
Tenaga
Kepala Tukang
Oh
1.200 Rp.
Mandor
Oh
0.200 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
200,000.00
Rp.
864,000.00
Rp.
96,000.00
Rp.
14,400.00
1,174,400.00
Rp.
7,983,200.00
Rp.
7,983,200.00

SNI.DT 91-0011-2007.6.15
Memasang 1 m3 konstruksi gordeng, kayu klas II
Kebutuhan
Satuan Indeks
Balok kayu klas II
m3
1.100
Besi
strip
tebal
5
mm
kg
15.000
Bahan
Paku 12 cm
kg
3.000
Pekerja
Oh
2.400
Tukang Kayu
Oh
7.200
Tenaga Kepala Tukang
Oh
0.720
Mandor
Oh
0.120

Harga satuan
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
120,000.00
Rp.
518,400.00
Rp.
57,600.00
Rp.
8,640.00
704,640.00
Rp.
7,471,840.00
Rp.
7,471,840.00

Harga satuan
Rp. 5,822,000.00
Rp.
21,000.00
Rp.
16,000.00
Rp.
Rp.
Rp.
Rp.

Jumlah harga bahan


Rp.
349,320.00
Rp.
2,400.00
Rp.
Rp.
Rp.
Rp.
351,720.00
Jumlah harga =
Pembulatan =

Jumlah harga upah


Rp.
Rp.
Rp.

Jumlah harga bahan


Rp.
6,404,200.00
Rp.
315,000.00
Rp.
89,600.00
Rp.
Rp.
Rp.
Rp.
6,808,800.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
6,404,200.00
Rp.
315,000.00
Rp.
48,000.00
Rp.
Rp.
Rp.
Rp.
6,767,200.00
Jumlah harga =
Pembulatan =

SNI.DT 91-0011-2007.6.16
Memasang 1 m2 rangka atap genteng keramik, kayu klas II
Kebutuhan
Satuan Indeks
Harga satuan
Kaso-kaso (5x7)cm
m3
0.014 Rp. 5,822,000.00
Bahan Reng (2x3)cm
m3
0.036 Rp. 5,822,000.00
Paku 5 cm dan 10 c
kg
0.250 Rp.
16,000.00
Pekerja
Oh
0.100 Rp.
Tukang Kayu
Oh
0.100 Rp.
Tenaga
Kepala Tukang
Oh
0.010 Rp.
Mandor
Oh
0.005 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
5,000.00
Rp.
7,200.00
Rp.
800.00
Rp.
360.00
13,360.00
Rp.
308,460.00
Rp.
308,460.00

SNI.DT 91-0011-2007.6.17
Memasang 1 m2 rangka atap genteng beton, kayu klas II
Kebutuhan
Satuan Indeks
Harga satuan
Kaso-kaso (5x7)cm
m3
0.014 Rp. 5,822,000.00
Bahan Reng (2x3)cm
m3
0.057 Rp. 5,822,000.00
Paku 5 cm dan 10 c
kg
0.250 Rp.
16,000.00
Pekerja
Oh
0.100 Rp.
Tukang Kayu
Oh
0.100 Rp.
Tenaga
Kepala Tukang
Oh
0.010 Rp.
Mandor
Oh
0.005 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
5,000.00
Rp.
7,200.00
Rp.
800.00
Rp.
360.00
13,360.00
Rp.
430,722.00
Rp.
430,720.00

SNI.DT 91-0011-2007.6.18
Memasang 1 m2 rangka atap seng BJLS, kayu klas II
Kebutuhan
Satuan Indeks
Harga satuan
m3
Kayu klas II
0.165 Rp. 5,822,000.00
Bahan
Paku 5 cm dan 10 c
kg
0.200 Rp.
16,000.00
Pekerja
Oh
0.120 Rp.
Tukang Kayu
Oh
0.120 Rp.
Tenaga
Kepala Tukang
Oh
0.012 Rp.
Mandor
Oh
0.006 Rp.

Harga satuan
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
6,000.00
Rp.
8,640.00
Rp.
960.00
Rp.
432.00
16,032.00
Rp.
979,862.00
Rp.
979,860.00

SNI.DT 91-0011-2007.6.19
Memasang 1 m2 rangka plafond, kayu klas III
Kebutuhan
Satuan Indeks
m3
Kaso-kaso (5x7)cm
0.015
Bahan
Paku 7 cm dan 10 c
kg
0.200
Pekerja
Oh
0.150
Tukang Kayu
Oh
0.300
Tenaga
Kepala Tukang
Oh
0.030
Mandor
Oh
0.075

Harga satuan
Rp. 3,115,000.00
Rp.
16,000.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
7,500.00
Rp.
21,600.00
Rp.
2,400.00
Rp.
5,400.00
36,900.00
Rp.
88,071.00
Rp.
88,070.00

SNI.DT 91-0011-2007.6.21
Memasang 1 m' lisplank ukuran ( 1.5"x8") cm, kayu klas II
Kebutuhan
Satuan Indeks
Harga satuan
Papan Kayu klas II
m3
0.011 Rp. 5,822,000.00
Bahan
Paku 5 cm dan 7 cm kg
0.100 Rp.
16,000.00
Pekerja
Oh
0.100 Rp.
Tukang Kayu
Oh
0.200 Rp.
Tenaga
Kepala Tukang
Oh
0.020 Rp.
Mandor
Oh
0.005 Rp.

Harga satuan
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga upah


Rp.
Rp.
Rp.
5,000.00
Rp.
14,400.00
Rp.
1,600.00
Rp.
360.00
21,360.00
Rp.
85,837.60
Rp.
85,840.00

Jumlah harga bahan


Rp.
81,508.00
Rp.
209,592.00
Rp.
4,000.00
Rp.
Rp.
Rp.
Rp.
295,100.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
81,508.00
Rp.
331,854.00
Rp.
4,000.00
Rp.
Rp.
Rp.
Rp.
417,362.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
960,630.00
Rp.
3,200.00
Rp.
Rp.
Rp.
Rp.
963,830.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
47,971.00
Rp.
3,200.00
Rp.
Rp.
Rp.
Rp.
51,171.00
Jumlah harga =
Pembulatan =

Jumlah harga bahan


Rp.
62,877.60
Rp.
1,600.00
Rp.
Rp.
Rp.
Rp.
64,477.60
Jumlah harga =
Pembulatan =

SNI.DT 91-0011-2007.6.23
Memasang 1 m2 dinding pemisah (60x120)cm kayu klasIII
Kebutuhan
Satuan Indeks
Harga satuan
Papan Kayu klas III
m3
0.028 Rp. 3,115,000.00
Bahan
Paku 5 cm dan 7 cm kg
0.150 Rp.
16,000.00
Pekerja
Oh
0.150 Rp.
Tukang Kayu
Oh
0.450 Rp.
Tenaga
Kepala Tukang
Oh
0.045 Rp.
Mandor
Oh
0.008 Rp.

Harga satuan
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga bahan


Rp.
87,220.00
Rp.
2,400.00
Rp.
Rp.
Rp.
Rp.
89,620.00
Jumlah harga =
Pembulatan =

Jumlah harga upah


Rp.
Rp.
Rp.
7,500.00
Rp.
32,400.00
Rp.
3,600.00
Rp.
576.00
44,076.00
Rp.
133,696.00
Rp.
133,700.00

SNI.DT 91-0011-2007.6.25
Memasang 1 m2 dinding partisi plywood rangkap, rangka kayu klas III
Kebutuhan
Satuan Indeks
Harga satuan
Balok kayu, ukuran
m3
0.028 Rp. 3,115,000.00
kg
0.150 Rp.
16,000.00
Bahan Paku 5 cm- 10 cm
Lem kayu
kg
0.560 Rp.
13,000.00
Tripleks 6mm
lbr
0.860 Rp.
90,000.00
Pekerja
Oh
0.200 Rp.
Tukang Kayu
Oh
0.600 Rp.
Tenaga
Kepala Tukang
Oh
0.060 Rp.
Mandor
Oh
0.010 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga bahan


Rp.
87,220.00
Rp.
2,400.00
Rp.
7,280.00
Rp.
77,400.00
Rp.
Rp.
Rp.
Rp.
174,300.00
Jumlah harga =
Pembulatan =

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

10,000.00
43,200.00
4,800.00
720.00
58,720.00
233,020.00
233,020.00

DAFTAR ANALISA PEKERJAAN


SNI.DT 91-0013-2007
PEKERJAAN LANGIT-LANGIT
SNI.DT 91-0013-2007.6.1
Memasang 1 m2 langit-langit asbes semen
Kebutuhan
Satuan
Indeks
Asbes semen
m2
1.100
Bahan
Paku tripleks
kg
0.010
Pekerja
Oh
0.030
Tukang Kayu
Oh
0.070
Tenaga Kepala Tukang
Oh
0.007
Mandor
Oh
0.004

Harga satuan
Rp.
13,000.00
Rp.
16,000.00
Rp.
Rp.
Rp.
Rp.

SNI.DT 91-0013-2007.6.5
Memasang 1 m2 langit-langit tripleks ukuran (120x240) cm
Kebutuhan
Satuan
Indeks
Harga satuan
Tripleks 4 mm
Lbr
0.375 Rp.
60,000.00
Bahan
Paku tripleks
kg
0.030 Rp.
16,000.00
Pekerja
Oh
0.100 Rp.
Tukang Kayu
Oh
0.100 Rp.
Tenaga Kepala Tukang
Oh
0.010 Rp.
Mandor
Oh
0.005 Rp.

SNI.DT 91-0013-2007.6.6
Memasang 1 m2 langit-langit lambriziring kayu, tebal 9 mm
Kebutuhan
Satuan
Indeks
Harga satuan
Kayu Papan klas I m3
0.015 Rp. 3,115,000.00
Bahan
Paku tripleks
kg
0.010 Rp.
16,000.00
Pekerja
Oh
0.800 Rp.
Tukang Kayu
Oh
0.800 Rp.
Tenaga
Kepala Tukang
Oh
0.080 Rp.
Mandor
Oh
0.040 Rp.

Harga satuan
Rp.
Rp.
Rp. 50,000.00
Rp. 72,000.00
Rp. 80,000.00
Rp. 72,000.00

Jumlah harga bahan


Rp.
14,300.00
Rp.
160.00
Rp.
Rp.
Rp.
Rp.
14,460.00
Jumlah harga =
Pembulatan =

Harga satuan
Rp.
Rp.
Rp. 50,000.00
Rp. 72,000.00
Rp. 80,000.00
Rp. 72,000.00

Jumlah harga bahan


Rp.
22,500.00
Rp.
480.00
Rp.
Rp.
Rp.
Rp.
22,980.00
Jumlah harga =
Pembulatan =

Harga satuan
Rp.
Rp.
Rp. 50,000.00
Rp. 72,000.00
Rp. 80,000.00
Rp. 72,000.00

Jumlah harga bahan


Rp.
46,725.00
Rp.
160.00
Rp.
Rp.
Rp.
Rp.
46,885.00
Jumlah harga =
Pembulatan =

SNI.DT 91-0013-2007.6.7
Memasang 1 m2 langit-langit gypsum board ukuran (120x240x 90)mm
Kebutuhan
Satuan
Indeks
Harga satuan
Harga satuan
Gypsum board
lbr
0.364 Rp.
20,000.00 Rp.
Bahan
Paku skrup
kg
0.110 Rp.
23,000.00 Rp.
Pekerja
Oh
0.100 Rp.
Rp. 50,000.00
Tukang Kayu
Oh
0.050 Rp.
Rp. 72,000.00
Tenaga
Kepala Tukang
Oh
0.005 Rp.
Rp. 80,000.00
Mandor
Oh
0.005 Rp.
Rp. 72,000.00

Jumlah harga bahan


Rp.
7,280.00
Rp.
2,530.00
Rp.
Rp.
Rp.
Rp.
9,810.00
Jumlah harga =
Pembulatan =

SNI.DT 91-0013-2007.6.9
Memasang 1 m' list langit-langit kayu profil
Kebutuhan
Satuan
Indeks
Harga satuan
List kayu profil
m'
1.050 Rp.
4,500.00
Bahan
Paku
kg
0.010 Rp.
16,000.00
Pekerja
Oh
0.050 Rp.
Tenaga

Harga satuan
Rp.
Rp.
Rp. 50,000.00

Jumlah harga bahan


Rp.
4,725.00
Rp.
160.00
Rp.

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Jumlah harga upah


Rp.
Rp.
Rp.

Tenaga

Tukang Kayu
Kepala Tukang
Mandor

Oh
Oh
Oh

0.050 Rp.
0.005 Rp.
0.003 Rp.

Rp.
Rp.
Rp.

72,000.00 Rp.
80,000.00 Rp.
72,000.00 Rp.

Rp.
Rp.
Rp.
4,885.00

Jumlah harga =
Pembulatan =

Rp.
Rp.

Jumlah harga upah

1,500.00
5,040.00
560.00
288.00
7,388.00
21,848.00
21,850.00

Jumlah harga upah

5,000.00
7,200.00
800.00
360.00
13,360.00
36,340.00
36,340.00

Jumlah harga upah

40,000.00
57,600.00
6,400.00
2,880.00
106,880.00
153,765.00
153,770.00

Jumlah harga upah

5,000.00
3,600.00
400.00
360.00
9,360.00
19,170.00
19,170.00

Jumlah harga upah

2,500.00

3,600.00
400.00
216.00
6,716.00
11,601.00
11,600.00

DAFTAR ANALISA PEKERJAAN


SNI.DT 91-0012-2007
PEKERJAAN PENUTUP LANTAI DAN DINDING
SNI.DT 91-0012-2007.6.13
Memasang 1 m2 lantai keramik ukuran (60x60) cm
Kebutuhan
Satuan Indeks
Lantai keramik 60x60
Bh
3.100
Portland cement
kg
9.600
Bahan
Pasir pasang
m3
0.045
Semen warna
kg
1.500
Pekerja
Oh
0.240
Tukang Batu
Oh
0.120
Tenaga
Kepala Tukang
Oh
0.012
Mandor
Oh
0.012

SNI.DT 91-0012-2007.6.34
Memasang 1 m2 lantai keramik ukuran (40x40) cm
Kebutuhan
Satuan Indeks
Lantai keramik
Bh
6.500
Portland cement
kg
8.190
Bahan
Pasir pasang
m3
0.045
Semen warna
kg
1.620
Pekerja
Oh
0.700
Tukang Kayu
Oh
0.350
Tenaga
Kepala Tukang
Oh
0.035
Mandor
Oh
0.035

SNI.DT 91-0012-2007.6.35
Memasang 1 m2 lantai keramik ukuran (30x30) cm
Kebutuhan
Satuan Indeks
Lantai keramik
Bh
11.500
Portland cement
kg
10.000
Bahan
Pasir pasang
m3
0.045
Semen warna
kg
1.500
Pekerja
Oh
0.700
Tukang Kayu
Oh
0.350
Tenaga
Kepala Tukang
Oh
0.035
Mandor
Oh
0.035

SNI.DT 91-0012-2007.6.36
Memasang 1 m2 lantai keramik ukuran (20x20) cm
Kebutuhan
Satuan Indeks
Lantai keramik
Bh
25.000
Portland cement
kg
10.400
Bahan
Pasir pasang
m3
0.045
Semen warna
kg
1.620
Pekerja
Oh
0.700
Tukang Kayu
Oh
0.350
Tenaga
Kepala Tukang
Oh
0.035
Mandor
Oh
0.035

Harga satuan
Rp.
45,000.00
Rp.
1,100.00
Rp.
90,000.00
Rp.
3,075.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
8,833.33
Rp.
1,100.00
Rp.
90,000.00
Rp.
3,075.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
4,909.09
Rp.
1,100.00
Rp.
90,000.00
Rp.
3,075.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
1,960.00
Rp.
1,100.00
Rp.
90,000.00
Rp.
3,075.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga bahan


Rp.
139,500.00
Rp.
10,560.00
Rp.
4,050.00
Rp.
4,612.50
Rp.
Rp.
Rp.
Rp.
158,722.50
Jumlah harga =
Pembulatan =

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga bahan


Rp.
57,416.65
Rp.
9,009.00
Rp.
4,050.00
Rp.
4,981.50
Rp.
Rp.
Rp.
Rp.
75,457.15
Jumlah harga =
Pembulatan =

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga bahan


Rp.
56,454.54
Rp.
11,000.00
Rp.
4,050.00
Rp.
4,612.50
Rp.
Rp.
Rp.
Rp.
76,117.04
Jumlah harga =
Pembulatan =

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga bahan


Rp.
49,000.00
Rp.
11,440.00
Rp.
4,050.00
Rp.
4,981.50
Rp.
Rp.
Rp.
Rp.
69,471.50
Jumlah harga =
Pembulatan =

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

SNI.DT 91-0012-2007.6.36.1
Memasang 1 m2 dinding keramik ukuran (20x25) cm
Kebutuhan
Satuan Indeks
Harga satuan
Lantai keramik
Bh
20.000 Rp.
2,250.00
Portland cement
kg
10.400 Rp.
1,100.00
Bahan
Pasir pasang
m3
0.045 Rp.
90,000.00
Semen warna
kg
1.620 Rp.
3,075.00
Pekerja
Oh
0.700 Rp.
Tukang Kayu
Oh
0.350 Rp.
Tenaga
Kepala Tukang
Oh
0.035 Rp.
Mandor
Oh
0.035 Rp.

SNI.DT 91-0012-2007.6.44
Memasang 1 m2 lantai karpet
Kebutuhan
Karpet
Bahan
Lem
Pekerja
Tukang Kayu
Tenaga
Kepala Tukang
Mandor

SNI.DT 91-0012-2007.6.46
Memasang 1 m2 lantai parquet
Kebutuhan
Parquet
Bahan
Lem
Pekerja
Tukang Kayu
Tenaga
Kepala Tukang
Mandor

Satuan Indeks
Harga satuan
m2
1.050 Rp.
36,000.00
kg
0.350 Rp.
45,000.00
Oh
0.170 Rp.
Oh
0.170 Rp.
Oh
0.017 Rp.
Oh
0.009 Rp.

Satuan Indeks
Harga satuan
m2
1.050 Rp. 270,000.00
kg
0.600 Rp.
45,000.00
Oh
0.700 Rp.
Oh
0.350 Rp.
Oh
0.035 Rp.
Oh
0.035 Rp.

SNI.DT 91-0012-2007.6.47
Memasang 1 m2 lantai kayu (gym floor)
Kebutuhan
Satuan Indeks
Harga satuan
m2
Gymfloor
1.050 Rp. 180,000.00
Bahan
Lem
kg
0.600 Rp.
45,000.00
Pekerja
Oh
0.700 Rp.
Tukang Kayu
Oh
0.350 Rp.
Tenaga
Kepala Tukang
Oh
0.035 Rp.
Mandor
Oh
0.035 Rp.

SNI.DT 91-0012-2007.6.57
Memasang 1 m2 dinding batu paras
Kebutuhan
Satuan Indeks
Harga satuan
m2
Batu paras
1.100 Rp. 180,000.00
kg
11.750 Rp.
1,100.00
Bahan Potrland cement
Pasir pasang
m3
0.035 Rp.
90,000.00
Pekerja
Oh
0.700 Rp.
Tukang batu
Oh
0.350 Rp.
Tenaga
Kepala Tukang
Oh
0.035 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga bahan


Rp.
45,000.00
Rp.
11,440.00
Rp.
4,050.00
Rp.
4,981.50
Rp.
Rp.
Rp.
Rp.
65,471.50
Jumlah harga =
Pembulatan =

Harga satuan
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga bahan


Rp.
37,800.00
Rp.
15,750.00
Rp.
Rp.
Rp.
Rp.
53,550.00
Jumlah harga =
Pembulatan =

Harga satuan
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga bahan


Rp.
283,500.00
Rp.
27,000.00
Rp.
Rp.
Rp.
Rp.
310,500.00
Jumlah harga =
Pembulatan =

Harga satuan
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga bahan


Rp.
189,000.00
Rp.
27,000.00
Rp.
Rp.
Rp.
Rp.
216,000.00
Jumlah harga =
Pembulatan =

Harga satuan
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00

Jumlah harga bahan


Rp.
198,000.00
Rp.
12,925.00
Rp.
3,150.00
Rp.
Rp.
Rp.

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Tenaga
Mandor

Oh

0.035 Rp.

Rp.

72,000.00 Rp.

Rp.
214,075.00

Jumlah harga =
Pembulatan =
SNI.DT 91-0012-2007.6.58
Memasang 1 m2 dinding batu tempel hitam
Kebutuhan
Satuan Indeks
Batu tempel hitam
m2
1.100
kg
11.750
Bahan Potrland cement
Pasir pasang
m3
0.035
Pekerja
Oh
0.700
Tukang batu
Oh
0.350
Tenaga
Kepala Tukang
Oh
0.035
Mandor
Oh
0.035

SNI.DT 91-0012-2007.6.60
Memasang 1 m2 wall paper
Kebutuhan
Wallpaper
Bahan
Lem
Pekerja
Tukang
Tenaga
Kepala Tukang
Mandor

SNI.DT 91-0012-2007.6.61
Memasang 1 m2 floor hardener
Kebutuhan
Bahan Floor Hardener
Pekerja
Tukang
Tenaga
Kepala Tukang
Mandor

SNI.DT 91-0012-2007.6.7
Memasang 1 m2 conblok #6 cm
Kebutuhan
Conblok #6cm
Bahan
Pasir urug
Pekerja
Tukang
Tenaga
Kepala Tukang
Mandor

Harga satuan
Rp. 135,000.00
Rp.
1,100.00
Rp.
90,000.00
Rp.
Rp.
Rp.
Rp.

Satuan Indeks
Harga satuan
m2
2.200 Rp.
94,000.00
kg
0.250 Rp.
45,000.00
Oh
0.350 Rp.
Oh
0.175 Rp.
Oh
0.017 Rp.
Oh
0.002 Rp.

Satuan Indeks
Harga satuan
kg
5.000 Rp.
3,500.00
Oh
0.120 Rp.
Oh
0.120 Rp.
Oh
0.012 Rp.
Oh
0.006 Rp.

Satuan Indeks
Harga satuan
bh
44.000 Rp.
1,800.00
m3
0.055 Rp.
73,000.00
Oh
0.300 Rp.
Oh
0.200 Rp.
Oh
0.010 Rp.
Oh
0.010 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga bahan


Rp.
148,500.00
Rp.
12,925.00
Rp.
3,150.00
Rp.
Rp.
Rp.
Rp.
164,575.00
Jumlah harga =
Pembulatan =

Harga satuan
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga bahan


Rp.
206,800.00
Rp.
11,250.00
Rp.
Rp.
Rp.
Rp.
218,050.00
Jumlah harga =
Pembulatan =

Harga satuan
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga bahan


Rp.
17,500.00
Rp.
Rp.
Rp.
Rp.
17,500.00
Jumlah harga =
Pembulatan =

Harga satuan
Rp.
Rp.
Rp.
50,000.00
Rp.
72,000.00
Rp.
80,000.00
Rp.
72,000.00

Jumlah harga bahan


Rp.
79,200.00
Rp.
4,015.00
Rp.
Rp.
Rp.
Rp.
83,215.00
Jumlah harga =
Pembulatan =

Rp.
Rp.

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Jumlah harga upah

0.00
8,640.00
960.00
864.00
10,464.00
169,186.50
169,190.00

Jumlah harga upah

0.00
25,200.00
2,800.00
2,520.00
30,520.00
105,977.15
105,980.00

Jumlah harga upah

35,000.00
25,200.00
2,800.00
2,520.00
65,520.00
141,637.04
141,640.00

Jumlah harga upah

35,000.00
25,200.00
2,800.00
2,520.00
65,520.00
134,991.50
134,990.00

Jumlah harga upah

35,000.00
25,200.00
2,800.00
2,520.00
65,520.00
130,991.50
130,990.00

Jumlah harga upah

8,500.00
12,240.00
1,360.00
648.00
22,748.00
76,298.00
76,300.00

Jumlah harga upah

35,000.00
25,200.00
2,800.00
2,520.00
65,520.00
376,020.00
376,020.00

Jumlah harga upah

35,000.00
25,200.00
2,800.00
2,520.00
65,520.00
281,520.00
281,520.00

Jumlah harga upah

35,000.00
25,200.00
2,800.00

2,520.00
65,520.00
279,595.00
279,600.00

Jumlah harga upah

35,000.00
25,200.00
2,800.00
2,520.00
65,520.00
230,095.00
230,100.00

Jumlah harga upah

17,500.00
12,600.00
1,360.00
144.00
31,604.00
249,654.00
249,650.00

Jumlah harga upah


6,000.00
8,640.00
960.00
432.00
16,032.00
33,532.00
33,530.00

Jumlah harga upah

15,000.00
14,400.00
800.00
720.00
30,920.00
114,135.00
114,140.00

DAFTAR ANALISA PEKERJAAN


SNI.DT 91-0009-2007
PEKERJAAN DINDING
SNI.DT 91-0009-2007.6.1
Memasang 1 m2 dinding bata merah tebal 1 bata, campuran spesi 1 PC: 2PP
Kebutuhan
Satuan Indeks
Harga satuan
Harga satuan
Bata merah
bh
140.000 Rp.
800.00 Rp.
kg
43.500 Rp.
1,100.00 Rp.
Bahan Semen portland
Pasir pasang
m3
0.080 Rp.
90,000.00 Rp.
Pekerja
Oh
0.600 Rp.
Rp. 50,000.00
Tukang batu
Oh
0.200 Rp.
Rp. 72,000.00
Tenaga
Kepala Tukang
Oh
0.020 Rp.
Rp. 80,000.00
Mandor
Oh
0.030 Rp.
Rp. 72,000.00

Jumlah harga bahan


Rp.
112,000.00
Rp.
47,850.00
Rp.
7,200.00
Rp.
Rp.
Rp.
Rp.
167,050.00
Jumlah harga =
Pembulatan

SNI.DT 91-0009-2007.6.2
Memasang 1 m2 dinding bata merah tebal 1 bata, campuran spesi 1 PC: 3PP
Kebutuhan
Satuan Indeks
Harga satuan
Harga satuan
Bata merah
bh
140.000 Rp.
800.00 Rp.
kg
32.950 Rp.
1,100.00 Rp.
Bahan Semen portland
Pasir pasang
m3
0.091 Rp.
90,000.00 Rp.
Pekerja
Oh
0.600 Rp.
Rp. 50,000.00
Tukang batu
Oh
0.200 Rp.
Rp. 72,000.00
Tenaga
Kepala Tukang
Oh
0.020 Rp.
Rp. 80,000.00
Mandor
Oh
0.030 Rp.
Rp. 72,000.00

Jumlah harga bahan


Rp.
112,000.00
Rp.
36,245.00
Rp.
8,190.00
Rp.
Rp.
Rp.
Rp.
156,435.00
Jumlah harga =
Pembulatan

SNI.DT 91-0009-2007.6.3
Memasang 1 m2 dinding bata merah tebal 1 bata, campuran spesi 1 PC: 4PP
Kebutuhan
Satuan Indeks
Harga satuan
Harga satuan
Bata merah
bh
140.000 Rp.
800.00 Rp.
kg
26.550 Rp.
1,100.00
Bahan Semen portland
Pasir pasang
m3
0.093 Rp.
90,000.00 Rp.
Pekerja
Oh
0.600 Rp.
Rp. 50,000.00
Tukang Batu
Oh
0.200 Rp.
Rp. 72,000.00
Tenaga
Kepala Tukang
Oh
0.020 Rp.
Rp. 80,000.00
Mandor
Oh
0.030 Rp.
Rp. 72,000.00

Jumlah harga bahan


Rp.
112,000.00
Rp.
29,205.00
Rp.
8,370.00
Rp.
Rp.
Rp.
Rp.
149,575.00
Jumlah harga =
Pembulatan

SNI.DT 91-0009-2007.6.7
Memasang 1 m2 dinding bata merah tebal 1/2 bata, campuran spesi 1 PC: 2PP
Kebutuhan
Satuan Indeks
Harga satuan
Harga satuan
Bata merah
bh
70.000 Rp.
800.00 Rp.
kg
18.950 Rp.
1,100.00 Rp.
Bahan Semen portland
Pasir pasang
m3
0.038 Rp.
90,000.00 Rp.
Pekerja
Oh
0.300 Rp.
Rp. 50,000.00
Tukang batu
Oh
0.100 Rp.
Rp. 72,000.00
Tenaga
Kepala Tukang
Oh
0.010 Rp.
Rp. 80,000.00
Mandor
Oh
0.015 Rp.
Rp. 72,000.00

Jumlah harga bahan


Rp.
56,000.00
Rp.
20,845.00
Rp.
3,420.00
Rp.
Rp.
Rp.
Rp.
80,265.00
Jumlah harga =
Pembulatan

SNI.DT 91-0009-2007.6.8
Memasang 1 m2 dinding bata merah tebal 1/2 bata, campuran spesi 1 PC: 3PP

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Kebutuhan
Bata merah
Bahan Semen portland
Pasir pasang
Pekerja
Tukang batu
Tenaga
Kepala Tukang
Mandor

Satuan
bh
kg
m3
Oh
Oh
Oh
Oh

Indeks
70.000
14.370
0.040
0.300
0.100
0.010
0.015

Harga satuan
Rp.
800.00
Rp.
1,100.00
Rp.
90,000.00
Rp.
Rp.
Rp.
Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp. 50,000.00
Rp. 72,000.00
Rp. 80,000.00
Rp. 72,000.00

Jumlah harga bahan


Rp.
56,000.00
Rp.
15,807.00
Rp.
3,600.00
Rp.
Rp.
Rp.
Rp.
75,407.00
Jumlah harga =
Pembulatan

SNI.DT 91-0009-2007.6.9
Memasang 1 m2 dinding bata merah tebal 1/2 bata, campuran spesi 1 PC: 4PP
Kebutuhan
Satuan Indeks
Harga satuan
Harga satuan
Bata merah
bh
70.000 Rp.
800.00 Rp.
kg
11.500 Rp.
1,100.00 Rp.
Bahan Semen portland
Pasir pasang
m3
0.043 Rp.
90,000.00 Rp.
Pekerja
Oh
0.300 Rp.
Rp. 50,000.00
Tukang batu
Oh
0.100 Rp.
Rp. 72,000.00
Tenaga
Kepala Tukang
Oh
0.010 Rp.
Rp. 80,000.00
Mandor
Oh
0.015 Rp.
Rp. 72,000.00

Jumlah harga bahan


Rp.
56,000.00
Rp.
12,650.00
Rp.
3,870.00
Rp.
Rp.
Rp.
Rp.
72,520.00
Jumlah harga =
Pembulatan

SNI.DT 91-0009-2007.6.23
Memasang 1 m2 dinding terawang campuran spesi 1 PC: 4PP
Kebutuhan
Satuan Indeks
Harga satuan
Batu kerawang
bh
30.000 Rp.
4,000.00
kg
11.000 Rp.
1,100.00
Bahan Semen portland
Pasir pasang
m3
0.035 Rp.
90,000.00
Pekerja
Oh
0.300 Rp.
Tukang batu
Oh
0.100 Rp.
Tenaga
Kepala Tukang
Oh
0.010 Rp.
Mandor
Oh
0.015 Rp.

Harga satuan
Rp.
Rp.
Rp.
Rp. 50,000.00
Rp. 72,000.00
Rp. 80,000.00
Rp. 72,000.00

Jumlah harga bahan


Rp.
120,000.00
Rp.
12,100.00
Rp.
3,150.00
Rp.
Rp.
Rp.
Rp.
135,250.00
Jumlah harga =
Pembulatan

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Jumlah harga upah


Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Jumlah harga upah

30,000.00
14,400.00
1,600.00
2,160.00
48,160.00
215,210.00
215,210.00

Jumlah harga upah

30,000.00
14,400.00
1,600.00
2,160.00
48,160.00
204,595.00
204,600.00

Jumlah harga upah

30,000.00
14,400.00
1,600.00
2,160.00
48,160.00
197,735.00
197,740.00

Jumlah harga upah

15,000.00
7,200.00
800.00
1,080.00
24,080.00
104,345.00
104,350.00

Jumlah harga upah

15,000.00
7,200.00
800.00
1,080.00
24,080.00
99,487.00
99,490.00

Jumlah harga upah

15,000.00
7,200.00
800.00
1,080.00
24,080.00
96,600.00
96,600.00

Jumlah harga upah

15,000.00
7,200.00
800.00
1,080.00
24,080.00
159,330.00
159,330.00

Anda mungkin juga menyukai