Tugas Rab
Tugas Rab
NO
PEMBERSIHAN LAHAN
BOWPLANK
PEKERJAAN SLOOF
PEKERJAAN KOLOM
PEKERJAAN DINDING
REKAP VOLUME
NO
1
2
3
4
5
6
7
8
9
BOWPLANK
GALIAN TANAH PONDASI BATU KALI
PEKERJAAN PONDASI BATU KALI
MENGURUG TANAH KEMBALI
PEKERJAAN SLOOF
PEKERJAAN KOLOM
PEKERJAAN DINDING
PEKERJAAN RING BALOK
SATUAN
m
PERHITUNGAN
12
10 m
VOLUME = KELILING
VOLUME = (12x2)+(10x2)
VOLUME =
44 m
12 m
1m
VOLUME =
VOLUME =
ISI MENGGALI
LUAS TRAPESIUM x
PANJANG
150 GALIAN
(1,5m + 1m) x (1m /2) x 62m
77.50 15m
100
VOLUME =
VOLUME =
17
100
100
100
VOLUME =
VOLUME =
100
VOLUME =
VOLUME =
ISI PONDASI
LUAS TRAPESIUM
x
150
PANJANG PONDASI
(0,15m +151m) x (1m /2) x 62m
35.65 m
17
100
VOLUME =
VOLUME =
VOLUME =
100
17
15
100
VOLUME =
410
17
8-15
15
410
17
8-15
15
m
VOLUME =
15
8-15
15
m
VOLUME =
62 m'
VOLUME
240
44
77.5
35.65
41.8
1.581
0.81
168.56
62
m
m
m
m
m
m
m
m'
VOLUME
240 m
44 m
77.5 m
35.65 m
41.8 m
1.581 m
0.81 m
168.56 m
62 m'
NO
ITEM PEKERJAAN
PEMBERSIHAN LAHAN
PEKERJAAN BOWPLANK
PEKERJAAN SLOOF
Membuat 1 m3 sloof beton bertulang
(200 kg besi + bekisting)
PEKERJAAN KOLOM
Membuat 1 m3 kolom beton bertulang
(300 kg besi + bekisting)
PEKERJAAN DINDING
Memasang 1 m2 dinding bata merah
ukuran (5 x 11 x 22) cm tebal 1/2 bata
campuran spesi 1 PC : 2 PP
REKAP MATERIAL
MATERIAL
bata merah
Batu Belah 15/20
Besi beton polos
Dolken kayu galam, (8-10) cm, panjang 4 m
Kawat beton
Kayu 5/7 (Kayu Klas IV)
Kayu kelas II balok
Kayu kelas III
Kayu Papan 3/20 (Kayu Klas III)
KR
Minyak bekisting
Paku 5 cm-12cm
Paku Biasa 2" - 5"
Pasir Pasang (PP)
PB
PC
Plywood 9 mm
Pasir Pasang
Batu Belah 15/20
PC
0.012
0.020
0.007
m
Kg
m
0.485
1.200
202.000
m
m
kg
0.27 m3
2 kg
0.6 Liter
210 kg
3 kg
336 kg
0.54 m3
0.81 m3
0.4 m3
4 kg
2 Liter
315 kg
4.5 kg
336 kg
0.54 m3
0.81 m3
0.15 m3
3.5 lmbr
20 btg
PP
PC
bata merah
0.038 m
18.950 Kg
70.000 buah
0.003 m3
0.02 kg
3.6 kg
0.05 kg
5.5 kg
0.009 m3
0.015 m3
KUANTITAS
SATUAN
23598.4
42.78
810.360
16.2
11.488
0.528
0.1215
0.937
0.308
2.867
2.569
7.642
0.88
23.696
1.849
11539.888
2.835
buah
m
kg
btg
kg
m
m3
m3
m
m
Liter
kg
Kg
m
m
kg
lmbr
VOLUME
TOTAL
44 m
0.528
0.880
0.308
m
Kg
m
35.65 m
17.290
42.780
7201.300
m
m
kg
1.581 m
0.427
3.162
0.949
332.010
4.743
531.216
0.854
1.281
m3
kg
Liter
kg
kg
kg
m3
m3
0.81 m
0.324
3.240
1.620
255.150
3.645
272.160
0.437
0.656
0.122
2.835
16.200
m3
kg
Liter
kg
kg
kg
m3
m3
m3
lmbr
btg
168.56 m
6.405
3194.212
11799.200
m
Kg
buah
62 m'
0.186
1.240
223.200
3.100
341.000
0.558
0.930
m3
kg
kg
kg
kg
m3
m3