DATA - DATA PAKET KONTRAKTUAL

SATKER PELAKSANAAN JALAN NASIONAL METROPOLITAN I JAKARTA


TAHUN ANGGARAN 2014
Status 27 Nopember 2014

NO

NAMA PAKET KONTRAKTUAL

Nilai Kontrak/
Addendum
(x1.000)

Penyedia Jasa

Konsultan
(Pengawas)

Waktu
Pel.
(HK)

Tanggal
Konrak

PHO

PT. Kwarsa
Hexagon

90

8-Sep-14

8-Dec-14

FHO

Pjg
Eff.
(Km)

Lebar
(m)

Progress Fisik (%)


Real.

Dev.

Progress
Keu.
(%)

Penanganan

Ren.

93.98%

94.01%

0.03%

20.00%

Pembuatan Baru Kartu


Leger Jalan dan
Jembatan

93.98%

94.01%

0.03%

20.00%

Permasalahan

Solusi

A INDUK
PAKET PEMBUATAN LEGER JALAN
1 DAN JEMBATAN SNVT PJN
METROPOLITAN I JAKARTA

Rp

583,050

Rp

583,050

Pemeliharaan Berkala Jalan Raya Bitung


Rp
(Cikarang) dan Jalan Transyogi (Depok)

11,049,743

PT. Rama Abdi


Pratama

PT. Indec
Internusa JO. PT.
Epadascon
Permata

210

28-Mar-14 28-Nov-14 26-Nov-16

5.600

14

100.0%

100.0%

0.00%

73.06%

Peningkatan Jalan Fatahillah (Cikarang),


Fly Over Cikarang, Jalan Gatot Subroto,
2 Jalan Urip Sumoharjo (Cikarang), Bts.
Rp
Kota Cikarang - Bts. Kota Karawang dan
Jalan Akses Marunda

27,631,588

PT. Rama Abdi


Pratama

PT. Indec
Internusa JO. PT.
Epadascon
Permata

270

28-Mar-14 22-Dec-14 20-Dec-16

3.550

14

93.6%

92.3%

-1.33%

62.18%

Rp

38,681,331

96.8%

96.1%

-0.7%

67.62%

Pemeliharaan Berkala Jln. A.Yani


2 (Bekasi), Jln. Cut Mutia (Bekasi) dan Jln. Rp
Juanda (Bekasi)

11,288,964

PT. Boriandy
Putra

Pemeliharaan Berkala Jln. Sultan Agung


Rp
(Bekasi) dan Jln. Sudirman (Bekasi)

13,850,827

PT. Jaya
Wibawaguna

Sub Total A

B PPK 1 (REGULER)

Sub Total B

Overlay (Pelapisan
Ulang)
Ekternal Prestressing
Jembatan
Raising berupa LC dan
Rigid Pavement
Overlay AC-WC dan UDitch

Adanya Pengalihan
Kegiatan Rigid Pavement
pada Ruas Jalan Yos
Sudarso (Cikarang)

Percepat Kegiatan Rigid


Pavement.

C PPK PBMC 1

Peningkatan Jl. Mayjen Sutoyo, Jl. Bogor


6 Raya, Jl. Jend. Ahmad Yani dan Jl. TB
Rp
Simatupang
Sub Total C

Rp

PT. Rekaya
14,928,015 Semesta Utama

PT. Indec
Internusa JO. PT.
Epadascon
Permata
PT. Indec
Internusa JO. PT.
Epadascon
Permata
PT. Herda Carter
Indonesia

100

2-May-14

18-Jul-14

16-Jul-16

1.000 14-20

100.00% 100.00% 0.00%

Raising berupa AC-Base


100.00% dan Rigid Pavement
Overlay AC-WC

100

2-May-14

18-Jul-14

16-Jul-16

1.900 14-20

100.00% 100.00% 0.00%

Raising berupa AC-Base


100.00% dan Rigid Pavement
Overlay AC-WC

150

25-Jul-14

21-Dec-14 9-Dec-16

3.250 14-20

40,067,806

72.14%

55.66% -16.48%

38.27%

90.71%

85.22%

79.42%

-5.49%

Raising berupa AC-Base Kurangnya Personil dan


dan Rigid Pavement
Peralatan akibat lokasi
Overlay AC-WC
pekerjaan tersebar di 4
lokasi ruas jalan

Penambahan 1 set alat


pengaspalan dan
penambahan personil pada
lokasi yang belum
dikerjakan

C PPK Cimanggis - Nagrak

Pembangunan Jalan Akses Tol


1
Cimanggis-Nagrak

Rp

25,468,920

Sub Total D

Rp

25,468,920

Total A+B+C

Rp

104,801,107

Rp

149,646,126

Pagu Revisi-3 Satuan Kerja PJN


Metropolitan 1 Jakarta Tahun Anggaran
2014

PT. Paesa
Pasindo
Engineering

PT. Wahana Mitra


Amerta JO. PT.
Konsindotama
Persada

200

20-May-14

7-Dec-14

5-Dec-16

2.000

14

83.2%

54.10% -29.12%

40.97%

83.23%

54.10%

-29.12%

40.97%

91.18%

82.37%

-8.81%

63.60%

Rigid Pavement, Galian


dan Timbunan,
Jembatan Riverside

Terkendala Pembebasan
Lahan di Lokasi yang akan
dikerjakan

Percepat Proses
Pembebasan Lahan dengan
Koordinasi Antara
Satker,P2T,BPN dan Pihak
terkait lainnnya.

PROGNOSIS SATKER METROPOLITAN I JAKARTA TA. 2014 (DANA SIAP)


Status 27 Nopember 2014
No.

1
2
3
4
5

ID Paket *)
04.08.2409.
001.2.00
04.08.2409.
001.1.00
04.08.2409.
001.53.00
04.08.2409.
002.4.00
04.08.2409.
002.3.00

Nama Paket / Subpaket

K/AU/SW
**)

PAGU
(Rp.Ribu)
TOTAL

REALISASI
s.d 10 Okt. 2014
(Rp.Ribu)
%
TOTAL

Keu

Dana Belum
Terserap
Fis

(Rp.Ribu)

November

Desember

Rencana
Realisasi S.d
Desember 2014

(Rp.Ribu)

(Rp.Ribu)

(Rp.Ribu)

Rencana Penyerapan

(%)

Dana Siap
TA.2014

Keterangan ****)

(Rp.Ribu)

PEMELIHARAAN RUTIN JALAN PPK1

5,769,227

4,440,436

76.97%

76.97%

1,328,791

500,000

400,000

5,340,436

92.57%

428,791

PEMELIHARAAN RUTIN JALAN PPK PBMC 1

5,708,046

4,774,559

83.65%

83.65%

933,487

400,000

533,100

5,707,659

99.99%

387

PEMELIHARAAN RUTIN JALAN PPK CIMANGGIS


NAGRAK

492,594

218,312

44.32%

44.32%

274,282

100,000

318,312

64.62%

174,282

PEMELIHARAAN RUTIN JEMBATAN PPK 1

4,694,041

2,743,677

58.45%

58.45%

1,950,364

800,000

800,000

4,343,677

92.54%

350,364

PEMELIHARAAN RUTIN JEMBATAN PPK PBMC 1

4,619,795

4,177,254

90.42%

90.42%

442,541

441,200

4,618,454

99.97%

1,341

2,990,402

11,073,404

100.00%

04.08.2409. PAKET PEMELIHARAAN BERKALA JALAN RAYA


003.6.00
BITUNG (CIKARANG) DAN JALAN TRANSYOGI (DEPOK)

11,073,404

8,083,002

72.99%

96.40%

2,990,402

04.08.2409. PEMELIHARAAN BERKALA JLN. A.YANI (BEKASI), JLN.


003.50.00
CUT MUTIA (BEKASI) DAN JLN. JUANDA (BEKASI)

11,303,164

11,294,900

99.93%

100.00%

8,264

8,264

11,303,164

100.00%

13,867,727

13,839,531

99.80%

100.00%

28,196

28,196

13,867,727

100.00%

27,658,888

17,192,356

62.16%

92.30%

10,466,532

5,000,000

5,466,532

27,658,888

100.00%

14,951,675

5,723,819

38.28%

65.66%

9,227,856

4,000,000

5,227,856

14,951,675

100.00%

25,500,000

10,435,393

40.92%

54.10%

15,064,607

6,000,000

7,500,000

23,935,393

93.86%

10

11

12
13
14

15

16
17
18
19
20
21

04.08.2409. PEMELIHARAAN BERKALA JLN. SULTAN AGUNG


003.51.00
(BEKASI) DAN JLN. SUDIRMAN (BEKASI)
PAKET PENINGKATAN JALAN FATAHILLAH
(CIKARANG), FLY OVER CIKARANG, JALAN URIP
04.08.2409.
SUMOHARJO (CIKARANG), BTS. KOTA CIKARANG005.8.00
BTS. KOTA KARAWANG DAN JALAN AKSES
MARUNDA
PENINGKATAN JLN. MAYJEN SUTOYO, JLN. BOGOR
04.08.2409.
RAYA, JLN. JEND. AHMAD YANI DAN JLN. TB.
005.52.00
SIMATUPANG
04.08.2409. PAKET PEMBANGUNAN AKSES TOL CIMANGGIS 011.10.00
NAGRAK TAHAP 4
04.08.2409.
011.19.00
04.08.2409.
014.11.00
04.08.2409.
994.14.00

PEMBEBASAN TANAH PEMBANGUNAN AKSES TOL


CIMANGGIS - NAGRAK TAHAP 4
PAKET PEMBUATAN LEGER JALAN DAN JEMBATAN
SNVT PJN METROPOLITAN I JAKARTA
MONITORING DAN EVALUASI

04.08.2409.
PEMBAYARAN GAJI dan TUNJAGAN
994.12.00
04.08.2409.
994.29.00
04.08.2409.
994.30.00
04.08.2409.
994.31.00

PENYELENGGARAAN OPERASIONAL DAN


PEMELIHARAAN PERKANTORAN SATKER
PENYELENGGARAAN OPERASIONAL DAN
PEMELIHARAAN PERKANTORAN PPK PBMC 1
PENYELENGGARAAN KEBUTUHAN DAN OPERASIONAL
PERKANTORAN PPK 1
PENYELENGGARAAN OPERASIONAL DAN
04.08.2409.
PEMELIHARAAN PERKANTORAN PPK CIMANGGIS
994.32.00
NAGRAK
04.08.2409. FASILITASI PERANGKAT PENGOLAH DATA dan
996.17.00
KOMUNIKASI
04.08.2409. FASILITASI PERALATAN dan FASILITAS
997.18.00
PERKANTORAN
Total
K = Kontrak, AU = Administrasi Umum, SW = Swakelola

Lahan Belum
1,564,607 Bebas dan

Lahan Sengketa
S

18,000,000

4,630,207

25.72%

25.72%

13,369,793

3,000,000

7,630,207

42.39%

594,530

116,610

19.61%

19.61%

477,920

116,000

361,920

594,530

100.00%

496,436

329,790

66.43%

66.43%

166,646

166,646

496,436

100.00%

AU

297,858

81,746

27.44%

27.44%

216,112

81,746

27.44%

216,112

AU

2,676,104

1,771,239

66.19%

66.19%

904,865

454,865

2,676,104

100.00%

AU

635,524

510,800

80.37%

80.37%

124,724

124,724

635,524

100.00%

AU

764,720

532,219

69.60%

69.60%

232,501

232,501

764,720

100.00%

AU

455,023

285,640

62.77%

62.77%

169,383

169,383

455,023

100.00%

57,370

57,050

99.44%

99.44%

320

57,050

99.44%

320

30,000

29,700

99.00%

99.00%

300

29,700

99.00%

149,646,126

91,268,240

60.99%

65.01%

58,377,886

136,539,829

91.24%

S
S

450,000

20,797,602

24,473,987

10,369,793 Lahan Sengketa

TKK tidak dapat


dibayarkan
akibat
Remunerasi

Sisa Dana
Pengadaan
Sisa Dana
300
Pengadaan
13,106,297

8.76%

Rencana Pengadaan Barang / Jasa Kontraktual TA. 2015


Kementerian Pekerjaan Umum
Unit Organisasi
Satker

: BBPJN IV
: METROPOLITAN I JAKARTA
Tanggal Perkiraan

No. ID Paket

Nama Paket Kontraktual

Peningkatan Jalan Cakung - Cilincing, Jalan Akses Marunda, Fly Over


Cikarang (Cikarang), Jalan Raya Bitung (Cikarang), Jalan Fatahillah
(Cikarang), Jalan Gatot Subroto (Cikarang), Jalan Urip Sumoharjo
(Cikarang) dan Bts. Kota Cikarang - Bts. Kota Karawang

Penggantian Jembatan Srengseng (Metland Tambun)

3
4

Pagu
(Rp. 000)

Pengumuman Lelang

Ttd Kontrak

PHO

Keterangan

38,821,092

29 Oktober 2014

25 Fe bruari 2015 21 N ove m be r 2015

270 HK

6,000,000

29 Oktober 2014

25 Fe bruari 2015

180 HK

Pembangunan Akses Dryport Cikarang (MYC)

55,000,000

08 Desember 2014

Peningkatan Jalan Sultan Agung (Bekasi), Jalan Sudirman (Bekasi),


Jalan A. Yani (Bekasi), Jalan Cut Mutia (Bekasi), Jalan Juanda (Bekasi)
dan Jalan Diponegoro (Tambun)

31,480,859

10 Januari 2015

09 Me i 2015

04 De se m be r 2015

210 HK, PBMC

19,451,849

10 Januari 2015

09 Me i 2015

02 Fe bruari 2016

270 HK, PBMC

5,534,200

29 Oktober 2014

25 Fe bruari 2015

23 A gustus 2015

180 HK

20,000,000

29 Oktober 2014

25 Fe bruari 2015 22 Se pte m be r 2015

210 HK

Peningkatan Jalan Perintis Kemerdekaan, Jalan Jend. A. Yani, Jalan D.I


Panjaitan, Jalan Bogor Raya, dan Jalan TB. Simatupang

Pemeliharaan Berkala Jalan Trans Yogi (Depok)

Pembangunan Jalan Akses Tol Cimanggis - Nagrak Tahap - 5

Total

176,288,000

23 A gustus 2015

06 A pril 2015 25 N ove m be r 2016 Multy Years (600 HK)