Anda di halaman 1dari 2

L=

t=

6.4
6.4

m
m

hs=
hp=he=
ne=

3
3.3
23

m
m
etaje

IASI
ag=
Tc=

0.2
0.7

g
s

ba=

25

fcd=
fyd,s=
fyd=

26.7
300
355

kN/m

N/mm
N/mm2
N/mm2

PREDIMENSIONARE
placa
hpl>=

14.22

+1..2 cm

grinzi
hg
bg

64
35

hpl=

hg=
bg=

70
40

16

cm
cm

Ac,ef Ac=bg*hg
Aa=Ac*p/100
=As*fyd,s/(Ac*fcd+Aa*fyd+As*fyd,s)
pp. =0.25
As=(Ac*fcd+Aa*fyd)/(fyd,s*(1-))
p=
Ac=
Aa nec=
n=
=
Aa=
=
As nec=

0.01
280000
2800
10
20
3142
0.25
7896

mm2
2

mm
bare
mm
2
mm
mm2

aleg: IPE 450


A=
Iy=

9880
337.4

mm2
*106mm4

Wely= 1500000 mm3


iy=
185
mm
6
4
Iz=
16.8
*10 mm
Welz= 176000 mm3
iz=
41.2
mm
h=
b=

450
190

mm
mm

verificare dimensiuni sectiune de otel fata de sectiunea de beton


105
125

>
>

100
100

mm
mm

cm

rigle de cuplare
hr
80
bg
40

hr=
bg=

80
40

cm
cm

Ac,ef Ac=bg*hg
Aa=Ac*p/100
=As*fyd,s/(Ac*fcd+Aa*fyd+As*fyd,s)
pp. =0.25
As=(Ac*fcd+Aa*fyd)/(fyd,s*(1-))
p=
Ac=
Aa nec=
n=
=
Aa=
=
As nec=

0.01
320000
3200
10
22
3801
0.25
9083

mm
2
mm
bare
mm
mm2
mm2

aleg: IPE 500


A=

11600

mm2

6
4
Iy=
482
*10 mm
Wely= 1930000 mm3
iy=
204
mm
Iz=
21.4
*106mm4
Welz= 214000 mm3
iz=
43.1
mm

h=
b=

500
200

mm
mm

verificare dimensiuni sectiune de otel fata de sectiunea de beton


100
150

<
>

100
100

mm
mm