Anda di halaman 1dari 6

6/3/2014

Basic Steps to Create Dymanic Modification Rule | SCN

Process:
Quality M anagement --> Inspection Planning--> Basic data--> Sample --> Dynamic modification Rule (QDR1)

DMR is basically used to vary the inspection scope.


DMR can define in 1. Task list at header level
2. Task list at characteristic level
3. Inspection setup of the material master at
inspection type level

E.g:

Normal inspect(5 lots(A*)) --> skip(10lots(A*))--> Reduced inspect(1 lot(A*))--> skip(10lots(A*))


skip(10lots(R*))--> Tighten inspect(5 lot(A*))--> Normal inspect(5 lots(A*))

A- Lot Accept
R- Any one Lot Reject

Select option Dynamic modification rule is created for usage decision /At lot creation.

http://scn.sap.com/docs/DOC-46551

1/6

6/3/2014

Basic Steps to Create Dymanic Modification Rule | SCN

Assign stage, required inspection severity, enter short text and tick on Initial Inspection
Stage(ISt) )/Skip stage.

Normal inspection:
http://scn.sap.com/docs/DOC-46551

2/6

6/3/2014

Basic Steps to Create Dymanic Modification Rule | SCN

Skip Stage:
Max.skip duration is in days :
This field is used in the following ways:
To determine the current inspection stage at sample determination
When the quality level is updated
The system first checks the number of skips and then the skip duration.
Inspection lot creation
At sample determination for a lot, if the number of allowed skips has not yet been reached, but the
maximum skip duration has been reached or exceeded, the next stage in the sequence for
accepted lots is taken as the current stage for the inspection lot. If this stage is another skip, then
the next stage in the sequence for a rejected lot is taken as the current inspection stage. This
means that the current inspection lot is due for inspection as a result of the maximum skip duration,
although the quality level contains a skip as the next inspection stage.
Update of the quality level
The quality level is updated either at lot creation or when the usage decision is made. The update
occurs independently of sample determination for an inspection lot (even if dynamic modification
takes place at lot creation) and always occurs after the current inspection stage has been
determined for the inspection lot. If the maximum skip duration has been reached or exceeded,
when the quality level is updated, the system calculates the next inspection stage for the quality
level of an accepted lot based on the same algorithm. This means that the following stage in the
sequence for accepted lots is used as the next inspection stage. If this stage is a skip, the
following stage in the sequence for a rejected lot is taken as the inspection stage for the quality
level. Since this stage usually specifies an inspection, the next inspection lot is to be inspected.

http://scn.sap.com/docs/DOC-46551

3/6

6/3/2014

Basic Steps to Create Dymanic Modification Rule | SCN

Tighten inspection:

Reduced inspection:

http://scn.sap.com/docs/DOC-46551

4/6

6/3/2014

http://scn.sap.com/docs/DOC-46551

Basic Steps to Create Dymanic Modification Rule | SCN

5/6

6/3/2014

We can assign DMR in

Basic Steps to Create Dymanic Modification Rule | SCN

1. Task list at header level


2. Task list at characteristic level
3. Inspection setup of the material master at
inspection type level

We can review/change Quality level for DMR by using T.code QDL1/QDL2/QDL2


Thank You

http://scn.sap.com/docs/DOC-46551

6/6

Anda mungkin juga menyukai