Student Name:
Arquam Rahman
*1
Sf = staff
St = students
Cr = contractors
Cl = cleaners
V = visitors
Persons at
risk
*1
1. St
DEGREE OF RISK
Worst
Probability
outcome
*2
*3
1. Min
1. R
Risk
Rating
A-E
1. D
CONTROL MEASURES
Existing control measures taken
against the risk
ACTION PLAN
What further control
measures are required when
and by whom
1. None Applicable
STUDENT
Date: 18/09/14
Student Name:
Arquam Rahman
Persons at
risk
*1
1. St,
2. St, Sf
DEGREE OF RISK
Worst
Probability
outcome
*2
*3
1. Min
2. Min
1. R
2. Ps
Risk
Rating
A-E
1. D
2. D
CONTROL MEASURES
Existing control measures taken
against the risk
1. When taking the picture
make sure you arent too
close to the bikes.
2. Wait until the person has
taken their bike in/out.
ACTION PLAN
What further control
measures are required when
and by whom
1. None Applicable
2. None Applicable
*1
Sf = staff
St = students
Cr = contractors
Cl = cleaners
V = visitors