Anda di halaman 1dari 19

PERENCANAAN PELAT LANTAI

1. PELAT UTAMA

Spesifikasi Data
Penentuan tebal plat ( fy = 370 MPa ), maka :
Hmin pelat utama
= lx/28 x (0,4 + fy/700) (SNI-03-2847-2002)
= 3.5/28 x (0,4 + 370/700)
= 0,116 m
Diambil tebal pelat 120 mm

Beban Mati

Berat sendiri pelat

= tebal pelat beton


= 0,12 2400 kg/m3
= 288 kg/m2

Berat Spesi

= 0,02 21 00 kg/m3
= 42 kg/m2

Berat Plafond+Instalasi= 11 +14 kg/m2


= 25 kg/m2
Berat Pasir

= 0,05 1600 kg/m3


= 80 kg/m2

Berat Keramik

= 0,006 1700 kg/m3


= 10,2 kg/m2

sehingga, Qd = 445,20 kg/m2

Beban Hidup (Ql)


Beban hidup lantai gedung kuliah ditentukan sebesar 250 kg/m2 (PPIUG1983)

Beban Ultimate (Qu)


Qu

= 1,2 Qd + 1,6 Ql
= 1,2 . 445,2 + 1,6. 250
= 934,24 kg/m2

Perhitungan Tulangan

Tebal Plat

= 0,12 = 120 mm

Selimut Beton

= 20 mm

Diameter Tulangan

= 10 mm

fc

= 31 MPa

fy

= 370 MPa

Tinggi Efektif :

dy

dx = 120 20 (0,5 10) = 95 mm


dy = 120 20 10 (0,5 10) = 85 mm

= 0,85 0,008 (31 30) = 0,81

= 0,0403
maks

= 0,75 b = 0,75 0,0414 = 0,0302

min

= 0,0025 ( ketentuan untuk perhitungan pelat)

TIPE II-1
ly = 3.5 m

dx

ly
lx

lx = 3 m

MLx
MLy
Mtx
Mty

ly
lx

3.5
3

1.2

= 0,001 Qu lx2 x = 0,001 934,23


= 386.775 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 319.51008 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 538.12224 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 470.85696 kg.m

32 46
32 38
32 64
32 56

TIPE II-2
ly = 3 m
ly
lx

lx = 2.5 m

MLx
MLy
Mtx
Mty

ly
lx

3
2.5

1 .2

= 0,001 Qu lx2 x = 0,001 934,23


= 268.594 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 221.882 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 373.696 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 326.984 kg.m

2.52 46
2.52 38
2.52 64
2.52 56

TIPE II-3
ly = 4 m
ly
lx

lx = 3.5 m

ly
lx

4
3.5

1.2

MLx
MLy
Mtx
Mty

= 0,001 Qu lx2 x = 0,001 934,23


= 526.44424 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 434.88872 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 732.44416 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 640.88864 kg.m

3.52 46
3.52 38
3.52 64
3.52 56

TIPE II-4
ly = 4 m
ly
lx

lx = 2.5 m

MLx
MLy
Mtx
Mty

ly
lx

4
2.5

1 .6

= 0,001 Qu lx2 x = 0,001 934,23


= 338.662 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 210.204 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 461.281 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 332.823 kg.m

2.52 58
2.52 36
2.52 79
2.52 57

TIPE II-5
ly = 3.5 m
ly
lx

lx = 3.5 m

MLx
MLy

ly
lx

3.5
3.5

= 0,001 Qu lx2 x = 0,001 934,23 3.52 36


= 411.99984 kg.m
= 0,001 Qu lx2 x = 0,001 934,23 3.52 36

Mtx
Mty

= 411.99984 kg.m
= 0,001 Qu lx2 x = 0,001 934,23 3.52 52
= 595.11088 kg.m
= 0,001 Qu lx2 x = 0,001 934,23 3.52 572
= 595.11088 kg.m

TIPE II-6
ly = 3.5 m
ly
lx

lx = 2.5 m

MLx
MLy
Mtx
Mty

ly
lx

3.5
2.5

1.4

= 0,001 Qu lx2 x = 0,001 934,23


= 309.467 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 221.882 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 426.247 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 332.823 kg.m

2.52 36
2.52 36
2.52 52
2.52 572

TIPE III-1
ly = 3.5 m
ly
lx

lx = 3 m

MLx
MLy
Mtx
Mty

ly
lx

3.5
3

1.2

= 0,001 Qu lx2 x = 0,001 934,23


= 512.89776 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 428.81616 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 714.6936 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 622.20384 kg.m

32 61
32 51
32 85
32 74

TIPE III-2
ly = 3.5 m
ly
lx

lx = 2 m

MLx
MLy
Mtx
Mty

ly
lx

3.5
2

1.8

= 0,001 Qu lx2 x = 0,001 934,23


= 313.90464 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 186.848 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 422.27648 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 291.48288 kg.m

22 84
22 50
22 113
22 78

TIPE VIA-1
ly = 3.5 m
ly
lx

lx = 3 m

MLx
MLy
Mtx
Mty

TIPE VIA-2
ly = 4 m

ly
lx

3.5
3

1,2

= 0,001 Qu lx2 x = 0,001 934,23


= 445.63248 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 403.59168 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 622.20384 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 580.16304 kg.m

32 53
32 48
32 74
32 69

ly
lx

lx = 3.5 m

MLx
MLy
Mtx
Mty

ly
lx

4
3.5

1,2

= 0,001 Qu lx2 x = 0,001 934,23


= 606.55532 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 549.33312 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 846.88856 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 789.66636 kg.m

3.52 53
3.52 48
3.52 74
3.52 69

TIPE VIA-3
ly = 3.5 m
ly
lx

lx = 3.5 m

MLx
MLy
Mtx
Mty

ly
lx

3.5
3.5

= 0,001 Qu lx2 x = 0,001 934,23


= 434.88872 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 361.55088 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 462.4488 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 504.4896 kg.m

3.52 38
3.52 43
3.52 55
3.52 60

TIPE VIB-1
ly = 3.5 m
ly
lx

lx = 3 m

ly
lx

3.5
3

1 .2

MLx
MLy
Mtx
Mty

= 0,001 Qu lx2 x = 0,001 934,23


= 428.81616 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 319.51008 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 596.97936 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 479.26512 kg.m

32 51
32 38
32 71
32 57

TIPE VIB-2
ly = 3 m
ly
lx

lx = 2.5 m

MLx
MLy
Mtx
Mty

ly
lx

3
2.5

1.2

= 0,001 Qu lx2 x = 0,001 934,23


= 297.789 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 221.882 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 414.569 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 332.823 kg.m

2.52 51
2.52 38
2.52 71
2.52 57

2. PELAT KANTILEVER

Spesifikasi Data
Penentuan tebal plat ( fy = 370 MPa ), maka :
Hmin kantilever
= lx/10 x (0,4 + fy/700)
= 1.1/10 x (0,4 + 370/700)
= 0,1021 m
Diambil tebal pelat 110 mm

Beban Mati

Berat sendiri pelat

= tebal pelat beton


= 0,11 2400 kg/m3
= 264 kg/m2

Berat Spesi

= 0,02 2100 kg/m3


= 42 kg/m2

Berat Plafond+Instalasi= 11 + 14 kg/m2


= 25 kg/m2
Berat Pasir

= 0,05 1600 kg/m3


= 80 kg/m2

Berat Keramik

= 0,006 1700 kg/m3


= 10,2 kg/m2

Beban Sandaran Kantilever

= 0,1 x 1000 kg/m3


= 100 kg/m2

sehingga, Qd = 521,2 kg/m2

Beban Hidup (Ql)


Beban hidup lantai gedung kuliah ditentukan sebesar 250 kg/m2(PPIUG1983)

Beban Ultimate (Qu)


Qu

= 1,2 Qd + 1,6 Ql
= 1,2 . 521,2 + 1,6. 250
= 1025,44 kg/m2

Perhitungan Tulangan
Tebal Plat

= 0,11 = 110 mm

Selimut Beton

= 20 mm

Diameter Tulangan

= 10 mm

fc

= 31 MPa

fy

= 370 MPa

Tinggi Efektif :

dy

dx = 90 20 (0,5 10) = 85 mm
dy = 90 20 10 (0,5 10) = 75 mm

= 0,0371
maks

= 0,75 b= 0,75 0,0413= 0,0278

min

= 0,0025 ( ketentuan untuk perhitungan pelat)

dx

TIPE III-3
ly = 3.5 m
ly
lx

lx = 1.1 m

MLx
MLy
Mtx
Mty

ly
lx

3.5
1.1

2.5

= 0,001 Qu lx2 x = 0,001 934,23


= 114.1519808 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 58.3167728 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 151.3754528 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 98.0218096 kg.m

1.12 92
1.12 47
1.12 122
1.12 79

TIPE VIA-4
ly = 3.5 m
ly
lx

lx = 1.1 m

MLx
MLy
Mtx
Mty

ly
lx

3.5
1.1

2,5

= 0,001 Qu lx2 x = 0,001 934,23


= 111.670416 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 59.5575552 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 148.893888 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 96.7810272 kg.m

TIPE VIA-5
ly = 2.5 m

1.12 92
1.12 47
1.12 122
1.12 79

ly
lx
ly

lx = 1.1 m

MLx
MLy
Mtx
Mty

lx

2.5
1.1

2,3

= 0,001 Qu lx2 x = 0,001 934,23


= 109.1888 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 59.5575 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 146.4123 kg.m
= 0,001 Qu lx2 x = 0,001 934,23
= 96.781 kg.m

1.12 88
1.12 487
1.12 118
1.12 78

Tabel 1.1 Rekapitulasi

JENIS PELAT

TIPE
GAMBAR

Mlx

Mly

Mtx

(dalam kg.m)

Mty

Pelat Utama

Kantilever

II-1

386.775

319.510

538.122

470.857

II-2

268.594

221.882

373.696

326.984

II=3

526.444

434.889

732.444

640.889

II-4

338.662

210.204

461.281

332.823

II-5

412.000

412.000

595.111

595.111

II-6

309.467

221.882

426.247

332.823

III-1

512.898

428.816

714.694

622.204

III-2

141864.805

444685.102

360979.6713

668759.41

VIA1

445.632

403.592

622.204

580.163

VIA2

606.555

549.333

846.889

789.66636

VIA3

434.889

361.551

462.449

504.490

VIB1

428.816

319.510

596.979

479.265

VIB2

297.789

221.882

414.569

332.823

III-3

114.151981

58.3167728

151.3754528

98.02181

VIA4

111.670416

59.5575552

148.893888

96.781027

VIA5

109.188851

59.5575552

146.4123232

96.781027

Maximum

606.555

549.333

Jadi momen yang dipakai (terbesar) :


MLx = 606,555 kg.m
= 606,555 104 N.mm
MLy = 549,333 kg.m
= 549,333 104 N.mm
Mtx
= 846,889 kg.m
= 846,889 104 N.mm
Mty
= 789,66636 kg.m
= 789,66636 104 N.mm

PENULANGAN LAPANGAN ARAH X


Mu
= MLx = 606,555 104 N.mm
MU

606,555 10 4
0,8

Mn

Rn
m

= = 0,8401
= 14,04175

= 758,1938 104 N.mm

1
2 0,8401 14,04175
1 1

14,04175
370

= 2,308 10-3
< maks maka menggunakan tulangan tunggal
< min maka menggunakan = 0,0025
sehingga,
As
=bd
= 0,0025 1000 95
= 237,5 mm2

846.889

789.66636

Jumlah tulangan (n) = buah tulangan


Jarak Antar Tulangan (s) = = 250 mm
Pada dinding dan pelat lantai yang bukan berupa konstruksi pelat rusuk,
tulangan lentur utama harus berjarak tidak boleh lebih dari dua kali tebal
dinding (240 mm) atau pelat lantai, ataupun 250 mm dan diambil jarak
yang terkecil.
Sehingga digunakan spasi antar tulangan = 240 mm
Jadi dipakai Tulangan 10 - 240 mm

Analisis kapasitas lentur plat penulangan lapangan arah x


Mlx
= 606,555 104 Nmm
b (lebar plat)
= 1000 mm
s (spasi tulangan)= 240 mm
h(tebal pelat)
= 120 mm
dx
= 95 mm
diameter tulangan
= 10
mm
p(selimut beton) = 20 mm
Asada =327,08333 mm2
As ada f y
327,08333 370
a
=
=
= 4,5928 mm
'
0.85 31 1000
0.85 f c b
Mu = [Asada fy (d-a/2)]
= 0,8327,0833370(95-4,5928/2)]
= 897,4992 104 Nmm
Mu > Muterjadi
897,4992 104 Nmm > 606,555 104 Nmm

PENULANGAN LAPANGAN ARAH Y


Mu
= MLy = 549.333 104 N.mm
MU

Mn

Rn
m

= = 0,9504
= 14,04175

549.333 10 4
0.8

= 686,6663 104 N.mm

1
2 0,9504 14,04175
1 1

14,04175
370

= 2,617 10-3

< maks maka menggunakan tulangan tunggal


> min maka menggunakan = 0,002617
sehingga,
As
= min b d
= 0,002617 1000 85
= 222,4221 mm2
Jumlah tulangan (n) = buah tulangan
Jarak Antar Tulangan (s) = = 333,333 mm
Pada dinding dan pelat lantai yang bukan berupa konstruksi pelat rusuk,
tulangan lentur utama harus berjarak tidak boleh lebih dari dua kali tebal
dinding (240 mm) atau pelat lantai, ataupun 250 mm dan diambil jarak
yang terkecil.
Sehingga digunakan spasi antar tulangan = 240 mm
Jadi dipakai Tulangan 10 - 240 mm
Analisis kapasitas lentur plat penulangan lapangan arah y
Mly
= 549.333 104 Nmm
b (lebar plat)
= 1000 mm
s (spasi tulangan)= 240 mm
h(tebal pelat)
= 120 mm
dy
= 85 mm
diameter tulangan
= 10
mm
p(selimut beton) = 20 mm
Asada
=327,08333 mm2
As ada f y
327,08333 370
a =
=
= 4,5928 mm
'
0.85 31 1000
0.85 f c b
Mu = [Asada fy (d-a/2)]
= 0,8[261,6667370(85-3,6742/2)]
= 644,1242 104 Nmm
Mu > Muterjadi
644,1242 104 Nmm > 549,333 104 Nmm

PENULANGAN TUMPUAN ARAH X (Tumpuan Tengah)


Mu
= MTx = 846,88856 104 Nmm
MU

846,88856 10 4
0.8

Mn

Rn
m

= = 1,173
= 14,04175

= 1058,611 104 N.mm

1
2 1,173 14,04175
1 1

14,04175
370

= 3,244 10-3

< maks maka menggunakan tulangan tunggal


> min maka menggunakan = 3,244 10-3
Tulangan Pokok :
As
= bd
= 3,244 10-3 1000 95
= 308,1889 mm2
Jumlah tulangan (n) = tulangan
Jarak Antar Tulangan (s) = = 250 mm
Pada dinding dan pelat lantai yang bukan berupa konstruksi pelat rusuk,
tulangan lentur utama harus berjarak tidak boleh lebih dari dua kali tebal
dinding (240 mm) atau pelat lantai, ataupun 250 mm dan diambil jarak
yang terkecil.
Sehingga digunakan spasi antar tulangan = 240 mm
Jadi dipakai Tulangan 10 - 240 mm
Analisis kapasitas lentur plat penulangan tumpuan arah x
Mtx
= 846.88856 104Nmm
b (lebar plat)
= 1000 mm
s (spasi tulangan)= 250 mm
h(tebal pelat)
= 100 mm
dx
= 95 mm
diameter tulangan
= 10
mm
p(selimut beton) = 20 mm
Asada

= 314 mm2

As ada f y
0.85 f

'

314 370
0.85 31 1000

Mu = [Asada fy (d-a/2)]
= 0,8[314 370(95-4,4091/2)]

= 862,478 104 Nmm


Mu > Muterjadi
862,478 104 Nmm > 846,886 104 Nmm
Tulangan Bagi :
Asb = 20% As (PBI pasal 9)
= 0,2 308,1889
= 61,6378 mm
Asb = 0,002 b h
= 0,002 1000 120 = 200 mm
Jumlah tulangan (n) = tulangan
Jarak Antar Tulangan (s) = 333,333 mm

= 4,4091 mm

Pada dinding dan pelat lantai yang bukan berupa konstruksi pelat rusuk,
tulangan lentur utama harus berjarak tidak boleh lebih dari dua kali tebal
dinding (240 mm) atau pelat lantai, ataupun 250 mm dan diambil jarak
yang terkecil.
Sehingga digunakan spasi antar tulangan = 240 mm
Jadi dipakai Tulangan 10 - 240 mm

PENULANGAN TUMPUAN ARAH Y (Tumpuan Tengah)


Mu
= MTy = 789.66636 104 Nmm
MU

789.66636 10 4
0 .8

Mn

Rn
m

= = 1,3662 N.mm
= 14,04175

1
1
14,04175

= 987,083 104 N.mm

2 1,3662 14,04175

370

= 3,793 10-3
< maks maka menggunakan tulangan tunggal
> min maka menggunakan = 3,793 10-3

Tulangan Pokok :
As
= bd
= 3,793 10-3 1000 85
= 322,4457 mm2
Jumlah tulangan (n) = Z tulangan
Jarak Antar Tulangan (s) = 200 mm
Pada dinding dan pelat lantai yang bukan berupa konstruksi pelat rusuk,
tulangan lentur utama harus berjarak tidak boleh lebih dari dua kali tebal
dinding (240 mm) atau pelat lantai, ataupun 250 mm dan diambil jarak
yang terkecil.
Sehingga digunakan spasi antar tulangan = 200 mm
Jadi dipakai Tulangan 10 - 200 mm
Analisis kapasitas lentur plat penulangan tumpuan arah y
Mtx
= 789.66636 104 Nmm
b (lebar plat)
= 1000 mm
s (spasi tulangan)= 200 mm
h(tebal pelat)
= 120 mm
dy
= 85 mm
diameter tulangan
= 10
mm
p(selimut beton) = 20 mm

=392,5 mm2
As ada f y
392,5 370
a
=
=
'
0.85 31 1000
0.85 f c b
Mu = [Asada fy (d-a/2)]
= 0,8[392,5370(85-5,5114/2)]
= 955,514 x 104 Nmm
Mu > Muterjadi
955,514 104 Nmm > 789,666 104 Nmm
Asada

= 5,5114 mm

Tulangan Bagi :
Asb = 20% As (PBI Pasal 9)
= 0,2 789,666
= 64,4891 mm
Asb = 0,002 b h
= 0,002 1000 100 = 200 mm
Jumlah tulangan (n) = tulangan
Jarak Antar Tulangan (s) = 333,333 mm
Pada dinding dan pelat lantai yang bukan berupa konstruksi pelat rusuk,

tulangan lentur utama harus berjarak tidak boleh lebih dari dua kali tebal
dinding (240 mm) atau pelat lantai, ataupun 250 mm dan diambil jarak
yang terkecil.
Sehingga digunakan spasi antar tulangan = 240 mm
Jadi dipakai Tulangan 10 - 240 mm

PENULANGAN TUMPUAN TEPI (ARAH X DAN ARAH Y)


Diberikan tulangan sama dengan tulangan lapangan yaitu :

Tulangan Tumpuan Tepi Arah X : 10 mm 240 mm

Tulangan Tumpuan Tepi Arah Y : 10 mm 240 mm


REKAPITULASI PENULANGAN
Tulangan Lapangan Arah X
Tulangan Lapangan Arah Y
Tulangan Pokok Tumpuan Tengah Arah X
Tulangan Pokok Tumpuan Tengah Arah Y
Tulangan Bagi Arah X
Tulangan Bagi Arah Y
Tulangan Tumpuan Tepi Arah X
Tulangan Tumpuan Tepi Arah Y

: 10 mm 240 mm
: 10 mm 240 mm
: 10 mm 240 mm
: 10 mm 240 mm
: 10 mm 200 mm
: 10 mm 240 mm
: 10 mm 240 mm
: 10 mm 240 mm