CALCULOS PARA CONDUCCION DE AGUA POTABLE

A.- NOMBRE DEL PROYECTO

LC DE CASERIO ATUPAYAN

B.- POBLACION ACTUAL

NMERO DE FAMILIAS

C.- TASA DE CRECIMIENTO ( % )

D.- PERIODO DE DISEO ( AOS )

E.- POBLACIN FUTURA


Pf = Pa * (1+r*t/100)

E.- DOTACIN ( LT/HAB/DIA )

F.- CONSUMO PROMEDIO ANUAL ( LT/SEG ):


Qp = Pf * Dot/86400
G.- CONSUMO MAXIMO DIARIO (LT/SEG ) :
Qmd = 1.3 * Qp

H.- VOLUMEN DEL RESERVORIO ( M3 )

Vr = Qp*0.15*86400/1000

:
A UTILIZAR

G.- PORCENTAJE DE REGULACION( % )

%Regulacion = (Vr*100)/(Pf*Dotacion/1000)

H.- CONSUMO MAXIMO HORARIO (LT/SEG ) :


QmH = 1.5 * Qp

750.00
150.00
1.011
20.00

808.00
120.00

1.122

1.459

14.54
3.00

3.09

1.683

CALCULOS DE LINEA DE CONDUCCION:


PROYECTO :

CONSTRUCCION DE CANAL ENTUBADO ATUPAYAN

ESTRUCTURAS

DISTANCIA
TRAMO

COTAS

HORIZONTAL
(METROS)

INICIO

FIN

DIFERENCIA

PENDIENTE

CAUDAL DE

DE

TOPOGRAF.

DISEO

ALTURA

(Por mil)

(LPS)

DIAMETRO
CALCULADO
(Pulgadas)

DIAMETRO

PENDIENTE

ADOPTADO

HIDRAULICO

(Pulgadas)

(Por mil)

PERDIDA

COTA

Presin en

CARGA

PIEZOMETRICA

Estructuras

(HF)

INICIO

FINAL

INICIAL

AGUA
A

500.00

3,480.00

3,461.00

19.00

38.00

8.000

3.05

"

10.16

5.08

3,480.00

3,474.92

0.00

400.00

3,461.00

3,449.00

12.00

30.00

8.000

3.20

"

10.16

4.06

3,461.00

3,456.94

0.00

310.00

3,449.00

3,442.00

7.00

22.58

7.500

3.31

"

9.01

2.79

3,449.00

3,446.21

0.00

460.00

3,442.00

3,435.00

7.00

15.22

7.500

3.59

"

9.01

4.15

3,442.00

3,437.85

0.00

505.00

3,435.00

3,428.50

6.50

12.87

7.500

3.72

"

9.01

4.55

3,435.00

3,430.45

0.00

355.00

3,428.50

3,424.00

4.50

12.68

6.000

3.43

"

5.96

2.12

3,428.50

3,426.38

0.00

400.00

3,424.00

3,420.00

4.00

10.00

5.000

3.36

"

4.25

1.70

3,424.00

3,422.30

0.00

560.00

3,420.00

3,415.50

4.50

8.04

3.000

2.89

"

6.71

3.76

3,420.00

3,416.24

0.00

455.00

3,415.50

3,412.00

3.50

7.69

3.000

2.92

"

6.71

3.05

3,415.50

3,412.45

0.00

615.00

3,412.00

3,387.00

25.00

40.65

3.000

2.07

"

6.71

4.12

3,412.00

3,407.88

0.00

530.00

3,387.00

3,335.00

52.00

98.11

3.000

1.73

"

6.71

3.55

3,387.00

3,383.45

0.00

170.00

3,335.00

3,314.00

21.00

123.53

3.000

1.65

"

6.71

1.14

3,335.00

3,333.86

0.00

455.00

3,314.00

3,293.00

21.00

46.15

0.400

0.94

"

33.87

15.41

3,314.00

3,298.59

0.00

378.42

3,293.00

3,260.50

32.50

85.88

0.400

0.83

"

33.87

12.82

3,293.00

3,280.18

0.00

CALCULOS:
1).-Clculo de dimetro con pendiente topogrfica
HAAZEN-WILLIANS

Q = 0.0597*(S)^0.54*(D)^2.63

RESUM. TUBERIA
4"
3"
1"

S : Pendiente por mil metros


D : Dimetro en pulgadas

2,030.00
3,230.00
833.42

6,093.42

DE LINEA DE CONDUCCION:

Presin en
Estructuras
FINAL

COTA

13.92

3,461.00

7.94

3,449.00

4.21

3,442.00

2.85

3,435.00

1.95

3,428.50

2.38

3,424.00

2.30

3,420.00

0.74

3,415.50

0.45

3,412.00

20.88

3,387.00

48.45

3,335.00

19.86

3,314.00

5.59

3,293.00

19.68

3,260.50