Anda di halaman 1dari 2
Ts-400 ELECTRICITY SUPPLY GTS-401 AVAILABILITY OF POWER SUPPLY The e ion buildings at the toll plaz y will be made available at the supervision buildings at t a ow ebility of power supplies to the Sub-Contractor will be as detailed in the PTS: Supplies made available at supervision building atthe toll plaza will be nominally at 240 Volt, single phase, 2 wire 50 Hz or, 415 Volt, three phase, 4 wire 50 Hz. ‘Actual voltages may vary by + 10% and frequency by + 1% from the stated figures. Supplies made available at various locations will not necessarily be synchronised in frequency or from the same source. {All equipment and systems shall be capable of withstanding randomly phased transient ‘over-voltages on the power supply without damage and without the performance being affected. These transients may be either common mode or series mode up to the limits shown in the table below. (Peak amplitudes are expressed as percentages of the supply rms. and the transients may be assumed to be half sine wave.) Over - voltage amplitude Duration % of supply rm. Milliseconds 50% 50 100% 10 200% 1 300% 0.02 500% 0.005 Line filters and fast acting stabilisers shall be provided as necessary to ensure that all equipment and systems installed under the Sub-Contract shall perform properly when operating from any supply source and subjected to transients within the limits defined above. These filters and stabilisers shall be provided and installed by the Sub-Contractor and their cost shall be deemed to be included in the Tender Sum. Certain equipment and systems may be required to operate from uninterruptible power supplies, battery supplies or standby generators. i i supplies, y Details of these requirements are given ‘The Sub-Contractor shall guarantee the power factor of his electrical installation will not drop below 0.85 for all load conditi is i i Freee Bose Tent oad conditions. A surcharge is imposed by the National d tl ign and Build Contractor when power factor of power sspply ee easel below 0.85. Sub-Contractors installing main distribution drctibaton te eZBhase) shall install a power factor meter within the main power PERUNDIN Lise EAGLES. GTS400 172 ters connected in the final sured by these meters or test me tie Pov 0 85 during comnise/oning and defects ibility periods, apaitor banks circ ralied to i factor to better than 0.85 al a smust be instal id Contractor reserves the right to recover the surcharges imposed by Desi Tp from the Sub-Contractor. PERUNDING EAGLES GTS400 2/2 erennrayi00 (TS) eo"

Anda mungkin juga menyukai