Anda di halaman 1dari 2
t AURORA WATER CITY OF AURORA ‘STORMWATER QUALITY DISCHARGE PERMIT FOR CONSTRUCTION ACTIVITIES. PERMIT # 2018806593 PROJECT GAYLORD 1 (OW NER/DEVELOPER INFORMATION: ‘CONTRACTOR INFORMATION: ‘BRIAN KUCKELMAN \ aso mute (ame of egaly responsible person) (name of egal responsible person) RIDA DEVELOPMENT CORPORATIO. MAA. MORTENSON {company name) {company name) 3120 SOUTHWEST FREEWAY STE 200, 1628 1g" STSTE 400 (adress) (edaress) HOUSTON TEXAS 22098 DENVER CO 30202 (cay, state, zp code) (city, state, ip code) 713 961-3825 303917-7549 {phone} (phone) SWMP Administrator: \ ROB HENRY WMP Administrator Employed By: [_] ownen/oevetorer [x] conTRacroR SWMP Administrator Information: 303 325-1166 ROB.HENRY@MORTENSON.COM (phone) (email) Anticipated Disturbed Area: 20 (acres) Approved Plan 215042 _ Completion Date: 2/1/19 PERMIT AUTHORIZATION (Permit is not valid without all Signatures): mit counter: WN) aaa 9 Outre pate: 4/r7lic Date:_Z/iz/ec OPER BY'CONTRACTOR Erosion Control stat (/ Member: Date: thls ~-SEE REVERSE SIDE FOR THE TERMS AND CONDITIONS OF THIS PERMIT— ‘AURORA WATER. 15151 €. ALAMEDA PARKWAY, SUITE 600 AURORA, CO 80012-1555 TERMS AND CONDITIONS 1) This Stormwater Qualty Discharge Permit for Construction Activites, as lsu by the City of Aurora-Aurora Water, authorizes the Permittee to dscharge stormwater from construction actives within the City of Aurora, as governed by the rules, regulations and specications detalled in the Rules and Regulations Regarding Stormwater Discharges ‘Associated with Construction Activites manual. All demolition, constuction and earthwork activities must comply with City code andthe criteria established inthe COA Rules and Regulations Regarding Stormwater Discharges with Construction Activites, which establish the Permitting Conditions accompanying this Permit and govern al ‘onstruction activites in the City of Aurora, 2} The projectlisted on tis Permit may be inspected at anytime by City Erosion Control Staff to verfycomplance. [Any vilations, deficiencies or action items note on a Stormwater Management Erosion Control (SMEC) report must be corrected immediately and documentation i required tobe submitted within two (2) business dayst the Erosion Control Supervisor and appropriate Staff per the SMEC report language. Permitees may be subject o Stop ‘Work Orders and/or other enforcement action fr instances ofnan-compliances and vilations ofthe conditions of this Permit 3) This Permit must be executed bya City of Aurora Erosion Control Staff or other authorized agent of Aurara Water, to be valid. No construction, demolition or earthwork activites (Including clearing and grubbing) are autherited prior ‘tothe execution of this Permit. An Ina inspection must be scheduled with COA Erosion Control Staff, conducted, and passed, prior to Permit execution. Inspections may be scheduled by calling: 720-859-8615, 4) This Permits valid for one year after execution and mus be renewed fourteen (14) days prior to expiration to remain valid. This Permit may not be closed untl the Final Stabilization teria detailed inthe Rules ond Regulations Regarding Stormwater Dicharges Associated with Construction Activities manual are me, 5} The stespecic Stormwater Management Plan (SWIMP) forthe permitted activity must be implemented according ‘oits terms unite Permit closed. Control features and practices must be installed and implemented to properly ‘manage al onsite sources of pollution, so that thelr dscharge ito drainageways, cur flow lines, storm sewers and storm sewer appurtenances, off the project boundary, o into any water conveyance feature i reduced and ‘minimized to reduce and minimize the contribution of pllutants to state waters. 6) Control features and practices must be appropriately selected so they are adequate forthe application, Control features and practices must be effectively installed and proactvely maintained in ood operating condition such ‘that they willbe continually funciona 7) isthe responsibilty ofthe SWMP Administrator to continuously evaluate all n-site sources of pollution and thelr ‘elated control features and practices to ensue thelr appropriate management and verity the function and adequacy ofthe features and practices. 8}, Additional feature, and/or control measures may be required to ensure and maintain compliance with the permiting conditions, The need and requirement for ational measures may also be noted by CON Erosion contol Saft 9). Any stormwater or other waters dlscharged nto dralnageways, curb flow lines, storm sewer, storm sewer appurtenances, of the project boundary, or into any water conveyance feature, and which may ceach tate waters, shall be subject othe controls identified in this permit

Anda mungkin juga menyukai