Basic Command PA3
Basic Command PA3
Check OBIF
Bekasi_Bintara> lt all
Bekasi_Bintara> cabx
Bekasi_Bintara> get OBIF
Bekasi_Bintara> get optical
...
Check sektor status
lt utrancell
182_Jamrut> lt all
182_Jamrut> pr fach
SET Clock NODE B
$ setclock yyyy-mm-dd hh:mm:ss
eg:
$ setclock 2006-10-26 18:39:00
Print Out Clock
$Readclock
...
Ubah antennaSupervisionThreshold
$ lt antenna
$ get Antenna
$ set antennaSupervisionThreshold 20 (jika 0 maka VSWR tidak tersupervisi)
...
Melihat status transmisi
Pada EMAS RNC, jika site A down E1 harus merah. Akan tetapi jika site A down dan LED E1 hijau,
hal ini pasti karena di loop ke RNC.
Pada Moshell RNC, lt E1 dan lst, jika site down dan Op state disable, maka TRS problem (open),
tapi jika Op state enable, maka TRS loop ke RNC.
Check E1.
MoShell> lst ImaGroup=ES-2-2-1 dis
MoShell> lk <ImaLink proxy #> phy
MoShell> lpr Subrack=...,Slot=..,PlugInUnit=1,Etmc41=1,Os155SpiTtp=pp1,Vc4.....
MoShell> lpget <PhyPath MO proxy #>
RNC>lt all
RNC> pget es1-2-1 (lihat Value pmReceivedAtmCells, pmSecondsWithUnexp,
pmTransmittedAtmCells)
Error VC ete Loss of Connectivity aal5 hang
$get aal5
$set 4 continuityCheck false (jika True coba di false lalu di kembalikan lagi ke posisi awal)
$set 4 continuityCheck true
Check Kelerusan E1
RNSBY01> strt check VC pertama dan ke dua (bila ada)
RNSBY01> lt vc
RNSBY01> lacc atmport=es1-24-17 eteloopback
2193 AtmPort=ES1-24-17,VplTp=vp1,VpcTp=1,VclTp=vc32
>>> Return value = false
eteLoopBack 0
Atau lewat EM RNC equipment pilih MS atau ES terus pilih VC ke XX cari E1 keXX
...
Melihat status RBS yang available
RNC> str
RNC> str I 1003 melihat RBS 1003
RNC> lt utrancell
RNC> get utrancell
RNC> lst utrancell
RNC> set (no proxy) primaryCpichpower (value) per 3 dB max.
...
Melihat RNC ok atau gak
RNC> std
...
Melihat cell error code
RNC> tg
...
Troubleshooting
Melihat status E1
RNC> lt E1
RNC> lst
...
Ubah Cell ID
RJK01> lt cell
RJK01> lt cell=0920
RJK01> get cell=0920 local
RJK01> get cell=0920
RJK01> set 1489 localCellId=9201
...
...
...
...
Salah satu Penyebab Common Channel down
1 .Check
RJK01> lk iublink=1003
Looks PROXY 6574 6573, Aal5TpVccTp disable, and I look that
2.
3G_PERS_BLD>lt aal5
3G_PERS_BLD> get 1333 1334 Aal5TpVccTp
Looks..continuity check set to true, and I check in RBS
3.
RJK01> set 6574 continuityCheck false
In RBS continuity check set to false..So change continuity check in RNC to false :
...
CEK SCRAMBLING CODE/ PNCODE
RJK01>lt all
RJK01> get all primaryScramblingCode
Atau:
RJK01> get utrancell=4184 primaryScramblingCode - utk satu cell
...
CEK PARAMETER CELL
RNC1> lt utrancell
RNC1> get 13091 cell 1309 sektor 1
...
CEK STATUS CROSSCONNECT
RXI>> stc 2051 --> show all crossconnections where the information matches "2051" (in the case
below, where the atmport is 2051)
RXI >> stc .* 0 --> show all crossconnections that are disabled.
...
CEK STATUS IubLink
RNSBY01> lst .1040
...
CEK STATUS CELL
RNSBY01> str | grep 1040
...
CEK STATUS CELL
RNSBY01> lst .SBY040
...
CEK INTERFERENCE
RNJKT01> tgd cell=51361 ulinterference celldata
cell 5136 sektor 1
Atau:
RNJKT01> dyncelldata cid 51361
...
CEK MGW
1. Check capacity
lhsh xxxx00
capi tot (on all boards)
2. Check te error log
lhsh xxxx00 (need to check all boards)
te log read
3. check disks
mirror stat
lhsh 000300 mirror stat
4. Use OSS/EMAS to check alarms
5. Use OSS/EMAS to check signalling and routes
5. Check hardware
vii (on all boards)
...
...
9. Go to JOBS menu and see the progress/log of Install Software (wait until it show the activity
install complete) after activity install complete
10.Go to NE Thread again, right click and select Start NE Threads --> this activity will upgrade the
node go to JOBS menu and see the progress/log of Upgrade (wait until it show the activity
upgrade complete)
11. After the upgrade complete back to NETWROKS menu right click and choose ADJUST
12. In menu adjust thick All Filters and Jobs scheduling Immediate
13. Go to JOBS menu and see the log, wait until Adjust activity complete
14.Go to network menu Choose RBS or RNC want to Upgrade, right click choose Upgrade.
15. In Jobs Configuration Thick Upgrade "Immediate", Confirm Upgrade "Manual" and SWAdjust
"Manual"
16. TAB Upgrade choose Reboot Node upgrade
17. See progress in Jobs menu
18. If activity upgrade complete go to NE Threads -->choose the NODE and right click and choose
Start NE Thread
19. Go back again to NE Threads to verify the Software Adjusment by right click and choose start
NE Thread again
20. FINISH UPGRADE ACTIVITY