BANGALORE
Date: 1/3/2011
Time: 11:28 AM
OWNER
OWNER ENGINEER
EPC CONTRACTOR
ORGINATOR EPC
Project
SYSTEM DETAILS
Generator Rating
Generator Voltage
Ref.No.
2001/CTPT/01
Revision
07
Date
03.01.11
Generator PF
Generator FLC
0.8
KW
150000
3VCosF
Generator FLC
After 15% of Over ucrrent
6873.419114
7904.431981
(1.732*15.75*0.8)
150000
6873.419114
21.8232
Amps
Amps
Description
Digital Ammeter
Digital Voltmeter
Digital Frequency Meter
Digital MW Meter
Digital MVA Meter
Digital MVAR Meter
Digital PF Meter
Double Voltmeter
Double Frequency Meter
MW Transducer
Multi Transducer
Synchroscope
Autosynchroniser
Check Synchronising Relay
No Volt Relays
PT Fuse failure relay
Cable Burden
Total Burden
2. AVR Panel
Sl.
Description
No.
1
2
3
4
5
6
7
Voltmeter
Ammeter
PF Meter
AVR Droop Ckt.
AVR Cards
PT Fuse failure relay
Cable Burden
Total Burden
Page 1 of 7
OWNER
OWNER ENGINEER
EPC CONTRACTOR
ORGINATOR EPC
Total Burden
Date: 1/3/2011
Time: 11:28 AM
Ref.No.
2001/CTPT/01
Revision
07
Date
03.01.11
Sl.
Description
No.
1 Multifunctional Relay-2 (G60)
2 PT Fuse failure
3 Cable Burden
Total Burden
4. GT-Transformer Relay Panel (TRP)
Sl.
Description
No.
1 Multifunctional Relay-2 (T60)
2 Cable Burden
Total Burden
Sl.
Description
No.
1 Multifunctional Relay-1 (T60)
2 Cable Burden
Total Burden
5. TVM (MAIN & CHECK)
Sl.
Description
No.
1 Trivector Meter (Main & Check)
2 Cable Burden
Total Burden
3.591
10.37
Burden in VA
1
0.2955
10.591 VA
Total Burden on Netural side CT1: (Over all Differentaila - Protection core)
12.591 VA
12.591 VA
Page 2 of 7
OWNER
OWNER ENGINEER
EPC CONTRACTOR
ORGINATOR EPC
Neutral Side CT's.
CT Ratio
:
Metering core :
CT Ratio
:
Protection core :
8000/5A
(CT-2-Neutral side) GE-60-2
CL : PS, Vk>=500V,Imag<30mA@vK/2
CT Ratio
:
Protection core
8000/5A
(CT-1-Neutral side) 87O Over All Differentail
CL : PS, Vk>=500V,Imag<30mA@vK/2
CT Ratio
:
Protection core
8000/5A
(CT-3-Neutral side) GE-60-1
CL : PS, Vk>=500V,Imag<30mA@vK/2
8000/5A
(CT-5-Phase side) AVR
CL : 0.2,30 VA
CT Ratio
:
Metering core :
8000/5A
(CT-6-Phase side) AVR Sensing
CL : 0.2,30 VA
CT Ratio
:
Protection core
8000/5A
(CT-7-Phase side) GE-60-1
CL : PS, Vk>=500V,Imag<30mA@vK/2
CT Ratio
:
Protection core
8000/5A
(CT-8-Phase side) GE-60-2
CL : PS, Vk>=500V,Imag<30mA@vK/2
CT Ratio
:
Protection core
8000/5A
(CT-19-Phase side) GE-T60-2
CL : PS, Vk>=500V,Imag<30mA@vK/2
CT Ratio
:
Protection core
8000/5A
(CT-20-Phase side) GE-T60-1
CL : PS, Vk>=500V,Imag<30mA@vK/2
PT's
PT Ratio
:
Metering core :
Protection core :
PT-1
PT Ratio
:
Metering core :
Protection core :
PT-2
PT Ratio
:
Metering core :
Protection core :
PT-3
Cable Burden
Cable lead resistance per km (2.5Sq mm)
Cable length between relay to Field
Cable burden
8.7 ohm/ km
50 meters Considered
I2*R
0.435 VA
Page 3 of 7
Date: 1/3/2011
Time: 11:28 AM
Ref.No.
2001/CTPT/01
Revision
07
Date
03.01.11
OWNER ENGINEER
EPC CONTRACTOR
ORGINATOR EPC
ENGINEER
Project
Date: 1/3/2011
Time: 11:28 AM
Ref.No.
2001/CTPT/02
Revision
07
Date
03.01.11
SYSTEM DETAILS
Generator Rating
Generator Voltage
:
:
Generator PF
0.8 Amps
Generator FLC
6873 Amps
150 MW
15.75 KV
Xd"
Rct
13.9 %
5 Ohms
8000 Amps
5 Amps
0.139 p.u.
considered
considered
100 meter 5.91 Ohms / KM
RL
0.591 ohms
Rp
0.05 ohms
Vkp
If
MW/(root3xkVxPFxXd")
150MW/(root3x15.75kVx0.8x0.139)
=
If(sec) =
=
Vkp
=
=
2.If(sec).(Rct+RL+Rp)
49.45 KA
If(pri)/CT ratio
30.91 Amps
2x30.906x (5+0.591+0.05)
348.7 Volts
Page 4 of 7
at 90 Deg.C
Date: 1/3/2011
Time: 11:28 AM
OWNER ENGINEER
EPC CONTRACTOR
ORGINATOR EPC
ENGINEER
Project
Ref.No.
2001/CTPT/03
Revision
07
Date
03.01.11
SYSTEM DETAILS
UAT Rating
UAT Primary Voltage
31.5 MVA
15.75 KV
Generator FLC
After 15% of Over ucrrent
KVA
31500
3V
1154.734411
1327.944573
(1.732*15.75)
31500
1154.734411
27.279
Amps
Amps
Hence the Selected CT ratio 1500/1 Amps is suitable for the application.
References :
1. AE Meter Catalogue
2. GE Manual
3. Single Line Diagram No. 2001010101, Revision-04
1. UAT Protection & Relay Panel
CT Circuit (CT 11.1-11.3 &16.1-16.32 )
Burden in VA
Qty
Total Burden in VA
1
1/phase
1
1
1
1
1
3
3
0.2955
2
0.591
5.591
Sl.
Description
No.
1 Multifunctional Relay-1 (T60)
2 Cable Burden
Total Burden
Sl.
Description
No.
1
Multifunctional Relay-2 (T60)
2 Cable Burden
Total Burden
3. TVM
Sl.
Description
No.
1 Trivector Meter (Main & Check)
2 Cable Burden
Total Burden
Sl.
No.
1
2
3
4
Description
Digital Ammeter
MW Transducer
Digital MW Meter
Cable Burden
Total Burden
Total Burden on UAT Primary side CT11&CT16: (UAT METERING - Metering core)
5.87 VA
Total Burden on UAT Primary side CT12&CT17: (Metering core for TVM)
Page 5 of 7
1VA
OWNER ENGINEER
EPC CONTRACTOR
ORGINATOR EPC
ENGINEER
1500/1A
(CT-9-UAT Primary side) UAT-TRP-T60-1
CL : PS, Vk>=500V,Imag<30mA@vK/2
CT Ratio :
Protection core :
1500/1A
(CT-10-UAT Primary side) UAT-TRP-T60-2
CL : PS, Vk>=500V,Imag<30mA@vK/2
CT Ratio :
Metering core :
1500/1A
(CT-11-UAT Primary side) UAT-Metering
CL : 0.2S,30 VA
CT Ratio :
Metering core :
1500/1A
(CT-12-UAT Primary side) UAT-Metering (TVM)
CL : 0.2S,30 VA
CT Ratio :
Protection core :
1500/1A
(CT-13- 87O Over All Differentail-UAT Primary side)
CL : PS, Vk>=500V,Imag<30mA@vK/2
PT's
PT Ratio :
Metering core :
Metering core :
PT From GCB
Cable Burden
Cable lead resistance per km (2.5Sq mm)
Cable length between relay to Field
Cable burden
8.7 ohm/ km
50 meters
Considered
0.435 VA
I2*R
5.91 ohm/ km
50 meters
Considered
I2*R
0.02955
VA
Page 6 of 7
Date: 1/3/2011
Time: 11:28 AM
Ref.No.
2001/CTPT/03
Revision
07
Date
03.01.11
OWNER ENGINEER
EPC CONTRACTOR
ORGINATOR EPC
ENGINEER
Project
Date: 1/3/2011
Time: 11:28 AM
Ref.No.
2001/CTPT/04
Revision
07
Date
03.01.11
SYSTEM DETAILS
Transformer Rating
Transformer HV Voltage
:
:
31.5 MVA
15.75 KV
1154 Amps
Xd"
Rct
12.5 %
5 Ohms
1500 Amps
1 Amps
0.125 p.u.
considered
considered
100 meter 5.91 Ohms / KM
RL
0.591 ohms
Rp
0.05 ohms
Vkp
If
MVA/(root3xkVxXd")
31.5MVA/(root3x15.75kVx0.125)
=
If(sec) =
=
Vkp
=
=
2.If(sec).(Rct+RL+Rp)
9.238 KA
If(pri)/CT ratio
6.159 Amps
2x30.906x (5+0.591+0.05)
69.48 Volts
Page 7 of 7
at 90 Deg.C