Anda di halaman 1dari 2

concreto hecho en obra

2
f`c=150 kg/cmT.M.A
3/4"
CEMENTO GRIS
Revendimiento de 8 a 10cm

Clave

Material

Un.

Cant.

Costo

Importe

Cemento gris tipo


portland maya extra
(3.23 TON+3%)

TON

0.3327

2753.29

916.019583

Arena (0.480+8%)

M3

0.5184

340.24

176.380416

Grava (0.670+8%)

0.7236

340.24

246.197664

Agua (0.210+30%)

M3

0.273

Material

Un.

Cant.

Costo

Importe

Cemento gris tipo


portland maya extra
(3.23 TON+3%)

TON

0.3657

2753.29

1006.87815

Arena (0.470+8%)

M3

0.5076

340.24

172.705824

Grava (0.650+8%)

M3

0.702

340.24

238.84848

Agua (0.2535+30%)

0.2535

40
TOTAL

10.92
$ 1,349.52

concreto hecho en obra


2
f`c=150 kg/cmT.M.A
3/4"
CEMENTO GRIS
Revendimiento de 8 a 10cm

Clave

40
TOTAL

10.14
$ 1,428.57

concreto hecho en obra


2
f`c=150 kg/cmT.M.A
3/4"
CEMENTO GRIS
Revendimiento de 8 a 10cm

Clave

Material

Un.

Cant.

Costo

Importe

Cemento gris tipo


portland maya extra
(3.23 TON+3%)

TON

0.3327

2753.29

916.019583

Arena (0.480+8%)

M3

0.5184

340.24

176.380416

Grava (0.670+8%)

0.7236

340.24

246.197664

Agua (0.210+30%)

M3

MANO DE OBRA
clave
categoria o cuadrilla

un

cuadrilla No# 7 peones


R=9.50m3/jor
mando intermedio

MAQ. y/o EQUIPO


clave
maquinaria

jor
%

un.

0.273

cant.

40
TOTAL

10.92
$ 1,349.52

precio unitari importe

0.1053 $ 1,870.82
0.08 $
197.00

$
$
MANO DE OBRA $

cant.

197.00
15.76
212.76